Carbon Saving Initiatives
Update
2009 / 2010
FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS
FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS
ConCom (Continuous Commissioning)
– Flowers building, ‘Night Set-Back’ – delivered 239 tCO2 savings / year.
– Faculty building, ‘Weekend Set-Back’ – delivered 60 tCO2 savings / year
– SAF building, AHU ‘Set-Backs’ - initial air readings underway.
– SAF, transformer voltage reduction – savings being assessed
– Commonwealth building, AHU ‘Set-Backs’ – desk-top report of operational times & fan ratings completed, ConCom to review with FM team & academic community, identify and initiate opportunities.
– Obtained Carbon Trust matched funding to support ConCom - £38,765
FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS
Lighting
– Faculty building, LED lights installed on ramp and in secure bike store – delivered 26.3 tCO2 savings / year.
– Sherfield building, LED lights installed in level 2 main concourse – delivered 6.3 tCO2 savings / year.
– Sherfield building, LED lights extension to ground floor concourse – programmed for 26th / 27th June expected to deliver 11.5 tCO2
savings / year.
– All lighting works, are now being challenged to demonstrate carbon savings, projects in development include: Skempton stairwells, RSM mezzanine corridors, Elec Eng workshops.
– ConCom survey of existing lighting on SK Campus, to commence 1st July, will establish strategy for installing more efficient lighting and introducing controls.
FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS
Other inititatives
– Silwood transformers, ‘Power Perfector ’ installation, controlling operational voltage – delivered 32 tCO2 savings / year.
– RSM & Bessemer, office ‘Hot Water Boilers’, programmed to occupied office hours only – delivered 10 tCO2 savings / year
– Food recycling composter – delivered 166 tCO2 savings / year
– Lagging & insulation works – delivered 55 tCO2 savings / year
– Silwood buildings ‘Cavity Wall Insulation’ – works due to start 2nd July, expected to deliver, 75 tCO2 savings / year.
– Steam trap remedial works, survey identified improvements – expected to deliver, 491 tCO2 savings / year.
FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS
Opportuities under review
– ETHOS ‘waste to heat’ , convert, 550 tonnes of waste to heat / steam on site – expected to realise 450 tCO2 savings / year.
– Plant Replacement : installation of new chillers, efficient lifts & air conditioning units – potential savings under assessment.
– Photovoltaic's (PV): Discussions with Inside2Outside regarding OPV Membrane, potential applications and Solar Century identifying potential roof locations for systems on site for PV panels – potential savings and viability to be assessed.
– CHP operation - initial discussions regarding more efficient operation & exploring with Kiwi Power potential income from the ‘Grid’.
– Bike & Electric car provision on SK campus – initial operational desk-top report completed, ConCom Team commencing review with FM team / academic community, identify & initiate opportunities.