Carbon Saving Initiatives

Update

2009 / 2010

FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS

Page 2: Carbon Saving Initiatives Update 2009 / 2010 FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS

FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS

ConCom (Continuous Commissioning)

– Flowers building, ‘Night Set-Back’ – delivered 239 tCO2 savings / year.

– Faculty building, ‘Weekend Set-Back’ – delivered 60 tCO2 savings / year

– SAF building, AHU ‘Set-Backs’ - initial air readings underway.

– SAF, transformer voltage reduction – savings being assessed

– Commonwealth building, AHU ‘Set-Backs’ – desk-top report of operational times & fan ratings completed, ConCom to review with FM team & academic community, identify and initiate opportunities.

– Obtained Carbon Trust matched funding to support ConCom - £38,765

Page 3: Carbon Saving Initiatives Update 2009 / 2010 FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS

FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS

Lighting

– Faculty building, LED lights installed on ramp and in secure bike store – delivered 26.3 tCO2 savings / year.

– Sherfield building, LED lights installed in level 2 main concourse – delivered 6.3 tCO2 savings / year.

– Sherfield building, LED lights extension to ground floor concourse – programmed for 26th / 27th June expected to deliver 11.5 tCO2

savings / year.

– All lighting works, are now being challenged to demonstrate carbon savings, projects in development include: Skempton stairwells, RSM mezzanine corridors, Elec Eng workshops.

– ConCom survey of existing lighting on SK Campus, to commence 1st July, will establish strategy for installing more efficient lighting and introducing controls.

Page 4: Carbon Saving Initiatives Update 2009 / 2010 FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS

FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS

Other inititatives

– Silwood transformers, ‘Power Perfector ’ installation, controlling operational voltage – delivered 32 tCO2 savings / year.

– RSM & Bessemer, office ‘Hot Water Boilers’, programmed to occupied office hours only – delivered 10 tCO2 savings / year

– Food recycling composter – delivered 166 tCO2 savings / year

– Lagging & insulation works – delivered 55 tCO2 savings / year

– Silwood buildings ‘Cavity Wall Insulation’ – works due to start 2nd July, expected to deliver, 75 tCO2 savings / year.

– Steam trap remedial works, survey identified improvements – expected to deliver, 491 tCO2 savings / year.

Page 5: Carbon Saving Initiatives Update 2009 / 2010 FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS

FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS

Opportuities under review

– ETHOS ‘waste to heat’ , convert, 550 tonnes of waste to heat / steam on site – expected to realise 450 tCO2 savings / year.

– Plant Replacement : installation of new chillers, efficient lifts & air conditioning units – potential savings under assessment.

– Photovoltaic's (PV): Discussions with Inside2Outside regarding OPV Membrane, potential applications and Solar Century identifying potential roof locations for systems on site for PV panels – potential savings and viability to be assessed.

– CHP operation - initial discussions regarding more efficient operation & exploring with Kiwi Power potential income from the ‘Grid’.

– Bike & Electric car provision on SK campus – initial operational desk-top report completed, ConCom Team commencing review with FM team / academic community, identify & initiate opportunities.