CAPITAL IMPROVEMENT PROGRAM - 2018-2022
Funding Sources 2018 2019 2020 2021 2022
Sales Taxes 6,966,400 7,175,400 7,468,300 7,764,900 6,885,000
Municipal & Department Reimbursements 16,996 300,000 - - -
Equipment Sale Proceeds 39,140 40,314 41,524 42,769 44,052
Designated Fund Balances 250,000 - - -
CTH K Reconstruction Debt Issue - - 5,000,000 - -
Sales Tax Fund Balance 698,464 46,986 - - -
7,971,000 7,562,700 12,509,824 7,807,669 6,929,052
2018 Priority Project Summaries
I Highway Road Projects 3,090,000 3,182,700 8,278,181 3,376,526 3,477,822
I Radio Upgrade - 300,000 500,000 500,000 500,000
I/II Parks 250,000 250,000 250,000 250,000 250,000
II Facility Projects 420,000 315,000 270,000 450,000 450,000
II Fair Park 275,000 100,000 140,000 140,000 160,000
II Equipment Replacement Fund 495,000 430,000 435,000 480,000 460,000
Economic Development 2,141,000 2,140,000 2,139,000 2,138,000 1,137,000
- Samaritan Chiller Replacement - 300,000 - - -
- Countywide AudioVisual Upgrades 600,000 - - -
- Schmidt Road Closure Improvements 250,000 95,000 - -
IS Projects 450,000 450,000 250,000 250,000 250,000
7,971,000 7,562,700 12,262,181 7,584,526 6,684,822
Unassigned Sales Tax Fund Balance 2018 2019 2020 2021 2022
Beginning Unassigned Sales Tax Fund Balance 747,474 49,010 2,024 249,667 472,810
Use of Sales Tax Fund Balance (698,464) (46,986) 247,643 223,143 244,230
Ending Unassigned Sales Tax Fund Balance 49,010 2,024 249,667 472,810 717,040
Sales Tax Allocation 2018 2019 2020 2021 2022
Total Estimated Sales Tax Revenue* 12,115,500 12,479,000 12,988,400 13,504,100 13,909,200
42.5% 42.5% 42.5% 42.5% 50.5%
5,149,100 5,303,600 5,520,100 5,739,200 7,024,100
17.7% 17.1% 16.5% 15.8% 8.2%
2,141,000 2,140,000 2,139,000 2,138,000 1,137,000
39.8% 40.4% 41.0% 41.7% 41.3%
4,825,400 5,035,400 5,329,300 5,626,900 5,748,000
* Sales Tax Revenue in Excess of Total Estimated will be designated for the Revolving Loan Fund .
General Fund - Property Tax Relief
Capital Improvement Program
Economic Development
Amended Project List
Department Project Cost Priority Department Project Cost Priority Department Project Cost Priority
Adm/COC Ctywide Audio Visual Proj 0.600 I Admin/IS Ctywide Audio Visual Proj0.000 I Admin/IS Website Redesign 0.100 III
Adm/IS AS400 Migration 0.450 I AS400 Migration 0.450 I IS Projects 0.15 II
Website Redesign 0.000 III
Facilities Boiler Replacements 0.150 II Facilities UWWC Pkg Lot 0.060 II Facilities UWWC 0.095 II
Replace UPS 0.110 II Parking Lots 0.080 II Boiler 0.175 II
Tuck Pointing 0.100 II Roof Replacement 0.085 II Schmidt Rd Closure 0.000 II
UWWC Pkg Lot 0.060 II Security System 0.090 I
Schmidt Rd Closure 0.250 II Schmidt Rd Closure 0.095 II
Fair Park Asphalt 0.050 II Fair Park Asphalt 0.020 II Fair Park HVAC Roof top 0.090 II
Ext. Bldg Reprs 0.050 II HVAC 0.080 II Boiler Repl 0.050 II
Repl Elec Sign 0.175 II Repl Elec Sign 0.000
Highway CTH P 1.700 II Highway CTH K 0.000 II Highway CTH D 0.750 II
CTH NN/Z 1.425 II CTH M Bridge 0.450 II CTH WW 0.810 II
CTH MY 0.225 II CTH W 0.745 II CTH K 0.235 II
CTH M 0.120 II CTH G 0.035 II CTH E 1.170 II
CTH K 0.000 II CTH C 0.590 II
CTH P 0.100 II CTH K 5.000 II
CTH Y 0.100 II
Parks Energy Audit 0.075 II Parks Equip Repl 0.080 I Parks Coutywide bike 0.250 II
Equip Repl 0.125 I Fin Sustain Proj 0.000 III Equip Repl 0.070 I
Fin Sustain Proj 0.000 III Glacier Hills Acq 0.000 II Fin Sustain Proj 0.000 III
Glacier Hills Acq 0.000 II Heritage Tr Impr 0.000 II
Coutywide bike 0.175 II Coutywide bike 0.250 II
Samaritan Chillar 0.300 II
WCSD ERP 0.370 I WCSD ERP 0.350 I WCSD ERP 0.365 I
Jail Addition 0.000 II Radio System 0.300 I Radio System 0.500 I
Jail Addition 0.000 II Jail Addition 0.000 II
Economic Development 2.141 Economic Development 2.14 Economic Development2.139
TOTAL 8.351 TOTAL 5.810 TOTAL 12.539
Added Removed Amended
2018 2019 2020
Amended Project List
2021 2022
Department Project Cost Priority Department Project Cost Priority
Admin/IS IS Projects 0.25 III Admin/IS IS Projects 0.25 III
Facilities UWWC 0.150 II Facilities UWWC 0.150 II
Roof Replacement 0.300 II YTC Furnance & A/C 0.050 II
Projects TBD 0.25 II
Fair Park Asphalt 0.050 II Fair Park Asphalt 0.020 II
HVAC Rooftop 0.09 II Roof Replacement 0.140 II
Highway CTH G 2.765 II Highway CTH G Bridge 0.480 II
CTH G Bridge 0.040 II CTH Q 0.465 II
CTH U 0.660 II
CTH F 0.775 II
CTH M 0.625 II
Parks Countywide Bike 0.250 II Parks Countywide Bike 0.250 II
Equip Repl 0.110 I Equip Repl 0.075 I
Fin Sustain Proj 0.000 III Fin Sustain Proj 0.000 III
WCSD ERP 0.369 I WCSD ERP 0.385 I
Radio System 0.500 I Radio System 0.500 I
Jail Addition 0.000 II Jail Addition 0.000 II
Economic Development2.138 Economic Development 1.137
TOTAL 7.012 TOTAL 6.212
Capital Improvement Program
Washington County, Wisconsin
PROJECTS BY YEAR
2018 2022thru
Project Name Department Project # Priority Project Cost
2018
ADM-17-001Countywide Audiovisual Equipment Upgrades 1 600,000Administration
CVB-18-001Convention & Visitors Bureau Yearly Support 3 45,000Economic Development
EDWC-18-001Revolving Loan Funds n/a 2,000,000Economic Development
EDWC-18-002Revolving Loans Administration n/a 96,000Economic Development
FAC-18-001PAC Boiler Replacements 2 150,000Facilities
FAC-18-003PAC UPS Replacement 2 110,000Facilities
FAC-18-004Exterior Tuckpointing 2 100,000Facilities
FAC-18-010UWWC Parking Lot Maintenance 2 60,000Facilities
FAC-20-005Schmidt Road Closure 2 250,000Facilities
FAC-18-002Fair Park - Ashphalt Maintenance 2 50,000Facilities - Fair Park
FAC-18-006Fair Park Exterior Caulking 2 50,000Facilities - Fair Park
FAC-20-004Fair Park Electronic Sign Replacement 2 175,000Facilities - Fair Park
HWY-18-001P from STH 60 North 2 1,700,000Highway Department
HWY-18-002NN/Z from CTH NN Easterly 2 1,425,000Highway Department
HWY-18-003MY from CTH M East 2 225,000Highway Department
HWY-18-004M from Park Manor North 2 120,000Highway Department
IS-18-001Migration off AS400 Technology 1 450,000Information Services
PPD-18-001Energy Audit 2 75,000Parks & Planning Department
PPD-18-002Equipment Replacement - Parks 1 125,000Parks & Planning Department
PPD-20-001Countywide Bike/ trail plan implementation 2 175,000Parks & Planning Department
SD-17-003Equipment Replacement Program 1 368,784Sheriff's Department
8,349,784Total for 2018
2019
ADM-17-001Countywide Audiovisual Equipment Upgrades 1 0Administration
CVB-18-001Convention & Visitors Bureau Yearly Support 3 45,000Economic Development
EDWC-18-001Revolving Loan Funds n/a 2,000,000Economic Development
EDWC-18-002Revolving Loans Administration n/a 95,000Economic Development
FAC-18-010UWWC Parking Lot Maintenance 2 60,000Facilities
FAC-19-002County Parking Lot Maintenance 2 80,000Facilities
FAC-19-003Courthouse Roof Replacement 2 85,000Facilities
FAC-19-006Security System Upgrade 1 90,000Facilities
FAC-20-005Schmidt Road Closure 2 95,000Facilities
FAC-18-002Fair Park - Ashphalt Maintenance 2 20,000Facilities - Fair Park
FAC-19-005Fair Park HVAC Roof Top Unit Replacement 2 80,000Facilities - Fair Park
