1 | P a g e Cardinal Environmental Consultants, Inc. 2691 Dow Avenue, Suite C-2 Tustin, CA 92780 Phone: (714) 730-5931 Fax: (714) 730-1697 Date: April 5th, 2018 Owner/Client: Tustin Unified School District Maintenance and Operations 1302 Service Road Tustin, California 92780 Attention: Mr. Dave Heckathorn SUBJECT: Results of AHERA Six Month Surveillance of Asbestos-Containing Materials – Winter, 2018 Dear Dave Heckathorn: During Winter 2018 Cardinal conducted the Six-Month Surveillance of Asbestos-Containing Materials, as required by the Asbestos Hazard Emergency Response Act (AHERA). Removals have been noted throughout the district, and some enclosures have also been noted. Our staff witnessed new improvements made in a couple of administration buildings. Carpet has been laid over enclosing some of the vinyl asbestos tiles. The damaged report lists materials that are located in mechanical rooms and storage rooms not inhabited by students. No other damaged materials were found at the District. At a minimum, staff should continue to observe any damaged areas. Damage to the fire doors can cause a risk of exposure. It is highly recommended these be replaced with newer more suitable materials. As you know, copies of individual school reports must be kept at each school site, which in turn must make them available to staff and parents upon request. As agreed, we have included a “thumb drive” with the AHERA documents. Sincerely yours, CARDINAL ENVIRONMENTAL CONSULTANTS INC., A California Corporation By: Ronald R. McDaniel California Certified Asbestos Consultant #01-2865 CDPH Certified Lead Inspector/Assessor and Project Monitor/Designer #3599 Registered Environmental Assessor Certified Microbial Consultant by American Indoor Air Quality Council

CARDINAL ENVIRONMENTAL CONSULTANTS INC., Ronald R

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

1 | P a g e

Cardinal Environmental Consultants, Inc. 2691 Dow Avenue, Suite C-2

Tustin, CA 92780 Phone: (714) 730-5931

Fax: (714) 730-1697

Date: April 5th, 2018 Owner/Client: Tustin Unified School District Maintenance and Operations 1302 Service Road Tustin, California 92780 Attention: Mr. Dave Heckathorn SUBJECT: Results of AHERA Six Month Surveillance of Asbestos-Containing

Materials – Winter, 2018 Dear Dave Heckathorn: During Winter 2018 Cardinal conducted the Six-Month Surveillance of Asbestos-Containing Materials, as required by the Asbestos Hazard Emergency Response Act (AHERA). Removals have been noted throughout the district, and some enclosures have also been noted. Our staff witnessed new improvements made in a couple of administration buildings. Carpet has been laid over enclosing some of the vinyl asbestos tiles. The damaged report lists materials that are located in mechanical rooms and storage rooms not inhabited by students. No other damaged materials were found at the District. At a minimum, staff should continue to observe any damaged areas. Damage to the fire doors can cause a risk of exposure. It is highly recommended these be replaced with newer more suitable materials. As you know, copies of individual school reports must be kept at each school site, which in turn must make them available to staff and parents upon request. As agreed, we have included a “thumb drive” with the AHERA documents.

Sincerely yours,

CARDINAL ENVIRONMENTAL CONSULTANTS INC., A California Corporation

By:

Ronald R. McDaniel California Certified Asbestos Consultant #01-2865

CDPH Certified Lead Inspector/Assessor and Project Monitor/Designer #3599 Registered Environmental Assessor

Certified Microbial Consultant by American Indoor Air Quality Council

Tustin Unified School DistrictDISTRICT ADMINISTRATION

TUSD17H

4/5/2018Inspection Date:

DAMAGE REPORT: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Building CBoiler room and A/C room - Left door

Fire door insulationMISCF

1 EADAMAGEDLOW1

Damaged

Remove and replace.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recomended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

Tustin Unified School DistrictNELSON ELEMENTARY SCHOOL

TUSD17V

4/5/2018Inspection Date:

DAMAGE REPORT: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Building DMechanical room

Aircell duct insulationTSIF

5 LF 6"DDAMAGEDLOW1

Deteriorating

Repair or replace

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recomended Response Action

Building EMechanical room

Aircell duct insulationTSIF

6 LF 6"DDAMAGEDLOW4

Torn; deteriorating, debris

Repair or remove

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recomended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

Tustin Unified School DistrictTUSTIN MEMORIAL ELEMENTARY SCHOOL

TUSD17S

4/5/2018Inspection Date:

DAMAGE REPORT: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

C: KindergartenCustodial storage

Fire door insulationMISCF

2 EASIGNIFICANT DAMAGELOW6

Door is coming apart to reveal interior insulation

Repair or Replace

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recomended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictARROYO ELEMENTARY SCHOOL

TUSD17Q

4/5/2018Inspection Date:

A, B, C, D, E, FExterior walls and overhangs

StuccoSURFNF

N.A.GOODLOW*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A, B, C, D, E, FExterior windows

Window puttyMISCNF

N.A.GOODLOW*

No significant damage; on selected windows

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A, B, C, D, E, FUnder windows

Transite panelsMISCNF

N.A.GOOD

MOD*

Cracked panel at room 12 and one broken at room 8

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationConference room

9x9 Beige floor tileMISCNF

40 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationNurse's office

9x9 Beige floor tileMISCNF

165 SFREMOVEDN.A.*

Removed July, 2004

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationSupply room

9x9 Beige floor tileMISCNF

117 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictARROYO ELEMENTARY SCHOOL

TUSD17Q

4/5/2018Inspection Date:

A: AdministrationWorkroom

9x9 Beige floor tileMISCNF

154 SFGOODHIGH*

No significant damage; partially enclosed by rug

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: KindergartenExterior heater closet

Fire door insulationMISCF

1 EAENCLOSEDLOW1

Enclosed inside door

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: KindergartenOffice and north end of classroom

9x9 Beige floor tileMISCNF

350 SFENCLOSEDLOW*

Enclosed by new floor tile or removed

routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

CCustodial office

Fire door insulationTSIF

2 EAENCLOSEDLOW1

Enclosed inside doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C, D, E, FHeater closets

Aircell insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

EWest of ramp on south side of building E

Transite drain pipeMISCNF

N.A.GOOD

MOD*

No significant damage; imbedded in asphalt

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictARROYO ELEMENTARY SCHOOL

TUSD17Q

4/5/2018Inspection Date:

FFood service

Fire door insulationTSIF

2 EAENCLOSEDLOW1

Enclosed inside doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Throughout except where notedHeater closets

Fire door insulationMISCNF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictBENSON ELEMENTARY (SYCAMORE)

TUSD17R

4/5/2018Inspection Date:

A: AdministrationAbove doors

Transite panelsMISCNF

10 EAREMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationLounge above stovetop

Transite panelMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationRoof

Transite flue pipeMISCNF

10 LFREMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationRoof

Transite panelsMISCNF

305 SFREMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationThroughout

9x9 Brown floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: KindergartenMechanical room

Fire door insulationMISCF

2 EAENCLOSEDLOW1

Enclosed inside doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictBENSON ELEMENTARY (SYCAMORE)

TUSD17R

4/5/2018Inspection Date:

B: KindergartenWorkroom

Ceiling tile masticSURFNF

N.A.ENCLOSEDLOW*

Enclosed by ceiling tiles

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: ClassroomsCustodial and storage rooms

Fire door insulationMISCF

2 EAREMOVEDN.A.

Removed, 2006

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: ClassroomsCustodial room

Light heat shieldMISCF

1 EAGOODLOW1

Light fixture lens missing; insulation exposed

Replace missing lens

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: ClassroomsRoof

Transite flue pipesMISCNF

10 LFGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: ClassroomsStorage room

12x12 Yellow floor tileMISCNF

N.A.GOODLOW

Loose and missing tiles

Repair or replace

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: ClassroomsThroughout

9x9 Green floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictBENSON ELEMENTARY (SYCAMORE)

TUSD17R

4/5/2018Inspection Date:

D: ClassroomsThroughout

9x9 Green floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: ClassroomsThroughout

Cove base masticSURFNF

N.A.ENCLOSEDLOW*

Enclosed by cove base

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: ClassroomsThroughout

9x9 Green floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: ClassroomsCustodial and storage rooms

Fire door insulationMISCF

1 EAREMOVEDN.A.1

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: ClassroomsCustodial and storage rooms

Light heat shieldsMISCF

2 EAGOODLOW1

Light fixture lenses are missing; insulation exposed

Replace missing lenses

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: ClassroomsRoof

Transite flue pipeMISCNF

10 LFGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictBENSON ELEMENTARY (SYCAMORE)

TUSD17R

4/5/2018Inspection Date:

G: MultipurposeAttic

Drywall joint compoundMISCF

N.A.ENCLOSEDLOW1

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: MultipurposeMechanical room

Fire door insulationMISCF

1 EAENCLOSEDLOW1

Enclosed inside door

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: MultipurposeMultipurpose beams

Spray-applied fireproofingSURFF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: MultipurposeRestrooms

Light heat shieldsMISCF

4 EAREMOVEDN.A.

Removed, 2006

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: MultipurposeThroughout

9x9 Green floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Restroom portableThroughout

Brown sheet vinylMISCF

N.A.REMOVEDN.A.

Removed Summer 2006; portable demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictBENSON ELEMENTARY (SYCAMORE)

TUSD17R

4/5/2018Inspection Date:

ThroughoutExterior windows

Window puttyMISCNF

N.A.GOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutHeater closets

Paper tapeMISCF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutHeater closets

Aircell insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutRoofs

Patching compoundMISCNF

N.A.GOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictBESWICK ELEMENTARY SCHOOL

TUSD17U

4/5/2018Inspection Date:

A - FBuilding walls and overhang

Exterior stuccoSURFNF

N.A.GOODMOD*

No significant damage

Routine Operations and Maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationCopy and storeroom

Floor tile masticSURFNF

1,500 SFENCLOSEDLOW*

Enclosed under non-ACM floor tile

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationHall and nurse

Floor tile masticSURFNF

1,000 SFENCLOSEDLOW*

Enclosed under non-ACM floor tile

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationOld furnace room

Fire door insulationTSIF

2 EAENCLOSEDLOW1

Enclosed inside doors

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationOld furnace room HWH

Pipe fitting insulationTSIF

1 EAGOODLOW4

Minor damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationThroughout except east end of teachers lounge

Green floor tile and masticMISCNF

2,800 SFENCLOSED

LOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictBESWICK ELEMENTARY SCHOOL

TUSD17U

4/5/2018Inspection Date:

A: AdministrationUnder windows

Transite panelsMISCNF

300 SFGOODLOW*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: KindergartenThroughout

Green floor tile and masticMISCNF

2,000 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: KindergartenUnder windows

Transite panelsMISCNF

300 SFGOODLOW*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Rooms A-1 to A-4Throughout

Green floor tile and masticMISCNF

4,000 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Rooms A-1 to A-4Under windows

Transite panelsMISCNF

300 SFGOODLOW*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: Rooms C-1 to C-3Throughout

Green floor tile and masticMISCNF

2700 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictBESWICK ELEMENTARY SCHOOL

TUSD17U

4/5/2018Inspection Date:

D: Rooms C-1 to C-3Under windows

Transite panelsMISCNF

300 SFGOODLOW*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Rooms E-1 to E-2Throughout

Green floor tile and masticMISCNF

1800 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Rooms E-1 to E-2Under windows

Transite panelsMISCNF

300 SFGOODLOW*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: Rooms B-1 to B-4Throughout

Brown floor tile and masticMISCNF

2700 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: Rooms B-1 to B-4Under windows

Transite panelsMISCNF

300 SFGOODLOW*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: Rooms D-1 to D-4Throughout

Green floor tile and masticMISCNF

2700 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictBESWICK ELEMENTARY SCHOOL

TUSD17U

4/5/2018Inspection Date:

G: Rooms D-1 to D-4Under windows

Transite panelsMISCNF

300 SFGOODLOW*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: Rooms F-1 to F-4Exterior under windows

Transite panelsMISCNF

300 SFGOODLOW*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: Rooms F1 to F-4F-1 Food service

12x12 Brown floor tile and masticMISCNF

160 SFGOODHIGH*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: Rooms F1 to F-4Furnace room between F-2 and F-3

Fire door insulationMISCF

2 EAGOODLOW1

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: Rooms F1 to F-4Furnace rooms

