CAP'EM WP2 A10 GUI [avniR] Demonstration Brian Murphy BSc Dip Arch (Hons+Dist)
Environmental Specification Consultant @ www.GreenSpec.co.uk
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 3
The CAP’EM project
• financed by North West Europe (NWE)
Program INTERREG IVB
• Match-funded by many
• 10 expert project partners from Belgium,
France, Germany, the Netherlands and
the UK.
• 4 years
• Euro 8m
07/11/2011 4 © GreenSpec 2008-11 CAPEM GUI
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 5
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 6
The CAP’EM project aims
• to increase manufacture, distribution and
use of eco-materials in NWE building
industry by:
– easy access to data
– comparing ‘component’ properties
– better demonstration of eco materials benefits
– supply chain development into 5 countries
• A key hurdle was
– overcoming differences in regional and national
approaches to how we define, evaluate and
promote eco-materials.` 07/11/2011 8 © GreenSpec 2008-11 CAPEM GUI
NWE common tools
• Definition of eco-materials
• ‘Jargon buster’ of 130 definitions (English)
• Eco Construction term translator
– (4 languages)
• Measurement Unit translator
– (ISO metric & UK Imperial)
• Life Cycle Assessment (LCA) methodology
for evaluating the environmental impacts of
these materials:
– the CAP’EM method. 9
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 10
07/11/2011 © NGS GreenSpec 2010 BrianMurphy 11
07/11/2011 © NGS GreenSpec 2010 BrianMurphy 12
07/11/2011 © NGS GreenSpec 2010 BrianMurphy 14
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 15
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 16
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 17
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 18
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 19
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 20
07/11/2011 © NGS GreenSpec 2010 BrianMurphy 21
CAP'EM’s database
• 100 eco and conventional construction ‘components’ – products and materials
• a unique combination of information: – product technical
– social
– environmental
– end of life solutions
– cradle to gate Life Cycle Assessment (LCA) data
• Many generic materials (50+): – Concrete, timber, steel, etc.
– regionalised LCA • For 5 participating countries in NW Europe.
22
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 23
CAP'EM LCA GUI
• CAP'EM are in a 4 month project
• PRé Consultants.
– SimaPro & host of EcoInvent LCA database,
• Making recommendations for the
development of data and CAP'EM Method
• Responsible for the design of the
database Graphic User Interface (GUI)
• GreenDeltaTC is in charge of the
development/programming of the tool 24 © GreenSpec 2008-11 CAPEM GUI
CAP'EM GUI
• The GUI presentation will show searches for ‘components’ by:
– building applications • avoiding inappropriate applications
• once found selected equivalent product’s can be compared side by side
• adding project site Address to the GUI will calculate ‘gate-to-site LCA’.
• Project data will be added to Product Data Sheets and stored for users to download or emailed to users.
07/11/2011 25 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxx
07/11/2011 26 © GreenSpec 2008-11 CAPEM GUI
07/11/2011 27 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 28 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 29 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 30 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 31 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 32 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 33 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 34 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 35 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 36 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 37 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 38 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 39 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 40 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 41 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 42 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 43 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 44
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 45 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 46 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
07/11/2011 47 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
Under
Development
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 48
07/11/2011 49 © GreenSpec 2008-11 CAPEM GUI
xxxxxxxxxxxxxxxxxxxxxxxxx
Outputs:
Product Data
Sheet with LCA to site
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 50
Having added Site Postcode
Factory to Site LCA
Calculated by GUI
To Site LCA added to PDS
Project specific LCA
Front End:
Selection of
elements or
components 07/11/2011 © GreenSpec 2008-11 CAPEM GUI 52
Point at an element filter the database
• Brian Murphy
• Twitter: http://twitter.com/brianspecman
• Scribd: www.scribd.com/brianspecman – (132,000 reads of 230 CPD seminar files,
Specifications, Appendix)
• LinkedIN, Facebook, Plaxo, etc.
• GreenSpec www.greenspec.co.uk
• GreenSpecStudio Design and Specification tool http://www.greenspec.co.uk/greenspec/studio/
07/11/2011 © GreenSpec 2008-11 CAPEM GUI 54