HWY-17-005M Bridge over Milwaukee River 2 450,000Highway Department
HWY-18-005W from STH 175 North 2 745,000Highway Department
HWY-19-001G Bridge over Cedar Creek 2 35,000Highway Department
HWY-19-004P from STH 145 North 2 100,000Highway Department
HWY-20-005Y from STH 175 North 2 100,000Highway Department
Hwy-20-007CTH K STH 83 East 2.6 miles to Addison Rd 2 0Highway Department
IS-18-001Migration off AS400 Technology 1 450,000Information Services
PPD-18-002Equipment Replacement - Parks 1 80,000Parks & Planning Department
PPD-20-001Countywide Bike/ trail plan implementation 2 250,000Parks & Planning Department
Thursday, September 28, 2017Page 1Washington County Capital Improvement Program
Project Name Department Project # Priority Project Cost
SAM-19-001Samaritan Chillar Replacement 2 300,000Samaritan
SD-17-002Radio System 1 300,000Sheriff's Department
SD-17-003Equipment Replacement Program 1 350,271Sheriff's Department
5,810,271Total for 2019
2020
ADM-19-003Website Redesign - Countywide 3 100,000Administration
CVB-18-001Convention & Visitors Bureau Yearly Support 3 45,000Economic Development
EDWC-18-001Revolving Loan Funds n/a 2,000,000Economic Development
EDWC-18-002Revolving Loans Administration n/a 94,000Economic Development
FAC-20-001UWWC Roof Replace Area H 2 95,000Facilities
FAC-20-002History Center Boiler 2 175,000Facilities
FAC-19-005Fair Park HVAC Roof Top Unit Replacement 2 90,000Facilities - Fair Park
FAC-20-003Fair Park Boiler Replacement 2 50,000Facilities - Fair Park
HWY-17-004D from Nenno Rd East 2 750,000Highway Department
HWY-20-001WW from STH 33 North 2 810,000Highway Department
HWY-20-002K from Monroe Ave North 2 235,000Highway Department
HWY-20-003AE from CTH K East 2 1,170,000Highway Department
HWY-20-004C from CTH Z East 2 590,000Highway Department
Hwy-20-007CTH K STH 83 East 2.6 miles to Addison Rd 2 5,000,000Highway Department
IS-20-001IS Infrastructure Projects 2 150,000Information Services
PPD-18-002Equipment Replacement - Parks 1 70,000Parks & Planning Department
PPD-20-001Countywide Bike/ trail plan implementation 2 250,000Parks & Planning Department
SD-17-002Radio System 1 500,000Sheriff's Department
SD-17-003Equipment Replacement Program 1 364,941Sheriff's Department
12,538,941Total for 2020
2021
CVB-18-001Convention & Visitors Bureau Yearly Support 3 45,000Economic Development
EDWC-18-001Revolving Loan Funds n/a 2,000,000Economic Development
EDWC-18-002Revolving Loans Administration n/a 93,000Economic Development
FAC-21-001UWWC Chiller Replacement 2 150,000Facilities
FAC-21-002PAC Roof Replacement 2 300,000Facilities
FAC-18-002Fair Park - Ashphalt Maintenance 2 50,000Facilities - Fair Park
FAC-19-005Fair Park HVAC Roof Top Unit Replacement 2 90,000Facilities - Fair Park
HWY-21-002G from STH 145 North 2 2,765,000Highway Department
HWY-21-003G Bridge over Evergreen Creek 2 40,000Highway Department
IS-20-001IS Infrastructure Projects 2 250,000Information Services
PPD-18-002Equipment Replacement - Parks 1 110,000Parks & Planning Department
PPD-20-001Countywide Bike/ trail plan implementation 2 250,000Parks & Planning Department
SD-17-002Radio System 1 500,000Sheriff's Department
SD-17-003Equipment Replacement Program 1 369,464Sheriff's Department
7,012,464Total for 2021
2022
CVB-18-001Convention & Visitors Bureau Yearly Support 3 45,000Economic Development
EDWC-18-001Revolving Loan Funds n/a 1,000,000Economic Development
EDWC-18-002Revolving Loans Administration n/a 92,000Economic Development
FAC-22-001UWWC Boiler Replacement 2 150,000Facilities
FAC-22-002YTC Furnace and Air Conditioner Replacement 2 50,000Facilities
FAC-22-003Facilities Projects 2 250,000Facilities
FAC-18-002Fair Park - Ashphalt Maintenance 2 20,000Facilities - Fair Park
FAC-22-004Fair Park Roof Replacement 2 140,000Facilities - Fair Park
HWY-19-001G Bridge over Cedar Creek 2 480,000Highway Department
Thursday, September 28, 2017Page 2Washington County Capital Improvement Program
Project Name Department Project # Priority Project Cost
HWY-19-002Q from STH 83 East 2 465,000Highway Department
HWY-20-006U from Saddle Dr North 2 660,000Highway Department
HWY-21-001F from STH 145 East 2 775,000Highway Department
HWY-22-001CTH M (from CTH F to Pioneer Rd.) 2 625,000Highway Department
IS-20-001IS Infrastructure Projects 2 250,000Information Services
PPD-18-002Equipment Replacement - Parks 1 75,000Parks & Planning Department
PPD-20-001Countywide Bike/ trail plan implementation 2 250,000Parks & Planning Department
SD-17-002Radio System 1 500,000Sheriff's Department
SD-17-003Equipment Replacement Program 1 385,195Sheriff's Department
6,212,195Total for 2022
GRAND TOTAL 39,923,655
Thursday, September 28, 2017Page 3Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This project includes adding audiovisual equipment to two Commissioner hearing rooms, upgrading the audio/video equipment in 4 courtrooms,
adding two stationary units in the commissioner courtrooms, upgrading the county board room audiovisual equipment and voting system, and
other miscellaneous equipment upgrades throughout the County.
Project # ADM-17-001
Priority 1 High
Justification
The analog audio/video equipment in all of the courtrooms will be 10 years old in 2016. With the age of the equipment and knowing the
technology has moved away from analog to digital, it is time to review and replace the aging equipment before it can no longer be fixed as the
courts are dependant on the equipment.
The commissioner courtrooms were equipped with a mobile unit that is to be shared. It is extremely difficult to set-up and move to the other
commissioner's courtroom. For maximum use of the equipment, stationary equipment is necessary.
The County Board room computer fails intermittently and we cannot purchase a new computer as the technology for the large voting board
requires two communication cards and new computers only contain one.
Useful Life 10 years
Project Name Countywide Audiovisual Equipment Upgrades
Category Equipment: Miscellaneous
Type Equipment
Contact Administration
Department Administration
Total Project Cost: $950,000
Rep. Committee: Public Safety, Executive
Result Area: Well-Governed County
Total2018 2019 2020 2021 2022Expenditures
600,000600,000 0Equip/Vehicles/Furnishings
600,000 0 600,000Total
Total2018 2019 2020 2021 2022Funding Sources
600,000600,000 0Sales Tax
600,000 0 600,000Total
Thursday, September 28, 2017Page 1Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This project seeks to create a new, unique website for Washington County that meets the needs of changing technologies (including mobility) and
includes additional functionality for residents of Washington County. This may include but is not limited to alert centers, archives, bids,
calendars, facilitating and standardizing ePayment, FAQs, online forms, social media integration including video, opendata concepts, citizen
request modules and facilitating administration for County Departments.