Duct wrapTSIF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: Rooms F1 to F-4Throughout except F-1

Floor tile and masticMISCNF

3,000 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictBESWICK ELEMENTARY SCHOOL

TUSD17U

4/5/2018Inspection Date:

J: MultipurposeAbove ceiling panels

Spray-applied fireproofingSURFF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: MultipurposeFurnace room

Fire door insulationMISCF

1 EAENCLOSEDLOW1

Enclosed inside door

Verify ACM; routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: MultipurposeFurnace room

Insulation paperTSIF

100 SFGOODLOW1

Located on old ducts; minor damage

Monitor damage

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: MultipurposeStage

Orange sheet vinylMISCNF

270 SFENCLOSEDN.A.*

Enclosed by 12 X 12 VFT (verify removal)

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: MultipurposeUnder windows

Transite panelsMISCNF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: MultipurposeWorkroom

Drywall tape and mudSURFF

N.A.ENCLOSEDLOW1

No significant damage; above ceiling panels

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictBESWICK ELEMENTARY SCHOOL

TUSD17U

4/5/2018Inspection Date:

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL

TUSD17G

4/5/2018Inspection Date:

A: AdministrationAbove furnace and HWH

Transite pipesMISCNF

12 LFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationCoat closet

12x12 White floor tile and masticMISCNF

8 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationCopy room and Nurse's office

12x12 Yellow floor tile and masticMISCNF

300 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationExterior walls and overhang

StuccoSURFNF

5,000 SFGOODMOD-

Partially removed Fall 1992

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationThroughout

Pipe fitting insulation behind walls and ceilings

TSIF

N.A.REMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard Ranking

TypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationThroughout

9x9 floor tileMISCNF

2,000 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL

TUSD17G

4/5/2018Inspection Date:

A: AdministrationUnder windows

Transite panelsMISCNF

170 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: B1-B2 and Teachers loungeClassroom heat registers

Aircell insulationTSIF

28 REGREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: B1-B2 and Teachers loungeClassrooms

9x9 Grey floor tileMISCNF

2,200 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: B1-B2 and Teachers loungeExterior walls and overhang

StuccoSURFNF

5,000 SFGOODMOD-

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: B1-B2 and Teachers loungeFurnace rooms

Duct tape and flex jointsMISCF

N.A.REMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: B1-B2 and Teachers loungeUnder windows

Transite panelsMISCNF

250 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL

TUSD17G

4/5/2018Inspection Date:

C: C1-C3Room C1

9x9 Green floor tileMISCNF

900 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: C1-C3Room C2

12x12 White floor tileMISCNF

256 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: C1-C3Room C2

9x9 Green floor tileMISCNF

644 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: C1-C3Room C3

9x9 Blue floor tileMISCNF

1,000 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: C1-C3Throughout

Cove base masticSURFNF

250 LFENCLOSEDLOW*

Enclosed by cove base; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: C1-C3Under windows

Transite panelsMISCNF

36 SFGOODMOD-

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL

TUSD17G

4/5/2018Inspection Date:

E: E1-E3Classroom heat registers

Aircell insulationTSIF

28 REGREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: E1-E3Heater closets

Insulating duct tapeTSIF

10 LFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: E1-E3Under windows

Transite panelsMISCNF

250 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: F1-F3Above ceiling

Pipe insulationTSIF

200 LFENCLOSEDLOW1

Exposed ends encapsulated

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: F1-F3Boiler room

Tank insulation and debrisTSIF

125 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: F1-F3Boiler room

Pipe insulationTSIF

200 LFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL

TUSD17G

4/5/2018Inspection Date:

F: F1-F3Throughout

9x9 Green floor tileMISCNF

900 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: G1-G4Classroom heat registers

Aircell insulationTSIF

28 REG.REMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: G1-G4Heater closets

Duct tape and flex jointsTSIF

12 LFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: G1-G4Under windows

Transite panelsMISCNF

250 SFGOODMOD-

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: H1-H3Heater closet

Duct tape and flex jointsTSIF

3 LFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: H1-H3Room H1

9x9 Green floor tileMISCNF

900 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL

TUSD17G

4/5/2018Inspection Date:

H: H1-H3Room H2

12x12 Pink floor tileMISCNF

100 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: H1-H3Room H3

9x9 Green floor tileMISCNF

900 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: H1-H3Under windows

Transite panelsMISCNF

192 SFGOODMOD-

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

I: I1-I4Classroom heat registers

Aircell insulationTSIF

24 REG.REMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

I: I1-I4Classrooms

Floor tileMISCNF

3,300 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

I: I1-I4Exterior walls and overhang

StuccoSURFF

5,000 SFGOODMOD-

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL

TUSD17G

4/5/2018Inspection Date:

I: I1-I4Under windows

Transite panelsMISCNF

300 SFGOODLOW-

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: J1-J4Classroom heat registers

Aircell insulationTSIF

28 REG.REMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: J1-J4Heater closets

Insulating duct tapeTSIF

6 LF EAREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: J1-J4Under windows

Transite panelsMISCNF

250 SFGOODMOD-

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: K1-K2Heater closet

Aircell duct wrapTSIF

12 LFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: K1-K2Kiln (east side of K2)

Transite panelsMISCNF

300 SFGOODMOD-

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL

TUSD17G

4/5/2018Inspection Date:

K: K1-K2Throughout

9x9 Grey floor tileMISCNF

2,200 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: K1-K2Under windows

Transite panelsMISCNF

192 SFGOODMOD-

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

L: LibraryFurnace room - east side

Duct tape and flex jointsMISCF

N.A.REMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

L: LibraryLibrary workroom

12x12 Yellow floor tileMISCNF

200 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

L: LibraryUnder windows

Transite panelsMISCNF

25 SFGOODMOD-

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeAbove windows

Transite panelsMISCNF

27 SFGOODMOD-

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 8

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL

TUSD17G

4/5/2018Inspection Date:

MultipurposeAttic

Drywall joint compoundSURFF

N.A.ENCLOSEDLOW1

In attic and under ceiling tiles

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeAttic

Pipe fitting insulationTSIF

16REMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeAttic

Flex jointMISCNF

3REMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeBand room M5

Floor tileMISCNF

364 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeCustodial closet

9x9 Grey floor tileMISCNF

24 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeExterior walls and overhang

StuccoSURFNF

10,000 SFGOODMOD-

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 9

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL

TUSD17G

4/5/2018Inspection Date:

MultipurposeHeater room at north side of kitchen

Transite flue pipeMISCNF

3 LFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeHeater room at north side of kitchen

Pipe insulationTSIF

8 LFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeKitchen

12x12 Beige floor tileMISCNF

1,000 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeKitchen furnace room

Flex jointMISCF

1 EAREMOVEDN.A.-

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeKitchen, pantry, serving and auditorium

12x12 Brown floor tileMISCNF

2,000 SFREMOVED

N.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeMain room

9x9 Green floor tileMISCNF

2,000 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 10

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL

TUSD17G

4/5/2018Inspection Date:

MultipurposeStaff restrooms and kitchen

Ceiling tile masticSURNF

1,800 SFENCLOSED

LOW-

Removed in restrooms; enclosed under ceiling tiles in kitchen

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeStage

12x12 White floor tileMISCNF

550 SFREMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutFurnace rooms

Transite pipesMISCNF

N.A.REMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutFurnace rooms

Fire door insulationMISCNF

N.A.REMOVEDN.A.-

Removed Fall 1992

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 11

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCURRIE MIDDLE SCHOOL

TUSD17C

4/5/2018Inspection Date:

400Boiler room

Pipe InsulationTSIF

20 LFREMOVEDN.A.*

Removed Summer 2012

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

400Entries and workrooms

Ceiling tile masticSURFNF

2,800 SFREMOVEDN.A.*

Removed Summer 2012

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

400Restrooms

Ceiling tile masticSURFNF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

400Room 405

Transite lab counterMISCNF

1 EAREMOVEDN.A.*

Removed June 2006

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

500Boiler room

Pipe insulationTSIF

20 LFREMOVEDN.A.*

Removed Summer 2012

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

500Entries and workrooms

Ceiling tile masticSURFNF

3,000 SFREMOVEDN.A.*

Remmoved Summer 2012

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCURRIE MIDDLE SCHOOL

TUSD17C

4/5/2018Inspection Date:

500Rooms 502 and 512

Transite lab counterMISCNF

2 EAREMOVEDN.A.*

Removed June 2006

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

600Boiler room

Pipe injsulationTSIF

15 LFREMOVEDN.A.*

Removed Summer 2012

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

600Entries and workrooms

Ceiling tile masticSURFNF

2,800 SFREMOVEDN.A.*

Removed Summer 2012

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

600Restrooms

Ceiling tile masticSURFNF

N.A.REMOVEDN.A*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

600Room 605

Transite lab counterMISCNF

1REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

700Boys' Coaches' Office

12x12 Olive floor tileMISCNF

210 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCURRIE MIDDLE SCHOOL

TUSD17C

4/5/2018Inspection Date:

700Girls' Coaches' Office

12x12 Olive floor tileMISCNF

210 SFGOODHIGH*

Minor damage at door

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

700Locker rooms

Ceiling tile masticSURFNF

2,000 SFENCLOSEDLOW*

Enclosed by 1x1 ceiling tiles

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

700Mechanical room

GasketsMISCF

5 SFENCLOSEDLOW1

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

700Mechanical room

Boiler insulationTSIF

N.A.GOODMOD4

Boiler plate detached from boiler

Monitor for damage

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

700Mechanical room

Tank insulationTSIF

N.A.ENCLOSEDLOW1

Enclosed by fiberglass and wrap

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Above Ceiling

Pipe InsulationTSIF

20 EAGOODLOW1

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCURRIE MIDDLE SCHOOL

TUSD17C

4/5/2018Inspection Date:

800Art storage by kiln

Transite panelsMISCNF

N.A.REMOVEDN.A.*

Removed summer 1997

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Boiler Room

Pipe InsulationTSIF

8 EAGOODLOW1

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Kitchen

Oven insulationMISCF

4 SFREMOVEDN.A.1

Removed (new appliance in place)

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Kitchen hall and office

Ceiling tile masticSURFNF

1,500 SFENCLOSEDLOW*

Enclosed by 1x1 ceiling tile, one missing tile

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Kitchen office

12x12 Grey floor tileMISCNF

300 SFGOODHIGH*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Kitchen restroom

Tan sheet vinylMISCNF

30 SFREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCURRIE MIDDLE SCHOOL

TUSD17C

4/5/2018Inspection Date:

800Kitchen storeroom and hall

12x12 Olive floor tileMISCNF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Multipurpose

Ceiling tile masticSURFNF

5,000 SFENCLOSEDLOW*

Enclosed by 1x1 ceiling tile

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Multipurpose and 4 closets

12x12 Beige floor tileMISCNF

3,000 SFGOODHIGH*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Multipurpose stage door

Fire door insulationMISCF

1 EAREMOVEDN.A*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Room 802 Music

12x12 Olive floor tileMISCNF

1,124 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Room 802 Music

Wall tile masticSURFNF

400 SFENCLOSEDLOW*

Enclosed by 1x1 wall tile

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCURRIE MIDDLE SCHOOL

TUSD17C

4/5/2018Inspection Date:

800Room 803

Fire door insulationMISCF

1 EAREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Room 803

12x12 Olive floor tileMISCNF

1,124 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Room 804

12x12 Olive floor tileMISCNF

980 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Room 805

12x12 Olive floor tileMISCNF

1,109 SFGOODHIGH*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Room 808 Home Ec

12x12 Tan floor tileMISCNF

1,300 SFGOODHIGH*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

800Room 809

12x12 Beige floor tileMISCNF

1,109 SFENCLOSEDLOW*

Enclosed by carpet except at entry, torn

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCURRIE MIDDLE SCHOOL

TUSD17C

4/5/2018Inspection Date:

