81
CAPITAL IMPROVEMENT PROGRAM 2016 – 2020

CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

CAPITAL IMPROVEMENT PROGRAM

2016 – 2020

Page 2: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

Greenville Water

Capital Improvement Program

2016 – 2020

Phillip A. Kilgore Chairman

James W. Bannister Vice Chairman

Deb Sofield Commissioner

Knox H. White Mayor-Ex-Officio

J. David Sudduth Commissioner-Ex-Officio

David H. Bereskin Chief Executive Officer

Page 3: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

Table of Contents

INTRODUCTION………………………………………………………………………………………………………………. 1

SUMMARY SCHEDULES

Project Summary………………………………………………………………………………………………………… 12

Project Summary by Type…………………………………………………………………………………………… 13

Project Summary by Funding Source………………………………………………………………………….. 15

Summary of Additional Operating Impacts………………………………………………………………… 16

PROJECT DESCRIPTIONS

General

Central Campus Improvements………………………………………………………………………………… 17

SCADA Study……………………………………………………………………………………………………………….18

New Bill Inserter………………………………………………………………………………………………………… 19

FIS Project……………………………………………………………………………………………………………………20

Water Resources Master Plan……………………………………………………………………………………. 21

Residence at Trammel Gap……………………………………………………………………………………….. 22

Remodel Table Rock Caretaker House………………………………………………………………………. 23

Imaging System………………………………………………………………………………………………………….. 24

Update Emergency Response Plan……………………………………………………………………………. 25

Arc Flash Compliance/Study………………………………………………………………………………………. 26

Comprehensive Asset Management Program…………………………………………………………… 27

Administrative Building Renovations………………………………………………………………………… 28

System Wide Security Master Plan……………………………………………………………………………. 29

Data Warehouse……………………………………………………………………………………………………….. 30

Intake

North Saluda Intake Structure - Rehab………………………………………………………………………. 31

Gayley PS Portable Generator Connection…………………………………………………………………. 32

Dredge Channel at North Saluda Intake and Outlet Bldg…………………………………………… 33

North Saluda Treating Station – Rehab………………………………………………………………………. 34

Table Rock Treating Station – Rehab………………………………………………………………………….. 35

Valves

Rutherford Rd – Check Valves……………………………………………………………………………………. 36

FCV Flow and Pressure Monitoring Improvements……………………………………………………. 37

Remote Monitoring for PRVs……………………………………………………………………………………… 38

Pumping

Cliffs Valley/Upper Paris Mtn. PS Upgrade………………………………………………………………… 39

Crestwood PS – Increase Pump Size…………………………………………………………………………… 40

Upper White Horse PS – Increase Pump Capacity……………………………………………………… 41

Page 4: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

Storage

Paris Mountain/Lake Circle Storage Tank – Repaint Tank………………………………………….. 42

Repaint Wham Tank…………………………………………………………………………………………………… 43

Hillandale - New Storage Tank…………………………………………………………………………………… 44

Goodwin Bridge Reservoir - Additional Storage………………………………………………………… 45

Treatment

Clearwell Dehumidifiers……………………………………………………………………………………………. 46

Alkalinity Improvements at WTPs…………………………………………………………………………….. 47

Stovall WTP - Redundant Transformer…………………………………………………………………….. 48

Stovall WTP - New Roof…………………………………………………………………………………………….. 49

Sludge Removal at WTPs…………………………………………………………………………………………… 50

Residuals Handling Study and Permitting………………………………………………………………….. 51

Replace Lab Floors at Stovall WTP…………………………………………………………………………….. 52

Fume Hood Replacement at Stovall WTP Lab…………………………………………………………… 53

Adkins WTP – Basin Rehab and Painting…………………………………………………………………… 54

Adkins WTP – Filter Gallery Rehab……………………………………………………………………………. 55

Stovall WTP – Painting……………………………………………………………………………………………….. 56

Reservoirs

Dam Improvements at Table Rock and North Saluda……………………………………………….. 57

Mains

Piney Mountain Rd. #1 – New Main………………………………………………………………………….. 58

Aiken Chapel Rd. – New Water Main………………………………………………………………………… 59

N. Pleasantburg Rd. – Parallel Water Main……………………………………………………………….. 60

Rutherford Rd. – New Water Main……………………………………………………………………………. 61

Highway 276 – New Water Main……………………………………………………………………………….. 62

SE Main St. – New Water Main………………………………………………………………………………….. 63

Main St. – Replace 24-in Main…………………………………………………………………………………… 64

Pineforest Dr. – New Water Main……………………………………………………………………………… 65

Pelham Commons Blvd. – New Water Main…………………………………………………………….. 66

S Parker Rd. – Replacement Water Main………………………………………………………………….. 67

S Buckhorn Rd. – Replacement Water Main…………………………………………………………….. 68

Tally Bridge Rd. – New Water Main…………………………………………………………………………... 69

Bates Crossing Rd. – New Water Main……………………………………………………………………… 70

Moore Rd. – Replacement Water Main……………………………………………………………………… 71

Old White Horse Rd. – Replacement Main……………………………………………………………….. 72

Goodwin Bridge Rd. – New Water Main……………………………………………………………………. 73

Wellborn Rd. to Saluda River – Inspect 72-in Trans Main………………………………………… 74

Page 5: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

Introduction

Page 6: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016-2INTROThe Capfuture cathose caexceed $projects

Normal Spart of thneeds arrecurringinclude tAdditionsnew or re

The capifor the improvemannual aand the forecast. New FacIn 2015, Master Pof the waprovide a

Asset inswere consystem. of the tre An all-pigreater) tplanning on capac

20 CAPIODUCTIOpital Improveapital needs apital needs$100,000 in included in t

System Imphe Annual Ore funded w

g capital neethe City CIPs & Extensioeplacement

ital budget ifirst year o

ments. Theappropriationfinancing pla

cilities MastBlack & V

Plan and Caater treatmea phased ap

spections ofnducted to dIn addition

eatment facil

pes hydrauthat is includlevel analys

city and pres

ITAL IMPON ement Progr

of Greenvils. Generall

cost and hathe CIP may

provements Operating Buwith current reds is steadyP, Water Linons. Routinevehicles, eq

s adopted aof the plane subsequenn. The Fivean for the C

ter Plan eatch comppital Improvent and distriproach for th

f intake, treadetermine coto the inspeities from a w

lic model wded in the Gsis to assesssure deficie

PROVEM

ram (CIP) islle Water, ay, projects ave a usefuly also require

and Routineudget rather revenues gey and constane Replaceme Annual Ad

quipment and

annually, enc, and authnt four year-Year Finan

CIP has bee

pleted a comements Progibution systehe implemen

atment, pumondition andections at thewater quality

was developreenville Was overall sys

encies in the

MENT P

s a five-yeas well as idincluded inl life of at lee the use of

e Annual Adthan the CI

enerated by ant from yeament Progradditions and d meters.

compassingorizing any

rs are consincial Forecaen shaped b

mprehensivegram. The pem. The oventation of rec

mping, and s need for ree treatment y and operat

ed to includater GIS. Thstem performdistribution

ROGRA

ar fiscal plandentify the ti the CIP a

east five yeadebt or rese

dditions & RIP. This is bour rates a

ar to year. am, HighwaReplaceme

g appropriatiy bond issuidered plannst is used in

by the availa

e and long‐rplanning proerall goal wacommended

storage faciepair/replacefacilities, antional standp

de each acthe all-pipes mance and system.

AM

nning tool uming and m

are non-recuars. The sigerves to fina

Replacemenbecause theand the fundNormal Sys

ay Improvements are gen

ons for the ues necessaning years n the develoability of fun

range Wateocess encomas to create d improveme

lities as weement of assn evaluation point was co

tive water mmodel was uidentify spe

used to idenmethod of finurring projecgnificant cosnce their co

nts are incluese types ofding level fostem Improvments, and erally purch

projects schary to fundand are subopment of thds projected

r System Fmpassed all a

a 25‐year Cents.

ll as controlsets throughof the perfo

ompleted.

main (0.5 inutilized for acific projects

ntify the nancing cts that st of the st.

uded as f capital or these vements System ases of

heduled d these bject to he CIP, d in the

Facilities aspects CIP and

l valves hout the ormance

nch and a master s based

1

Page 7: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

The masthe residfor decadbehind thdecade. decreasiappliancewere estand inducontinue

  

                                    

 

ster planningential populdes, residenhis trend is d

Declining ng averagees, increasetimated baseustrial use. into the futu

g effort invoation within ntial customdue to the fa

per capitae householded conservated on expecThe sustain

ure before le

olved populathe Greenver water usact that per

a trends cad size, use tion as well acted per capned patternveling out af

ation and deille Water see has beencapita use n be attrib

of high efas economicpita residentof declining

fter 20 years

emand projeervice area

n flat in recehas been truted to a fficiency pluc conditionstial use and g per‐capitas at 45 gpcd

ections throuhas been st

ent years. Trending dowvariety of fumbing fixtus. Future wa probable fu

a water use.

ugh 2040. Wteadily increThe driving

wnward for ofactors incluures and inater requiremuture commee is projecte

While asing force

over a uding ndoor ments ercial ed to

2

Page 8: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

The evalconsistenfollowingboth planplanning

 

                                  

The StovMinor mphospha The mos90 MGDupgraded

A M

pp

uation of trently meet w shows the

nts. Since prfor future tre

 

vall WTP is modifications

te feed pum

t recent pumD. Some tred, to include

An evaluationMinor modific

ost‐sodium hosphate m

eatment facilwater quality

maximum drojected maxeatment cap

rated for 75to the che

ps were rec

mping improveatment pro;

n of the sedimcations to thhydroxide feixing tank.

lities determgoals and

day demandximum day

pacity was no

5 million gallemical feedommended.

vements at tcesses are

mentation prhe chemicaleed pumps,

mined that bothe level of

d projectionsdemands caot recomme

lons per daysystem to

he Adkins Wonly capab

rocess relatifeed systema larger sod

oth the Stovaf service des along withan be handlended.

y (MGD) an include in

WTP positionble of 60 M

ng to the dem to includedium hydrox

all WTP andesired for eh the combined within ex

d is capablecreased ca

ned the plantMGD and w

etention timee increased xide day tan

the Adkinsach facility.ned capacitixisting capac

e of that flowapacity of th

t for a re‐ratiwould need t

e. capacity ofk, and a lar

WTP The

es of cities,

w. he

ing to to be

the rger

3

Page 9: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

Additional pumping capacity for the raw and intermediate transfer pumps. Space is available for the additional pumps needed to reach 90 MGD.

With an updated and calibrated, hydraulic model, it was possible to evaluate the capacities of components in the distribution system through 2040 based on population and flow projections. The evaluation of the distribution system determined that overall it is in very good condition. There are pumping, storage and pressure improvements that were identified.

The following pump stations will need capacity upgrades by 2040:

Cliffs Valley PS (another PS is currently undergoing design). Crestwood PS is deficient in pumping capacity by 1.75 MGD. Paris Mountain PS (another PS is currently undergoing design).

The following reservoirs do not have sufficient capacity through 2040:

Altamont & Hillandale Reservoirs, combined, are deficient in storage by 1.5 million gallons (MG).

Goodwin Bridge Reservoir is deficient in storage by 0.5 MG.