Project # ADM-19-003
Priority 3 Low
Justification
Result: Well-Governed and Administered County (Provides responsive and accessible leadershipo and facilitates timely and effective
communication. Protects, maintains, manages, and invests in technology resources. Fosters fiscal responsibility, sustainable services, operational
excellence, trust and transparency by ensuring accountability, integrity, efficiency and innovation)
Useful Life
Project Name Website Redesign - Countywide
Category Other
Type Improvement
Contact Administration
Department Administration
Total Project Cost: $100,000
Rep. Committee: Executive
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
100,000100,000Planning/Design
100,000 100,000Total
Total2018 2019 2020 2021 2022Funding Sources
100,000100,000Sales Tax
100,000 100,000Total
Thursday, September 28, 2017Page 2Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
Project # CVB-18-001
Priority 3 Low
Justification
Useful Life
Project Name Convention & Visitors Bureau Yearly Support
Category Other
Type Improvement
Contact CVB
Department Economic Development
Total Project Cost: $225,000
Rep. Committee: Executive
Result Area: Economic Growth and Vitality
Total2018 2019 2020 2021 2022Expenditures
225,00045,000 45,000 45,000 45,000 45,000Other
45,000 45,000 45,000 45,000 45,000 225,000Total
Total2018 2019 2020 2021 2022Funding Sources
225,00045,000 45,000 45,000 45,000 45,000Sales Tax
45,000 45,000 45,000 45,000 45,000 225,000Total
Thursday, September 28, 2017Page 3Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
Project # EDWC-18-001
Priority n/a
Justification
Useful Life
Project Name Revolving Loan Funds
Category Row, Utilities, and Constructio
Type Unassigned
Contact
Department Economic Development
Total Project Cost: $9,000,000
Rep. Committee: Executive
Result Area: Economic Growth and Vitality
Total2018 2019 2020 2021 2022Expenditures
9,000,0002,000,000 2,000,000 2,000,000 2,000,000 1,000,000Other
2,000,000 2,000,000 2,000,000 2,000,000 1,000,000 9,000,000Total
Total2018 2019 2020 2021 2022Funding Sources
9,000,0002,000,000 2,000,000 2,000,000 2,000,000 1,000,000Sales Tax
2,000,000 2,000,000 2,000,000 2,000,000 1,000,000 9,000,000Total
Thursday, September 28, 2017Page 4Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
Project # EDWC-18-002
Priority n/a
Justification
Useful Life
Project Name Revolving Loans Administration
Category Row, Utilities, and Constructio
Type Unassigned
Contact
Department Economic Development
Total Project Cost: $740,000
Rep. Committee: Executive
Result Area: Economic Growth and Vitality
Total2018 2019 2020 2021 2022Expenditures
470,00096,000 95,000 94,000 93,000 92,000Other
96,000 95,000 94,000 93,000 92,000 470,000Total
Total2018 2019 2020 2021 2022Funding Sources
470,00096,000 95,000 94,000 93,000 92,000Sales Tax
96,000 95,000 94,000 93,000 92,000 470,000Total
Thursday, September 28, 2017Page 5Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This project includes the replacement of boilers at the Public Agency Center.
Project # FAC-18-001
Priority 2 Medium
Justification
The existing boilers have limited parts available for repair. There are currently seven boilers of which 5 of them will be 27 years old by the year
2018. These 7 boilers will be replaced with 2 boilers in order to reduce ongoing maintenance costs. The two boilers will allow for excellent
capacity control and will maintain complete redundancy of the heating system.
Useful Life 25 years
Project Name PAC Boiler Replacements
Category Buildings
Type Equipment
Contact Parks and Planning
Department Facilities
Total Project Cost: $150,000
Rep. Committee: Administrative
Result Area: Safe and Secure Community
Total2018 2019 2020 2021 2022Expenditures
150,000150,000Equip/Vehicles/Furnishings
150,000 150,000Total
Total2018 2019 2020 2021 2022Funding Sources
150,000150,000 0Sales Tax
150,000 0 150,000Total
Thursday, September 28, 2017Page 6Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This Uninterruptable Power Supply replacement is necessary due to the age and criticality of the unit. This unit is a backup power system for all
computer servers that operate the various systems that each department uses.
Project # FAC-18-003
Priority 2 Medium
Justification
This unit was installed in 1991 and is well beyond it’s useful age.
Useful Life 25 years
Project Name PAC UPS Replacement
Category Buildings
Type Equipment
Contact Parks and Planning
Department Facilities
Total Project Cost: $110,000
Rep. Committee: Administrative
Result Area: Safe and Secure Community
Total2018 2019 2020 2021 2022Expenditures
110,000110,000Equip/Vehicles/Furnishings
110,000 110,000Total
Total2018 2019 2020 2021 2022Funding Sources
110,000110,000Sales Tax
110,000 110,000Total
Thursday, September 28, 2017Page 7Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
Masonry is typically the most susceptible to cracking of any exterior wall systems because of the sheer number of components bound by mortar.
When cracks appear, a procedure called tuck-pointing is necessary. Tuck-pointing involves removing all loose unstable mortar and reapplying new
mortar to all of the joints. Many exterior components such as windows and doors are placed with caulk joints that fail over time due to the
changing climates and UV degradation.
Buildings include: Courthouse, Sheriff's Dept., PAC, Lover Lane Tower, Vehicle Maintenance, Jefferson Tower
Project # FAC-18-004
Priority 2 Medium
Justification
The county buildings will be inspected by Facilities staff; Areas in need of repair will be identified and inventoried followed by development of a
specification for competitive bidding. The buildings exteriors are monitored for any critical conditions annually but generally a 5-7 year schedule
has been the normal intervals for this type of work.
Useful Life 25 years
Project Name Exterior Tuckpointing
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities
Total Project Cost: $100,000
Rep. Committee: Administrative
Result Area: Reliable Infrastructure
Total2018 2019 2020 2021 2022Expenditures
100,000100,000Construction/Maintenance
100,000 100,000Total
Total2018 2019 2020 2021 2022Funding Sources
100,000100,000Sales Tax
100,000 100,000Total
Thursday, September 28, 2017Page 8Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
The University has approximately 233,253 square feet of asphalt. This will include repairing areas of asphalt that are spider cracked and may
require over excavation to ensure that new asphalt has a solid base course to prevent movement and future cracking.
Replacement of the Theater Parking Lot (2) is necessary due to the deteriorated asphalt and moving base material in this parking lot. There are
many spider cracks throughout this area which indicated that the base material is moving due to freeze and thaw conditions throughout the year.
Project # FAC-18-010
Priority 2 Medium
Justification
Once the base material begins moving beneath the asphalt the only permanent solution is to mill the asphalt, remove and/or add base material and
repave the area.
Useful Life 25 years
Project Name UWWC Parking Lot Maintenance
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities
Total Project Cost: $120,000
Rep. Committee: Administrative
Result Area: Reliable Infrastructure
Total2018 2019 2020 2021 2022Expenditures
120,00060,000 60,000Construction/Maintenance
60,000 60,000 120,000Total
Total2018 2019 2020 2021 2022Funding Sources
120,00060,000 60,000Sales Tax
60,000 60,000 120,000Total
Thursday, September 28, 2017Page 9Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
A 3 year maintenance schedule of crack filling, seal coating and striping of the asphalt parking lots is expected to continue. Spot repairs may be
made if areas are determined to be critical during the interim.
Lots include: Courthouse, PAC, Old Courthouse Square, Jefferson Tower.
Project # FAC-19-002
Priority 2 Medium
Justification
A comprehensive maintenance plan for the asphalt will assure that the maximum life is being realized. Replacement of specific localized areas will
be done at this time as well.
Useful Life 25 years
Project Name County Parking Lot Maintenance
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities
Total Project Cost: $80,000
Rep. Committee: Administrative
Result Area: Safe and Secure Community
Total2018 2019 2020 2021 2022Expenditures
80,00080,000Construction/Maintenance
80,000 80,000Total
Total2018 2019 2020 2021 2022Funding Sources
80,00080,000Sales Tax
80,000 80,000Total
Thursday, September 28, 2017Page 10Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This section of roof is the last of the original roof areas remaining on the Courthouse. This section of roof is located on the 1986 addition and lies
over the current Child Support department. The 5,450 sq. ft. section of roof is currently a ballasted rubber membrane roof.
Project # FAC-19-003
Priority 2 Medium
Justification
The roof should be included in a replacement plan due to its age and signs of membrane failure.
Useful Life 25 years
Project Name Courthouse Roof Replacement
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities
Total Project Cost: $85,000
Rep. Committee: Administrative
Result Area: Safe and Secure Community
Total2018 2019 2020 2021 2022Expenditures
85,00085,000Construction/Maintenance
85,000 85,000Total
Total2018 2019 2020 2021 2022Funding Sources
85,00085,000Sales Tax
85,000 85,000Total
Thursday, September 28, 2017Page 11Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
All card readers and automatic door locks are controlled through the JCI P2000 computer system. The software that operates this system hasn't
been upgraded due to the need to replace several control panels in the courthouse. We are unable to upgrade the software until the panels are
replaced.
Project # FAC-19-006
Priority 1 High
Justification
There are a total of 7 control panels that need to be updated in order to complete this upgrade.
