116
1052-001-3.1.3 Xeneca_L01_DK_Marter TWP HEC-RAS r1.doc CANADIAN PROJECTS LIMITED # 240, 523 Woodpark Blvd SW Calgary, Alberta T2W 4J3 Phone: (403) 508-1560 Fax: (403) 238-5460 July 10, 2012 Mr. Nava Pokharel, M.Sc., P.Eng. Senior Project Manager Xeneca Power Development Inc. 5160 Yonge Street, Suite 520 Toronto, ON, M2N 6L9 Dear Nava: Re: Blanche River Site #03 – Marter TWP HEC-RAS Modelling Hydraulic Report Supplement 1.0 Introduction R.J. Burnside & Associates Limited (Burnside) issued the “Headpond Inundation Mapping Blanche River Site #03 – Marter TWP Hydraulic Report” to Xeneca Power Development Inc. (Xeneca) on August 9, 2011. Xeneca has requested that Canadian Projects Limited (CPL) expand the modelling carried out to include additional bathymetric data and to evaluate the channel hydraulics in environmentally sensitive areas during low flow scenarios. This summary letter report is provided as a supplement to the Burnside report and should be read in conjunction with it. The Hydraulic Engineering Centre River Analysis System (HEC-RAS), Version 4.1.0 river model was used for both the Burnside and CPL modelling. Xeneca provided the HEC-RAS files that Burnside used and these files were used as the basis for the expanded analysis. The scope of this work included: Addition of sections derived from bathymetric surveys carried out after the completion of the initial Burnside report; Re-calibration of the HEC-RAS hydraulic model along the river with the additional sections added; Production of tables for the Project based on the results of the HEC-RAS model for the conditions outlined in Tables 1 and 2; and Production of tables for the Project based on the results of the HEC-RAS model for monthly 10% and 90% exceedance flows. File: 1052-001-3.1.3

CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

1052-001-3.1.3 Xeneca_L01_DK_Marter TWP HEC-RAS r1.doc

CANADIAN PROJECTS LIMITED#240, 523 Woodpark Blvd SW

Calgary, Alberta T2W 4J3 Phone: (403) 508-1560 Fax: (403) 238-5460

July 10, 2012

Mr. Nava Pokharel, M.Sc., P.Eng. Senior Project Manager Xeneca Power Development Inc. 5160 Yonge Street, Suite 520 Toronto, ON, M2N 6L9

Dear Nava:

Re: Blanche River Site #03 – Marter TWP HEC-RAS Modelling Hydraulic Report Supplement

1.0 Introduction

R.J. Burnside & Associates Limited (Burnside) issued the “Headpond Inundation Mapping Blanche River Site #03 – Marter TWP Hydraulic Report” to Xeneca Power Development Inc. (Xeneca) on August 9, 2011. Xeneca has requested that Canadian Projects Limited (CPL) expand the modelling carried out to include additional bathymetric data and to evaluate the channel hydraulics in environmentally sensitive areas during low flow scenarios.

This summary letter report is provided as a supplement to the Burnside report and should be read in conjunction with it. The Hydraulic Engineering Centre River Analysis System (HEC-RAS), Version 4.1.0 river model was used for both the Burnside and CPL modelling. Xeneca provided the HEC-RAS files that Burnside used and these files were used as the basis for the expanded analysis.

The scope of this work included:

• Addition of sections derived from bathymetric surveys carried out after the completion of the initial Burnside report;

• Re-calibration of the HEC-RAS hydraulic model along the river with the additional sections added;

• Production of tables for the Project based on the results of the HEC-RAS model for the conditions outlined in Tables 1 and 2; and

• Production of tables for the Project based on the results of the HEC-RAS model for monthly 10% and 90% exceedance flows.

File: 1052-001-3.1.3

Page 2: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

Nava Pokharel Xeneca Power Development Inc. July 10, 2012 Page 2

Canadian Projects Limited

Table 1: Flow Conditions Modelled for Determination of Inundation Extents

Flow Condition Modelled Flow Description (m3/s) Pre-Project Post-Project

Long Term Annual Flow (LTAF) 12.4 X X

1:2 Year Flood Flow 83.7 X X

1:100 Year Flood Flow 164.8 X X

Table 2: Flow Conditions Modelled for Determination of Bypass Channel Hydraulics

Flow Description Flow (m3/s)

Condition Modelled

Reference Flow 0.5 X

Reference Flow 1.0 X

Reference Flow 2.0 X

Reference Flow 3.0 X

Reference Flow 4.8 X

Reference Flow 7.0 X

Reference Flow 10.4 X

LTAF 12.4 X

Reference Flow 16.0 X

The results of the HEC-RAS modelling presented within this letter report are intended to provide an estimate of the relative magnitude of the difference between water surface elevations for a range of flow conditions.

The HEC-RAS input and output electronic files have been provided.

2.0 Input Information

The creation of the HEC-RAS hydraulic model requires various hydrologic, hydraulic and geometric inputs.

2.1 Geometry

The Marter TWP model prepared by Burnside provided the base geometry for the river reach being modelled. The LiDAR survey data provided by Xeneca was obtained by flight, over the Project on May 28, 2010 Terrapointi. The vertical accuracy of the LiDAR data is reported by Terrapoint as ± 0.3 m at the 95% confidence level in on all but extremely hilly terrain. The horizontal accuracy is reported as ± 1.0 m at the 95% confidence level. The cross sectional data included in the HEC-RAS files provided by Xeneca was reviewed relative to its accuracy to the new bathymetric information.

Page 3: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

Nava Pokharel Xeneca Power Development Inc. July 10, 2012 Page 3

Canadian Projects Limited

New bathymetric survey information was provided by Xeneca and was obtained on November 5, 2011 by BPR Engineeringii,iii.

The LiDAR and bathymetric survey points were compiled into a single three-dimensional model and a triangulated irregular network (TIN) surface was created from these points. Representative cross sections of the river valley were then extracted from the TIN surface for inclusion in the HEC-RAS model. These additional cross sections and locations were then incorporated in the Burnside HEC-RAS model.

The locations of the cross sections used for the HEC-RAS hydraulic analysis of the Project are shown on Drawings 03-161 to 03-164. Different line-types and colours have been used on these Drawings to distinguish new, updated, and original Burnside cross sections.

As directed by Xeneca, the proposed structure at Marter TWP has been modelled as an inline structure in HEC-RAS. The spillway geometry was based on conceptual drawings by HACHiv. CPL assumed a weir coefficient of 1.4. Figure 1 shows the rating curve calculated by HEC-RAS for the proposed structure.

200.5

201

201.5

202

202.5

203

203.5

204

0 50 100 150 200

Hea

dp

on

d W

ater

Su

rfac

e E

leva

tio

n (

m M

SL

)

Discharge (m3/s)

Figure 1: Proposed Structure Rating Curve

Page 4: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

Nava Pokharel Xeneca Power Development Inc. July 10, 2012 Page 4

Canadian Projects Limited

2.2 Roughness Estimates

The roughness coefficients used for the additional sections were in line with the coefficients used in the initial modelling which generally includes a Manning’s n = 0.100 for overbank areas and n = 0.030 - 0.035 for the main channel areas.

2.3 Steady Flow Data

The following flows of interest were modelled at the Project:

• Flows of 0.5, 1, 2, 5, 10, 15 and 20 m3/s through the bypassed reach;

• Measured flow during the bathymetric survey from BPR Engineeringii;

• The 1:2 and 1:100 year flood flows as estimated by Hatch Ltd.v;

• LTAF estimated by Hatch Ltdv; and

• Monthly 10% and 90% exceedance flow as estimated by HATCH Ltdv

The flow magnitudes associated with these scenarios are included in the HEC-RAS electronic files.

Approximately 2.0 km downstream of the project the Misema River enters the Blanche River. To account for the additional flow entering at this location a flow change location has been added to the HEC-RAS model at station -2+081. Burnside has developed a flow ratio of 0.54 between Marter TWP and WSC station 02CJ008 based on the ratio of drainage areas and runoff values. Using this flow ratio additional flow entering near station -2+081 was obtained by adjusting each flow value by 1.85 (the inverse of 0.54).

2.4 Boundary Conditions

The upstream boundary condition was not altered from that used by Burnside.

The downstream boundary condition was modified to a rating curve developed from flow and water level data gathered from Water Survey of Canada (WSC) station 02JC008 Blanche River Above Englehart, located approximately 3.0 km downstream of the project. Flow and water level data was collected from WSC daily archived hydrometric data, from January 1, 2002 to December 31, 2009. Water level information available at this station was in reference to an assumed datum and was thus compared to LiDAR and bathymetry surveyed water levels in order to convert it to the datum used in the HEC-RAS model. CPL has assumed the water surface profile to be flat from the most downstream surveyed water surface elevation of 183.50 m MSL to the WSC station. Figure 2 shows the resulting rating curve developed and used as the downstream boundary condition for the HEC-RAS model.

Page 5: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

Nava Pokharel Xeneca Power Development Inc. July 10, 2012 Page 5

Canadian Projects Limited

181.00

182.00

183.00

184.00

185.00

186.00

187.00

0 50 100 150 200 250

Wat

er S

urf

ace

Ele

vati

on

(m

MS

L)

Discharge (m3/s)

WSC Data

Rating Curve

Figure 2: Downstream Boundary Condition: Rating Curve

3.0 Model Calibration

The model was calibrated using available estimated and observed flow and level conditions.

One source of calibration information was the LiDAR survey information combined with the daily flow estimate at the Project on that day. Although the LiDAR survey is unable to detect a water surface, the riverbank is detected at the edge of the water. The conversion of these riverbank points into a TIN surface across the river width produces a reasonable estimate of the water surface elevation. The LiDAR survey for Marter TWP occurred on May 28, 2010 and the estimated flow at the Project on this date was 8.5 m3/s as estimated by Burnside.

A profile plot of this TIN surface along the river centreline was compared to the water surface profile produced by HEC-RAS at the corresponding flow. The comparison is a useful means of determining locations where additional cross sections are needed or where estimated channel geometry needs refinement. Cross sections were added and estimated bed geometry was adjusted to increase the accuracy of the predicted water surface throughout the modelled reach.

Page 6: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

Nava Pokharel Xeneca Power Development Inc. July 10, 2012 Page 6

Canadian Projects Limited

The flow and water level information gathered as part of the bathymetric survey on October 15, 2010 and November 5, 2011 was used as the second calibration method. This information is likely more accurate than the LiDAR information but is limited in extent due to the relatively short reach surveyed compared to the LiDAR information. The water surface profile produced by HEC-RAS at the estimated flow of 7.2 m3/s was compared to the water surface elevations surveyed during the October 1, 2010 bathymetric survey. Similarly, the water surface profile produced by HEC-RAS at the estimated flow of 20.9 m3/s was compared to the water surface elevations surveyed during the November 5, 2011 bathymetric survey.

The modelled water levels generally compared very well at the locations surveyed and are within the expected accuracy of the bathymetric survey of ± 10 cm. Tables 4 and 5 compare the water levels during the bathymetric survey to those estimated by the HEC-RAS model at the stated flow. BPR sections 2 and 3 102 did not have a surveyed water level and thus are not included in Table 3. Based on nearby surveyed sections, LiDAR and aerial photography BPR section 102 was considered to be erroneous and was not included in Table 4.

Table 3: Surveyed Water Levels during 2010 Bathymetric Survey

BPR Engineering

Section

Approximate Cross

Section

Surveyed Water Level (m MSL)

Modelled Water Level (m MSL)

-3 0+497 193.60 193.68 -2 0+294 193.63 193.67 -1 0+112 193.65 193.67 0 0+22 193.64 193.67 3 -0+571 183.05 182.91

Table 4: Surveyed Water Levels during 2011 Bathymetric Survey

BPR Engineering Section

Approximate Cross

Section

Surveyed Water Level (m MSL)

Modelled Water Level (m MSL)

101 2+397 201.98 201.90 103 2+081 199.82 199.76 104 1+818 199.77 199.74 105 1+683 197.09 197.16 106 1+589 196.04 195.98 107 1+494 195.45 195.37 108 1+411 195.06 195.07 109 1+324 194.42 194.34 110 -0+426 183.67 183.63 111 -0+483 183.65 183.61 112 -0+779 183.58 183.60 113 -1+088 183.57 183.58 114 -1+691 183.54 183.55 115 -1+838 183.50 183.53

Page 7: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

Nava Pokharel Xeneca Power Development Inc. July 10, 2012 Page 7

Canadian Projects Limited

A comparison of the water surface profile from the LiDAR survey and the complete calibrated HEC-RAS model is shown on Figure 3 and 4. Points shown on the “HEC-RAS Model” series indicate locations of cross sections in the HEC-RAS model.

���

���

���

���

���

���

���� ����� ����� � ���� ���� ��� ��� ����

������������� ������

����

�����

�����������������

�� ��

�������������

Figure 3: Calibrated HEC-RAS Water Surface Profile

Page 8: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

Nava Pokharel Xeneca Power Development Inc. July 10, 2012 Page 8

Canadian Projects Limited

���

��

���

���

���

���

��

���

��� ���� ���� ���� ���� ��� � �� ���

������������� ������

����

�����

�����������������

�� ��

�������������

Figure 4: Calibrated HEC-RAS Water Surface Profile – Rapids near Project

The LiDAR water surface profile shows some scatter of elevations due to the conversion of the LiDAR riverbank survey points to the TIN surface.

4.0 Modelling

Modelled water surface profiles for the flow conditions in Table 1 are provided in the Appendix in Table A-1 and illustrated in Figures A-1 through A-3 for pre and post-project conditions including the estimated water level increases. Further details on velocity, flow area, wetted perimeter, average and maximum depth can be found in Table A-2 in the Appendix.

Through the range of flows modelled, water levels in the headpond immediately upstream of the proposed structure location will be raised by approximately 7.5 – 6.7 m. The headpond will extend approximately 2.4 km upstream during the LTAF and approximately 2.4 km during the 1:100 year flood. A rail bridge exists at station 2+418, however the inundation results suggest that this structure will not be affected by the proposed Project.

Figure 5 compares the approximate water levels at the LTAF pre and post-project to those at the 1:100 year flood pre-project. As illustrated, water levels upstream of the proposed structure post-project during the LTAF will be higher than those reached by 1:100 year flood pre-project for approximately 1.8 km upstream of the Project. Post-project LTAF water levels approximately 1.8 km and further upstream of the Project are estimated to be lower than 1:100 year flood levels pre-project. As stated in Section 1.0, the results of the HEC-RAS model presented within this section are intended to provide an estimate of the relative magnitude of difference between water surface elevations pre and post-project.

Page 9: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

Nava Pokharel Xeneca Power Development Inc. July 10, 2012 Page 9

Canadian Projects Limited

180.00

185.00

190.00

195.00

200.00

205.00

0+000 1+000 2+000 3+000 4+000

W.S

. Ele

vati

on

(m

MS

L)

Station (m)

Pre-Project 1:100 Year Flood Flow

Pre-Project LTAF

Post-Project LTAF

Figure 5: Pre and Post-Project Water Level Comparison

5.0 Environmentally Sensitive Areas

Modelled water surface profiles for the flow conditions in Table 2 in the bypass channel are illustrated in Figure 6. The channel consists of rapids with high velocity flow and several drops and pools. From 0.5 m3/s to 16 m3/s the flow depth increases a maximum of 0.86 m. Further details on water depth flow velocity, flow area and wetted perimeter can be found in Table A-3 in the Appendix.

Page 10: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

Nava Pokharel Xeneca Power Development Inc. July 10, 2012 Page 10

Canadian Projects Limited

178

180

182

184

186

188

190

192

194

196

-350 -300 -250 -200 -150 -100 -50 0 50

Wat

er S

urf

ace

Ele

vati

on

(m

MS

L)

Distance From Dam (m)

16 m3/s

12.4 m3/s

10.4 m3/s

7 m3/s

4.8 m3/s

3 m3/s

2 m3/s

1 m3/s

0.5 m3/s

Channel Bottom

��������

�����������

Figure 6: Bypass Channel – Various Flow Profiles

6.0 Monthly Minimum and Monthly Maximum Flows

In addition to the results presented above, the model was run with the monthly 90% exceedance flow and 10% exceedance flow provided by HATCHError! Bookmark not defined.. Results upstream of the dam for pre and post-project conditions are shown in Tables A-4 and A-5 in the Appendix. Results downstream of the dam and in the west and east channels for pre-project conditions are shown in Table A-6 in the Appendix.

Page 11: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

Nava Pokharel Xeneca Power Development Inc. July 10, 2012 Page 11

Canadian Projects Limited

7.0 Conclusion

The results of the one-dimensional hydraulic modelling using HEC-RAS for Marter TWP Project on the Blanche River are presented within this letter report and are supplemented by the electronic modelling files. This letter report should be read in conjunction with the Burnside report.

The information expressed in this Report represents Canadian Projects Limited’s best professional judgement and is based on Canadian Projects Limited’s experience as applied to the information provided at the time of preparation within the scope of the assignment. Canadian Projects Limited does not guarantee or warrant the water surface profile or flood inundation maps expressed herein.

We trust that this report meets with your requirements. If you require any clarification, have questions or would like to discuss the information contained within, please contact us.

Sincerely,

CANADIAN PROJECTS LIMITED

David Kushner, E.I.T. Richard Slopek, P.Eng. Junior Engineer Project Manager

DK/dk

Attachments: HEC-RAS Input and Output files on CD

i Terrapoint #: 2008-172-C (C1 and C2 inclusive). Terrapoint. August 5, 2009. ii Marter Twp Upstream Survey reach 2011 Field Survey. BPR Engineering. January 16, 2012. iii Marter Twp Downstream Survey reach 2011 Field Survey. BPR Engineering. January 16, 2012. iv Marter Site – Blanche river Hydropower Development – Conceptual Dam and Powerhouse Layout Plate

2. Hatch Engineering, June 23, 2011. v Marter Township Hydro Project – EA Hydrology Memo. Hatch Engineering. March 3, 2011.

Page 12: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

����������� ������� �����!��"���#�$� ��� %�&�����'�$��(�� �%������))� *�++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++������ �����!��!��,�� ����������-�#�$� ��� %�&�����'�$��(�� �%������))� *�++++++++++++++++++++++++++++++++++++++++++++++++������ ����!��!����,�� ����������-�#�$� ��� %�&�����'�$��(�� �%������))� *�++++++++++++++++++++++++++++++++++++++++++++���

������������ ���"�.������!����������#�$� ��� %�&�����'�$��(���))� *�++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++���"�.������!����������/01$ ��)���1��$1�2�3(�(��$��(����-1�+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++���"�.�����!������������1��$1�4*0�11��5�((���2���-����-1�+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++����"�.�����!�/01$ ��)�����������1��$1�%� ���($5�*�6����(��6������-1�2��7�1$�(����(��$��(1�+++++++++++++++++����"�.������!�/01$ ��)�����������1��$1�%� ���($5�*�6����(��6������-1�2�� �0�1�����(��$��(1�++++++++++++++����"�.�����8!� �-(1$ ��)�����������1��$1�%� ���($5�*�6����(��6������-1�2��7�1$�(����(��$��(1�++++++++++++����� �

Page 13: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

���������

Figure A-1: LTAF Water Surface Elevation Profile Summary

Figure A-2: 1:2 Year Flood Flow Water Surface Elevation Profile Summary

8

���+��

���+��

���+��

���+��

���+��

���+��

�9��� �9��� �9��� 9��� 9���

�����

������

����� ������

�������������

������ ������

����

�����

�����������

� ��� �:�&$��"��

��1$�� �:�&$��"��

�1$�)�$���#�$� ���'���3(& ��1�

8

���+��

���+��

���+��

���+��

���+��

���+��

�9��� �9��� �9��� 9��� 9���

�����

������

����� ������

�������������

������ ������

����

�����

�����������

� ��� �:�&$��!��,�� ����������-

��1$�� �:�&$��!��,�� ����������-

�1$�)�$���#�$� ���'���3(& ��1�

Page 14: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

���������

Figure A-3: 1:100 Year Flood Flow Water Surface Elevation Profile Summary

� �

8

���+��

���+��

���+��

���+��

���+��

���+��

�9��� �9��� �9��� 9��� 9���

�����

������

����� ������

�������������

������ ������

����

�����

�����������

� ��� �:�&$��!����,�� ����������-

��1$�� �:�&$��!����,�� ����������-

�1$�)�$���#�$� ���'���3(& ��1�

Page 15: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Table A-1: HEC-RAS Water Surface Elevation Summary

�������������� ����!�������!�

������������������������� ��

"##��$������������������� �������� ��� ��%����

���������

"##��$������������������� �������� ���� ��%����

���������

����������������������� ������������������������������

������ �&"'� ()*�+����

' ����' �,�()(--�+����' ����' �,� �&"'� ()*�+����

' ����' �,�()(--�+����' ����' �,� �&"'� ()*�+����

' ����' �,�()(--�+����' ����' �,�

�� 9���� ���+��� ��+8� ��+��� ���+��� ��+8� ��+��� �� �� ��

�� 98� ���+��� ��+��� ��+8�� ���+��� ��+��� ��+8�� �� �� ��

�� 9��� ���+��� ��+��� ��+88� ���+��� ��+��� ��+88� �� �� ��

�� 9��� ���+�� ��+�� ��+��� ���+�� ��+�� ��+��� �� �� ��

�� 98� ���+�� ��+�� ��+��� ���+�� ��+�� ��+��� �� �� ��

�� 9�8� ���+�� ��+8� ��+�� ���+�� ��+8� ��+�� �� �� ��

�� 9��� ���+�� ��+� ��+�� ���+�� ��+� ��+�� �� �� ��

�� �9���� ���+�� ��+�� ��+�� ���+�� ��+�� ��+�� �� �� ��

�� �9��� ���+��� ��+� ��+�8� ���+��� ��+� ��+�8� �� �� ��

�� �98�� ���+��� ��+��� ��+��� ���+��� ��+��� ��+��� �� �� ��

�� �9��� ���+��� ��+��� ��+��� ���+��� ��+��� ��+��� �� �� ��

�� �9��� ���+��� ���+��� ��+��� ���+��� ���+��� ��+��� �� �� ��

���� �9��� ���+��� ���+�� ��+�� ���+��� ���+�� ��+�� �� �� ��

�� �9��� ���+�� ���+�� ��+�� ���+�� ���+�� ��+�� �� �� ��

���� �9��� ���+8�� ���+�� ���+8�� ���+�� ���+8�� ��+8�� �+��� �+�8� ��

�� �9�� ���+8�� ���+��� ���+8� ���+�� ���+8�� ��+8�� �+��� �+��� �+��

�� �9��� ���+�� ���+��� ���+� ���+� ���+8� ��+8� �+�8� �+��� �+���

�� �9��� ���+� ���+�8� ���+�� ���+�� ���+8�� ��+8� �+��� �+�� �+�8�

��� �9���� ���+8� ���+��� ���+�� ���+� ���+8� ��+8�� �+��� �+�� �+���

�� �9�8�� ���+8� ���+��� ���+�� ���+� ���+8� ��+8�� �+��� �+�� �+���

�� �9�8�� ���+�� ���+��� ���+�� ���+� ���+8� ��+��� �+��� �+� �+���

��� �9���� ���+�� ���+��� ���+8� ���+� ���+8� ��+��� �+��� �+�� �+��

�� �9���� ���+��� ���+�� ���+�� ���+� ���+�� ��+�� �+�� �+�8� �+���

�� �9�� ��8+�8� ���+8�� ���+�� ���+� ���+�8� ��+� +8�� +��� �+���

���� �98�� ���+�8� ���+8�� ���+��� ���+� ���+��� ��+�� +�� +�� �+��

�� �98��� ��8+�� ��8+��� ���+�� ���+� ���+��� ��+��� �+� �+��� 8+��

��8� �9���� ���+��� ��8+�� ���+��� ���+� ���+��� ��+��� �+��� 8+��� 8+�

�� �9���� ���+��� ��8+�� ���+��� ���+� ���+��� ��+��� 8+��� 8+�� 8+���

���� �9�� ���+��� ��8+�� ���+��� ���+� ���+��� ��+��� 8+�8� 8+8� 8+���

�� �9��� ���+�� ���+�� ��8+��� ���+� ���+��� ��+�� 8+�� 8+8� 8+���

���� �9��� ��+��� ���+8�� ��8+��� ���+� ���+��� ��+�� 8+�� 8+�8� 8+���

�� �9��� ��+��� ���+�� ���+�� ���+� ���+��� ��+�� �+�� 8+�� 8+��

���� �9�� ��+��� ���+�� ���+�� ���+� ���+��� ��+�� �+�� 8+��� 8+8�

�� �9��8� ��+�8� ���+�8� ��8+�� ���+� ���+��� ��+�� �+�� 8+��� 8+���

�� �9�8� ��+�8� ���+�� ��8+�� ���+� ���+��� ��+�� �+�� 8+�� 8+�8�

�� �9���� ��+�8� ���+�� ��8+��� ���+� ���+��� ��+�� �+�� 8+��� 8+���

Page 16: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������8��

�������������� ����!�������!�

������������������������� ��

"##��$������������������� �������� ��� ��%����

���������

"##��$������������������� �������� ���� ��%����

���������

����������������������� ������������������������������

������ �&"'� ()*�+����

' ����' �,�()(--�+����' ����' �,� �&"'� ()*�+����

' ����' �,�()(--�+����' ����' �,� �&"'� ()*�+����

' ����' �,�()(--�+����' ����' �,�

�� �9��� ��+�8� ���+��� ��8+��� ���+� ���+��� ��+�� �+�� 8+�8� 8+8�

��� �9��� ��+��� ���+8�� ��8+�� ���+� ���+��� ��+�� �+�� 8+�� 8+8��

��� �9���� ��+�� ���+8�� ��8+��� ���+� ���+��� ��+�� �+�� 8+�� 8+8��

�� �9��� ��+�� ���+8�� ��8+��� ���+� ���+��� ��+�� �+�� 8+�� 8+8��

�� �9�8� ��+�� ���+8� ��8+��� ���+� ���+��� ��+�� �+�� 8+�� 8+��

�� -.-**� (/0�/1� (/2�31� (/3�45� *-(�11� *-*�25� *-0�15� 4�2� 3�/1� 3�4�

�� ��9��8� ��+�� ���+8�� ��8+�� ��+�� ���+8�� ��8+�� �� �� ��

�� ��9��� ��+�� ��+��� ���+8�� ��+�� ��+��� ���+8�� �� �� ��

�� ��9�8�� ��+��� ��+��� ���+��� ��+��� ��+��� ���+��� �� �� ��

�� ��9���� ��+��� ��+��� ��+�� ��+��� ��+�� ��+�� �� �� ��

�� ��9��� ���+8� ��+�� ��+��� ���+8� ��+�� ��+��� �� �� ��

�� ��9���� ���+8�� ���+�� ���+��� ���+8�� ���+�� ���+��� �� �� ��

�� ��9���� ���+�� ���+��� ���+��� ���+�� ���+��� ���+��� �� �� ��

�� ��9�� ���+�� ���+��� ���+�8� ���+�� ���+��� ���+�8� �� �� ��

�� ��9���� ��8+8�� ���+�� ���+8�� ��8+8�� ���+�� ���+8�� �� �� ��

�� ��9��� ���+��� ���+8� ���+��� ���+��� ���+8� ���+��� �� �� ��

�� ��9���� ��+�� ��+��� ���+��� ��+�� ��+��� ���+��� �� �� ��

�� ��9���� ��+��� ���+�� ���+��� ��+��� ���+�� ���+��� �� �� ��

�� ��9�� ��+��� ���+�� ���+��� ��+��� ���+�� ���+��� �� �� ��

�� ��9�� ��+��� ���+�� ���+��� ��+��� ���+�� ���+��� �� �� ��

�� ��98�� ��+��� ���+�� ���+��� ��+��� ���+�� ���+��� �� �� ��

�� ��9��� ��+��� ���+�� ���+��� ��+��� ���+�� ���+��� �� �� ��

�� ��9�8� ��+��� ���+�� ���+��� ��+��� ���+�� ���+��� �� �� ��

���� ��9�� ��+�� ���+��� ���+��� ��+�� ���+��� ���+��� �� �� ��

�� ��9���� ��+�� ���+��� ���+��� ��+�� ���+��� ���+��� �� �� ��

� ��9���� ��+�� ���+��� ���+��� ��+�� ���+��� ���+��� �� �� ��

�� ��98�� ��+�� ���+��� ���+��� ��+�� ���+��� ���+��� �� �� ��

���� ��9���� ��+�� ���+��� ���+��� ��+�� ���+��� ���+��� �� �� ��

�� ��9��� ��+��� ���+�� ���+��� ��+��� ���+�� ���+��� �� �� ��

��� ��9���� ��+��� ���+��� ���+��� ��+��� ���+��� ���+��� �� �� ��

�� ��9���� ��+��� ���+��� ���+�8� ��+��� ���+��� ���+�8� �� �� ��

�� ��9�� ��+��� ���+��� ���+�8� ��+��� ���+��� ���+�8� �� �� ��

�� ��98��� ��+��� ���+�� ���+�8� ��+��� ���+�� ���+�8� �� �� ��

�� ��9��� ��+��� ��+��� ���+��� ��+��� ��+��� ���+��� �� �� ��

�� ��9���� ��+��� ��+�8� ���+��� ��+��� ��+�8� ���+��� �� �� ��

�� �9���� ��+�8� ��+��� ���+��� ��+�8� ��+��� ���+��� �� �� ��

Page 17: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Table A-2: HEC-RAS Upstream Results – Inundation Flows

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� $� � �� ���� �"��� �����;�3<� ��+� �+��� �8+��� �8+��� ��+�� ���+��� ���+��� �+��� +��

�� $� � �� ���� �"��� �������3<� ��+� �+��� �8+��� �8+��� ��+�� ���+��� ���+��� �+��� +��

�� $� � �� ���� ��,���� �����;�3<� �+�� �+��� ��+8� �+�� +��� ���+��� ��+8� +��� +8�

�� $� � �� ���� ��,���� �������3<� �+�� �+��� ��+��� �+�� +��� ���+��� ��+8� +��� +8�

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+��� ��+8�� �+��� �+��� ���+��� ��+��� +��� �+��

�� $� � �� ���� ����,���� �������3<� �8+�� �+��� ��+8�� �+��� �+��� ���+��� ��+��� +��� �+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� 8� �"��� �����;�3<� ��+� �+��� ��+� �8+�8� ��+��� ���+��� ���+��� �+�� +��

�� $� � �� 8� �"��� �������3<� ��+� �+��� ��+� �8+�8� ��+��� ���+��� ���+��� �+�� +��

�� $� � �� 8� ��,���� �����;�3<� �+�� �+��� ���+� 8+��� �+�� ���+��� ��+��� �+��� +���

�� $� � �� 8� ��,���� �������3<� �+�� �+��� ���+� 8+�� �+�� ���+��� ��+��� �+��� +���

�� $� � �� 8� ����,���� �����;�3<� �8+�� �+�8� �8�+��� �8+��� ��+��� ���+��� ��+8�� �+�� �+8��

�� $� � �� 8� ����,���� �������3<� �8+�� �+�8� �8�+��� �8+��� ��+��� ���+��� ��+8�� �+�� �+8��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �"��� �����;�3<� ��+� �+��� �+�� ��+��� �+8� ���+��� ���+��� �+�� +�8�

�� $� � �� ��� �"��� �������3<� ��+� �+��� �+�� ��+��� �+8� ���+��� ���+��� �+�� +�8�

�� $� � �� ��� ��,���� �����;�3<� �+�� �+8�� ��+�� �+��� �+��� ���+��� ��+��� +� +���

�� $� � �� ��� ��,���� �������3<� �+�� �+8�� ��+�� �+��� �+��� ���+��� ��+��� +� +���

�� $� � �� ��� ����,���� �����;�3<� �8+�� �+��� �8�+��� �+�� ��+8� ���+��� ��+88� +��� �+8��

�� $� � �� ��� ����,���� �������3<� �8+�� �+��� �8�+��� �+�� ��+8� ���+��� ��+88� +��� �+8��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �"��� �����;�3<� ��+� �+��� 8+��� ��+��� ��+88� ���+�� ���+�� �+��� +��

�� $� � �� ��� �"��� �������3<� ��+� �+��� 8+��� ��+��� ��+88� ���+�� ���+�� �+��� +��

�� $� � �� ��� ��,���� �����;�3<� �+�� �+��� ���+��� �+8�� +�� ���+�� ��+�� +�� +���

�� $� � �� ��� ��,���� �������3<� �+�� �+��� ���+��� �+8�� +�� ���+�� ��+�� +�� +���

�� $� � �� ��� ����,���� �����;�3<� �8+�� �+��� �+�� �+��� �+�� ���+�� ��+��� +8� �+8�

�� $� � �� ��� ����,���� �������3<� �8+�� �+��� �+�� �+��� �+�� ���+�� ��+��� +8� �+8�

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� 8� �"��� �����;�3<� ��+� �+��� 8�+��� ��+��� ��+��� ���+��� ���+�� �+�� +���

�� $� � �� 8� �"��� �������3<� ��+� �+��� 8�+��� ��+��� ��+��� ���+��� ���+�� �+�� +���

�� $� � �� 8� ��,���� �����;�3<� �+�� �+��� ���+��� �+�� +��� ���+��� ��+�� +� +8��

�� $� � �� 8� ��,���� �������3<� �+�� �+��� ���+�� �+�� +��� ���+��� ��+�� +� +8��

�� $� � �� 8� ����,���� �����;�3<� �8+�� �+�� ��+�� ��+8� �+� ���+��� ��+��� �+��� �+8��

�� $� � �� 8� ����,���� �������3<� �8+�� �+�� ��+�� ��+8� �+� ���+��� ��+��� �+��� �+8��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �8� �"��� �����;�3<� ��+� �+��� 8+��� ��+�� ��+�� ���+�� ���+�� �+�� +��

�� $� � �� �8� �"��� �������3<� ��+� �+��� 8+��� ��+�� ��+�� ���+�� ���+�� �+�� +��

�� $� � �� �8� ��,���� �����;�3<� �+�� �+��� ���+�� �+�� �+��� ���+�� ��+8� +��� +88�

�� $� � �� �8� ��,���� �������3<� �+�� �+��� ���+�� �+�� �+��� ���+�� ��+8� +��� +88�

Page 18: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� $� � �� �8� ����,���� �����;�3<� �8+�� �+��� ��� �+��� ��+8�� ���+�� ��+�� �+��� �+8��

�� $� � �� �8� ����,���� �������3<� �8+�� �+��� ��+��� �+��� ��+8�� ���+�� ��+�� �+��� �+8��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �"��� �����;�3<� ��+� �+��� ��+�8� +��� �+�� ���+�8� ���+�� �+� +���

�� $� � �� ��� �"��� �������3<� ��+� �+��� ��+�8� +��� �+�� ���+�8� ���+�� �+� +���

�� $� � �� ��� ��,���� �����;�3<� �+�� �+8�� ��+� �+��� �+��� ���+�8� ��+� +�� +���

�� $� � �� ��� ��,���� �������3<� �+�� �+8�� ��+� �+��� �+��� ���+�8� ��+� +�� +���

�� $� � �� ��� ����,���� �����;�3<� �8+�� �+�� ���+8�� 8�+�� 8�+�� ���+�8� ��+�� �+��� �+���

�� $� � �� ��� ����,���� �������3<� �8+�� �+�� ���+88� 8�+�� 8�+�� ���+�8� ��+�� �+��� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �"��� �����;�3<� ��+� �+�8� ��+8�� �+��� �+8�� ���+��� ���+�� �+��� +�8�

�� $� � �� ����� �"��� �������3<� ��+� �+�8� ��+8�� �+��� �+8�� ���+��� ���+�� �+��� +�8�

�� $� � �� ����� ��,���� �����;�3<� �+�� �+8�� ���+��� �+�� �+8�� ���+��� ��+�� +�� +��

�� $� � �� ����� ��,���� �������3<� �+�� �+8�� ���+�� �+�� �+8�� ���+��� ��+�� +�� +��

�� $� � �� ����� ����,���� �����;�3<� �8+�� �+�8� ���+�� �+�8� �+�� ���+��� ��+�� +��� �+���

�� $� � �� ����� ����,���� �������3<� �8+�� �+�8� ���+��� �+�8� �+�� ���+��� ��+�� +��� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �"��� �����;�3<� ��+� �+�� ��+�� �+��� ��+�� ���+��� ���+��� �+��� �+��

�� $� � �� ���� �"��� �������3<� ��+� �+�� ��+�� �+��� ��+�� ���+��� ���+��� �+��� �+��

�� $� � �� ���� ��,���� �����;�3<� �+�� �+��� ��+8�� ��+��� �+��� ���+��� ��+� �+��� +���

�� $� � �� ���� ��,���� �������3<� �+�� �+��� ��+8� ��+��� �+��� ���+��� ��+� �+��� +���

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+�� ���+�� ��+��� �+��� ���+��� ��+�8� �+� �+��

�� $� � �� ���� ����,���� �������3<� �8+�� �+�� ���+�� ��+��� �+�� ���+��� ��+�8� �+� �+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �8�� �"��� �����;�3<� ��+� �+��� ��+��� �+��� 8+��� ���� ���+��� �+8�� �+���

�� $� � �� �8�� �"��� �������3<� ��+� �+��� ��+��� �+��� 8+��� ���� ���+��� �+8�� �+���

�� $� � �� �8�� ��,���� �����;�3<� �+�� �+��� ���+��� �+��� +��� ���� ��+��� �+��� +���

�� $� � �� �8�� ��,���� �������3<� �+�� �+��� ���+�� �+��� +��� ���� ��+��� �+��� +���

�� $� � �� �8�� ����,���� �����;�3<� �8+�� �+��� ��+��� �+8�� ��+�� ���� ��+��� +��� +���

�� $� � �� �8�� ����,���� �������3<� �8+�� �+��� ��+��� �+8�� ��+�� ���� ��+��� +��� +���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �"��� �����;�3<� ��+� �+�� �+��� ��+��� ��+�� ���+�� ���� �+��� �+�8�

�� $� � �� ���� �"��� �������3<� ��+� �+�� �+��� ��+��� ��+�� ���+�� ���� �+��� �+�8�

�� $� � �� ���� ��,���� �����;�3<� �+�� �+�� 8+� �+8�� �+�� ���+�� ��+��� �+8� �+���

�� $� � �� ���� ��,���� �������3<� �+�� �+�� 8+�� �+8�� �+�� ���+�� ��+��� �+8� �+���

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+8� ���+� 8+�� �+� ���+�� ��+��� �+��� +���

�� $� � �� ���� ����,���� �������3<� �8+�� �+8� ���+��� 8+�� �+� ���+�� ��+��� �+��� +��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �"��� �����;�3<� ��+� �+��� 8+8�� ��+�� ��+�� ���+�� ���+��� �+�� �+��

�� $� � �� ���� �"��� �������3<� ��+� �+��� 8+8�� ��+�� ��+�� ���+�� ���+��� �+�� �+��

Page 19: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� $� � �� ���� ��,���� �����;�3<� �+�� �+��� ��+�� �8+8� �8+��� ���+�� ���+��� �+��� �+��

�� $� � �� ���� ��,���� �������3<� �+�� �+��� ��+8� �8+8�� �8+�8� ���+�� ���+��� �+��� �+��

�� $� � �� ���� ����,���� �����;�3<� �8+�� � ��+��� �+��� �+8� ���+�� ��+��� �+8� �+���

�� $� � �� ���� ����,���� �������3<� �8+�� � ��+��� �+�� �+8�� ���+�� ��+��� �+8� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ���� �"��� �����;�3<� ��+� �+��� �+8�� �8+��� ��+�� ���+��� ���+��� �+��� �+8��

�� $� � ���� ���� �"��� �������3<� ��+� �+��� �+8�� �8+��� ��+�� ���+��� ���+��� �+��� �+8��

�� $� � ���� ���� ��,���� �����;�3<� �+�� �+��� �+��� ��+�� �+��� ���+��� ���+�� �+� �+���

�� $� � ���� ���� ��,���� �������3<� �+�� �+��� �+�� ��+�� �+�� ���+��� ���+�� �+� �+���

�� $� � ���� ���� ����,���� �����;�3<� �8+�� +8� �+�� �8+� ��+� ���+��� ��+�� �+�� �+��

�� $� � ���� ���� ����,���� �������3<� �8+�� +8� �+��� �8+� ��+� ���+��� ��+�� �+�� �+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �"��� �����;�3<� ��+� �+�8� 8+� �8+�� �8+8� ���+��� ���+�� �+�� �+�8�

�� $� � �� ���� �"��� �������3<� ��+� �+�8� 8+� �8+�� �8+8� ���+��� ���+�� �+�� �+�8�

�� $� � �� ���� ��,���� �����;�3<� �+�� +�� �+�� ��+�� ��+�� ���+��� ���+�� �+�� �+��

�� $� � �� ���� ��,���� �������3<� �+�� +8� �+�� ��+�� ��+��� ���+��� ���+�� �+��� �+��

�� $� � �� ���� ����,���� �����;�3<� �8+�� +�8� �+��� �+�� �+�� ���+��� ��+�� �+8�� �+���

�� $� � �� ���� ����,���� �������3<� �8+�� +�8� �+��� �+��� �+�� ���+��� ��+�� �+8�� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ���� �"��� �����;�3<� ��+� �+�� �8+��� �+�� +��� ���+��� ���+8�� �+��� +�

�� $� � ���� ���� �"��� �������3<� ��+� �+��� ���+��� �+��� �+��� ���+��� ���+�� +�� +��

�� $� � ���� ���� ��,���� �����;�3<� �+�� �+�� ���+��� +��� 8+��� ���+��� ���+�� +8�� +��

�� $� � ���� ���� ��,���� �������3<� �+�� �+��� ���+8�� +8� �+��� ���+��� ���+8�� +� �+�

�� $� � ���� ���� ����,���� �����;�3<� �8+�� �+��� ���+��� +� �+�� ���+��� ���+8�� +� �+�

�� $� � ���� ���� ����,���� �������3<� �8+�� �+��� ���+�� �+�� �+�� ���+��� ��+8�� �+�� 8+�

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �"��� �����;�3<� ��+� �+��� +��� 8+�8� �+�� ���+��� ���+8�� �+��� �+8��

�� $� � �� ��� �"��� �������3<� ��+� �+�8� �8+��� �+��� �+88� ���+��� ���+�� �+��� �+8�

�� $� � �� ��� ��,���� �����;�3<� �+�� �+��� �8+8� �+��� +�� ���+��� ���+�� �+�� �+���

�� $� � �� ��� ��,���� �������3<� �+�� �+8�� ���+�� +8�� 8+�8� ���+��� ���+8�� �+��� +8��

�� $� � �� ��� ����,���� �����;�3<� �8+�� �+� ���+�8� +�� 8+�� ���+��� ���+8� �+�8� +8��

�� $� � �� ��� ����,���� �������3<� �8+�� �+�8� ��+�� 8+�� �+��� ���+��� ��+8�� +��� +8��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �"��� �����;�3<� ��+� �+�� �+�� +�� +��� ���+��� ���+�� �+�� �+���

�� $� � �� ���� �"��� �������3<� ��+� �+�� ��+��� 8�+��� 8�+��� ���+��� ���+� �+��� �+��

�� $� � �� ���� ��,���� �����;�3<� �+�� �+�� 8+��� �+��� �+�� ���+��� ���+��� �+8�� �+���

�� $� � �� ���� ��,���� �������3<� �+�� �+8� ��+��� 8�+88� 88+88� ���+��� ���+8� �+��� �+�

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+� ���+�� 8�+�� 88+��� ���+��� ���+� �+��� �+��

�� $� � �� ���� ����,���� �������3<� �8+�� �+��� ���+�� 8�+�� 8�+�� ���+��� ��+8� �+�� +��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

Page 20: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� $� � �� ���� �"��� �����;�3<� ��+� +��� +�8� �8+��� �8+��� ���+��� ���+� �+��� �+���

�� $� � �� ���� �"��� �������3<� ��+� �+��� ���+�� 8�+�� 8�+8�� ���+��� ���+�� �+��� �+���

�� $� � �� ���� ��,���� �����;�3<� �+�� �+�� ��+�� ��+�� 8�+�� ���+��� ���+�8� �+8�� �+���

�� $� � �� ���� ��,���� �������3<� �+�� �+8� ��8+�� 8�+��� 88+� ���+��� ���+8�� �+�8� +��

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+�8� ��+��� 8+��� 8�+�� ���+��� ���+�� �+��� +�

�� $� � �� ���� ����,���� �������3<� �8+�� �+8�� ���+��� 8�+8�� 8�+��� ���+��� ��+8� +��� +8�

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ��� ����� �"��� �����;�3<� ��+� �+�� ��+��� 8+�� �+��� ���+��� ���+8� �+�� �+���

�� $� � ��� ����� �"��� �������3<� ��+� �+��� ��+�� +��� 8+��� ���+��� ���+� +��� +�8�

�� $� � ��� ����� ��,���� �����;�3<� �+�� �+8�� ���+��� +��� �+��� ���+��� ���+��� �+�� +8�

�� $� � ��� ����� ��,���� �������3<� �+�� �+�� ���+8� ��+��� ��+�8� ���+��� ���+8� +� �+�8�

�� $� � ��� ����� ����,���� �����;�3<� �8+�� �+�� ���+��� �+�� ��+�8� ���+��� ���+�� +�� +��

�� $� � ��� ����� ����,���� �������3<� �8+�� �+��� ��+�8� 8�+8�� 8�+�� ���+��� ��+8�� +�� 8+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��8�� �"��� �����;�3<� ��+� �+�� �+��� 8+��� �+�� ���+�8� ���+8� �+�� �+��

�� $� � �� ��8�� �"��� �������3<� ��+� �+��� �+��� +��� 8+��� ���+�8� ���+� +��� +���

�� $� � �� ��8�� ��,���� �����;�3<� �+�� �+8�� ��+��� +�� �+��� ���+�8� ���+��� �+�8� +88�

�� $� � �� ��8�� ��,���� �������3<� �+�� �+8� ���� �+8� �8+�� ���+�8� ���+8� +��� �+���

�� $� � �� ��8�� ����,���� �����;�3<� �8+�� �+��� ���+�� ��+�� �+8�� ���+�8� ���+�� +�� +�8�

�� $� � �� ��8�� ����,���� �������3<� �8+�� �+�� �8+��� ��+�� 8�+�� ���+�8� ��+8�� +��� 8+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��8�� �"��� �����;�3<� ��+� �+��� ��+��� �+�8� �+��� ��8+��� ���+�� �+��� �+��

�� $� � �� ��8�� �"��� �������3<� ��+� �+�� ��+��� �+8� �+�� ��8+��� ���+� +�� +��

�� $� � �� ��8�� ��,���� �����;�3<� �+�� �+�� ���+��� �+��� �+�� ��8+��� ���+��� +��� +���

�� $� � �� ��8�� ��,���� �������3<� �+�� �+�� ��+�� �+��� ��+��� ��8+��� ���+8� +�8� �+���

�� $� � �� ��8�� ����,���� �����;�3<� �8+�� �� ���+�� �+� �+�� ��8+��� ���+�� +8�� �+��

�� $� � �� ��8�� ����,���� �������3<� �8+�� �+��� ��+��� �+�� �8+��� ��8+��� ��+��� +�� 8+8��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ��� ����� �"��� �����;�3<� ��+� �+��� ��+��� �+8�� �+�� ��8+��� ���+�� �+��� �+��

�� $� � ��� ����� �"��� �������3<� ��+� �+�� ���+��� �+8� �� ��8+��� ���+� +��� +��

�� $� � ��� ����� ��,���� �����;�3<� �+�� �+�� ���+�8� �+�� �+�8� ��8+��� ���+��� +��� +���

�� $� � ��� ����� ��,���� �������3<� �+�� �+�� ���+� +��� 8+��� ��8+��� ���+8� +��� �+���

�� $� � ��� ����� ����,���� �����;�3<� �8+�� �+��� �8+�8� �+��� �+��� ��8+��� ���+8� +��� �+��

�� $� � ��� ����� ����,���� �������3<� �8+�� �+��� ���+� �+��� ��+8� ��8+��� ��+��� +�8� 8+8��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �"��� �����;�3<� ��+� �+�� �+��� ��+��� �+��� ���+88� ���+�� �+�� �+��

�� $� � �� ����� �"��� �������3<� ��+� �+�� �+� �8+��� ��+�� ���+88� ���+� �+�� �+���

�� $� � �� ����� ��,���� �����;�3<� �+�� +�� ��+�8� �+8�� �8+� ���+88� ���+�� �+�� �+���

�� $� � �� ����� ��,���� �������3<� �+�� �+�� ��+��� ��+�� +��� ���+88� ���+�� �+��� +���

�� $� � �� ����� ����,���� �����;�3<� �8+�� +�� �+8� ��+8�� ��+��� ���+88� ���+� �+8�� �+8�

Page 21: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� $� � �� ����� ����,���� �������3<� �8+�� �+��� ���+��� �+��� �+��� ���+88� ��+�� +�� +���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �"��� �����;�3<� ��+� �+��� �+�� 8+�� 8+�� ��8+��� ��8+�8� �+�� �+���

�� $� � �� ��� �"��� �������3<� ��+� �+��� ���+��� +�� 8+��� ��8+��� ���+� �+��� �+���

�� $� � �� ��� ��,���� �����;�3<� �+�� �+�� ��+��� ��+��� �+� ��8+��� ���+8�� �+�� �+��

�� $� � �� ��� ��,���� �������3<� �+�� �+��� ��+�8� 8+��� �+� ��8+��� ���+�8� +��� 8+��

�� $� � �� ��� ����,���� �����;�3<� �8+�� �+��� ��+�� ��+��� �8+�� ��8+��� ���+�� �+�� �+�8�

�� $� � �� ��� ����,���� �������3<� �8+�� �+8� ��+��� �+�8� +��� ��8+��� ��+� +�� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� �8�� �"��� �����;�3<� ��+� �+�� �+�� +��� +��� ��8+��� ���+�8� �+�� �+��

�� $� � ���� �8�� �"��� �������3<� ��+� �+��� ���+�8� ��+8�� �+�8� ��8+��� ���+� +�� +��

�� $� � ���� �8�� ��,���� �����;�3<� �+�� �+�8� �+8� �+�� �+��� ��8+��� ���+8�� �+�8� �+��

�� $� � ���� �8�� ��,���� �������3<� �+�� �+8� �8+�� �+88� ��+�� ��8+��� ���+��� +�� �+���

�� $� � ���� �8�� ����,���� �����;�3<� �8+�� +8� �+�� �+� �+��� ��8+��� ���+��� �+��� �+���

�� $� � ���� �8�� ����,���� �������3<� �8+�� �+8�� �+�8� ��+�� 8�+�� ��8+��� ��+�� �+�� 8+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �8��� �"��� �����;�3<� ��+� �+�� +� 8�+8�� 8�+�� ���+�� ��8+�� �+�� �+88�

�� $� � �� �8��� �"��� �������3<� ��+� �+�� ��+��� ��+��� ��+88� ���+�� ���+� �+��� 8+�8�

�� $� � �� �8��� ��,���� �����;�3<� �+�� �+�� ��+�8� 8�+8� 8�+�� ���+�� ��8+��� �+��� �+��

�� $� � �� �8��� ��,���� �������3<� �+�� �+�8� ���+��� ��+��� ��+��� ���+�� ���+��� 8+��� �+���

�� $� � �� �8��� ����,���� �����;�3<� �8+�� �+� ���+�� �+��� ��+��� ���+�� ���+� �+��� �+���

�� $� � �� �8��� ����,���� �������3<� �8+�� �+��� 8+8� ��+�� ���+��� ���+�� ��+�� 8+8�� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ��8� ����� �"��� �����;�3<� ��+� �+�� �+�� �+�� �+�� ���+8� ���+��� �+��� �+���

�� $� � ��8� ����� �"��� �������3<� ��+� �+�� ��+��� ��+��� ��+�8� ���+8� ���+� +��� �+��

�� $� � ��8� ����� ��,���� �����;�3<� �+�� �+�� +8� �+� �+8� ���+8� ��8+�� �+8� �+��

�� $� � ��8� ����� ��,���� �������3<� �+�� �+��� �+��� ��+��� �+��� ���+8� ���+��� �+�� 8+���

�� $� � ��8� ����� ����,���� �����;�3<� �8+�� �+��� �8+��� ��+8� �8+�� ���+8� ���+��� �+�� �+��

�� $� � ��8� ����� ����,���� �������3<� �8+�� �+�� ��+��� �8+�8� ��+�� ���+8� ��+�� �+8�� �+�8�

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �"��� �����;�3<� ��+� �+� �+�8� �+8� �+��� ��+�� ���+��� �+��� �+�8�

�� $� � �� ����� �"��� �������3<� ��+� �+�� �+�� 8�+�� 8�+��� ��+�� ���+� �+8�� �+���

�� $� � �� ����� ��,���� �����;�3<� �+�� �+�� �8� +8� �+��� ��+�� ��8+�� �+��� �+���

�� $� � �� ����� ��,���� �������3<� �+�� �+��� �+� ��+8� ��+�8� ��+�� ���+��� �+��� �+8�

�� $� � �� ����� ����,���� �����;�3<� �8+�� �+8� ���+��� �+�8� �+��� ��+�� ���+��� �+��� �+���

�� $� � �� ����� ����,���� �������3<� �8+�� �+�� ��+8� �+��� ��+��� ��+�� ��+�� �+��� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ��� �"��� �����;�3<� ��+� �+��� �+�� �+��� �+��� ��+�� ���+��� �+�� �+���

�� $� � ���� ��� �"��� �������3<� ��+� �+�� �+�� �8+8�� ��+��� ��+�� ���+� �+��� �+��

�� $� � ���� ��� ��,���� �����;�3<� �+�� �+�� ��+��� �+��� �8+�8� ��+�� ��8+�� �+��� �+��

Page 22: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� $� � ���� ��� ��,���� �������3<� �+�� �+��� ��+�� ��+�8� �+�� ��+�� ���+��� 8+�� �+�8�

�� $� � ���� ��� ����,���� �����;�3<� �8+�� �+��� ���+�� ��+8� 8�+�� ��+�� ���+��� �+8�� +���

�� $� � ���� ��� ����,���� �������3<� �8+�� �+�� 8��+��� ��� ��+�� ��+�� ��+�� 8+8� �+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �"��� �����;�3<� ��+� �+�� ��+��� ��+�8� ��+��� ��+��� ���+�� �+8�� �+���

�� $� � �� ���� �"��� �������3<� ��+� �+�8� ��+��� �+8� ��+�� ��+��� ���+� �+��� �+���

�� $� � �� ���� ��,���� �����;�3<� �+�� �+��� �+��� �+��� �+�� ��+��� ���+�� �+�8� �+8��

�� $� � �� ���� ��,���� �������3<� �+�� �+� ��+��� �+��� ��+��� ��+��� ���+��� �+8�� �+�

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+� 8�+��� �+8�� +�� ��+��� ��8+�� �+��� �+8��

�� $� � �� ���� ����,���� �������3<� �8+�� �+��� ��+��� ��+�� 8+��� ��+��� ��+�� 8+�� �+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ���� �"��� �����;�3<� ��+� �+88� �+�� ��+8�� ��+��� ��+��� ��+��� �+��� �+�

�� $� � ���� ���� �"��� �������3<� ��+� �+��� ���+8� ��+�� 8+��� ��+��� ���+� �+��� 8+��

�� $� � ���� ���� ��,���� �����;�3<� �+�� �+��� ��+��� +�8� �+�8� ��+��� ���+8�� �+�� �+���

�� $� � ���� ���� ��,���� �������3<� �+�� �+��� 88+��� 8+��� 8�+�� ��+��� ���+��� �+8� �+���

�� $� � ���� ���� ����,���� �����;�3<� �8+�� �+��� ��+�8� �+�� �+�8� ��+��� ��8+�� �+��� �+��

�� $� � ���� ���� ����,���� �������3<� �8+�� �+�� �8+��� 8�+�� �+�8� ��+��� ��+�� 8+�8� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �"��� �����;�3<� ��+� �+�� �+�� ��+�8� ��+�� ���+8�� ��+��� �+��� �+��

�� $� � �� ���� �"��� �������3<� ��+� �+��� 8�+��� ��+��� ��+��� ���+8�� ���+� 8+�� �+�8�

�� $� � �� ���� ��,���� �����;�3<� �+�� �+�� �8�+��� ��+��� ��+��� ���+8�� ���+�� �+�� +�8�

�� $� � �� ���� ��,���� �������3<� �+�� �+��� ���+�8� ���+��� ���+��� ���+8�� ���+��� �+� �+��

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+8�� ��8+�� ��+�� ��+��� ���+8�� ���+�� +��� +8�

�� $� � �� ���� ����,���� �������3<� �8+�� �+��� �8�+��� ���+� ��+8� ���+8�� ��+�� �+��� ��+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ��� �"��� �����;�3<� ��+� �+��� +��� �+��� 8+�� ���+�� ��+��� �+�8� �+���

�� $� � ���� ��� �"��� �������3<� ��+� �+��� ���+��� �8+88� ��+��� ���+�� ���+� 8+8�� �+�8�

�� $� � ���� ��� ��,���� �����;�3<� �+�� �+��� �+��� 8�+� 88+8� ���+�� ���+�� �+��� +��

�� $� � ���� ��� ��,���� �������3<� �+�� �+�� 8�+�� ��+�� ��+��� ���+�� ���+��� �+��� ��+��

�� $� � ���� ��� ����,���� �����;�3<� �8+�� �+�� ��8+��� ��+8� ��+� ���+�� ���+�� +��� +���

�� $� � ���� ��� ����,���� �������3<� �8+�� �+�� �8�+��� ��+�� ���+�� ���+�� ��+�� �+�� ��+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��8� �"��� �����;�3<� ��+� �+��� 8+�� �+�� �+�8� ���+��� ��+�8� �+�� �+���

�� $� � �� ��8� �"��� �������3<� ��+� �+�� ��+�� �8+��� ��+�� ���+��� ���+� �+�� �+��

�� $� � �� ��8� ��,���� �����;�3<� �+�� �+�8� ���+8�� �+8�� �+�8� ���+��� ���+�8� �+88� +���

�� $� � �� ��8� ��,���� �������3<� �+�� �+��� ���+��� ��+��� ��+��� ���+��� ���+��� 8+�� ��+���

�� $� � �� ��8� ����,���� �����;�3<� �8+�� �+��� �8+�� �+�8� ��+�� ���+��� ��8+�� +�� �+��

�� $� � �� ��8� ����,���� �������3<� �8+�� �+� 88+� �8+��� ���+�� ���+��� ��+�� 8+��� ��+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �8� �"��� �����;�3<� ��+� �+�� 8�+�� ��+��� �+88� ���+��� ��+�8� �+�� �+��

Page 23: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� $� � �� �8� �"��� �������3<� ��+� �+�� �8+��� �8+��� ��+8�� ���+��� ���+� �+��� ��+��

�� $� � �� �8� ��,���� �����;�3<� �+�� �+8�� ���+�� �+8�� �+�� ���+��� ���+�� +�� +8��

�� $� � �� �8� ��,���� �������3<� �+�� �+�8� ��+8�� ��+�� �8+��� ���+��� ���+��� 8+��� ��+8�

�� $� � �� �8� ����,���� �����;�3<� �8+�� �+�8� ��8+�� ��+�� �+� ���+��� ��8+�� �+�� �+���

�� $� � �� �8� ����,���� �������3<� �8+�� �+��� ���+�� ��+�� ���+� ���+��� ��+�� �+�� ��+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �"��� �����;�3<� ��+� �+�8� ��+�8� +��� �+�8� ���+�8� ��+�8� �+��� +��

�� $� � �� ���� �"��� �������3<� ��+� �+�� 8��+��� ���+�� ��+� ���+�8� ���+� �+8�� ��+���

�� $� � �� ���� ��,���� �����;�3<� �+�� �+��� �+�� +��� �+�� ���+�8� ���+�� +�8� +���

�� $� � �� ���� ��,���� �������3<� �+�� �+�8� ���+�� ���+�8� ��+�� ���+�8� ���+��� 8+�� ��+���

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+�� ���+��� 8�+8�� ��+�� ���+�8� ��8+��� �+��� 8+���

�� $� � �� ���� ����,���� �������3<� �8+�� �+��� ��+�� �+8� �8+��� ���+�8� ��+�� �+�� ��+8�

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �"��� �����;�3<� ��+� �+��� 8�+�� �+��� 8+��� ���+�� ��+�8� �+��� �+���

�� $� � �� ��� �"��� �������3<� ��+� �+�� ���+�� ��+8� ��+�� ���+�� ���+� �+��� ��+�8�

�� $� � �� ��� ��,���� �����;�3<� �+�� �+8�� ���+� �+�� �+��� ���+�� ���+��� �+�� +�

�� $� � �� ��� ��,���� �������3<� �+�� �+��� 8�8+��� ��8+8� ���+�� ���+�� ���+��� 8+�� ��+��

�� $� � �� ��� ����,���� �����;�3<� �8+�� �+�� ��+�� 8�+��� 8+��� ���+�� ��8+��� +��� �+���

�� $� � �� ��� ����,���� �������3<� �8+�� �+�� ��8+��� ���+8�� ���+�� ���+�� ��+�� �+��� ��+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ��� ��� �"��� �����;�3<� ��+� �+�� ��+��� ��+�� ��+��� ���+��� ��+��� �+�8� +��

�� $� � ��� ��� �"��� �������3<� ��+� �+�� 8�+��� ���+� ���+8�� ���+��� ���+� �+8� ��+���

�� $� � ��� ��� ��,���� �����;�3<� �+�� �+��� ��8+��� �+�� �+�� ���+��� ���+8�� �+��� +�8�

�� $� � ��� ��� ��,���� �������3<� �+�� �+��� ��+��� ���+��� ���+��� ���+��� ���+��� 8+�� ��+�8�

�� $� � ��� ��� ����,���� �����;�3<� �8+�� �+��� ��+��� �+�� �8+�� ���+��� ��8+�� �+�� 8+���

�� $� � ��� ��� ����,���� �������3<� �8+�� �+� �+��� ��8+�� ���+8� ���+��� ��+�� �+��� ��+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ��� ���� �"��� �����;�3<� ��+� �+�� 8�+8�� +��� �+�8� ���+�� ��+�� �+��� �+�

�� $� � ��� ���� �"��� �������3<� ��+� �+�� ���+��� �+�� ��+��� ���+�� ���+� �+�� �+��

�� $� � ��� ���� ��,���� �����;�3<� �+�� �+8�� ��+��� �+�� +��� ���+�� ���+8�� +�� +���

�� $� � ��� ���� ��,���� �������3<� �+�� �+�8� ���+�� ��+��� ���+�� ���+�� ���+��� 8+��� ��+���

�� $� � ��� ���� ����,���� �����;�3<� �8+�� �+��� ���+�� ���+��� ��+��� ���+�� ��8+��� �+��� �+��

�� $� � ��� ���� ����,���� �������3<� �8+�� �+��� ����+��� �8�+�8� �88+��� ���+�� ��+�� 8+��� ��+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �� �"��� �����;�3<� ��+� �+�� 8�+8� �+��� +�8� ���+�� ��+�� �+��� �+��

�� $� � �� �� �"��� �������3<� ��+� �+�� ���+��� �8+��� �8�+� ���+�� ���+� �+8� ��+��

�� $� � �� �� ��,���� �����;�3<� �+�� �+8�� ��+�� �+8� �+��� ���+�� ���+8�� +��� +��

�� $� � �� �� ��,���� �������3<� �+�� �+��� ����+�8� �8�+��� ��+� ���+�� ���+��� 8+�� ��+���

�� $� � �� �� ����,���� �����;�3<� �8+�� �+��� ���+��� ��+�8� ��8+8�� ���+�� ��8+�� �+8�� �+��

�� $� � �� �� ����,���� �������3<� �8+�� �+�8� ��+8� ���+�� ���+�� ���+�� ��+�� �+�� ��+���

Page 24: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� 8� �"��� �����;�3<� ��+� �+�� 8�+�� ��+8�� �+��� ���+�� ��+�� �+��� �+���

�� $� � �� 8� �"��� �������3<� ��+� �+�� ���+8�� ��+�� ��+8� ���+�� ���+� �+��� ��+���

�� $� � �� 8� ��,���� �����;�3<� �+�� �+��� ���+8� �+�� �+�� ���+�� ���+8� +�� +��

�� $� � �� 8� ��,���� �������3<� �+�� �+��� ���+8� ��+8� ���+��� ���+�� ���+��� 8+�� ��+��

�� $� � �� 8� ����,���� �����;�3<� �8+�� �+��� ��+��� ���+��� ���+��� ���+�� ��8+��� �+�8� �+�8�

�� $� � �� 8� ����,���� �������3<� �8+�� �+��� ���+��� ��+��� ���+8� ���+�� ��+�� �+��� ��+�8�

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �"��� �����;�3<� ��+� �+�� 8�+8�� ��+��� ��+��� ���+�8� ��+�� �+�� �+���

�� $� � �� ��� �"��� �������3<� ��+� �+�� ��+��� ��+��� ��+�� ���+�8� ���+� 8+�� ��+��

�� $� � �� ��� ��,���� �����;�3<� �+�� �+�� ��+��� �+8�� �+��� ���+�8� ���+8� +��� +���

�� $� � �� ��� ��,���� �������3<� �+�� �+��� 88�+�8� �8+�� ���+��� ���+�8� ���+��� 8+��� ��+���

�� $� � �� ��� ����,���� �����;�3<� �8+�� �+�� ���+��� ��+�� �+88� ���+�8� ��8+��� �+��� �+���

�� $� � �� ��� ����,���� �������3<� �8+�� �+� ���+��� ���+��� ���+�� ���+�8� ��+�� �+�� ��+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �� �"��� �������3<� ��+� �+��� ���+8�� ��+�� �+�8� ���� ���+� �+��� ��+�

�� $� � �� �� ��,���� �������3<� �+�� �+�� ��+�� �+��� �+�8� ���� ���+��� �+�8� ��+���

�� $� � �� �� ����,���� �������3<� �8+�� �+��� �8�+�� �+��� �+�8� ���� ��+8� �+��� ��+8�

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �8� �"��� �����;�3<� ��+� �+��� 8+��� �+��� ��+��� ���� ��+�� �+��� �+��

�� $� � �� �8� �"��� �������3<� ��+� �+��� 8+��� �+��� ��+��� ���� ��+�� �+��� �+��

�� $� � �� �8� ��,���� �����;�3<� �+�� �+��� ��+�� ��+8� �+�8� ���� ���+8�� +��� +8��

�� $� � �� �8� ��,���� �������3<� �+�� �+��� ��+�� ��+8� �+�8� ���� ���+8�� +��� +8��

�� $� � �� �8� ����,���� �����;�3<� �8+�� �+� ���+� 8+��� �+�� ���� ��8+�� +�� �+��

�� $� � �� �8� ����,���� �������3<� �8+�� �+� ���+� 8+��� �+�� ���� ��8+�� +�� �+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �"��� �����;�3<� ��+� �+�8� 8+� ��+��� ��� ���+�� ��+�� �+��� �+��

�� $� � �� ��� �"��� �������3<� ��+� �+�8� 8+� ��+��� ��� ���+�� ��+�� �+��� �+��

�� $� � �� ��� ��,���� �����;�3<� �+�� +8� ��+��� �8+��� ��+8�� ���+�� ��+��� �+�� �+�8�

�� $� � �� ��� ��,���� �������3<� �+�� +8� ��+��� �8+��� ��+8�� ���+�� ��+��� �+�� �+�8�

�� $� � �� ��� ����,���� �����;�3<� �8+�� +�� �+8�� ��+��� ��+8� ���+�� ���+8�� �+�� �+���

�� $� � �� ��� ����,���� �������3<� �8+�� +�� �+8�� ��+��� ��+8� ���+�� ���+8�� �+�� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �8�� �"��� �����;�3<� ��+� �+�� +��� �+�� �+� ���+� ��+��� �+8� �+���

�� $� � �� �8�� �"��� �������3<� ��+� �+�� +��� �+�� �+� ���+� ��+��� �+8� �+���

�� $� � �� �8�� ��,���� �����;�3<� �+�� +��� ��+��� ��+��� ��+��� ���+� ��+��� �+��� �+���

�� $� � �� �8�� ��,���� �������3<� �+�� +��� ��+��� ��+�8� ��� ���+� ��+�� �+��� �+��

�� $� � �� �8�� ����,���� �����;�3<� �8+�� �� +8�� ��+8� ��+��� ���+� ���+�� �+8� �+��

�� $� � �� �8�� ����,���� �������3<� �8+�� �� +8�� ��+8� ��+��� ���+� ���+�� �+8� �+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

Page 25: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� $� � �� ���� �"��� �����;�3<� ��+� �+�� �+��� �+��� �+�� ���+��� ��+��� �+��� �+��

�� $� � �� ���� �"��� �������3<� ��+� �+�� �+��� �+��� �+�� ���+��� ��+��� �+��� �+��

�� $� � �� ���� ��,���� �����;�3<� �+�� +�� ��+�� ��+��� ��+�� ���+��� ��+��� �+��� �+���

�� $� � �� ���� ��,���� �������3<� �+�� +8� �+�� ��+��� ��+�8� ���+��� ��+� �+�� �+���

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+�� �+��� ��+�� �+��� ���+��� ��+�� �+8� �+��

�� $� � �� ���� ����,���� �������3<� �8+�� �+�� �+��� ��+�� �+��� ���+��� ��+�� �+8� �+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �"��� �����;�3<� ��+� +�� +��� �+�� �+�� ���+�� ���+8� �+��� �+�

�� $� � �� ��� �"��� �������3<� ��+� +��� +��� �+�� �+�� ���+�� ���+8� �+��� �+�

�� $� � �� ��� ��,���� �����;�3<� �+�� �+��� �8+��� �8+�� ��+�� ���+�� ��+�� �+��� �+���

�� $� � �� ��� ��,���� �������3<� �+�� �+�� �8+��� �8+�� ��+8� ���+�� ��+�� �+��� �+���

�� $� � �� ��� ����,���� �����;�3<� �8+�� �+��� ��+��� ��+��� ��+��� ���+�� ��+��� �+8� �+���

�� $� � �� ��� ����,���� �������3<� �8+�� �+��� ��+��� ��+��� ��+��� ���+�� ��+��� �+8� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �"��� �����;�3<� ��+� 8+�8� �+�� +�� �+�� ���� ���+8�� �+�� �+8��

�� $� � �� ����� �"��� �������3<� ��+� 8+��� �+�� +�� �+�� ���� ���+8�� �+�� �+8��

�� $� � �� ����� ��,���� �����;�3<� �+�� �+�8� ��+��� ��+�� ��+� ���� ���+�� �+��� �+��

�� $� � �� ����� ��,���� �������3<� �+�� �+��� ��+��� ��+��� ��+�� ���� ���+�� �+��� �+��

�� $� � �� ����� ����,���� �����;�3<� �8+�� �+��� ��+��� ��+�� ��+8� ���� ���+��� �+�8� �+���

�� $� � �� ����� ����,���� �������3<� �8+�� �+��� ��+��� ��+�� ��+8� ���� ���+��� �+�8� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �"��� �����;�3<� ��+� +��� +�� �+�8� �+8�� ���+��� ���+�� �+8� �+��

�� $� � �� ����� �"��� �������3<� ��+� +��� +8� �+�8� �+8�� ���+��� ���+�� �+8� �+��

�� $� � �� ����� ��,���� �����;�3<� �+�� 8+� �� �8+��� ��+��� ���+��� ���+��� �+��� �+��

�� $� � �� ����� ��,���� �������3<� �+�� 8+� ��+��� �8+�� ��+��� ���+��� ���+��� �+��� �+��

�� $� � �� ����� ����,���� �����;�3<� �8+�� �+� ��+��� ��+�8� ��+��� ���+��� ���+��� �+��� �+���

�� $� � �� ����� ����,���� �������3<� �8+�� �+� ��+��� ��+�8� ��+��� ���+��� ���+��� �+��� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �"��� �����;�3<� ��+� +8�� �+8�� �+��� �+�� ��8+��� ���+�� �+��� �+���

�� $� � �� ��� �"��� �������3<� ��+� +8�� �+8�� �+��� �+�� ��8+��� ���+�� �+��� �+���

�� $� � �� ��� ��,���� �����;�3<� �+�� �+��� ��+��� �+��� ��+�� ��8+��� ���+��� �+��� �+�

�� $� � �� ��� ��,���� �������3<� �+�� �+��� ��� �+��� ��+�� ��8+��� ���+��� �+��� �+�

�� $� � �� ��� ����,���� �����;�3<� �8+�� �+��� ��+�� ��+88� ��+�� ��8+��� ���+�8� �+�� +���

�� $� � �� ��� ����,���� �������3<� �8+�� �+��� ��+�� ��+88� ��+�� ��8+��� ���+�8� �+�� +���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �"��� �����;�3<� ��+� �+��� +�� �+�8� �+�� ���+�8� ��8+8�� �+8�� �+���

�� $� � �� ����� �"��� �������3<� ��+� �+��� +�� �+�8� �+�� ���+�8� ��8+8�� �+8�� �+���

�� $� � �� ����� ��,���� �����;�3<� �+�� �+8�� �+��� ��+�� ��+8�� ���+�8� ���+�� �+�� �+���

�� $� � �� ����� ��,���� �������3<� �+�� �+8�� �+��� ��+�� ��+8�� ���+�8� ���+�� �+�� �+���

�� $� � �� ����� ����,���� �����;�3<� �8+�� +��� ��+��� ��+8�� ��+�� ���+�8� ���+8� �+��� +��

Page 26: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

��������8��

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� $� � �� ����� ����,���� �������3<� �8+�� +��� ��+�� ��+8�� ��+�� ���+�8� ���+8� �+��� +��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �"��� �����;�3<� ��+� +�8� �+��� +��� +�� ��+8�� ���+��� �+��� �+��

�� $� � �� ���� �"��� �������3<� ��+� +�8� �+��� +��� +�� ��+8�� ���+��� �+��� �+��

�� $� � �� ���� ��,���� �����;�3<� �+�� �+�8� �8+�� ��+��� ��+��� ��+8�� ���+8� �+��� �+���

�� $� � �� ���� ��,���� �������3<� �+�� �+�8� �8+��� ��+��� ��+��� ��+8�� ���+8� �+��� �+���

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+��� ���+�� ��+��� 8�+��� ��+8�� ���+��� �+�� 8+��

�� $� � �� ���� ����,���� �������3<� �8+�� �+��� ���+��� ��+�8� 8�+��� ��+8�� ���+��� �+�� 8+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �"��� �����;�3<� ��+� +8�� �+8�� �+��� �+��� ���+��� ��+�� �+�� �+�

�� $� � �� ����� �"��� �������3<� ��+� +8�� �+8�� �+��� �+��� ���+��� ��+�� �+�� �+�

�� $� � �� ����� ��,���� �����;�3<� �+�� �+�8� ��+�8� ��+��� �+��� ���+��� ��+��� �+��� �+��

�� $� � �� ����� ��,���� �������3<� �+�� �+�8� ��+�8� ��+��� �+��� ���+��� ��+��� �+��� �+��

�� $� � �� ����� ����,���� �����;�3<� �8+�� �+��� ��+� ��+��� �+�� ���+��� ���+��� +��� �+�8�

�� $� � �� ����� ����,���� �������3<� �8+�� �+��� ��+� ��+��� �+�� ���+��� ���+��� +��� �+�8�

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �"��� �����;�3<� ��+� �+��� 8+��� �+��� �+�� ���+�� ��+��� �+8� +���

�� $� � �� ����� �"��� �������3<� ��+� �+��� 8+��� �+��� �+�� ���+�� ��+��� �+8� +���

�� $� � �� ����� ��,���� �����;�3<� �+�� �+��� �8�+��� ��+� �+��� ���+�� ���+�� �+�� �+���

�� $� � �� ����� ��,���� �������3<� �+�� �+��� �8�+��� ��+�� �+��� ���+�� ���+�� �+�� �+���

�� $� � �� ����� ����,���� �����;�3<� �8+�� �+� �+�8� ���+8� ��8+�� ���+�� ���+��� 8+��� ��+�8�

�� $� � �� ����� ����,���� �������3<� �8+�� �+� �+��� ���+8� ��8+��� ���+�� ���+��� 8+��� ��+�8�

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �"��� �����;�3<� ��+� �+��� ��+�� ��+� ��+��� ���+��� ��+��� �+��� �

�� $� � �� ��� �"��� �������3<� ��+� �+��� ��+�� ��+� ��+��� ���+��� ��+��� �+��� �

�� $� � �� ��� ��,���� �����;�3<� �+�� �+��� ��+�� ���+��� ���+��� ���+��� ���+�� �+��� �+���

�� $� � �� ��� ��,���� �������3<� �+�� �+��� ��� ���+��� ���+�� ���+��� ���+�� �+��� �+���

�� $� � �� ��� ����,���� �����;�3<� �8+�� �+��� ���8+�� ���+�8� ���� ���+��� ���+��� 8+�� ��+8�

�� $� � �� ��� ����,���� �������3<� �8+�� �+��� ���8+��� ���+�8� ���� ���+��� ���+��� 8+�� ��+8�

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �"��� �����;�3<� ��+� �+�8� ���+�� ��+�� ��+�� ���+�� ��+��� �+��� +���

�� $� � �� ��� �"��� �������3<� ��+� �+�8� ���+�� ��+�� ��+�� ���+�� ��+��� �+��� +���

�� $� � �� ��� ��,���� �����;�3<� �+�� �+�� ��+�� ��+� ��8+��� ���+�� ���+�� +�� 8+��

�� $� � �� ��� ��,���� �������3<� �+�� �+�� ��+�� ��+� ��8+�8� ���+�� ���+�� +�� 8+��

�� $� � �� ��� ����,���� �����;�3<� �8+�� �+��� ����+�� ��+��� ���+��� ���+�� ���+��� 8+8� ��+��

�� $� � �� ��� ����,���� �������3<� �8+�� �+��� ����+��� ��+��� ���+��� ���+�� ���+��� 8+8� ��+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �8�� �"��� �����;�3<� ��+� �+�� ��8+��� ��+8� �8+�� ��8+��� ��+��� �+��� �+�8�

�� $� � �� �8�� �"��� �������3<� ��+� �+�� ��8+��� ��+8� �8+�� ��8+��� ��+��� �+��� �+�8�

�� $� � �� �8�� ��,���� �����;�3<� �+�� �+��� �+��� ��+��� ���+��� ��8+��� ���+�� +�� �+���

Page 27: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� $� � �� �8�� ��,���� �������3<� �+�� �+��� �+��� ��+�8� ���+�� ��8+��� ���+�� +�� �+���

�� $� � �� �8�� ����,���� �����;�3<� �8+�� �+��� ��+�� ���+�� ���+��� ��8+��� ���+��� �+88� �+��

�� $� � �� �8�� ����,���� �������3<� �8+�� �+��� ��+� ���+�� ���+�� ��8+��� ���+��� �+88� �+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �"��� �����;�3<� ��+� �+�� ��+��� ��+��� �+�� ���+�� ��+��� �+��� 8+���

�� $� � �� ���� �"��� �������3<� ��+� �+�� ��+��� ��+��� �+�� ���+�� ��+��� �+��� 8+���

�� $� � �� ���� ��,���� �����;�3<� �+�� �+�� 8�+�� ��+�� ���+��� ���+�� ���+�� +�� �+��

�� $� � �� ���� ��,���� �������3<� �+�� �+�� 8�+�� ��+�� ���+��� ���+�� ���+�� +�� �+��

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+��� �8+��� ���+�� ���+��� ���+�� ���+��� �+��� �+���

�� $� � �� ���� ����,���� �������3<� �8+�� �+��� �8+��� ���+�� ���+��� ���+�� ���+��� �+��� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ��8� �"��� �����;�3<� ��+� �+�� ��+8� �8+��� ��+�� ���+��� ��+��� +�� +�

�� $� � ���� ��8� �"��� �������3<� ��+� �+�� ��+8� �8+��� ��+�� ���+��� ��+��� +�� +�

�� $� � ���� ��8� ��,���� �����;�3<� �+�� �+�8� ���+8� ��+��� ��+��� ���+��� ���+�� +��� 8+���

�� $� � ���� ��8� ��,���� �������3<� �+�� �+�8� ���+��� ��+��� ��+��� ���+��� ���+�� +��� 8+���

�� $� � ���� ��8� ����,���� �����;�3<� �8+�� �+�� �+�� ���+� ��+8� ���+��� ���+��� �+��� ��+��

�� $� � ���� ��8� ����,���� �������3<� �8+�� �+�� �+�� ���+�� ��+8� ���+��� ���+��� �+��� ��+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ��� �"��� �����;�3<� ��+� �+�8� ��+��� ��+��� �+88� ���+��� ��+�� �+�8� �+8�

�� $� � ���� ��� �"��� �������3<� ��+� �+�8� ��+�� ��+��� �+88� ���+��� ��+�� �+�8� �+8�

�� $� � ���� ��� ��,���� �����;�3<� �+�� �+�� ��+��� �+�8� �+��� ���+��� ���+��� �+��� +8�

�� $� � ���� ��� ��,���� �������3<� �+�� �+�� ��+�8� �+��� �+��� ���+��� ���+��� �+��� +8�

�� $� � ���� ��� ����,���� �����;�3<� �8+�� �+�� ��+��� ��+�8� ���+�� ���+��� ���+��� +��� �+���

�� $� � ���� ��� ����,���� �������3<� �8+�� �+�� ��+�� ��+��� ���+�� ���+��� ���+��� +��� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �"��� �����;�3<� ��+� �+�� �+��� ��+� ��+�� ���+��� ��+�� �+��� �+��

�� $� � �� ����� �"��� �������3<� ��+� �+�� �+��� ��+� ��+�� ���+��� ��+�� �+��� �+��

�� $� � �� ����� ��,���� �����;�3<� �+�� �+��� ��+��� �+��� �+��� ���+��� ���+��� �+�� +��

�� $� � �� ����� ��,���� �������3<� �+�� �+��� ��+��� �+�8� �+��� ���+��� ���+��� �+�� +��

�� $� � �� ����� ����,���� �����;�3<� �8+�� �+� ���+��� ��+�� ���+��� ���+��� ���+��� �+�� ��+���

�� $� � �� ����� ����,���� �������3<� �8+�� �+� ���+��� ��+�� ���+��� ���+��� ���+��� �+�� ��+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � � ����� �"��� �����;�3<� ��+� �+�� ��+��� �+�� �+8�� ���+��� ��+�� +�8� +��

�� $� � � ����� �"��� �������3<� ��+� �+�� ��+��� �+�� �+8�� ���+��� ��+�� +�8� +��

�� $� � � ����� ��,���� �����;�3<� �+�� �+�� ���+��� ��+��� �+��� ���+��� ���+��� +��� 8+8�

�� $� � � ����� ��,���� �������3<� �+�� �+�� ���+��� ��+�� �+�� ���+��� ���+��� +��� 8+8�

�� $� � � ����� ����,���� �����;�3<� �8+�� �+��� ����+8�� �8�+�� ��+��� ���+��� ���+��� �+��� ��+��

�� $� � � ����� ����,���� �������3<� �8+�� �+��� ����+8� �8�+�� ��+��� ���+��� ���+��� �+��� ��+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �8�� �"��� �����;�3<� ��+� �+�� 8�+�� +�� 8+��� ���+�� ��+�� �+��� �+��

Page 28: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� $� � �� �8�� �"��� �������3<� ��+� �+�� 8�+�� +�� 8+��� ���+�� ��+�� �+��� �+��

�� $� � �� �8�� ��,���� �����;�3<� �+�� �+8� ��+��� �+�� +��� ���+�� ���+��� +�� +�8�

�� $� � �� �8�� ��,���� �������3<� �+�� �+8� ��+��� �+�� +��� ���+�� ���+��� +�� +�8�

�� $� � �� �8�� ����,���� �����;�3<� �8+�� �+� ���+�� ��+8� ���+��� ���+�� ���+��� +��� �+��

�� $� � �� �8�� ����,���� �������3<� �8+�� �+� ���+� ��+�� ���+��� ���+�� ���+��� +��� �+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ����� �"��� �����;�3<� ��+� �+� �+�� �+�� +�� ���+8� ��+�� �+�� �+���

�� $� � ���� ����� �"��� �������3<� ��+� �+� �+�� �+�� +�� ���+8� ��+�� �+�� �+���

�� $� � ���� ����� ��,���� �����;�3<� �+�� �+��� ��+�� �+� �+�� ���+8� ���+��� �+��� +���

�� $� � ���� ����� ��,���� �������3<� �+�� �+��� ��+� �+� �+�� ���+8� ���+��� �+��� +���

�� $� � ���� ����� ����,���� �����;�3<� �8+�� �+�� ���+88� ���+�8� ���+��� ���+8� ���+��� +� �+���

�� $� � ���� ����� ����,���� �������3<� �8+�� �+�� ���+8�� ���+�8� ���+��� ���+8� ���+��� +� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �"��� �����;�3<� ��+� �+�8� �+��� �+��� +�8� ���+��� ��+��� �+��� �+��

�� $� � �� ���� �"��� �������3<� ��+� �+�8� �+��� �+��� +�8� ���+��� ��+��� �+��� �+��

�� $� � �� ���� ��,���� �����;�3<� �+�� �+��� ���+� �+� +��� ���+��� ���+�� �+�8� +���

�� $� � �� ���� ��,���� �������3<� �+�� �+��� ���+�� �+� +�8� ���+��� ���+�� �+�8� +���

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+� ��8+��� ���+��� ���+�� ���+��� ���+��� �+��� ���

�� $� � �� ���� ����,���� �������3<� �8+�� �+� ��8+��� ���+��� ���+�� ���+��� ���+��� �+��� ���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ��� ������ �"��� �����;�3<� ��+� �+�� �+� ��+�� �+��� ���+8� ��+��� �+�� �+���

�� $� � ��� ������ �"��� �������3<� ��+� �+�� �+� ��+�� �+��� ���+8� ��+��� �+�� �+���

�� $� � ��� ������ ��,���� �����;�3<� �+�� �+��� ��+��� +��� �+��� ���+8� ���+��� �+��� +��

�� $� � ��� ������ ��,���� �������3<� �+�� �+��� ��+��� +��� �+��� ���+8� ���+��� �+��� +��

�� $� � ��� ������ ����,���� �����;�3<� �8+�� �+�� �8�+� ���+�� �+� ���+8� ���+��� +�� ��+��

�� $� � ��� ������ ����,���� �������3<� �8+�� �+�� �8�+�� ���+�� �+� ���+8� ���+��� +�� ��+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ������ �"��� �����;�3<� ��+� �+��� +�� �+8�� ��+�� ���+��� ��+��� �+��� �+��

�� $� � �� ������ �"��� �������3<� ��+� �+��� +�� �+8�� ��+8� ���+��� ��+��� �+��� �+��

�� $� � �� ������ ��,���� �����;�3<� �+�� �+��� �8+��� �+8�� 8+8�� ���+��� ���+�� �+��� +���

�� $� � �� ������ ��,���� �������3<� �+�� �+��� �8+��� �+8�� 8+8�� ���+��� ���+�� �+��� +���

�� $� � �� ������ ����,���� �����;�3<� �8+�� �+��� ���+��� ��8+� ���+�� ���+��� ���+�8� +��� ��+��

�� $� � �� ������ ����,���� �������3<� �8+�� �+��� ���+��� ��8+� ���+�� ���+��� ���+�8� +��� ��+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �"��� �����;�3<� ��+� �+�� ��+8� �8+��� ��+��� ���+8�� ��+��� �+��� �+8�

�� $� � �� ���� �"��� �������3<� ��+� �+�� ��+8� �8+��� ��+��� ���+8�� ��+��� �+��� �+8�

�� $� � �� ���� ��,���� �����;�3<� �+�� �+��� ���+��� +�8� �+��� ���+8�� ���+��� +�8� +��

�� $� � �� ���� ��,���� �������3<� �+�� �+��� ���+�� +�8� �+��� ���+8�� ���+��� +�8� +��

�� $� � �� ���� ����,���� �����;�3<� �8+�� �+��� �+�8� ��+�8� �8+��� ���+8�� ���+�8� �+��� ��+���

�� $� � �� ���� ����,���� �������3<� �8+�� �+��� �+��� ��+�8� �8+��� ���+8�� ���+�8� �+��� ��+���

Page 29: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

����6�� ������

���������� ��� �� ���

7�&��� �

8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� �

������ ���

"�����#�6�

��$���#�6�

�� �� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ��� ��8��� �"��� �����;�3<� ��+� �+��� �+��� ��+�� ��+�� ���+�� ��+�� �+�8� �+��

�� $� � ��� ��8��� �"��� �������3<� ��+� �+��� �+��� ��+�� ��+�� ���+�� ��+�� �+�8� �+��

�� $� � ��� ��8��� ��,���� �����;�3<� �+�� �+�� ��+� +�� �+��� ���+�� ���+�� +�� +�8�

�� $� � ��� ��8��� ��,���� �������3<� �+�� �+�� ��+��� +� �+��� ���+�� ���+�� +�� +�8�

�� $� � ��� ��8��� ����,���� �����;�3<� �8+�� �+�� �+�� 8�+�� 8�+��� ���+�� ���+�8� 8+��� ��+��

�� $� � ��� ��8��� ����,���� �������3<� �8+�� �+�� �+�� 8�+�� 8�+��� ���+�� ���+�8� 8+��� ��+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ����� �"��� �����;�3<� �� �+� �+�8� �+8�� +�� ���+�� ��+��� �+�� �+���

�� $� � ���� ����� �"��� �������3<� �� �+� �+��� �+8�� +�� ���+�� ��+��� �+�� �+���

�� $� � ���� ����� ��,���� �����;�3<� ���� �+��� �8�+��� 88+��� 8�+�� ���+�� ��+��� �+8� +�8�

�� $� � ���� ����� ��,���� �������3<� ���� �+��� �8�+��� 88+��� 8�+8� ���+�� ��+��� �+8� +�8�

�� $� � ���� ����� ����,���� �����;�3<� ��+�� �+�� 8��+8� ���+��� ��+�� ���+�� ���+��� 8+��� �+���

�� $� � ���� ����� ����,���� �������3<� ��+�� �+�� 8��+8�� ���+��� ��+�� ���+�� ���+��� 8+��� �+���

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ������ �"��� �����;�3<� �� �+��� ���+�� ��+�� �+�� ���+8�� ��+��� �+��� �+��

�� $� � �� ������ �"��� �������3<� �� �+��� ���+8�� ��+��� �+��� ���+8�� ��+��� �+��� �+��

�� $� � �� ������ ��,���� �����;�3<� ���� �+��� ��+��� �8+� 8+8�� ���+8�� ��+�8� 8+�8� �+���

�� $� � �� ������ ��,���� �������3<� ���� �+��� ��+�� �8+�� 8+8�� ���+8�� ��+�8� 8+��� �+���

�� $� � �� ������ ����,���� �����;�3<� ��+�� �+�� �+� �+88� �+�� ���+8�� ���+��� ��+��� �+��

�� $� � �� ������ ����,���� �������3<� ��+�� �+��� �+��� �+��� �+��� ���+8�� ���+��� ��+��� �+��

�� �� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �"��� �����;�3<� �� �+�� ���+��� ��+8� 8�+8� ���+�� ��+�8� �+8�� �+�8�

�� $� � �� ����� �"��� �������3<� �� �+�� ���+��� ��+8� 8�+8� ���+�� ��+�8� �+8�� �+�8�

�� $� � �� ����� ��,���� �����;�3<� ���� �+�8� ���+�� 8�+8� ��+��� ���+�� ��+��� �+��� +���

�� $� � �� ����� ��,���� �������3<� ���� �+�8� ���+�� 8�+8� ��+��� ���+�� ��+��� �+��� +���

�� $� � �� ����� ����,���� �����;�3<� ��+�� �+�� �+8�� ���+8�� ��8+��� ���+�� ���+�� 8+��� �+��

�� $� � �� ����� ����,���� �������3<� ��+�� �+�� �+8�� ���+8�� ��8+��� ���+�� ���+�� 8+��� �+��

Page 30: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Table A-3: HEC-RAS Results Bypass Channel – Low Flows

����6� � ������������

���������� ��� �� 7�

&��� �8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� � ������ ��� "���

��#�6���$���#�6�

�� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� $� � ��� ���� �+��&)1� �+�� �+��� �+8�� �+�8� �+�� ���+�� ��+��� �+��� �+���

�� $� � ��� ���� ��&)1� �� �+�� +��� �+��� �+8�� ���+�� ��+��� �+��� �+8��

�� $� � ��� ���� ��&)1� �� �+��� �+��� �+�� +�� ���+�� ��+��� �+��� �+���

�� $� � ��� ���� �&)1� � �+��� �+��� �+��� +8�� ���+�� ��+�� �+�8� �+���

�� $� � ��� ���� +��&)1� +�� �+�� �+��� +��� +�8� ���+�� ��+��� �+�� �+���

�� $� � ��� ���� ��&)1� �� �+�� ��+��� +�� +��� ���+�� ��+88� �+��� �+�8�

�� $� � ��� ���� ��+�&)1� ��+� �+��� ��+��� +�� �+��� ���+�� ��+��� �+88� �+��

�� $� � ��� ���� ��+�&)1� ��+� �+�� 8�+8�� +��� �+��� ���+�� ��+�� �+��� �+�

�� $� � ��� ���� �8�&)1� �8� �+�� 88+��� +�� 8+��� ���+�� ��+�� �+��� �+8�

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �� �+��&)1� �+�� �+��� 8� ��+�� ��+� ���+�� ��+��� �+��� �+88�

�� $� � �� �� ��&)1� �� �+�� �+��� ��+�� ��+��� ���+�� ��+��� �+�� �+��

�� $� � �� �� ��&)1� �� �+��� �+��� ��+�� ��+��� ���+�� ��+��� �+� �+�8�

�� $� � �� �� �&)1� � �+��� +�8� ��+��� �+�8� ���+�� ��+�� �+��� �+�8�

�� $� � �� �� +��&)1� +�� �+�� �+��� �+�� �+��� ���+�� ��+��� �+8�� �+��

�� $� � �� �� ��&)1� �� �+�� �+��� �+��� �+�8� ���+�� ��+88� �+��� �+���

�� $� � �� �� ��+�&)1� ��+� �+��� ��+�8� �+��� �+��� ���+�� ��+��� �+�� �+�

�� $� � �� �� ��+�&)1� ��+� �+�� 8�+8� �+��� +�8� ���+�� ��+�� �+��� �+��

�� $� � �� �� �8�&)1� �8� �+�� 8�+8�� +�� +� ���+�� ��+�� �+��� �+8��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� 8� �+��&)1� �+�� �+��� �+��� ��+�� �8+�� ���+�� ��+��� �+� �+��

�� $� � �� 8� ��&)1� �� �+�� �+�� �8+��� �8+��� ���+�� ��+��� �+��� �+���

�� $� � �� 8� ��&)1� �� �+��� �+��� �8+�� ��+�� ���+�� ��+��� �+��� �+��

�� $� � �� 8� �&)1� � �+��� �+��� ��+��� ��+�� ���+�� ��+�� �+88� �+��

�� $� � �� 8� +��&)1� +�� �+�� �+��� ��+�� ��+��� ���+�� ��+��� �+��� �+���

�� $� � �� 8� ��&)1� �� �+�� �+��� ��+�� ��+��� ���+�� ��+88� �+��� �+�

�� $� � �� 8� ��+�&)1� ��+� �+��� ��+�� ��+��� �+��� ���+�� ��+��� �+��� �+8��

�� $� � �� 8� ��+�&)1� ��+� �+�� 8�+�� ��+8�� �+��� ���+�� ��+�� �+��� �+���

�� $� � �� 8� �8�&)1� �8� �+�� 88+�� �+��� �+� ���+�� ��+�� �+��� �+���

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �+��&)1� �+�� �+��� �� �+�� ��+�� ���+�8� ��+��� �+�� �+���

�� $� � �� ��� ��&)1� �� �+�� �+��� �+�8� �8+��� ���+�8� ��+��� �+8�� �+���

�� $� � �� ��� ��&)1� �� �+��� �+��� ��+��� �8+�� ���+�8� ��+��� �+��� �+���

�� $� � �� ��� �&)1� � �+��� �+� ��+� �8+��� ���+�8� ��+�� �+��� �+��

�� $� � �� ��� +��&)1� +�� �+�� �+��� ��+8� ��+��� ���+�8� ��+��� �+��� �+��

�� $� � �� ��� ��&)1� �� �+�� ��+��� �8+��� ��+��� ���+�8� ��+88� �+��� �+8�

�� $� � �� ��� ��+�&)1� ��+� �+��� ��+��� ��+8�� ��+� ���+�8� ��+�� �+��� �+���

�� $� � �� ��� ��+�&)1� ��+� �+�� 8�+8�� ��+��� ��+��� ���+�8� ��+�� �+�� �+���

�� $� � �� ��� �8�&)1� �8� �+��� 8�+�� ��+��� �+8�� ���+�8� ��+�� �+��� +��

Page 31: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

����6� � ������������

���������� ��� �� 7�

&��� �8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� � ������ ��� "���

��#�6���$���#�6�

�� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �8� �+��&)1� �+�� �+��� ��+8� ��+��� ��+�� ���� ��+��� �+�� �+���

�� $� � �� �8� ��&)1� �� �+�� ��+�� ��+�� ��+�� ���� ��+��� �+�� �+���

�� $� � �� �8� ��&)1� �� �+�8� �+8�� ��+�� ��+�� ���� ��+��� �+�� �+���

�� $� � �� �8� �&)1� � �+��� +��� ��+��� �+��� ���� ��+�� �+��� �+��

�� $� � �� �8� +��&)1� +�� �+�� 8+�� ��+�8� �+�� ���� ��+��� �+8�� �+���

�� $� � �� �8� ��&)1� �� �+��� �+��� ��+�8� �+��� ���� ��+88� �+��� �+88�

�� $� � �� �8� ��+�&)1� ��+� �+�� +�� �+��� �+��� ���� ��+�� �+��� �+��

�� $� � �� �8� ��+�&)1� ��+� �+��� 8+��� �+��� ��+��� ���� ��+�� �+��� �+��

�� $� � �� �8� �8�&)1� �8� �+�� ��+��� �+�� ��+�� ���� ��+��� �+��� +���

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �+��&)1� �+�� �+�� �+�� �+��� 8+��� ���+�� ��+��� �+��� �+���

�� $� � �� ��� ��&)1� �� �+�8� �+�8� 8+�� 8+�� ���+�� ��+��� �+�� �+���

�� $� � �� ��� ��&)1� �� �+�� �+� 8+�� 8+��� ���+�� ��+�8� �+��� �+��

�� $� � �� ��� �&)1� � �+8� �+��� �+��� �+8� ���+�� ��+�� �+�8� �+�

�� $� � �� ��� +��&)1� +�� �+��� �+8�� �+��� �+�� ���+�� ��+� �+� �+�

�� $� � �� ��� ��&)1� �� �+��� +8� �+8�� �+�� ���+�� ��+�� �+�� �+���

�� $� � �� ��� ��+�&)1� ��+� �+��� �+� ��+��� ��+�� ���+�� ��+8� �+�� �+��

�� $� � �� ��� ��+�&)1� ��+� �+�8� 8+� ��+��� ��� ���+�� ��+�� �+��� �+��

�� $� � �� ��� �8�&)1� �8� �+��� �+�� ��+�8� ��+�� ���+�� ��+��� �+8�� �+��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �8�� �+��&)1� �+�� �+8�� �+��� �+�� �+�� ���+� ���+8�� �+�� �+���

�� $� � �� �8�� ��&)1� �� �+��� �+�� �+��� �+�8� ���+� ���+��� �+��� �+��

�� $� � �� �8�� ��&)1� �� �+��� �+��� 8+��� 8+� ���+� ���+�� �+��� �+�

�� $� � �� �8�� �&)1� � �+�� �+��� 8+�� 8+8�� ���+� ���+��� �+�� �+���

�� $� � �� �8�� +��&)1� +�� �+8�� �+�8� 8+��� �+��� ���+� ��+��� �+� �+8��

�� $� � �� �8�� ��&)1� �� �+��� +8� �+�8� �+�� ���+� ��+�� �+��� �+��

�� $� � �� �8�� ��+�&)1� ��+� �+�� +�� �+8�� �+�� ���+� ��+��� �+��� �+���

�� $� � �� �8�� ��+�&)1� ��+� �+�� +��� �+�� �+� ���+� ��+��� �+8� �+���

�� $� � �� �8�� �8�&)1� �8� �+8�� �+��� �+�� �+�� ���+� ��+� �+��� ��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �+��&)1� �+�� �+��� �+�� 8+��� 8+��� ���+��� ���+�� �+��� �+��

�� $� � �� ���� ��&)1� �� �+��� �+�8� 8+�� 8+��� ���+��� ���+�� �+��� �+���

�� $� � �� ���� ��&)1� �� �+8� �+�� �+�� �+�� ���+��� ���+8� �+��� �+��

�� $� � �� ���� �&)1� � �+��� �+��� �+8� �+�� ���+��� ���+8�� �+��� �+�

�� $� � �� ���� +��&)1� +�� �+��� �+8� �+��� �+�� ���+��� ���+��� �+� �+��

�� $� � �� ���� ��&)1� �� �+�� +�� �+� �+�� ���+��� ���+�� �+�� �+���

�� $� � �� ���� ��+�&)1� ��+� �+��� +��� �+��� �+��� ���+��� ���+��� �+��� �+��

�� $� � �� ���� ��+�&)1� ��+� �+�� �+�� �+��� �+8� ���+��� ��+��� �+��� �+��

�� $� � �� ���� �8�&)1� �8� �+�� �+�� �+�� �+8�� ���+��� ��+��� �+8� �+���

Page 32: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

����6� � ������������

���������� ��� �� 7�

&��� �8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� � ������ ��� "���

��#�6���$���#�6�

�� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �+��&)1� �+�� �+��� �+��� �+��� �+�� ���+�� ���+�� �+��� �+���

�� $� � �� ��� ��&)1� �� �+��� �+�� ��+��� ��+�� ���+�� ���+�� �+��� �+���

�� $� � �� ��� ��&)1� �� �+��� �+8�� ��+��� ��+�� ���+�� ���+�� �+�� �+���

�� $� � �� ��� �&)1� � �+��� �+��� ��+�8� ��+��� ���+�� ���+�� �+��� �+���

�� $� � �� ��� +��&)1� +�� �+��� �+�� �+��� �+�� ���+�� ���+��� �+��� �+��

�� $� � �� ��� ��&)1� �� �+�� �+�� �� �+�� ���+�� ���+�8� �+��� �+8�

�� $� � �� ��� ��+�&)1� ��+� �+��� +��� �+�� �+� ���+�� ���+8�� �+��� �+��

�� $� � �� ��� ��+�&)1� ��+� +�� +��� �+�� �+�� ���+�� ���+8� �+��� �+�

�� $� � �� ��� �8�&)1� �8� +�� +�� �+8� �+��� ���+�� ���+8�� �+�� �+��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �+��&)1� �+�� �+�� �+��� �+��� �+��� ���� ���+�� �+�� �+��

�� $� � �� ����� ��&)1� �� 8+��� �+�8� �+��� �+�� ���� ���+��� �+��� �+���

�� $� � �� ����� ��&)1� �� 8+�� �+��� �+� �+�� ���� ���+�� �+��� �+��

�� $� � �� ����� �&)1� � 8+� �+�� �+8�� �+�8� ���� ���+��� �+��� �+���

�� $� � �� ����� +��&)1� +�� �+�� �+��� +��� +�� ���� ���+�� �+�8� �+��

�� $� � �� ����� ��&)1� �� �+��� �+��� +8� +�� ���� ���+� �+� �+�

�� $� � �� ����� ��+�&)1� ��+� 8+��� �+�� +�� +�� ���� ���+��� �+�� �+���

�� $� � �� ����� ��+�&)1� ��+� 8+�8� �+�� +�� �+�� ���� ���+8�� �+�� �+8��

�� $� � �� ����� �8�&)1� �8� 8+��� �+��� �+��� 8+��� ���� ���+��� �+�� �+���

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �+��&)1� �+�� �+�� �+�� �+�� �+� ���+��� ���+��� �+��� �+��

�� $� � �� ����� ��&)1� �� �+�� �+��� �+�� �+��� ���+��� ���+�� �+��� �+���

�� $� � �� ����� ��&)1� �� �+��� �+�� 8+�� 8+� ���+��� ���+��� �+�8� �+��

�� $� � �� ����� �&)1� � �+�� �+� 8+��� �� ���+��� ���+�� �+��� �+���

�� $� � �� ����� +��&)1� +�� �+�� �+�� �+��� �+��� ���+��� ���+� �+��� �+��

�� $� � �� ����� ��&)1� �� �+��� �+�� �+� �+� ���+��� ���+8� �+��� �+��

�� $� � �� ����� ��+�&)1� ��+� +�� +��� �+��� �+�� ���+��� ���+� �+� �+8�

�� $� � �� ����� ��+�&)1� ��+� +��� +8� �+�8� �+8�� ���+��� ���+�� �+8� �+��

�� $� � �� ����� �8�&)1� �8� +��� +��� ��+� ��+� ���+��� ���+�� �+�� �+�8�

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �+��&)1� �+�� �+��� �+��� +�� +� ��8+��� ��8+8�� �+�� �+��

�� $� � �� ��� ��&)1� �� �+�� �+�� +� +�� ��8+��� ��8+8�� �+��� �+���

�� $� � �� ��� ��&)1� �� +��� �+8� +�� +8�� ��8+��� ��8+��� �+�� �+��

�� $� � �� ��� �&)1� � +�� �+��� +��� +�8� ��8+��� ��8+�8� �+��� �+���

�� $� � �� ��� +��&)1� +�� +��� �+��� +8�� +�8� ��8+��� ��8+�� �+�8� �+���

�� $� � �� ��� ��&)1� �� +��� �+8�� +��� �+�� ��8+��� ��8+�� �+�� �+��

�� $� � �� ��� ��+�&)1� ��+� +�� �+�� �+��� �+��� ��8+��� ���+��� �+8� �+��

�� $� � �� ��� ��+�&)1� ��+� +8�� �+8�� �+��� �+�� ��8+��� ���+�� �+��� �+���

�� $� � �� ��� �8�&)1� �8� +�� +�� �+��� 8� ��8+��� ���+�8� �+8� �+8��

Page 33: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

����6� � ������������

���������� ��� �� 7�

&��� �8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� � ������ ��� "���

��#�6���$���#�6�

�� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �+��&)1� �+�� �+��� �+�� +8�� +��� ���+�8� ���+��� �+��� �+���

�� $� � �� ����� ��&)1� �� �+�8� �+��� +��� +��� ���+�8� ���+�� �+�8� �+���

�� $� � �� ����� ��&)1� �� �+�8� �+��� �+�� �+�� ���+�8� ��8+�� �+��� �+���

�� $� � �� ����� �&)1� � �+�8� �+��� �+8� �+88� ���+�8� ��8+��� �+�� �+��

�� $� � �� ����� +��&)1� +�� �� �+� �+�8� 8+��� ���+�8� ��8+�� �+�� �+��

�� $� � �� ����� ��&)1� �� �+��� +��� 8+�8� 8+8� ���+�8� ��8+8� �+��� �+8�

�� $� � �� ����� ��+�&)1� ��+� �+�� +��� 8+��� �+��� ���+�8� ��8+��� �+8�� �+�8�

�� $� � �� ����� ��+�&)1� ��+� �+��� +��� �+��� �+��� ���+�8� ��8+8�� �+8�� �+���

�� $� � �� ����� �8�&)1� �8� �+�� �+��� �+�� �+��� ���+�8� ��8+�� �+��� �+���

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �+��&)1� �+�� �� �+��� �+��� +��� ��+8�� ��+�8� �+��� �+���

�� $� � �� ���� ��&)1� �� �+��� �+�� +��� +��� ��+8�� ��+�� �+�� �+��

�� $� � �� ���� ��&)1� �� +�� �+8�� +�� +�� ��+8�� ��+��� �+��� �+���

�� $� � �� ���� �&)1� � +�� �+��� +��� +�� ��+8�� ��+�8� �+��� �+���

�� $� � �� ���� +��&)1� +�� +�� �+��� +��� +��� ��+8�� ���+��� �+�� �+��

�� $� � �� ���� ��&)1� �� +��� �+��� +� +�� ��+8�� ���+�� �+��� �+�8�

�� $� � �� ���� ��+�&)1� ��+� +��� �+�� +8� +8�� ��+8�� ���+�� �+��� �+���

�� $� � �� ���� ��+�&)1� ��+� +��� �+��� +��� +��� ��+8�� ���+��� �+��� �+��

�� $� � �� ���� �8�&)1� �8� +�8� +��� +��� �+�� ��+8�� ���+��� �+�� �+���

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �+��&)1� �+�� �+��� �+��� �+8�� �+�� ���+��� ���+��� �+��� �+���

�� $� � �� ����� ��&)1� �� �+��� �+��� �+�� �+��� ���+��� ���+��� �+��� �+���

�� $� � �� ����� ��&)1� �� �+8�� �+��� �+��� �+��� ���+��� ���+�8� �+��� �+���

�� $� � �� ����� �&)1� � �+�8� �+�� �+�� �+��� ���+��� ���+�� �+��� �+���

�� $� � �� ����� +��&)1� +�� �+8�� �+��� �+� �+�� ���+��� ���+�� �+��� �+��

�� $� � �� ����� ��&)1� �� +� �+��� �+��� �+8�� ���+��� ���+��� �+��� �+���

�� $� � �� ����� ��+�&)1� ��+� +�� �+�� �+��� �+��� ���+��� ��+��� �+��� �+��

�� $� � �� ����� ��+�&)1� ��+� +8�� �+8�� �+��� �+��� ���+��� ��+�� �+�� �+�

�� $� � �� ����� �8�&)1� �8� �+��� +�� �+�8� �+��� ���+��� ��+��� �+� �+��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �+��&)1� �+�� �+��� �+��� ��+�� �+��� ���+�� ���+��� �+�8� �+�8�

�� $� � �� ����� ��&)1� �� �+�� ��+��� �+��� ��+8� ���+�� ���+��� �+�� �+��

�� $� � �� ����� ��&)1� �� �+�8� +8� �+�8� +88� ���+�� ���+�� �+��� �+��

�� $� � �� ����� �&)1� � �+��� �+��� �+�� �+� ���+�� ���+��� �+��� �+��

�� $� � �� ����� +��&)1� +�� �+��� +�� �+8�� 8+�� ���+�� ���+��� �+�� �+8��

�� $� � �� ����� ��&)1� �� �+�� ��+8� 8+��� �+��� ���+�� ���+�� �+�� �+���

�� $� � �� ����� ��+�&)1� ��+� �+��� ��+�� �+�� �+��� ���+�� ��+�� �+�� +��

�� $� � �� ����� ��+�&)1� ��+� �+��� 8+��� �+��� �+�� ���+�� ��+��� �+8� +���

�� $� � �� ����� �8�&)1� �8� �+�� ��� �+8�� +��� ���+�� ��+� �+��� +�

Page 34: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

����6� � ������������

���������� ��� �� 7�

&��� �8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� � ������ ��� "���

��#�6���$���#�6�

�� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �+��&)1� �+�� �+��� 8�+�� ��+��� �+��� ���+��� ���+��� �+� �+��

�� $� � �� ��� ��&)1� �� �+��� ��+�� �8+�� ��+�� ���+��� ���+��� �+�� �+���

�� $� � �� ��� ��&)1� �� �+��� ��+�� ��+�� 8�+�� ���+��� ���+�� �+��� +��

�� $� � �� ��� �&)1� � �+�� ��+��� 8�+��� 8+�� ���+��� ���+��� �+8� +���

�� $� � �� ��� +��&)1� +�� �+�� ���+��� 88+��� 8�+�� ���+��� ���+��� �+8�� +��

�� $� � �� ��� ��&)1� �� �+�8� ��+��� ��+��� �+�� ���+��� ���+�� �+��� +8��

�� $� � �� ��� ��+�&)1� ��+� �+��� ��+��� ��+��� ��+��� ���+��� ��+�� �+�8� +���

�� $� � �� ��� ��+�&)1� ��+� �+��� ��+�� ��+� ��+��� ���+��� ��+��� �+��� �

�� $� � �� ��� �8�&)1� �8� �+�� �8�+�� �+��� ��+��� ���+��� ��+� �+��� +���

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ��� �+��&)1� �+�� �� ���+��� 8�+��� 8�+�� ���+�� ���+��� �+�� +��

�� $� � �� ��� ��&)1� �� �+��� ���+��� ��+��� ��+�� ���+�� ���+��� �+8�� +8��

�� $� � �� ��� ��&)1� �� �+��� �+��� ��+��� �+��� ���+�� ���+�� �+��� +���

�� $� � �� ��� �&)1� � �+��� �+��� �+�� �+��� ���+�� ���+��� �+�8� +���

�� $� � �� ��� +��&)1� +�� �+�� ���+��� �+��� ��+��� ���+�� ���+��� �+��� +���

�� $� � �� ��� ��&)1� �� �+�� ���+��� �8+8� ��+� ���+�� ���+�� �+��� +�

�� $� � �� ��� ��+�&)1� ��+� �+��� ���+��� ��+��� ��+��� ���+�� ��+�� �+� +8�

�� $� � �� ��� ��+�&)1� ��+� �+�8� ���+�� ��+�� ��+�� ���+�� ��+��� �+��� +���

�� $� � �� ��� �8�&)1� �8� �+��� ��+��� ��+8� ��+��� ���+�� ��+� �+8�� +��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �8�� �+��&)1� �+�� �� �8�+� ��+��� �+�� ��8+��� ���+��� �+�8� �+��

�� $� � �� �8�� ��&)1� �� �+��� ���+��� �8+��� ��+�� ��8+��� ���+��� �+��� �+���

�� $� � �� �8�� ��&)1� �� �+��� ���+�8� ��+��� ��+8� ��8+��� ���+�� �+��� 8+���

�� $� � �� �8�� �&)1� � �+��� ���+��� ��+��� ��+��� ��8+��� ���+��� �+�� 8+�

�� $� � �� �8�� +��&)1� +�� �+��� ���+��� ��+��� �+�� ��8+��� ���+��� �+�� 8+��

�� $� � �� �8�� ��&)1� �� �+�� ��+��� ��+�� �+� ��8+��� ���+�� �+��� 8+���

�� $� � �� �8�� ��+�&)1� ��+� �+�� �8�+�� ��� ��+��� ��8+��� ��+�� �+��� 8+��

�� $� � �� �8�� ��+�&)1� ��+� �+�� ��8+��� ��+8� �8+�� ��8+��� ��+��� �+��� �+�8�

�� $� � �� �8�� �8�&)1� �8� �+��� ��+�� �+�� ��+��� ��8+��� ��+� +�� �+��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �+��&)1� �+�� �� ��+�� ��+��� �8+� ���+�� ���+��� �+��� +���

�� $� � �� ���� ��&)1� �� �� ��+��� ���+8�� ���+8�� ���+�� ���+��� �+�� �+��

�� $� � �� ���� ��&)1� �� �+��� ��+8� ��8+8�� ���+��� ���+�� ���+�� �+�� �+��

�� $� � �� ���� �&)1� � �+��� �8�� ���+��� ���+��� ���+�� ���+��� �+� �+��

�� $� � �� ���� +��&)1� +�� �+��� ���+��� ��8+8�� ���+��� ���+�� ���+��� �+��� �+���

�� $� � �� ���� ��&)1� �� �+��� �+�8� ���+��� ��+� ���+�� ���+�� �+��� �+�8�

�� $� � �� ���� ��+�&)1� ��+� �+�� �+�� ���+��� ��+��� ���+�� ��+�� �+8�� �+���

�� $� � �� ���� ��+�&)1� ��+� �+�� ��+��� ��+��� �+�� ���+�� ��+��� �+��� 8+���

�� $� � �� ���� �8�&)1� �8� �+�� ��+��� ��+��� ��+��� ���+�� ��+� �+��� 8+���

Page 35: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

����6� � ������������

���������� ��� �� 7�

&��� �8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� � ������ ��� "���

��#�6���$���#�6�

�� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ��8� �+��&)1� �+�� �� ���+�8� ��+��� ��+��� ���+��� ���+��� �+�� +��

�� $� � ���� ��8� ��&)1� �� �� ��+8� �8+�8� ��+�� ���+��� ���+��� �+8� +���

�� $� � ���� ��8� ��&)1� �� �+��� ��+8�� ��+��� ��+� ���+��� ���+�� �+8�� +�

�� $� � ���� ��8� �&)1� � �+��� �+��� ��+��� ��+�� ���+��� ���+��� �+��� +���

�� $� � ���� ��8� +��&)1� +�� �+��� �8�+�8� ��+��� ��+8� ���+��� ���+��� �+��� +���

�� $� � ���� ��8� ��&)1� �� �+�� ���+�� �+8� �+�� ���+��� ���+�� �+��� +���

�� $� � ���� ��8� ��+�&)1� ��+� �+�� ��+��� ��+��� �8+��� ���+��� ��+�� +�� +���

�� $� � ���� ��8� ��+�&)1� ��+� �+�� ��+8� �8+��� ��+�� ���+��� ��+��� +�� +�

�� $� � ���� ��8� �8�&)1� �8� �+��� �+� ��+�8� ��+� ���+��� ��+� +�� +��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ��� �+��&)1� �+�� �+8� �+�� +�� +8�� ���+��� ���+��� �+��� �+��

�� $� � ���� ��� ��&)1� �� �+8�� �+8� +�� +�� ���+��� ���+��� �+�� �+�8�

�� $� � ���� ��� ��&)1� �� �+�8� �+�� �+8�� �+�� ���+��� ���+� �+�� �+���

�� $� � ���� ��� �&)1� � �+��� +8�� ��+�� ��+��� ���+��� ���+�� �+8� �+���

�� $� � ���� ��� +��&)1� +�� �+8�� �+�8� �+8� �+�� ���+��� ���+8�� �+�� �+��

�� $� � ���� ��� ��&)1� �� �+��� ��+� ��+��� ��+��� ���+��� ���+��� �+� �+���

�� $� � ���� ��� ��+�&)1� ��+� �+��� ��+�� ��+�� �+�8� ���+��� ��+��� �+8�� �+���

�� $� � ���� ��� ��+�&)1� ��+� �+�8� ��+�� ��+��� �+88� ���+��� ��+�� �+�8� �+8�

�� $� � ���� ��� �8�&)1� �8� �+��� ��+8�� ��+��� �+�� ���+��� ��+�� �+��� �+���

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �+��&)1� �+�� �+�� �8+��� �8+8� ��+�� ���+��� ���+��� �+��� �+���

�� $� � �� ����� ��&)1� �� �+��� ��+��� ��+�� ��+� ���+��� ���+�8� �+�� �+��

�� $� � �� ����� ��&)1� �� �+��� �+�� ��+��� ��+�� ���+��� ���+8� �+��� �+���

�� $� � �� ����� �&)1� � �+��� ��+�8� ��+�� ��+�� ���+��� ���+��� �+�� �+��

�� $� � �� ����� +��&)1� +�� �+�8� ��+8� ��+�8� ��+��� ���+��� ���+�� �+��� �+��

�� $� � �� ����� ��&)1� �� �+��� +��� ��+��� ��+8�� ���+��� ���+��� �+�� �+���

�� $� � �� ����� ��+�&)1� ��+� �+��� �+��� ��+�� ��+��� ���+��� ��+��� �+�� �+��

�� $� � �� ����� ��+�&)1� ��+� �+�� �+��� ��+� ��+�� ���+��� ��+�� �+��� �+��

�� $� � �� ����� �8�&)1� �8� �+�� +� ��+8�� ��+��� ���+��� ��+�� �+��� �+8��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � � ����� �+��&)1� �+�� �+��� ��+��� �+��� +��� ���+��� ���+��� �+�� +��

�� $� � � ����� ��&)1� �� �+��� �+8�� +�� +�8� ���+��� ���+�8� �+�� +��

�� $� � � ����� ��&)1� �� �+��� ��+� +� �+�� ���+��� ���+8� �+8�� +8��

�� $� � � ����� �&)1� � �+�� �8+� �+�8� 8+8�� ���+��� ���+��� �+�� +�8�

�� $� � � ����� +��&)1� +�� �+��� ��+�� 8+��� �+�8� ���+��� ���+�� �+��� +���

�� $� � � ����� ��&)1� �� �+�8� ���+�� 8+��� �+��� ���+��� ���+��� +��� +��

�� $� � � ����� ��+�&)1� ��+� �+��� ���+8�� �+�� �+��� ���+��� ��+��� +��� +��

�� $� � � ����� ��+�&)1� ��+� �+�� ��+��� �+�� �+8�� ���+��� ��+�� +�8� +��

�� $� � � ����� �8�&)1� �8� �+��� ��+�� �+�� �+�� ���+��� ��+�� +�� +8��

Page 36: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

��������8��

����6� � ������������

���������� ��� �� 7�

&��� �8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� � ������ ��� "���

��#�6���$���#�6�

�� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� �8�� �+��&)1� �+�� �+�� ��+��� �+�� �+� ���+�� ���+��� �+8�� �+���

�� $� � �� �8�� ��&)1� �� �+�� ��+��� �+��� �+��� ���+�� ���+�8� �+��� �+��

�� $� � �� �8�� ��&)1� �� �+�8� �+8�� �+��� +�� ���+�� ���+8� �+��� �+�

�� $� � �� �8�� �&)1� � �+��� 8+��� �+�� +��� ���+�� ���+��� �+��� �+���

�� $� � �� �8�� +��&)1� +�� �+��� �+�� �+��� +8� ���+�� ���+�� �+�� �+���

�� $� � �� �8�� ��&)1� �� �+�� �+��� +�� �+��� ���+�� ���+��� �+�� �+�8�

�� $� � �� �8�� ��+�&)1� ��+� �+��� �8+��� +��� �+8�� ���+�� ��+��� �+8�� �+���

�� $� � �� �8�� ��+�&)1� ��+� �+�� 8�+�� +�� 8+��� ���+�� ��+�� �+��� �+��

�� $� � �� �8�� �8�&)1� �8� �+�� 88+��� +� 8+��� ���+�� ��+�� �+�� �+��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ����� �+��&)1� �+�� �+��� +��� �+��� ��+��� ���+8� ���+��� �+�� �+8��

�� $� � ���� ����� ��&)1� �� �+�� �+��� ��+��� ��+�8� ���+8� ���+�8� �+�� �+��

�� $� � ���� ����� ��&)1� �� �+�8� ��+��� ��+��� ��+�� ���+8� ���+8� �+�� ��

�� $� � ���� ����� �&)1� � �+��� �8+�� �8+8� ��+��� ���+8� ���+�� �+8�� �+��

�� $� � ���� ����� +��&)1� +�� �+��� ��+�� ��+�� �+�� ���+8� ���+�� �+��� �+�

�� $� � ���� ����� ��&)1� �� �+�8� ��+��� ��+�� �+8�� ���+8� ���+��� �+�� �+��

�� $� � ���� ����� ��+�&)1� ��+� �+�� +�� �� �+�� ���+8� ��+��� �+��� �+���

�� $� � ���� ����� ��+�&)1� ��+� �+� �+�� �+�� +�� ���+8� ��+�� �+�� �+���

�� $� � ���� ����� �8�&)1� �8� �+�� �+�8� �+��� +��� ���+8� ��+�� �+�� �+���

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �+��&)1� �+�� �+�� ��+8� ��+8� ��+��� ���+��� ���+��� �+�� �+���

�� $� � �� ���� ��&)1� �� �+�8� �8+�� ��+��� ��+��� ���+��� ���+�8� �+��� �+���

�� $� � �� ���� ��&)1� �� �+��� ��+��� ��+��� ��+�� ���+��� ���+8� �+�8� �+��

�� $� � �� ���� �&)1� � �+��� �8+��� ��+�� �+��� ���+��� ���+�� �+��� �+8�

�� $� � �� ���� +��&)1� +�� �+��� �+��� �+�8� �+��� ���+��� ���+8�� �+�8� �+���

�� $� � �� ���� ��&)1� �� �+��� �+8� �+��� �+�8� ���+��� ���+��� �+��� �+���

�� $� � �� ���� ��+�&)1� ��+� �+�� +8�� �+8� �+��� ���+��� ��+�� �+�� �+��

�� $� � �� ���� ��+�&)1� ��+� �+�8� �+��� �+��� +�8� ���+��� ��+��� �+��� �+��

�� $� � �� ���� �8�&)1� �8� �+� �+��� �+8� � ���+��� ��+� �+88� �+��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ��� ������ �+��&)1� �+�� �+��� ��+�8� �+8� ��+�� ���+8� ���+��� �+��� �+�

�� $� � ��� ������ ��&)1� �� �+��� ��+��� �8+��� ��+��� ���+8� ���+�8� �+��� �+���

�� $� � ��� ������ ��&)1� �� �+��� �8+8�� ��+�� �+��� ���+8� ���+�� �+�� �+���

�� $� � ��� ������ �&)1� � �+��� ��� �+��� ��+��� ���+8� ���+�� �+�� �+�8�

�� $� � ��� ������ +��&)1� +�� �+��� �+��� ��+�� ��+�� ���+8� ���+8�� �+��� �+���

�� $� � ��� ������ ��&)1� �� �+�� ��+�� ��+�8� ��+��� ���+8� ���+��� �+��� �+��

�� $� � ��� ������ ��+�&)1� ��+� �+��� �+�8� ��+��� �+��� ���+8� ��+�� �+�� �+8�

�� $� � ��� ������ ��+�&)1� ��+� �+�� �+� ��+�� �+��� ���+8� ��+��� �+�� �+���

�� $� � ��� ������ �8�&)1� �8� �+8� +��� ��+�� �+8� ���+8� ��+�� �+��� �+���

Page 37: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

����6� � ������������

���������� ��� �� 7�

&��� �8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� � ������ ��� "���

��#�6���$���#�6�

�� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ������ �+��&)1� �+�� �+�� ��+�8� ��+��� ��+�� ���+��� ���+��� �+��� �+��

�� $� � �� ������ ��&)1� �� �+��� ��+�� ��+��� �+88� ���+��� ���+�8� �+�� �+8��

�� $� � �� ������ ��&)1� �� �+��� �+�� �+��� ��+��� ���+��� ���+�� �+��� �+��

�� $� � �� ������ �&)1� � �+��� �8+�� �+�� ��+�8� ���+��� ���+�� �+�� �+���

�� $� � �� ������ +��&)1� +�� �+��� �+��� �+��� �8+��� ���+��� ���+8�� �+�� �+���

�� $� � �� ������ ��&)1� �� �+�� �+8�� �+�� �8+��� ���+��� ���+��� �+�� �+8�

�� $� � �� ������ ��+�&)1� ��+� �+��� �+�� �+�� ��+�8� ���+��� ��+��� �+8�� �+���

�� $� � �� ������ ��+�&)1� ��+� �+��� +�� �+8�� ��+8� ���+��� ��+��� �+��� �+��

�� $� � �� ������ �8�&)1� �8� �+� �+�� �+��� ��+�� ���+��� ��+�� �+�� �+���

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ���� �+��&)1� �+�� �+�� ��+�� �+�� �8+�� ���+8�� ���+��� �+��� �+��

�� $� � �� ���� ��&)1� �� �+�� �+��� ��+�� ��+� ���+8�� ���+�8� �+��� �+���

�� $� � �� ���� ��&)1� �� �+��� ��+�� ��+�� ��+��� ���+8�� ���+�� �+��� �+��

�� $� � �� ���� �&)1� � �+��� �+��� ��+�� ��+�8� ���+8�� ���+�� �+�� �+���

�� $� � �� ���� +��&)1� +�� �+�� 8+�� �8+��� ��+8� ���+8�� ���+8�� �+�� �+���

�� $� � �� ���� ��&)1� �� �+��� �+�� �8+� ��+��� ���+8�� ���+��� �+��� �+�8�

�� $� � �� ���� ��+�&)1� ��+� �+��� �+��� �8+��� ��+8� ���+8�� ��+��� �+��� �+��

�� $� � �� ���� ��+�&)1� ��+� �+�� ��+8� �8+��� ��+��� ���+8�� ��+��� �+��� �+8�

�� $� � �� ���� �8�&)1� �8� �+��� ��+� ��+�� �+�� ���+8�� ��+�� �+�� �+���

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ��� ��8��� �+��&)1� �+�� �+�� ��+8� �+��� ��+��� ���+�� ���+��� �+��� �+���

�� $� � ��� ��8��� ��&)1� �� �+��� ��+88� �+8�� ��+��� ���+�� ���+�8� �+��� �+8��

�� $� � ��� ��8��� ��&)1� �� �+��� �8+��� ��+��� �8+8�� ���+�� ���+�� �+��� �+���

�� $� � ��� ��8��� �&)1� � �+�� �+�� ��+�� ��+��� ���+�� ���+�� �+��� �+���

�� $� � ��� ��8��� +��&)1� +�� �+�� �+��� �8+��� ��+��� ���+�� ���+8�� �+� �+���

�� $� � ��� ��8��� ��&)1� �� �+��� �+�� �8+�� ��+�� ���+�� ���+��� �+�� �+�

�� $� � ��� ��8��� ��+�&)1� ��+� �+�� �+�8� ��+��� ��+�� ���+�� ��+��� �+88� �+8��

�� $� � ��� ��8��� ��+�&)1� ��+� �+��� �+��� ��+�� ��+�� ���+�� ��+�� �+�8� �+��

�� $� � ��� ��8��� �8�&)1� �8� �+� �+�� ��+�� �+��� ���+�� ��+�� �+��� �+��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � ���� ����� �+��&)1� �+�� �+��� ��+�� ��+�� ��+�� ���+�� ���+��� �+� �+���

�� $� � ���� ����� ��&)1� �+�� �+��� ��+��� �+8� �+��� ���+�� ���+��� �+��� �+���

�� $� � ���� ����� ��&)1� +�� �+�8� �+��� �+�� +8�� ���+�� ���+�� �+��� �+��

�� $� � ���� ����� �&)1� �+8� �+�� ��+��� +�� �+� ���+�� ���+�� �+��� �+�8�

�� $� � ���� ����� +��&)1� �+�� �+�8� +8� �+��� �+�� ���+�� ���+8�� �+�8� �+���

�� $� � ���� ����� ��&)1� �� �+�� �+��� �+��� �+��� ���+�� ���+��� �+��� �+���

�� $� � ���� ����� ��+�&)1� ��+� �+�� �+� �+�� �+�� ���+�� ��+��� �+��� �+��

�� $� � ���� ����� ��+�&)1� �� �+� �+��� �+8�� +�� ���+�� ��+��� �+�� �+���

�� $� � ���� ����� �8�&)1� �� �+�� 8�+�� ��+��� �+8�� ���+�� ��+�� �+��� �+��

Page 38: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

����6� � ������������

���������� ��� �� 7�

&��� �8� ��6� �

' �,�"����

&�#�����6�

�� ��&��� �

�����6�� � ������ ��� "���

��#�6���$���#�6�

�� �� �� �� ��09��� ��9��� ��*�� ���� ���� ���� ���� ���� ����

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ������ �+��&)1� �+�� �+��� ��+��� �+�� �+8� ���+8�� ���+��� +��� +�

�� $� � �� ������ ��&)1� �+�� �+��� ���+�8� �+�� �+�� ���+8�� ���+��� +��� +��

�� $� � �� ������ ��&)1� +�� �+�� ��8+�� �+��� �+��� ���+8�� ���+�� +�� +8��

�� $� � �� ������ �&)1� �+8� �+��� ���+�� �+8�� �+� ���+8�� ���+�� +�� +���

�� $� � �� ������ +��&)1� �+�� �+��� ���+�8� �+�� �+��� ���+8�� ���+8�� +8� ��

�� $� � �� ������ ��&)1� �� �+��� ���+��� �+�8� �+�� ���+8�� ���+�8� +��� �+���

�� $� � �� ������ ��+�&)1� ��+� �+��� ��+��� ��+��� �+8�� ���+8�� ��+��� +��� �+��

�� $� � �� ������ ��+�&)1� �� �+��� ���+8�� ��+��� �+��� ���+8�� ��+��� �+��� �+��

�� $� � �� ������ �8�&)1� �� �+�� ��+�� ��+�� +��� ���+8�� ��+�� �+��� �+8��

�� �� �� �� �� �� �� �� �� �� �� �� ��

�� $� � �� ����� �+��&)1� �+�� �+�� +��� ��+��� ��+��� ���+�� ���+��� �+8�� �+���

�� $� � �� ����� ��&)1� �+�� �+�� +��� ��+8�� �+��� ���+�� ���+��� �+�� �+���

�� $� � �� ����� ��&)1� +�� �+��� �+�� �+��� �+8�� ���+�� ���+�� �+��� �+��

�� $� � �� ����� �&)1� �+8� �+��� 8�+�� ��+��� ��+��� ���+�� ���+�� �+��� �+���

�� $� � �� ����� +��&)1� �+�� �+��� ��+�� �8+8� ��+�8� ���+�� ���+8�� �+��� �+���

�� $� � �� ����� ��&)1� �� �+�8� ��+�� ��+�� ��+��� ���+�� ���+��� �+� �+���

�� $� � �� ����� ��+�&)1� ��+� �+�� �+8� ��+�� ��+�� ���+�� ��+�8� �+8�� �+�8�

�� $� � �� ����� ��+�&)1� �� �+�� ���+��� ��+8� 8�+8� ���+�� ��+�8� �+8�� �+�8�

�� $� � �� ����� �8�&)1� �� �+��� ���+88� 8�+� 8�+��� ���+�� ��+� �+�� �+�

Page 39: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Table A-4: Upstream HEC-RAS Results for Monthly Q10 and Q90 Flows – Existing Conditions

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 4571 Jan 10% 7.14 0.14 51.4 25.75 26.8 199.01 201.86 2.00 2.85

Marter 4571 Feb 10% 5.1 0.1 49.16 25.28 26.3 199.01 201.77 1.94 2.76

Marter 4571 Mar 10% 7.76 0.15 52.04 25.89 26.95 199.01 201.88 2.01 2.87

Marter 4571 Apr 10% 78.7 0.78 101.01 31.47 33.6 199.01 203.55 3.21 4.54

Marter 4571 May 10% 68.7 0.72 95.56 31.06 33.06 199.01 203.38 3.08 4.37

Marter 4571 Jun 10% 25.2 0.37 67.3 28.9 30.16 199.01 202.44 2.33 3.43

Marter 4571 Jul 10% 15.5 0.26 59.32 27.37 28.53 199.01 202.16 2.17 3.15

Marter 4571 Aug 10% 8.81 0.17 53.11 26.11 27.19 199.01 201.92 2.03 2.91

Marter 4571 Sep 10% 9.14 0.17 53.44 26.18 27.26 199.01 201.94 2.04 2.93

Marter 4571 Oct 10% 18.1 0.29 61.55 27.8 28.99 199.01 202.24 2.21 3.23

Marter 4571 Nov 10% 20.6 0.32 63.62 28.2 29.42 199.01 202.31 2.26 3.3

Marter 4571 Dec 10% 15.4 0.26 59.24 27.35 28.51 199.01 202.15 2.17 3.14

Marter 4571 Jan 90% 3.02 0.06 46.6 24.72 25.7 199.01 201.67 1.89 2.66

Marter 4571 Feb 90% 2.52 0.05 45.91 24.57 25.54 199.01 201.64 1.87 2.63

Marter 4571 Mar 90% 2.55 0.06 45.96 24.58 25.55 199.01 201.64 1.87 2.63

Marter 4571 Apr 90% 4.3 0.09 48.21 25.07 26.08 199.01 201.73 1.92 2.72

Marter 4571 May 90% 14.5 0.25 58.44 27.19 28.34 199.01 202.12 2.15 3.11

Marter 4571 Jun 90% 6.49 0.13 50.71 25.61 26.65 199.01 201.83 1.98 2.82

Marter 4571 Jul 90% 2.86 0.06 46.38 24.68 25.65 199.01 201.66 1.88 2.65

Marter 4571 Aug 90% 1.86 0.04 44.95 24.36 25.32 199.01 201.6 1.85 2.59

Marter 4571 Sep 90% 1.86 0.04 44.95 24.36 25.32 199.01 201.6 1.85 2.59

Marter 4571 Oct 90% 2.59 0.06 46.01 24.59 25.57 199.01 201.64 1.87 2.63

Marter 4571 Nov 90% 5.9 0.12 50.06 25.47 26.5 199.01 201.8 1.97 2.79

Marter 4571 Dec 90% 4.32 0.09 48.24 25.08 26.09 199.01 201.73 1.92 2.72

Marter 4363 Jan 10% 7.14 0.14 50.5 25.08 26.22 199.01 201.85 2.01 2.84

Marter 4363 Feb 10% 5.1 0.11 48.34 24.64 25.74 199.01 201.77 1.96 2.76

Marter 4363 Mar 10% 7.76 0.15 51.13 25.2 26.36 199.01 201.88 2.03 2.87

Marter 4363 Apr 10% 78.7 0.79 99.5 35.15 36.9 199.01 203.51 2.83 4.5

Marter 4363 May 10% 68.7 0.73 93.65 33.65 35.36 199.01 203.34 2.78 4.33

Marter 4363 Jun 10% 25.2 0.38 65.65 27.98 29.35 199.01 202.43 2.35 3.42

Marter 4363 Jul 10% 15.5 0.27 58.09 26.57 27.83 199.01 202.15 2.19 3.14

Marter 4363 Aug 10% 8.81 0.17 52.15 25.41 26.58 199.01 201.92 2.05 2.91

Marter 4363 Sep 10% 9.14 0.17 52.47 25.47 26.65 199.01 201.93 2.06 2.92

Marter 4363 Oct 10% 18.1 0.3 60.21 26.97 28.27 199.01 202.23 2.23 3.22

Marter 4363 Nov 10% 20.6 0.33 62.18 27.34 28.66 199.01 202.3 2.27 3.29

Marter 4363 Dec 10% 15.4 0.27 58.01 26.56 27.81 199.01 202.15 2.18 3.14

Marter 4363 Jan 90% 3.02 0.07 45.86 24.12 25.18 199.01 201.67 1.90 2.66

Page 40: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 4363 Feb 90% 2.52 0.06 45.2 23.98 25.03 199.01 201.64 1.88 2.63

Marter 4363 Mar 90% 2.55 0.06 45.24 23.99 25.04 199.01 201.64 1.89 2.63

Marter 4363 Apr 90% 4.3 0.09 47.43 24.45 25.54 199.01 201.73 1.94 2.72

Marter 4363 May 90% 14.5 0.25 57.25 26.41 27.66 199.01 202.12 2.17 3.11

Marter 4363 Jun 90% 6.49 0.13 49.84 24.94 26.07 199.01 201.83 2.00 2.82

Marter 4363 Jul 90% 2.86 0.06 45.65 24.07 25.14 199.01 201.66 1.90 2.65

Marter 4363 Aug 90% 1.86 0.04 44.26 23.78 24.82 199.01 201.6 1.86 2.59

Marter 4363 Sep 90% 1.86 0.04 44.26 23.78 24.82 199.01 201.6 1.86 2.59

Marter 4363 Oct 90% 2.59 0.06 45.3 24 25.05 199.01 201.64 1.89 2.63

Marter 4363 Nov 90% 5.9 0.12 49.21 24.82 25.94 199.01 201.8 1.98 2.79

Marter 4363 Dec 90% 4.32 0.09 47.45 24.45 25.54 199.01 201.73 1.94 2.72

Marter 4147 Jan 10% 7.14 0.1 68.14 29.16 30.65 198.99 201.85 2.34 2.86

Marter 4147 Feb 10% 5.1 0.08 65.63 28.84 30.28 198.99 201.77 2.28 2.78

Marter 4147 Mar 10% 7.76 0.11 68.86 29.26 30.75 198.99 201.88 2.35 2.89

Marter 4147 Apr 10% 78.7 0.65 120.86 35.4 37.74 198.99 203.49 3.41 4.5

Marter 4147 May 10% 68.7 0.6 114.99 34.72 36.97 198.99 203.32 3.31 4.33

Marter 4147 Jun 10% 25.2 0.3 85.22 31.26 33.04 198.99 202.42 2.73 3.43

Marter 4147 Jul 10% 15.5 0.2 76.79 30.24 31.88 198.99 202.14 2.54 3.15

Marter 4147 Aug 10% 8.81 0.13 70.04 29.4 30.92 198.99 201.92 2.38 2.93

Marter 4147 Sep 10% 9.14 0.13 70.4 29.45 30.97 198.99 201.93 2.39 2.94

Marter 4147 Oct 10% 18.1 0.23 79.17 30.53 32.21 198.99 202.22 2.59 3.23

Marter 4147 Nov 10% 20.6 0.25 81.37 30.8 32.51 198.99 202.29 2.64 3.3

Marter 4147 Dec 10% 15.4 0.2 76.7 30.23 31.87 198.99 202.14 2.54 3.15

Marter 4147 Jan 90% 3.02 0.05 62.73 28.47 29.86 198.99 201.67 2.20 2.68

Marter 4147 Feb 90% 2.52 0.04 61.95 28.37 29.74 198.99 201.64 2.18 2.65

Marter 4147 Mar 90% 2.55 0.04 62 28.37 29.75 198.99 201.64 2.19 2.65

Marter 4147 Apr 90% 4.3 0.07 64.57 28.71 30.13 198.99 201.73 2.25 2.74

Marter 4147 May 90% 14.5 0.19 75.85 30.13 31.75 198.99 202.11 2.52 3.12

Marter 4147 Jun 90% 6.49 0.1 67.37 29.07 30.54 198.99 201.83 2.32 2.84

Marter 4147 Jul 90% 2.86 0.05 62.48 28.44 29.82 198.99 201.66 2.20 2.67

Marter 4147 Aug 90% 1.86 0.03 60.84 28.22 29.57 198.99 201.6 2.16 2.61

Marter 4147 Sep 90% 1.86 0.03 60.84 28.22 29.57 198.99 201.6 2.16 2.61

Marter 4147 Oct 90% 2.59 0.04 62.06 28.38 29.76 198.99 201.64 2.19 2.65

Marter 4147 Nov 90% 5.9 0.09 66.65 28.97 30.43 198.99 201.8 2.30 2.81

Marter 4147 Dec 90% 4.32 0.07 64.6 28.71 30.13 198.99 201.73 2.25 2.74

Marter 3884 Jan 10% 7.14 0.12 60.05 25.22 26.95 198.94 201.85 2.38 2.91

Marter 3884 Feb 10% 5.1 0.09 57.9 24.95 26.63 198.94 201.77 2.32 2.83

Marter 3884 Mar 10% 7.76 0.13 60.67 25.29 27.04 198.94 201.88 2.40 2.94

Page 41: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 3884 Apr 10% 78.7 0.75 104.69 31.23 33.78 198.94 203.45 3.35 4.51

Marter 3884 May 10% 68.7 0.69 99.69 30.48 32.96 198.94 203.29 3.27 4.35

Marter 3884 Jun 10% 25.2 0.34 74.57 26.98 29.04 198.94 202.41 2.76 3.47

Marter 3884 Jul 10% 15.5 0.23 67.43 26.12 28.03 198.94 202.14 2.58 3.2

Marter 3884 Aug 10% 8.81 0.14 61.68 25.42 27.19 198.94 201.92 2.43 2.98

Marter 3884 Sep 10% 9.14 0.15 61.99 25.46 27.24 198.94 201.93 2.43 2.99

Marter 3884 Oct 10% 18.1 0.26 69.45 26.37 28.32 198.94 202.22 2.63 3.28

Marter 3884 Nov 10% 20.6 0.29 71.31 26.59 28.58 198.94 202.29 2.68 3.35

Marter 3884 Dec 10% 15.4 0.23 67.35 26.11 28.02 198.94 202.14 2.58 3.2

Marter 3884 Jan 90% 3.02 0.05 55.41 24.63 26.25 198.94 201.67 2.25 2.73

Marter 3884 Feb 90% 2.52 0.05 54.73 24.54 26.15 198.94 201.64 2.23 2.7

Marter 3884 Mar 90% 2.55 0.05 54.77 24.55 26.16 198.94 201.64 2.23 2.7

Marter 3884 Apr 90% 4.3 0.08 56.99 24.83 26.49 198.94 201.73 2.30 2.79

Marter 3884 May 90% 14.5 0.22 66.63 26.03 27.92 198.94 202.11 2.56 3.17

Marter 3884 Jun 90% 6.49 0.11 59.39 25.13 26.85 198.94 201.83 2.36 2.89

Marter 3884 Jul 90% 2.86 0.05 55.19 24.6 26.22 198.94 201.66 2.24 2.72

Marter 3884 Aug 90% 1.86 0.03 53.77 24.42 26 198.94 201.6 2.20 2.66

Marter 3884 Sep 90% 1.86 0.03 53.77 24.42 26 198.94 201.6 2.20 2.66

Marter 3884 Oct 90% 2.59 0.05 54.83 24.55 26.16 198.94 201.64 2.23 2.7

Marter 3884 Nov 90% 5.9 0.1 58.77 25.06 26.76 198.94 201.8 2.35 2.86

Marter 3884 Dec 90% 4.32 0.08 57.01 24.83 26.5 198.94 201.73 2.30 2.79

Marter 3633 Jan 10% 7.14 0.11 63.18 26.82 28.32 198.87 201.85 2.36 2.98

Marter 3633 Feb 10% 5.1 0.08 60.91 26.51 27.96 198.87 201.77 2.30 2.9

Marter 3633 Mar 10% 7.76 0.12 63.83 26.91 28.42 198.87 201.87 2.37 3

Marter 3633 Apr 10% 78.7 0.72 109.27 32.15 34.53 198.87 203.41 3.40 4.54

Marter 3633 May 10% 68.7 0.66 104.26 31.53 33.83 198.87 203.26 3.31 4.39

Marter 3633 Jun 10% 25.2 0.32 78.45 28.87 30.63 198.87 202.4 2.72 3.53

Marter 3633 Jul 10% 15.5 0.22 70.96 27.88 29.52 198.87 202.13 2.55 3.26

Marter 3633 Aug 10% 8.81 0.14 64.9 27.06 28.59 198.87 201.91 2.40 3.04

Marter 3633 Sep 10% 9.14 0.14 65.22 27.11 28.64 198.87 201.93 2.41 3.06

Marter 3633 Oct 10% 18.1 0.25 73.08 28.16 29.84 198.87 202.21 2.60 3.34

Marter 3633 Nov 10% 20.6 0.27 75.04 28.42 30.13 198.87 202.28 2.64 3.41

Marter 3633 Dec 10% 15.4 0.22 70.88 27.87 29.51 198.87 202.13 2.54 3.26

Marter 3633 Jan 90% 3.02 0.05 58.27 26.13 27.53 198.87 201.67 2.23 2.8

Marter 3633 Feb 90% 2.52 0.04 57.56 26.03 27.42 198.87 201.64 2.21 2.77

Marter 3633 Mar 90% 2.55 0.04 57.61 26.04 27.43 198.87 201.64 2.21 2.77

Marter 3633 Apr 90% 4.3 0.07 59.95 26.37 27.8 198.87 201.73 2.27 2.86

Marter 3633 May 90% 14.5 0.21 70.11 27.77 29.39 198.87 202.1 2.52 3.23

Marter 3633 Jun 90% 6.49 0.1 62.49 26.73 28.21 198.87 201.82 2.34 2.95

Page 42: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 3633 Jul 90% 2.86 0.05 58.05 26.1 27.5 198.87 201.66 2.22 2.79

Marter 3633 Aug 90% 1.86 0.03 56.55 25.89 27.25 198.87 201.6 2.18 2.73

Marter 3633 Sep 90% 1.86 0.03 56.55 25.89 27.25 198.87 201.6 2.18 2.73

Marter 3633 Oct 90% 2.59 0.04 57.66 26.05 27.44 198.87 201.64 2.21 2.77

Marter 3633 Nov 90% 5.9 0.1 61.83 26.64 28.1 198.87 201.8 2.32 2.93

Marter 3633 Dec 90% 4.32 0.07 59.97 26.37 27.81 198.87 201.73 2.27 2.86

Marter 3476 Jan 10% 7.14 0.12 59.79 26.24 27.65 198.8 201.85 2.28 3.05

Marter 3476 Feb 10% 5.1 0.09 57.58 25.88 27.25 198.8 201.76 2.22 2.96

Marter 3476 Mar 10% 7.76 0.13 60.42 26.34 27.77 198.8 201.87 2.29 3.07

Marter 3476 Apr 10% 78.7 0.75 104.9 32.49 34.66 198.8 203.39 3.23 4.59

Marter 3476 May 10% 68.7 0.69 99.95 31.74 33.85 198.8 203.23 3.15 4.43

Marter 3476 Jun 10% 25.2 0.34 74.66 28.57 30.23 198.8 202.39 2.61 3.59

Marter 3476 Jul 10% 15.5 0.23 67.36 27.45 28.99 198.8 202.13 2.45 3.33

Marter 3476 Aug 10% 8.81 0.14 61.46 26.51 27.95 198.8 201.91 2.32 3.11

Marter 3476 Sep 10% 9.14 0.15 61.77 26.56 28.01 198.8 201.92 2.33 3.12

Marter 3476 Oct 10% 18.1 0.26 69.42 27.77 29.35 198.8 202.21 2.50 3.41

Marter 3476 Nov 10% 20.6 0.29 71.33 28.06 29.67 198.8 202.27 2.54 3.47

Marter 3476 Dec 10% 15.4 0.23 67.27 27.44 28.98 198.8 202.13 2.45 3.33

Marter 3476 Jan 90% 3.02 0.05 55.02 25.45 26.78 198.8 201.66 2.16 2.86

Marter 3476 Feb 90% 2.52 0.05 54.32 25.33 26.65 198.8 201.64 2.14 2.84

Marter 3476 Mar 90% 2.55 0.05 54.37 25.34 26.65 198.8 201.64 2.15 2.84

Marter 3476 Apr 90% 4.3 0.08 56.64 25.72 27.08 198.8 201.73 2.20 2.93

Marter 3476 May 90% 14.5 0.22 66.53 27.32 28.85 198.8 202.1 2.44 3.3

Marter 3476 Jun 90% 6.49 0.11 59.11 26.13 27.53 198.8 201.82 2.26 3.02

Marter 3476 Jul 90% 2.86 0.05 54.8 25.41 26.74 198.8 201.66 2.16 2.86

Marter 3476 Aug 90% 1.86 0.03 53.34 25.17 26.46 198.8 201.6 2.12 2.8

Marter 3476 Sep 90% 1.86 0.03 53.34 25.17 26.46 198.8 201.6 2.12 2.8

Marter 3476 Oct 90% 2.59 0.05 54.42 25.35 26.67 198.8 201.64 2.15 2.84

Marter 3476 Nov 90% 5.9 0.1 58.47 26.03 27.41 198.8 201.8 2.25 3

Marter 3476 Dec 90% 4.32 0.08 56.66 25.73 27.08 198.8 201.73 2.20 2.93

Marter 3237 Jan 10% 7.14 0.09 76.55 33.16 34.32 198.86 201.85 2.31 2.99

Marter 3237 Feb 10% 5.1 0.07 73.77 32.74 33.87 198.86 201.76 2.25 2.9

Marter 3237 Mar 10% 7.76 0.1 77.34 33.28 34.45 198.86 201.87 2.32 3.01

Marter 3237 Apr 10% 78.7 0.59 132.5 39.88 41.73 198.86 203.37 3.32 4.51

Marter 3237 May 10% 68.7 0.54 126.48 39.48 41.23 198.86 203.22 3.20 4.36

Marter 3237 Jun 10% 25.2 0.26 95.1 35.85 37.21 198.86 202.39 2.65 3.53

Marter 3237 Jul 10% 15.5 0.18 86.02 34.56 35.82 198.86 202.13 2.49 3.27

Marter 3237 Aug 10% 8.81 0.11 78.64 33.48 34.66 198.86 201.91 2.35 3.05

Page 43: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

���������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 3237 Sep 10% 9.14 0.12 79.04 33.54 34.72 198.86 201.92 2.36 3.06

Marter 3237 Oct 10% 18.1 0.2 88.6 34.93 36.22 198.86 202.2 2.54 3.34

Marter 3237 Nov 10% 20.6 0.23 90.97 35.27 36.59 198.86 202.27 2.58 3.41

Marter 3237 Dec 10% 15.4 0.18 85.92 34.55 35.81 198.86 202.13 2.49 3.27

Marter 3237 Jan 90% 3.02 0.04 70.53 32.25 33.33 198.86 201.66 2.19 2.8

Marter 3237 Feb 90% 2.52 0.04 69.66 32.11 33.18 198.86 201.64 2.17 2.78

Marter 3237 Mar 90% 2.55 0.04 69.71 32.12 33.19 198.86 201.64 2.17 2.78

Marter 3237 Apr 90% 4.3 0.06 72.58 32.56 33.67 198.86 201.73 2.23 2.87

Marter 3237 May 90% 14.5 0.17 85 34.41 35.66 198.86 202.1 2.47 3.24

Marter 3237 Jun 90% 6.49 0.09 75.7 33.04 34.18 198.86 201.82 2.29 2.96

Marter 3237 Jul 90% 2.86 0.04 70.26 32.2 33.28 198.86 201.66 2.18 2.8

Marter 3237 Aug 90% 1.86 0.03 68.41 31.92 32.97 198.86 201.6 2.14 2.74

Marter 3237 Sep 90% 1.86 0.03 68.41 31.92 32.97 198.86 201.6 2.14 2.74

Marter 3237 Oct 90% 2.59 0.04 69.78 32.13 33.2 198.86 201.64 2.17 2.78

Marter 3237 Nov 90% 5.9 0.08 74.9 32.91 34.05 198.86 201.8 2.28 2.94

Marter 3237 Dec 90% 4.32 0.06 72.62 32.57 33.68 198.86 201.73 2.23 2.87

Marter 2990 Jan 10% 7.14 0.1 70.16 29.44 30.89 198.87 201.85 2.38 2.98

Marter 2990 Feb 10% 5.1 0.08 67.7 29.12 30.52 198.87 201.76 2.32 2.89

Marter 2990 Mar 10% 7.76 0.11 70.86 29.53 30.99 198.87 201.87 2.40 3

Marter 2990 Apr 10% 78.7 0.67 118.22 35.16 37.36 198.87 203.34 3.36 4.47

Marter 2990 May 10% 68.7 0.61 113.08 34.56 36.68 198.87 203.19 3.27 4.32

Marter 2990 Jun 10% 25.2 0.29 86.34 31.48 33.19 198.87 202.38 2.74 3.51

Marter 2990 Jul 10% 15.5 0.2 78.47 30.51 32.09 198.87 202.12 2.57 3.25

Marter 2990 Aug 10% 8.81 0.12 72 29.68 31.16 198.87 201.91 2.43 3.04

Marter 2990 Sep 10% 9.14 0.13 72.35 29.73 31.21 198.87 201.92 2.43 3.05

Marter 2990 Oct 10% 18.1 0.22 80.71 30.79 32.41 198.87 202.2 2.62 3.33

Marter 2990 Nov 10% 20.6 0.25 82.77 31.04 32.69 198.87 202.26 2.67 3.39

Marter 2990 Dec 10% 15.4 0.2 78.38 30.5 32.08 198.87 202.12 2.57 3.25

Marter 2990 Jan 90% 3.02 0.05 64.83 28.74 30.09 198.87 201.66 2.26 2.79

Marter 2990 Feb 90% 2.52 0.04 64.05 28.63 29.98 198.87 201.64 2.24 2.77

Marter 2990 Mar 90% 2.55 0.04 64.1 28.64 29.98 198.87 201.64 2.24 2.77

Marter 2990 Apr 90% 4.3 0.06 66.65 28.98 30.37 198.87 201.73 2.30 2.86

Marter 2990 May 90% 14.5 0.19 77.57 30.39 31.96 198.87 202.1 2.55 3.23

Marter 2990 Jun 90% 6.49 0.09 69.41 29.34 30.78 198.87 201.82 2.37 2.95

Marter 2990 Jul 90% 2.86 0.04 64.59 28.7 30.06 198.87 201.66 2.25 2.79

Marter 2990 Aug 90% 1.86 0.03 62.94 28.48 29.81 198.87 201.6 2.21 2.73

Marter 2990 Sep 90% 1.86 0.03 62.94 28.48 29.81 198.87 201.6 2.21 2.73

Marter 2990 Oct 90% 2.59 0.04 64.17 28.65 29.99 198.87 201.64 2.24 2.77

Marter 2990 Nov 90% 5.9 0.09 68.7 29.25 30.67 198.87 201.8 2.35 2.93

Page 44: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

���������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2990 Dec 90% 4.32 0.06 66.68 28.98 30.37 198.87 201.73 2.30 2.86

Marter 2735 Jan 10% 7.14 0.15 46.58 23.27 24.51 199.22 201.85 2.00 2.63

Marter 2735 Feb 10% 5.1 0.11 44.67 22.92 24.13 199.22 201.76 1.95 2.54

Marter 2735 Mar 10% 7.76 0.16 47.13 23.37 24.62 199.22 201.87 2.02 2.65

Marter 2735 Apr 10% 78.7 0.94 83.71 28.79 30.79 199.22 203.27 2.91 4.05

Marter 2735 May 10% 68.7 0.86 79.78 28.25 30.17 199.22 203.13 2.82 3.91

Marter 2735 Jun 10% 25.2 0.43 59.17 25.42 26.92 199.22 202.36 2.33 3.14

Marter 2735 Jul 10% 15.5 0.29 53.05 24.4 25.77 199.22 202.12 2.17 2.9

Marter 2735 Aug 10% 8.81 0.18 48.02 23.52 24.8 199.22 201.91 2.04 2.69

Marter 2735 Sep 10% 9.14 0.19 48.29 23.57 24.85 199.22 201.92 2.05 2.7

Marter 2735 Oct 10% 18.1 0.33 54.79 24.7 26.1 199.22 202.19 2.22 2.97

Marter 2735 Nov 10% 20.6 0.37 56.39 24.96 26.4 199.22 202.25 2.26 3.03

Marter 2735 Dec 10% 15.4 0.29 52.98 24.39 25.76 199.22 202.11 2.17 2.89

Marter 2735 Jan 90% 3.02 0.07 42.43 22.51 23.67 199.22 201.66 1.88 2.44

Marter 2735 Feb 90% 2.52 0.06 41.83 22.4 23.55 199.22 201.64 1.87 2.42

Marter 2735 Mar 90% 2.55 0.06 41.87 22.41 23.55 199.22 201.64 1.87 2.42

Marter 2735 Apr 90% 4.3 0.1 43.85 22.77 23.96 199.22 201.73 1.93 2.51

Marter 2735 May 90% 14.5 0.28 52.35 24.28 25.64 199.22 202.09 2.16 2.87

Marter 2735 Jun 90% 6.49 0.14 46 23.16 24.4 199.22 201.82 1.99 2.6

Marter 2735 Jul 90% 2.86 0.07 42.24 22.48 23.63 199.22 201.66 1.88 2.44

Marter 2735 Aug 90% 1.86 0.05 40.96 22.24 23.37 199.22 201.6 1.84 2.38

Marter 2735 Sep 90% 1.86 0.05 40.96 22.24 23.37 199.22 201.6 1.84 2.38

Marter 2735 Oct 90% 2.59 0.06 41.92 22.42 23.56 199.22 201.64 1.87 2.42

Marter 2735 Nov 90% 5.9 0.13 45.45 23.06 24.29 199.22 201.8 1.97 2.58

Marter 2735 Dec 90% 4.32 0.1 43.87 22.78 23.97 199.22 201.73 1.93 2.51

Marter 2469 Jan 10% 7.14 0.13 53.34 34.57 35.19 200 201.84 1.54 1.84

Marter 2469 Feb 10% 5.1 0.1 50.54 34.11 34.7 200 201.76 1.48 1.76

Marter 2469 Mar 10% 7.76 0.14 54.14 34.7 35.33 200 201.86 1.56 1.86

Marter 2469 Apr 10% 78.7 0.74 106.15 41.87 43.06 200 203.22 2.54 3.22

Marter 2469 May 10% 68.7 0.68 100.64 41.46 42.57 200 203.08 2.43 3.08

Marter 2469 Jun 10% 25.2 0.35 71.45 37.42 38.22 200 202.35 1.91 2.35

Marter 2469 Jul 10% 15.5 0.25 62.7 36.07 36.79 200 202.11 1.74 2.11

Marter 2469 Aug 10% 8.81 0.16 55.44 34.91 35.55 200 201.9 1.59 1.9

Marter 2469 Sep 10% 9.14 0.16 55.83 34.98 35.62 200 201.91 1.60 1.91

Marter 2469 Oct 10% 18.1 0.28 65.2 36.46 37.2 200 202.18 1.79 2.18

Marter 2469 Nov 10% 20.6 0.31 67.49 36.82 37.57 200 202.24 1.83 2.24

Marter 2469 Dec 10% 15.4 0.25 62.6 36.06 36.77 200 202.1 1.74 2.1

Marter 2469 Jan 90% 3.02 0.06 47.25 33.56 34.12 200 201.66 1.41 1.66

Page 45: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2469 Feb 90% 2.52 0.05 46.35 33.41 33.96 200 201.64 1.39 1.64