Additionally, the Master Plan noted that the following components may become deficient during the planning period and require a large capital investment:

Reservoir No. 3 Tank 1 replacement due to age and construction materials. Roper Mountain Reservoir Tank 1 monitoring and evaluation due to deflection of the roof.

The pressure zones are recommended to have increased fire flow by 2040.

 

PRESSURE ZONE  DESIRED FIRE FLOW (GPM)

DURATION (HOURS)

AVAILABLE FIRE FLOW (GPM)

% DEFICIENCY 

Blue Bonnet  2,250  2 700 69% 

Cliffs Valley  2,250  2 1,200 47% 

Mountain Park  2,250  2 2,000 11% 

Paris Mountain  2,250  2 2,000 11% 

Upper Paris Mountain  1,000  2  1,000  0% 

 

Also, recommendations were made for system monitoring and SCADA improvements, to include:

Flow meters at control valves, namely the Green Avenue and J.L. Mann valves. Flow and pressure monitoring at pressure reducing valves (PRVs). Pressure transmitters at critical low and high pressures locations in each pressure zone.

4

Page 10: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

The Facilities Master Plan recommended that Greenville Water continue with a steady investment program targeting the highest priority pipes for replacement, with an approximate investment rate of $4.0 million per year to replace aging and deteriorating infrastructure. Using planned replacement budgets and asset management scores for each pipe, pipes were identified and prioritized for replacement over the planning horizon. Strategic Planning and the CIP The Operational Excellence focus area of our Strategic Plan places an emphasis on the implementation of technology to improve operational performance and efficiency. The inclusion of technology projects in the 2016-20 CIP reflects this emphasis. Specifically, the Document Imaging and Data Warehouse projects, the Comprehensive Asset Management Program and the ongoing Financial Information Systems projects are investments that will more fully integrate technology and automation into our workflows and business processes. Information will be available real time or near real time across the organization to improve customer service and to provide access for employees deployed in the field with available mobile technology.

A Comprehensive Asset Management Program can optimize infrastructure life cycle costs and also provide data that will assist the organization in prioritizing future operating and capital expenditures. Phase I of the project will involve an organizational capacity assessment to assess current maintenance management practices as well as an evaluation of the staff and organization needs to properly and fully implement and utilize a Computerized Maintenance Management System (CMMS).

Long Term Viability is a new focus area in the Strategic Plan. The second phase of the Water Resources Master Plan project continues our efforts to ensure that we have a secure long-term water supply to meet the demands of our growing service area. Phase I of the Plan is complete and involved projections of population and future water requirements, safe yield studies and reservoir optimization, an assessment of the Broad River basin water resource and the development of a Saluda River basin model. The work done in Phase I established that Greenville Water has sufficient water resources to meet projected demand with its existing service area through 2100. Phase II will involve an analysis of the Saluda, Broad and Upper Savannah River basins as well Surface Water Withdrawal permits and Lake Keowee permitted withdrawals.

Other projects in the CIP that address the Long Term Viability focus area include the update to our Emergency Response Plan and the development of a System Wide Security Master Plan. These projects will address technical and physical security measures to mitigate or reduce risk to staff, data and infrastructure and ensure business and technology continuity.

Changes to the CIP

In order to be consistent with the Facilities Master Plan, projects in the CIP have been segregated into the following categories: intakes (raw water intakes and raw water pumping), treatment (including transfer and finished water pumping within the treatment plant), pumping (distribution system), mains, valves (control valves), storage and general.

5

Page 11: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

Project RProject re

Im P M S Im C P

Each pro

E R P A R

The CEOrequests Commiss

Ranking equests hav

mproves WaProvides CapMitigates RisSystematic Rmproves Ope

Coordinates wPromotes Eco

oject has bee

Evaluation crReview of thePriority assigAssessment oRisks of defe

O and the exand to bet

sioners a co

ve been eval

ater Quality pacity to Meek to Public S

Replacementerational Effwith Other Ponomic Dev

en reviewed

riteria they me project objned to themof their urgerring project

xecutive mantter understamprehensiv

uated again

et Current orSafety or Het of Existing ficiency Projects and velopment

and evaluat

met ectives by the prop

ency t`

nagement teand their pre recommen

st the follow

r Future Demalth Infrastructur

Requiremen

ted as to how

posing depar

eam have miorities. Frondation on o

wing criteria:

mand

re

nts

w it meets th

rtment

met with eachom this procour most criti

he following

h departmencess, the Cical capital n

requiremen

nt to go overEO provide

needs.

nts:

r their s the

6

Page 12: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

Highlights of the 2016-20 CIP The 2016-20 CIP totals $47,424,000.

The 2016-20 CIP includes the use of rate revenue and reserves totaling $28,955,000

and Capacity Fees in the amount of $18,469,000.

The CIP calls for no new bond issues over the five-year period.

The CIP includes the assumption that there will be 3% annual adjustments to retail rates in 2016 and 2017.

Highlights of the 2016 Capital Budget The capital budget for 2016 is $10,111,500.

The 2016 Capital Budget includes the use of rate revenue and reserves totaling $7,604,000 and Capacity Fees in the amount of $2,507,000.

Paris Mountain/Lake Circle Storage Tank – Repaint Tank (Year 2) - $79,000

Total project request of $379,000 funded over 2 years ($300,000 funded in 2015).

Repaint a 300,000 gallon tank that was last painted in 1978.

Additional funding provided in 2016 to complete the project.

Residence at Trammel Gap (Year 2) - $35,000

Total project request of $182,500 funded over 2 years ($147,500 funded in 2015).

The current residence at this location is in disrepair and needs to be replaced.

This constructs a new residence to house Watershed personnel to help maintain security on the northern boundary of the North Saluda Watershed.

$20,000 transferred into this project during 2015 from the North Saluda Intake Repairs project.

Additional funding provided in 2016 to tear down old house and barn, and seal well.

Clearwell Dehumidifiers (Year 2) – $305,000

Total project request of $500,000 funded over 2 years ($195,000 funded in 2015).

Replacement of the dehumidifiers in the basement of the Adkins Treatment Plant to reduce moisture and stop corrosion that is occurring.

7

Page 13: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

Additional funding provided in 2016 as required to fully fund this project.

Alkalinity Improvements at Treatment Plants (Year 2) - $2,200,000

Total project request of $4,905,000 funded over 3 years ($450,000 funded in 2015).

Constructs liquid lime feed and carbon dioxide feed equipment in order to control the alkalinity of the water in the distribution system.

Provides additional buffering capacity to our finished water to reduce finished water pH variations, improves distribution system water quality, limits corrosion potential and mitigates the pricing volatility associated with the use of caustic soda.

Water Resources Master Plan (Year 2) - $550,000

Total project request of $1,734,000 funded over 3 years ($600,000 funded in 2015).

Develop a plan to meet the growing water supply demands of our system for the next 100 years.

Phase II will involve an analysis of the Saluda, Broad and Upper Savannah River

basins as well Surface Water Withdrawal permits and Lake Keowee permitted withdrawals.

Replace Lab Floors at Stovall WTP - $125,000

Replace original flooring in facility that was built in 2000. Floor has damage and/or significant wear.

Stovall WTP – Redundant Transformers – $212,000

Installation of a redundant 225kva 4160 to 480 transformer near the finished water PS.

Stovall WTP – New Roof - $381,000

Replace original roof on DAF building that was built in 2000. Roof is exhibiting signs of deterioration.

Residuals Handling Study and Permitting - $110,000

Residuals handling study for both treatment plants. Permitting for land application of residuals at Stovall plant. Evaluate automation of centrifuge operation at Stovall.

8

Page 14: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

Arc Flash Compliance/Study - $200,000

Compliance with the OSHA arc flash regulations requires a study which results in a safe work program including classroom training, physical training on the specific equipment involved, and training on the proper use and care of the required personal protective equipment. Arc flash compliance ensures adequate protection of employees from injury from electric components. A safety consultant will be hired to conduct the study and there will be some cost to implement the study recommendations. The consultant will prepare an arc flash PPE report, arc flash diagrams and labels, as well as conduct training sessions.

Remodel Table Rock Caretaker House – $305,000

A complete remodel to address structural issues, and bring the house up to current building code standards. The remodel will also improve energy efficiency and make the structure more habitable for our caretaker. This will be the most substantial renovation of this residence since its construction by the Civilian Conservation Corps in the 1930’s.

Imaging System – $300,000

Replaces the existing Documentum imaging system, converts existing data in the system, and indexes all images to accounts. The imaging system serves as a reference filing system for several processes, especially in Engineering and Business Services, operating at a sublayer beneath products like CIS Infinity. Paper items are scanned from paper daily—maps, service orders, contracts, check remittances and other correspondences. These scanned images are important when discussing details with customers regarding their accounts, and its continual operation is vital to the flow of operations in the field regarding tap orders, and contractual concerns with developers. The project also includes replacement of scanning hardware, and includes an effort to integrate existing scanning capabilities into the project.

Update Emergency Response Plan - $200,000

The current ERP was completed in 2003 and is in need of an overall comprehensive system wide update. The propose scope of work will include an updated threat identification, be it natural or man-made, development of a business and technology continuity plan, and pandemic plan.

Dam Improvements at Table Rock and North Saluda - $150,000

Address the perched water issue at North Saluda dam identified by 2014 Bunnell Lammons Engineering (BLE) evaluation. Installation of electronic instrumentation to enhance dam operations at both reservoirs. Additional improvements may be needed based on recommendations of geotechnical evaluation by BLE.

9

Page 15: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

Piney Mountain Rd #1 – New Water Main - $298,000

The new water main will maintain looping and service to the southern portion of Hillandale. Location is Piney Mountain Rd from Milian Dr to View Point Dr.

Rutherford Rd – Check Valves - $129,000

Add 2 check valves located on pipes 32353 and 26301. Part of the Zone Boundary adjustment from Gravity to Hillandale.

Aiken Chapel Rd – New Water Main - $320,000

New water main is needed for fire flow capacity (addresses minimum 500 gpm fire flow and cluster area). Location is Aiken Chapel Rd from Riverside Dr to Old Chick Springs Rd.

N Pleasantburg Rd – Parallel Water Main - $931,000

Part of the Zone Boundary adjustment from Gravity to Hillandale. Location is N Pleasantburg Dr from Piney Mountain Rd to Rutherford Rd; Parallel to 8-inch.

Sludge Removal at Water Treatment Plants - $1,500,000

Periodic removal of accumulated sludge at Adkins WTP that is performed every 5-7 years. First time removal of sludge from lagoons that has accumulated at Stovall WTP since the plant was placed in service.

Comprehensive Asset Management Plan (Year 1) - $130,000

Total project request of $643,000 funded over 2 years.

Develop a comprehensive Asset Management Program. Phase I will consist of an organizational capacity assessment to assess current maintenance management practices including work order generation, asset inventory, preventative maintenance and scheduling. Phase 1 will also include an evaluation of the staff and organization needs to properly and fully implement and utilize a Computerized Maintenance Management System (CMMS). Phase 2 is the selection and implementation of a GIS CMMS integrated for all vertical and horizontal assets (plants, pump stations, reservoirs, pipelines, etc.).

Fume Hood Replacement at Stovall WTP Lab (Year 1) - $25,000

Total project request of $128,000 funded over 2 years.