AdministrationFaculty women's restroom

Brown sheet vinylMISCNF

100 SFREMOVEDN.A*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationHealth office restroom

Brown sheet vinylMISCNF

300 SFREMOVEDN.A*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationOffice workroom

12x12 Beige floor tileMISCNF

55 SFGOODHIGH*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationThorman health office restroom

Brown sheet vinylMISCNF

25 SFGOODHIGH*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutExterior window panels

Transite panelsMISCNF

381 SFGOODMOD*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutRoof mansard

Transite shinglesMISCNF

N.A.REMOVEDN.A.*

Removed summer 2008

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictCURRIE MIDDLE SCHOOL

TUSD17C

4/5/2018Inspection Date:

ThroughoutRoof patches and penetrations

MasticSURFNF

N.A.REMOVEDN.A.*

Removed summer 2008

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutRoof walkways

Black composition roofingMISCNF

N.A.REMOVEDN.A.*

Removed summer 2008

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 8

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictDISTRICT ADMINISTRATION

TUSD17H

4/5/2018Inspection Date:

Building AMain entrance phone closet (NE)

12x12 Brown floor tileMISCNF

200 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building AMain entrance vault closet (SE)

9x9 Beige and Grey floor tileMISCNF

50 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building APayroll room closet

12x12 Red floor tileMISCNF

100 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building APrint shop and offices

12x12 Brown and Beige floor tileMISCNF

600 SFGOOD

HIGH*

No significant damage; one office enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building APrint shop hall

12x12 Brown and Beige floor tileMISCNF

425 SFGOODHIGH*

Minor damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building APrint shop health storage closet

12x12 Brown floor tileMISCNF

180 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictDISTRICT ADMINISTRATION

TUSD17H

4/5/2018Inspection Date:

Building APrint shop paper storage

12x12 Brown and Beige floor tileMISCNF

1,800 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building APrint shop woman's restroom

12x12 White floor tileMISC

NF

45 SFENCLOSEDLOW*

Enclosed by sheet vinyl or removed

Verify presence; routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingType

Friable Non-Friable

Comments

Recommended Response Action

Building ARoof access closet

9x9 Beige floor tileMISCNF

60 SFGOODHIGH*

No significant damage; near interior restrooms

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building AThroughout

Wall plasterSURFNF

16,000 SFGOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building AThroughout under carpet

9x9 Beige and Grey floor tileMISCNF

12,000 SFENCLOSEDLOW*

200 SF exposed in three closets

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictDISTRICT ADMINISTRATION

TUSD17H

4/5/2018Inspection Date:

Building CBoiler room and A/C room - Left door

Pipe insulationTSIF

20 LFREMOVED

N.A.*

Removed Summer 2012

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building CBoiler room and A/C room - Left door

Fire door insulationMISCF

1 EADAMAGED

LOW1

Damaged

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building CBoiler room and A/C room - Right door

Pipe fitting insulationTSIF

55 EAREMOVED

N.A.*

Removed Summer 2012

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building CExterior restrooms

12x12 Brown floor tileMISCNF

120 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building CMechanical Room

Transite pipeMISCNF

10 LFGOODN.A.*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictDISTRICT ADMINISTRATION

TUSD17H

4/5/2018Inspection Date:

Building DCommunication Room

Linoliumn FlooringMISCNF

100 SFREMOVEDN.A.*

Removed Summer 2011

Routine Operations And Maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building DRoof

Roof MasticSURFNF

50 SFREMOVEDN.A.*

Removed Summer 2011

Routine Operations And Maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building ERoof

Roof MasticSURFNF

50 SFREMOVEDN.A.*

Removed Summer 2011

Routine Operations And Maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL

TUSD17M

4/5/2018Inspection Date:

A: Rooms A1 to A6Classrooms

9x9 Tan floor tileMISCNF

36,00 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: Rooms A1 to A6Exterior walls and overhangs

StuccoSURFNF

10,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: Rooms A1 to A6Heater rooms

Aircell duct wrapTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: Rooms A1 to A6Under windows

Transite panelsMISCNF

600 SFGOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationExterior walls and overhangs

StuccoSURFNF

5,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationNurse's office

9x9 Beige floor tileMISCNF

200 SFENCLOSEDLOW*

Enclosed by carpet except in storage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL

TUSD17M

4/5/2018Inspection Date:

AdministrationTeachers lounge

Floor tile masticSURFNF

800 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationUnder windows

Transite panelsMISCNF

400 SFGOODMOD*

No significant damage; some are metal

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationWorkroom and storage

9x9 Beige floor tileMISCNF

287 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: Rooms B1 to B5Classrooms

9x9 Green floor tileMISCNF

3,600 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: Rooms B1 to B5Exterior walls and overhangs

StuccoSURFNF

8,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: Rooms B1 to B5Exterior windows

Window puttyMISCF

500 SFGOODLOW*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL

TUSD17M

4/5/2018Inspection Date:

B: Rooms B1 to B5Food service

Fire door insulationMISCF

2 EAENCLOSEDLOW*

Enclosed inside doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: Rooms B1 to B5Heater rooms

Aircell duct wrapTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: Rooms B1 to B5Under windows

Transite panelsMISCNF

500 SFGOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Rooms C1 to C6Classrooms

9x9 Green floor tileMISCNF

3,600 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Rooms C1 to C6Exterior walls and overhangs

StuccoSURFNF

8,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Rooms C1 to C6Heater rooms

Aircell duct wrapTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL

TUSD17M

4/5/2018Inspection Date:

C: Rooms C1 to C6Under windows

Transite panelsMISCNF

600 SFGOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: Rooms D1 to D4Exterior walls and overhangs

StuccoSURFNF

5,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: Rooms D1 to D4Exterior windows

Window puttyMISCNF

400 SFGOODLOW*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: Rooms D1 to D4Heater rooms

Aircell duct wrapTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: Rooms D1 to D4Under windows

Transite panelsMISCNF

600 SFGOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Rooms D1 to D4Classrooms

9x9 Green floor tileMISCNF

3,600 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL

TUSD17M

4/5/2018Inspection Date:

E: Rooms E1 to E4Classrooms

9x9 Green floor tileMISCNF

3,600 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Rooms E1 to E4Custodial office

Fire door insulationMISCF

2 EAENCLOSEDLOW1

Enclosed inside doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Rooms E1 to E4Exterior walls and overhangs

StuccoSURFNF

5,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Rooms E1 to E4Exterior windows

Window puttyMISCNF

300 SFGOODLOW*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Rooms E1 to E4Heater rooms

Aircell duct wrapTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Rooms E1 to E4Under windows

Transite panelsMISCNF

578 SFGOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL

TUSD17M

4/5/2018Inspection Date:

Kindergarten K1Exterior windows

Window puttyMISCNF

300 SFGOODLOW*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Kindergarten K1Mechanical room

Fire door insulationMISCF

1 EAENCLOSEDLOW1

Enclosed inside door

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Kindergarten K1Room K1

9x9 floor tileMISCNF

400 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Kindergarten K1Under windows

Transite panelsMISCNF

400 SFGOODMOD*

No significant damage; some are metal

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeCeiling beams

Spray-applied fireproofingSURFF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeExterior walls and overhangs

StuccoSURFNF

10,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL

TUSD17M

4/5/2018Inspection Date:

MultipurposeMechanical room

Fire door insulationMISCF

1 EAREMOVEDN.A.1

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

MultipurposeUnder windows

Transite panelsMISCNF

400 SFGOODMOD*

No significant damage; some are metal

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutClassroom heater closets

Fire door insulationMISCF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutHeater rooms

Flex jointsMISCNF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

500: HorticultureThroughout

12x12 Green floor tileMISCNF

2,700 SFREMOVEDN.A.*

Removed 1998; building demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sAir conditioning room

Pipe fitting insulationTSIF

N.A.REMOVEDN.A.*

Removed 1993BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sFaculty restroom hall

Grey floor tile and masticMISCNF

50 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sFaculty restrooms

Grey floor tile and masticMISCNF

406 SFENCLOSEDN.A.*

Removed June, 2004BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sFaculty restrooms and hall

Light heat shieldsMISCF

4 EAREMOVEDN.A.*

Removed June, 2004

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sHallways

Mastic under Black and Gold floor tile

MISCNF

5,700 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard Ranking

TypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

A: 100'sLibrary history storage

9x9 Grey floor tile and masticMISCNF

288 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sLibrary office

9x9 Grey floor tile and masticMISCNF

216 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sLibrary storage - northeast end

9x9 Grey floor tile and masticMISCNF

280 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sLibrary workroom

9x9 Grey floor tile and masticMISCNF

216 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sPsychologist

9x9 Grey floor tile and masticMISCNF

160 SFENCLOSEDHIGH*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 101

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

A: 100'sRoom 102

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 103

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 104

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 105

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 106

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 107

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

A: 100'sRoom 108

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 109

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 110

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 111

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 112 and "Knightlife"

9x9 Grey floor tile and masticMISCNF

900 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 113

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

A: 100'sRoom 114

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 115 (north)

9x9 Grey floor tile and masticMISCNF

400 SFENCLOSEDHIGH*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 115 (south) and storage

9x9 Beige floor tile and masticMISCNF

840 SFENCLOSEDHIGH*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 115 (south) storage

Light heat shieldsMISCNF

1 EAENCLOSEDLOW*

Enclosed inside light fixture

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 116

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 117

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

A: 100'sRoom 118

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 119

9x9 Grey floor tile and masticMISCNF

900 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 120

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 121

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 122

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sRoom 123

9x9 Grey floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

A: 100'sStage area

9x9 Grey floor tile and masticMISCNF

500 SFENCLOSEDHIGH*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 100'sVideo production lab (S. of room 115)

9x9 Grey floor tile and masticMISCNF

600 SFENCLOSED

LOW*

Carpet replace 2015. Mastic and VFT remain.

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sAir conditioning room

Pipe fitting insulationTSIF

25 EAREMOVEDN.A.*

Removed 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sAir conditioning room

Pipe insulationTSI

75 LFREMOVEDN.A.*

Removed 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sArt Gallery and offices above ceiling panels

FireproofingSURF

3,000 SFREMOVED

N.A.*

Removed 1993

N.A.

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

B: 300'sInside walls between rooms

FireproofingSURFF

N.A.ENCLOSED

LOW1

Minor quantities in inaccessible areas after summer '93 abatement

Use caution during renovations

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sNorth hallway

Yellow floor tile masticMISCNF

1,300 SFENCLOSEDLOW*

Enclosed under gold floor tile

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sNorth hallway above ceiling panels

FireproofingSURFF

N.A.REMOVEDN.A.*

Removed 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sRoom 301

9x9 White floor tileMISCNF

812 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sRoom 302

9x9 White floor tileMISCNF

812 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sRoom 303

9x9 White floor tileMISCNF

812 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 8

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

B: 300'sRoom 304

9x9 White floor tileMISCNF

812 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sRoom 305

9x9 White floor tileMISCNF

840 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sRoom 306

9x9 Beige floor tileMISCNF

840 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sRoom 307

9x9 White floor tileMISCNF

837 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sRoom 308

9x9 White floor tileMISCNF

840 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sRoom 309

9x9 White floor tileMISCNF

783 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 9

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

B: 300'sRoom 310

9x9 White floor tileMISCNF

810 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sRoom 311 and office

9x9 White floor tileMISCNF

810 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sRoom 312

9x9 White floor tileMISCNF

810 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sRoom 313 and 313A

9x9 White floor tileMISCNF

1,404 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sRoom 314

9x9 White floor tileMISCNF

900 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 300'sStaff restrooms

Light heat shieldsMISCNF

2 EAREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 10

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

B: 300'sThroughout

2x4 "Daisy" ceiling panelsMISCF

N.A.REMOVEDN.A.*

Removed 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: AdministrationAttendance hall storage

9x9 White floor tileMISCNF

20 SFENCLOSEDLOW*

Enclosed by carpet; SW corner of attendance

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: AdministrationAttendance paper storage

9x9 White floor tileMISCNF

75 SFENCLOSEDLOW*

No significant damage; NW corner of attendance

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: AdministrationAttendance photocopy room

9x9 White floor tileMISCNF

100 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: AdministrationFaculty resource (near 305)

9x9 White floor tileMISCNF

260 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: AdministrationFaculty resource (near 305) storage

Light heat shieldMISCF

1 EAENCLOSEDLOW1

Enclosed inside light fixture

Verify ACM; routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 11

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

B: AdministrationNurse

9x9 White floor tileMISCNF

370 SFREMOVEDN.A.*

Removed July, 2005

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: AdministrationOffice attic

Pipe fitting insulationTSIF

5 EAENCLOSEDLOW1

Enclosed in attic; entry in custodial closet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: AdministrationOffice attic

Fireproofing on beamsSURFF

N.A.ENCLOSED

LOW1

Enclosed in attic; entry in custodial closet. Clean-up and encapsulation was done on 2009.