Marter 2469 Mar 90% 2.55 0.05 46.41 33.42 33.97 200 201.64 1.39 1.64

Marter 2469 Apr 90% 4.3 0.09 49.34 33.91 34.49 200 201.73 1.46 1.73

Marter 2469 May 90% 14.5 0.24 61.7 35.92 36.62 200 202.08 1.72 2.08

Marter 2469 Jun 90% 6.49 0.12 52.48 34.43 35.04 200 201.82 1.52 1.82

Marter 2469 Jul 90% 2.86 0.06 46.96 33.51 34.07 200 201.65 1.40 1.65

Marter 2469 Aug 90% 1.86 0.04 45.07 33.19 33.73 200 201.6 1.36 1.6

Marter 2469 Sep 90% 1.86 0.04 45.07 33.19 33.73 200 201.6 1.36 1.6

Marter 2469 Oct 90% 2.59 0.06 46.48 33.43 33.98 200 201.64 1.39 1.64

Marter 2469 Nov 90% 5.9 0.11 51.68 34.3 34.9 200 201.79 1.51 1.79

Marter 2469 Dec 90% 4.32 0.09 49.37 33.91 34.5 200 201.73 1.46 1.73

Marter 2418 Jan 10% 7.14 0.35 20.31 25.88 26.15 200.94 201.83 0.78 0.89

Marter 2418 Feb 10% 5.1 0.28 18.3 25.32 25.56 200.94 201.76 0.72 0.82

Marter 2418 Mar 10% 7.76 0.37 20.89 26.04 26.31 200.94 201.86 0.80 0.92

Marter 2418 Apr 10% 78.7 1.29 61.02 38.18 38.82 200.94 203.13 1.60 2.19

Marter 2418 May 10% 68.7 1.22 56.29 37.12 37.73 200.94 203.01 1.52 2.07

Marter 2418 Jun 10% 25.2 0.75 33.5 29.26 29.67 200.94 202.31 1.14 1.37

Marter 2418 Jul 10% 15.5 0.57 27.09 27.67 28.01 200.94 202.09 0.98 1.15

Marter 2418 Aug 10% 8.81 0.4 21.82 26.29 26.57 200.94 201.89 0.83 0.95

Marter 2418 Sep 10% 9.14 0.41 22.11 26.37 26.65 200.94 201.9 0.84 0.96

Marter 2418 Oct 10% 18.1 0.63 28.92 28.13 28.49 200.94 202.15 1.03 1.21

Marter 2418 Nov 10% 20.6 0.67 30.59 28.55 28.93 200.94 202.21 1.07 1.27

Marter 2418 Dec 10% 15.4 0.57 27.02 27.65 27.99 200.94 202.08 0.98 1.14

Marter 2418 Jan 90% 3.02 0.19 15.93 24.65 24.87 200.94 201.66 0.65 0.72

Marter 2418 Feb 90% 2.52 0.16 15.28 24.47 24.67 200.94 201.63 0.62 0.69

Marter 2418 Mar 90% 2.55 0.17 15.32 24.48 24.68 200.94 201.64 0.63 0.7

Marter 2418 Apr 90% 4.3 0.25 17.43 25.08 25.31 200.94 201.72 0.69 0.78

Marter 2418 May 90% 14.5 0.55 26.36 27.48 27.82 200.94 202.06 0.96 1.12

Marter 2418 Jun 90% 6.49 0.33 19.7 25.71 25.97 200.94 201.81 0.77 0.87

Marter 2418 Jul 90% 2.86 0.18 15.72 24.59 24.8 200.94 201.65 0.64 0.71

Marter 2418 Aug 90% 1.86 0.13 14.36 24.2 24.39 200.94 201.6 0.59 0.66

Marter 2418 Sep 90% 1.86 0.13 14.36 24.2 24.39 200.94 201.6 0.59 0.66

Marter 2418 Oct 90% 2.59 0.17 15.38 24.49 24.7 200.94 201.64 0.63 0.7

Marter 2418 Nov 90% 5.9 0.31 19.12 25.55 25.8 200.94 201.79 0.75 0.85

Marter 2418 Dec 90% 4.32 0.25 17.45 25.09 25.32 200.94 201.72 0.70 0.78

Marter 2407 Jan 10% 7.14 1.58 4.51 17.84 17.91 201.42 201.69 0.25 0.27

Marter 2407 Feb 10% 5.1 1.43 3.57 17.43 17.49 201.42 201.64 0.20 0.22

Marter 2407 Mar 10% 7.76 1.62 4.78 17.96 18.03 201.42 201.71 0.27 0.29

Page 46: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������8��

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2407 Apr 10% 78.7 2.91 27.07 26.08 26.41 201.42 202.73 1.04 1.31

Marter 2407 May 10% 68.7 2.89 23.81 24.94 25.24 201.42 202.6 0.95 1.18

Marter 2407 Jun 10% 25.2 2.3 10.93 20.43 20.59 201.42 202.03 0.53 0.61

Marter 2407 Jul 10% 15.5 2 7.74 19.19 19.3 201.42 201.87 0.40 0.45

Marter 2407 Aug 10% 8.81 1.69 5.22 18.14 18.22 201.42 201.73 0.29 0.31

Marter 2407 Sep 10% 9.14 1.71 5.36 18.2 18.28 201.42 201.74 0.29 0.32

Marter 2407 Oct 10% 18.1 2.09 8.65 19.55 19.68 201.42 201.92 0.44 0.5

Marter 2407 Nov 10% 20.6 2.17 9.48 19.88 20.01 201.42 201.96 0.48 0.54

Marter 2407 Dec 10% 15.4 2 7.71 19.18 19.29 201.42 201.87 0.40 0.45

Marter 2407 Jan 90% 3.02 1.21 2.49 16.94 16.98 201.42 201.58 0.15 0.16

Marter 2407 Feb 90% 2.52 1.14 2.21 16.82 16.85 201.42 201.56 0.13 0.14

Marter 2407 Mar 90% 2.55 1.15 2.23 16.82 16.86 201.42 201.56 0.13 0.14

Marter 2407 Apr 90% 4.3 1.35 3.18 17.26 17.31 201.42 201.62 0.18 0.2

Marter 2407 May 90% 14.5 1.96 7.39 19.05 19.16 201.42 201.85 0.39 0.43

Marter 2407 Jun 90% 6.49 1.54 4.22 17.72 17.78 201.42 201.68 0.24 0.26

Marter 2407 Jul 90% 2.86 1.18 2.42 16.91 16.95 201.42 201.57 0.14 0.15

Marter 2407 Aug 90% 1.86 1.03 1.81 16.63 16.66 201.42 201.54 0.11 0.12

Marter 2407 Sep 90% 1.86 1.03 1.81 16.63 16.66 201.42 201.54 0.11 0.12

Marter 2407 Oct 90% 2.59 1.15 2.25 16.83 16.87 201.42 201.56 0.13 0.14

Marter 2407 Nov 90% 5.9 1.49 3.95 17.6 17.66 201.42 201.66 0.22 0.24

Marter 2407 Dec 90% 4.32 1.36 3.19 17.26 17.31 201.42 201.62 0.18 0.2

Marter 101 2397 Jan 10% 7.14 1.02 7.02 15.73 15.84 201.02 201.55 0.45 0.53

Marter 101 2397 Feb 10% 5.1 0.89 5.75 15.01 15.1 201.02 201.47 0.38 0.45

Marter 101 2397 Mar 10% 7.76 1.05 7.36 15.88 15.99 201.02 201.57 0.46 0.55

Marter 101 2397 Apr 10% 78.7 2.72 28.97 22.25 22.83 201.02 202.68 1.30 1.66

Marter 101 2397 May 10% 68.7 2.59 26.52 21.74 22.26 201.02 202.57 1.22 1.55

Marter 101 2397 Jun 10% 25.2 1.75 14.43 19.05 19.27 201.02 201.98 0.76 0.96

Marter 101 2397 Jul 10% 15.5 1.42 10.91 17.49 17.67 201.02 201.79 0.62 0.77

Marter 101 2397 Aug 10% 8.81 1.11 7.91 16.1 16.23 201.02 201.61 0.49 0.59

Marter 101 2397 Sep 10% 9.14 1.13 8.08 16.17 16.3 201.02 201.62 0.50 0.6

Marter 101 2397 Oct 10% 18.1 1.52 11.92 17.96 18.15 201.02 201.85 0.66 0.83

Marter 101 2397 Nov 10% 20.6 1.6 12.84 18.36 18.57 201.02 201.9 0.70 0.88

Marter 101 2397 Dec 10% 15.4 1.42 10.87 17.48 17.65 201.02 201.79 0.62 0.77

Marter 101 2397 Jan 90% 3.02 0.72 4.19 14.03 14.09 201.02 201.36 0.30 0.34

Marter 101 2397 Feb 90% 2.52 0.67 3.75 13.73 13.79 201.02 201.33 0.27 0.31

Marter 101 2397 Mar 90% 2.55 0.68 3.78 13.75 13.81 201.02 201.33 0.27 0.31

Marter 101 2397 Apr 90% 4.3 0.83 5.19 14.66 14.74 201.02 201.43 0.35 0.41

Marter 101 2397 May 90% 14.5 1.38 10.49 17.3 17.47 201.02 201.76 0.61 0.74

Marter 101 2397 Jun 90% 6.49 0.98 6.63 15.54 15.64 201.02 201.53 0.43 0.51

Page 47: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 101 2397 Jul 90% 2.86 0.71 4.05 13.93 13.99 201.02 201.35 0.29 0.33

Marter 101 2397 Aug 90% 1.86 0.6 3.11 13.3 13.34 201.02 201.28 0.23 0.26

Marter 101 2397 Sep 90% 1.86 0.6 3.11 13.3 13.34 201.02 201.28 0.23 0.26

Marter 101 2397 Oct 90% 2.59 0.68 3.81 13.78 13.83 201.02 201.34 0.28 0.32

Marter 101 2397 Nov 90% 5.9 0.94 6.27 15.32 15.42 201.02 201.5 0.41 0.48

Marter 101 2397 Dec 90% 4.32 0.83 5.2 14.67 14.75 201.02 201.43 0.35 0.41

Marter 2390 Jan 10% 7.14 1.72 4.16 14.09 14.14 200.98 201.4 0.30 0.42

Marter 2390 Feb 10% 5.1 1.59 3.21 12.7 12.74 200.98 201.33 0.25 0.35

Marter 2390 Mar 10% 7.76 1.75 4.44 14.48 14.53 200.98 201.42 0.31 0.44

Marter 2390 Apr 10% 78.7 3.31 23.77 21.56 22.01 200.98 202.42 1.10 1.44

Marter 2390 May 10% 68.7 3.18 21.59 21.23 21.61 200.98 202.32 1.02 1.34

Marter 2390 Jun 10% 25.2 2.37 10.65 19.02 19.14 200.98 201.78 0.56 0.8

Marter 2390 Jul 10% 15.5 2.08 7.46 17.25 17.33 200.98 201.6 0.43 0.62

Marter 2390 Aug 10% 8.81 1.79 4.92 15.11 15.16 200.98 201.45 0.33 0.47

Marter 2390 Sep 10% 9.14 1.81 5.04 15.28 15.33 200.98 201.46 0.33 0.48

Marter 2390 Oct 10% 18.1 2.17 8.36 17.79 17.89 200.98 201.65 0.47 0.67

Marter 2390 Nov 10% 20.6 2.24 9.2 18.3 18.4 200.98 201.7 0.50 0.72

Marter 2390 Dec 10% 15.4 2.07 7.43 17.23 17.31 200.98 201.6 0.43 0.62

Marter 2390 Jan 90% 3.02 1.4 2.16 10.95 10.97 200.98 201.24 0.20 0.26

Marter 2390 Feb 90% 2.52 1.34 1.88 10.44 10.46 200.98 201.21 0.18 0.23

Marter 2390 Mar 90% 2.55 1.34 1.9 10.47 10.49 200.98 201.21 0.18 0.23

Marter 2390 Apr 90% 4.3 1.52 2.82 12.08 12.12 200.98 201.29 0.23 0.31

Marter 2390 May 90% 14.5 2.04 7.12 17.04 17.11 200.98 201.58 0.42 0.6

Marter 2390 Jun 90% 6.49 1.68 3.87 13.68 13.72 200.98 201.37 0.28 0.39

Marter 2390 Jul 90% 2.86 1.38 2.07 10.79 10.82 200.98 201.23 0.19 0.25

Marter 2390 Aug 90% 1.86 1.23 1.51 9.7 9.73 200.98 201.17 0.16 0.19

Marter 2390 Sep 90% 1.86 1.23 1.51 9.7 9.73 200.98 201.17 0.16 0.19

Marter 2390 Oct 90% 2.59 1.35 1.92 10.51 10.54 200.98 201.21 0.18 0.23

Marter 2390 Nov 90% 5.9 1.64 3.6 13.29 13.33 200.98 201.36 0.27 0.38

Marter 2390 Dec 90% 4.32 1.53 2.83 12.1 12.13 200.98 201.29 0.23 0.31

Marter 102 2372 Jan 10% 7.14 0.09 81.52 30.18 32.55 197.25 200.53 2.70 3.28

Marter 102 2372 Feb 10% 5.1 0.06 79.51 29.98 32.31 197.25 200.46 2.65 3.21

Marter 102 2372 Mar 10% 7.76 0.09 82.1 30.27 32.64 197.25 200.55 2.71 3.3

Marter 102 2372 Apr 10% 78.7 0.66 118.83 33.16 36.5 197.25 201.69 3.58 4.44

Marter 102 2372 May 10% 68.7 0.6 115.28 33.07 36.27 197.25 201.58 3.49 4.33

Marter 102 2372 Jun 10% 25.2 0.26 95.11 32.09 34.65 197.25 200.96 2.96 3.71

Marter 102 2372 Jul 10% 15.5 0.18 88.5 31.18 33.64 197.25 200.75 2.84 3.5

Marter 102 2372 Aug 10% 8.81 0.11 83.06 30.4 32.79 197.25 200.58 2.73 3.33

Page 48: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 102 2372 Sep 10% 9.14 0.11 83.35 30.45 32.84 197.25 200.59 2.74 3.34

Marter 102 2372 Oct 10% 18.1 0.2 90.39 31.44 33.94 197.25 200.82 2.88 3.57

Marter 102 2372 Nov 10% 20.6 0.22 92.12 31.68 34.2 197.25 200.87 2.91 3.62

Marter 102 2372 Dec 10% 15.4 0.17 88.42 31.17 33.63 197.25 200.75 2.84 3.5

Marter 102 2372 Jan 90% 3.02 0.04 77.21 29.84 32.09 197.25 200.38 2.59 3.13

Marter 102 2372 Feb 90% 2.52 0.03 76.6 29.8 32.04 197.25 200.36 2.57 3.11

Marter 102 2372 Mar 90% 2.55 0.03 76.64 29.8 32.04 197.25 200.36 2.57 3.11

Marter 102 2372 Apr 90% 4.3 0.05 78.66 29.93 32.23 197.25 200.43 2.63 3.18

Marter 102 2372 May 90% 14.5 0.17 87.74 31.07 33.53 197.25 200.73 2.82 3.48

Marter 102 2372 Jun 90% 6.49 0.08 80.9 30.09 32.45 197.25 200.51 2.69 3.26

Marter 102 2372 Jul 90% 2.86 0.04 77.02 29.82 32.08 197.25 200.38 2.58 3.13

Marter 102 2372 Aug 90% 1.86 0.02 75.74 29.74 31.96 197.25 200.33 2.55 3.08

Marter 102 2372 Sep 90% 1.86 0.02 75.74 29.74 31.96 197.25 200.33 2.55 3.08

Marter 102 2372 Oct 90% 2.59 0.03 76.69 29.8 32.05 197.25 200.37 2.57 3.12

Marter 102 2372 Nov 90% 5.9 0.07 80.32 30.04 32.38 197.25 200.49 2.67 3.24

Marter 102 2372 Dec 90% 4.32 0.05 78.68 29.93 32.23 197.25 200.43 2.63 3.18

Marter 2345 Jan 10% 7.14 0.18 39.44 35.06 35.31 198.99 200.53 1.12 1.54

Marter 2345 Feb 10% 5.1 0.14 37.14 34.25 34.49 198.99 200.46 1.08 1.47

Marter 2345 Mar 10% 7.76 0.19 40.1 35.29 35.54 198.99 200.54 1.14 1.55

Marter 2345 Apr 10% 78.7 0.93 84.94 42.47 43.27 198.99 201.66 2.00 2.67

Marter 2345 May 10% 68.7 0.85 80.53 42.26 42.97 198.99 201.56 1.91 2.57

Marter 2345 Jun 10% 25.2 0.45 55.61 40.3 40.62 198.99 200.96 1.38 1.97

Marter 2345 Jul 10% 15.5 0.33 47.6 37.8 38.08 198.99 200.75 1.26 1.76

Marter 2345 Aug 10% 8.81 0.21 41.21 35.67 35.93 198.99 200.58 1.16 1.59

Marter 2345 Sep 10% 9.14 0.22 41.55 35.79 36.05 198.99 200.59 1.16 1.6

Marter 2345 Oct 10% 18.1 0.36 49.86 38.52 38.82 198.99 200.81 1.29 1.82

Marter 2345 Nov 10% 20.6 0.4 51.96 39.18 39.49 198.99 200.86 1.33 1.87

Marter 2345 Dec 10% 15.4 0.32 47.51 37.77 38.06 198.99 200.75 1.26 1.76

Marter 2345 Jan 90% 3.02 0.09 34.56 33.32 33.54 198.99 200.38 1.04 1.39

Marter 2345 Feb 90% 2.52 0.07 33.89 33.07 33.29 198.99 200.36 1.02 1.37

Marter 2345 Mar 90% 2.55 0.08 33.93 33.08 33.31 198.99 200.36 1.03 1.37

Marter 2345 Apr 90% 4.3 0.12 36.18 33.91 34.14 198.99 200.43 1.07 1.44

Marter 2345 May 90% 14.5 0.31 46.7 37.5 37.79 198.99 200.73 1.25 1.74

Marter 2345 Jun 90% 6.49 0.17 38.72 34.81 35.06 198.99 200.51 1.11 1.52

Marter 2345 Jul 90% 2.86 0.08 34.35 33.24 33.47 198.99 200.38 1.03 1.39

Marter 2345 Aug 90% 1.86 0.06 32.94 32.72 32.94 198.99 200.33 1.01 1.34

Marter 2345 Sep 90% 1.86 0.06 32.94 32.72 32.94 198.99 200.33 1.01 1.34

Marter 2345 Oct 90% 2.59 0.08 33.98 33.1 33.33 198.99 200.37 1.03 1.38

Marter 2345 Nov 90% 5.9 0.16 38.06 34.57 34.82 198.99 200.49 1.10 1.5

Page 49: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2345 Dec 90% 4.32 0.12 36.21 33.91 34.15 198.99 200.43 1.07 1.44

Marter 2300 Jan 10% 7.14 1.31 5.47 31.82 31.84 200.21 200.4 0.17 0.19

Marter 2300 Feb 10% 5.1 1.18 4.32 30.73 30.74 200.21 200.36 0.14 0.15

Marter 2300 Mar 10% 7.76 1.33 5.81 32.15 32.16 200.21 200.41 0.18 0.2

Marter 2300 Apr 10% 78.7 2.49 31.6 50.72 50.77 200.21 201.03 0.62 0.82

Marter 2300 May 10% 68.7 2.41 28.51 48.86 48.91 200.21 200.97 0.58 0.76

Marter 2300 Jun 10% 25.2 1.86 13.52 38.64 38.67 200.21 200.63 0.35 0.42

Marter 2300 Jul 10% 15.5 1.63 9.51 35.41 35.43 200.21 200.52 0.27 0.31

Marter 2300 Aug 10% 8.81 1.39 6.34 32.63 32.65 200.21 200.43 0.19 0.22

Marter 2300 Sep 10% 9.14 1.4 6.51 32.78 32.8 200.21 200.43 0.20 0.22

Marter 2300 Oct 10% 18.1 1.7 10.66 36.36 36.39 200.21 200.55 0.29 0.34

Marter 2300 Nov 10% 20.6 1.76 11.71 37.22 37.24 200.21 200.58 0.31 0.37

Marter 2300 Dec 10% 15.4 1.63 9.47 35.38 35.4 200.21 200.52 0.27 0.31

Marter 2300 Jan 90% 3.02 1 3.02 29.44 29.45 200.21 200.32 0.10 0.11

Marter 2300 Feb 90% 2.52 0.95 2.65 29.06 29.07 200.21 200.31 0.09 0.1

Marter 2300 Mar 90% 2.55 0.96 2.67 29.08 29.09 200.21 200.31 0.09 0.1

Marter 2300 Apr 90% 4.3 1.12 3.83 30.25 30.26 200.21 200.35 0.13 0.14

Marter 2300 May 90% 14.5 1.6 9.07 35.04 35.06 200.21 200.51 0.26 0.3

Marter 2300 Jun 90% 6.49 1.26 5.14 31.51 31.52 200.21 200.39 0.16 0.18

Marter 2300 Jul 90% 2.86 0.99 2.9 29.32 29.33 200.21 200.31 0.10 0.1

Marter 2300 Aug 90% 1.86 0.86 2.16 28.56 28.56 200.21 200.29 0.08 0.08

Marter 2300 Sep 90% 1.86 0.86 2.16 28.56 28.56 200.21 200.29 0.08 0.08

Marter 2300 Oct 90% 2.59 0.96 2.71 29.12 29.13 200.21 200.31 0.09 0.1

Marter 2300 Nov 90% 5.9 1.23 4.8 31.19 31.2 200.21 200.38 0.15 0.17

Marter 2300 Dec 90% 4.32 1.12 3.85 30.27 30.28 200.21 200.35 0.13 0.14

Marter 2284 Jan 10% 7.14 2.78 2.57 24.18 24.18 199.17 199.29 0.11 0.12

Marter 2284 Feb 10% 5.1 2.5 2.04 23.26 23.27 199.17 199.27 0.09 0.1

Marter 2284 Mar 10% 7.76 2.84 2.74 24.46 24.46 199.17 199.3 0.11 0.13

Marter 2284 Apr 10% 78.7 0.84 93.96 58.79 59.26 199.17 201.17 1.60 2

Marter 2284 May 10% 68.7 0.83 82.61 57.47 57.87 199.17 200.98 1.44 1.81

Marter 2284 Jun 10% 25.2 0.99 25.43 47.46 47.51 199.17 199.91 0.54 0.74

Marter 2284 Jul 10% 15.5 3.38 4.58 27.38 27.39 199.17 199.37 0.17 0.2

Marter 2284 Aug 10% 8.81 2.94 3 24.9 24.91 199.17 199.31 0.12 0.14

Marter 2284 Sep 10% 9.14 2.96 3.08 25.03 25.04 199.17 199.31 0.12 0.14

Marter 2284 Oct 10% 18.1 3.5 5.17 28.25 28.26 199.17 199.39 0.18 0.22

Marter 2284 Nov 10% 20.6 3.6 5.72 29.04 29.05 199.17 199.41 0.20 0.24

Marter 2284 Dec 10% 15.4 3.37 4.56 27.36 27.37 199.17 199.37 0.17 0.2

Marter 2284 Jan 90% 3.02 2.07 1.46 22.21 22.21 199.17 199.24 0.07 0.07

Page 50: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2284 Feb 90% 2.52 1.92 1.31 21.93 21.94 199.17 199.23 0.06 0.06

Marter 2284 Mar 90% 2.55 1.92 1.33 21.96 21.96 199.17 199.23 0.06 0.06

Marter 2284 Apr 90% 4.3 2.36 1.83 22.88 22.88 199.17 199.26 0.08 0.09

Marter 2284 May 90% 14.5 3.34 4.34 27.02 27.03 199.17 199.36 0.16 0.19

Marter 2284 Jun 90% 6.49 2.69 2.42 23.91 23.92 199.17 199.28 0.10 0.11

Marter 2284 Jul 90% 2.86 2.03 1.41 22.11 22.12 199.17 199.24 0.06 0.07

Marter 2284 Aug 90% 1.86 1.7 1.09 21.52 21.52 199.17 199.22 0.05 0.05

Marter 2284 Sep 90% 1.86 1.7 1.09 21.52 21.52 199.17 199.22 0.05 0.05

Marter 2284 Oct 90% 2.59 1.95 1.33 21.96 21.97 199.17 199.23 0.06 0.06

Marter 2284 Nov 90% 5.9 2.61 2.26 23.64 23.64 199.17 199.28 0.10 0.11

Marter 2284 Dec 90% 4.32 2.36 1.83 22.88 22.88 199.17 199.26 0.08 0.09

Marter 103 2081 Jan 10% 7.14 0.17 43.09 35.97 37.27 197.58 199.24 1.20 1.66

Marter 103 2081 Feb 10% 5.1 0.13 39.44 35.86 37.03 197.58 199.13 1.10 1.55

Marter 103 2081 Mar 10% 7.76 0.18 44.12 36 37.33 197.58 199.26 1.23 1.68

Marter 103 2081 Apr 10% 78.7 0.67 118.14 42.77 45.52 197.58 201.13 2.76 3.55

Marter 103 2081 May 10% 68.7 0.63 109.88 42.11 44.75 197.58 200.94 2.61 3.36

Marter 103 2081 Jun 10% 25.2 0.37 67.6 38.96 40.95 197.58 199.89 1.74 2.31

Marter 103 2081 Jul 10% 15.5 0.28 55.47 37.64 39.27 197.58 199.57 1.47 1.99

Marter 103 2081 Aug 10% 8.81 0.19 45.82 36.05 37.44 197.58 199.31 1.27 1.73

Marter 103 2081 Sep 10% 9.14 0.2 46.33 36.06 37.47 197.58 199.33 1.28 1.75

Marter 103 2081 Oct 10% 18.1 0.31 58.9 38.18 39.9 197.58 199.66 1.54 2.08

Marter 103 2081 Nov 10% 20.6 0.33 62.06 38.49 40.32 197.58 199.75 1.61 2.17

Marter 103 2081 Dec 10% 15.4 0.28 55.33 37.61 39.24 197.58 199.57 1.47 1.99

Marter 103 2081 Jan 90% 3.02 0.09 35.04 35.71 36.72 197.58 199.01 0.98 1.43

Marter 103 2081 Feb 90% 2.52 0.07 33.8 35.58 36.53 197.58 198.98 0.95 1.4

Marter 103 2081 Mar 90% 2.55 0.08 33.88 35.59 36.54 197.58 198.98 0.95 1.4

Marter 103 2081 Apr 90% 4.3 0.11 37.87 35.82 36.93 197.58 199.09 1.06 1.51

Marter 103 2081 May 90% 14.5 0.27 54.11 37.35 38.96 197.58 199.54 1.45 1.96

Marter 103 2081 Jun 90% 6.49 0.15 41.97 35.93 37.2 197.58 199.2 1.17 1.62

Marter 103 2081 Jul 90% 2.86 0.08 34.66 35.67 36.66 197.58 199 0.97 1.42

Marter 103 2081 Aug 90% 1.86 0.06 31.99 35.38 36.23 197.58 198.92 0.90 1.34

Marter 103 2081 Sep 90% 1.86 0.06 31.99 35.38 36.23 197.58 198.92 0.90 1.34

Marter 103 2081 Oct 90% 2.59 0.08 33.98 35.6 36.56 197.58 198.98 0.95 1.4

Marter 103 2081 Nov 90% 5.9 0.14 40.92 35.9 37.13 197.58 199.17 1.14 1.59

Marter 103 2081 Dec 90% 4.32 0.11 37.91 35.82 36.94 197.58 199.09 1.06 1.51

Marter 2061 Jan 10% 7.14 0.16 45.8 35.57 36.46 197.56 199.23 1.29 1.67

Marter 2061 Feb 10% 5.1 0.12 42.21 35.24 36.08 197.56 199.13 1.20 1.57

Marter 2061 Mar 10% 7.76 0.17 46.82 35.66 36.57 197.56 199.26 1.31 1.7

Page 51: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2061 Apr 10% 78.7 0.66 119.33 42.66 44.56 197.56 201.13 2.80 3.57

Marter 2061 May 10% 68.7 0.62 111.13 41.74 43.56 197.56 200.93 2.66 3.37

Marter 2061 Jun 10% 25.2 0.36 69.72 37.64 38.93 197.56 199.89 1.85 2.33

Marter 2061 Jul 10% 15.5 0.27 58.02 36.65 37.75 197.56 199.57 1.58 2.01

Marter 2061 Aug 10% 8.81 0.18 48.5 35.81 36.75 197.56 199.31 1.35 1.75

Marter 2061 Sep 10% 9.14 0.19 49.01 35.85 36.8 197.56 199.32 1.37 1.76

Marter 2061 Oct 10% 18.1 0.3 61.35 36.89 38.05 197.56 199.66 1.66 2.1

Marter 2061 Nov 10% 20.6 0.32 64.4 37.11 38.33 197.56 199.75 1.74 2.19

Marter 2061 Dec 10% 15.4 0.27 57.89 36.64 37.74 197.56 199.57 1.58 2.01

Marter 2061 Jan 90% 3.02 0.08 37.91 34.85 35.62 197.56 199.01 1.09 1.45

Marter 2061 Feb 90% 2.52 0.07 36.69 34.74 35.49 197.56 198.98 1.06 1.42

Marter 2061 Mar 90% 2.55 0.07 36.77 34.75 35.49 197.56 198.98 1.06 1.42

Marter 2061 Apr 90% 4.3 0.11 40.67 35.1 35.92 197.56 199.09 1.16 1.53

Marter 2061 May 90% 14.5 0.26 56.7 36.55 37.63 197.56 199.54 1.55 1.98

Marter 2061 Jun 90% 6.49 0.15 44.69 35.47 36.35 197.56 199.2 1.26 1.64

Marter 2061 Jul 90% 2.86 0.08 37.53 34.82 35.58 197.56 199 1.08 1.44

Marter 2061 Aug 90% 1.86 0.05 34.93 34.58 35.29 197.56 198.92 1.01 1.36

Marter 2061 Sep 90% 1.86 0.05 34.93 34.58 35.29 197.56 198.92 1.01 1.36

Marter 2061 Oct 90% 2.59 0.07 36.87 34.75 35.51 197.56 198.98 1.06 1.42

Marter 2061 Nov 90% 5.9 0.14 43.67 35.37 36.24 197.56 199.17 1.23 1.61

Marter 2061 Dec 90% 4.32 0.11 40.71 35.11 35.92 197.56 199.09 1.16 1.53

Marter 1865 Jan 10% 7.14 0.13 53.22 29.79 30.56 196.91 199.23 1.79 2.32

Marter 1865 Feb 10% 5.1 0.1 50.26 29.2 29.93 196.91 199.13 1.72 2.22

Marter 1865 Mar 10% 7.76 0.14 54.06 29.96 30.73 196.91 199.26 1.80 2.35

Marter 1865 Apr 10% 78.7 0.67 116.72 37.93 39.67 196.91 201.1 3.08 4.19

Marter 1865 May 10% 68.7 0.63 109.54 36.8 38.48 196.91 200.91 2.98 4

Marter 1865 Jun 10% 25.2 0.34 73.75 33.03 34.15 196.91 199.88 2.23 2.97

Marter 1865 Jul 10% 15.5 0.24 63.6 32.26 33.15 196.91 199.57 1.97 2.66

Marter 1865 Aug 10% 8.81 0.16 55.46 30.25 31.03 196.91 199.31 1.83 2.4

Marter 1865 Sep 10% 9.14 0.16 55.89 30.33 31.13 196.91 199.32 1.84 2.41

Marter 1865 Oct 10% 18.1 0.27 66.49 32.48 33.44 196.91 199.66 2.05 2.75

Marter 1865 Nov 10% 20.6 0.3 69.14 32.68 33.7 196.91 199.74 2.12 2.83

Marter 1865 Dec 10% 15.4 0.24 63.49 32.25 33.14 196.91 199.56 1.97 2.65

Marter 1865 Jan 90% 3.02 0.06 46.74 28.48 29.17 196.91 199.01 1.64 2.1

Marter 1865 Feb 90% 2.52 0.06 45.76 28.27 28.95 196.91 198.98 1.62 2.07

Marter 1865 Mar 90% 2.55 0.06 45.82 28.29 28.96 196.91 198.98 1.62 2.07

Marter 1865 Apr 90% 4.3 0.09 48.99 28.94 29.66 196.91 199.09 1.69 2.18

Marter 1865 May 90% 14.5 0.23 62.45 32.17 33.04 196.91 199.53 1.94 2.62

Marter 1865 Jun 90% 6.49 0.12 52.3 29.61 30.37 196.91 199.2 1.77 2.29

Page 52: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 1865 Jul 90% 2.86 0.06 46.44 28.41 29.1 196.91 199 1.63 2.09

Marter 1865 Aug 90% 1.86 0.04 44.33 27.97 28.63 196.91 198.92 1.58 2.01

Marter 1865 Sep 90% 1.86 0.04 44.33 27.97 28.63 196.91 198.92 1.58 2.01

Marter 1865 Oct 90% 2.59 0.06 45.9 28.3 28.98 196.91 198.98 1.62 2.07

Marter 1865 Nov 90% 5.9 0.11 51.45 29.44 30.19 196.91 199.17 1.75 2.26

Marter 1865 Dec 90% 4.32 0.09 49.03 28.95 29.67 196.91 199.09 1.69 2.18

Marter 104 1818 Jan 10% 7.14 0.14 50.21 31.06 31.97 196.91 199.23 1.62 2.32

Marter 104 1818 Feb 10% 5.1 0.11 47.11 30.81 31.64 196.91 199.13 1.53 2.22

Marter 104 1818 Mar 10% 7.76 0.15 51.09 31.13 32.07 196.91 199.26 1.64 2.35

Marter 104 1818 Apr 10% 78.7 0.7 112.37 36.86 39.16 196.91 201.09 3.05 4.18

Marter 104 1818 May 10% 68.7 0.65 105.45 35.44 37.69 196.91 200.9 2.98 3.99

Marter 104 1818 Jun 10% 25.2 0.36 70.7 32.69 34.09 196.91 199.87 2.16 2.96

Marter 104 1818 Jul 10% 15.5 0.26 60.69 31.92 33.08 196.91 199.56 1.90 2.65

Marter 104 1818 Aug 10% 8.81 0.17 52.53 31.25 32.22 196.91 199.31 1.68 2.4

Marter 104 1818 Sep 10% 9.14 0.17 52.97 31.29 32.27 196.91 199.32 1.69 2.41

Marter 104 1818 Oct 10% 18.1 0.28 63.53 32.15 33.38 196.91 199.65 1.98 2.74

Marter 104 1818 Nov 10% 20.6 0.31 66.14 32.36 33.65 196.91 199.73 2.04 2.82

Marter 104 1818 Dec 10% 15.4 0.25 60.58 31.91 33.07 196.91 199.56 1.90 2.65

Marter 104 1818 Jan 90% 3.02 0.07 43.39 30.28 31.06 196.91 199.01 1.43 2.1

Marter 104 1818 Feb 90% 2.52 0.06 42.35 30.08 30.84 196.91 198.98 1.41 2.07

Marter 104 1818 Mar 90% 2.55 0.06 42.41 30.09 30.86 196.91 198.98 1.41 2.07

Marter 104 1818 Apr 90% 4.3 0.09 45.78 30.65 31.46 196.91 199.09 1.49 2.18

Marter 104 1818 May 90% 14.5 0.24 59.56 31.82 32.96 196.91 199.53 1.87 2.62

Marter 104 1818 Jun 90% 6.49 0.13 49.25 30.98 31.87 196.91 199.2 1.59 2.29

Marter 104 1818 Jul 90% 2.86 0.07 43.07 30.22 30.99 196.91 199 1.43 2.09

Marter 104 1818 Aug 90% 1.86 0.05 40.83 29.78 30.53 196.91 198.92 1.37 2.01

Marter 104 1818 Sep 90% 1.86 0.05 40.83 29.78 30.53 196.91 198.92 1.37 2.01

Marter 104 1818 Oct 90% 2.59 0.06 42.5 30.11 30.88 196.91 198.98 1.41 2.07

Marter 104 1818 Nov 90% 5.9 0.12 48.37 30.91 31.78 196.91 199.17 1.56 2.26

Marter 104 1818 Dec 90% 4.32 0.09 45.81 30.66 31.47 196.91 199.09 1.49 2.18

Marter 1775 Jan 10% 7.14 1.78 4.01 12.62 12.73 198.66 199.05 0.32 0.39

Marter 1775 Feb 10% 5.1 1.6 3.19 12.38 12.42 198.66 198.99 0.26 0.33

Marter 1775 Mar 10% 7.76 1.83 4.25 12.65 12.77 198.66 199.07 0.34 0.41

Marter 1775 Apr 10% 78.7 3.77 20.87 14.52 16.1 198.66 200.3 1.44 1.64

Marter 1775 May 10% 68.7 3.62 18.98 14.22 15.66 198.66 200.17 1.33 1.51

Marter 1775 Jun 10% 25.2 2.66 9.47 13.21 13.8 198.66 199.48 0.72 0.82

Marter 1775 Jul 10% 15.5 2.29 6.78 12.93 13.28 198.66 199.27 0.52 0.61

Marter 1775 Aug 10% 8.81 1.91 4.62 12.69 12.85 198.66 199.1 0.36 0.44

Page 53: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

���������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 1775 Sep 10% 9.14 1.93 4.74 12.7 12.87 198.66 199.11 0.37 0.45