Project involves having a consultant evaluate the 4 fume hoods in the laboratory to determine if more energy efficient hoods are available. The current hoods are on all the time resulting in very high energy bills. Replacement hoods would be purchased based on consultant's recommendation that will take into account safety regulations, the safety of laboratory staff and minimizing energy usage.

10

Page 16: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

Rutherford Rd – New Water Main (Year 1) - $1,026,000

Total project request of $2,077,000 funded over 2 years.

Part of the Zone Boundary adjustment from Gravity to Hillandale. Also, the connection from the 16-inch transmission line should be moved to the new water main. Location is Rutherford Rd from Waddell Rd to N Pleasantburg; Parallel to 16-inch.

Administrative Building Renovations (Year 1) - $600,000

Total project request of $1,500,000 funded over 3 years.

Subject to project budget constraints, the following improvements and renovations will be considered: relocate Commission Meeting Room to first level, paint and carpet all interior space, renovate or replace HVAC system, paint wood exterior, power wash and clean aluminum exterior, relocate engineering and remodel training room area on second floor.

 

11

Page 17: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

Summary

Schedules

Page 18: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

GREENVILLE WATER 

2016‐2020 CIP 

PROJECT SUMMARY 

  Capital 

Committed Budget Total  Total 

PROJECTS  Funding 2016 2017 2018 2019 2020 2016‐20 Project 

Central Campus Improvements  $13,500,000 $0 $0 $0 $0 $0 $0 $13,500,000

Cliffs Valley/Upper Paris Mtn. PS Upgrade  850,000         ‐                 850,000      

SCADA Study  150,000         ‐                 150,000      

New Bill Inserter 280,000         ‐                 280,000      

FIS Project  400,000         ‐                 400,000      

Paris Mountain/Lake Circle Storage Tank ‐ Repaint Tank  300,000         79,000         79,000           379,000      

Residence at Trammel Gap  147,500         35,000         35,000           182,500      

Clearwell Dehumidifiers 195,000         305,000       305,000         500,000      

Alkalinity Improvements at WTPs  450,000         2,200,000    2,255,000    4,455,000      4,905,000   

Water Resources Master Plan  600,000         550,000       584,000       1,134,000      1,734,000   

North Saluda Intake Structure ‐ Rehab 565,000         ‐                1,017,000    1,017,000      1,582,000   

Replace Lab Floors at Stovall WTP  125,000       125,000         125,000      

Stovall WTP ‐ Redundant Transformer 212,000       212,000         212,000      

Stovall WTP ‐ New Roof 381,000       381,000         381,000      

Residuals Handling Study and Permitting  110,000       110,000         110,000      

Arc Flash Compliance/Study 200,000       200,000         200,000      

Remodel Table Rock Caretaker House 305,000       305,000         305,000      

Imaging System 300,000       300,000         300,000      

Update Emergency Response Plan  200,000       200,000         200,000      

Dam Improvements at Table Rock and North Saluda  150,000       150,000         150,000      

Piney Mountain Rd #1 ‐ New Water Main 298,000       298,000         298,000      

Rutherford Rd ‐ Check Valves 129,000       129,000         129,000      

Aiken Chapel Rd ‐ New Water Main 320,000       320,000         320,000      

N Pleasantburg Rd ‐ Parallel Water Main 931,000       931,000         931,000      

Sludge Removal at WTPs  1,500,000    1,500,000      1,500,000   

Comprehensive Asset Management Program  130,000       513,000       643,000         643,000      

Fume Hood Replacement at Stovall WTP Lab 25,000         103,000       128,000         128,000      

Rutherford Rd ‐ New Water Main  1,026,000    1,051,000    2,077,000      2,077,000   

Administrative Building Renovations  600,000       500,000       400,000       1,500,000      1,500,000   

System Wide Security Master Plan ‐                103,000       ‐                103,000         103,000      

Adkins WTP ‐ Basin Rehab and Painting  51,000         915,000       966,000         966,000      

Adkins WTP ‐ Filter Gallery Rehab 77,000         872,000       949,000         949,000      

Gayley PS Portable Generator Connection 23,000         412,000       435,000         435,000      

Highway 276 ‐ New Water Main 1,861,000    1,907,000    3,768,000      3,768,000   

Data Warehouse  349,000       89,000         92,000         530,000         530,000      

Hillandale ‐ New Storage Tank 136,000       140,000       1,414,000    1,450,000      3,140,000      3,140,000   

Main St ‐ Replace 24‐in Main  2,450,000    2,450,000      2,450,000   

Pineforest Dr ‐ New Water Main 1,184,000    1,184,000      1,184,000   

Repaint Wham Tank  578,000       578,000         578,000      

SE Main St ‐ New Water Main 125,000       125,000         125,000      

North Saluda Treating Station ‐ Rehab 11,000         187,000       198,000         198,000      

Table Rock Treating Station ‐ Rehab 18,000         309,000       327,000         327,000      

Stovall WTP ‐ Painting  30,000         543,000       573,000         573,000      

Dredge Channel at North Saluda Intake and Outlet Bldg 11,000         179,000       190,000         190,000      

Crestwood PS ‐ Increase Pump Size  58,000         1,051,000    1,109,000      1,109,000   

Upper White Horse PS ‐ Increase Pump Capacity 111,000       1,003,000    1,027,000      2,141,000      2,141,000   

Goodwin Bridge Reservoir ‐ Additional Storage 86,000         773,000       793,000         1,652,000      1,652,000   

Pelham Commons Blvd ‐ New Water Main 233,000       233,000         233,000      

S Parker Rd ‐ Replacement Water Main 220,000       220,000         220,000      

S Buckhorn Rd ‐ Replacement Water Main 151,000       151,000         151,000      

Tally Bridge Rd ‐ New Water Main 2,086,000    2,086,000      2,086,000   

Bates Crossing Rd ‐ New Water Main 1,333,000    1,333,000      1,333,000   

Remote Monitoring for PRVs 462,000         462,000         462,000      

FCV Flow and Pressure Monitoring Improvements 219,000         219,000         219,000      

Wellborn Rd to Saluda River ‐ Inspect 72‐in Trans Main 1,573,000      1,573,000      1,573,000   

Moore Rd ‐ Replacement Water Main 1,105,000      1,105,000      1,105,000   

Old White Horse Rd ‐ Replacement Main 1,480,000      1,480,000      1,480,000   

Goodwin Bridge Rd ‐ New Water Main 1,610,000      1,610,000      1,610,000   

  TOTAL PROJECTS  $17,437,500 $10,111,000 $8,623,000 $9,397,000 $9,574,000 $9,719,000 $47,424,000 $64,861,500

FUNDING SOURCES 

Rates/Reserves  $8,827,500 $7,604,000 $4,991,000 $5,911,000 $4,000,000 $6,449,000 $28,955,000 $37,782,500

Capacity Fees  3,110,000      2,507,000    3,632,000    3,486,000    5,574,000    3,270,000      18,469,000    21,579,000 

Debt  5,500,000      ‐                ‐                ‐                ‐                ‐                  ‐                 5,500,000   

  TOTAL FUNDING SOURCES  $17,437,500 $10,111,000 $8,623,000 $9,397,000 $9,574,000 $9,719,000 $47,424,000 $64,861,500

Planning Years Only 

12

Page 19: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

GREENVILLE WATER 

2016‐2020 CIP PROJECT SUMMARY BY TYPE 

  Capital 

Committed Budget Total  Total 

Project  Funding 2016 2017 2018 2019 2020 2016‐20 Project 

GENERAL 

Central Campus Improvements  $13,500,000 $0 $13,500,000

SCADA Study  150,000         ‐                 150,000      

New Bill Inserter 280,000         ‐                 280,000      

FIS Project  400,000         ‐                 400,000      

Water Resources Master Plan  600,000         550,000       584,000       1,134,000      1,734,000   

Residence at Trammel Gap  147,500         35,000         35,000           182,500      

Remodel Table Rock Caretaker House 305,000       305,000         305,000      

Imaging System 300,000       300,000         300,000      

Update Emergency Response Plan  200,000       200,000         200,000      

Arc Flash Compliance/Study 200,000       200,000         200,000      

Comprehensive Asset Management Program  130,000       513,000       643,000         643,000      

Administrative Building Renovations  600,000       500,000       400,000       1,500,000      1,500,000   

System Wide Security Master Plan ‐                103,000       ‐                103,000         103,000      

Data Warehouse  ‐                349,000       89,000         92,000         530,000         530,000      

  TOTAL GENERAL  $15,077,500 $2,320,000 $2,049,000 $489,000 $92,000 $0 $4,950,000 $20,027,500

INTAKE

North Saluda Intake Structure ‐ Rehab $565,000 $1,017,000 $1,017,000 $1,582,000

Gayley PS Portable Generator Connection 23,000         412,000       435,000         435,000      

Dredge Channel at North Saluda Intake and Outlet Bldg 11,000         179,000       190,000         190,000      

North Saluda Treating Station ‐ Rehab 11,000         187,000       198,000         198,000      

Table Rock Treating Station ‐ Rehab 18,000         309,000       327,000         327,000      

  TOTAL INTAKE $565,000 $0 $1,040,000 $452,000 $675,000 $0 $2,167,000 $2,732,000

VALVES

Rutherford Rd ‐ Check Valves $129,000 $129,000 $129,000

FCV Flow and Pressure Monitoring Improvements 219,000         219,000         219,000      

Remote Monitoring for PRVs 462,000         462,000         462,000      

  TOTAL VALVES $0 $129,000 $0 $0 $0 $681,000 $810,000 $810,000

PUMPING 

Cliffs Valley/Upper Paris Mtn. PS Upgrade  $850,000 $0 $850,000

Crestwood PS ‐ Increase Pump Size  58,000         1,051,000    1,109,000      1,109,000   

Upper White Horse PS ‐ Increase Pump Capacity 111,000       1,003,000    1,027,000      2,141,000      2,141,000   

  TOTAL PUMPING  $850,000 $0 $0 $169,000 $2,054,000 $1,027,000 $3,250,000 $4,100,000

STORAGE 

Paris Mountain/Lake Circle Storage Tank ‐ Repaint Tank  $300,000 $79,000 $79,000 $379,000

Repaint Wham Tank  578,000       578,000         578,000      

Hillandale ‐ New Storage Tank 136,000       140,000       1,414,000    1,450,000      3,140,000      3,140,000   

Goodwin Bridge Reservoir ‐ Additional Storage 86,000         773,000       793,000         1,652,000      1,652,000   

  TOTAL STORAGE  $300,000 $79,000 $136,000 $804,000 $2,187,000 $2,243,000 $5,449,000 $5,749,000

TREATMENT 

Clearwell Dehumidifiers $195,000 $305,000 $305,000 $500,000

Alkalinity Improvements at WTPs  450,000         2,200,000    2,255,000    4,455,000      4,905,000   

Stovall WTP ‐ Redundant Transformer 212,000       212,000         212,000      

Stovall WTP ‐ New Roof 381,000       381,000         381,000      

Sludge Removal at WTPs  1,500,000    1,500,000      1,500,000   

Residuals Handling Study and Permitting  110,000       110,000         110,000      

Replace Lab Floors at Stovall WTP  125,000       125,000         125,000      

Fume Hood Replacement at Stovall WTP Lab 25,000         103,000       128,000         128,000      