Useful Life
Project Name Security System Upgrade
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities
Total Project Cost: $90,000
Rep. Committee: Administrative
Result Area: Safe and Secure Community
Total2018 2019 2020 2021 2022Expenditures
90,00090,000Equip/Vehicles/Furnishings
90,000 90,000Total
Total2018 2019 2020 2021 2022Funding Sources
90,00090,000Sales Tax
90,000 90,000Total
Thursday, September 28, 2017Page 12Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This area consists of approximately 13,200 sq. ft. A roofing consultant/engineering firm may be retained as part of this budget to provide the
engineering, specifications and project management. This section was put out for bids as part of the 2015 roofing project and it was determined at
that time that the life of this roof could be extended for a few more years.
Project # FAC-20-001
Priority 2 Medium
Justification
Replacement is necessary due to the deteriorated membrane, deteriorated paver ballasts and numerous seams, flashing and coping failures.
Useful Life 25 years
Project Name UWWC Roof Replace Area H
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities
Total Project Cost: $95,000
Rep. Committee: Administrative
Result Area: Reliable Infrastructure
Total2018 2019 2020 2021 2022Expenditures
95,00095,000Construction/Maintenance
95,000 95,000Total
Total2018 2019 2020 2021 2022Funding Sources
95,00095,000Sales Tax
95,000 95,000Total
Thursday, September 28, 2017Page 13Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This project would entail some engineering study to determine if the county can eliminate the steam boilers and convert that system to hot water.
Hot water systems are more efficient and require less maintenance thus reducing life cycle costs.
Project # FAC-20-002
Priority 2 Medium
Justification
The existing steam boilers were installed in 1993 and are nearing the end of their useful life. This building contains both hot water boilers and
steam boilers for heat and humidity control.
Useful Life 25 years
Project Name History Center Boiler
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities
Total Project Cost: $175,000
Rep. Committee: Administrative
Result Area: Reliable Infrastructure
Total2018 2019 2020 2021 2022Expenditures
175,000175,000Equip/Vehicles/Furnishings
175,000 175,000Total
Total2018 2019 2020 2021 2022Funding Sources
175,000175,000Sales Tax
175,000 175,000Total
Thursday, September 28, 2017Page 14Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This project will close Schmidt Road per the 2016 agreement with the City of West Bend. Schmidt Road will be closed at Highway 33 to through
traffic going north on Schmidt Road and will be closed to south bound traffic at the entrance to the courthouse parking lot as shown in the
attached drawing. Sidewalk and curb will be installed directing traffic in and out of the courthouse lot and along Highway 33 as needed to
facilitate pedestrian traffic.
Project # FAC-20-005
Priority 2 Medium
Justification
Schmidt Road will close per the 2016 agreement with the City of West Bend.
Useful Life
Project Name Schmidt Road Closure
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities
Total Project Cost: $345,000
Rep. Committee: Administrative
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
345,000250,000 95,000Other
250,000 95,000 345,000Total
Total2018 2019 2020 2021 2022Funding Sources
250,000250,000Fund Balance - Designated
95,00095,000Sales Tax
250,000 95,000 345,000Total
Thursday, September 28, 2017Page 15Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This is one of two chillers that handle the UWWC Campus cooling needs. This unit was installed in 1998 and will be 23 years old at the time of
replacement.
Project # FAC-21-001
Priority 2 Medium
Justification
The standard life expectancy of a chiller is approximately 20 years. New units are much more efficient and thus reduce operating and maintenance
costs.
Useful Life 25 years
Project Name UWWC Chiller Replacement
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities
Total Project Cost: $150,000
Rep. Committee: Administrative
Result Area: Well-Governed County
Total2018 2019 2020 2021 2022Expenditures
150,000150,000Equip/Vehicles/Furnishings
150,000 150,000Total
Total2018 2019 2020 2021 2022Funding Sources
150,000150,000Sales Tax
150,000 150,000Total
Thursday, September 28, 2017Page 16Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This area consists of approximately 28,000 sq. ft. The new roofing system will be specified to be a 4 ply built-up type roof. A roofing
consultant/engineering firm would be retained as part of this budget to provide the engineering, specifications and project management.
Project # FAC-21-002
Priority 2 Medium
Justification
Replacement is necessary due to the deteriorated and stretching membrane, and increasing number seams, flashing and coping failures.
Useful Life 25 years
Project Name PAC Roof Replacement
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities
Total Project Cost: $300,000
Rep. Committee: Administrative
Result Area: Safe and Secure Community
Total2018 2019 2020 2021 2022Expenditures
300,000300,000Construction/Maintenance
300,000 300,000Total
Total2018 2019 2020 2021 2022Funding Sources
300,000300,000Sales Tax
300,000 300,000Total
Thursday, September 28, 2017Page 17Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
The existing boilers have limited parts available for repair. There are currently two boilers which will be 29 years old at the time of replacement.
This project includes only one boiler, the second boiler will be slated for 2023.
Project # FAC-22-001
Priority 2 Medium
Justification
A study will be done to determine and ensure that the most efficient and economical replacement is specified prior to going out for bids.
Useful Life
Project Name UWWC Boiler Replacement
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities
Total Project Cost: $150,000
Rep. Committee: Administrative
Result Area: Safe and Secure Community
Total2018 2019 2020 2021 2022Expenditures
150,000150,000Equip/Vehicles/Furnishings
150,000 150,000Total
Total2018 2019 2020 2021 2022Funding Sources
150,000150,000Sales Tax
150,000 150,000Total
Thursday, September 28, 2017Page 18Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
The Youth Treatment Center contains seven Furnaces and Air Conditioning units to condition the air for the residents and staff. The furnaces and
air conditioners will be replaced at the same time.
Project # FAC-22-002
Priority 2 Medium
Justification
All 7 units were installed new in 1996, making them 26 years of age at time of replacement. The average life expenctancy of a furnace and/or air
conditioning unit is 25 years.
Useful Life
Project Name YTC Furnace and Air Conditioner Replacement
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities
Total Project Cost: $50,000
Rep. Committee: Administrative
Result Area: Safe and Secure Community
Total2018 2019 2020 2021 2022Expenditures
50,00050,000Equip/Vehicles/Furnishings
50,000 50,000Total
Total2018 2019 2020 2021 2022Funding Sources
50,00050,000Sales Tax
50,000 50,000Total
Thursday, September 28, 2017Page 19Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
Project # FAC-22-003
Priority 2 Medium
Justification
Useful Life
Project Name Facilities Projects
Category Buildings
Type Unassigned
Contact
Department Facilities
Total Project Cost: $250,000
Rep. Committee:
Result Area:
Total2018 2019 2020 2021 2022Expenditures
250,000250,000Other
250,000 250,000Total
Total2018 2019 2020 2021 2022Funding Sources
250,000250,000Sales Tax
250,000 250,000Total
Thursday, September 28, 2017Page 20Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This asphalt maintenance project includes crack filling, seal coating and re-striping of the parking lots and drives outside of the fence and inside
the fenced grounds. This maintenance is scheduled on a three year cycle. This schedule is based on years of monitoring parking lot conditions
each spring. The area outside the fence has approximately 442,265 square feet of asphalt. The area inside the fence has about 155,910 square feet
of asphalt. The project budget is calculated at .08/sq.ft. based on previous years plus 6% inflation.
Project # FAC-18-002
Priority 2 Medium
Justification
Water is the most destructive element to our pavements. Filling or sealing pavement cracks to prevent water from entering the base and sub base
will extend the pavement life by three to five years. Filling cracks and joints with asphalt materials (such as AC 20 or asphalt emulsions) are
intended to keep most of the water out of the pavement. When water is kept out, pavement deterioration is slowed. Unsealed pavement allows
water to penetrate in and through it. This leads to base erosion, freeze-thaw damage and ultimately pavement failure. Seal coating provides a
protective barrier to stop water penetration, and lastly, the upkeep of legible parking stall stripes, ADA markings; arrows etc. benefit the user’s
safety.
Useful Life 25 years
Project Name Fair Park - Ashphalt Maintenance
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities - Fair Park
Total Project Cost: $140,000
Rep. Committee: Administrative
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
140,00050,000 20,000 50,000 20,000Construction/Maintenance
50,000 20,000 50,000 20,000 140,000Total
Total2018 2019 2020 2021 2022Funding Sources
140,00050,000 20,000 50,000 20,000Sales Tax
50,000 20,000 50,000 20,000 140,000Total
Thursday, September 28, 2017Page 21Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
Many exterior components such as windows and doors are placed with caulk joints that fail over time due to the changing climates and UV
degradation. The re-caulking of the large expansion joints in the tip-up wall panels is included with this work.
This project would also include the refurbishing of the gutters located on the Pavilion. The gutters are leaking in several areas and the brackets
holding the gutters in place need to be replaced.
Project # FAC-18-006
Priority 2 Medium
Justification
The areas identified will be inspected by Facilities staff; areas in need of repair will be identified and inventoried followed by development of a
specification for competitive bidding. The buildings exteriors are monitored for any critical conditions annually and spot repairs may be made at
that time, but generally a 5-7 year schedule has been the normal intervals for this type of work.