Marter 1775 Oct 10% 18.1 2.4 7.54 13.01 13.43 198.66 199.33 0.58 0.67

Marter 1775 Nov 10% 20.6 2.5 8.24 13.08 13.56 198.66 199.38 0.63 0.72

Marter 1775 Dec 10% 15.4 2.28 6.75 12.92 13.27 198.66 199.27 0.52 0.61

Marter 1775 Jan 90% 3.02 1.39 2.17 11.18 11.21 198.66 198.9 0.19 0.24

Marter 1775 Feb 90% 2.52 1.32 1.91 10.86 10.88 198.66 198.88 0.18 0.22

Marter 1775 Mar 90% 2.55 1.32 1.93 10.88 10.91 198.66 198.88 0.18 0.22

Marter 1775 Apr 90% 4.3 1.53 2.81 11.94 11.98 198.66 198.96 0.24 0.3

Marter 1775 May 90% 14.5 2.24 6.48 12.89 13.22 198.66 199.25 0.50 0.59

Marter 1775 Jun 90% 6.49 1.72 3.77 12.6 12.68 198.66 199.03 0.30 0.37

Marter 1775 Jul 90% 2.86 1.37 2.09 11.08 11.11 198.66 198.89 0.19 0.23

Marter 1775 Aug 90% 1.86 1.21 1.54 10.37 10.39 198.66 198.84 0.15 0.18

Marter 1775 Sep 90% 1.86 1.21 1.54 10.37 10.39 198.66 198.84 0.15 0.18

Marter 1775 Oct 90% 2.59 1.33 1.95 10.91 10.94 198.66 198.88 0.18 0.22

Marter 1775 Nov 90% 5.9 1.67 3.53 12.57 12.63 198.66 199.01 0.28 0.35

Marter 1775 Dec 90% 4.32 1.53 2.82 11.96 11.99 198.66 198.96 0.24 0.3

Marter 1743 Jan 10% 7.14 0.95 7.54 11.32 11.73 196.25 197.31 0.67 1.06

Marter 1743 Feb 10% 5.1 0.78 6.58 11.09 11.44 196.25 197.22 0.59 0.97

Marter 1743 Mar 10% 7.76 4.93 1.57 5.54 5.67 196.25 196.63 0.28 0.38

Marter 1743 Apr 10% 78.7 6.96 11.37 12.64 13.21 196.25 197.63 0.90 1.38

Marter 1743 May 10% 68.7 6.79 10.12 12.21 12.73 196.25 197.53 0.83 1.28

Marter 1743 Jun 10% 25.2 5.74 4.39 10.08 10.35 196.25 197.01 0.44 0.76

Marter 1743 Jul 10% 15.5 5.45 2.84 6.64 6.85 196.25 196.84 0.43 0.59

Marter 1743 Aug 10% 8.81 5.03 1.75 5.71 5.85 196.25 196.66 0.31 0.41

Marter 1743 Sep 10% 9.14 5.06 1.81 5.76 5.9 196.25 196.67 0.31 0.42

Marter 1743 Oct 10% 18.1 5.49 3.3 8.16 8.39 196.25 196.9 0.40 0.65

Marter 1743 Nov 10% 20.6 5.56 3.71 9.39 9.63 196.25 196.94 0.40 0.69

Marter 1743 Dec 10% 15.4 5.45 2.83 6.63 6.84 196.25 196.83 0.43 0.58

Marter 1743 Jan 90% 3.02 0.57 5.27 10.51 10.81 196.25 197.1 0.50 0.85

Marter 1743 Feb 90% 2.52 0.51 4.91 10.34 10.62 196.25 197.06 0.47 0.81

Marter 1743 Mar 90% 2.55 0.52 4.93 10.35 10.64 196.25 197.07 0.48 0.82

Marter 1743 Apr 90% 4.3 0.7 6.12 10.91 11.24 196.25 197.18 0.56 0.93

Marter 1743 May 90% 14.5 5.41 2.68 6.51 6.71 196.25 196.81 0.41 0.56

Marter 1743 Jun 90% 6.49 0.9 7.25 11.26 11.65 196.25 197.28 0.64 1.03

Marter 1743 Jul 90% 2.86 0.55 5.17 10.46 10.76 196.25 197.09 0.49 0.84

Marter 1743 Aug 90% 1.86 0.43 4.34 10.06 10.32 196.25 197.01 0.43 0.76

Marter 1743 Sep 90% 1.86 0.43 4.34 10.06 10.32 196.25 197.01 0.43 0.76

Marter 1743 Oct 90% 2.59 0.52 4.97 10.37 10.65 196.25 197.07 0.48 0.82

Marter 1743 Nov 90% 5.9 0.84 6.98 11.2 11.57 196.25 197.26 0.62 1.01

Page 54: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

���������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 1743 Dec 90% 4.32 0.7 6.13 10.92 11.25 196.25 197.18 0.56 0.93

Marter 105 1683 Jan 10% 7.14 1.34 5.34 29.93 29.94 196.71 196.97 0.18 0.26

Marter 105 1683 Feb 10% 5.1 1.23 4.16 27.66 27.67 196.71 196.93 0.15 0.22

Marter 105 1683 Mar 10% 7.76 1.37 5.66 30.52 30.53 196.71 196.98 0.19 0.27

Marter 105 1683 Apr 10% 78.7 2.71 29.11 39.95 40.14 196.71 197.62 0.73 0.91

Marter 105 1683 May 10% 68.7 2.59 26.55 39.77 39.92 196.71 197.56 0.67 0.85

Marter 105 1683 Jun 10% 25.2 1.92 13.13 35.58 35.63 196.71 197.2 0.37 0.49

Marter 105 1683 Jul 10% 15.5 1.66 9.36 34.23 34.26 196.71 197.1 0.27 0.39

Marter 105 1683 Aug 10% 8.81 1.39 6.35 33.03 33.05 196.71 197.01 0.19 0.3

Marter 105 1683 Sep 10% 9.14 1.41 6.5 33.1 33.12 196.71 197.01 0.20 0.3

Marter 105 1683 Oct 10% 18.1 1.73 10.44 34.62 34.66 196.71 197.13 0.30 0.42

Marter 105 1683 Nov 10% 20.6 1.81 11.41 34.97 35.01 196.71 197.16 0.33 0.45

Marter 105 1683 Dec 10% 15.4 1.65 9.32 34.22 34.25 196.71 197.09 0.27 0.38

Marter 105 1683 Jan 90% 3.02 1.06 2.85 24.74 24.75 196.71 196.88 0.12 0.17

Marter 105 1683 Feb 90% 2.52 1.05 2.4 21.46 21.47 196.71 196.86 0.11 0.15

Marter 105 1683 Mar 90% 2.55 1.05 2.43 21.73 21.74 196.71 196.87 0.11 0.16

Marter 105 1683 Apr 90% 4.3 1.17 3.66 26.66 26.67 196.71 196.91 0.14 0.2

Marter 105 1683 May 90% 14.5 1.62 8.94 34.08 34.11 196.71 197.08 0.26 0.37

Marter 105 1683 Jun 90% 6.49 1.3 4.98 29.24 29.26 196.71 196.96 0.17 0.25

Marter 105 1683 Jul 90% 2.86 1.05 2.72 24.17 24.18 196.71 196.88 0.11 0.17

Marter 105 1683 Aug 90% 1.86 0.98 1.89 19.25 19.25 196.71 196.84 0.10 0.13

Marter 105 1683 Sep 90% 1.86 0.98 1.89 19.25 19.25 196.71 196.84 0.10 0.13

Marter 105 1683 Oct 90% 2.59 1.05 2.47 22.05 22.05 196.71 196.87 0.11 0.16

Marter 105 1683 Nov 90% 5.9 1.27 4.64 28.6 28.61 196.71 196.95 0.16 0.24

Marter 105 1683 Dec 90% 4.32 1.17 3.68 26.69 26.7 196.71 196.92 0.14 0.21

Marter 1628 Jan 10% 7.14 0.27 26.53 60.85 60.88 195.38 195.93 0.44 0.55

Marter 1628 Feb 10% 5.1 0.22 23.3 58.71 58.73 195.38 195.88 0.40 0.5

Marter 1628 Mar 10% 7.76 0.28 27.42 61.36 61.39 195.38 195.95 0.45 0.57

Marter 1628 Apr 10% 78.7 1 78.66 69.26 69.45 195.38 196.73 1.14 1.35

Marter 1628 May 10% 68.7 0.94 73.28 68.49 68.67 195.38 196.65 1.07 1.27

Marter 1628 Jun 10% 25.2 0.55 45.42 64.48 64.57 195.38 196.23 0.70 0.85

Marter 1628 Jul 10% 15.5 0.42 36.69 63.19 63.25 195.38 196.09 0.58 0.71

Marter 1628 Aug 10% 8.81 0.3 28.9 62.01 62.04 195.38 195.97 0.47 0.59

Marter 1628 Sep 10% 9.14 0.31 29.34 62.08 62.12 195.38 195.98 0.47 0.6

Marter 1628 Oct 10% 18.1 0.46 39.24 63.57 63.64 195.38 196.13 0.62 0.75

Marter 1628 Nov 10% 20.6 0.5 41.53 63.91 63.98 195.38 196.17 0.65 0.79

Marter 1628 Dec 10% 15.4 0.42 36.58 63.18 63.23 195.38 196.09 0.58 0.71

Marter 1628 Jan 90% 3.02 0.15 19.49 56.07 56.09 195.38 195.81 0.35 0.43

Page 55: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 1628 Feb 90% 2.52 0.14 18.45 55.32 55.34 195.38 195.79 0.33 0.41

Marter 1628 Mar 90% 2.55 0.14 18.52 55.37 55.39 195.38 195.79 0.33 0.41

Marter 1628 Apr 90% 4.3 0.2 21.91 57.75 57.78 195.38 195.85 0.38 0.47

Marter 1628 May 90% 14.5 0.41 35.64 63.04 63.09 195.38 196.08 0.57 0.7

Marter 1628 Jun 90% 6.49 0.25 25.55 60.21 60.24 195.38 195.92 0.42 0.54

Marter 1628 Jul 90% 2.86 0.15 19.17 55.83 55.85 195.38 195.81 0.34 0.43

Marter 1628 Aug 90% 1.86 0.11 16.97 54.24 54.26 195.38 195.77 0.31 0.39

Marter 1628 Sep 90% 1.86 0.11 16.97 54.24 54.26 195.38 195.77 0.31 0.39

Marter 1628 Oct 90% 2.59 0.14 18.6 55.43 55.45 195.38 195.79 0.34 0.41

Marter 1628 Nov 90% 5.9 0.24 24.61 59.58 59.61 195.38 195.9 0.41 0.52

Marter 1628 Dec 90% 4.32 0.2 21.95 57.78 57.8 195.38 195.85 0.38 0.47

Marter 106 1589 Jan 10% 7.14 1.22 5.84 38.87 38.87 195.64 195.82 0.15 0.18

Marter 106 1589 Feb 10% 5.1 1.11 4.59 36.96 36.97 195.64 195.78 0.12 0.14

Marter 106 1589 Mar 10% 7.76 1.24 6.23 39.44 39.45 195.64 195.83 0.16 0.19

Marter 106 1589 Apr 10% 78.7 2.45 32.1 53.28 53.56 195.64 196.35 0.60 0.71

Marter 106 1589 May 10% 68.7 2.34 29.33 53.19 53.4 195.64 196.29 0.55 0.65

Marter 106 1589 Jun 10% 25.2 1.71 14.77 50.37 50.38 195.64 196.02 0.29 0.38

Marter 106 1589 Jul 10% 15.5 1.51 10.27 44.94 44.95 195.64 195.92 0.23 0.28

Marter 106 1589 Aug 10% 8.81 1.3 6.8 40.26 40.26 195.64 195.84 0.17 0.2

Marter 106 1589 Sep 10% 9.14 1.31 6.98 40.51 40.52 195.64 195.85 0.17 0.21

Marter 106 1589 Oct 10% 18.1 1.57 11.56 46.56 46.57 195.64 195.95 0.25 0.31

Marter 106 1589 Nov 10% 20.6 1.62 12.71 47.96 47.97 195.64 195.98 0.27 0.34

Marter 106 1589 Dec 10% 15.4 1.5 10.24 44.9 44.91 195.64 195.92 0.23 0.28

Marter 106 1589 Jan 90% 3.02 0.95 3.19 34.72 34.72 195.64 195.75 0.09 0.11

Marter 106 1589 Feb 90% 2.52 0.9 2.8 34.07 34.07 195.64 195.73 0.08 0.09

Marter 106 1589 Mar 90% 2.55 0.9 2.82 34.1 34.1 195.64 195.73 0.08 0.09

Marter 106 1589 Apr 90% 4.3 1.05 4.08 36.16 36.16 195.64 195.77 0.11 0.13

Marter 106 1589 May 90% 14.5 1.48 9.79 44.32 44.33 195.64 195.91 0.22 0.27

Marter 106 1589 Jun 90% 6.49 1.2 5.42 38.23 38.24 195.64 195.81 0.14 0.17

Marter 106 1589 Jul 90% 2.86 0.93 3.07 34.51 34.52 195.64 195.74 0.09 0.1

Marter 106 1589 Aug 90% 1.86 0.82 2.27 33.16 33.16 195.64 195.72 0.07 0.08

Marter 106 1589 Sep 90% 1.86 0.82 2.27 33.16 33.16 195.64 195.72 0.07 0.08

Marter 106 1589 Oct 90% 2.59 0.91 2.86 34.16 34.16 195.64 195.74 0.08 0.1

Marter 106 1589 Nov 90% 5.9 1.15 5.12 37.77 37.78 195.64 195.8 0.14 0.16

Marter 106 1589 Dec 90% 4.32 1.06 4.08 36.17 36.17 195.64 195.77 0.11 0.13

Marter 1550 Jan 10% 7.14 0.29 25 38.3 38.4 194.23 195.03 0.65 0.8

Marter 1550 Feb 10% 5.1 0.23 22.19 37.56 37.64 194.23 194.96 0.59 0.73

Marter 1550 Mar 10% 7.76 0.3 25.78 38.48 38.58 194.23 195.05 0.67 0.82

Page 56: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������8��

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 1550 Apr 10% 78.7 1.07 73.65 44.44 45.08 194.23 196.19 1.66 1.96

Marter 1550 May 10% 68.7 1 68.67 44.09 44.67 194.23 196.07 1.56 1.84

Marter 1550 Jun 10% 25.2 0.6 42.15 41.98 42.2 194.23 195.46 1.00 1.23

Marter 1550 Jul 10% 15.5 0.45 34.07 40.29 40.45 194.23 195.26 0.85 1.03

Marter 1550 Aug 10% 8.81 0.33 27.06 38.76 38.88 194.23 195.09 0.70 0.86

Marter 1550 Sep 10% 9.14 0.33 27.45 38.85 38.97 194.23 195.1 0.71 0.87

Marter 1550 Oct 10% 18.1 0.5 36.36 40.77 40.96 194.23 195.32 0.89 1.09

Marter 1550 Nov 10% 20.6 0.54 38.49 41.22 41.42 194.23 195.37 0.93 1.14

Marter 1550 Dec 10% 15.4 0.45 33.98 40.27 40.43 194.23 195.26 0.84 1.03

Marter 1550 Jan 90% 3.02 0.16 18.86 36.54 36.6 194.23 194.87 0.52 0.64

Marter 1550 Feb 90% 2.52 0.14 17.92 36.25 36.31 194.23 194.84 0.49 0.61

Marter 1550 Mar 90% 2.55 0.14 18.01 36.27 36.34 194.23 194.85 0.50 0.62

Marter 1550 Apr 90% 4.3 0.2 20.98 37.19 37.26 194.23 194.93 0.56 0.7

Marter 1550 May 90% 14.5 0.44 33.11 40.08 40.24 194.23 195.24 0.83 1.01

Marter 1550 Jun 90% 6.49 0.27 24.14 38.11 38.2 194.23 195.01 0.63 0.78

Marter 1550 Jul 90% 2.86 0.15 18.57 36.45 36.51 194.23 194.86 0.51 0.63

Marter 1550 Aug 90% 1.86 0.11 16.62 35.84 35.9 194.23 194.81 0.46 0.58

Marter 1550 Sep 90% 1.86 0.11 16.62 35.84 35.9 194.23 194.81 0.46 0.58

Marter 1550 Oct 90% 2.59 0.14 18.08 36.3 36.36 194.23 194.85 0.50 0.62

Marter 1550 Nov 90% 5.9 0.25 23.34 37.9 37.99 194.23 194.99 0.62 0.76

Marter 1550 Dec 90% 4.32 0.21 21.01 37.2 37.27 194.23 194.93 0.56 0.7

Marter 107 1494 Jan 10% 7.14 0.19 37.96 46.72 47.06 194.03 195.03 0.81 1

Marter 107 1494 Feb 10% 5.1 0.15 34.57 46.25 46.54 194.03 194.96 0.75 0.93

Marter 107 1494 Mar 10% 7.76 0.2 38.91 46.85 47.2 194.03 195.05 0.83 1.02

Marter 107 1494 Apr 10% 78.7 0.82 96.36 54.44 55.93 194.03 196.17 1.77 2.14

Marter 107 1494 May 10% 68.7 0.76 90.27 53.79 55.24 194.03 196.06 1.68 2.03

Marter 107 1494 Jun 10% 25.2 0.43 58.45 50.22 51.27 194.03 195.45 1.16 1.42

Marter 107 1494 Jul 10% 15.5 0.32 48.84 48.84 49.54 194.03 195.26 1.00 1.23

Marter 107 1494 Aug 10% 8.81 0.22 40.43 47.16 47.54 194.03 195.08 0.86 1.05

Marter 107 1494 Sep 10% 9.14 0.22 40.9 47.26 47.67 194.03 195.09 0.87 1.06

Marter 107 1494 Oct 10% 18.1 0.35 51.58 49.26 50.06 194.03 195.31 1.05 1.28

Marter 107 1494 Nov 10% 20.6 0.38 54.11 49.63 50.52 194.03 195.36 1.09 1.33

Marter 107 1494 Dec 10% 15.4 0.32 48.73 48.82 49.51 194.03 195.25 1.00 1.22

Marter 107 1494 Jan 90% 3.02 0.1 30.49 45.67 45.9 194.03 194.87 0.67 0.84

Marter 107 1494 Feb 90% 2.52 0.09 29.33 45.5 45.71 194.03 194.84 0.64 0.81

Marter 107 1494 Mar 90% 2.55 0.09 29.44 45.51 45.73 194.03 194.84 0.65 0.81

Marter 107 1494 Apr 90% 4.3 0.13 33.09 46.04 46.3 194.03 194.92 0.72 0.89

Marter 107 1494 May 90% 14.5 0.3 47.7 48.64 49.29 194.03 195.23 0.98 1.2

Marter 107 1494 Jun 90% 6.49 0.18 36.93 46.58 46.9 194.03 195.01 0.79 0.98

Page 57: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 107 1494 Jul 90% 2.86 0.09 30.13 45.61 45.84 194.03 194.86 0.66 0.83

Marter 107 1494 Aug 90% 1.86 0.07 27.71 45.27 45.46 194.03 194.81 0.61 0.78

Marter 107 1494 Sep 90% 1.86 0.07 27.71 45.27 45.46 194.03 194.81 0.61 0.78

Marter 107 1494 Oct 90% 2.59 0.09 29.52 45.53 45.74 194.03 194.85 0.65 0.82

Marter 107 1494 Nov 90% 5.9 0.16 35.96 46.44 46.75 194.03 194.99 0.77 0.96

Marter 107 1494 Dec 90% 4.32 0.13 33.13 46.04 46.31 194.03 194.92 0.72 0.89

Marter 1429 Jan 10% 7.14 0.58 12.28 24.54 24.74 194.25 195 0.50 0.75

Marter 1429 Feb 10% 5.1 0.48 10.72 23.91 24.1 194.25 194.94 0.45 0.69

Marter 1429 Mar 10% 7.76 0.61 12.72 24.67 24.88 194.25 195.02 0.52 0.77

Marter 1429 Apr 10% 78.7 2.12 37.16 30.13 30.65 194.25 195.9 1.23 1.65

Marter 1429 May 10% 68.7 1.98 34.72 29.77 30.26 194.25 195.82 1.17 1.57

Marter 1429 Jun 10% 25.2 1.18 21.35 27.24 27.54 194.25 195.35 0.78 1.1

Marter 1429 Jul 10% 15.5 0.9 17.19 26.03 26.29 194.25 195.2 0.66 0.95

Marter 1429 Aug 10% 8.81 0.66 13.41 24.89 25.1 194.25 195.05 0.54 0.8

Marter 1429 Sep 10% 9.14 0.67 13.63 24.95 25.17 194.25 195.06 0.55 0.81

Marter 1429 Oct 10% 18.1 0.98 18.38 26.38 26.65 194.25 195.24 0.70 0.99

Marter 1429 Nov 10% 20.6 1.06 19.48 26.7 26.98 194.25 195.28 0.73 1.03

Marter 1429 Dec 10% 15.4 0.9 17.14 26.02 26.27 194.25 195.19 0.66 0.94

Marter 1429 Jan 90% 3.02 0.34 8.83 23.08 23.25 194.25 194.86 0.38 0.61

Marter 1429 Feb 90% 2.52 0.3 8.3 22.92 23.08 194.25 194.83 0.36 0.58

Marter 1429 Mar 90% 2.55 0.31 8.35 22.94 23.1 194.25 194.84 0.36 0.59

Marter 1429 Apr 90% 4.3 0.43 10.03 23.54 23.72 194.25 194.91 0.43 0.66

Marter 1429 May 90% 14.5 0.87 16.68 25.88 26.13 194.25 195.18 0.64 0.93

Marter 1429 Jun 90% 6.49 0.55 11.81 24.39 24.58 194.25 194.98 0.48 0.73

Marter 1429 Jul 90% 2.86 0.33 8.67 23.03 23.2 194.25 194.85 0.38 0.6

Marter 1429 Aug 90% 1.86 0.25 7.54 22.7 22.85 194.25 194.8 0.33 0.55

Marter 1429 Sep 90% 1.86 0.25 7.54 22.7 22.85 194.25 194.8 0.33 0.55

Marter 1429 Oct 90% 2.59 0.31 8.39 22.95 23.11 194.25 194.84 0.37 0.59

Marter 1429 Nov 90% 5.9 0.52 11.36 24.21 24.4 194.25 194.96 0.47 0.71

Marter 1429 Dec 90% 4.32 0.43 10.05 23.55 23.73 194.25 194.91 0.43 0.66

Marter 108 1411 Jan 10% 7.14 1.4 5.08 26.11 26.32 194.51 194.86 0.19 0.35

Marter 108 1411 Feb 10% 5.1 1.27 4.01 25.49 25.66 194.51 194.82 0.16 0.31

Marter 108 1411 Mar 10% 7.76 1.44 5.39 26.29 26.51 194.51 194.87 0.21 0.36

Marter 108 1411 Apr 10% 78.7 2.84 27.72 34.27 34.86 194.51 195.58 0.81 1.07

Marter 108 1411 May 10% 68.7 2.73 25.18 33.74 34.3 194.51 195.5 0.75 0.99

Marter 108 1411 Jun 10% 25.2 1.99 12.63 31.91 32.29 194.51 195.12 0.40 0.61

Marter 108 1411 Jul 10% 15.5 1.71 9.07 31.43 31.75 194.51 195 0.29 0.49

Marter 108 1411 Aug 10% 8.81 1.49 5.92 26.57 26.8 194.51 194.89 0.22 0.38

Page 58: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 108 1411 Sep 10% 9.14 1.51 6.07 26.65 26.88 194.51 194.9 0.23 0.39

Marter 108 1411 Oct 10% 18.1 1.79 10.13 31.58 31.92 194.51 195.04 0.32 0.53

Marter 108 1411 Nov 10% 20.6 1.87 11.01 31.7 32.05 194.51 195.07 0.35 0.56

Marter 108 1411 Dec 10% 15.4 1.7 9.03 31.43 31.74 194.51 195 0.29 0.49

Marter 108 1411 Jan 90% 3.02 1.08 2.78 24.74 24.88 194.51 194.77 0.11 0.26

Marter 108 1411 Feb 90% 2.52 0.99 2.54 24.59 24.72 194.51 194.76 0.10 0.25

Marter 108 1411 Mar 90% 2.55 1.04 2.45 24.54 24.67 194.51 194.76 0.10 0.25

Marter 108 1411 Apr 90% 4.3 1.2 3.57 25.22 25.38 194.51 194.8 0.14 0.29

Marter 108 1411 May 90% 14.5 1.67 8.67 30.12 30.43 194.51 194.99 0.29 0.48

Marter 108 1411 Jun 90% 6.49 1.36 4.76 25.92 26.12 194.51 194.85 0.18 0.34

Marter 108 1411 Jul 90% 2.86 1.06 2.69 24.69 24.82 194.51 194.77 0.11 0.26

Marter 108 1411 Aug 90% 1.86 0.89 2.09 24.31 24.43 194.51 194.74 0.09 0.23

Marter 108 1411 Sep 90% 1.86 0.89 2.09 24.31 24.43 194.51 194.74 0.09 0.23

Marter 108 1411 Oct 90% 2.59 1.04 2.5 24.57 24.7 194.51 194.76 0.10 0.25

Marter 108 1411 Nov 90% 5.9 1.33 4.45 25.74 25.93 194.51 194.84 0.17 0.33

Marter 108 1411 Dec 90% 4.32 1.21 3.58 25.23 25.39 194.51 194.8 0.14 0.29

Marter 1358 Jan 10% 7.14 0.18 39.68 46.92 47.06 192.68 193.7 0.85 1.02

Marter 1358 Feb 10% 5.1 0.15 33.32 44.78 44.9 192.68 193.56 0.74 0.88

Marter 1358 Mar 10% 7.76 0.19 41.52 47.52 47.67 192.68 193.73 0.87 1.05

Marter 1358 Apr 10% 78.7 0.49 161.62 69.66 70.32 192.68 195.75 2.32 3.07

Marter 1358 May 10% 68.7 0.46 148.39 68.68 69.27 192.68 195.56 2.16 2.88

Marter 1358 Jun 10% 25.2 0.31 80.86 56.29 56.59 192.68 194.48 1.44 1.8

Marter 1358 Jul 10% 15.5 0.25 61.73 53.14 53.36 192.68 194.13 1.16 1.45

Marter 1358 Aug 10% 8.81 0.2 44.55 48.49 48.65 192.68 193.8 0.92 1.12

Marter 1358 Sep 10% 9.14 0.2 45.48 48.79 48.95 192.68 193.82 0.93 1.14

Marter 1358 Oct 10% 18.1 0.27 67.46 54.1 54.34 192.68 194.24 1.25 1.56

Marter 1358 Nov 10% 20.6 0.28 72.5 54.94 55.2 192.68 194.33 1.32 1.65

Marter 1358 Dec 10% 15.4 0.25 61.5 53.1 53.32 192.68 194.13 1.16 1.45

Marter 1358 Jan 90% 3.02 0.12 25.87 42.13 42.23 192.68 193.39 0.61 0.71

Marter 1358 Feb 90% 2.52 0.11 23.85 41.38 41.47 192.68 193.34 0.58 0.66

Marter 1358 Mar 90% 2.55 0.11 23.97 41.43 41.52 192.68 193.34 0.58 0.66

Marter 1358 Apr 90% 4.3 0.14 30.61 43.83 43.94 192.68 193.5 0.70 0.82

Marter 1358 May 90% 14.5 0.24 59.37 52.74 52.95 192.68 194.09 1.13 1.41

Marter 1358 Jun 90% 6.49 0.17 37.72 46.27 46.41 192.68 193.65 0.82 0.97

Marter 1358 Jul 90% 2.86 0.11 25.24 41.9 41.99 192.68 193.37 0.60 0.69

Marter 1358 Aug 90% 1.86 0.09 20.96 40.29 40.37 192.68 193.27 0.52 0.59

Marter 1358 Sep 90% 1.86 0.09 20.96 40.29 40.37 192.68 193.27 0.52 0.59

Marter 1358 Oct 90% 2.59 0.11 24.14 41.49 41.58 192.68 193.34 0.58 0.66

Marter 1358 Nov 90% 5.9 0.16 35.89 45.65 45.78 192.68 193.61 0.79 0.93

Page 59: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 1358 Dec 90% 4.32 0.14 30.68 43.86 43.97 192.68 193.5 0.70 0.82

Marter 109 1324 Jan 10% 7.14 0.23 30.86 43.74 44.34 192.48 193.69 0.71 1.21

Marter 109 1324 Feb 10% 5.1 0.2 24.93 42.12 42.69 192.48 193.55 0.59 1.07

Marter 109 1324 Mar 10% 7.76 0.24 32.56 44.34 44.95 192.48 193.73 0.73 1.25

Marter 109 1324 Apr 10% 78.7 0.57 138.96 64.38 65.47 192.48 195.74 2.16 3.26

Marter 109 1324 May 10% 68.7 0.54 126.88 62.03 63.09 192.48 195.55 2.05 3.07

Marter 109 1324 Jun 10% 25.2 0.37 67.3 49.14 50.01 192.48 194.48 1.37 2

Marter 109 1324 Jul 10% 15.5 0.31 50.68 46.49 47.25 192.48 194.13 1.09 1.65

Marter 109 1324 Aug 10% 8.81 0.25 35.37 44.84 45.47 192.48 193.79 0.79 1.31

Marter 109 1324 Sep 10% 9.14 0.25 36.23 44.96 45.6 192.48 193.81 0.81 1.33

Marter 109 1324 Oct 10% 18.1 0.33 55.68 47.18 47.98 192.48 194.24 1.18 1.76

Marter 109 1324 Nov 10% 20.6 0.34 60.06 47.77 48.6 192.48 194.33 1.26 1.85

Marter 109 1324 Dec 10% 15.4 0.31 50.48 46.46 47.22 192.48 194.12 1.09 1.64

Marter 109 1324 Jan 90% 3.02 0.17 18.02 39.67 40.18 192.48 193.38 0.45 0.9

Marter 109 1324 Feb 90% 2.52 0.16 16.13 38.92 39.4 192.48 193.33 0.41 0.85

Marter 109 1324 Mar 90% 2.55 0.16 16.24 38.97 39.45 192.48 193.34 0.42 0.86

Marter 109 1324 Apr 90% 4.3 0.19 22.41 40.19 40.74 192.48 193.49 0.56 1.01

Marter 109 1324 May 90% 14.5 0.3 48.63 46.25 47 192.48 194.08 1.05 1.6

Marter 109 1324 Jun 90% 6.49 0.22 29.03 43.07 43.67 192.48 193.65 0.67 1.17

Marter 109 1324 Jul 90% 2.86 0.16 17.43 39.46 39.95 192.48 193.37 0.44 0.89

Marter 109 1324 Aug 90% 1.86 0.14 13.45 36.51 36.93 192.48 193.26 0.37 0.78

Marter 109 1324 Sep 90% 1.86 0.14 13.45 36.51 36.93 192.48 193.26 0.37 0.78

Marter 109 1324 Oct 90% 2.59 0.16 16.4 39.04 39.52 192.48 193.34 0.42 0.86

Marter 109 1324 Nov 90% 5.9 0.22 27.33 42.51 43.1 192.48 193.61 0.64 1.13

Marter 109 1324 Dec 90% 4.32 0.19 22.47 40.19 40.74 192.48 193.49 0.56 1.01

Marter 976 Jan 10% 7.14 0.19 38.35 27.84 28.3 191.71 193.68 1.38 1.97

Marter 976 Feb 10% 5.1 0.15 34.69 26.72 27.15 191.71 193.54 1.30 1.83

Marter 976 Mar 10% 7.76 0.2 39.41 28.15 28.62 191.71 193.71 1.40 2

Marter 976 Apr 10% 78.7 0.74 107.05 41.16 42.28 191.71 195.67 2.60 3.96

Marter 976 May 10% 68.7 0.69 99.45 40.13 41.18 191.71 195.48 2.48 3.77

Marter 976 Jun 10% 25.2 0.41 61.81 33 33.71 191.71 194.44 1.87 2.73

Marter 976 Jul 10% 15.5 0.3 50.96 31.07 31.65 191.71 194.1 1.64 2.39

Marter 976 Aug 10% 8.81 0.21 41.15 28.66 29.15 191.71 193.77 1.44 2.06

Marter 976 Sep 10% 9.14 0.22 41.68 28.81 29.31 191.71 193.79 1.45 2.08

Marter 976 Oct 10% 18.1 0.33 54.22 31.66 32.28 191.71 194.21 1.71 2.5

Marter 976 Nov 10% 20.6 0.36 57.09 32.17 32.83 191.71 194.3 1.77 2.59

Marter 976 Dec 10% 15.4 0.3 50.83 31.04 31.62 191.71 194.1 1.64 2.39

Marter 976 Jan 90% 3.02 0.1 30.38 25.34 25.73 191.71 193.38 1.20 1.67

Page 60: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 976 Feb 90% 2.52 0.09 29.2 24.95 25.33 191.71 193.33 1.17 1.62

Marter 976 Mar 90% 2.55 0.09 29.27 24.97 25.36 191.71 193.33 1.17 1.62

Marter 976 Apr 90% 4.3 0.13 33.13 26.23 26.65 191.71 193.48 1.26 1.77

Marter 976 May 90% 14.5 0.29 49.62 30.82 31.39 191.71 194.06 1.61 2.35

Marter 976 Jun 90% 6.49 0.17 37.23 27.5 27.95 191.71 193.63 1.35 1.92

Marter 976 Jul 90% 2.86 0.1 30.01 25.22 25.61 191.71 193.36 1.19 1.65

Marter 976 Aug 90% 1.86 0.07 27.51 24.38 24.75 191.71 193.26 1.13 1.55

Marter 976 Sep 90% 1.86 0.07 27.51 24.38 24.75 191.71 193.26 1.13 1.55

Marter 976 Oct 90% 2.59 0.09 29.37 25.01 25.39 191.71 193.34 1.17 1.63

Marter 976 Nov 90% 5.9 0.16 36.17 27.18 27.62 191.71 193.6 1.33 1.89

Marter 976 Dec 90% 4.32 0.13 33.17 26.24 26.66 191.71 193.48 1.26 1.77

Marter 864 Jan 10% 7.14 0.14 52.28 28.05 28.9 191.12 193.67 1.86 2.55

Marter 864 Feb 10% 5.1 0.1 48.57 27.27 28.08 191.12 193.54 1.78 2.42

Marter 864 Mar 10% 7.76 0.15 53.33 28.27 29.13 191.12 193.71 1.89 2.59

Marter 864 Apr 10% 78.7 0.67 117.8 38.12 39.82 191.12 195.66 3.09 4.54

Marter 864 May 10% 68.7 0.62 110.85 36.93 38.57 191.12 195.47 3.00 4.35

Marter 864 Jun 10% 25.2 0.33 75.31 32.47 33.59 191.12 194.44 2.32 3.32

Marter 864 Jul 10% 15.5 0.24 64.71 30.52 31.52 191.12 194.1 2.12 2.98

Marter 864 Aug 10% 8.81 0.16 55.07 28.62 29.51 191.12 193.77 1.92 2.65

Marter 864 Sep 10% 9.14 0.16 55.6 28.73 29.62 191.12 193.79 1.94 2.67

Marter 864 Oct 10% 18.1 0.27 67.9 31.12 32.15 191.12 194.2 2.18 3.08

Marter 864 Nov 10% 20.6 0.29 70.7 31.64 32.7 191.12 194.29 2.23 3.17

Marter 864 Dec 10% 15.4 0.24 64.58 30.49 31.49 191.12 194.09 2.12 2.97

Marter 864 Jan 90% 3.02 0.07 44.14 26.31 27.06 191.12 193.38 1.68 2.26

Marter 864 Feb 90% 2.52 0.06 42.92 26.04 26.77 191.12 193.33 1.65 2.21

Marter 864 Mar 90% 2.55 0.06 43 26.05 26.79 191.12 193.33 1.65 2.21

Marter 864 Apr 90% 4.3 0.09 46.98 26.93 27.72 191.12 193.48 1.74 2.36

Marter 864 May 90% 14.5 0.23 63.4 30.27 31.25 191.12 194.06 2.09 2.94

Marter 864 Jun 90% 6.49 0.13 51.14 27.81 28.65 191.12 193.63 1.84 2.51

Marter 864 Jul 90% 2.86 0.07 43.76 26.22 26.97 191.12 193.36 1.67 2.24

Marter 864 Aug 90% 1.86 0.05 41.16 25.64 26.35 191.12 193.26 1.61 2.14

Marter 864 Sep 90% 1.86 0.05 41.16 25.64 26.35 191.12 193.26 1.61 2.14

Marter 864 Oct 90% 2.59 0.06 43.1 26.08 26.82 191.12 193.34 1.65 2.22

Marter 864 Nov 90% 5.9 0.12 50.08 27.59 28.42 191.12 193.6 1.82 2.48

Marter 864 Dec 90% 4.32 0.09 47.02 26.94 27.73 191.12 193.48 1.75 2.36

Marter 705 Jan 10% 7.14 0.11 65.45 33.07 33.88 190.86 193.67 1.98 2.81

Marter 705 Feb 10% 5.1 0.08 61.1 32.17 32.94 190.86 193.54 1.90 2.68

Marter 705 Mar 10% 7.76 0.12 66.69 33.32 34.14 190.86 193.71 2.00 2.85

Page 61: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 705 Apr 10% 78.7 0.56 140.06 43.39 44.99 190.86 195.64 3.23 4.78

Marter 705 May 10% 68.7 0.52 132.2 41.99 43.54 190.86 195.46 3.15 4.6

Marter 705 Jun 10% 25.2 0.27 92.09 36.63 37.77 190.86 194.43 2.51 3.57

Marter 705 Jul 10% 15.5 0.19 80.01 35.47 36.43 190.86 194.1 2.26 3.24

Marter 705 Aug 10% 8.81 0.13 68.73 33.73 34.57 190.86 193.77 2.04 2.91

Marter 705 Sep 10% 9.14 0.13 69.36 33.86 34.7 190.86 193.79 2.05 2.93

Marter 705 Oct 10% 18.1 0.22 83.69 35.83 36.84 190.86 194.2 2.34 3.34

Marter 705 Nov 10% 20.6 0.24 86.88 36.13 37.2 190.86 194.29 2.40 3.43

Marter 705 Dec 10% 15.4 0.19 79.87 35.45 36.42 190.86 194.09 2.25 3.23

Marter 705 Jan 90% 3.02 0.05 55.88 31.06 31.78 190.86 193.37 1.80 2.51

Marter 705 Feb 90% 2.52 0.05 54.44 30.75 31.45 190.86 193.33 1.77 2.47

Marter 705 Mar 90% 2.55 0.05 54.53 30.77 31.47 190.86 193.33 1.77 2.47

Marter 705 Apr 90% 4.3 0.07 59.22 31.78 32.53 190.86 193.48 1.86 2.62

Marter 705 May 90% 14.5 0.18 78.5 35.32 36.26 190.86 194.05 2.22 3.19

Marter 705 Jun 90% 6.49 0.1 64.12 32.8 33.59 190.86 193.63 1.95 2.77

Marter 705 Jul 90% 2.86 0.05 55.43 30.96 31.68 190.86 193.36 1.79 2.5

Marter 705 Aug 90% 1.86 0.04 52.36 30.29 30.97 190.86 193.26 1.73 2.4

Marter 705 Sep 90% 1.86 0.04 52.36 30.29 30.97 190.86 193.26 1.73 2.4

Marter 705 Oct 90% 2.59 0.05 54.65 30.79 31.5 190.86 193.33 1.77 2.47

Marter 705 Nov 90% 5.9 0.09 62.87 32.54 33.32 190.86 193.59 1.93 2.73

Marter 705 Dec 90% 4.32 0.07 59.27 31.79 32.54 190.86 193.48 1.86 2.62

Marter -3 497 Jan 10% 7.14 0.14 50.48 34.06 35.34 191.38 193.67 1.48 2.29

Marter -3 497 Feb 10% 5.1 0.11 45.98 33.53 34.74 191.38 193.54 1.37 2.16

Marter -3 497 Mar 10% 7.76 0.15 51.75 34.25 35.55 191.38 193.71 1.51 2.33

Marter -3 497 Apr 10% 78.7 0.63 124.51 43.87 46.34 191.38 195.63 2.84 4.25

Marter -3 497 May 10% 68.7 0.59 116.76 41.28 43.67 191.38 195.45 2.83 4.07

Marter -3 497 Jun 10% 25.2 0.33 77.24 36.53 38.39 191.38 194.43 2.11 3.05

Marter -3 497 Jul 10% 15.5 0.24 65.22 35.64 37.21 191.38 194.09 1.83 2.71

Marter -3 497 Aug 10% 8.81 0.16 53.84 34.56 35.88 191.38 193.77 1.56 2.39

Marter -3 497 Sep 10% 9.14 0.17 54.48 34.65 35.98 191.38 193.79 1.57 2.41

Marter -3 497 Oct 10% 18.1 0.26 68.89 35.91 37.58 191.38 194.2 1.92 2.82

Marter -3 497 Nov 10% 20.6 0.29 72.07 36.15 37.89 191.38 194.28 1.99 2.9

Marter -3 497 Dec 10% 15.4 0.24 65.07 35.63 37.2 191.38 194.09 1.83 2.71

Marter -3 497 Jan 90% 3.02 0.07 40.51 33.05 34.16 191.38 193.37 1.23 1.99

Marter -3 497 Feb 90% 2.52 0.06 38.97 32.92 34 191.38 193.33 1.18 1.95

Marter -3 497 Mar 90% 2.55 0.07 39.06 32.93 34.01 191.38 193.33 1.19 1.95

Marter -3 497 Apr 90% 4.3 0.1 44.02 33.36 34.54 191.38 193.48 1.32 2.1

Marter -3 497 May 90% 14.5 0.23 63.7 35.53 37.06 191.38 194.05 1.79 2.67

Marter -3 497 Jun 90% 6.49 0.13 49.11 33.85 35.12 191.38 193.63 1.45 2.25

Page 62: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -3 497 Jul 90% 2.86 0.07 40.03 33.01 34.11 191.38 193.36 1.21 1.98