Adkins WTP ‐ Basin Rehab and Painting  51,000         915,000       966,000         966,000      

Adkins WTP ‐ Filter Gallery Rehab 77,000         872,000       949,000         949,000      

Stovall WTP ‐ Painting  ‐                30,000         543,000       573,000         573,000      

  TOTAL TREATMENT  $645,000 $4,858,000 $2,486,000 $1,817,000 $543,000 $0 $9,704,000 $10,349,000

RESERVOIRS 

Dam Improvements at Table Rock and North Saluda  $150,000 $150,000 $150,000

Planning Years Only 

13

Page 20: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

GREENVILLE WATER 

2016‐2020 CIP PROJECT SUMMARY BY TYPE (cont'd)

  Capital 

Committed Budget Total  Total 

Project  Funding 2016 2017 2018 2019 2020 2016‐20 Project 

MAINS 

Piney Mountain Rd #1 ‐ New Main $298,000 $298,000 $298,000

Aiken Chapel Rd ‐ New Water Main 320,000       320,000         320,000      

N Pleasantburg Rd ‐ Parallel Water Main 931,000       931,000         931,000      

Rutherford Rd ‐ New Water Main  1,026,000    1,051,000    2,077,000      2,077,000   

Highway 276 ‐ New Water Main 1,861,000    1,907,000    3,768,000      3,768,000   

SE Main St ‐ New Water Main 125,000       125,000         125,000      

Main St ‐ Replace 24‐in Main  2,450,000    2,450,000      2,450,000   

Pineforest Dr ‐ New Water Main 1,184,000    1,184,000      1,184,000   

Pelham Commons Blvd ‐ New Water Main 233,000       233,000         233,000      

S Parker Rd ‐ Replacement Water Main 220,000       220,000         220,000      

S Buckhorn Rd ‐ Replacement Water Main 151,000       151,000         151,000      

Tally Bridge Rd ‐ New Water Main 2,086,000    2,086,000      2,086,000   

Bates Crossing Rd ‐ New Water Main 1,333,000    1,333,000      1,333,000   

Moore Rd ‐ Replacement Water Main 1,105,000      1,105,000      1,105,000   

Old White Horse Rd ‐ Replacement Main 1,480,000      1,480,000      1,480,000   

Goodwin Bridge Rd ‐ New Water Main 1,610,000      1,610,000      1,610,000   

Wellborn Rd to Saluda River ‐ Inspect 72‐in Trans Main 1,573,000      1,573,000      1,573,000   

  TOTAL MAINS  $0 $2,575,000 $2,912,000 $5,666,000 $4,023,000 $5,768,000 $20,944,000 $20,944,000

TOTAL CIP  $17,437,500 $10,111,000 $8,623,000 $9,397,000 $9,574,000 $9,719,000 $47,424,000 $64,861,500

Planning Years Only 

14

Page 21: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

GREENVILLE WATER 

2016‐2020 CIP 

PROJECT SUMMARY BY FUNDING SOURCE    Capital 

Committed Budget Total  Total 

Project  Funding 2016 2017 2018 2019 2020 2016‐20 Project 

RATES/RESERVES 

Central Campus Improvements  $8,000,000 $0 $8,000,000

New Bill Inserter 280,000         ‐                  280,000      

FIS Project  400,000         ‐                  400,000      

Residence at Trammel Gap  147,500         35,000         35,000           182,500      

Replace Lab Floors at Stovall WTP  125,000       125,000         125,000      

Paris Mountain/Lake Circle Storage Tank ‐ Repaint Tank  79,000         79,000           79,000        

Stovall WTP ‐ Redundant Transformer 212,000       212,000         212,000      

Stovall WTP ‐ New Roof 381,000       381,000         381,000      

Residuals Handling Study and Permitting  110,000       110,000         110,000      

Arc Flash Compliance/Study 200,000       200,000         200,000      

Remodel Table Rock Caretaker House 305,000       305,000         305,000      

Imaging System 300,000       300,000         300,000      

Clearwell Dehumidifiers 305,000       305,000         305,000      

Update Emergency Response Plan  200,000       200,000         200,000      

Dam Improvements at Table Rock and North Saluda  150,000       150,000         150,000      

Sludge Removal at WTPs  1,500,000    1,500,000      1,500,000   

Piney Mountain Rd #1 ‐ New Main 298,000       298,000         298,000      

Rutherford Rd ‐ Check Valves 129,000       129,000         129,000      

Aiken Chapel Rd ‐ New Water Main 320,000       320,000         320,000      

Alkalinity Improvements at WTPs 2,200,000    2,255,000    4,455,000      4,455,000   

Comprehensive Asset Management Program  130,000       513,000       643,000         643,000      

Fume Hood Replacement at Stovall WTP Lab 25,000         103,000       128,000         128,000      

Administrative Building Renovations  600,000       500,000       400,000       1,500,000      1,500,000   

North Saluda Intake Structure ‐ Rehab 1,017,000    1,017,000      1,017,000   

System Wide Security Master Plan 103,000       103,000         103,000      

Adkins WTP ‐ Basin Rehab and Painting  51,000         915,000       966,000         966,000      

Adkins WTP ‐ Filter Gallery Rehab 77,000         872,000       949,000         949,000      

Gayley PS Portable Generator Connection 23,000         412,000       435,000         435,000      

Data Warehouse  349,000       89,000         92,000         530,000         530,000      

Repaint Wham Tank  578,000       578,000         578,000      

SE Main St ‐ New Water Main 125,000       125,000         125,000      

Main St ‐ Replace 24‐in Main  2,450,000    2,450,000      2,450,000   

North Saluda Treating Station ‐ Rehab 11,000         187,000       198,000         198,000      

Table Rock Treating Station ‐ Rehab 18,000         309,000       327,000         327,000      

Stovall WTP ‐ Painting  30,000         543,000       573,000         573,000      

Dredge Channel at North Saluda Intake and Outlet Bldg 11,000         179,000       190,000         190,000      

Pelham Commons Blvd ‐ New Water Main 233,000       233,000         233,000      

S Parker Rd ‐ Replacement Water Main 220,000       220,000         220,000      

S Buckhorn Rd ‐ Replacement Water Main 151,000       151,000         151,000      

Tally Bridge Rd ‐ New Water Main 2,086,000    2,086,000      2,086,000   

Remote Monitoring for PRVs 462,000        462,000         462,000      

FCV Flow and Pressure Monitoring Improvements 219,000        219,000         219,000      

Wellborn Rd to Saluda River ‐ Inspect 72‐in Trans Main 1,573,000     1,573,000      1,573,000   

Moore Rd ‐ Replacement Water Main 1,105,000     1,105,000      1,105,000   

Old White Horse Rd ‐ Replacement Main 1,480,000     1,480,000      1,480,000   

Goodwin Bridge Rd ‐ New Water Main 1,610,000     1,610,000      1,610,000   

  TOTAL RATES/RESERVES  $8,827,500 $7,604,000 $4,991,000 $5,911,000 $4,000,000 $6,449,000 $28,955,000 $37,782,500

Planning Years Only 

15

Page 22: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

GREENVILLE WATER 

2016‐2020 CIP 

PROJECT SUMMARY BY FUNDING SOURCE (cont'd)   Capital 

Committed Budget Total  Total 

Project  Funding 2016 2017 2018 2019 2020 2016‐20 Project 

CAPACITY FEES 

Paris Mountain/Lake Circle Storage Tank ‐ Repaint Tank  $300,000 $0 $300,000

Alkalinity Improvements at Treatment Plants  450,000         ‐                  450,000      

Clearwell Dehumidifiers 195,000         ‐                  195,000      

SCADA Study  150,000         ‐                  150,000      

North Saluda Intake Structure ‐ Rehab 565,000         ‐                  565,000      

Cliffs Valley/Upper Paris Mtn. PS Upgrade  850,000         ‐                  850,000      

Water Resources Master Plan  600,000         550,000       584,000       1,134,000      1,734,000   

N Pleasantburg Rd ‐ Parallel Water Main 931,000       931,000         931,000      

Rutherford Rd ‐ New Water Main  1,026,000    1,051,000    2,077,000      2,077,000   

Highway 276 ‐ New Water Main 1,861,000    1,907,000    3,768,000      3,768,000   

Hillandale ‐ New Storage Tank 136,000       140,000       1,414,000    1,450,000     3,140,000      3,140,000   

Crestwood PS ‐ Increase Pump Size  58,000         1,051,000    ‐                 1,109,000      1,109,000   

Upper White Horse PS ‐ Increase Pump Capacity 111,000       1,003,000    1,027,000     2,141,000      2,141,000   

Goodwin Bridge Reservoir ‐ Additional Storage 86,000         773,000       793,000        1,652,000      1,652,000   

Pineforest Dr ‐ New Water Main 1,184,000    1,184,000      1,184,000   

Bates Crossing Rd ‐ New Water Main 1,333,000    1,333,000      1,333,000   

  TOTAL CAPACITY FEES $3,110,000 $2,507,000 $3,632,000 $3,486,000 $5,574,000 $3,270,000 $18,469,000 $21,579,000

DEBT 

Central Campus Improvements  $5,500,000 $5,500,000

TOTAL CIP  $17,437,500 $10,111,000 $8,623,000 $9,397,000 $9,574,000 $9,719,000 $47,424,000 $64,861,500

        

SUMMARY OF ADDITIONAL OPERATING IMPACTS  Capital 

Budget Total 

2016 2017 2018 2019 2020 2016‐20

Central Campus Improvements  $152,600 $201,077 $207,035 $213,200 $219,580 $993,492

Alkalinity Improvements at WTPs ‐               499,800       514,794       530,238       546,145        2,090,977     Total Operating Impacts  $152,600 $700,877 $721,829 $743,438 $765,725 $3,084,468

                           

Planning Years Only 

Planning Years Only 

16

Page 23: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

 

Project Descriptions

Page 24: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Under contract 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $57,000 $57,000

Easements ‐                    

Planning/Legal/Engineering  810,000          810,000           

Equipment  359,000          359,000           

Construction/Improvements   11,910,000     11,910,000     

Contingency  364,000          364,000           

TOTAL PR0JECT COSTS  $13,500,000 $0 $0 $0 $0 $0 $13,500,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $8,000,000 $8,000,000

Capacity Fees  ‐                    

Revenue Bonds  5,500,000       5,500,000        

TOTAL PROJECT FINANCING  $13,500,000 $0 $0 $0 $0 $0 $13,500,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $152,600 $201,077 $207,035 $213,200 $219,580 $993,492

Cumulative Operational Impact 152,600        353,677        560,712        773,912        993,492          993,492           

FTEs Added  1                     1                       

Cumulative FTEs added ‐                 1                     1                     1                      1                       1                       

Consists of constructing a new operations facility and relocating the Field Operations group and vehicle maintenance facility from its existing 

location at 87 Mayberry St. to newly acquired property adjacent to the Main office located at 407 W. Broad St.  The colocation of the Field 

Operations and Management on one campus will allow for better oversight and efficiencies of operation.  

CENTRAL CAMPUS IMPROVEMENTS 

Pending closeout in 2016 with project anticipated to be completed during 2nd quarter.  

None 

17

Page 25: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

A cost estimate was provided in the 2009 Master Plan updated with an inflation factor.