Useful Life 25 years
Project Name Fair Park Exterior Caulking
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities - Fair Park
Total Project Cost: $50,000
Rep. Committee: Administrative
Result Area: Well-Governed County
Total2018 2019 2020 2021 2022Expenditures
50,00050,000Construction/Maintenance
50,000 50,000Total
Total2018 2019 2020 2021 2022Funding Sources
50,00050,000Sales Tax
50,000 50,000Total
Thursday, September 28, 2017Page 22Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
The existing Roof Top Units are experiencing an increase in repairs as expected due to age. The estimated cost of one roof top unit is $20,000 to
$30,000 depending on the size. 9 total units will be replaced over a 3 year period between 2019-2021.
Project # FAC-19-005
Priority 2 Medium
Justification
There are currently nine roof top units that will be 20 years old by the year 2019.
Useful Life 25 years
Project Name Fair Park HVAC Roof Top Unit Replacement
Category Equipment: Miscellaneous
Type Maintenance
Contact Parks and Planning
Department Facilities - Fair Park
Total Project Cost: $260,000
Rep. Committee: Administrative
Result Area: Reliable Infrastructure
Total2018 2019 2020 2021 2022Expenditures
260,00080,000 90,000 90,000Equip/Vehicles/Furnishings
80,000 90,000 90,000 260,000Total
Total2018 2019 2020 2021 2022Funding Sources
260,00080,000 90,000 90,000Sales Tax
80,000 90,000 90,000 260,000Total
Thursday, September 28, 2017Page 23Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
The existing boiler was installed when the building was constructed in 1999 and will be 21 years old at the time of replacement. This boiler
supplies heat to the Pavilion Building.
Project # FAC-20-003
Priority 2 Medium
Justification
The existing boiler was installed when the building was constructed in 1999 and will be 21 years old at the time of replacement. This boiler
supplies heat to the Pavilion Building.
Useful Life 25 years
Project Name Fair Park Boiler Replacement
Category Buildings
Type Maintenance
Contact Parks and Planning
Department Facilities - Fair Park
Total Project Cost: $50,000
Rep. Committee: Administrative
Result Area: Well-Governed County
Total2018 2019 2020 2021 2022Expenditures
50,00050,000Equip/Vehicles/Furnishings
50,000 50,000Total
Total2018 2019 2020 2021 2022Funding Sources
50,00050,000Sales Tax
50,000 50,000Total
Thursday, September 28, 2017Page 24Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
The existing signs were installed in 2005 and have a 10 - 15 year life span. This sign will be at the end of its useful life at this time. A new LED
sign will require less maintenance and be more visible from the highway thus increasing attendance at Fair Park events.
Project # FAC-20-004
Priority 2 Medium
Justification
The existing signs were installed in 2005 and have a 10 – 15 year life span. This sign will be at the end of its useful life at this time. A new LED
sign will require less maintenance and be more visible from the highway thus increasing attendance at Fair Park events.
Useful Life 25 years
Project Name Fair Park Electronic Sign Replacement
Category Equipment: Miscellaneous
Type Maintenance
Contact Parks and Planning
Department Facilities - Fair Park
Total Project Cost: $175,000
Rep. Committee: Administrative
Result Area: Well-Governed County
Total2018 2019 2020 2021 2022Expenditures
175,000175,000Equip/Vehicles/Furnishings
175,000 175,000Total
Total2018 2019 2020 2021 2022Funding Sources
175,000175,000Sales Tax
175,000 175,000Total
Thursday, September 28, 2017Page 25Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
The existing Roof Top Units are experiencing an increase in repairs as expected due to age. The estimated cost of one roof top unit is $20,000 to
$30,000 depending on the size. 9 total units will be replaced over a 3 year period between 2019-2021.
Project # FAC-22-004
Priority 2 Medium
Justification
There are currently nine roof top units that will be 20 years old by the year 2019.
Useful Life 25 years
Project Name Fair Park Roof Replacement
Category Equipment: Miscellaneous
Type Maintenance
Contact Parks and Planning
Department Facilities - Fair Park
Total Project Cost: $140,000
Rep. Committee: Administrative
Result Area: Reliable Infrastructure
Total2018 2019 2020 2021 2022Expenditures
140,000140,000Construction/Maintenance
140,000 140,000Total
Total2018 2019 2020 2021 2022Funding Sources
140,000140,000Sales Tax
140,000 140,000Total
Thursday, September 28, 2017Page 26Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
D from Nenno Rd Easterly 0.7 miles to Railroad Tracks
Project # HWY-17-004
Priority 2 Medium
Justification
The Washington County Highway Department maintains a Six-Year Highway Improvement Plan to fund the reconstruction and rehabilitation of
county highways and county bridges.
The funding level of $3,000,000 provided from the Washington County Sales Tax maintains the current level of service provided by the
Washington County Highway Department.
With 182 miles of centerline county highways, 9.1 miles must be repaved or reconstructed each year to maintain the estimated 20-year lifecycle of
our highway system. The current Six-Year Highway Improvement Plan averages 7.18 miles each year through 2022.
Useful Life 10 years
Project Name D from Nenno Rd East
Category Design & Construction
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $850,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
750,000750,000Construction/Maintenance
750,000 750,000Total
Total2018 2019 2020 2021 2022Funding Sources
262,153262,153County Road & Bridges Fund Sales Taxes
487,847487,847Local Road Improvement Program
750,000 750,000Total
Thursday, September 28, 2017Page 27Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
M Bridge over Milwaukee River
Project # HWY-17-005
Priority 2 Medium
Justification
The Washington County Highway Department maintains a Six-Year Highway Improvement Plan to fund the reconstruction and rehabilitation of
county highways and county bridges.
The funding level of $3,000,000 provided from the Washington County Sales Tax maintains the current level of service provided by the
Washington County Highway Department.
With 182 miles of centerline county highways, 9.1 miles must be repaved or reconstructed each year to maintain the estimated 20-year lifecycle of
our highway system. The current Six-Year Highway Improvement Plan averages 7.18 miles each year through 2022.
Useful Life 10 years
Project Name M Bridge over Milwaukee River
Category Bridges
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $500,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
450,000450,000Construction/Maintenance
450,000 450,000Total
Total2018 2019 2020 2021 2022Funding Sources
450,000450,000County Road & Bridges Fund Sales Taxes
450,000 450,000Total
Thursday, September 28, 2017Page 28Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 1.2-mile segment of CTH P is scheduled to be reconstructed in 2018. This portion of CTH P is also known as "Old Highway 45" and has a
deteriorating concrete road bed.
Project # HWY-18-001
Priority 2 Medium
Justification
This segment of CTH P was last paved in 1986 and had a PASER rating of 3-4 in 2015. Average annual daily traffic (AADT) has increased
consistantly in recent years with 4,000 in 2007, 4,100 in 2010, and 4,300 in 2013. AADT has likely increased since 2013 due to additional
residential and industrial development occurring in the area since 2013. This segment serves as a link between the USH 45/STH 60 interchange
and the Jackson Northwest Business Park. There is also a newly constructed park and ride on this stretch owned by the Wisconsin Department of
Transportation as well as a property owned by the Wisconsin Department of Natural Resources offering public access to Hasmer Lake.
Useful Life 20 years
Project Name P from STH 60 North
Category Mill & Overlay
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $1,700,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
1,700,0001,700,000Construction/Maintenance
1,700,000 1,700,000Total
Total2018 2019 2020 2021 2022Funding Sources
1,212,1531,212,153County Road & Bridges Fund Sales Taxes
487,847487,847Local Road Improvement Program
1,700,000 1,700,000Total
Thursday, September 28, 2017Page 29Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 1.6-mile segment of CTH NN/Z is scheduled to be reconstructed in 2018. This project involves unique challenges as it wraps around the
eastern and northern shores of Little Cedar Lake and through residential areas along the lake shore with very narrow right-of-way areas.
Project # HWY-18-002
Priority 2 Medium
Justification
This segment of CTH NN/Z was last paved in 1997 and had a PASER rating of 4 in 2015. Average annual daily traffic (AADT) was 1,200 in
2010 and 1,400 in 2016 (preliminary). This project will address many hazardous and problematic issues. Examples of such issues include
inadequate guard rail protecting homes from errant vehicles traveling along the lakeshore merely feet from building structures, poorly designed
intersections and turning movements, and many water drainage problems. There have even been reports of water draining/flowing under the
roadway and building structures toward Little Cedar Lake.