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: AdministrationOffice supply room

9x9 White floor tileMISCNF

68 SFGOODHIGH*

No significant damage; behind reception desk.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sCentral workroom

Transite counter, sink and under autoclave (oven) at kitchen

MISCNF

10 EAGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard Ranking

TypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 12

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

C1: 200'sCentral workroom

Transite lab cartMISCNF

2 EAGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sCentral workroom storage

Light heat shieldMISCF

1 EAENCLOSEDLOW1

Enclosed inside light fixture

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sCentral workroom storage and under most cabinets

9x9 Tan floor tile and masticMISCNF

10 SFGOOD

LOW*

No significant damage

Routine Operations And Maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sExterior walls

StuccoSURFNF

8,000 SFGOODLOW*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sGeneral science lab

9x9 Beige floor tile and masticMISCNF

600 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sRoom 201

9x9 White floor tile and masticMISCNF

812 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 13

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

C1: 200'sRoom 202

9x9 White floor tile and masticMISCNF

812 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sRoom 203

9x9 White floor tile and masticMISCNF

812 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sRoom 204

9x9 White floor tile and masticMISCNF

812 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sRoom 205

9x9 White floor tile and masticMISCNF

812 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sRoom 206

9x9 White floor tile and masticMISCNF

812 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sRoom 207

9x9 White floor tile and masticMISCNF

812 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 14

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

C1: 200'sRoom 208

Transite counters and sinksMISCNF

10 EAGOODLOW*

Sinks removed, counters remaining

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sRoom 208

Transite panels on fume hoodMISCNF

200 SFREMOVEDN.A.*

Hood removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sRoom 208-215, halls and workrooms

9x9 White floor tile and masticMISCNF

N.A.REMOVED

N.A.*

Removed 7/03

N.A.

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sRoom 209

Transite counter and sinkMISCNF

32 SFGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sRoom 215

Transite counters and sinksMISCNF

10 EAGOODLOW*

No significant damage, only one sink remaining

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sRoom 215

Transite panels on fume hoodMISCNF

200 SFREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 15

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

C1: 200'sRoom 215 storage

Light heat shieldMISCNF

1 EAENCLOSEDLOW*

Enclosed inside light fixture

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sRooms 213 & 214 under cabinets

9x9 floor tile and masticMISCNF

2,200 SFENCLOSEDHIGH*

In some areas is expose and loose and broken

Routine Operations and Maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sZone #1 Air conditioning and boiler room

Fire door insulationMISCF

2 EAENCLOSED

LOW1

No significant damage

Encapsulate exposed insulation

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sZone #1 Air conditioning and boiler room

Pipe insulationTSIF

142 LFREMOVED

N.A.*

Removed 1993

N.A.

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C1: 200'sZone #1 Air conditioning and mechanical room

Pipe fitting insulationTSI

N.A.REMOVED

N.A.*

Removed 1993

N.A.

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 16

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

C2: 200'sFaculty resource

Ceiling panelsMISCF

200 SFREMOVEDN.A.1

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C2: 200'sFaculty resource

9x9 White floor tile and masticMISCNF

200 SFREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C2: 200'sRoom 216 storage

9x9 White floor tile and masticMISCNF

1,172 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C2: 200'sRoom 216 storage

Light heat shieldMISCNF

2 EAENCLOSEDLOW*

One enclosed in light fixture

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C2: 200'sRoom 216-220

2x4 "Daisy" ceiling panelsMISCF

N.A.REMOVEDN.A.*

Removed Spring 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C2: 200'sRoom 217

Transite panelsMISCNF

12 SFREMOVEDN.A.*

Removed Summer 1997

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 17

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

C2: 200'sRoom 217 and storage

9x9 White floor tile and masticMISCNF

1,178 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C2: 200'sRoom 217 storage

Light heat shieldMISCNF

2 EAENCLOSEDLOW*

Enclosed in light fixture

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C2: 200'sRoom 218 and pantry

9x9 White floor tile and masticMISCNF

1,178 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C2: 200'sRoom 219

9x9 White floor tile and masticMISCNF

812 SFREMOVEDN.A.*

Removed 7/03

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C2: 200'sRoom 220

9x9 White floor tile and masticMISCNF

840 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C2: 200'sZone #4 Air conditioning room

3" pipe insulationTSIF

N.A.REMOVEDN.A.*

Removed 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 18

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

C2: 200'sZone #4 Air conditioning room

Pipe fitting insulationTSIF

N.A.REMOVEDN.A.*

Removed 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Snack barRestroom

Light heat shieldMISCNF

2 EAGOODLOW*

Light fixture is new, verify presence

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: CafeteriaCafeteria

9x9 Green floor tile and masticMISCNF

3,000 SFGOOD

HIGH*

Minor damage throughout several missing, broken and lifting

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: CafeteriaCafeteria storage rooms

Light heat shieldMISCNF

6 EAGOODLOW*

One enclosed in light fixture

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: CafeteriaFood service area

9x9 White floor tile and masticMISCNF

754 SFREMOVEDN.A.*

Removed 12/99

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: CafeteriaFurnace rooms (4)

FireproofingSURFF

225 SFGOODLOW1

No significant damage; NW room

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 19

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

F: CafeteriaFurnace rooms (SW)

Pipe fitting insulationTSIF

3 EAREMOVEDN.A.1

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: CafeteriaKitchen office and storage

9x9 White floor tile and masticMISCNF

150 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: CafeteriaKitchen restroom and hall

9x9 White floor tile and masticMISCNF

100 SFREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: CafeteriaKitchen restroom, hall and storage

Light heat shieldMISCNF

4 EAREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: CafeteriaStudent restrooms

Light heat shieldMISCNF

5 EAREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: CafeteriaTeachers cafeteria

9x9 White floor tile and masticMISCNF

144 SFENCLOSEDLOW*

Partially removed 12/99

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 20

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

G: Boys P.E.Equipment room

9x9 Tan floor tile and masticMISCNF

100 SFREMOVEDN.A.*

Removed 2010

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: Boys P.E.Roof parapet wall

Capsheet roofingMISCNF

N.A.REMOVEDN.A.*

Removed 2010

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: Boys P.E.Training room

Floor tile masticMISCNF

200 SFREMOVEDN.A.*

Removed 2010

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: Boys P.E.Various

Glue spotsSURFNF

N.A.REMOVEDN.A.*

Removed 2010

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: GymBetween foyer and student store; above overhang

FireproofingSURFF

N.A.ENCLOSED

LOW1

Small quantities remain enclosed in inaccessible areas

Use caution during renovations

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: GymElectric room

9x9 Tan floor tile and masticMISCNF

50 SFGOODLOW*

Missing pieces

Repair or replace

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 21

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

H: GymFoyer and student store

2x4 "Daisy" ceiling panelsMISCF

1,097 SFREMOVEDN.A.*

Removed Summer 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: GymFoyer and student store attic

FireproofingSURFF

2,193 SFREMOVEDN.A.*

Removed Summer 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: GymFoyer, student store, and restrooms

Floor tile masticMISCNF

1,097 SFENCLOSED

LOW*

Enclosed under carpet and tile; removed in restrooms

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: GymStudent restrooms

Light heat shieldMISCNF

4 EAREMOVEDN.A.*

Removed 7/04

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: Girls P.E.Halls, restrooms, offices, and equipment storage

9x9 Grey floor tile and masticMISCNF

1,000 SFREMOVED

N.A.*

Removed 2010

N.A.

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 22

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

J: Girls P.E.Mechanical room

FireproofingSURFF

900 SFREMOVEDN.A.*

Removed Summer 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: Girls P.E.Mechanical room

Tank insulationTSIF

160 SFREMOVEDN.A.*

Removed 2010

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: Girls P.E.Mechanical room

Pipe fitting insulationTSIF

15 EAREMOVEDN.A.*

Removed Summer 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sMain dark room

FireproofingMISCF

N.A.REMOVEDN.A.*

Removed Summer 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sMechanical room

Pipe insulationTSIF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sMechanical room (north)

FireproofingSURFF

360 SFGOODLOW1

Minor damage at penetration

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 23

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

K: 400'sMechanical room (north)

Fire door insulationMISCF

2 EAENCLOSEDLOW1

Enclosed inside doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sMechanical room (north)

Pipe fitting insulationTSIF

6 EAGOODLOW1

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sMechanical room (southeast)

FireproofingSURFF

360 SFGOODLOW1

Minor delamination

Monitor damage

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sMechanical room (southwest)

Fire door insulationMISCF

2 EAENCLOSEDMOD2

Enclosed inside door

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 402

9x9 Brown floor tile and masticMISCNF

1,500 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 402 duplicating office

9x9 Tan floor tile and masticMISCNF

50 SFGOODHIGH*

Minor damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 24

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

K: 400'sRoom 402 duplicating office

Light heat shieldMISCF

1 EAENCLOSEDLOW1

Enclosed inside light fixture

routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 402 storage

9x9 Brown floor tile and masticMISCNF

50 SFGOODHIGH*

No significant damage.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 403 wood shop

Pipe fitting insulationTSIF

15 EAGOODLOW1

No significant damage; at ceiling

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 403 wood shop (gym room)

9x9 Tan floor tile and masticMISCNF

600 SFGOOD

HIGH*

No visible damage but maybe missing tiles under equipment

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 403 wood shop finishing room

Fire door insulationMISCF

1 EAENCLOSED

LOW1

Enclosed inside door

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 25

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

K: 400'sRoom 403 wood shop storages (2) and finishing room

Light heat shieldsMISCF

3 EAENCLOSED

LOW1

Enclosed inside light fixtures

Verify ACM; routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 404 welding booth walls

Transite panelsMISCNF

N.A.REMOVEDN.A.*

Removed 1997

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 405, 408, storage and darkroom

9x9 Tan floor tile and masticMISCNF

N.A.REMOVED

N.A.*

Removed 7/03

N.A.

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 405-408 and main darkroom

2x4 ceiling panelsMISCF

N.A.REMOVEDN.A.*

Removed 1993

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 405-408 office

9x9 Tan floor tile and masticMISCNF

80 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 26

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

K: 400'sRoom 406 choir, hall, storages, and restrooms

9x9 Tan floor tile and masticMISCNF

2,100 SFGOOD

LOW*

No significant damage; removed in restrooms and robe storage

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 406 dressing, restroom, and robe storage

Light heat shieldsMISCNF

11 EAREMOVED

N.A.*

Removed

N.A.