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  150,000          150,000           

Equipment  ‐                    

Construction/Improvements   ‐                    

Contingency  ‐                    

TOTAL PR0JECT COSTS  $150,000 $0 $0 $0 $0 $0 $150,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $0

Capacity Fees  150,000          150,000           

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $150,000 $0 $0 $0 $0 $0 $150,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

This project consists of a study to determine the best approach to Supervisory Control and Data Acquisition (SCADA) improvements.The SCADA 

system at the Stovall Plant was placed in service in 2000.  Computer hardware and software have a useful service life.  Prior to making upgrades to 

the system a detailed sudy should be performed.

SCADA STUDY 

Continuation 

None

18

Page 26: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

A past quote from Pitney Bowes for an equivalent‐class inserter updated for inflation. 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  280,000          280,000           

Construction/Improvements   ‐                    

Contingency  ‐                    

TOTAL PR0JECT COSTS  $280,000 $0 $0 $0 $0 $0 $280,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $280,000 $280,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $280,000 $0 $0 $0 $0 $0 $280,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Project adds a second folder/inserter to serve as a more modernized system, adding not only the redundancy aspect to billing operations, but also 

greater speed in output. Newer model will serve as the primary insertion system, with the existing Pitney Bowes Series 8 serving as a 

backup/parallel, running system, depending on circumstances. When the existing folder/inserter was procured in 2007, billing volumes were lower 

under quarterly billing, so it now processes three times the volume than was anticipated.  Any stoppage of the system for even a half‐day causes a 

backup in workflow processes, and poses risks of sending bills late to customers. 

NEW BILL INSERTER 

Planned/Programmed 

None 

19

Page 27: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Quote provided by Microsoft Value Added Reseller (VAR).  

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  ‐                    

Construction/Improvements   400,000          400,000           

Contingency  ‐                    

TOTAL PR0JECT COSTS  $400,000 $0 $0 $0 $0 $0 $400,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $400,000 $400,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $400,000 $0 $0 $0 $0 $0 $400,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

This project is for enhancements to our Microsoft Dynamics GP financial software.   The installation of additional modules will improve workflows, 

increase staff efficiency and provide greater transparency and access to financial, human resource, and employee information.   Enhancements to be 

purchased and implemented include the following:  bank reconciliation module, HR module (creation of annual employee benefits statement), 

encumbrance module, online applicant tracking software,  "on demand" reports and inquiry functionality, capital project tracking software, 

automated time reporting and time off management software, purchase requistion software and fleet management software. 

FIS PROJECT 

Continuation ‐ HR module activated (annual benefits statement generated), , bank reconciliation and encumbrance modules implemented.  

Purchase requisition, time reporting and time off, and applicant tracking software purchased and implemented . 

None 

20

Page 28: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Pricing provided by consultant. 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  600,000          550,000        584,000        1,734,000        

Equipment  ‐                    

Construction/Improvements   ‐                    

Contingency  ‐                    

TOTAL PR0JECT COSTS  $600,000 $550,000 $584,000 $0 $0 $0 $1,734,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $0

Capacity Fees  600,000          550,000        584,000        1,734,000        

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $600,000 $550,000 $584,000 $0 $0 $0 $1,734,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

This project includes an intensive, long range, water resource planning effort for the next 100 years so that GW can identify and begin pursuit of the 

next water source to meet growing water supply demands.  Phase I is complete and involved projections of population and future water 

requirements, safe yield studies and reservoir optimization, assessment of the Broad River basin water resource and the development of a Saluda 

River basin model.  Phase II will involve an analysis of the Saluda, Broad and Upper Savannah River basins as well Surface Water Withdrawal permits 

and Lake Keowee permitted withdrawals.  Phase III will identify and develop potential water supplies.

WATER RESOURCES MASTER PLAN

Revision ‐ Phases II and III have been added. 

None

21

Page 29: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Contract and contractor estimate. 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  ‐                    

Construction/Improvements   147,500          35,000           182,500           

Contingency  ‐                    

TOTAL PR0JECT COSTS  $147,500 $35,000 $0 $0 $0 $0 $182,500

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $147,500 $35,000 $182,500

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $147,500 $35,000 $0 $0 $0 $0 $182,500

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

To construct a new residence at Trammell Gap Road to house Watershed personnel to help maintain security on the northern boundary of the North 

Saluda Watershed.  The current residence is in disrepair and needs to be replaced.   

RESIDENCE AT TRAMMEL GAP 

Revision ‐ additional money requested for 2016 to tear down old house, old barn, seal well, and rebuild new barn. Construction of new residence is 

substantially complete.  $20,000 transferred in 2015 from N. Saluda Intake Repairs project. 

None 

22

Page 30: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General 

PROJECT DRIVER Maintenance 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Architect estimate  

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  ‐                    

Construction/Improvements   305,000        305,000           

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $305,000 $0 $0 $0 $0 $305,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $305,000 $305,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $305,000 $0 $0 $0 $0 $305,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                    

A complete remodel to address structural issues, and bring the house up to current building code standards.  The remodel will also improve energy 

efficiency and make the structure more habitable for our caretaker.  This will be the most substantial rehabilitation of this residence since its 

construction by the Civilian Conservation Corps in the 1930s. 

REMODEL TABLE ROCK CARETAKER HOUSE 

New ‐ project moved from operating budget due to quotes exceeding $100,000.  

23

Page 31: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General

PROJECT DRIVER System Management

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Costs of the existing and competing systems, informal estimates of manpower costs‐per‐hour for technical expertise to convert the data.  

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  300,000        300,000           

Construction/Improvements   ‐                    

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $300,000 $0 $0 $0 $0 $300,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $300,000 $300,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $300,000 $0 $0 $0 $0 $300,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Replaces existing Documentum imaging system, converts existing data in the system, and to indexes all images to accounts. The imaging system 

serves as a reference filing system for several processes, especially in Engineering and Business Services, and users barely recognize the service is 

there, operating at a sublayer beneath products like CIS Infinity. Paper items are scanned from paper daily‐‐maps; service orders; contracts; check 

remittances; and other correspondences. These scanned images are important when discussing details with customers regarding their accounts, and 

its continual operation is vital to the flow of operations in the field regarding tap orders, and contractual concerns with developers. The project also 

includes replacement of scanning hardware, and includes an effort to integrate existing scanning capabilities into the project.

IMAGING SYSTEM 

Planned/Programmed 

The existing imaging system has been off software support for over three years and has missed several software updates in the interim.  Repairs may 

require purchasing upgrades to the current version, which could exceed cost of a data conversion and implementation. 

24

Page 32: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Staff estimate

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  200,000        200,000           

Equipment  ‐                    

Construction/Improvements  ‐                    

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $200,000 $0 $0 $0 $0 $200,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $200,000 $200,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $200,000 $0 $0 $0 $0 $200,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

The current ERP was completed in 2003 and is in need of an overall comprehensive system wide update.  The propose scope of work will include and 

updated threat identification, be it natural or man‐made, development of a business and technology continuity plan, and pandemic plan. 

UPDATE EMERGENCY RESPONSE PLAN

New 

None 

25

Page 33: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Consultant's estimate 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  200,000        200,000           

Equipment  ‐                    

Construction/Improvements   ‐                    

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $200,000 $0 $0 $0 $0 $200,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $200,000 $200,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $200,000 $0 $0 $0 $0 $200,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                    

Compliance with the OSHA arc flash regulations requires a study which results in a safe work program including classroom training, physical training 

on the specific equipment involved, and training on the proper use and care of the required personal protective equipment.  Arc flash compliance 

ensures adequate protection of employees from injury from electric components.  A safety consultant will be hired to conduct the study and there 

will be some cost to implement the study recommendations.  The consultant will prepare and arc flash PPE report, arc flash diagrams and labels, as 

well as conduct training sessions.  

ARC FLASH COMPLIANCE/STUDY

New 

None 

26

Page 34: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Consultant estimate 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  130,000        130,000           

Equipment  ‐                    

Construction/Improvements   513,000        513,000           

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $130,000 $513,000 $0 $0 $0 $643,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $130,000 $513,000 $643,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $130,000 $513,000 $0 $0 $0 $643,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Develop a comprehensive Asset Management Program.  Phase I will consist of an organizational capacity assessment to assess current maintenance 

management practices including work order generation, asset inventory, preventative maintenance and scheduling.  Phase 1 will also include an 

evaluation of the staff and organization needs to properly and fully implement and utilize a CMMS. Phase 2 is the selection and implementation of a 

GIS integrated Computerized Maintenance Management System for all vertical and horizontal assets (plants, pump stations, reservoirs, pipelines, 

etc)

COMPREHENSIVE ASSET MANAGEMENT PROGRAM 

New 

None 

27

Page 35: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Architect's estimate 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  ‐                    

Construction/Improvements 600,000        500,000        400,000        1,500,000        

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $600,000 $500,000 $400,000 $0 $0 $1,500,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $600,000 $500,000 $400,000 $1,500,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $600,000 $500,000 $400,000 $0 $0 $1,500,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Subject to project budget constraints, the following improvements and renovations will be considered; relocate Commission Meeting Room to first 

level; paint and carpet all interior space; renovate or replace HVAC system; paint wood exterior; power wash and clean aluminum exterior; relocate 

engineering and remodel training room area on second floor. 

ADMINISTRATIVE BUILDING RENOVATIONS 

New 

None 

28

Page 36: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Staff estimate 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  103,000        103,000           

Equipment  ‐                    

Construction/Improvements   ‐                    

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $0 $103,000 $0 $0 $0 $103,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $103,000 $103,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $103,000 $0 $0 $0 $103,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Security Risk Assessment Master Plan a will provide recommendations for the following aspects:  technical and physical security measures to 

mitigate or reduce risk to staff, data and infrastructure assets; security awareness programs to prevent crimes, trespassing, and terrorism related 

events; modifications to existing security policies and procedures as appropriate; incident response measures for security driven events; phased 

Security implementation strategies with detailed security design cost estimates for recommended measures. 

SYSTEM WIDE SECURITY MASTER PLAN 

New 

None 

29

Page 37: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  General 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Based on Teradata projected costs of $34,000 per terabyte, and with an estimate of 15 terabytes. 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  ‐                    

Construction/Improvements   349,000        89,000           92,000           530,000           

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $0 $349,000 $89,000 $92,000 $0 $530,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $349,000 $89,000 $92,000 $530,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $349,000 $89,000 $92,000 $0 $530,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Implementation of a data warehousing system which will be used to integrate all Greenville Water data sources, serving as a hub for conversion, 

correlation and reporting that spans backward through record periods for purposes of contrast and trend analysis.This enables the shaping of data 

over periods if time which supports key performance indicators, and protects the integrity of production database. The DW system will serve as a 

central hub of information that can be summoned by any department for reports and comparisons, to include auto‐populated dashboards. The 

system will offload the performance impact of reports being run from production systems, which affects productivity negatively. Examples of data to 

be integrated: CIS; GIS; Financials; LIMS; OperationsWork Orders; Field Services Work Orders; Befare/After listing; etc.