Useful Life 20 years
Project Name NN/Z from CTH NN Easterly
Category Bridges
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $1,425,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
1,425,0001,425,000Construction/Maintenance
1,425,000 1,425,000Total
Total2018 2019 2020 2021 2022Funding Sources
1,425,0001,425,000County Road & Bridges Fund Sales Taxes
1,425,000 1,425,000Total
Thursday, September 28, 2017Page 30Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 1.2-mile segment of CTH MY is scheduled to receive a mill and overlay in 2018. From west to east, this segment includes a rural stretch of
roadway that transitions into an area with sewer and water utilities and crosses the Milwaukee River. The majority of this project will occur within
the Village of Newburg with travel lanes being improved only.
Project # HWY-18-003
Priority 2 Medium
Justification
Most of CTH MY was last paved in the late 1960s and early 1970s and had a PASER rating as low as 3 in 2015. Average annual daily traffic
(AADT) was 1,400 in 2010. This project will address significant asphalt deterioration that is severe in many locations.
Useful Life 20 years
Project Name MY from CTH M East
Category Design & Construction
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $225,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
225,000225,000Construction/Maintenance
225,000 225,000Total
Total2018 2019 2020 2021 2022Funding Sources
225,000225,000County Road & Bridges Fund Sales Taxes
225,000 225,000Total
Thursday, September 28, 2017Page 31Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
STH 60 to 0.5 miles north (to previous curve project.
Project # HWY-18-004
Priority 2 Medium
Justification
Segment was not paved as part of curve or bridge project. Pavement is narrow and we will look to widen the road utilizing County crews.
Useful Life 20 years
Project Name M from Park Manor North
Category Design & Construction
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $120,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
120,000120,000Construction/Maintenance
120,000 120,000Total
Total2018 2019 2020 2021 2022Funding Sources
120,000120,000County Road & Bridges Fund Sales Taxes
120,000 120,000Total
Thursday, September 28, 2017Page 32Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 3-mile segment of CTH W is scheduled to be pulverized and repaved in 2018. From north to south, this segment includes an area with sewer
and water utilities in Allenton and transitions into a straight rural stretch with a large hill and valley.
Project # HWY-18-005
Priority 2 Medium
Justification
This segment of CTH W was last paved in 1977 and had a PASER rating of 4 in 2015. Average annual daily traffic (AADT) was 1,700 in 2010.
Useful Life 10 years
Project Name W from STH 175 North
Category Design & Construction
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $745,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
745,000745,000Construction/Maintenance
745,000 745,000Total
Total2018 2019 2020 2021 2022Funding Sources
745,000745,000County Road & Bridges Fund Sales Taxes
745,000 745,000Total
Thursday, September 28, 2017Page 33Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
Approximately 80' long by 30' wide, 3-span bridge. Design scheduled for 2019 and reconstruction in 2022.
Project # HWY-19-001
Priority 2 Medium
Justification
This project will be funded through the WisDOT 2015-2020 Local Bridge Program (80% Federal and 20% Local funding). Total cost for the
entire project is estimated to be $2,394,000 with the County's 20% share totalling $478,800.
Useful Life 20 years
Project Name G Bridge over Cedar Creek
Category Bridges
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $515,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
515,00035,000 480,000Construction/Maintenance
35,000 480,000 515,000Total
Total2018 2019 2020 2021 2022Funding Sources
515,00035,000 480,000County Road & Bridges Fund Sales Taxes
35,000 480,000 515,000Total
Thursday, September 28, 2017Page 34Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 1.9-mile segment of CTH Q is scheduled to be pulverized and repaved in 2019. It currently includes 2 12-foot driving lanes and 3-foot gravel
shoulders.
Project # HWY-19-002
Priority 2 Medium
Justification
This segment of CTH Q was last paved in 1981 and had a PASER rating of 4 in 2015. Average annual daily traffic (AADT) was 1,100 in 2010.
Asphalt surface on this segment of has experienced significant cracking and deterioration.
Useful Life 20 years
Project Name Q from STH 83 East
Category Pulverize & Repave
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $465,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
465,000465,000Construction/Maintenance
465,000 465,000Total
Total2018 2019 2020 2021 2022Funding Sources
465,000465,000County Road & Bridges Fund Sales Taxes
465,000 465,000Total
Thursday, September 28, 2017Page 35Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 2.8-mile segment of CTH P is scheduled to be redesigned in 2019 and reconstructed in 2022.
Project # HWY-19-004
Priority 2 Medium
Justification
This segment of CTH P was last paved (overlay) in 2013 and had a PASER rating of 10 in 2015. Average annual daily traffic (AADT) was 2,800
in 2013.
Useful Life 20 years
Project Name P from STH 145 North
Category Pulverize & Repave
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $2,900,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
100,000100,000Construction/Maintenance
100,000 100,000Total
Total2018 2019 2020 2021 2022Funding Sources
100,000100,000County Road & Bridges Fund Sales Taxes
100,000 100,000Total
Thursday, September 28, 2017Page 36Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 3.0-mile segment of CTH WW is scheduled to be pulverized and repaved in 2020.
Project # HWY-20-001
Priority 2 Medium
Justification
Two miles of this stretch of CTH D were last paved in 1978 and one mile was paved in 1983. Average annual daily traffic (AADT) was 1,400 in
2010. PASER ratings were 5-6 in 2015.
Useful Life 20 years
Project Name WW from STH 33 North
Category Pulverize & Repave
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $810,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
810,000810,000Construction/Maintenance
810,000 810,000Total
Total2018 2019 2020 2021 2022Funding Sources
810,000810,000County Road & Bridges Fund Sales Taxes
810,000 810,000Total
Thursday, September 28, 2017Page 37Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 0.75-mile segment of CTH K is scheduled to be pulverized and repaved in 2020.
Project # HWY-20-002
Priority 2 Medium
Justification
This 0.75 segment of CTH K was last paved in 2006. PASER ratings were 7-8 in 2015. Average annual daily traffic (AADT) was has steadily
increased in recent years with 6,400 in 2010, 7,600 in 2013, and 8,500 in 2016 (preliminary). AADT counts are anticipated to continue to rise due
recent and future development in the area.
Useful Life 20 years
Project Name K from Monroe Ave North
Category Pulverize & Repave
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $235,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
235,000235,000Construction/Maintenance
235,000 235,000Total
Total2018 2019 2020 2021 2022Funding Sources
235,000235,000County Road & Bridges Fund Sales Taxes
235,000 235,000Total
Thursday, September 28, 2017Page 38Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 3.75-mile segment of CTH E is scheduled to be pulverized and repaved in 2020.
Project # HWY-20-003A
Priority 2 Medium
Justification
This 3.75-mile segment of CTH E was last paved in 2002 and 2003 and chip sealed in 2012 and 2013. PASER rating was 6-7 in 2015. Average
annual daily traffic (AADT) was 3,100 in 2010.
Useful Life 20 years
Project Name E from CTH K East
Category Pulverize & Repave
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $1,170,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
1,170,0001,170,000Construction/Maintenance
1,170,000 1,170,000Total
Total2018 2019 2020 2021 2022Funding Sources
1,170,0001,170,000County Road & Bridges Fund Sales Taxes
1,170,000 1,170,000Total
Thursday, September 28, 2017Page 39Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 2.0-mile segment of CTH C is scheduled to be pulverized and repaved in 2020.
Project # HWY-20-004
Priority 2 Medium
Justification
This 2.0 segment of CTH C was last paved in 1969. PASER rating was 4 in 2015. Average annual daily traffic (AADT) was 2,200 in 2010 in
Cedar Creek.
Useful Life 20 years
Project Name C from CTH Z East
Category Pulverize & Repave
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $590,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
590,000590,000Construction/Maintenance
590,000 590,000Total
Total2018 2019 2020 2021 2022Funding Sources
590,000590,000County Road & Bridges Fund Sales Taxes
590,000 590,000Total
Thursday, September 28, 2017Page 40Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 0.6-mile segment of CTH Y is scheduled to be redesigned in 2020 and reconstructed in 2023.
Project # HWY-20-005
Priority 2 Medium
Justification
This 0.6-mile segment of CTH Y was last paved in 1998 and chip sealed in 2016. PASER rating was 6 in 2015. Average annual daily traffic
(AADT) was 11,400 in 2013.
Useful Life 10 years
Project Name Y from STH 175 North
Category Pulverize & Repave
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $100,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
100,000100,000Construction/Maintenance
100,000 100,000Total
Total2018 2019 2020 2021 2022Funding Sources
100,000100,000County Road & Bridges Fund Sales Taxes
100,000 100,000Total
Thursday, September 28, 2017Page 41Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 2.3-mile segment of CTH U is scheduled to be pulverized and repaved in 2020.
Project # HWY-20-006
Priority 2 Medium
Justification
Portions of this 2.3-mile segment of CTH U were last paved in 1975 and 1981. PASER rating was 4 in 2015. Average annual daily traffic
(AADT) was 1,100 in 2014.
