CaOling Project - First experiences on the 1,7MWt calcium looping pilot in La Pereda 29|06|12 endesa Subdirección de Ingeniería e I+D A. Sánchez-Biezma *, L. Diaz ** , J. López *** , B. Arias****, J. Paniagua*, M.Lorenzo**, J. Álvarez *** , J.C. Abanades **** *Endesa Generación, Madrid, Spain. **HUNOSA, Oviedo, Spain ***Foster Wheeler Energía S.L.U, Madrid, Spain. **** Spanish Research Council (CSIC-INCAR), Oviedo, Spain.

CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

CaOling Project - First experiences on the1,7MWt calcium looping pilot in La Pereda

2 9 | 0 6 | 1 2endesa Subdirección de Ingeniería e I+D

Subdirección de ingeniería e I+D

A. Sánchez-Biezma*, L. Diaz**, J. López***, B. Arias****, J. Paniagua*, M.Lorenzo**, J. Álvarez***, J.C. Abanades****

*Endesa Generación, Madrid, Spain.

**HUNOSA, Oviedo, Spain

***Foster Wheeler Energía S.L.U, Madrid, Spain.

**** Spanish Research Council (CSIC-INCAR), Oviedo, Spain.

Page 2: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

CaOling Project - Development of Calcium looping

CaOling Project started on December 2009 as a three-years project to develop and demonstrate post-combustion calcium looping in a pilot-scale unit whichis fully integrated with a power plant.

Subdirección de ingeniería e I+D

2

Partners:

Page 3: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

Concept

CARBONATORCARBONATOREXISTINGEXISTING

CaCO3

Flue gas“without” CO2

OXY-FIREDCFBC

OXY-FIREDCFBC

Concentrated CO2

O2

Subdirección de ingeniería e I+D

3

CARBONATORCARBONATOREXISTINGPOWER PLANT

EXISTINGPOWER PLANT

CaOFlue Gas(FCO2)

Coal Air

CFBCCALCINER

CFBCCALCINER

CoalCaCO3

(F0)CaOPurge

2

Air

N2

ASUASU

Page 4: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

CaOling Project. Work plan

WP1: Lab-Scale pilot testing

WP2: Sorbent Properties

WP3: Reactor modelling andscale-up tools

Leader Other partners

Subdirección de ingeniería e I+D

4

WP4: 1,7MWt Plant design and

erection

WP5: Experimental campaignsin the 1,7Mw test facility

WP6: Scaling parameters forindustrial plant demo

WP7: Coordination anddissemination

All

Page 5: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and OverviewLa Pereda CO2 capture pilot plant - Location

Subdirección de ingeniería e I+D

5

Page 6: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

The 1,7MWt experimental facility is located at the La Pereda power plant.

La Pereda is an existing 50MWe CFB power plant.

La Pereda CO2 capture pilot plant

Subdirección de ingeniería e I+D

6

FacilityArea

Page 7: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and OverviewLa Pereda pilot plant - Concept

Subdirección de ingeniería e I+D

7

Page 8: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and OverviewLa Pereda CO2 capture pilot plant - Main equipment

ESP stack

Gas inlet tie point

Gas outlet tie point

Reactors

Metallic structure

Pipes andgas cooler

Page 9: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and OverviewLa Pereda CO2 capture pilot plant - Main equipment

ESP stack

Gas outlet tie pointBurners and valveCO2 y O2 Tanks

Solid removal system

Gas outlet tie pointBurners and valve

skids

Coal and limestone feedingsystem

CO2 y O2 Tanks

Reactors

Page 10: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and OverviewLa Pereda CO2 capture pilot plant - Main equipment

ESP stack

Gas outlet tie point

Propane Tank

Control and electric systems room

O2 & CO2 tanksGas outlet tie point

Fans

Solid removal system

O2 & CO2 tanks

Page 11: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

Status of the pilot plant-Building finished in September 2011-Start of cold commissioning: October 2011- Start of hot commissioning: January 2012- Operational hours with coal combustion (dual fluidized bed mode): ~ 800 h- Operational hours in CO2 capture mode : ~ 160 h-Initial test carried out with the calciner in air mode- First validation under oxy mode in the calciner