DATA WAREHOUSE

New 

None 

30

Page 38: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Intake 

PROJECT DRIVER Condition/ Reliability

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  109,000        109,000           

Equipment  ‐                    

Construction/Improvements  565,000          727,000        1,292,000        

Contingency  181,000        181,000           

TOTAL PR0JECT COSTS  $565,000 $0 $1,017,000 $0 $0 $0 $1,582,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $1,017,000 $1,017,000

Capacity Fees  565,000          565,000           

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $565,000 $0 $1,017,000 $0 $0 $0 $1,582,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Replace top portion of screen.  Replace electrical equipment on intake.  New power supply, including poles and wiring from treating station to 

intake.  Concrete repairs. 

NORTH SALUDA INTAKE STRUCTURE ‐ REHAB

Revision ‐ cost updated as part of Facilities Master Plan.   In 2015, $40,000 was transferred to the Study for North Saluda Pump Station project and 

$20,000 was transferred to the Trammel Gap Residence project. 

None 

31

Page 39: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Intake 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  23,000           23,000           46,000             

Equipment  ‐                    

Construction/Improvements  311,000        311,000           

Contingency  78,000           78,000             

TOTAL PR0JECT COSTS  $0 $0 $23,000 $412,000 $0 $0 $435,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $23,000 $412,000 $435,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $23,000 $412,000 $0 $0 $435,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Installation of portable generator plug and electrical modifications to operate one pump. 

GAYLEY PS PORTABLE GENERATOR CONNECTION 

New

Recommended in CH2MHill Report. 

32

Page 40: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Intake 

PROJECT DRIVER Condition 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  11,000           10,000           21,000             

Equipment  ‐                    

Construction/Improvements   135,000        135,000           

Contingency  34,000           34,000             

TOTAL PR0JECT COSTS  $0 $0 $0 $11,000 $179,000 $0 $190,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $11,000 $179,000 $190,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $11,000 $179,000 $0 $190,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Overall general repairs and maintenance.  Dredge channel beneath outlet structure as needed. 

DREDGE CHANNEL AT NORTH SALUDA INTAKE AND OUTLET BLDG

New 

None

33

Page 41: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Intake 

PROJECT DRIVER Condition 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  11,000           11,000           22,000             

Equipment  ‐                    

Construction/Improvements  141,000        141,000           

Contingency  35,000           35,000             

TOTAL PR0JECT COSTS  $0 $0 $0 $11,000 $187,000 $0 $198,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $11,000 $187,000 $198,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $11,000 $187,000 $0 $198,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Repainting of interior of structure as needed.  Replace windows and remove unused equipment.  Repainting of interior large piping beneath treating 

station.

NORTH SALUDA TREATING STATION ‐ REHAB

New 

None 

34

Page 42: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Intake 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  18,000           17,000           35,000             

Equipment  ‐                    

Construction/Improvements   234,000        234,000           

Contingency  58,000           58,000             

TOTAL PR0JECT COSTS  $0 $0 $0 $18,000 $309,000 $0 $327,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $18,000 $309,000 $327,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $18,000 $309,000 $0 $327,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Repainting of interior of structure as needed.  Replace windows and remove unused equipment.  Replace strainer and Ludlow gate valves in pit.  

Transition above‐grade pits to vaults.

TABLE ROCK TREATING STATION ‐ REHAB

New 

None 

35

Page 43: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Valves 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  14,000           14,000             

Equipment  ‐                    

Construction/Improvements   92,000           92,000             

Contingency  23,000           23,000             

TOTAL PR0JECT COSTS  $0 $129,000 $0 $0 $0 $0 $129,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $129,000 $129,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $129,000 $0 $0 $0 $0 $129,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Add 2 check valves located on pipes 32353 and 26301. Part of the Zone Boundary adjustment from Gravity to Hillandale. 

RUTHERFORD RD ‐ CHECK VALVES 

New

Must have for Rutherford Rd ‐ New Water Main project to work.  

36

Page 44: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Valves 

PROJECT DRIVER Reliability 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  23,000             23,000             

Equipment  ‐                    

Construction/Improvements   157,000          157,000           

Contingency  39,000             39,000             

TOTAL PR0JECT COSTS  $0 $0 $0 $0 $0 $219,000 $219,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $219,000 $219,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $0 $0 $219,000 $219,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Install flow and pressure monitoring on existing flow control valves at JL Mann and Green avenue. 

FCV FLOW AND PRESSURE MONITORING IMPROVEMENTS 

New 

SCADA improvements

37

Page 45: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Valves 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Estimate based on manufacturer's data.  

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  ‐                    

Construction/Improvements   348,000          348,000           

Contingency  114,000          114,000           

TOTAL PR0JECT COSTS  $0 $0 $0 $0 $0 $462,000 $462,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $462,000 $462,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $0 $0 $462,000 $462,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

This project consists of installing  remote monitoring devices for PRV's to monitor upstream and downstream pressure and valve position.   This 

information is important to know if PRV's are functioning properly and allowing the storage tanks to operate properly. There are approximately 53 

PRV's.

REMOTE MONITORING FOR PRVs

Revision ‐ contingency added. 

None

38

Page 46: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Pumping 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan.  Manufacturer's estimate for the generators. 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                      

Planning/Legal/Engineering  ‐                      

Equipment  ‐                      

Construction/Improvements   850,000          850,000             

Contingency  ‐                      

TOTAL PR0JECT COSTS  $850,000 $0 $0 $0 $0 $0 $850,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $0

Capacity Fees  850,000          850,000           

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $850,000 $0 $0 $0 $0 $0 $850,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

The firm capacity of the Cliffs Valley Pump Station will be increased from 250 gpm to 800 gpm.  A new diesel generator willl be added to the Cliffs 

Valley Pump Station for backup power supply.   Currently, one pump is equipped with a diesel drive, but if this pump is not available, then there is no 

emergency pumping available. With the addition of a new connection for the Blue Ridge Rural Water Company to serve the Cliffs Valley North 

community, the need for redundancy is essential.  The firm capacity of the Paris Mountain Pump Station will be increased from 125 gpm to 250 gpm.  

The Paris Mountain Pump Station has operated at a max day 116% of firm capacity with a 5 year max day average of approximately 94% of firm 

capacity.  These peaking conditions typically occur during the hottest summer days.  It is recommended that plans be made to increase pumping 

capacity when a pump station operates at approximately 80% firm capacity during peak summer usage.The existing generator will be reviewed to 

determine if it is capable of operating the new pumps.  An engineering study was performed to determine recommended pump capacities and 

number of pumps to be installed.  

CLIFFS VALLEY/UPPER PARIS MTN PS UPGRADE

Continuation ‐ substantially complete 

None 

39

Page 47: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Pumping 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  58,000           59,000           117,000           

Equipment  ‐                    

Construction/Improvements   794,000        794,000           

Contingency  198,000        198,000           

TOTAL PR0JECT COSTS  $0 $0 $0 $58,000 $1,051,000 $0 $1,109,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $0

Capacity Fees  58,000           1,051,000     1,109,000        

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $58,000 $1,051,000 $0 $1,109,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Analysis of system demand indicated the need for a firm capacity increase to 5.5 MGD at 185 ft.

CRESTWOOD PS ‐ INCREASE PUMP SIZE

New 

Alternative analysis of E. Paris Mtn PS & Reservoir. 

40

Page 48: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Pumping

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                      

Planning/Legal/Engineering  111,000          57,000             58,000             226,000             

Equipment  ‐                      

Construction/Improvements   757,000          775,000          1,532,000          

Contingency  189,000          194,000          383,000             

TOTAL PR0JECT COSTS  $0 $0 $0 $111,000 $1,003,000 $1,027,000 $2,141,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $0

Capacity Fees  111,000        1,003,000     1,027,000       2,141,000        

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $111,000 $1,003,000 $1,027,000 $2,141,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Analysis of system demand indicated the need for a firm capacity increase to 4.5 MGD at 185 ft. Recommendation is to separate the plant water PS 

from the Service area PS. 

UPPER WHITE HORSE PS ‐ INCREASE PUMP CAPACITY 

New 

Based on firm capacity & MDD demands spreadsheet analysis. 

41

Page 49: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Storage 

PROJECT DRIVER Age/Condition 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Historical pricing and Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  ‐                    

Construction/Improvements   300,000          3,000             303,000           

Contingency  76,000           76,000             

TOTAL PR0JECT COSTS  $300,000 $79,000 $0 $0 $0 $0 $379,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $79,000 $79,000

Capacity Fees  300,000          300,000           

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $300,000 $79,000 $0 $0 $0 $0 $379,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                    

Based on sequencing of tank painting, this tank is due for repainting.

PARIS MOUNTAIN/LAKE CIRCLE STORAGE TANK ‐ REPAINT TANK

Revision ‐ contingency added.  Out for bid. 

None 

42

Page 50: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Storage 

PROJECT DRIVER Condition 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  ‐                    

Construction/Improvements  578,000        578,000           

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $0 $0 $578,000 $0 $0 $578,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $578,000 $578,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $578,000 $0 $0 $578,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Based on sequencing of tank painting, this tank is due for repainting.

REPAINT WHAM TANK 

Planned/Programmed 

None 

43

Page 51: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Storage 

PROJECT DRIVER Condition/Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  136,000        140,000        143,000        148,000          567,000           

Equipment  ‐                    

Construction/Improvements   1,017,000     1,042,000       2,059,000        

Contingency  254,000        260,000          514,000           

TOTAL PR0JECT COSTS  $0 $0 $136,000 $140,000 $1,414,000 $1,450,000 $3,140,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $0

Capacity Fees  136,000        140,000        1,414,000     1,450,000       3,140,000        

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $136,000 $140,000 $1,414,000 $1,450,000 $3,140,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

New tank with 1.5 MG prestressed concrete reservoir. 

HILLANDALE ‐ NEW STORAGE TANK 

New 

Alternative analysis of E. Paris Mtn PS & Reservoir. 

44

Page 52: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Storage 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  86,000           43,000           45,000             174,000           

Equipment  ‐                    

Construction/Improvements   584,000        598,000          1,182,000        

Contingency  146,000        150,000          296,000           

TOTAL PR0JECT COSTS  $0 $0 $0 $86,000 $773,000 $793,000 $1,652,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $0

Capacity Fees  86,000           773,000        793,000          1,652,000        

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $86,000 $773,000 $793,000 $1,652,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Analysis of system demand indicated the need for an additional 0.5 MG of storage at this location in the Upper White Horse Pressure Zone. 

GOODWIN BRIDGE RESERVOIR ‐ ADDITIONAL STORAGE

New 

Spreadsheet analysis for storage requirements for each zone.  

45

Page 53: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Treatment 

PROJECT DRIVER Condition 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Estimate obtained from manufacturer. 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  195,000          305,000        500,000           

Construction/Improvements   ‐                    

Contingency  ‐                    

TOTAL PR0JECT COSTS  $195,000 $305,000 $0 $0 $0 $0 $500,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $305,000 $305,000

Capacity Fees  195,000          195,000           

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $195,000 $305,000 $0 $0 $0 $0 $500,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Replacement of 3 dehumidifiers in the basement of the Adkins Treatement Plant. Installation of a coolant on the exhaust to prevent heat build up in 

the basement.  Replacements needed due to the considerable amount of corrosion that is taking place on the metal surfaces in the filter gallery 

located in the basement of Adkins plant.   

CLEARWELL DEHUMIDIFIERS 

Revision ‐ engineering study performed to make recommendation to address humidity conditions.  Additional funding requested in 2016 to fully 

cover the cost of replacing the dehumidifiers and any ventilation work that may be needed.    