Useful Life 20 years
Project Name U from Saddle Dr North
Category Pulverize & Repave
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $660,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
660,000660,000Construction/Maintenance
660,000 660,000Total
Total2018 2019 2020 2021 2022Funding Sources
660,000660,000County Road & Bridges Fund Sales Taxes
660,000 660,000Total
Thursday, September 28, 2017Page 42Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 2.6-mile segment of CTH K is scheduled to be reconstructed in 2020. Acquisition of right-of-way is anticipated.
Project # Hwy-20-007
Priority 2 Medium
Justification
This segment of CTH K was last paved in 2000 and had a PASER rating of 4-5 in 2015. Average annual daily traffic (AADT) was 4,300 in 2010.
SEWRPC estimates that AADT will increase nearly 100% by 2050.
Useful Life 20 years
Project Name CTH K STH 83 East 2.6 miles to Addison Rd
Category Design & Construction
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $5,100,000
Rep. Committee: Public Works Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
00Planning/Design
5,000,0005,000,000Construction/Maintenance
0 5,000,000 5,000,000Total
Total2018 2019 2020 2021 2022Funding Sources
5,000,0005,000,000Debt
00Sales Tax
0 5,000,000 5,000,000Total
Thursday, September 28, 2017Page 43Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 2.7-mile segment of CTH F is scheduled to be pulverized and repaved in 2021.
Project # HWY-21-001
Priority 2 Medium
Justification
This 2.7-mile segment of CTH F was last paved in 2005. It was crack filled in 2012. PASER rating was 7-8 in 2015. Average annual daily traffic
(AADT) was 3,500 in 2013.
Useful Life 20 years
Project Name F from STH 145 East
Category Pulverize & Repave
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $775,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
775,000775,000Construction/Maintenance
775,000 775,000Total
Total2018 2019 2020 2021 2022Funding Sources
775,000775,000County Road & Bridges Fund Sales Taxes
775,000 775,000Total
Thursday, September 28, 2017Page 44Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 8.9-mile segment of CTH G is scheduled to be pulverized and repaved in 2021.
Project # HWY-21-002
Priority 2 Medium
Justification
Portions of this 8.9-mile segment of CTH G were last paved in 2002 and 2004. Portions were crack sealed (overband) in 2011 and chip sealed in
2015. PASER rating was 6-7 in 2015. Average annual daily traffic (AADT) was 6,100 in 2010.
Useful Life 20 years
Project Name G from STH 145 North
Category Pulverize & Repave
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $2,765,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
2,765,0002,765,000Construction/Maintenance
2,765,000 2,765,000Total
Total2018 2019 2020 2021 2022Funding Sources
2,765,0002,765,000County Road & Bridges Fund Sales Taxes
2,765,000 2,765,000Total
Thursday, September 28, 2017Page 45Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
Approximately 30' long by 30' wide, 1-span bridge. Scheduled for design in 2021 and reconstruction possibly in 2023.
Project # HWY-21-003
Priority 2 Medium
Justification
This project will be funded through the WisDOT 2015-2020 Local Bridge Program (80% Federal and 20% Local funding). Total cost for the
entire project is estimated to be $1,152,000 with the County's 20% share totalling $230,400.
Useful Life 20 years
Project Name G Bridge over Evergreen Creek
Category Bridges
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $40,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
40,00040,000Construction/Maintenance
40,000 40,000Total
Total2018 2019 2020 2021 2022Funding Sources
40,00040,000County Road & Bridges Fund Sales Taxes
40,000 40,000Total
Thursday, September 28, 2017Page 46Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This 2.5-mile non-contiguous segment of CTH M is scheduled to be pulverized and repaved in 2022.
Project # HWY-22-001
Priority 2 Medium
Justification
This 2.5-mile segment of CTH M was last paved in 1998. It was slag sealed in 2005. It was crack filled in 2016 prior to chip seal. PASER rating
was 4-5 in 2015. Average annual daily traffic (AADT) was 4, 700 in 2010.
Useful Life 20 years
Project Name CTH M (from CTH F to Pioneer Rd.)
Category Pulverize & Repave
Type Improvement
Contact Highway
Department Highway Department
Total Project Cost: $625,000
Rep. Committee: Transportation Committee
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
625,000625,000Construction/Maintenance
625,000 625,000Total
Total2018 2019 2020 2021 2022Funding Sources
625,000625,000County Road & Bridges Fund Sales Taxes
625,000 625,000Total
Thursday, September 28, 2017Page 47Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
"The recently adopted Washington County Technology plan identified ""Develop and implement a plan to migrate all systems off the AS400"" as
a strategic goal. Current AS400 hardware will reach end of life around 2018 and would be very costly to replace. With retirements and staff
reductions, Washington County does not have internal resources to properly support AS400 hardware and current applications.
Some of the previous efforts toward this goal included migrations of Tax Listing/Zoning, e-mail, Sheriff records, most Register of Deeds records,
and Human Services records. Projects underway or already budgeted include HR/Payroll, enterprise imaging (IMS21), and Veterans Services
records. Replacement of the current JDE financial system and the much smaller, but related receipting programs is the major unfunded project
needed to decommission the remaining AS400s. Elimination of all AS400s will eliminate the need to upgrade and maintain that platform.
The vast majority of the project budget would be a replacement to JDE. This could take the form of a windows version of JDE, the acquisition
and migration to additional Tyler Munis Modules, a new software (hosted or on-premise), or an intergovernmental agreement. The presented
budget assumes a deployment method similar to what will be implemented for HR/Payroll. If completed through Intergovernmental Agreement or
Software as a Service, the initial cost may go down and the on-going costs may go up.
A very small component of the project budget could be used to complete the migration of Register of Deeds records, the contracts database
application, and other small applications that remain on the AS400 platform. "
Project # IS-18-001
Priority 1 High
Justification
"Replacement of the current JDE financial program will allow Washington County to move the last major system off the AS400 and provide the
opportunity to eliminate several custom-written AS400 programs (by combining their functionality into the new system). Note that several of
these programs are difficult to maintain due to custom programming by staff no longer working at the County. Additionally, this switch would
allow Finance to implement a county-wide business process improvement project to standardize common tasks across all departments (such as
journal entries, deposits, financial reporting, etc.). For IS it would eliminate the internal and external maintenance, support and replacement of
an entire system. It would allow IS to focus on its existing Windows/SQL Server platform and begin a strategic move to more hosted solutions as
was directed by Administrative Committee. It is assumed that the increases in hardware/software support for systems implemented through
this project will be offset by the elimination of support for AS400 hardware/software/programming when that system is decommissioned."
Useful Life 10 years
Project Name Migration off AS400 Technology
Category Other
Type Equipment
Contact Administration
Department Information Services
Total Project Cost: $900,000
Rep. Committee: Executive
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
900,000450,000 450,000Equip/Vehicles/Furnishings
450,000 450,000 900,000Total
Total2018 2019 2020 2021 2022Funding Sources
16,99616,996Municipal Reimbursements
883,004433,004 450,000Sales Tax
450,000 450,000 900,000Total
Thursday, September 28, 2017Page 48Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
Project # IS-20-001
Priority 2 Medium
Justification
Useful Life
Project Name IS Infrastructure Projects
Category Other
Type Equipment
Contact
Department Information Services
Total Project Cost: $650,000
Rep. Committee: Administrative
Result Area: Well-Governed County
Total2018 2019 2020 2021 2022Expenditures
650,000150,000 250,000 250,000Equip/Vehicles/Furnishings
150,000 250,000 250,000 650,000Total
Total2018 2019 2020 2021 2022Funding Sources
650,000150,000 250,000 250,000Sales Tax
150,000 250,000 250,000 650,000Total
Thursday, September 28, 2017Page 49Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
Washington County will contract with a provider to conduct a detailed audit of the current lighting systems used in the County parks. The detailed
audit will provide Parks staff with an inventory of all the lighting used in the parks, as well as recommendations for cost-saving measures to
implement.
Energy audit & Convert Dusk/ dawn parking lot, path and roadway lights to full cutoff LED lights. ADA audit of parks.
Project # PPD-18-001
Priority 2 Medium
Justification
Without a current inventory of the parks lighting system, there is really no way to know if we are operating efficiently and effectively. A thorough
audit will potentially lead to a reduction in the number of fixtures used, as well as increased visibility and decreased maintenance costs. Based on
recommendations made through the audit process, County staff is likely to see decreased energy expenses, maximizng return investment.