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 407 Band

9x9 Tan floor tile and masticMISCNF

2,000 SFENCLOSEDLOW*

Enclosed by carpet; exposed in storage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sRoom 408 Photo, on work table

Transite panelsMISCNF

2x3GOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutAdjacent to windows

Transite panelsMISCNF

N.A.GOOD

MOD*

No significant damage, removed in Boy's and Girl's Locker Rooms

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 27

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictFOOTHILL HIGH SCHOOL

TUSD17B

4/5/2018Inspection Date:

ThroughoutHeater closets

Fire door insulationMISCF

40 EAENCLOSEDLOW1

Enclosed inside doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutRoofs

Patching masticSURFNF

N.A.GOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 28

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictGUIN FOSS SCHOOL

TUSD17J

4/5/2018Inspection Date:

Building A: AdministrationThroughout

9x9 Brown floor tile and/or masticMISCNF

5,000 SFENCLOSEDLOW*

Enclosed by carpet and new floor tile

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building B: KindergartenRestrooms

12x12 Orange floor tile and masticMISCNF

N.A.REMOVEDN.A.*

Removed 6/04

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building B: KindergartenRoom A2 heater room

Fire door insulationTSIF

1 EAENCLOSEDLOW1

Enclosed inside door

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building B: KindergartenThroughout except A2 restrooms

Floor tile masticSURFF

1,000 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building C: Rooms B1 - B4Exterior windows

Window puttyMISCNF

300 SFGOODLOW*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building C: Rooms B1 - B4Throughout

Cove baseMISCNF

N.A.REMOVEDN.A.*

Removed 1996-97

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictGUIN FOSS SCHOOL

TUSD17J

4/5/2018Inspection Date:

Building C: Rooms B1 - B4Throughout

Floor tile masticSURFF

3,600 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building D1: Rooms C1 - C4Custodial room

Transite panelMISCNF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building D1: Rooms C1 - C4Exterior windows

Window puttyMISCNF

300 SFGOODLOW*

Minor damage: <1% ACM, some loose @ room 4

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building D1: Rooms C1 - C4Throughout

Cove baseMISCNF

N.A.REMOVEDN.A.*

Removed Summer 1997

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building D1: Rooms C1 - C4Throughout

9x9 Brown floor tile and masticMISCNF

3,600 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building D2: Rooms D1 - D4Exterior windows

Window puttyMISCNF

300 SFGOODLOW*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictGUIN FOSS SCHOOL

TUSD17J

4/5/2018Inspection Date:

Building D2: Rooms D1 - D4Food service

Floor tile masticSURFF

200 SFENCLOSEDLOW*

Enclosed by Tan 12x12 floor tile

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building D2: Rooms D1 - D4Throughout

9x9 Brown floor tile and masticMISCNF

3,400 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building E: MultipurposeAbove windows

Transite panelsMISCNF

32 SFGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building E: MultipurposeLibrary

Floor tile masticSURFF

2,500 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building E: MultipurposeLibrary restroom

9x9 Tan floor tile and masticMISCNF

45 SFENCLOSEDLOW*

Enclosed by new sheet vinyl

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building E: MultipurposeMain room walls

Spray-applied wall plasterSURFF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictGUIN FOSS SCHOOL

TUSD17J

4/5/2018Inspection Date:

Building E: MultipurposeMechanical room

Straight run pipe insulationTSIF

2 LFREMOVEDN.A.1

Removed; may remain inside walls

Verify presence

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building E: MultipurposeMechanical room

Fire door insulationMISCF

2 EAENCLOSEDLOW1

Enclosed inside door

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building E: MultipurposeMechanical room

Transite flue pipeMISCNF

3 LFREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building E: MultipurposeMechanical room

GasketMISCNF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building F: Rooms E1 - E4Throughout

9x9 Brown floor tile and masticMISCNF

3,600 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building F: Rooms E1 - E4Under windows

Transite panelsMISCNF

300 SFGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictGUIN FOSS SCHOOL

TUSD17J

4/5/2018Inspection Date:

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictHEIDEMAN ELEMENTARY SCHOOL

TUSD17O

4/5/2018Inspection Date:

AFaculty lounge

12x12 Green floor tileMISCNF

N.A.REMOVEDN.A.*

Removed; building demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AThroughout

Floor tile and linoleumMISCNF

N.A.REMOVEDN.A.*

Removed; building demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BExterior walls and overhangs

StuccoSURFNF

8,000 SFGOODLOW*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BKindergarten room 1

9x9 Beige floor tileMISCNF

500 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BKindergarten workroom

Transite panelMISCNF

12 SFREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BRoom B5

9x9 Beige floor tileMISCNF

324 SFREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictHEIDEMAN ELEMENTARY SCHOOL

TUSD17O

4/5/2018Inspection Date:

BUnder windows

Transite panelsMISCNF

44 SFGOODMOD*

No significant damage; some are metal

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutRoofs

Patching masticSURFNF

500 SFGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutThroughout

Fire door insulationMISCF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictHEWES MIDDLE SCHOOL

TUSD17E

4/5/2018Inspection Date:

A: AdministrationHealth office and restrooms

9x9 Beige floor tileMISCNF

189 SFREMOVEDN.A.*

Remove 09/00

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationInterior restroom

Fire door insulationMISCF

1REMOVEDN.A.

Removed 7/07

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationOffice area

9x9 Beige floor tileMISCNF

5,000 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenanc

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationOffices and workroom

Fire door insulationMISCF

4 EAENCLOSEDLOW1

Enclosed inside doors

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationWorkroom

9x9 Beige floor tileMISCNF

205 SFENCLOSED

N.A.*

New carpeting over tile. New lounge area. Observed 2018

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: ClassroomsRoom 08, 10

9x9 Beige floor tileMISCNF

2,400 SFREMOVEDN.A.*

REMOVED 7/14

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictHEWES MIDDLE SCHOOL

TUSD17E

4/5/2018Inspection Date:

B: ClassroomsRoom 09

9x9 Beige floor tileMISCNF

1,200 SFREMOVEDN.A.*

REMOVED 7/14

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: ClassroomsRoom 09 at Kiln

Transite panelsMISCNF

300 SFREMOVEDN.A.*

REMOVED 7/14

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: ClassroomsRoom 10

Transite counters and sinksMISCNF

10 EAREMOVEDN.A.*

REMOVED 7/14

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: ClassroomsRoom 11

9x9 Green floor tileMISCNF

1,200 SFREMOVEDN.A.*

REMOVED 7/14

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: ClassroomsRoom 11

Transite counters and sinksMISCNF

8 EAREMOVEDN.A.*

REMOVED 7/14

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: ClassroomsRoom 11-12 Prep room

9x9 Green floor tileMISCNF

2,400 SFREMOVEDN.A.*

REMOVED 7/14

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictHEWES MIDDLE SCHOOL

TUSD17E

4/5/2018Inspection Date:

B: ClassroomsRoom 11-12 Prep room

Fire door insulationMISCF

2 EAREMOVEDLOW1

REMOVED

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: ClassroomsRoom 11-12 Prep room

Transite counters and sinksMISCNF

5 EAREMOVEDN.A.*

REMOVED 7/14

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: ClassroomsRoom 12

Transite counters and sinksMISCNF

10 EAREMOVEDN.A.*

REMOVED 7/14

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: classroomsRoom 12

9x9 Green floor tileMISCNF

1,000 SFREMOVEDN.A.*

REMOVED 7/14

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: LibraryLibrary storage room/custodian

9x9 Beige floor tileMISCNF

50 SFGOODMOD*

Minor damage; obscured

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: LibraryLibrary workroom

9x9 Beige floor tileMISCNF

240 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictHEWES MIDDLE SCHOOL

TUSD17E

4/5/2018Inspection Date:

E: LibraryLibrary, workroom, and computer room

9x9 Beige floor tileMISCNF

4,800 SFENCLOSED

LOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: ClassroomsRoom F-1, pantry, and storeroom

9x9 Beige floor tileMISCNF

2,200 SFREMOVEDN.A.*

REMOVED 7/14

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: ClassroomsRoom F-2 and F-4

9x9 Beige floor tileMISCNF

3,600 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: ClassroomsRoom F-3 wood shop storage

Fire door insulationMISCF

1 EAREMOVEDN.A.1

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: Locker roomsBoys coaches' office

9x9 Green floor tileMISCNF

305 SFENCLOSEDHIGH*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: Locker roomsCourtyard furnace room

GasketsTSIF

16 LFENCLOSEDLOW1

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictHEWES MIDDLE SCHOOL

TUSD17E

4/5/2018Inspection Date:

G: Locker roomsCourtyard furnace room

Pipe fitting insulationTSIF

33 EAGOODLOW1

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: Locker roomsCourtyard furnace room

Tank insulationTSIF

400 SFGOODLOW1

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: Locker roomsCustodial room

Fire door insulationMISCF

2 EAENCLOSEDLOW1

Enclosed inside door

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: Locker roomsGirls coaches' office

9x9 Green floor tileMISCNF

700 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: MultipurposeMultipurpose

9x9 Beige floor tileMISCNF

3,500 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: MultipurposeMultipurpose stage and two storage rooms

9x9 Beige floor tileMISCNF

300 SFGOOD

HIGH*

Minor damage, many replaced @ stage

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictHEWES MIDDLE SCHOOL

TUSD17E

4/5/2018Inspection Date:

H: MultipurposeMultipurpose stage storage rooms

Fire door insulationMISCF

2 EAGOODLOW1

West storage door removed

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: MultipurposeRoom H-1

9x9 Beige floor tileMISCNF

900 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: MultipurposeRoom H-2 Band

9x9 Beige floor tileMISCNF

1,000 SFGOODHIGH*

No significant damage, some replaced

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutExterior walls

StuccoSURFNF

N.A.GOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutExterior windows

Window puttyMISCNF

N.A.GOODLOW*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutHeater closets

Fire door insulationMISC

F

N.A.ENCLOSEDLOW1

Enclosed inside doors; some have been removed

Verify presence; routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingType

Friable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictHEWES MIDDLE SCHOOL

TUSD17E

4/5/2018Inspection Date:

ThroughoutRoofs

Patching masticSURFNF

N.A.REMOVEDN.A.*

Removed 7/04

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutUnder windows

Transite panelsMISCNF

1,600 SFGOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictHILLVIEW HIGH SCHOOL

TUSD17F

4/5/2018Inspection Date:

BClassroom B-1

Floor Tile MasticMISCF

1000 SFREMOVEDN.A.*

Removed during Tennis Court Renovation ProjectBuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BFurnace room

Flex collarMISCF

1 EAREMOVEDN.A.1

No significant damageBuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BKiln room outside B-1

Fire door insulationMISCF

2 EAREMOVEDN.A.1

Enclosed inside doorsBuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BKiln room outside B-1

Asbestos gloveMISCF

REMOVEDN.A.*

Removed Prior to Sept. 2011BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BKiln room outside B-1

Transite panelsMISCNF

35 SFREMOVEDN.A.*

At walls around kiln (not attach)BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BWood shop student store

9x9 Green floor tile and masticMISCNF

575 SFREMOVEDLOW*

Removed 8/10BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictHILLVIEW HIGH SCHOOL

TUSD17F

4/5/2018Inspection Date:

B and CExterior walls and overhang

StuccoSURF

NF

6,000 SFGOOD

MOD*

Minor damage; <1% ACM. Some cracks and peeling off

Bldg B- Removed during demolitionRoutine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingType

Friable Non-Friable

Comments

Recommended Response Action

B and CUnder and over windows

Transite panelsMISC

NF

110 SFGOODMOD*

No significant damage

Bldg B- Removed prior to demolitionRoutine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingType

Friable Non-Friable

Comments

Recommended Response Action

CAttic above ceilings panels

Pipe insulationTSI

F

200 LFENCLOSEDLOW1

Seen above ceiling panels in rooms C-6 and C-4

10 LF Removed during renovation Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingType

Friable Non-Friable

Comments

Recommended Response Action

CMechanical room

Pipe insulationTSIF

35 LFREMOVEDLOW1

Removed between 8/13 & 1/14BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

CMechanical room

Pipe fitting insulationTSIF

28 LFREMOVEDLOW1

Removed between 8/13 & 1/14BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictHILLVIEW HIGH SCHOOL

TUSD17F

4/5/2018Inspection Date:

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictLAMBERT SCHOOL

TUSD17W

4/5/2018Inspection Date:

A: AdministrationHeater room

Transite flue pipeMISCNF

1 EAGOODLOW*

Verify presence

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationHeater room

Flex jointMISCNF

1 EAREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationHeater room

Aircell duct insulationTSIF

8 LFREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationNurse's office

9x9 Beige floor tileMISCNF

150 SFREMOVEDN.A.*

Removed 7/04

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationUnder windows

Transite panelsMISCNF

200 SFGOODLOW*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationWorkroom

9x9 Beige floor tileMISCNF

175 SFENCLOSEDLOW*

Enclosed by carpet.