None 

46

Page 54: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Treatment 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

HDR Corrosion Control Study and Facilities Master Plan

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  450,000          450,000           

Equipment  ‐                    

Construction/Improvements   2,200,000     2,255,000     4,455,000        

Contingency  ‐                    

TOTAL PR0JECT COSTS  $450,000 $2,200,000 $2,255,000 $0 $0 $0 $4,905,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $2,200,000 $2,255,000 $4,455,000

Capacity Fees  450,000          450,000           

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $450,000 $2,200,000 $2,255,000 $0 $0 $0 $4,905,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $499,800 $514,794 $530,238 $546,145 $2,090,977

Cumulative Operational Impact ‐                 499,800        1,014,594     1,544,832     2,090,977       2,090,977        

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

The HDR 2013 Corrosion Control Study recommended implementation of the following improvements:

‐ Construct pre and post liquid lime feed systems at the Stovall and Adkins WTPs

‐ Construct a post CO2 alkalinity supplementation feed system at the Stovall and Adkins WTPs

These improvements will enhance operator safety as these facilities, add additional buffering capacity to GW’s finished water to reduce finished 

water pH variations, improve distribution system water quality, limit corrosion potential and mitigate recent and projected chemical pricing volatility 

associated with the use of caustic soda as a pH adjustment chemical.

ALKALINITY IMPROVEMENTS AT WTPs

Revision ‐ cost estimate updated as part of Facilities Master Plan 

None 

47

Page 55: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Treatment 

PROJECT DRIVER Redundancy

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  23,000           23,000             

Equipment  151,000        151,000           

Construction/Improvements  38,000           38,000             

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $212,000 $0 $0 $0 $0 $212,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $212,000 $212,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $212,000 $0 $0 $0 $0 $212,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                    

Install redundant 225kva 4160 to 480 transformer near FWPS.

STOVALL WTP ‐ REDUNDANT TRANSFORMER

New 

None 

48

Page 56: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Treatment 

PROJECT DRIVER Age/Condition 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Estimate provided by Black & Veatch.  

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  ‐                    

Construction/Improvements  381,000        381,000           

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $381,000 $0 $0 $0 $0 $381,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $381,000 $381,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $381,000 $0 $0 $0 $0 $381,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                    

Replace original roof on DAF building that was built in 2000.  Roof is exhibiting signs of deterioration.  

STOVALL WTP ‐ NEW ROOF 

New 

None 

49

Page 57: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Treatment  

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Vendor quote 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  ‐                    

Construction/Improvements   1,500,000     1,500,000        

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $1,500,000 $0 $0 $0 $0 $1,500,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $1,500,000 $1,500,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $1,500,000 $0 $0 $0 $0 $1,500,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Periodic removal of accumulated sludge at Adkins WTP that is performed every 5‐7 years.  First time removal of sludge from lagoons that has 

accumulated at Stovall WTP since the plant was placed in service.   

SLUDGE REMOVAL AT WTPs

New 

None 

50

Page 58: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Treatment 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan  

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  110,000        110,000           

Equipment  ‐                    

Construction/Improvements   ‐                    

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $110,000 $0 $0 $0 $0 $110,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $110,000 $110,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $110,000 $0 $0 $0 $0 $110,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                    

Residuals handling study (both WTPs).  Permitting for land application of residuals at Stovall plant.  Evaluate automation of centrifuge operation at 

Stovall.

RESIDUALS HANDLING AND PERMITTING STUDY

Planned/Programmed 

None 

51

Page 59: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Treatment

PROJECT DRIVER Condition 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Estimate obtained from contractor for 5,000 sq. ft. at $18/sq.ft..  

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  ‐                    

Construction/Improvements  125,000        125,000           

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $125,000 $0 $0 $0 $0 $125,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $125,000 $125,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $125,000 $0 $0 $0 $0 $125,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                    

Replace original flooring in facility that was built in 2000.  Floor has damage and/or significant wear.   

REPLACE LAB FLOORS AT STOVALL WTP 

New 

None 

52

Page 60: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Treatment 

PROJECT DRIVER System Management 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Staff estimate 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  25,000           25,000             

Equipment  103,000        103,000           

Construction/Improvements   ‐                    

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $25,000 $103,000 $0 $0 $0 $128,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $25,000 $103,000 $128,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $25,000 $103,000 $0 $0 $0 $128,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Project involves having a consultant evaluate the 4 fume hoods in the laboratory to determine if more energy efficient hoods are available.  The 

current hoods are on all the time resulting in very high energy bills.  Replacement hoods would be purchased based on consultant's 

recommendation that will take into account safety regulations, the safety of laboratory staff and minimizing energy usage. 

FUME HOOD REPLACEMENT AT STOVALL WTP LAB

New 

None 

53

Page 61: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Treatment 

PROJECT DRIVER Condition 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  51,000           53,000           104,000           

Equipment  ‐                    

Construction/Improvements  690,000        690,000           

Contingency  172,000        172,000           

TOTAL PR0JECT COSTS  $0 $0 $51,000 $915,000 $0 $0 $966,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $51,000 $915,000 $966,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $51,000 $915,000 $0 $0 $966,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Repaint/repair flocculators, sludge collectors (1985 basins only), and baffle walls.  Minor paint repair to rapid mixer motors. Perform touchup 

painting on finished water equipment/ piping as needed. General touchup painting at residuals facility. keowee RWPS ‐ Minor painting.  Repair basin 

concrete and expansion joints.  Sedimentation basin flume and gate modifications to allow for year 2003 sedimentation basins to feed the year 1985 

filters.  Install water pipe headers around basins.

ADKINS WTP ‐ BASIN REHAB AND PAINTING 

New 

None 

54

Page 62: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Treatment

PROJECT DRIVER Condition 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  77,000           23,000           100,000           

Equipment  ‐                    

Construction/Improvements   679,000        679,000           

Contingency  170,000        170,000           

TOTAL PR0JECT COSTS  $0 $0 $77,000 $872,000 $0 $0 $949,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $77,000 $872,000 $949,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $77,000 $872,000 $0 $0 $949,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Filter gallery rehabilitation including repainting/repair of piping, panels as needed.  New pneumatic filter effluent valves.  New filter control panels.  

Repair existing filter coating.

ADKINS WTP ‐ FILTER GALLERY REHAB

New 

None 

55

Page 63: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Treatment 

PROJECT DRIVER Condition 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  30,000           30,000           60,000             

Equipment  ‐                    

Construction/Improvements   411,000        411,000           

Contingency  102,000        102,000           

TOTAL PR0JECT COSTS  $0 $0 $0 $30,000 $543,000 $0 $573,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $30,000 $543,000 $573,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $30,000 $543,000 $0 $573,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Painting ‐ raw water piping, DAF gallery piping, DAF effluent flume, filter gallery piping, finished water PS piping, residuals piping, repair chemical 

containment coatings.

STOVALL WTP ‐ PAINTING 

New

None 

56

Page 64: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Reservoirs 

PROJECT DRIVER Condition 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Staff estimate 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  ‐                    

Equipment  ‐                    

Construction/Improvements   150,000        150,000           

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $150,000 $0 $0 $0 $0 $150,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $150,000 $150,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $150,000 $0 $0 $0 $0 $150,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Address perched water issue at North Saluda dam identified by 2014 BLE evaluation.  Installation of electronic instrumentation to enhance dam 

operations at both reservoirs.   Additional improvements may be needed based on recommendations of geotechnical evaluation by BLE.  

DAM IMPROVEMENTS AT TABLE ROCK AND NORTH SALUDA

New 

None 

57

Page 65: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 8,000              8,000                 

Planning/Legal/Engineering  31,000           31,000               

Equipment  ‐                     

Construction/Improvements   207,000          207,000             

Contingency  52,000           52,000               

TOTAL PR0JECT COSTS  $0 $298,000 $0 $0 $0 $0 $298,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $298,000 $298,000

Capacity Fees  ‐                     

Revenue Bonds  ‐                     

TOTAL PROJECT FINANCING  $0 $298,000 $0 $0 $0 $0 $298,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

FTEs Added  ‐                     

Cumulative FTEs added ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

The new water main will maintain looping and service to the southern portion of Hillandale. Location is Piney Mountain Rd from Milian Dr to View 

Point Dr. 

PINEY MOUNTAIN RD #1 ‐ NEW MAIN

New 

Must have for Rutherford Rd ‐ New Water Main project to work.  

58

Page 66: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Fire Flow 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 6,000              6,000                 

Planning/Legal/Engineering  34,000           34,000               

Equipment  ‐                     

Construction/Improvements   224,000          224,000             Contingency  56,000           56,000               

TOTAL PR0JECT COSTS  $0 $320,000 $0 $0 $0 $0 $320,000

TOTAL 

COMMITTED  PROJECT PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $320,000 $320,000

Capacity Fees  ‐                     Revenue Bonds  ‐                     

TOTAL PROJECT FINANCING  $0 $320,000 $0 $0 $0 $0 $320,000

TOTAL 

OPERATIONAL OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

FTEs Added  ‐                     Cumulative FTEs added ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

New water main is needed for fire flow capacity (addresses minimum 500 gpm Fire flow and cluster area). Location is Aiken Chapel Rd from Riverside Dr 

to Old Chick Springs Rd. 

AIKEN CHAPEL RD ‐ NEW WATER MAIN

New 

None 

59

Page 67: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  99,000           99,000             

Equipment  ‐                    

Construction/Improvements   666,000        666,000           

Contingency  166,000        166,000           

TOTAL PR0JECT COSTS  $0 $931,000 $0 $0 $0 $0 $931,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $0

Capacity Fees  931,000        931,000           

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $931,000 $0 $0 $0 $0 $931,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Part of the Zone Boundary adjustment from Gravity to Hillandale. Location is N Pleasantburg Dr from Piney Mountain Rd to Rutherford Rd; Parallel 

to 8‐inch. 

N PLEASANTBURG RD ‐ PARALLEL WATER MAIN 

New 

Must have for Rutherford Rd ‐ New Water Main project to work.  

60

Page 68: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 19,000           20,000           39,000             

Planning/Legal/Engineering  108,000        111,000        219,000           

Equipment  719,000        736,000        1,455,000        

Construction/Improvements   180,000        184,000        364,000           

Contingency  ‐                    

TOTAL PR0JECT COSTS  $0 $1,026,000 $1,051,000 $0 $0 $0 $2,077,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $0

Capacity Fees  1,026,000     1,051,000     2,077,000        

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $1,026,000 $1,051,000 $0 $0 $0 $2,077,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Part of the Zone Boundary adjustment from Gravity to Hillandale. Also, the connection from the 16‐inch transmission line should be moved to the 

new water main. Location is Rutherford Rd from Waddell Rd to N Pleasantburg; Parallel to 16‐inch. 