Marter -3 497 Aug 90% 1.86 0.05 36.73 32.68 33.72 191.38 193.26 1.12 1.88

Marter -3 497 Sep 90% 1.86 0.05 36.73 32.68 33.72 191.38 193.26 1.12 1.88

Marter -3 497 Oct 90% 2.59 0.07 39.19 32.94 34.02 191.38 193.33 1.19 1.95

Marter -3 497 Nov 90% 5.9 0.12 47.82 33.68 34.94 191.38 193.59 1.42 2.21

Marter -3 497 Dec 90% 4.32 0.1 44.07 33.36 34.54 191.38 193.48 1.32 2.1

Marter -2 294 Jan 10% 7.14 0.16 43.98 27.32 28.42 190.72 193.67 1.61 2.95

Marter -2 294 Feb 10% 5.1 0.13 40.39 27.06 28.04 190.72 193.54 1.49 2.82

Marter -2 294 Mar 10% 7.76 0.17 44.98 27.38 28.52 190.72 193.71 1.64 2.99

Marter -2 294 Apr 10% 78.7 0.76 103.65 37.54 39.76 190.72 195.59 2.76 4.87

Marter -2 294 May 10% 68.7 0.71 97.11 35.54 37.67 190.72 195.41 2.73 4.69

Marter -2 294 Jun 10% 25.2 0.39 64.95 29.53 31.17 190.72 194.41 2.20 3.69

Marter -2 294 Jul 10% 15.5 0.28 55.51 28.16 29.64 190.72 194.09 1.97 3.37

Marter -2 294 Aug 10% 8.81 0.19 46.63 27.48 28.68 190.72 193.77 1.70 3.05

Marter -2 294 Sep 10% 9.14 0.19 47.13 27.52 28.73 190.72 193.78 1.71 3.06

Marter -2 294 Oct 10% 18.1 0.31 58.38 28.58 30.11 190.72 194.19 2.04 3.47

Marter -2 294 Nov 10% 20.6 0.34 60.87 28.94 30.51 190.72 194.27 2.10 3.55

Marter -2 294 Dec 10% 15.4 0.28 55.4 28.14 29.62 190.72 194.08 1.97 3.36

Marter -2 294 Jan 90% 3.02 0.08 36 26.72 27.55 190.72 193.37 1.35 2.65

Marter -2 294 Feb 90% 2.52 0.07 34.76 26.62 27.41 190.72 193.33 1.31 2.61

Marter -2 294 Mar 90% 2.55 0.07 34.84 26.63 27.42 190.72 193.33 1.31 2.61

Marter -2 294 Apr 90% 4.3 0.11 38.82 26.93 27.87 190.72 193.48 1.44 2.76

Marter -2 294 May 90% 14.5 0.27 54.33 28.02 29.47 190.72 194.04 1.94 3.32

Marter -2 294 Jun 90% 6.49 0.15 42.89 27.25 28.32 190.72 193.63 1.57 2.91

Marter -2 294 Jul 90% 2.86 0.08 35.61 26.69 27.51 190.72 193.36 1.33 2.64

Marter -2 294 Aug 90% 1.86 0.06 32.96 26.48 27.21 190.72 193.26 1.24 2.54

Marter -2 294 Sep 90% 1.86 0.06 32.96 26.48 27.21 190.72 193.26 1.24 2.54

Marter -2 294 Oct 90% 2.59 0.07 34.94 26.63 27.43 190.72 193.33 1.31 2.61

Marter -2 294 Nov 90% 5.9 0.14 41.86 27.17 28.2 190.72 193.59 1.54 2.87

Marter -2 294 Dec 90% 4.32 0.11 38.86 26.94 27.87 190.72 193.48 1.44 2.76

Marter -1 112 Jan 10% 7.14 0.14 51.06 33.83 34.88 191.5 193.67 1.51 2.17

Marter -1 112 Feb 10% 5.1 0.11 46.65 33.37 34.34 191.5 193.53 1.40 2.03

Marter -1 112 Mar 10% 7.76 0.15 52.3 33.94 35.02 191.5 193.7 1.54 2.2

Marter -1 112 Apr 10% 78.7 0.65 120.4 40.4 42.75 191.5 195.57 2.98 4.07

Marter -1 112 May 10% 68.7 0.61 113.31 39.46 41.74 191.5 195.39 2.87 3.89

Marter -1 112 Jun 10% 25.2 0.33 76.64 35.33 37.07 191.5 194.4 2.17 2.9

Marter -1 112 Jul 10% 15.5 0.24 65.28 34.79 36.21 191.5 194.08 1.88 2.58

Marter -1 112 Aug 10% 8.81 0.16 54.33 34.12 35.25 191.5 193.76 1.59 2.26

Page 63: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -1 112 Sep 10% 9.14 0.17 54.95 34.18 35.32 191.5 193.78 1.61 2.28

Marter -1 112 Oct 10% 18.1 0.26 68.77 34.96 36.48 191.5 194.18 1.97 2.68

Marter -1 112 Nov 10% 20.6 0.29 71.78 35.1 36.7 191.5 194.27 2.05 2.77

Marter -1 112 Dec 10% 15.4 0.24 65.14 34.79 36.2 191.5 194.08 1.87 2.58

Marter -1 112 Jan 90% 3.02 0.07 41.28 32.79 33.68 191.5 193.37 1.26 1.87

Marter -1 112 Feb 90% 2.52 0.06 39.77 32.61 33.47 191.5 193.33 1.22 1.83

Marter -1 112 Mar 90% 2.55 0.06 39.87 32.62 33.49 191.5 193.33 1.22 1.83

Marter -1 112 Apr 90% 4.3 0.1 44.73 33.16 34.11 191.5 193.48 1.35 1.98

Marter -1 112 May 90% 14.5 0.23 63.82 34.72 36.1 191.5 194.04 1.84 2.54

Marter -1 112 Jun 90% 6.49 0.13 49.72 33.69 34.72 191.5 193.63 1.48 2.13

Marter -1 112 Jul 90% 2.86 0.07 40.81 32.74 33.62 191.5 193.36 1.25 1.86

Marter -1 112 Aug 90% 1.86 0.05 37.58 32.33 33.16 191.5 193.26 1.16 1.76

Marter -1 112 Sep 90% 1.86 0.05 37.58 32.33 33.16 191.5 193.26 1.16 1.76

Marter -1 112 Oct 90% 2.59 0.06 39.99 32.64 33.5 191.5 193.33 1.23 1.83

Marter -1 112 Nov 90% 5.9 0.12 48.46 33.56 34.56 191.5 193.59 1.44 2.09

Marter -1 112 Dec 90% 4.32 0.1 44.78 33.17 34.11 191.5 193.48 1.35 1.98

Marter 94 Jan 10% 7.14 0.13 53.53 31.22 31.91 191.41 193.67 1.71 2.26

Marter 94 Feb 10% 5.1 0.1 49.49 30.49 31.13 191.41 193.53 1.62 2.12

Marter 94 Mar 10% 7.76 0.14 54.68 31.43 32.12 191.41 193.7 1.74 2.29

Marter 94 Apr 10% 78.7 0.65 120.76 39.08 40.78 191.41 195.57 3.09 4.16

Marter 94 May 10% 68.7 0.6 113.9 38.4 40 191.41 195.39 2.97 3.98

Marter 94 Jun 10% 25.2 0.32 77.92 34.63 35.67 191.41 194.4 2.25 2.99

Marter 94 Jul 10% 15.5 0.23 66.91 33.38 34.23 191.41 194.08 2.00 2.67

Marter 94 Aug 10% 8.81 0.16 56.56 31.76 32.48 191.41 193.76 1.78 2.35

Marter 94 Sep 10% 9.14 0.16 57.14 31.86 32.58 191.41 193.78 1.79 2.37

Marter 94 Oct 10% 18.1 0.26 70.27 33.77 34.68 191.41 194.18 2.08 2.77

Marter 94 Nov 10% 20.6 0.28 73.18 34.1 35.06 191.41 194.26 2.15 2.85

Marter 94 Dec 10% 15.4 0.23 66.77 33.37 34.22 191.41 194.07 2.00 2.66

Marter 94 Jan 90% 3.02 0.07 44.61 29.59 30.17 191.41 193.37 1.51 1.96

Marter 94 Feb 90% 2.52 0.06 43.25 29.34 29.9 191.41 193.33 1.47 1.92

Marter 94 Mar 90% 2.55 0.06 43.34 29.35 29.92 191.41 193.33 1.48 1.92

Marter 94 Apr 90% 4.3 0.09 47.74 30.17 30.79 191.41 193.48 1.58 2.07

Marter 94 May 90% 14.5 0.22 65.51 33.22 34.05 191.41 194.04 1.97 2.63

Marter 94 Jun 90% 6.49 0.12 52.3 31 31.67 191.41 193.63 1.69 2.22

Marter 94 Jul 90% 2.86 0.06 44.19 29.51 30.09 191.41 193.36 1.50 1.95

Marter 94 Aug 90% 1.86 0.05 41.28 28.96 29.5 191.41 193.26 1.43 1.85

Marter 94 Sep 90% 1.86 0.05 41.28 28.96 29.5 191.41 193.26 1.43 1.85

Marter 94 Oct 90% 2.59 0.06 43.45 29.37 29.94 191.41 193.33 1.48 1.92

Marter 94 Nov 90% 5.9 0.12 51.14 30.79 31.45 191.41 193.59 1.66 2.18

Page 64: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 94 Dec 90% 4.32 0.09 47.78 30.18 30.8 191.41 193.48 1.58 2.07

Marter 63 Jan 10% 7.14 0.13 53.31 28.4 29.25 191.23 193.67 1.88 2.44

Marter 63 Feb 10% 5.1 0.1 49.63 27.83 28.62 191.23 193.53 1.78 2.3

Marter 63 Mar 10% 7.76 0.14 54.35 28.56 29.42 191.23 193.7 1.90 2.47

Marter 63 Apr 10% 78.7 0.69 114.4 36.5 38.3 191.23 195.56 3.13 4.33

Marter 63 May 10% 68.7 0.64 108.13 35.12 36.84 191.23 195.38 3.08 4.15

Marter 63 Jun 10% 25.2 0.33 75.35 31.45 32.66 191.23 194.4 2.40 3.17

Marter 63 Jul 10% 15.5 0.24 65.4 30.17 31.2 191.23 194.08 2.17 2.85

Marter 63 Aug 10% 8.81 0.16 56.06 28.82 29.71 191.23 193.76 1.95 2.53

Marter 63 Sep 10% 9.14 0.16 56.58 28.9 29.79 191.23 193.78 1.96 2.55

Marter 63 Oct 10% 18.1 0.26 68.43 30.56 31.65 191.23 194.18 2.24 2.95

Marter 63 Nov 10% 20.6 0.29 71.07 30.9 32.04 191.23 194.26 2.30 3.03

Marter 63 Dec 10% 15.4 0.24 65.28 30.15 31.18 191.23 194.07 2.17 2.84

Marter 63 Jan 90% 3.02 0.07 45.17 27.13 27.84 191.23 193.37 1.66 2.14

Marter 63 Feb 90% 2.52 0.06 43.92 26.93 27.62 191.23 193.33 1.63 2.1

Marter 63 Mar 90% 2.55 0.06 44 26.94 27.63 191.23 193.33 1.63 2.1

Marter 63 Apr 90% 4.3 0.09 48.03 27.58 28.34 191.23 193.48 1.74 2.25

Marter 63 May 90% 14.5 0.23 64.15 30 31.01 191.23 194.04 2.14 2.81

Marter 63 Jun 90% 6.49 0.12 52.19 28.23 29.06 191.23 193.63 1.85 2.4

Marter 63 Jul 90% 2.86 0.06 44.78 27.07 27.77 191.23 193.36 1.65 2.13

Marter 63 Aug 90% 1.86 0.04 42.12 26.63 27.3 191.23 193.26 1.58 2.03

Marter 63 Sep 90% 1.86 0.04 42.12 26.63 27.3 191.23 193.26 1.58 2.03

Marter 63 Oct 90% 2.59 0.06 44.1 26.96 27.65 191.23 193.33 1.64 2.1

Marter 63 Nov 90% 5.9 0.12 51.13 28.07 28.88 191.23 193.59 1.82 2.36

Marter 63 Dec 90% 4.32 0.09 48.07 27.59 28.35 191.23 193.48 1.74 2.25

Marter 0 22 Jan 10% 7.14 0.13 53.03 26.57 28.16 191.06 193.66 2.00 2.6

Marter 0 22 Feb 10% 5.1 0.1 49.61 25.77 27.31 191.06 193.53 1.93 2.47

Marter 0 22 Mar 10% 7.76 0.14 54 26.8 28.4 191.06 193.7 2.01 2.64

Marter 0 22 Apr 10% 78.7 0.71 111.08 35.24 37.73 191.06 195.55 3.15 4.49

Marter 0 22 May 10% 68.7 0.65 104.98 34.29 36.72 191.06 195.38 3.06 4.32

Marter 0 22 Jun 10% 25.2 0.34 73.9 29.69 31.69 191.06 194.4 2.49 3.34

Marter 0 22 Jul 10% 15.5 0.24 64.48 28.83 30.61 191.06 194.08 2.24 3.02

Marter 0 22 Aug 10% 8.81 0.16 55.6 27.16 28.79 191.06 193.76 2.05 2.7

Marter 0 22 Sep 10% 9.14 0.16 56.1 27.27 28.91 191.06 193.78 2.06 2.72

Marter 0 22 Oct 10% 18.1 0.27 67.37 29.09 30.94 191.06 194.18 2.32 3.12

Marter 0 22 Nov 10% 20.6 0.29 69.86 29.32 31.23 191.06 194.26 2.38 3.2

Marter 0 22 Dec 10% 15.4 0.24 64.37 28.82 30.6 191.06 194.07 2.23 3.01

Marter 0 22 Jan 90% 3.02 0.07 45.47 25.3 26.71 191.06 193.37 1.80 2.31

Page 65: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 0 22 Feb 90% 2.52 0.06 44.31 25.21 26.58 191.06 193.33 1.76 2.27

Marter 0 22 Mar 90% 2.55 0.06 44.38 25.22 26.58 191.06 193.33 1.76 2.27

Marter 0 22 Apr 90% 4.3 0.09 48.13 25.51 27.01 191.06 193.48 1.89 2.42

Marter 0 22 May 90% 14.5 0.23 63.29 28.72 30.47 191.06 194.04 2.20 2.98

Marter 0 22 Jun 90% 6.49 0.12 51.98 26.33 27.9 191.06 193.63 1.97 2.57

Marter 0 22 Jul 90% 2.86 0.06 45.11 25.28 26.67 191.06 193.36 1.78 2.3

Marter 0 22 Aug 90% 1.86 0.04 42.61 25.08 26.38 191.06 193.26 1.70 2.2

Marter 0 22 Sep 90% 1.86 0.04 42.61 25.08 26.38 191.06 193.26 1.70 2.2

Marter 0 22 Oct 90% 2.59 0.06 44.48 25.22 26.6 191.06 193.33 1.76 2.27

Marter 0 22 Nov 90% 5.9 0.12 51 26.1 27.66 191.06 193.59 1.95 2.53

Marter 0 22 Dec 90% 4.32 0.09 48.17 25.52 27.02 191.06 193.48 1.89 2.42

Marter -6 Jan 10% 7.14 0.18 40.21 22.59 24.08 191 193.66 1.78 2.66

Marter -6 Feb 10% 5.1 0.14 37.29 22.13 23.55 191 193.53 1.69 2.53

Marter -6 Mar 10% 7.76 0.19 41.03 22.71 24.23 191 193.7 1.81 2.7

Marter -6 Apr 10% 78.7 0.89 88.54 29.31 31.9 191 195.53 3.02 4.53

Marter -6 May 10% 68.7 0.82 83.56 28.55 31.02 191 195.36 2.93 4.36

Marter -6 Jun 10% 25.2 0.44 57.61 25.17 27.07 191 194.39 2.29 3.39

Marter -6 Jul 10% 15.5 0.31 49.76 24.02 25.75 191 194.07 2.07 3.07

Marter -6 Aug 10% 8.81 0.21 42.38 22.92 24.47 191 193.76 1.85 2.76

Marter -6 Sep 10% 9.14 0.21 42.79 22.98 24.54 191 193.78 1.86 2.78

Marter -6 Oct 10% 18.1 0.35 52.15 24.38 26.16 191 194.17 2.14 3.17

Marter -6 Nov 10% 20.6 0.38 54.23 24.68 26.51 191 194.26 2.20 3.26

Marter -6 Dec 10% 15.4 0.31 49.66 24.01 25.74 191 194.07 2.07 3.07

Marter -6 Jan 90% 3.02 0.09 33.75 21.73 23.03 191 193.37 1.55 2.37

Marter -6 Feb 90% 2.52 0.08 32.75 21.62 22.89 191 193.33 1.51 2.33

Marter -6 Mar 90% 2.55 0.08 32.81 21.63 22.9 191 193.33 1.52 2.33

Marter -6 Apr 90% 4.3 0.12 36.03 21.96 23.34 191 193.48 1.64 2.48

Marter -6 May 90% 14.5 0.3 48.77 23.88 25.58 191 194.03 2.04 3.03

Marter -6 Jun 90% 6.49 0.17 39.32 22.45 23.92 191 193.62 1.75 2.62

Marter -6 Jul 90% 2.86 0.09 33.44 21.69 22.99 191 193.36 1.54 2.36

Marter -6 Aug 90% 1.86 0.06 31.3 21.47 22.69 191 193.26 1.46 2.26

Marter -6 Sep 90% 1.86 0.06 31.3 21.47 22.69 191 193.26 1.46 2.26

Marter -6 Oct 90% 2.59 0.08 32.9 21.64 22.91 191 193.33 1.52 2.33

Marter -6 Nov 90% 5.9 0.15 38.48 22.32 23.77 191 193.59 1.72 2.59

Marter -6 Dec 90% 4.32 0.12 36.06 21.96 23.35 191 193.48 1.64 2.48

Marter -35 Jan 10% 7.14 1.92 3.72 8.72 8.89 192.93 193.46 0.43 0.53

Marter -35 Feb 10% 5.1 1.82 2.8 8.03 8.16 192.93 193.35 0.35 0.42

Marter -35 Mar 10% 7.76 1.93 4.02 8.94 9.11 192.93 193.49 0.45 0.56

Page 66: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

��������8��

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -35 Apr 10% 78.7 3.6 21.89 16.71 17.37 192.93 194.83 1.31 1.9

Marter -35 May 10% 68.7 3.47 19.79 16.16 16.77 192.93 194.7 1.22 1.77

Marter -35 Jun 10% 25.2 2.38 10.59 13.25 13.59 192.93 194.08 0.80 1.15

Marter -35 Jul 10% 15.5 2.02 7.68 11.69 11.96 192.93 193.85 0.66 0.92

Marter -35 Aug 10% 8.81 1.94 4.55 9.38 9.57 192.93 193.55 0.49 0.62

Marter -35 Sep 10% 9.14 1.94 4.72 9.52 9.72 192.93 193.57 0.50 0.64

Marter -35 Oct 10% 18.1 2.08 8.71 12.34 12.63 192.93 193.93 0.71 1

Marter -35 Nov 10% 20.6 2.16 9.54 12.85 13.16 192.93 194 0.74 1.07

Marter -35 Dec 10% 15.4 2.02 7.64 11.66 11.93 192.93 193.84 0.66 0.91

Marter -35 Jan 90% 3.02 1.6 1.88 7.27 7.36 192.93 193.23 0.26 0.3

Marter -35 Feb 90% 2.52 1.52 1.65 7.07 7.15 192.93 193.2 0.23 0.27

Marter -35 Mar 90% 2.55 1.53 1.67 7.08 7.17 192.93 193.2 0.24 0.27

Marter -35 Apr 90% 4.3 1.77 2.43 7.74 7.85 192.93 193.3 0.31 0.37

Marter -35 May 90% 14.5 2 7.25 11.4 11.66 192.93 193.81 0.64 0.88

Marter -35 Jun 90% 6.49 1.9 3.42 8.51 8.66 192.93 193.42 0.40 0.49

Marter -35 Jul 90% 2.86 1.58 1.81 7.21 7.3 192.93 193.22 0.25 0.29

Marter -35 Aug 90% 1.86 1.4 1.33 6.78 6.84 192.93 193.15 0.20 0.22

Marter -35 Sep 90% 1.86 1.4 1.33 6.78 6.84 192.93 193.15 0.20 0.22

Marter -35 Oct 90% 2.59 1.54 1.69 7.1 7.18 192.93 193.2 0.24 0.27

Marter -35 Nov 90% 5.9 1.87 3.15 8.3 8.45 192.93 193.39 0.38 0.46

Marter -35 Dec 90% 4.32 1.77 2.44 7.74 7.86 192.93 193.3 0.32 0.37

Marter -61 Jan 10% 7.14 1.94 3.67 7.27 7.56 192.4 193.11 0.50 0.71

Marter -61 Feb 10% 5.1 1.67 3.05 6.94 7.18 192.4 193.02 0.44 0.62

Marter -61 Mar 10% 7.76 2.02 3.84 7.36 7.65 192.4 193.13 0.52 0.73

Marter -61 Apr 10% 78.7 3.68 21.39 17.93 18.76 192.4 194.46 1.19 2.06

Marter -61 May 10% 68.7 3.49 19.71 17.39 18.18 192.4 194.37 1.13 1.97

Marter -61 Jun 10% 25.2 2.58 9.78 13.62 14.19 192.4 193.73 0.72 1.33

Marter -61 Jul 10% 15.5 2.64 5.87 8.35 8.78 192.4 193.39 0.70 0.99

Marter -61 Aug 10% 8.81 2.15 4.1 7.49 7.81 192.4 193.17 0.55 0.77

Marter -61 Sep 10% 9.14 2.19 4.17 7.53 7.85 192.4 193.18 0.55 0.78

Marter -61 Oct 10% 18.1 2.42 7.49 12.54 13.05 192.4 193.55 0.60 1.15

Marter -61 Nov 10% 20.6 2.53 8.16 12.87 13.39 192.4 193.61 0.63 1.21

Marter -61 Dec 10% 15.4 2.64 5.84 8.33 8.76 192.4 193.39 0.70 0.99

Marter -61 Jan 90% 3.02 1.32 2.29 6.51 6.68 192.4 192.91 0.35 0.51

Marter -61 Feb 90% 2.52 1.22 2.07 6.38 6.54 192.4 192.87 0.32 0.47

Marter -61 Mar 90% 2.55 1.22 2.09 6.39 6.55 192.4 192.88 0.33 0.48

Marter -61 Apr 90% 4.3 1.54 2.79 6.79 7.01 192.4 192.98 0.41 0.58

Marter -61 May 90% 14.5 2.6 5.58 8.22 8.63 192.4 193.35 0.68 0.95

Marter -61 Jun 90% 6.49 1.86 3.49 7.18 7.45 192.4 193.08 0.49 0.68

Page 67: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -61 Jul 90% 2.86 1.29 2.22 6.47 6.64 192.4 192.9 0.34 0.5

Marter -61 Aug 90% 1.86 1.09 1.7 6.15 6.28 192.4 192.81 0.28 0.41

Marter -61 Sep 90% 1.86 1.09 1.7 6.15 6.28 192.4 192.81 0.28 0.41

Marter -61 Oct 90% 2.59 1.23 2.1 6.4 6.56 192.4 192.88 0.33 0.48

Marter -61 Nov 90% 5.9 1.78 3.32 7.09 7.34 192.4 193.06 0.47 0.66

Marter -61 Dec 90% 4.32 1.55 2.8 6.8 7.01 192.4 192.98 0.41 0.58

Marter -78 Jan 10% 7.14 2.04 3.5 8.36 8.56 192.25 192.85 0.42 0.6

Marter -78 Feb 10% 5.1 1.84 2.77 8.04 8.19 192.25 192.76 0.34 0.51

Marter -78 Mar 10% 7.76 2.09 3.72 8.46 8.67 192.25 192.88 0.44 0.63

Marter -78 Apr 10% 78.7 3.58 21.97 19.99 20.8 192.25 194.25 1.10 2

Marter -78 May 10% 68.7 3.34 20.55 19.69 20.47 192.25 194.18 1.04 1.93

Marter -78 Jun 10% 25.2 2.89 8.71 10.37 10.85 192.25 193.41 0.84 1.16

Marter -78 Jul 10% 15.5 2.7 5.75 9.28 9.61 192.25 193.11 0.62 0.86

Marter -78 Aug 10% 8.81 2.17 4.07 8.61 8.84 192.25 192.92 0.47 0.67

Marter -78 Sep 10% 9.14 2.19 4.18 8.65 8.89 192.25 192.93 0.48 0.68

Marter -78 Oct 10% 18.1 2.77 6.53 9.58 9.95 192.25 193.19 0.68 0.94

Marter -78 Nov 10% 20.6 2.81 7.34 9.88 10.29 192.25 193.27 0.74 1.02

Marter -78 Dec 10% 15.4 2.69 5.73 9.27 9.6 192.25 193.1 0.62 0.85

Marter -78 Jan 90% 3.02 1.58 1.91 7.65 7.74 192.25 192.65 0.25 0.4

Marter -78 Feb 90% 2.52 1.5 1.68 7.54 7.62 192.25 192.62 0.22 0.37

Marter -78 Mar 90% 2.55 1.51 1.69 7.55 7.62 192.25 192.62 0.22 0.37

Marter -78 Apr 90% 4.3 1.76 2.44 7.9 8.02 192.25 192.72 0.31 0.47

Marter -78 May 90% 14.5 2.62 5.53 9.2 9.51 192.25 193.08 0.60 0.83

Marter -78 Jun 90% 6.49 1.99 3.27 8.26 8.44 192.25 192.82 0.40 0.57

Marter -78 Jul 90% 2.86 1.56 1.83 7.61 7.7 192.25 192.64 0.24 0.39

Marter -78 Aug 90% 1.86 1.3 1.43 7.36 7.42 192.25 192.59 0.19 0.34

Marter -78 Sep 90% 1.86 1.3 1.43 7.36 7.42 192.25 192.59 0.19 0.34

Marter -78 Oct 90% 2.59 1.51 1.71 7.56 7.63 192.25 192.63 0.23 0.38

Marter -78 Nov 90% 5.9 1.94 3.05 8.17 8.33 192.25 192.8 0.37 0.55

Marter -78 Dec 90% 4.32 1.77 2.45 7.9 8.03 192.25 192.72 0.31 0.47

Page 68: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Table A-5: Upstream HEC-RAS Results for Monthly Q10 and Q90 Flows – Proposed Conditions

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 4571 Jan 10% 7.14 0.14 51.4 25.75 26.8 199.01 201.86 2.00 2.85

Marter 4571 Feb 10% 5.1 0.1 49.16 25.28 26.3 199.01 201.77 1.94 2.76

Marter 4571 Mar 10% 7.76 0.15 52.04 25.89 26.95 199.01 201.88 2.01 2.87

Marter 4571 Apr 10% 78.7 0.78 101 31.47 33.6 199.01 203.55 3.21 4.54

Marter 4571 May 10% 68.7 0.72 95.56 31.06 33.06 199.01 203.38 3.08 4.37

Marter 4571 Jun 10% 25.2 0.37 67.3 28.9 30.16 199.01 202.44 2.33 3.43

Marter 4571 Jul 10% 15.5 0.26 59.32 27.37 28.53 199.01 202.16 2.17 3.15

Marter 4571 Aug 10% 8.81 0.17 53.11 26.11 27.19 199.01 201.92 2.03 2.91

Marter 4571 Sep 10% 9.14 0.17 53.44 26.18 27.26 199.01 201.94 2.04 2.93

Marter 4571 Oct 10% 18.1 0.29 61.55 27.8 28.99 199.01 202.24 2.21 3.23

Marter 4571 Nov 10% 20.6 0.32 63.62 28.2 29.42 199.01 202.31 2.26 3.3

Marter 4571 Dec 10% 15.4 0.26 59.24 27.35 28.51 199.01 202.15 2.17 3.14

Marter 4571 Jan 90% 3.02 0.06 46.6 24.72 25.7 199.01 201.67 1.89 2.66

Marter 4571 Feb 90% 2.52 0.05 45.91 24.57 25.54 199.01 201.64 1.87 2.63

Marter 4571 Mar 90% 2.55 0.06 45.96 24.58 25.55 199.01 201.64 1.87 2.63

Marter 4571 Apr 90% 4.3 0.09 48.21 25.07 26.08 199.01 201.73 1.92 2.72

Marter 4571 May 90% 14.5 0.25 58.44 27.19 28.34 199.01 202.12 2.15 3.11

Marter 4571 Jun 90% 6.49 0.13 50.71 25.61 26.65 199.01 201.83 1.98 2.82

Marter 4571 Jul 90% 2.86 0.06 46.38 24.68 25.65 199.01 201.66 1.88 2.65

Marter 4571 Aug 90% 1.86 0.04 44.95 24.36 25.32 199.01 201.6 1.85 2.59

Marter 4571 Sep 90% 1.86 0.04 44.95 24.36 25.32 199.01 201.6 1.85 2.59

Marter 4571 Oct 90% 2.59 0.06 46.01 24.59 25.57 199.01 201.64 1.87 2.63

Marter 4571 Nov 90% 5.9 0.12 50.06 25.47 26.5 199.01 201.8 1.97 2.79

Marter 4571 Dec 90% 4.32 0.09 48.24 25.08 26.09 199.01 201.73 1.92 2.72

Marter 4363 Jan 10% 7.14 0.14 50.5 25.08 26.22 199.01 201.85 2.01 2.84

Marter 4363 Feb 10% 5.1 0.11 48.34 24.64 25.74 199.01 201.77 1.96 2.76

Marter 4363 Mar 10% 7.76 0.15 51.13 25.2 26.36 199.01 201.88 2.03 2.87

Marter 4363 Apr 10% 78.7 0.79 99.5 35.15 36.9 199.01 203.51 2.83 4.5

Marter 4363 May 10% 68.7 0.73 93.65 33.65 35.36 199.01 203.34 2.78 4.33

Marter 4363 Jun 10% 25.2 0.38 65.65 27.98 29.35 199.01 202.43 2.35 3.42

Marter 4363 Jul 10% 15.5 0.27 58.09 26.57 27.83 199.01 202.15 2.19 3.14

Marter 4363 Aug 10% 8.81 0.17 52.15 25.41 26.58 199.01 201.92 2.05 2.91

Marter 4363 Sep 10% 9.14 0.17 52.47 25.47 26.65 199.01 201.93 2.06 2.92

Marter 4363 Oct 10% 18.1 0.3 60.2 26.97 28.27 199.01 202.23 2.23 3.22

Marter 4363 Nov 10% 20.6 0.33 62.18 27.34 28.66 199.01 202.3 2.27 3.29

Marter 4363 Dec 10% 15.4 0.27 58.01 26.56 27.81 199.01 202.15 2.18 3.14

Marter 4363 Jan 90% 3.02 0.07 45.86 24.12 25.18 199.01 201.67 1.90 2.66

Page 69: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 4363 Feb 90% 2.52 0.06 45.2 23.98 25.03 199.01 201.64 1.88 2.63

Marter 4363 Mar 90% 2.55 0.06 45.24 23.99 25.04 199.01 201.64 1.89 2.63

Marter 4363 Apr 90% 4.3 0.09 47.43 24.45 25.54 199.01 201.73 1.94 2.72

Marter 4363 May 90% 14.5 0.25 57.25 26.41 27.66 199.01 202.12 2.17 3.11

Marter 4363 Jun 90% 6.49 0.13 49.84 24.94 26.07 199.01 201.83 2.00 2.82

Marter 4363 Jul 90% 2.86 0.06 45.65 24.07 25.14 199.01 201.66 1.90 2.65

Marter 4363 Aug 90% 1.86 0.04 44.26 23.78 24.82 199.01 201.6 1.86 2.59

Marter 4363 Sep 90% 1.86 0.04 44.26 23.78 24.82 199.01 201.6 1.86 2.59

Marter 4363 Oct 90% 2.59 0.06 45.3 24 25.05 199.01 201.64 1.89 2.63

Marter 4363 Nov 90% 5.9 0.12 49.21 24.82 25.94 199.01 201.8 1.98 2.79

Marter 4363 Dec 90% 4.32 0.09 47.45 24.45 25.54 199.01 201.73 1.94 2.72

Marter 4147 Jan 10% 7.14 0.1 68.14 29.16 30.65 198.99 201.85 2.34 2.86

Marter 4147 Feb 10% 5.1 0.08 65.63 28.84 30.28 198.99 201.77 2.28 2.78

Marter 4147 Mar 10% 7.76 0.11 68.86 29.26 30.75 198.99 201.88 2.35 2.89

Marter 4147 Apr 10% 78.7 0.65 120.86 35.4 37.74 198.99 203.49 3.41 4.5

Marter 4147 May 10% 68.7 0.6 114.99 34.72 36.97 198.99 203.32 3.31 4.33

Marter 4147 Jun 10% 25.2 0.3 85.22 31.26 33.04 198.99 202.42 2.73 3.43

Marter 4147 Jul 10% 15.5 0.2 76.79 30.24 31.88 198.99 202.14 2.54 3.15

Marter 4147 Aug 10% 8.81 0.13 70.04 29.4 30.92 198.99 201.92 2.38 2.93

Marter 4147 Sep 10% 9.14 0.13 70.4 29.45 30.97 198.99 201.93 2.39 2.94

Marter 4147 Oct 10% 18.1 0.23 79.17 30.53 32.21 198.99 202.22 2.59 3.23

Marter 4147 Nov 10% 20.6 0.25 81.37 30.8 32.51 198.99 202.29 2.64 3.3

Marter 4147 Dec 10% 15.4 0.2 76.7 30.23 31.87 198.99 202.14 2.54 3.15

Marter 4147 Jan 90% 3.02 0.05 62.73 28.47 29.86 198.99 201.67 2.20 2.68

Marter 4147 Feb 90% 2.52 0.04 61.95 28.37 29.74 198.99 201.64 2.18 2.65

Marter 4147 Mar 90% 2.55 0.04 62 28.37 29.75 198.99 201.64 2.19 2.65

Marter 4147 Apr 90% 4.3 0.07 64.57 28.71 30.13 198.99 201.73 2.25 2.74

Marter 4147 May 90% 14.5 0.19 75.85 30.13 31.75 198.99 202.11 2.52 3.12

Marter 4147 Jun 90% 6.49 0.1 67.37 29.07 30.54 198.99 201.83 2.32 2.84

Marter 4147 Jul 90% 2.86 0.05 62.48 28.44 29.82 198.99 201.66 2.20 2.67

Marter 4147 Aug 90% 1.86 0.03 60.84 28.22 29.57 198.99 201.6 2.16 2.61

Marter 4147 Sep 90% 1.86 0.03 60.84 28.22 29.57 198.99 201.6 2.16 2.61

Marter 4147 Oct 90% 2.59 0.04 62.06 28.38 29.76 198.99 201.64 2.19 2.65

Marter 4147 Nov 90% 5.9 0.09 66.65 28.97 30.43 198.99 201.8 2.30 2.81

Marter 4147 Dec 90% 4.32 0.07 64.6 28.71 30.13 198.99 201.73 2.25 2.74

Marter 3884 Jan 10% 7.14 0.12 60.05 25.22 26.95 198.94 201.85 2.38 2.91

Marter 3884 Feb 10% 5.1 0.09 57.9 24.95 26.63 198.94 201.77 2.32 2.83

Marter 3884 Mar 10% 7.76 0.13 60.67 25.29 27.04 198.94 201.88 2.40 2.94

Page 70: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������8���

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 3884 Apr 10% 78.7 0.75 104.68 31.23 33.78 198.94 203.45 3.35 4.51

Marter 3884 May 10% 68.7 0.69 99.69 30.48 32.96 198.94 203.29 3.27 4.35

Marter 3884 Jun 10% 25.2 0.34 74.57 26.98 29.04 198.94 202.41 2.76 3.47

Marter 3884 Jul 10% 15.5 0.23 67.43 26.12 28.03 198.94 202.14 2.58 3.2

Marter 3884 Aug 10% 8.81 0.14 61.68 25.42 27.19 198.94 201.92 2.43 2.98

Marter 3884 Sep 10% 9.14 0.15 61.99 25.46 27.24 198.94 201.93 2.43 2.99

Marter 3884 Oct 10% 18.1 0.26 69.45 26.37 28.32 198.94 202.22 2.63 3.28

Marter 3884 Nov 10% 20.6 0.29 71.31 26.59 28.58 198.94 202.29 2.68 3.35

Marter 3884 Dec 10% 15.4 0.23 67.35 26.11 28.02 198.94 202.14 2.58 3.2

Marter 3884 Jan 90% 3.02 0.05 55.41 24.63 26.25 198.94 201.67 2.25 2.73

Marter 3884 Feb 90% 2.52 0.05 54.73 24.54 26.15 198.94 201.64 2.23 2.7

Marter 3884 Mar 90% 2.55 0.05 54.77 24.55 26.16 198.94 201.64 2.23 2.7

Marter 3884 Apr 90% 4.3 0.08 56.99 24.83 26.49 198.94 201.73 2.30 2.79

Marter 3884 May 90% 14.5 0.22 66.63 26.03 27.92 198.94 202.11 2.56 3.17

Marter 3884 Jun 90% 6.49 0.11 59.39 25.13 26.85 198.94 201.83 2.36 2.89

Marter 3884 Jul 90% 2.86 0.05 55.19 24.6 26.22 198.94 201.66 2.24 2.72

Marter 3884 Aug 90% 1.86 0.03 53.77 24.42 26 198.94 201.6 2.20 2.66

Marter 3884 Sep 90% 1.86 0.03 53.77 24.42 26 198.94 201.6 2.20 2.66

Marter 3884 Oct 90% 2.59 0.05 54.83 24.55 26.16 198.94 201.64 2.23 2.7

Marter 3884 Nov 90% 5.9 0.1 58.77 25.06 26.76 198.94 201.8 2.35 2.86

Marter 3884 Dec 90% 4.32 0.08 57.01 24.83 26.5 198.94 201.73 2.30 2.79

Marter 3633 Jan 10% 7.14 0.11 63.18 26.82 28.32 198.87 201.85 2.36 2.98

Marter 3633 Feb 10% 5.1 0.08 60.91 26.51 27.96 198.87 201.77 2.30 2.9

Marter 3633 Mar 10% 7.76 0.12 63.83 26.91 28.42 198.87 201.87 2.37 3

Marter 3633 Apr 10% 78.7 0.72 109.27 32.15 34.53 198.87 203.41 3.40 4.54

Marter 3633 May 10% 68.7 0.66 104.26 31.53 33.83 198.87 203.26 3.31 4.39

Marter 3633 Jun 10% 25.2 0.32 78.45 28.87 30.63 198.87 202.4 2.72 3.53

Marter 3633 Jul 10% 15.5 0.22 70.96 27.88 29.52 198.87 202.13 2.55 3.26

Marter 3633 Aug 10% 8.81 0.14 64.9 27.06 28.59 198.87 201.91 2.40 3.04

Marter 3633 Sep 10% 9.14 0.14 65.22 27.11 28.64 198.87 201.93 2.41 3.06

Marter 3633 Oct 10% 18.1 0.25 73.08 28.16 29.84 198.87 202.21 2.60 3.34

Marter 3633 Nov 10% 20.6 0.27 75.04 28.42 30.13 198.87 202.28 2.64 3.41

Marter 3633 Dec 10% 15.4 0.22 70.88 27.87 29.51 198.87 202.13 2.54 3.26

Marter 3633 Jan 90% 3.02 0.05 58.27 26.13 27.53 198.87 201.67 2.23 2.8

Marter 3633 Feb 90% 2.52 0.04 57.56 26.03 27.42 198.87 201.64 2.21 2.77

Marter 3633 Mar 90% 2.55 0.04 57.61 26.04 27.43 198.87 201.64 2.21 2.77

Marter 3633 Apr 90% 4.3 0.07 59.95 26.37 27.8 198.87 201.73 2.27 2.86

Marter 3633 May 90% 14.5 0.21 70.11 27.77 29.39 198.87 202.1 2.52 3.23

Marter 3633 Jun 90% 6.49 0.1 62.49 26.73 28.21 198.87 201.82 2.34 2.95

Page 71: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������8���

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 3633 Jul 90% 2.86 0.05 58.05 26.1 27.5 198.87 201.66 2.22 2.79