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictLAMBERT SCHOOL

TUSD17W

4/5/2018Inspection Date:

B: Room 32Heater room

Aircell duct insulationMISCF

6 LFREMOVEDN.A.*

Removed Spring, 1997

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: Room 32Room 32

9x9 Beige floor tileMISCNF

1,160 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: Room 32Room 32 office

9x9 Beige floor tileMISCNF

80 SFGOODHIGH*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Classrooms 1-6Heater room

Pipe fitting insulationTSIF

10 EAGOODLOW1

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Classrooms 1-6Heater room

Aircell duct insulationTSIF

10 LFGOODLOW1

Minor Damage

Monitor damage

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Classrooms 1-6Room 4 workroom

Floor tile masticMISCNF

200 SFENCLOSEDLOW*

Enclosed under beige floor tile

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictLAMBERT SCHOOL

TUSD17W

4/5/2018Inspection Date:

C: Classrooms 1-6Throughout

Floor tile masticMISCNF

6,000 SFENCLOSEDLOW*

Enclosed under carpet and floor tile

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Classrooms 1-6Under windows

Transite panelsMISCNF

200 SFGOODMOD*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: Classrooms 13-18Heater room

Pipe fitting insulationTSIF

13 EAGOODLOW1

No significant damage.

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: Classrooms 13-18Heater room

Aircell duct insulationTSIF

6 LFGOOD

LOW1

Minor damage, whole piece is on ground on side of equipment.

Remove

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: Classrooms 13-18Over and under windows

Transite window panelsMISCNF

200 SFGOODMOD*

Cracked panels at rooms 13 and 14

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Classrooms 19-26Heater room

Aircell duct insulationTSIF

6 LFGOODLOW1

Deteriorating

Monitor damage

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictLAMBERT SCHOOL

TUSD17W

4/5/2018Inspection Date:

E: Classrooms 19-26Heater room

Pipe fitting insulationTSIF

12 EAGOODLOW1

Old water damage

Monitor damage

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Classrooms 19-26Over and under windows

Transite panelsMISCNF

200 SFGOODMOD*

No significant damage.

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutHeater rooms

Fire door insulationTSIF

10 EAENCLOSEDLOW1

Enclosed inside doors

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL

TUSD17N

4/5/2018Inspection Date:

AdministrationExterior walls and overhang

StuccoSURFNF

8,000 SFGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationNurse's office

Floor tile masticMISCNF

1,200 SFENCLOSEDLOW*

Enclosed by floor tile

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationSupply room

9x9 Brown floor tileMISCNF

200 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationTeachers' workroom

Transite wall panelMISCNF

9 SFREMOVEDN.A.

Removed 1998

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationTeachers' workroom - under kiln

Transite panelMISCNF

20 SFREMOVEDN.A.*

No longer present

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationThroughout

9x9 Grey floor tileMISCNF

4,500 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL

TUSD17N

4/5/2018Inspection Date:

AdministrationUnder windows

Transite panelsMISCNF

400 SFREMOVEDN.A.*

Removed 7/04

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationWater heater closet

Transite flue pipeMISCNF

20 LFENCLOSEDLOW*

No significant damage; enclosed in attic

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationWater heater closet

Pipe insulationTSIF

16 LFGOODLOW1

Exposed ends and minor tearing

Encapsulate exposed ends

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AdministrationWater heater closet

Fire door insulationTSIF

2 EAENCLOSEDLOW1

Enclosed inside doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BExterior walls and overhang

StuccoSURFNF

8,000 SFGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BExterior windows

Window puttyMISCNF

500 SFGOODLOW*

Minor damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL

TUSD17N

4/5/2018Inspection Date:

BMain field roof

Tar and gravel roofingMISCNF

3,000 SFGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BRooms B1 to B4

9x9 Green floor tileMISCNF

3,600 SFENCLOSED

LOW*

Loose and missing tiles in closets; enclosed in classrooms

Repair or remove in closets

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

CCustodial room

Transite flue pipeTSINF

20 LFENCLOSEDLOW

Enclosed in attic above HWH

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

CExterior walls and overhang

StuccoSURFNF

8,000 SFGOODLOW*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

CFood service C-1

Floor tile masticMISCNF

200 SFENCLOSEDLOW*

Enclosed by 12 X 12 white floor tile

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

CHeater room

Pipe wrapTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL

TUSD17N

4/5/2018Inspection Date:

CRooms C1 to C4

9x9 Green floor tileMISCNF

3,600 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C, D, MultiUnder windows

Transite panelsMISCNF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

DHeater room

Pipe wrapTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

DRooms D1 to D5

9x9 Green floor tileMISCNF

3,600 SFENCLOSEDLOW

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

EHeater rooms

8" pipe insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

EHWH Closet (behind E1-E2)

3" pipe insulationTSIF

8 LFGOODLOW1

Exposed ends and minor tearing

Encapsulate exposed ends

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL

TUSD17N

4/5/2018Inspection Date:

ERoom E1

9x9 Tan floor tileMISCNF

950 SFGOOD

HIGH*

120 SF exposed one is broken; rest enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ERoom E2

9x9 Tan floor tileMISCNF

950 SFGOODHIGH*

240 SF exposed; rest enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ERooms E1- E2 workroom

9x9 Tan floor tileMISCNF

80GOODHIGH*

Minor damage at doorway

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ERooms E3 to E7

9x9 Tan floor tileMISCNF

4,500 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

EUnder windows

Transite panelsMISCNF

200 SFGOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: KindergartenMechanical room

Pipe insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL

TUSD17N

4/5/2018Inspection Date:

F: KindergartenMechanical room

Fire door insulationTSINF

2 EAENCLOSEDLOW*

Enclosed inside doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: KindergartenThroughout

9x9 Grey floor tileMISCNF

2,200 SFENCLOSEDLOW*

Enclosed by carpet and new floor tile

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: KindergartenUnder windows

Transite panelsMISCNF

192 SFGOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: MultipurposeExterior walls and overhang

StuccoSURFNF

10,000 SFGOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: MultipurposeFurnace room

Fire door insulationMISCF

1 EAENCLOSEDLOW1

Enclosed inside door

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: MultipurposeFurnace room

Insulating paperTSIF

13 SFGOODLOW1

No significant damage; located on old ducts

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL

TUSD17N

4/5/2018Inspection Date:

G: MultipurposeThroughout

Spray-applied floor tileSURFF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: MultipurposeThroughout

9x9 Grey floor tileMISC

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutFurnace rooms

Expansion jointsTSINF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictNELSON ELEMENTARY SCHOOL

TUSD17V

4/5/2018Inspection Date:

Building A: AdministrationMechanical room

Straight run pipe insulationTSIF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building A: AdministrationMechanical room

Firedoor insulationTSIF

2 EAENCLOSEDLOW1

Enclosed inside doors

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building A: AdministrationNurse's office

9x9 Beige floor tileMISCNF

120 SFREMOVEDN.A.*

Removed 6/04

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building A: AdministrationUnder windows

Transite panelsMISCNF

69 SFGOODMOD*

No significant damage; some are metal

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building A: AdministrationWorkroom

9x9 Beige floor tileMISCNF

150 SFGOODHIGH*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building CMechanical room

Pipe elbow insulationTSIF

9 EAGOODLOW1

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictNELSON ELEMENTARY SCHOOL

TUSD17V

4/5/2018Inspection Date:

Building CMechanical room

Aircell duct insulationTSI

F

7 LF 6"DGOODLOW1

Deteriorating

Monitor damage; do not store objects against insulation

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingType

Friable Non-Friable

Comments

Recommended Response Action

Building CUnder windows

Transite panelsMISCNF

24 SFGOODMOD*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building DMechanical room

Pipe elbow insulationTSIF

20 EAGOODLOW1

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building DMechanical room

Aircell duct insulationTSIF

5 LF 6"DDAMAGEDLOW1

Deteriorating

Repair or replace

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building DUnder windows

Transit panelsMISCNF

147 SFGOODMOD*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building EExterior windows

Window puttyMISCNF

200 SFGOODLOW*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictNELSON ELEMENTARY SCHOOL

TUSD17V

4/5/2018Inspection Date:

Building EMechanical room

Pipe elbow insulationTSIF

20 EAGOODLOW1

Minor water damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building EMechanical room

Aircell duct insulationTSIF

6 LF 6"DDAMAGEDLOW4

Torn; deteriorating, debris

Repair or remove

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building EUnder windows

Transite panelsMISCNF

132 SFGOODMOD*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building FExterior storage rooms

Firedoor insulationMISCF

3 EAENCLOSEDLOW1

Enclosed inside doors

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building FRoom 19

9x9 Beige floor tileMISCNF

300 SFENCLOSEDLOW*

Enclosed by carpet

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building FRoom 19 mechanical room

Flex jointTSIF

2 EAGOODLOW1

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictNELSON ELEMENTARY SCHOOL

TUSD17V

4/5/2018Inspection Date:

Building FRoom 19 mechanical room

Aircell duct insulationTSIF

4 LFREMOVEDN.A.1

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building FRoom 19-20 workroom and storage

9x9 Beige floor tileMISCNF

160 SFGOODHIGH*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building FRoom 20

9x9 Beige floor tileMISCNF

300SFENCLOSEDLOW*

Removed or enclosed by new floor tile

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building FRoom 20 mechanical room

Aircell duct insulationTSIF

7 LFREMOVEDN.A.4

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building FRoom 20 mechanical room

Flex jointTSIF

2 EAGOODLOW1

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building FRoom 21 and office

9x9 Beige floor tileMISCNF

400 SFENCLOSEDLOW*

Enclosed

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictNELSON ELEMENTARY SCHOOL

TUSD17V

4/5/2018Inspection Date:

Building FRoom 21 mechanical room

Flex jointTSIF

N.A.REMOVEDN.A.*

Removed Summer, 1997

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building FRoom 21 mechanical room

Aircell duct insulationTSIF

N.A.REMOVEDN.A.*

Removed Summer, 1997

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutHeater closets

Firedoor insulationMISCF

10 EAENCLOSEDLOW1

Enclosed inside door

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictSUPPORT SERVICES FACILITY

TUSD17P

4/5/2018Inspection Date:

Support servicesA.V. shop and closet

12x12 Beige floor tileMISCNF

525 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Support servicesCustodial office

12x12 Beige floor tileMISCNF

40 SFGOODHIGH*

Minor damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Support servicesEntrance and offices

12x12 Beige floor tileMISCNF

400 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Support servicesHall to transportation

12x12 Beige floor tileMISCNF

720 SFGOODHIGH*

Cracks and bubbling

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Support servicesHall to warehouse

12x12 Beige floor tileMISCNF

113 SFGOODHIGH*

Minor damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Support servicesLocksmith

12x12 Beige floor tileMISCNF

300 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictSUPPORT SERVICES FACILITY

TUSD17P

4/5/2018Inspection Date:

Support servicesLounge

12x12 Beige floor tileMISCNF

480 SFGOODHIGH*

Minor damage at patio doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Support servicesPlan room

12x12 Beige floor tileMISCNF

120 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Support servicesPlan vault room

12x12 Beige floor tileMISCNF

120 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Support servicesWarehouse office

12x12 Beige floor tileMISCNF

150 SFGOODHIGH*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTHORMAN ELEMENTARY SCHOOL

TUSD17D

4/5/2018Inspection Date:

Building A: 30'sThroughout

Baseboard masticMISCNF

740 LFENCLOSEDLOW*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building B: 20'sKitchen

Mastic under red floor tileSURFNF

450 SFENCLOSEDLOW*

Enclosed by 12x12 red floor tile

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Building C: 10'sWorkroom 314 under kiln

Transite panelMISCNF

40 SFREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutExterior walls

StuccoSURFNF

N.A.GOODMOD*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutExterior window panels

Transite panelsMISCNF

200 SFGOODMOD*

No significant damage

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutRoof mansard

Transite shinglesMISCNF

N.A.REMOVEDN.A.*

Removed Summer 2008

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTHORMAN ELEMENTARY SCHOOL

TUSD17D

4/5/2018Inspection Date:

ThroughoutRoof patches and penetrations

MasticSURFNF

N.A.REMOVEDN.A.

Removed Summer 2008

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutRoof walkways

Black composition roofingMISCNF

N.A.REMOVEDN.A.

