    Daimeter of pile (D) = 0.50 m

    Effective pile length from bottom of pile cap = 28.50 m

    Height of GL from bottom of pile cap = 4.50 m

    Depth of ater table from GL = !."5 m

    Depth Length BH-01 BH-02 BH-03 BH-04 Average

    0 # $.55 m $.55 Dr% &en'it% !." tm$$.55 # !5.*5 m !2.40 +,bmerge& &en'it% 0." tm$

    !5.*5 # 2!."5 m 5.80 +,bmerge& &en'it% 0." tm$

    2!."5 # $2.50m !0."5 +,bmerge& &en'it% 0." tm$

    -otal = $2.50

    Depth Length BH-01 BH-02 BH-03 BH-04 Average

    0 # $.55 m $.55   φ 0 &egree'

    $.55 # !5.*5 m !2.40   φ 0 &egree'

    !5.*5 # 2!."5 m 5.80   φ 0 &egree'

    2!."5 # $2.50m !0."5   φ $4 &egree'

    -otal = $2.50

    Depth Length BH-01 BH-02 BH-03 BH-04 Average0 # $.55 m $.55 c 0 tm2

    $.55 # !5.*5 m !2.40 c $.5 tm2

    !5.*5 # 2!."5 m 5.80 c 8 tm2

    2!."5 # $2.50m !0."5 c 0 tm2

    -otal = $2.50

    ro'' 'ectional area of pile (/p) = 0.!*25 m2

    1nit eight of 'oil above ater table = !." tm$

    Effective ,nit eight at 'oil at pile toe = 0." tm$

    ohe'ion at pile toe = 0.00 tm20 &egree' $2.! 3 = $!.4 c = *

    verb,r&en pre'',re at bottom of pile cap (&0) = ".5 tm2

    verb,r&en pre'',re (&!) = 2.*8 tm2

    verb,r&en pre'',re (&2) = 2!.88 tm2

    -otal overb,r&en pre'',re (&) = 24.85 tm2

    !54.2$ t

     /p 6 (c 6 c)

     /&opt val,e of 7 = !.50 0.000

    0.50  /verage i = 0.00 tm2

     /'! = #4.$2 m2

     /'2 = 4*.0* m2

     /' = /'! 9 /'2 44."" m2

     /verage overb,r&en pre'',re for ,pper part of pile = 5.$! tm2

     /verage overb,r&en pre'',re for loer part of pile = !$.*! tm2

    +:in friction re'i'tant (f'!) = 0.00 t

    +:in friction re'i'tant (f'2) = 0.00 t

    0.00 t

    +,m (7 i to & 6 &i 6 tan& 6 /'i)

    -otal bearing re'i'tant (;b 9 ;') = !54.2$ t (/)

    Allowable bearing resistant Qu(allow. ! "#$ ! 2.% &1.&' t

    Qu(ultiate ! Ap)(0.% ) D )γ

     ) *γ

     + , ) * + $u (/ i to ) ,i ) tan 

    ) Asi +

    Ap ) ( ) * + ) i ) Asi

  • 8/9/2019 Capacity of Pile

    2/4

  • 8/9/2019 Capacity of Pile

    3/4

    Depth of pile cap bottom from GL = 4.5 m

    Diameter of pile = 0.5 m

    Depth (m) Den'it% (tm$)

    La%er o. /bove AL @elo AL ,m. total /bove AL @elo AL /verage /verage p B#'ec area

    C !."5 !.8 $.55 !." 0." 0 0 0.!*25

    CC 0 !2.4 !5.*5 !." 0." $.5 0 0.!*25CCC 0 5.8 2!."5 !." 0." 8 0 0.!*25

    C 0 !0."5 $2.5 !." 0." 0 $4 0.!*25

    0 0 $2.5 !." 0." 0 $4 0.!*25

    C

    oint re'i'tant (t) +:in

    La%er o. c 3 g 0.56D6g6g &63 c6/p6c -otal +,m(76&i6/'i)

    C 0 ! 0

    CC * ! 0

    CCC * ! 0

    C 0 $$.$ 48.0$

    0 $$.$ 48.0$C

  • 8/9/2019 Capacity of Pile

    4/4

    verb,r&en pre'',re (tm2)

    +haft length eri. /rea La%er top La%er bottom /verage

    0 0.000 0.000 4.2$5 2.!!8

    !!.45 !".*8 4.2$5 !2.*!5 8.5"55.8 *.!!! !2.*!5 !.*"5 !4.*45

    !0."5 !.88 !.*"5 24.500 20."$8

    0 0.000 24.500 24.500 24.500

     re'i'tant (t)

    a6i6/'i -otal