Capital Enhancements: GolfSUMMER 2019
PURPOSE: The south tee will be excavated and space will be added to the top tee, which will nearly double the size of the south tee to to comfortably accommodate our membership needs.
The removal of the lower tee will also allow more distance between the south and north tees to accomodate the use of golf clubs’ modern technology and the north tee usage.
SCOPE: Six weeks of excavation, irrigation install; six weeks of growth.
The small putting green (currently located behind the cart path of the driving range tee) will be removed to allow us to expand the tee to these specifications.
The overall south tee will nearly double from 35,000 sq. ft. to 68,000 sq. ft. The distance to the front edge of the north tee will also be expanded from 260 yds. to 280 yds., with 320 yds. from the back of new south tee.
*Timeline is approximate and is subject to change.
Capital Enhancements: Golf
SUMMER 2019 3
JUNE 1 - END OF AUGUST*
DRIVING RANGE TEE EXPANSION
PURPOSE: The chipping green (adjacent to the driving range’s south tee) will be reconfigured to accurately replicate the structure of our current greens, allowing players to practice various shot scenarios found on the golf course.
SCOPE: Six weeks of excavation, irrigation install; six weeks of growth.
The chipping green, which currently sits at 7,000 sq. ft., will expand to 11,000 sq. ft.
The green will be contoured to mimic #1 and #16 greens. The recontouring will enable players to see the shot roll out, as they currently are unable to, due to the severe undulations within the green.
*Timeline is approximate and is subject to change.
Capital Enhancements: Golf
SUMMER 20194
JUNE 1 - END OF AUGUST*
CHIPPING GREEN RENOVATION
Creates longer bumpand run Chipping area
Area for pitch shots fromvariable slopes
Elevated green toallow flop shot
with butterfly feet
Great off greenputting area
Proposed Green(11,000 s.f.)
PURPOSE: The tee box is being relocated to the right to avoid stray shots consistently going towards homes.
The restrooms will be updated and outfitted with air conditioning and new furnishings.
As the first phase of the course irrigation renovation, the aging pump station will be replaced to ensure the heart of course irrigation will be reliable for years to come.
SCOPE: Four to six weeks.
Restroom building will have roof replaced, will be outfitted with air conditioning and new furnishings, along with the addition of office space incorporated into building.
*Timeline is approximate and is subject to change.
Capital Enhancements: Golf
SUMMER 2019 7
JUNE 15 - AUGUST 1 *
HOLE #10 RENOVATIONSTEE BOX, RESTROOMS & PUMP STATION
CONTACT US QUESTIONS OR COMMENTS