Removed Summer 2008

Routine operation and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

A: 210-213Exterior walls

StuccoSURFNF

N.A.GOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: 210-213Interior walls

Drywall mudSURFF

N.A.REMOVEDN.A.1

Removed, Summer 2010 Mod.

N.A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Athletic director's trailerOffice, restroom, storage

9x9 Beige floor tile and masticMISCNF

264 SFREMOVEDN.A.*

Removed 8/02; trailer demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 110-113Exterior walls

StuccoSURFNF

5,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: 110-113Interior walls

Drywall mudSURFF

N.A.REMOVEDN.A.1

Removed, Summer 2010 Mod.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: 220-227Custodial office

Fire door insulationMISCF

2 EAENCLOSEDLOW1

Enclosed inside door

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

C: 220-227Exterior walls

StuccoSURFNF

10,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: 220-227Interior walls

Drywall mudSURFF

N.A.GOODLOW1

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

CustodialBoiler room

Aircell duct insulationTSIF

4 LFREMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

CustodialRestroom

Ceiling plasterSURFNF

820 SFGOODLOW*

No significant damage, innacc. 7/2011

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

CustodialRoom 110 Audio visual

9x9 Brown floor tileMISCNF

1,000 SFREMOVEDHIGH*

Removed 2016 (DEMOLISHED)

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: 120-125Attic walls

Drywall mudSURFF

N.A.ENCLOSED

LOW1

No significant damage; enclosed in attic, innaccessible 07/2011

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

D: 120-125Exterior walls

StuccoSURFNF

5,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: 120-125Room 120 dressing rooms, storage and ticket office

9x9 Tan floor tile and masticMISCNF

1,500 SFGOOD

HIGH*

Minor damage in dressing rooms, innaccessible 07/2011

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: 120-125Room 120 stage

Spot light wire insulationMISCF

N.A.GOODMOD3

No significant damage, innaccessible 07/2011

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationAttic

Pipe fitting insulationTSIF

38 EAREMOVEDLOW1

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationCloset near resources

9x9 Green floor tile and masticMISCNF

20 SFREMOVEDMOD*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationClosets across from nurse (2)

9x9 Beige floor tile and masticMISCNF

180 SFREMOVEDHIGH*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

E: AdministrationCopy room

9x9 Brown floor tile and masticMISCNF

204 SFREMOVEDHIGH*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationExterior windows

Window puttyMISCNF

300 SFREMOVEDMOD*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationKitchenette

9x9 Brown floor tile and masticMISCNF

65 SFREMOVEDHIGH*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationMail room (near principals office)

9x9 Brown floor tile and masticMISCNF

150 SFREMOVEDHIGH*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationMail room heater closet

Transite flue pipeMISCNF

10LFGOODLOW*

No significant damage

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationMail room heater closet

Fire door insulationTSIF

1 EAREMOVEDLOW1

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

E: AdministrationMechanical room 5

Duct insulationTSIF

N.A.REMOVEDN.A.*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationMechanical room 5

Pipe fitting insulationTSIF

N.A.REMOVEDN.A.*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationNurse's offices

9x9 Brown floor tile and masticMISCNF

634 SFREMOVEDN.A.*

Removed 6/04

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationPaper storage

9x9 Green floor tile and masticMISCNF

87 SFREMOVEDHIGH*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationPhone system and electric room

9x9 Green floor tile and masticMISCNF

100 SFREMOVEDHIGH*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationSecurity room

9x9 Brown floor tile and masticMISCNF

98 SFREMOVEDHIGH*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

E: AdministrationThroughout except as noted

9x9 Brown floor tile and masticMISCNF

10,000 SFREMOVEDLOW*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: AdministrationVault

9x9 Brown floor tile and masticMISCNF

100 SFGOODHIGH*

Removed summer 2015

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: 230-234Exterior walls

StuccoSURFNF

5,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: 230-234Room 232 exterior kilns

Transite panelsMISCNF

300 SFGOODMOD*

No significant damage, one broken. Inacc. 07/2011

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: 130-138Exterior walls

StuccoSURFNF

10,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

G: 130-138Room 133 and restroom

Spray-applied acoustic ceiling plaster

SURFF

10,000 SFGOODLOW1

No significant damage, innacc. 07/2011

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard Ranking

TypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

G: 130-138Room 136

Spray-applied acoustic ceiling plaster

SURFF

85 SFGOODLOW1

No significant damage; inacc. 07/2011

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard Ranking

TypeFriable Non-Friable

Comments

Recommended Response Action

G: Custodial RoomCustodial Room

Transite panelMISCNF

30 SFGOODLOW*

No significant damage

Routine Operations And Maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: 604-609Exterior walls

StuccoSURFNF

5,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: 604-609Inside walls

Pipe fitting insulationTSI

F

20 EAENCLOSEDLOW1

No significant damage

Verify presence; routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingType

Friable Non-Friable

Comments

Recommended Response Action

I: CafeteriaAttic

Pipe fitting insulationTSIF

10 EAENCLOSEDLOW1

No significant damage; enclosed in attic

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

I: CafeteriaCafeteria

9x9 Green floor tile and masticMISCNF

7,200 SFREMOVEDN.A.*

Removed 12/2009, except in closets (lifting)

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

I: CafeteriaCafeteria stage classroom & steps

9x9 Green floor tile and masticMISCNF

2,000 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

I: CafeteriaCustodial office

9x9 Beige floor tile and masticMISCNF

36 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

I: CafeteriaExterior mechanical room

Transite flue pipeMISCNF

8 LFENCLOSEDLOW*

Enclosed in attic

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

I: CafeteriaExterior windows

Window puttyMISCNF

500 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

I: CafeteriaFaculty dining (north side)

9x9 Beige floor tile and masticMISCNF

350 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 8

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

I: CafeteriaFaculty dining (south side)

Floor tile and masticMISCNF

500 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

I: CafeteriaHall to faculty dining

9x9 Beige floor tile and masticMISCNF

50 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

I: CafeteriaKitchen office

9x9 Brown floor tile and masticMISCNF

50 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

I: CafeteriaKitchen restrooms, locker room and hall

9x9 Beige floor tile and masticMISCNF

250 SFREMOVED

N.A.*

Removed

N/A

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

I: CafeteriaServing area

9x9 Green floor tile and masticMISCNF

1,000 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: Boy's locker room and gymBoiler and locker room

Pipe fitting insulationTSIF

45 EAGOODMOD5

Some removed; likely inside walls also.

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 9

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

J: Boy's locker room and gymBoiler room

Tank insulationTSIF

180 SFGOODMOD2

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: Boy's locker room and gymCoaches office

9x9 Beige floor tile and masticMISCNF

304 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: Boy's locker room and gymExterior walls

StuccoSURFNF

15,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: Boy's locker room and gymGym storage and custodial

Fire door insulationMISCF

2 EAENCLOSEDLOW1

Enclosed inside doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: Boy's locker room and gymGym vestibule

9x9 Beige floor tile and masticMISCNF

293 SFREMOVEDN.A.*

Removed 11/00

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J: Boy's locker room and gymLocker room

Ceiling tile masticSURFNF

5,000 SFENCLOSEDLOW*

Enclosed by ceiling tiles, one tile is missing

Verify ACM; routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 10

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

J1: Girl's locker roomBoiler room

Tank insulationTSIF

180 SFGOODMOD1

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J1: Girl's locker roomBoiler room and attic

Pipe fitting insulationTSIF

39 EAGOODLOW1

13 in boiler room; rest enclosed in attic

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J1: Girl's locker roomCoaches offices and first aid

9x9 Grey floor tile and masticMISCNF

900 SFREMOVEDN.A.*

Removed

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

J1: Girl's locker roomLocker room

Ceiling tile masticSURFNF

5,000 SFENCLOSEDLOW*

Enclosed by ceiling tiles, some exposed.

Verify ACM; routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sAll classrooms except 415 storage and office

9x9 Grey floor tile and masticMISCNF

N.A.REMOVED

N.A.*

Removed during Summer 2010 Mod.

N/A

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K: 400'sExterior heater rooms

Fire door insulationMISCF

N.A.REMOVEDN.A.1

Removed during Summer 2010 Mod.

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 11

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

K: 400'sThroughout

Pipe insulationTSIF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K1 - K4: 300'sExterior walls and overhang

StuccoSURFNF

5,000 SFGOOD

MOD*

Minor damage; <1% ACM, some cracking and peeling at overhang

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K1 - K4: 300'sExterior windows

Window puttyMISCNF

200 SFREMOVEDN.A.*

Removed summer 2014

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K1 - K4: 300'sRoom 321 heater closet

Pipe insulationTSI

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K1 - K4: 300'sThroughout

9x9 floor tile and/or masticMISCNF

N.A.REMOVEDN.A.*

Removed summer 2014

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

K1 - K4: 300'sThroughout

Duct wrapTSIF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 12

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

L: LibraryExterior heater room

Flex jointTSIF

1 EAGOODLOW1

No significant damage. Innaccessible 07/2011

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

L: LibraryExterior heater room

Aircell insulationTSIF

8 LFGOODLOW1

Minor damage, innaccessible 07/2011

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

L: LibraryExterior windows

Window puttyMISCNF

500 SFGOOD

LOW*

No significant damage; <1% ACM, broken & loose in back

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

L: LibraryLibrary storeroom

Floor tile masticSURFNF

736 SFENCLOSEDLOW*

Enclosed by red floor tile

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

L: LibraryStudent store

9x9 Tan floor tile and masticMISCNF

2,500 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

L: LibraryThroughout

Pipe insulationTSIF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 13

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

L: LibraryThroughout except storeroom

9x9 green floor tile and masticMISCNF

2,500 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

N: StadiumAttic boiler room

Boiler insulationTSIF

100 SFENCLOSEDLOW1

Debris under boiler is not ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

N: StadiumAttic boiler room

Flex jointsTSIF

5 SFENCLOSEDLOW1

Inside fan cabinet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

N: StadiumAttic boiler room

Tank insulationTSIF

150 SFGOODLOW1

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

N: StadiumAttic boiler room

Pipe insulationTSIF

130 SFGOODLOW1

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

N: StadiumAttic boiler room

Pipe fitting insulationTSIF

15 EAGOODLOW1

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 14

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

P: 600'sMechanical room

Aircell insulation on exhaust ductTSIF

6 LFGOODLOW1

No significant damage, innacc. 07/2011

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

P: 600'sRoom 600 and storages (2)

9x9 Brown floor tile and masticMISCNF

1,421 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

P: 600'sRoom 601 and office

9x9 Brown floor tile and masticMISCNF

1,116 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

P: 600'sRoom 602

9x9 Brown floor tile and masticMISCNF

1,116 SFREMOVEDN.A.*

Removed

N/A

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

P: 600'sRoom 603 dressing and uniform storage

9x9 Brown floor tile and masticMISCNF

1,500 SFREMOVED

N.A.*

Removed

N/A

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

P: 600'sRoom 604

Fire door insulationMISCF

2 EAREMOVEDN.A.1

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 15

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

ThroughoutHeater closets

Fire door insulationMISCF

2 EAENCLOSEDLOW1

Enclosed inside doors, innacc. 07/2011

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutUnder windows

Transite window panelsMISCNF

500 SFGOODMOD*

No significant damage; 3 broken @ room # 232

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sCentral area

9x9 Beige floor tileMISCNF

300 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sCentral area attic (near 525)

Fire door insulationMISCF

1 EAREMOVEDN.A.1

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sCentral area attic (near 525)

Pipe insulationTSIF

6 inchREMOVEDN.A.1

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sCentral area attic (near 525)

Pipe fitting insulationTSIF

32 EAREMOVEDN.A.1

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 16

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

X: 500'sExterior walls and overhang

StuccoSURFNF

1,800 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 520

9x9 Beige floor tileMISCNF

1,669 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 520 ceiling and upper walls

Spray-applied plasterSURFF

2,000 SFREMOVEDN.A.1

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 520 conference room

Spray-applied plasterSURFNF

180 SFREMOVEDN.A.1

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 520 conference room

9x9 Beige floor tileMISCNF

180 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 521 ceiling and upper walls

Spray-applied plasterSURFF

2,000 SFREMOVEDN.A.1

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 17

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

X: 500'sRoom 521, prep, and custodial room

9x9 Beige floor tileMISCNF

1,769 SFREMOVED

N.A.*

Removed July 2011, bldg. demoloshed

N.A.