La Pereda pilot plant – STATUS

Subdirección de ingeniería e I+D

11

Carbonator temperature (ºC) 600-715

Carbonator superficial gas velocity (m/s) 2.0-4.0

Inlet CO2 volume fraction 0.12-0.14

Inlet SO2 concentration (mg/m3) 100-250

Inventory of solids in the carbonator (kg m-2) 100-1000

Maximum CO2 carrying capacity of the solids 0.10-0.70

CO2 capture efficiency 0.4-0.95SO2 capture efficiency 0.95-1.00

Main parameters in the carbonator reactor during CO2 capture tests

Page 12: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

Effect of carbonator temperature Effect of inventory of solids on thecarbonator

0.8

0.9

1

cap

ture

eff

icie

ncy 710

730

Ca

rbo

na

tor

tem

per

atu

re(º

C)

0.8

0.9

1

cap

ture

eff

icie

ncy

800

1000

Inve

nto

ryo

fso

lid

s(k

g/m

2)

Results – dynamic testing

Subdirección de ingeniería e I+D

0.4

0.5

0.6

0.7

0.8

11:00 11:10 11:20 11:30 11:40 11:50

CO

2ca

ptu

ree

ffic

ien

cy

650

670

690

Ca

rbo

na

tor

tem

per

atu

re(º

C)

ECO2 eq

ECO2

Carbonator Temperature0.3

0.4

0.5

0.6

0.7

17:00 17:10 17:20 17:30 17:40C

O2

cap

ture

eff

icie

ncy

0

200

400

600

Inve

nto

ryo

fso

lid

s(k

g/m

2)

ECO2 eq

ECO2

Carbonator inventory

Page 13: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

1 15

- Total inventory of solids in carbonator = 300-800 kg/m2- Average carbonator temperature= 670 ºC- Xave = 0.3-0.1

Results – steady state testing

Subdirección de ingeniería e I+D

0

0.2

0.4

0.6

0.8

10:00:00 11:00:00 12:00:00 13:00:00 14:00:00 15:00:00 16:00:00

CO

2ca

ptu

ree

ffic

ien

cy

0

3

6

9

12

CO

2vo

l%ECO2 eq

ECO2

CO2 in

CO2 out

Deliberate alterationof solid circulation rates

Restart of solidcirculation

Page 14: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

0.95

1.00

0.12

0.15

SO2 capture in the Ca-looping facility

Results – SO2 capture

Subdirección de ingeniería e I+D

0.80

0.85

0.90

3:00 5:00 7:00 9:00 11:00 13:00 15:00

E SO

2

0

0.03

0.06

0.09

XC

aSO

4

ESO2 carb

ESO2 calc

Experimental

Calculated

Page 15: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

0.3

0.4

0.5

0.6

,XN,X

CaS

O4

Xave

XN (Grasa et al 2006)

XCaSO4 experimental

XCaSO4 calculated

CaO utilization0.4

0.6

0.8

1

EC

O2

400

600

800

1000

1200

Inve

nto

ryo

fso

lids

(kg/

m2)

ECO2 eq

Evolution of sorbent utilization with “lifetime” of particles in the system

Subdirección de ingeniería e I+D

0.0

0.1

0.2

0 5 10 15 20 25 30 35

N th

Xav

e,X

0

0.2

11:10 11:20 11:30 11:40 11:50 12:00

0

200

400

Inve

nto

ryo

fso

lids

(kg/

m

ECO2 eq

ECO2

Carbonator inventory

dtXN

EFN

t

aveCa

tcarbCO

th 0

)(2Number of times that the inventory

of CaO is carbonated up to Xave

Page 16: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

Calcination oxy mode

Results – oxycalcination

Subdirección de ingeniería e I+D

16

Calcination air mode

Page 17: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

• A flexible experimental facility has being constructed in LaPereda Power Plant aiming to validate the technology in the1MW’s size

• Successful proof of concept of postcombustion Ca-looping incontinuous mode of operation with two interconnectedCFBCs at the MWth scale.

Subdirección de ingeniería e I+D

CFBCs at the MWth scale.

• CO2 capture efficiencies over 90% achievable in a CFBcarbonator reactor operating with “standard” solids, bedinventories, gas velocities and solid circulation rates.

• SO2 capture in the CFB carbonator over 95%.

Page 18: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

Subdirección de ingeniería e I+D

18

More information in www.caoling.eu

Page 19: CaOling Project - First experiences on the 1,7MWt calcium ...oxyfbc.eu-projects.de/Portals/29/OxyFBC/11_Biezma... · Pereda Power Plant aiming to validate the technology in the 1MW’s

CaOling Project – Scope and Overview

Subdirección de ingeniería e I+D

19