RUTHERFORD RD ‐ NEW WATER MAIN 

New 

Significant improvement 

61

Page 69: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 28,000          29,000          57,000               

Planning/Legal/Engineering  196,000        201,000        397,000             

Equipment  ‐                     

Construction/Improvements   1,309,000     1,342,000     2,651,000         

Contingency  328,000        335,000        663,000             

TOTAL PR0JECT COSTS  $0 $0 $1,861,000 $1,907,000 $0 $0 $3,768,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $0

Capacity Fees  1,861,000     1,907,000     3,768,000         

Revenue Bonds  ‐                     

TOTAL PROJECT FINANCING  $0 $0 $1,861,000 $1,907,000 $0 $0 $3,768,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

FTEs Added  ‐                     

Cumulative FTEs added ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

New water main will increase pressures and looping and will decrease the HGL. Location is Hwy 276 from White Horse Rd to Renfrew Rd; Renfrew Rd 

to Hodgens Dr ending at Old White Horse Rd. 

HIGHWAY 276 ‐ NEW WATER MAIN 

New 

Significant improvement

62

Page 70: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Fire Flow

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 3,000               3,000                  

Planning/Legal/Engineering  13,000             13,000               

Equipment  ‐                      

Construction/Improvements   87,000             87,000               

Contingency  22,000             22,000               

TOTAL PR0JECT COSTS  $0 $0 $0 $125,000 $0 $0 $125,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $125,000 $125,000

Capacity Fees  ‐                      

Revenue Bonds  ‐                      TOTAL PROJECT FINANCING  $0 $0 $0 $125,000 $0 $0 $125,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                   ‐                  ‐                  ‐                  ‐                   ‐                     

FTEs Added  ‐                     

Cumulative FTEs added ‐                   ‐                  ‐                  ‐                  ‐                   ‐                     

New Water main is needed for fire flow capacity (addresses minimum 500 gpm fire flow). Location is SE Main St from W Curtis St to E Trade St

SE MAIN ST ‐ NEW WATER MAIN 

New 

None 

63

Page 71: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Age/Condition 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 28,000           28,000             

Planning/Legal/Engineering  259,000        259,000           

Equipment  ‐                    

Construction/Improvements   1,730,000     1,730,000        

Contingency  433,000        433,000           

TOTAL PR0JECT COSTS  $0 $0 $0 $2,450,000 $0 $0 $2,450,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $2,450,000 $2,450,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $2,450,000 $0 $0 $2,450,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Replacement of existing 24 in CI main. Location is from Rutherford Rd to Croft St. 

MAIN ST ‐ REPLACE 24‐IN. MAIN 

New 

None 

64

Page 72: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 25,000           25,000              

Planning/Legal/Engineering  124,000         124,000             

Equipment  ‐                     

Construction/Improvements   828,000         828,000             

Contingency  207,000         207,000             

TOTAL PR0JECT COSTS  $0 $0 $0 $1,184,000 $0 $0 $1,184,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $0

Capacity Fees  1,184,000     1,184,000          

Revenue Bonds  ‐                     

TOTAL PROJECT FINANCING  $0 $0 $0 $1,184,000 $0 $0 $1,184,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                   ‐                  ‐                  ‐                  ‐                   ‐                     

FTEs Added  ‐                     

Cumulative FTEs added ‐                   ‐                  ‐                  ‐                  ‐                   ‐                     

The new water main will increase pressure and reduce HGL. Location is Pineforest Dr from Altamont Ter to Little Texas Rd, along Little Texas Rd to 12‐

inch WM; Parallel to a 8‐inch. 

PINEFOREST DR ‐ NEW WATER MAIN 

New 

Significant improvement

65

Page 73: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 5,000             5,000               

Planning/Legal/Engineering  25,000           25,000             

Equipment  ‐                    

Construction/Improvements   162,000        162,000           

Contingency  41,000           41,000             

TOTAL PR0JECT COSTS  $0 $0 $0 $0 $233,000 $0 $233,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $233,000 $233,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $0 $233,000 $0 $233,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Part of the Zone Boundary Adjustment from Gravity to Lowndes. Location is Pelham Commons Blvd from Pelham Springs Pl to E North St, along E 

North St to Rock Side Ct. 

PELHAM COMMONS BLVD ‐ NEW WATER MAIN

New

None 

66

Page 74: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Fire Flow 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 4,000             4,000                

Planning/Legal/Engineering  23,000          23,000              

Equipment  ‐                    

Construction/Improvements   154,000        154,000            

Contingency  39,000          39,000              

TOTAL PR0JECT COSTS  $0 $0 $0 $0 $220,000 $0 $220,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $220,000 $220,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $0 $220,000 $0 $220,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                  ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                  ‐                 ‐                 ‐                 ‐                   ‐                    

New Water main is needed for fire flow capacity (addresses cluster area). Location is S Parker Rd from US 25 BR to Cheviot Dr; Replacing a 6‐inch. 

S. PARKER RD ‐ REPLACEMENT WATER MAIN 

New 

None 

67

Page 75: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 3,000             3,000                 

Planning/Legal/Engineering  16,000           16,000              

Equipment  ‐                     

Construction/Improvements   106,000         106,000             

Contingency  26,000           26,000              

TOTAL PR0JECT COSTS  $0 $0 $0 $0 $151,000 $0 $151,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $151,000 $151,000

Capacity Fees  ‐                     

Revenue Bonds  ‐                     

TOTAL PROJECT FINANCING  $0 $0 $0 $0 $151,000 $0 $151,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                   ‐                  ‐                  ‐                  ‐                   ‐                     

FTEs Added  ‐                     

Cumulative FTEs added ‐                   ‐                  ‐                  ‐                  ‐                   ‐                     

The new water main will increase pressure and reduce HGL. Location is S Buckhorn rd from State Park Rd to Coxe Dr. Replacing a 6‐inch.

S. BUCKHORN RD ‐ REPLACEMENT WATER MAIN 

New 

None 

68

Page 76: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 43,000           43,000             

Planning/Legal/Engineering  219,000        219,000           

Equipment  ‐                    

Construction/Improvements   1,459,000     1,459,000        

Contingency  365,000        365,000           

TOTAL PR0JECT COSTS  $0 $0 $0 $0 $2,086,000 $0 $2,086,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $2,086,000 $2,086,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $0 $2,086,000 $0 $2,086,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

The new water main will increase pressures and looping

TALLY BRIDGE RD ‐ NEW WATER MAIN

New 

Improves cluster pressures @ higher elevation. 

69

Page 77: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 28,000          28,000               

Planning/Legal/Engineering  140,000        140,000             

Equipment  ‐                     

Construction/Improvements   932,000        932,000             

Contingency  233,000        233,000             

TOTAL PR0JECT COSTS  $0 $0 $0 $0 $1,333,000 $0 $1,333,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $0

Capacity Fees  1,333,000     1,333,000         

Revenue Bonds  ‐                     

TOTAL PROJECT FINANCING  $0 $0 $0 $0 $1,333,000 $0 $1,333,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

FTEs Added  ‐                     

Cumulative FTEs added ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

The new water main will reduce the HGL and increase flow to storage tanks; Replacing a 8‐inch.

BATES CROSSING RD ‐ NEW WATER MAIN 

New 

None 

70

Page 78: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Fire Flow

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 23,000          23,000               

Planning/Legal/Engineering  116,000        116,000             

Equipment  ‐                     

Construction/Improvements   773,000        773,000             

Contingency  193,000        193,000             

TOTAL PR0JECT COSTS  $0 $0 $0 $0 $0 $1,105,000 $1,105,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $1,105,000 $1,105,000

Capacity Fees  ‐                     

Revenue Bonds  ‐                     

TOTAL PROJECT FINANCING  $0 $0 $0 $0 $0 $1,105,000 $1,105,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

FTEs Added  ‐                     

Cumulative FTEs added ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

New water main will increase Pressure. Location is Moore Rd from Old Stage Rd to NE Main St. Replacing a 2‐inch.

MOORE RD ‐ REPLACEMENT WATER MAIN

New 

None 

71

Page 79: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 30,000          30,000               

Planning/Legal/Engineering  156,000        156,000             

Equipment  ‐                     

Construction/Improvements   1,035,000     1,035,000         Contingency  259,000        259,000             

TOTAL PR0JECT COSTS  $0 $0 $0 $0 $0 $1,480,000 $1,480,000

TOTAL 

COMMITTED  PROJECT PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $1,480,000 $1,480,000

Capacity Fees  ‐                     Revenue Bonds  ‐                     

TOTAL PROJECT FINANCING  $0 $0 $0 $0 $0 $1,480,000 $1,480,000

TOTAL 

OPERATIONAL OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

FTEs Added  ‐                     Cumulative FTEs added ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

New Water Main will increase pressures and decrease HGL. Location is Old White Horse Rd from Batson Rd to Roe Ford Rd. Replacing a 8‐inch. 

OLD WHITE HORSE RD ‐ REPLACEMENT MAIN 

New 

None 

72

Page 80: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Capacity 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements 34,000          34,000               

Planning/Legal/Engineering  169,000        169,000             

Equipment  ‐                     

Construction/Improvements   1,126,000     1,126,000         

Contingency  281,000        281,000             

TOTAL PR0JECT COSTS  $0 $0 $0 $0 $0 $1,610,000 $1,610,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $1,610,000 $1,610,000

Capacity Fees  ‐                     

Revenue Bonds  ‐                     

TOTAL PROJECT FINANCING  $0 $0 $0 $0 $0 $1,610,000 $1,610,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

FTEs Added  ‐                     

Cumulative FTEs added ‐                  ‐                 ‐                 ‐                 ‐                  ‐                     

The new water main will reduce the HGL and increase flow to the upper Pressure zones; Parallel to a 12‐inch

GOODWIN BRIDGE RD ‐ NEW WATER MAIN

New 

Significant improvement

73

Page 81: CAPITAL IMPROVEMENT PROGRAM 2016 – 2020€¦ · Repaint Wham Tank ... f the plan subsequen. The Five n for the C. er Plan . eatch comp pital Improve nt and distri proach for t h

2016‐20 CIP 

PROJECT CATEGORY  Mains 

PROJECT DRIVER Capacity/Reliability 

PROJECT DETAILS AND JUSTIFICATION 

PROJECT STATUS 

METHOD FOR ESTMATING COST 

Facilities Master Plan 

SPECIAL CONSIDERATIONS 

TOTAL 

COMMITTED  PROJECT 

PR0JECT COSTS  FUNDING  2016 2017 2018 2019 2020 COST

Land Acquistion Cost  $0

Easements ‐                    

Planning/Legal/Engineering  169,000          169,000           

Equipment  ‐                    

Construction/Improvements   1,124,000       1,124,000        

Contingency  280,000          280,000           

TOTAL PR0JECT COSTS  $0 $0 $0 $0 $0 $1,573,000 $1,573,000

TOTAL 

COMMITTED  PROJECT 

PROJECT FINANCING FUNDING  2016 2017 2018 2019 2020 FINANCING 

Rates/Reserves  $1,573,000 $1,573,000

Capacity Fees  ‐                    

Revenue Bonds  ‐                    

TOTAL PROJECT FINANCING  $0 $0 $0 $0 $0 $1,573,000 $1,573,000

TOTAL 

OPERATIONAL 

OPERATIONAL IMPACT  2016 2017 2018 2019 2020 IMPACT

Net Operational Impact  $0

Cumulative Operational Impact ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

FTEs Added  ‐                    

Cumulative FTEs added ‐                 ‐                 ‐                 ‐                 ‐                   ‐                    

Inspect 72" transmission main.

WELLBORN RD TO SALUDA RIVER ‐ INSPECT 72‐IN TRANS MAIN

New

Include inspection every 5 years as recommended by pipe line inspector.

74