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 521-522 oxidizer storage

9x9 Beige floor tileMISCNF

80 SFREMOVEDN.A.*

Removed July 2011, bldg. demoloshed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 522

9x9 Beige floor tileMISCNF

1,200 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 522 ceiling and upper walls

Spray-applied plasterSURFF

1,500 SFREMOVEDN.A.1

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 522-523 prep

9x9 Beige floor tileMISCNF

120 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 523

9x9 Beige floor tileMISCNF

1,200 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 18

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

X: 500'sRoom 523 ceiling and upper walls

Spray-applied plasterSURFF

1,500 SFREMOVEDN.A.1

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 523-524 storage

9x9 Beige floor tileMISCNF

50 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 523-524 storage attic

Flex jointsTSIF

2 EAREMOVEDN.A.1

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 523-524 storage attic

Aircell and paper tape insulationTSIF

N.A.REMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 524

9x9 Beige floor tileMISCNF

1,669 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 524 ceiling and upper walls

Spray-applied plasterSURFF

2,000 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 19

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

X: 500'sRoom 524 prep (off center)

Spray-applied plasterSURFF

300 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 524 prep (off center)

9x9 Beige floor tileMISCNF

300 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 525

9x9 Beige floor tileMISCNF

1,669 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 525 ceiling and upper walls

Spray-applied plasterSURFF

2,000 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 525-526 prep

9x9 Beige floor tileMISCNF

300 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 525-526 storage and closet

9x9 Beige floor tileMISCNF

300 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 20

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN HIGH SCHOOL

TUSD17A

4/5/2018Inspection Date:

X: 500'sRoom 526

9x9 Beige floor tileMISCNF

1,669 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sRoom 526 ceiling and upper walls

Spray-applied plasterSURFF

2,000 SFREMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

X: 500'sThroughout

Base board masticSURFNF

N.A.REMOVEDN.A.*

Removed July 2011, bldg. demolished

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 21

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN MEMORIAL ELEMENTARY SCHOOL

TUSD17S

4/5/2018Inspection Date:

A: AdministrationOffices

12x12 White floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: ClassroomsAttic

Duct insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: ClassroomsRoom 5 sink counter

Brown sheet vinylMISCF

15 SFREMOVEDN.A.

Removed, 2006

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: ClassroomsRooms 5-7

9x9 Brown floor tile and masticMISCNF

3,000 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: ClassroomsRooms 8-10

9x9 brown floor tile and masticMISCNF

3,000 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: ClassroomsRooms 11 and 13 storage

Fire door insulationMISCF

2 EAENCLOSEDLOW1

Enclosed inside doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN MEMORIAL ELEMENTARY SCHOOL

TUSD17S

4/5/2018Inspection Date:

B: ClassroomsRooms 11-14

Brown floor tile and masticMISCNF

3,000 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

B: ClassroomsRooms 15-18

Brown floor tile and masticMISCNF

3,000 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: KindergartenCustodial storage

Fire door insulationMISCF

2 EASIGNIFICANT DAMAGELOW6

Door is coming apart to reveal interior insulation

Repair or Replace

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: KindergartenCustodial storage above HWH

Pipe fitting insulationTSIF

5 EAGOODMOD2

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: KindergartenRoof - west end

Tar and gravel roofingMISCNF

N.A.REMOVEDN.A.*

Removed Summer, 2011

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: KindergartenThroughout

Cove base masticSURFNF

N.A.ENCLOSEDLOW*

Enclosed by cove base; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN MEMORIAL ELEMENTARY SCHOOL

TUSD17S

4/5/2018Inspection Date:

C: KindergartenThroughout

9x9 Grey floor tile and masticMISCNF

2,500 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: KindergartenUnder exterior windows

Transite panelsMISCNF

45 SFGOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: MultipurposeElectric room

Black masticSURFNF

600 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: MultipurposeHeater closet - North side

Transite flue pipeMISCNF

3 LFGOODLOW*

No significant damage, visible on roof

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: MultipurposeInside walls

Pipe insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: MultipurposeMain room

Spray-applied acoustic ceiling and wall plaster

SURFF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard Ranking

TypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN MEMORIAL ELEMENTARY SCHOOL

TUSD17S

4/5/2018Inspection Date:

D: MultipurposeMultipurpose

9x9 Green floor tile and masticMISCNF

5,000 SFENCLOSEDMOD*

No significant damage, under stage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: MultipurposeSpeech above ceiling

Pipe insulationTSIF

N.A.ENCLOSEDLOW1

Enclosed above ceiling; removed inside walls

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: ClassroomsRooms 20-22 under windows

Transite panelsMISCNF

54 SFGOODLOW*

Panels cracked at rooms 20 and 22

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: ClassroomsRooms 20-24

9x9 Green floor tile and masticMISCNF

4,500 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: ClassroomsThroughout

Cove base masticSURFNF

1,000 LFENCLOSEDLOW*

Enclosed by cove base; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutAll buildings except C and E

Transite panelsMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictTUSTIN MEMORIAL ELEMENTARY SCHOOL

TUSD17S

4/5/2018Inspection Date:

ThroughoutExterior windows

Window puttyMISCNF

1,000 SFGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutRoofs

Grey patching masticSURFNF

N.A.REMOVEDN.A.*

Removed summer, 2011

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

WalkwaysRoofs

Roofing feltMISCNF

N.A.REMOVEDN.A.*

Removed summer, 2011

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictUTT INTERMEDIATE SCHOOL

TUSD17I

4/5/2018Inspection Date:

ACafeteria

LinoleumMISCF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ACounseling

Fire door insulationMISCF

5 EAENCLOSEDLOW1

Enclosed inside heater and custodial room doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AHeater Room

GasketsTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AHeater Room

Pipe wrapTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AHeater Room

Pipe fitting insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AMultipurpose

Drywall joint compoundSURFF

N.A.ENCLOSEDLOW1

Enclosed under ceiling tiles

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictUTT INTERMEDIATE SCHOOL

TUSD17I

4/5/2018Inspection Date:

AMultipurpose restrooms

Light insulationMISCF

5REMOVEDN.A.

Removed 2006

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AMultipurpose stage

Fire door insulationMISCF

5 EAENCLOSED

LOW1

Enclosed inside doors; three on stage, two in storage

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

AThroughout

9x9 Beige floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BHeater rooms

12" pipe insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

BThroughout

Floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

CBoiler room

6" pipe fitting insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictUTT INTERMEDIATE SCHOOL

TUSD17I

4/5/2018Inspection Date:

CBoiler room

Tank insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

CThroughout

9x9 Beige floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

DHeater room

12" pipe insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

DThroughout

Cove base masticSURFNF

1,000 LFENCLOSEDLOW*

Enclosed by cove base

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

DThroughout

Brown floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

EHeater room

12" pipe insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictUTT INTERMEDIATE SCHOOL

TUSD17I

4/5/2018Inspection Date:

EThroughout

9x9 Brown floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

FHeater room

12" pipe insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

FThroughout

Floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

GHeater room

Pipe insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

GThroughout

Beige floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

HHeater room

Pipe insulationTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictUTT INTERMEDIATE SCHOOL

TUSD17I

4/5/2018Inspection Date:

HThroughout

9x9 Brown floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

KThroughout

9x9 Brown floor tileMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutHeater rooms

Flex jointsTSIF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutHeater rooms

Fire door insulationMISCF

N.A.REMOVEDN.A.

Removed except building A

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutRoof

Patching masticMISCNF

N.A.REMOVEDN.A.

Removed Summer, 2005

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutUnder exterior windows

Transite panelsMISCNF

N.A.REMOVEDN.A.

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictUTT INTERMEDIATE SCHOOL

TUSD17I

4/5/2018Inspection Date:

ThroughoutWalls and overhangs

StuccoSURFNF

N.A.GOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutWindows

Window puttyMISCNF

N.A.GOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6

Thursday, April 05, 2018

david
Stamp

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictVEEH ELEMENTARY SCHOOL

TUSD17T

4/5/2018Inspection Date:

A: AdministrationExterior walls and overhang

StuccoSURFNF

5,000 SFGOODLOW*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationHealth office, workroom and storage

12x12 Beige floor tileMISCNF

277 SFGOOD

LOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationHealth storage

9x9 Grey floor tileMISCNF

42 SFGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationTeachers lounge heater closet

Aircell duct wrapTSIF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

A: AdministrationThroughout except health office, workroom and storage

9x9 Grey floor tileMISCNF

3,500 SFENCLOSED

LOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictVEEH ELEMENTARY SCHOOL

TUSD17T

4/5/2018Inspection Date:

B: KindergartenKindergarten

9x9 Tan floor tileMISCNF

2,000 SFENCLOSEDHIGH*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Rooms 2-5Exterior walls and overhangs

StuccoSURFNF

2,500 SFGOODMOD*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Rooms 2-5Food service

Fire door insulationMISCF

2 EAENCLOSEDLOW1

Enclosed inside doors

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Rooms 2-5Food service

Transite flue pipeMISCNF

1 EAGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

C: Rooms 2-5Rooms 2-5

9x9 Tan floor tileMISCNF

3,000 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

D: Rooms 6-11Exterior walls and overhang

StuccoSURFNF

5,000 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictVEEH ELEMENTARY SCHOOL

TUSD17T

4/5/2018Inspection Date:

D: Rooms 6-11Rooms 6-11

9x9 Tan floor tileMISCNF

5,000 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Rooms 12-17Exterior walls and overhang

StuccoSURFNF

7,500 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

E: Rooms 12-17Rooms 12-17

9x9 Tan floor tileMISCNF

5,000 SFENCLOSEDLOW*

Enclose by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: Rooms 18-21Custodial office

Transite flue pipeMISCNF

1 EAENCLOSEDLOW*

No significant damage; enclosed in attic

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: Rooms 18-21Custodial office

Fire door insulationTSIF

2 EAENCLOSEDLOW1

Enclosed inside doors; exposed in one door

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

F: Rooms 18-21Exterior walls and overhang

StuccoSURFNF

2,500 SFGOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictVEEH ELEMENTARY SCHOOL

TUSD17T

4/5/2018Inspection Date:

F: Rooms 18-21Rooms 18-21

9x9 Tan floor tileMISCNF

3,000 SFENCLOSEDLOW*

Enclosed by carpet

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: MultipurposeExterior walls and overhang

StuccoSURFNF

10,000 SF.GOODMOD*

No significant damage; <1% ACM

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: MultipurposeExterior windows

Window puttyMISCNF

300 SFGOODLOW*

No significant damage

Routine operations and maintenance

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: MultipurposeFurnace room

Fire door insulationMISCNF

1REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: MultipurposeFurnace room

Duct tapeTSIF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: MultipurposeFurnace room

Furnace gasketsTSIF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictVEEH ELEMENTARY SCHOOL

TUSD17T

4/5/2018Inspection Date:

H: MultipurposeMultipurpose ceiling beams

Spray-applied fireproofingSURFF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

H: MultipurposeNortheast exterior doors

Fire door insulationTSIF

2REMOVEDN.A.1

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutHeater rooms

Flex jointsMISCNF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutHeater rooms

Aircell duct insulationTSIF

N.A.REMOVEDN.A.*

Removed

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutUnder windows

Transite panelsMISCNF

834 SFGOOD

MOD*

No significant damage; one cracked panel at room 5

Routine operations and maintenance

BuildingLocation

Description

QuantityCondition

Potential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

ThroughoutWalkway roofs

Patching masticSURFNF

N.A.REMOVEDLOW*

Removed Summer 2011

N.A.

BuildingLocation

Description

QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable

Comments

Recommended Response Action

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5

Thursday, April 05, 2018

AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -

Tustin Unified School DistrictVEEH ELEMENTARY SCHOOL

TUSD17T

4/5/2018Inspection Date:

Inspector Signature

David Johnson Certified Site Surveillance Technician 17-5918

* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.

"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6

Thursday, April 05, 2018

david
Stamp