Australia ● Belgium ● Canada ● Ecuador ● Germany ● Indonesia ● Italy ● Kenya ●
New Zealand ● Papua New Guinea ● Peru ● Tanzania ● United Arab Emirates ● United Kingdom ● United States ● Operations in 85 countries
Cardno (QLD) Pty Ltd ABN 57 051 074 992
Level 2
56 Gordon Street
Mackay QLD 4740
Australia
Phone: +61 7 4953 2877
Fax: +61 7 4953 2577
www.cardno.com
www.hrppc.com.au
Our Ref: MJJ:JV:RD HRP12036 Contact: Rachel Daniels
21 August 2012
Chief Executive Officer Mackay Regional Council PO Box 41 MACKAY QLD 4740 Attn: Kathryn Goodman Dear Kathryn, APPLICANT RESPONSE TO SUBMISSIONS – RECONFIGURATION OF A LOT – SUBDIVISION (1 RURAL RESIDENTIAL LOT INTO 5 LOTS) AND EASEMENT GIVING ACCESS TO A LOT FROM A CONSTRUCTED ROAD – 25 GRAVINOS ROAD, VICTORIA PLAINS (LOT 3 ON RP736166) – DA-2012-176 I refer to Powerlink Queensland’s submission dated 14 August 2012 (Reference DA722), Attachment A of this response, making an “Advice Agency Response” in accordance with section 292 (1) of the Sustainable Planning Act 2009 (SPA). We note Powerlink’s request for the Plan of Development to be amended, as per below and, as such, we herewith provide the Applicant’s response to the submission. In accordance with section 345 of SPA, the Plan of Development has been revised with respect to matters raised in Powerlink’s submission only. Powerlink’s recommended changes:
“The boundary between the proposed Lots 2 and 23 to be realigned so that the boundary does not run between the two towers.
The boundary needs to be realigned so that there is a minimum 20 metres clearance is maintained from the outside of the tower footing
The proposed future access for the proposed lot 3 should be repositioned a minimum of 20 metres away from the tower located on the proposed lot 3.
Realigning of the property boundaries so that the easement only encumbrances on of the proposed lots – i.e. proposed Lot 2.”
A plan was further attached as part of this submission, which has been provided within Attachment A, outlining the required and recommended changes to the Plan of Development. In response to this submission, amendments to the proposed Plan of Development have been made as per section 354 of the Sustainable Planning Act 2009. The Revised Plan of Development is provided as Attachment B to this response and is considered to take into account all of the above mentioned issues raised by Powerlink.
2
www.cardno.com
We request that Council now continue the assessment of the application and that draft conditions be
provided for our review prior to a final decision.
If you have any queries or require any further clarification on aspects of this response, do not hesitate to contact me. Yours faithfully
John Viklund Senior Planner For Cardno HRP Enc: Attachment A – Powerlink Queensland - Advice Agency’s Response
Attachment B – Revised Plan of Development – Version 2.0 – August 2012
Cc: John and Heather Mifsud
!4 August 2012 Our ref: MSLink106623DA722
Cardno HRPPO Box 244MACKAY QLD 4740
Mackay Regional CouncilPO Box 41MACKAY QLD 4740
Attention: RachaelYour Ref: Smart eDA ID1340846346458 Your Ref: DA-2012-176
Dear Madam
MACKAY- NEBO 132KV TRANSMISSION CORRIDORNEBO - PIONEER VALLEY 132KV TRANSMISSION CORRIDOR
Lot 3 on RP736177Easement E on RP728169 - Dealing 601299363Easement B on SP190888 - Dealing 709926184
Subdivision of I Lot into 5 Lots
We refer to the above application for Subdivision received by our office recently. PowerlinkQueensland acting as an advice agency under the Sustainable Planning Act 2009 providesits response to the above application as follows.
Your application has been reviewed by Powerlink and the present proposed lotconfiguration has raised some concerns which we believe could be addressed by a planchange as follows:
- The boundary between the proposed lots 2 and 3 to be realigned so that theboundary does not run between the two towers.
- The boundary needs to be realigned so that there is a minimum 20 metres clearanceis maintained from the outside of the tower footing.
- The proposed future access for the proposed lot 3 should be repositioned aminimum of 20 metres away from the tower located on the proposed lot 3.
- Realigning of the property boundaries so that the easement only encumbrances oneof the proposed lots -i.e. proposed Lot 2.
(See attached plan for suggested proposed lot reconfigurations.)
As discussed in our phone conversation please provide a revised plan, taking intoconsideration the above points and information on the attached proposed revised plan.
33 Harold Street, Virginia
PO Box 1193, Virginia, Queensland 4014, Australia
Telephone: (07) 3860 2111 Facsimile: (07) 3860 2100Website: www.powerlink.com.au
Powerlink Queensland is the registered business name of theQueensland Electricity Transmission Corporation Limited
ABN 82 078 849 233
We look forward to receiving your revised plans. When replying please quote DA722 inyour response.
Please contact the enquiries number below if you require more information.
Yours sincerely
LAND MANAGEMENT TEAM LEADER
Attachements:
A. Revised plan with proposed lot reconfigurations.
Enquiries: Marianne Reid Telephone: (07) 3860 2045
Lot 5 2.16ha
Lot 4 2.17ha
Lot 2 2.23ha
Lot 1 1.89ha
10m
Existing dwellings
4 RP736166
7 RP899726
2 RP740028
2 SP238586
3 RP740028
4 RP740028
1 SP238586
2 SP238586
3 RP852486
3 RP852486
11 RP743417
6 RP899726
Easement E RP28169
Existing Access
Proposed future Access
Lot 3 2.15ha
10m
Access Easement A
22m
Underground Irrigation Line
Hydrant
Water Bore
Pole Mounted Sub-station
State Controlled Road
Sealed Access Street
Gravel Access Street
Drainage culvert
Existing dwellings and outbuildings
100 150 200metres0 50
1:5,000N
AMENDED >
FILENAME >
JOB NO. >
SCALE >
PoD
HRP12036
AS ABOVE
DATE >
VERSION >
AUGUST 2012
N/A
2.0
APPENDIX B
LEGEND
25 GRAVINOS ROAD, WALKERSTONLOT 3 ON RP736166
RevisedPlan of Development
APP
ENDI
XB