28
Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

  • Upload
    danil

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC. Capital Planning Module Providing Answers to Important Questions. What is the current condition of your facility? How much money do you need? Is your level of funding appropriate? - PowerPoint PPT Presentation

Citation preview

Page 1: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Capital Planning ModuleGary R. Schaecher

Founder, TMA Systems, LLC

Page 2: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Capital Planning ModuleProviding Answers to Important Questions

• What is the current condition of your facility?• How much money do you need?• Is your level of funding appropriate?• Given a capital budget, what will happen to

the condition of your assets over time?• What needs to be worked on first?• What is the baseline of your facility?

Page 3: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Capital Planning Module• Provides current replacement value of each

asset.• Determines if current funding levels are

adequate.• Helps forecast the impact of various funding

levels.• Helps prioritize what should be funded first

based on your needs.• Aligns your capital improvement plan with a

facilities mission and fiscal goals.

Page 4: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Capital Planning TimelinePhase I (2014 target for completion)

Release Capital Planning Module• BMAR database w/Estimating & Condition Assessment• Facility Improvements database w/Estimating• Life Cycle Renewal database w/Estimating• FCI Calculations & Analysis• Push Analysis data to Excel Worksheets

What-if-scenarios possible10-Year PlanBacklog Reduction PlanReports & Graphs

Page 5: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Phase II TimelinePhase II (Timeline Undermined)

• Mobile solution for collecting assessment data (iPad)• Integrate Capital Planning Data to Projects

Provides:Moving of CP Projects to Projects moduleProject ComponentsMeeting MinutesFinance Forms IntegrationTime ManagementContract Management Integration

Change Orders, Punch Lists, Change Directives, etc.Invoicing & Payments

Consultants and Contractors

Page 6: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Basic Assumptions• It’s always easier to fund a problem that is specific &

current. (Example: Roof leaks – past tense)• Data in Backlog of Maintenance & Repairs

• Planned needs (future) are harder to fund.• Data in Cyclic Renewal Items (Boilers, chillers, etc.)

• You will never reduce your backlog unless you keep it from getting worse.

• The solution is to fund your Backlog (Your Problems) with input from Cyclic Renewal (Your Plan).

Page 7: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Basic Assumptions (cont’d)

• If Backlog data is not separated from your improvement items, the clarity of problems becomes clouded.

• By separating the Backlog items from improvements, you have better control of your funding requests.

• When necessary, you can still combine the two. Improvements are program driven.

Page 8: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

National Standards for Estimates

• Our Elements table is Uniformat II.• This provides unique sorting capabilities.• The estimating breakdown format is a format

familiar to budgeting managers.• You can analyze your building conditions

down to major component levels. (Rollups)• Estimates of costs can be inflated over time.

Page 9: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Facility Condition Index• Facilities Condition Index (FCI) = Backlog of Maintenance &

Repair / Current Replacement Values (CRV)

• The recognized FCI rating from this calculation is:

0 - 5% = Good Condition rating 5% - 10% = Fair Condition rating > 10% = Poor Condition rating > 20% = Red Flag Condition rating

Page 10: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

CP Schema (Simplified)

BMAR

Improvements Cyclic Renewal

Uniformat

Groups

Capital $’s

Work Areas

Work Reason

Markups

Work Impact

Funding Grps

Graphs 6 Worksheets Reports

10 Year PlanFCI

Classify By:

Page 11: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Building Condition Browse

Page 12: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Building Condition

(FCI) Browse

Page 13: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Five Software Components

1. Backlog of Maintenance & Repair Form/Browse2. Cyclic Renewal Items Form/Browse3. Facility Improvements Form/Browse4. Conclusions: Excel worksheets & graphs• Interactive : What-if scenarios can be created.• Funding Needed worksheet• Strategic Plan worksheet

5. 10-Year Backlog Reduction Plan• Tool to select groups of projects and prioritize them.

Page 14: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

The 10 Processes1. Load all of your data.2. Update Backlog, Improvements, and Renewal

records through facility audits. 3. Level Cyclic Renewal items to find the annual

future need for your facilities.4. Use the Excel “Backlog/Improvement"

worksheet to analyze your Backlog Reduction Strategic Plan.

5. Develop a strategic plan to meet to your needs. Use the six Excel worksheets.

6. Test your plan.

Page 15: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

The 10 Processes (cont’d)

7. Select individual work projects for funding for the next biennium and annual budget period.

8. Complete the preparation of a 10 year plan.9. Print your results.10.Start over with the next funding periods –

Repeat Capital Planning Process.

Page 16: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Capital Planning Lookups

12 New Lookups to Classify:

1. BMAR 2. Facility Improvement Items3. Cyclic Renewal Items

Page 17: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Capital Planning Menu

3 New tables for tracking:

1. Backlog of Maintenance & Repair2. Facility Improvement Items3. Life Cycle Renewal Records

Page 18: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC
Page 19: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Estimating

Create Estimates by Craft, Unit Cost, or Lump Sum

Page 20: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Powerful Browse & Query Capabilities

Page 21: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

BMAR Browse Form

Page 22: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Graph BMAR/Facility Improvements Data

Page 23: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

10-Year Plan Form

Page 24: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Six Excel Worksheets for What-if-Scenarios

Page 25: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Pushing CP Data to Excel Is Automated

Page 26: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Display Data in Understandable Formats

Page 27: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Large Selection of Reports & Graphs (50+)

Page 28: Capital Planning Module Gary R. Schaecher Founder, TMA Systems, LLC

Questions and Comments?

Thank You!

Suggestions:

[email protected]