Useful Life 20 years
Project Name Energy Audit
Category Park Improvements
Type Improvement
Contact Parks and Planning
Department Parks & Planning Department
Total Project Cost: $75,000
Rep. Committee: Parks and Planning
Result Area: Economic Growth and Vitality
Total2018 2019 2020 2021 2022Expenditures
75,00075,000Construction/Maintenance
75,000 75,000Total
Total2018 2019 2020 2021 2022Funding Sources
75,00075,000Sales Tax
75,000 75,000Total
Thursday, September 28, 2017Page 50Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
The parks maintenance replacement plan and Parks Superintendant both indicate that the following new replacement equipment is needed in 2018;
a new Chevy 3500 one ton 4x4 plow truck ($56,000) is needed to replace truck #161, a 2005 one ton Chevy flatbed, a new 4x4 diesel Toro 12'
outfront rotary ($60,000) to replace the 2002 Toro 455D, #328, and a Wright stander mower 32'' deck ($7,000) to replace one of the 2002 Wright
stander mowers (#326 or #327). Future expenditures on replacement will be folllowing a future equipment replacement plan that is being prepared
this winter.
Project # PPD-18-002
Priority 1 High
Justification
Park equipment, used to maintain park properties, county campuses, and fair park have limited lifetimes and must be replaced in order to
effectively maintain these areas. The Parks division has maintained a replacement schedule to help guide the actual replacement on a year to year
basis with input from staff and mechanics for final decisions. The parks maintenance replacement plan and Parks Superintendant both indicate that
the aformentioned equipment is in need in 2018. No replacements were made last year due to staffing changes and budget adjustments and
therefore the replacement schedule was delayed a year. The three requests are all from the 2017 schedule. All 3 items are to replace aging
equipment that are heavily used and past expected operational lifetimes and are being repaired multiple times annually. Equipment that breaks
down during summer is often left unrepaired for weeks due to the mechanic spending most hours in summer at the golf couse. Due to changes in
the division and reduced staff, the equipment will be reinventoried and the schedule will be adjusted per the Superintendent and mechanics
recommendations which will result in a more financially sustainable equipment replacement plan.
Useful Life 10 years
Project Name Equipment Replacement - Parks
Category Equipment: PW Equip
Type Equipment
Contact Parks and Planning
Department Parks & Planning Department
Total Project Cost: $460,000
Rep. Committee: Parks and Planning
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
460,000125,000 80,000 70,000 110,000 75,000Equip/Vehicles/Furnishings
125,000 80,000 70,000 110,000 75,000 460,000Total
Total2018 2019 2020 2021 2022Funding Sources
460,000125,000 80,000 70,000 110,000 75,000Sales Tax
125,000 80,000 70,000 110,000 75,000 460,000Total
Thursday, September 28, 2017Page 51Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
"The Wisconsin Department of Transportation announced the award of the 2016-2020 Transportation Alternative Program (TAP) to the
Washington County Planning and Parks Department for the development of a Bike & Pedestrian Plan for Washington County. The project has
been awarded up to $72,000 of federal funds. It is one of 33 projects and $15 million of approved TAP funding for the 2016-2020 program
cycle. The Bike & Pedestrian Plan for Washington County is being developed in an effort to increase opportunities for non-motorized vehicle
transportation. The Plan will make recommendations to develop a countywide network of trails and routes as alternate modes of transportation
that can be integrated into a user’s daily routine. The Plan will focus on creating trails and routes that provide accessibility to essential services,
such as schools, commercial centers and major employment centers, as well as creating a trail network that provides varied recreational
opportunities that are enjoyable for all residents."
Project # PPD-20-001
Priority 2 Medium
Justification
The County Board identified "Providing an interconnected system of safe trails and paths that enhance the mobility of the community" as a top
priority for the Planning and Parks Division.
Useful Life 25 years
Project Name Countywide Bike/ trail plan implementation
Category Park Improvements
Type Improvement
Contact Parks and Planning
Department Parks & Planning Department
Total Project Cost: $1,175,000
Rep. Committee: Parks and Planning
Result Area: Effective Mobility and Reliable
Total2018 2019 2020 2021 2022Expenditures
1,175,000175,000 250,000 250,000 250,000 250,000Construction/Maintenance
175,000 250,000 250,000 250,000 250,000 1,175,000Total
Total2018 2019 2020 2021 2022Funding Sources
1,175,000175,000 250,000 250,000 250,000 250,000Sales Tax
175,000 250,000 250,000 250,000 250,000 1,175,000Total
Thursday, September 28, 2017Page 52Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This project replaces the chillar at the Samaritan campus.
Project # SAM-19-001
Priority 2 Medium
Justification
The standard life expectancy of a chillar is approximately 20 years. New units are much more efficient and thus reduce the operating and
mainteance costs.
Useful Life 25 years
Project Name Samaritan Chillar Replacement
Category Equipment: Miscellaneous
Type Equipment
Contact Administration
Department Samaritan
Total Project Cost: $300,000
Rep. Committee: Samaritan
Result Area: Well-Governed County
Total2018 2019 2020 2021 2022Expenditures
300,000300,000Equip/Vehicles/Furnishings
300,000 300,000Total
Total2018 2019 2020 2021 2022Funding Sources
300,000300,000Samaritan Fund
300,000 300,000Total
Thursday, September 28, 2017Page 53Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
The 2017 funding is part of an approved radio system enhancement project budgeted at $4.85 million. This project includes funds ($3.35m) in
2016. Ideally, the 700 MHz enhancement project will be completed with funds from 2016 and 2017. It is appropriate to continue to budget funds
for future radio system upgrades and/or improvements.
The project upgrades existing equipment including network system controller, consoles and adds four tower sites in the 700 MHz band primarily
improving in-building coverage in the municipalities of West Bend, Hartford, Slinger, Jackson and Germantown and the areas surrounding them.
Additionally, the last 3 years of the plan includes funds for future radio system upgrades and/or improvements.
Project # SD-17-002
Priority 1 High
Justification
A county wide public safety radio system is operated by the Sheriff's Office for use by all county and municipal law enforcement, fire, EMS and
DPW departments. It was determined that the VHF system required upgrades to stay current with equipment and software in the amount of $1.75
million. Additionally it was determined that this upgrade and a 700 MHz overlay could be accomplished in the same project. Combining the
projects leverages the VHF system for continued use in the future and improves in-building coverage in the higher density population areas of the
county. It also establishes a 700 MHz foot print for the county to build off of in future years. Additional funds are budgeted in the later years to
begin saving for future upgrades/improvements as needed.
Useful Life 10 years
Project Name Radio System
Category Equipment: Miscellaneous
Type Equipment
Contact Sheriff
Department Sheriff's Department
Total Project Cost: $3,300,000
Rep. Committee: Public Safety
Result Area: Safe and Secure Community
Total2018 2019 2020 2021 2022Expenditures
1,800,000300,000 500,000 500,000 500,000Equip/Vehicles/Furnishings
300,000 500,000 500,000 500,000 1,800,000Total
Total2018 2019 2020 2021 2022Funding Sources
1,800,000300,000 500,000 500,000 500,000Sales Tax
300,000 500,000 500,000 500,000 1,800,000Total
Thursday, September 28, 2017Page 54Washington County Capital Improvement Program
Capital Improvement Program
Washington County, Wisconsin
2018 2022thru
Description
This project funds annual vehicle replacement. The Sheriff's Office projects replacing 10 squads each year to maintain it's current squad fleet of
44 squads. The Parks and Planning Department is also scheduled to replace a vehicle in 2017.
Project # SD-17-003
Priority 1 High
Justification
The Sheriff's Office currently purchases Chevrolet Impala. After 2016, this vehicle will no longer be available to Law Enformcement Agencies.
The Sheriff's Office delevoped a committee to evaulate other police vehicles available to Law Enforcement. After careful consideration, the
committee selected the All-Wheel Drive Ford Police Interceptor Utility. The price of these vehicle are substantially higher than the previously
purchased Impala's.
The Sheriff's Office will continue to replace 3 Chevrolet Tahoe's currently in the fleet due to their increased towing capacity, which is needed for
towing Sheriff's Office owned trailers exceeding 2000 lbs. Additional cost were added for equipment needed as we transition to the new model
squad cars.
The model replacement and the need to replace squad equipment will be completed after 2019 and the cost of the initial vehicle will decrease,
however 3 % was added each year as we anticipate the increased cost of each vehicle.
Useful Life 10 years
Project Name Equipment Replacement Program
Category Equipment: Miscellaneous
Type Equipment
Contact Sheriff
Department Sheriff's Department
Total Project Cost: $2,223,655
Rep. Committee: Public Safety
Result Area: Safe and Secure Community
Total2018 2019 2020 2021 2022Expenditures
1,838,655368,784 350,271 364,941 369,464 385,195Equip/Vehicles/Furnishings
368,784 350,271 364,941 369,464 385,195 1,838,655Total
Total2018 2019 2020 2021 2022Funding Sources
207,79939,140 40,314 41,524 42,769 44,052Sale of Property
1,630,856329,644 309,957 323,417 326,695 341,143Sales Tax
368,784 350,271 364,941 369,464 385,195 1,838,655Total
Thursday, September 28, 2017Page 55Washington County Capital Improvement Program