Marter 3633 Aug 90% 1.86 0.03 56.55 25.89 27.25 198.87 201.6 2.18 2.73

Marter 3633 Sep 90% 1.86 0.03 56.55 25.89 27.25 198.87 201.6 2.18 2.73

Marter 3633 Oct 90% 2.59 0.04 57.66 26.05 27.44 198.87 201.64 2.21 2.77

Marter 3633 Nov 90% 5.9 0.1 61.83 26.64 28.1 198.87 201.8 2.32 2.93

Marter 3633 Dec 90% 4.32 0.07 59.97 26.37 27.81 198.87 201.73 2.27 2.86

Marter 3476 Jan 10% 7.14 0.12 59.79 26.24 27.65 198.8 201.85 2.28 3.05

Marter 3476 Feb 10% 5.1 0.09 57.58 25.88 27.25 198.8 201.76 2.22 2.96

Marter 3476 Mar 10% 7.76 0.13 60.42 26.34 27.77 198.8 201.87 2.29 3.07

Marter 3476 Apr 10% 78.7 0.75 104.9 32.49 34.66 198.8 203.39 3.23 4.59

Marter 3476 May 10% 68.7 0.69 99.95 31.74 33.85 198.8 203.23 3.15 4.43

Marter 3476 Jun 10% 25.2 0.34 74.66 28.57 30.23 198.8 202.39 2.61 3.59

Marter 3476 Jul 10% 15.5 0.23 67.36 27.45 28.99 198.8 202.13 2.45 3.33

Marter 3476 Aug 10% 8.81 0.14 61.46 26.51 27.95 198.8 201.91 2.32 3.11

Marter 3476 Sep 10% 9.14 0.15 61.77 26.56 28.01 198.8 201.92 2.33 3.12

Marter 3476 Oct 10% 18.1 0.26 69.42 27.77 29.35 198.8 202.21 2.50 3.41

Marter 3476 Nov 10% 20.6 0.29 71.33 28.06 29.67 198.8 202.27 2.54 3.47

Marter 3476 Dec 10% 15.4 0.23 67.27 27.44 28.98 198.8 202.13 2.45 3.33

Marter 3476 Jan 90% 3.02 0.05 55.02 25.45 26.78 198.8 201.66 2.16 2.86

Marter 3476 Feb 90% 2.52 0.05 54.32 25.33 26.65 198.8 201.64 2.14 2.84

Marter 3476 Mar 90% 2.55 0.05 54.37 25.34 26.65 198.8 201.64 2.15 2.84

Marter 3476 Apr 90% 4.3 0.08 56.64 25.72 27.08 198.8 201.73 2.20 2.93

Marter 3476 May 90% 14.5 0.22 66.53 27.32 28.85 198.8 202.1 2.44 3.3

Marter 3476 Jun 90% 6.49 0.11 59.11 26.13 27.53 198.8 201.82 2.26 3.02

Marter 3476 Jul 90% 2.86 0.05 54.8 25.41 26.74 198.8 201.66 2.16 2.86

Marter 3476 Aug 90% 1.86 0.03 53.34 25.17 26.46 198.8 201.6 2.12 2.8

Marter 3476 Sep 90% 1.86 0.03 53.34 25.17 26.46 198.8 201.6 2.12 2.8

Marter 3476 Oct 90% 2.59 0.05 54.42 25.35 26.67 198.8 201.64 2.15 2.84

Marter 3476 Nov 90% 5.9 0.1 58.47 26.03 27.41 198.8 201.8 2.25 3

Marter 3476 Dec 90% 4.32 0.08 56.66 25.73 27.08 198.8 201.73 2.20 2.93

Marter 3237 Jan 10% 7.14 0.09 76.55 33.16 34.32 198.86 201.85 2.31 2.99

Marter 3237 Feb 10% 5.1 0.07 73.77 32.74 33.87 198.86 201.76 2.25 2.9

Marter 3237 Mar 10% 7.76 0.1 77.34 33.28 34.45 198.86 201.87 2.32 3.01

Marter 3237 Apr 10% 78.7 0.59 132.49 39.88 41.73 198.86 203.37 3.32 4.51

Marter 3237 May 10% 68.7 0.54 126.48 39.48 41.23 198.86 203.22 3.20 4.36

Marter 3237 Jun 10% 25.2 0.26 95.1 35.85 37.21 198.86 202.39 2.65 3.53

Marter 3237 Jul 10% 15.5 0.18 86.02 34.56 35.82 198.86 202.13 2.49 3.27

Marter 3237 Aug 10% 8.81 0.11 78.64 33.48 34.66 198.86 201.91 2.35 3.05

Page 72: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������8���

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 3237 Sep 10% 9.14 0.12 79.04 33.54 34.72 198.86 201.92 2.36 3.06

Marter 3237 Oct 10% 18.1 0.2 88.59 34.93 36.22 198.86 202.2 2.54 3.34

Marter 3237 Nov 10% 20.6 0.23 90.97 35.27 36.59 198.86 202.27 2.58 3.41

Marter 3237 Dec 10% 15.4 0.18 85.92 34.55 35.81 198.86 202.13 2.49 3.27

Marter 3237 Jan 90% 3.02 0.04 70.53 32.25 33.33 198.86 201.66 2.19 2.8

Marter 3237 Feb 90% 2.52 0.04 69.66 32.11 33.18 198.86 201.64 2.17 2.78

Marter 3237 Mar 90% 2.55 0.04 69.71 32.12 33.19 198.86 201.64 2.17 2.78

Marter 3237 Apr 90% 4.3 0.06 72.58 32.56 33.67 198.86 201.73 2.23 2.87

Marter 3237 May 90% 14.5 0.17 85 34.41 35.66 198.86 202.1 2.47 3.24

Marter 3237 Jun 90% 6.49 0.09 75.7 33.04 34.18 198.86 201.82 2.29 2.96

Marter 3237 Jul 90% 2.86 0.04 70.26 32.2 33.28 198.86 201.66 2.18 2.8

Marter 3237 Aug 90% 1.86 0.03 68.41 31.92 32.97 198.86 201.6 2.14 2.74

Marter 3237 Sep 90% 1.86 0.03 68.41 31.92 32.97 198.86 201.6 2.14 2.74

Marter 3237 Oct 90% 2.59 0.04 69.78 32.13 33.2 198.86 201.64 2.17 2.78

Marter 3237 Nov 90% 5.9 0.08 74.9 32.91 34.05 198.86 201.8 2.28 2.94

Marter 3237 Dec 90% 4.32 0.06 72.62 32.57 33.68 198.86 201.73 2.23 2.87

Marter 2990 Jan 10% 7.14 0.1 70.16 29.44 30.89 198.87 201.85 2.38 2.98

Marter 2990 Feb 10% 5.1 0.08 67.7 29.12 30.52 198.87 201.76 2.32 2.89

Marter 2990 Mar 10% 7.76 0.11 70.86 29.53 30.99 198.87 201.87 2.40 3

Marter 2990 Apr 10% 78.7 0.67 118.22 35.16 37.36 198.87 203.34 3.36 4.47

Marter 2990 May 10% 68.7 0.61 113.08 34.56 36.68 198.87 203.19 3.27 4.32

Marter 2990 Jun 10% 25.2 0.29 86.34 31.48 33.19 198.87 202.38 2.74 3.51

Marter 2990 Jul 10% 15.5 0.2 78.47 30.51 32.09 198.87 202.12 2.57 3.25

Marter 2990 Aug 10% 8.81 0.12 72 29.68 31.16 198.87 201.91 2.43 3.04

Marter 2990 Sep 10% 9.14 0.13 72.35 29.73 31.21 198.87 201.92 2.43 3.05

Marter 2990 Oct 10% 18.1 0.22 80.71 30.79 32.41 198.87 202.2 2.62 3.33

Marter 2990 Nov 10% 20.6 0.25 82.77 31.04 32.69 198.87 202.26 2.67 3.39

Marter 2990 Dec 10% 15.4 0.2 78.38 30.5 32.08 198.87 202.12 2.57 3.25

Marter 2990 Jan 90% 3.02 0.05 64.83 28.74 30.09 198.87 201.66 2.26 2.79

Marter 2990 Feb 90% 2.52 0.04 64.05 28.63 29.98 198.87 201.64 2.24 2.77

Marter 2990 Mar 90% 2.55 0.04 64.1 28.64 29.98 198.87 201.64 2.24 2.77

Marter 2990 Apr 90% 4.3 0.06 66.65 28.98 30.37 198.87 201.73 2.30 2.86

Marter 2990 May 90% 14.5 0.19 77.57 30.39 31.96 198.87 202.1 2.55 3.23

Marter 2990 Jun 90% 6.49 0.09 69.41 29.34 30.78 198.87 201.82 2.37 2.95

Marter 2990 Jul 90% 2.86 0.04 64.59 28.7 30.06 198.87 201.66 2.25 2.79

Marter 2990 Aug 90% 1.86 0.03 62.94 28.48 29.81 198.87 201.6 2.21 2.73

Marter 2990 Sep 90% 1.86 0.03 62.94 28.48 29.81 198.87 201.6 2.21 2.73

Marter 2990 Oct 90% 2.59 0.04 64.17 28.65 29.99 198.87 201.64 2.24 2.77

Marter 2990 Nov 90% 5.9 0.09 68.7 29.25 30.67 198.87 201.8 2.35 2.93

Page 73: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������8��

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2990 Dec 90% 4.32 0.06 66.68 28.98 30.37 198.87 201.73 2.30 2.86

Marter 2735 Jan 10% 7.14 0.15 46.58 23.27 24.51 199.22 201.85 2.00 2.63

Marter 2735 Feb 10% 5.1 0.11 44.67 22.92 24.13 199.22 201.76 1.95 2.54

Marter 2735 Mar 10% 7.76 0.16 47.13 23.37 24.62 199.22 201.87 2.02 2.65

Marter 2735 Apr 10% 78.7 0.94 83.7 28.79 30.79 199.22 203.27 2.91 4.05

Marter 2735 May 10% 68.7 0.86 79.78 28.25 30.17 199.22 203.13 2.82 3.91

Marter 2735 Jun 10% 25.2 0.43 59.17 25.42 26.92 199.22 202.36 2.33 3.14

Marter 2735 Jul 10% 15.5 0.29 53.05 24.4 25.77 199.22 202.12 2.17 2.9

Marter 2735 Aug 10% 8.81 0.18 48.02 23.52 24.8 199.22 201.91 2.04 2.69

Marter 2735 Sep 10% 9.14 0.19 48.29 23.57 24.85 199.22 201.92 2.05 2.7

Marter 2735 Oct 10% 18.1 0.33 54.79 24.7 26.1 199.22 202.19 2.22 2.97

Marter 2735 Nov 10% 20.6 0.37 56.39 24.96 26.4 199.22 202.25 2.26 3.03

Marter 2735 Dec 10% 15.4 0.29 52.98 24.39 25.76 199.22 202.11 2.17 2.89

Marter 2735 Jan 90% 3.02 0.07 42.43 22.51 23.67 199.22 201.66 1.88 2.44

Marter 2735 Feb 90% 2.52 0.06 41.83 22.4 23.55 199.22 201.64 1.87 2.42

Marter 2735 Mar 90% 2.55 0.06 41.87 22.41 23.55 199.22 201.64 1.87 2.42

Marter 2735 Apr 90% 4.3 0.1 43.85 22.77 23.96 199.22 201.73 1.93 2.51

Marter 2735 May 90% 14.5 0.28 52.35 24.28 25.64 199.22 202.09 2.16 2.87

Marter 2735 Jun 90% 6.49 0.14 46 23.16 24.4 199.22 201.82 1.99 2.6

Marter 2735 Jul 90% 2.86 0.07 42.24 22.48 23.63 199.22 201.66 1.88 2.44

Marter 2735 Aug 90% 1.86 0.05 40.96 22.24 23.37 199.22 201.6 1.84 2.38

Marter 2735 Sep 90% 1.86 0.05 40.96 22.24 23.37 199.22 201.6 1.84 2.38

Marter 2735 Oct 90% 2.59 0.06 41.92 22.42 23.56 199.22 201.64 1.87 2.42

Marter 2735 Nov 90% 5.9 0.13 45.45 23.06 24.29 199.22 201.8 1.97 2.58

Marter 2735 Dec 90% 4.32 0.1 43.87 22.78 23.97 199.22 201.73 1.93 2.51

Marter 2469 Jan 10% 7.14 0.13 53.34 34.57 35.19 200 201.84 1.54 1.84

Marter 2469 Feb 10% 5.1 0.1 50.54 34.11 34.7 200 201.76 1.48 1.76

Marter 2469 Mar 10% 7.76 0.14 54.14 34.7 35.33 200 201.86 1.56 1.86

Marter 2469 Apr 10% 78.7 0.74 106.15 41.87 43.06 200 203.22 2.54 3.22

Marter 2469 May 10% 68.7 0.68 100.64 41.46 42.57 200 203.08 2.43 3.08

Marter 2469 Jun 10% 25.2 0.35 71.45 37.42 38.22 200 202.35 1.91 2.35

Marter 2469 Jul 10% 15.5 0.25 62.7 36.07 36.79 200 202.11 1.74 2.11

Marter 2469 Aug 10% 8.81 0.16 55.44 34.91 35.55 200 201.9 1.59 1.9

Marter 2469 Sep 10% 9.14 0.16 55.83 34.98 35.62 200 201.91 1.60 1.91

Marter 2469 Oct 10% 18.1 0.28 65.2 36.46 37.2 200 202.18 1.79 2.18

Marter 2469 Nov 10% 20.6 0.31 67.49 36.82 37.57 200 202.24 1.83 2.24

Marter 2469 Dec 10% 15.4 0.25 62.6 36.06 36.77 200 202.1 1.74 2.1

Marter 2469 Jan 90% 3.02 0.06 47.25 33.56 34.12 200 201.66 1.41 1.66

Page 74: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������8��

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2469 Feb 90% 2.52 0.05 46.35 33.41 33.96 200 201.64 1.39 1.64

Marter 2469 Mar 90% 2.55 0.05 46.41 33.42 33.97 200 201.64 1.39 1.64

Marter 2469 Apr 90% 4.3 0.09 49.34 33.91 34.49 200 201.73 1.46 1.73

Marter 2469 May 90% 14.5 0.24 61.7 35.92 36.62 200 202.08 1.72 2.08

Marter 2469 Jun 90% 6.49 0.12 52.48 34.43 35.04 200 201.82 1.52 1.82

Marter 2469 Jul 90% 2.86 0.06 46.96 33.51 34.07 200 201.65 1.40 1.65

Marter 2469 Aug 90% 1.86 0.04 45.07 33.19 33.73 200 201.6 1.36 1.6

Marter 2469 Sep 90% 1.86 0.04 45.07 33.19 33.73 200 201.6 1.36 1.6

Marter 2469 Oct 90% 2.59 0.06 46.48 33.43 33.98 200 201.64 1.39 1.64

Marter 2469 Nov 90% 5.9 0.11 51.68 34.3 34.9 200 201.79 1.51 1.79

Marter 2469 Dec 90% 4.32 0.09 49.37 33.91 34.5 200 201.73 1.46 1.73

Marter 2418 Jan 10% 7.14 0.35 20.31 25.88 26.15 200.94 201.83 0.78 0.89

Marter 2418 Feb 10% 5.1 0.28 18.3 25.32 25.56 200.94 201.76 0.72 0.82

Marter 2418 Mar 10% 7.76 0.37 20.89 26.04 26.31 200.94 201.86 0.80 0.92

Marter 2418 Apr 10% 78.7 1.29 61.01 38.18 38.82 200.94 203.13 1.60 2.19

Marter 2418 May 10% 68.7 1.22 56.29 37.12 37.73 200.94 203.01 1.52 2.07

Marter 2418 Jun 10% 25.2 0.75 33.5 29.26 29.67 200.94 202.31 1.14 1.37

Marter 2418 Jul 10% 15.5 0.57 27.09 27.67 28.01 200.94 202.09 0.98 1.15

Marter 2418 Aug 10% 8.81 0.4 21.82 26.29 26.57 200.94 201.89 0.83 0.95

Marter 2418 Sep 10% 9.14 0.41 22.11 26.37 26.65 200.94 201.9 0.84 0.96

Marter 2418 Oct 10% 18.1 0.63 28.91 28.13 28.49 200.94 202.15 1.03 1.21

Marter 2418 Nov 10% 20.6 0.67 30.59 28.55 28.93 200.94 202.21 1.07 1.27

Marter 2418 Dec 10% 15.4 0.57 27.02 27.65 27.99 200.94 202.08 0.98 1.14

Marter 2418 Jan 90% 3.02 0.19 15.93 24.65 24.87 200.94 201.66 0.65 0.72

Marter 2418 Feb 90% 2.52 0.16 15.28 24.47 24.67 200.94 201.63 0.62 0.69

Marter 2418 Mar 90% 2.55 0.17 15.32 24.48 24.68 200.94 201.64 0.63 0.7

Marter 2418 Apr 90% 4.3 0.25 17.43 25.08 25.31 200.94 201.72 0.69 0.78

Marter 2418 May 90% 14.5 0.55 26.36 27.48 27.82 200.94 202.06 0.96 1.12

Marter 2418 Jun 90% 6.49 0.33 19.7 25.71 25.97 200.94 201.81 0.77 0.87

Marter 2418 Jul 90% 2.86 0.18 15.72 24.59 24.8 200.94 201.65 0.64 0.71

Marter 2418 Aug 90% 1.86 0.13 14.36 24.2 24.39 200.94 201.6 0.59 0.66

Marter 2418 Sep 90% 1.86 0.13 14.36 24.2 24.39 200.94 201.6 0.59 0.66

Marter 2418 Oct 90% 2.59 0.17 15.38 24.49 24.7 200.94 201.64 0.63 0.7

Marter 2418 Nov 90% 5.9 0.31 19.12 25.55 25.8 200.94 201.79 0.75 0.85

Marter 2418 Dec 90% 4.32 0.25 17.45 25.09 25.32 200.94 201.72 0.70 0.78

Marter 2407 Jan 10% 7.14 1.58 4.51 17.84 17.91 201.42 201.69 0.25 0.27

Marter 2407 Feb 10% 5.1 1.43 3.57 17.43 17.49 201.42 201.64 0.20 0.22

Marter 2407 Mar 10% 7.76 1.62 4.78 17.96 18.03 201.42 201.71 0.27 0.29

Page 75: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������8���

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2407 Apr 10% 78.7 2.91 27.03 26.06 26.4 201.42 202.72 1.04 1.3

Marter 2407 May 10% 68.7 2.89 23.79 24.93 25.23 201.42 202.6 0.95 1.18

Marter 2407 Jun 10% 25.2 2.3 10.93 20.43 20.59 201.42 202.03 0.53 0.61

Marter 2407 Jul 10% 15.5 2 7.74 19.19 19.3 201.42 201.87 0.40 0.45

Marter 2407 Aug 10% 8.81 1.69 5.22 18.14 18.22 201.42 201.73 0.29 0.31

Marter 2407 Sep 10% 9.14 1.71 5.36 18.2 18.28 201.42 201.74 0.29 0.32

Marter 2407 Oct 10% 18.1 2.09 8.66 19.56 19.68 201.42 201.92 0.44 0.5

Marter 2407 Nov 10% 20.6 2.17 9.48 19.88 20.01 201.42 201.96 0.48 0.54

Marter 2407 Dec 10% 15.4 2 7.71 19.18 19.29 201.42 201.87 0.40 0.45

Marter 2407 Jan 90% 3.02 1.21 2.49 16.94 16.98 201.42 201.58 0.15 0.16

Marter 2407 Feb 90% 2.52 1.14 2.21 16.82 16.85 201.42 201.56 0.13 0.14

Marter 2407 Mar 90% 2.55 1.15 2.23 16.82 16.86 201.42 201.56 0.13 0.14

Marter 2407 Apr 90% 4.3 1.35 3.18 17.26 17.31 201.42 201.62 0.18 0.2

Marter 2407 May 90% 14.5 1.96 7.39 19.05 19.16 201.42 201.85 0.39 0.43

Marter 2407 Jun 90% 6.49 1.54 4.22 17.72 17.78 201.42 201.68 0.24 0.26

Marter 2407 Jul 90% 2.86 1.18 2.42 16.91 16.95 201.42 201.57 0.14 0.15

Marter 2407 Aug 90% 1.86 1.03 1.81 16.63 16.66 201.42 201.54 0.11 0.12

Marter 2407 Sep 90% 1.86 1.03 1.81 16.63 16.66 201.42 201.54 0.11 0.12

Marter 2407 Oct 90% 2.59 1.15 2.25 16.83 16.87 201.42 201.56 0.13 0.14

Marter 2407 Nov 90% 5.9 1.49 3.95 17.6 17.66 201.42 201.66 0.22 0.24

Marter 2407 Dec 90% 4.32 1.36 3.19 17.26 17.31 201.42 201.62 0.18 0.2

Marter 101 2397 Jan 10% 7.14 1.02 7.02 15.73 15.84 201.02 201.55 0.45 0.53

Marter 101 2397 Feb 10% 5.1 0.89 5.75 15.01 15.1 201.02 201.47 0.38 0.45

Marter 101 2397 Mar 10% 7.76 1.05 7.36 15.88 15.99 201.02 201.57 0.46 0.55

Marter 101 2397 Apr 10% 78.7 2.72 28.93 22.24 22.82 201.02 202.68 1.30 1.66

Marter 101 2397 May 10% 68.7 2.59 26.51 21.73 22.26 201.02 202.57 1.22 1.55

Marter 101 2397 Jun 10% 25.2 1.75 14.43 19.05 19.27 201.02 201.98 0.76 0.96

Marter 101 2397 Jul 10% 15.5 1.42 10.91 17.49 17.67 201.02 201.79 0.62 0.77

Marter 101 2397 Aug 10% 8.81 1.11 7.91 16.1 16.23 201.02 201.61 0.49 0.59

Marter 101 2397 Sep 10% 9.14 1.13 8.08 16.17 16.3 201.02 201.62 0.50 0.6

Marter 101 2397 Oct 10% 18.1 1.52 11.93 17.96 18.15 201.02 201.85 0.66 0.83

Marter 101 2397 Nov 10% 20.6 1.6 12.85 18.37 18.57 201.02 201.9 0.70 0.88

Marter 101 2397 Dec 10% 15.4 1.42 10.87 17.48 17.65 201.02 201.79 0.62 0.77

Marter 101 2397 Jan 90% 3.02 0.72 4.19 14.03 14.09 201.02 201.36 0.30 0.34

Marter 101 2397 Feb 90% 2.52 0.67 3.75 13.73 13.79 201.02 201.33 0.27 0.31

Marter 101 2397 Mar 90% 2.55 0.68 3.78 13.75 13.81 201.02 201.33 0.27 0.31

Marter 101 2397 Apr 90% 4.3 0.83 5.19 14.66 14.74 201.02 201.43 0.35 0.41

Marter 101 2397 May 90% 14.5 1.38 10.49 17.3 17.47 201.02 201.76 0.61 0.74

Marter 101 2397 Jun 90% 6.49 0.98 6.63 15.54 15.64 201.02 201.53 0.43 0.51

Page 76: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������88��

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 101 2397 Jul 90% 2.86 0.71 4.05 13.93 13.99 201.02 201.35 0.29 0.33

Marter 101 2397 Aug 90% 1.86 0.6 3.11 13.3 13.34 201.02 201.28 0.23 0.26

Marter 101 2397 Sep 90% 1.86 0.6 3.11 13.3 13.34 201.02 201.28 0.23 0.26

Marter 101 2397 Oct 90% 2.59 0.68 3.81 13.78 13.83 201.02 201.34 0.28 0.32

Marter 101 2397 Nov 90% 5.9 0.94 6.27 15.32 15.42 201.02 201.5 0.41 0.48

Marter 101 2397 Dec 90% 4.32 0.83 5.2 14.67 14.75 201.02 201.43 0.35 0.41

Marter 2390 Jan 10% 7.14 1.72 4.16 14.09 14.14 200.98 201.4 0.30 0.42

Marter 2390 Feb 10% 5.1 1.59 3.21 12.7 12.74 200.98 201.33 0.25 0.35

Marter 2390 Mar 10% 7.76 1.75 4.44 14.48 14.53 200.98 201.42 0.31 0.44

Marter 2390 Apr 10% 78.7 3.3 23.85 21.58 22.02 200.98 202.43 1.11 1.45

Marter 2390 May 10% 68.7 3.18 21.63 21.23 21.62 200.98 202.32 1.02 1.34

Marter 2390 Jun 10% 25.2 2.36 10.66 19.02 19.14 200.98 201.78 0.56 0.8

Marter 2390 Jul 10% 15.5 2.08 7.46 17.25 17.33 200.98 201.6 0.43 0.62

Marter 2390 Aug 10% 8.81 1.79 4.92 15.11 15.16 200.98 201.45 0.33 0.47

Marter 2390 Sep 10% 9.14 1.81 5.04 15.28 15.33 200.98 201.46 0.33 0.48

Marter 2390 Oct 10% 18.1 2.17 8.35 17.79 17.88 200.98 201.65 0.47 0.67

Marter 2390 Nov 10% 20.6 2.24 9.2 18.29 18.4 200.98 201.7 0.50 0.72

Marter 2390 Dec 10% 15.4 2.07 7.43 17.23 17.31 200.98 201.6 0.43 0.62

Marter 2390 Jan 90% 3.02 1.4 2.16 10.95 10.97 200.98 201.24 0.20 0.26

Marter 2390 Feb 90% 2.52 1.34 1.88 10.44 10.46 200.98 201.21 0.18 0.23

Marter 2390 Mar 90% 2.55 1.34 1.9 10.47 10.49 200.98 201.21 0.18 0.23

Marter 2390 Apr 90% 4.3 1.52 2.82 12.08 12.12 200.98 201.29 0.23 0.31

Marter 2390 May 90% 14.5 2.04 7.12 17.04 17.11 200.98 201.58 0.42 0.6

Marter 2390 Jun 90% 6.49 1.68 3.87 13.68 13.72 200.98 201.37 0.28 0.39

Marter 2390 Jul 90% 2.86 1.38 2.07 10.79 10.82 200.98 201.23 0.19 0.25

Marter 2390 Aug 90% 1.86 1.23 1.51 9.7 9.73 200.98 201.17 0.16 0.19

Marter 2390 Sep 90% 1.86 1.23 1.51 9.7 9.73 200.98 201.17 0.16 0.19

Marter 2390 Oct 90% 2.59 1.35 1.92 10.51 10.54 200.98 201.21 0.18 0.23

Marter 2390 Nov 90% 5.9 1.64 3.6 13.29 13.33 200.98 201.36 0.27 0.38

Marter 2390 Dec 90% 4.32 1.53 2.83 12.1 12.13 200.98 201.29 0.23 0.31

Marter 102 2372 Jan 10% 7.14 0.07 106.39 32.75 35.63 197.25 201.31 3.25 4.06

Marter 102 2372 Feb 10% 5.1 0.05 104.31 32.65 35.46 197.25 201.25 3.19 4

Marter 102 2372 Mar 10% 7.76 0.07 106.98 32.78 35.67 197.25 201.33 3.26 4.08

Marter 102 2372 Apr 10% 78.7 0.52 150.2 34.26 38.7 197.25 202.62 4.38 5.37

Marter 102 2372 May 10% 68.7 0.47 145.31 34.06 38.35 197.25 202.48 4.27 5.23

Marter 102 2372 Jun 10% 25.2 0.21 120.6 33.2 36.62 197.25 201.74 3.63 4.49

Marter 102 2372 Jul 10% 15.5 0.14 113.59 33.03 36.16 197.25 201.53 3.44 4.28

Marter 102 2372 Aug 10% 8.81 0.08 107.96 32.82 35.75 197.25 201.36 3.29 4.11

Page 77: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������8���

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 102 2372 Sep 10% 9.14 0.08 108.26 32.83 35.77 197.25 201.37 3.30 4.12

Marter 102 2372 Oct 10% 18.1 0.16 115.58 33.08 36.29 197.25 201.59 3.49 4.34

Marter 102 2372 Nov 10% 20.6 0.18 117.36 33.12 36.41 197.25 201.64 3.54 4.39

Marter 102 2372 Dec 10% 15.4 0.14 113.52 33.03 36.16 197.25 201.53 3.44 4.28

Marter 102 2372 Jan 90% 3.02 0.03 101.89 32.53 35.27 197.25 201.17 3.13 3.92

Marter 102 2372 Feb 90% 2.52 0.02 101.26 32.5 35.22 197.25 201.15 3.12 3.9

Marter 102 2372 Mar 90% 2.55 0.03 101.3 32.5 35.23 197.25 201.16 3.12 3.91

Marter 102 2372 Apr 90% 4.3 0.04 103.44 32.6 35.39 197.25 201.22 3.17 3.97

Marter 102 2372 May 90% 14.5 0.13 112.81 33.01 36.11 197.25 201.51 3.42 4.26

Marter 102 2372 Jun 90% 6.49 0.06 105.77 32.72 35.58 197.25 201.29 3.23 4.04

Marter 102 2372 Jul 90% 2.86 0.03 101.69 32.52 35.26 197.25 201.17 3.13 3.92

Marter 102 2372 Aug 90% 1.86 0.02 100.34 32.45 35.15 197.25 201.13 3.09 3.88

Marter 102 2372 Sep 90% 1.86 0.02 100.34 32.45 35.15 197.25 201.13 3.09 3.88

Marter 102 2372 Oct 90% 2.59 0.03 101.36 32.5 35.23 197.25 201.16 3.12 3.91

Marter 102 2372 Nov 90% 5.9 0.06 105.14 32.69 35.53 197.25 201.27 3.22 4.02

Marter 102 2372 Dec 90% 4.32 0.04 103.47 32.6 35.4 197.25 201.22 3.17 3.97

Marter 2345 Jan 10% 7.14 0.1 70.25 41.65 42.2 198.99 201.31 1.69 2.32

Marter 2345 Feb 10% 5.1 0.08 67.62 41.49 41.99 198.99 201.25 1.63 2.26

Marter 2345 Mar 10% 7.76 0.11 71.01 41.7 42.26 198.99 201.33 1.70 2.34

Marter 2345 Apr 10% 78.7 0.63 126.35 44.48 46.07 198.99 202.61 2.84 3.62

Marter 2345 May 10% 68.7 0.57 120.05 44.21 45.67 198.99 202.47 2.72 3.48

Marter 2345 Jun 10% 25.2 0.29 88.32 42.64 43.5 198.99 201.74 2.07 2.75

Marter 2345 Jul 10% 15.5 0.2 79.39 42.2 42.9 198.99 201.53 1.88 2.54

Marter 2345 Aug 10% 8.81 0.12 72.25 41.78 42.35 198.99 201.36 1.73 2.37

Marter 2345 Sep 10% 9.14 0.13 72.63 41.8 42.38 198.99 201.37 1.74 2.38

Marter 2345 Oct 10% 18.1 0.22 81.92 42.32 43.07 198.99 201.59 1.94 2.6

Marter 2345 Nov 10% 20.6 0.24 84.19 42.43 43.22 198.99 201.64 1.98 2.65

Marter 2345 Dec 10% 15.4 0.19 79.31 42.2 42.89 198.99 201.53 1.88 2.54

Marter 2345 Jan 90% 3.02 0.05 64.55 41.3 41.75 198.99 201.17 1.56 2.18

Marter 2345 Feb 90% 2.52 0.04 63.76 41.25 41.68 198.99 201.15 1.55 2.16

Marter 2345 Mar 90% 2.55 0.04 63.81 41.25 41.69 198.99 201.16 1.55 2.17

Marter 2345 Apr 90% 4.3 0.06 66.52 41.42 41.9 198.99 201.22 1.61 2.23

Marter 2345 May 90% 14.5 0.18 78.41 42.15 42.83 198.99 201.51 1.86 2.52

Marter 2345 Jun 90% 6.49 0.09 69.47 41.6 42.13 198.99 201.29 1.67 2.3

Marter 2345 Jul 90% 2.86 0.04 64.3 41.28 41.73 198.99 201.17 1.56 2.18

Marter 2345 Aug 90% 1.86 0.03 62.59 41.17 41.59 198.99 201.13 1.52 2.14

Marter 2345 Sep 90% 1.86 0.03 62.59 41.17 41.59 198.99 201.13 1.52 2.14

Marter 2345 Oct 90% 2.59 0.04 63.88 41.26 41.69 198.99 201.16 1.55 2.17

Marter 2345 Nov 90% 5.9 0.09 68.68 41.55 42.07 198.99 201.27 1.65 2.28

Page 78: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������8���

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2345 Dec 90% 4.32 0.06 66.55 41.42 41.9 198.99 201.22 1.61 2.23

Marter 2300 Jan 10% 7.14 0.15 46.67 58.92 58.99 200.21 201.31 0.79 1.1

Marter 2300 Feb 10% 5.1 0.12 43.1 57.08 57.15 200.21 201.25 0.76 1.04

Marter 2300 Mar 10% 7.76 0.16 47.72 59.45 59.52 200.21 201.32 0.80 1.11

Marter 2300 Apr 10% 78.7 0.62 127.52 65.54 66.48 200.21 202.57 1.95 2.36

Marter 2300 May 10% 68.7 0.59 118.35 65.3 66.11 200.21 202.43 1.81 2.22

Marter 2300 Jun 10% 25.2 0.35 72.46 63.52 63.81 200.21 201.72 1.14 1.51

Marter 2300 Jul 10% 15.5 0.26 59.62 63.04 63.17 200.21 201.52 0.95 1.31

Marter 2300 Aug 10% 8.81 0.18 49.44 60.31 60.38 200.21 201.35 0.82 1.14

Marter 2300 Sep 10% 9.14 0.18 49.98 60.57 60.65 200.21 201.36 0.83 1.15

Marter 2300 Oct 10% 18.1 0.29 63.25 63.19 63.36 200.21 201.57 1.00 1.36

Marter 2300 Nov 10% 20.6 0.31 66.51 63.32 63.53 200.21 201.63 1.05 1.42

Marter 2300 Dec 10% 15.4 0.26 59.49 63.04 63.17 200.21 201.52 0.94 1.31

Marter 2300 Jan 90% 3.02 0.08 39.03 54.92 54.98 200.21 201.17 0.71 0.96

Marter 2300 Feb 90% 2.52 0.07 37.99 54.35 54.41 200.21 201.15 0.70 0.94

Marter 2300 Mar 90% 2.55 0.07 38.06 54.38 54.45 200.21 201.15 0.70 0.94

Marter 2300 Apr 90% 4.3 0.1 41.63 56.31 56.38 200.21 201.22 0.74 1.01

Marter 2300 May 90% 14.5 0.25 58.2 62.92 63.03 200.21 201.49 0.92 1.28

Marter 2300 Jun 90% 6.49 0.14 45.61 58.38 58.45 200.21 201.29 0.78 1.08

Marter 2300 Jul 90% 2.86 0.07 38.7 54.73 54.8 200.21 201.17 0.71 0.96

Marter 2300 Aug 90% 1.86 0.05 36.48 53.51 53.57 200.21 201.13 0.68 0.92

Marter 2300 Sep 90% 1.86 0.05 36.48 53.51 53.57 200.21 201.13 0.68 0.92

Marter 2300 Oct 90% 2.59 0.07 38.15 54.43 54.5 200.21 201.16 0.70 0.95

Marter 2300 Nov 90% 5.9 0.13 44.53 57.82 57.89 200.21 201.27 0.77 1.06

Marter 2300 Dec 90% 4.32 0.1 41.67 56.33 56.4 200.21 201.22 0.74 1.01

Marter 2284 Jan 10% 7.14 0.07 102.04 60.02 60.54 199.17 201.31 1.70 2.14

Marter 2284 Feb 10% 5.1 0.05 98.34 59.56 60.05 199.17 201.25 1.65 2.08

Marter 2284 Mar 10% 7.76 0.08 103.1 60.15 60.67 199.17 201.32 1.71 2.15

Marter 2284 Apr 10% 78.7 0.44 181.88 64.88 66.11 199.17 202.58 2.80 3.41

Marter 2284 May 10% 68.7 0.41 172.78 64.5 65.64 199.17 202.44 2.68 3.27

Marter 2284 Jun 10% 25.2 0.2 127.5 62.13 62.85 199.17 201.72 2.05 2.55

Marter 2284 Jul 10% 15.5 0.14 114.9 61.5 62.1 199.17 201.52 1.87 2.35

Marter 2284 Aug 10% 8.81 0.08 104.85 60.36 60.9 199.17 201.35 1.74 2.18

Marter 2284 Sep 10% 9.14 0.09 105.38 60.43 60.97 199.17 201.36 1.74 2.19

Marter 2284 Oct 10% 18.1 0.15 118.46 61.68 62.31 199.17 201.58 1.92 2.41

Marter 2284 Nov 10% 20.6 0.17 121.66 61.84 62.5 199.17 201.63 1.97 2.46

Marter 2284 Dec 10% 15.4 0.13 114.78 61.49 62.09 199.17 201.52 1.87 2.35

Marter 2284 Jan 90% 3.02 0.03 94.03 58.79 59.27 199.17 201.17 1.60 2

Page 79: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�������8���

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2284 Feb 90% 2.52 0.03 92.91 58.67 59.13 199.17 201.15 1.58 1.98

Marter 2284 Mar 90% 2.55 0.03 92.99 58.67 59.14 199.17 201.15 1.58 1.98

Marter 2284 Apr 90% 4.3 0.04 96.8 59.36 59.85 199.17 201.22 1.63 2.05

Marter 2284 May 90% 14.5 0.13 113.51 61.41 62 199.17 201.5 1.85 2.33

Marter 2284 Jun 90% 6.49 0.06 100.95 59.88 60.4 199.17 201.29 1.69 2.12

Marter 2284 Jul 90% 2.86 0.03 93.67 58.75 59.23 199.17 201.17 1.59 2

Marter 2284 Aug 90% 1.86 0.02 91.27 58.48 58.93 199.17 201.13 1.56 1.96

Marter 2284 Sep 90% 1.86 0.02 91.27 58.48 58.93 199.17 201.13 1.56 1.96

Marter 2284 Oct 90% 2.59 0.03 93.08 58.69 59.15 199.17 201.16 1.59 1.99

Marter 2284 Nov 90% 5.9 0.06 99.83 59.74 60.25 199.17 201.27 1.67 2.1

Marter 2284 Dec 90% 4.32 0.04 96.84 59.37 59.86 199.17 201.22 1.63 2.05

Marter 103 2081 Jan 10% 7.14 0.06 125.72 43.34 46.19 197.58 201.31 2.90 3.73

Marter 103 2081 Feb 10% 5.1 0.04 123.05 43.13 45.94 197.58 201.25 2.85 3.67

Marter 103 2081 Mar 10% 7.76 0.06 126.48 43.39 46.25 197.58 201.32 2.91 3.74

Marter 103 2081 Apr 10% 78.7 0.43 187.79 55.49 58.88 197.58 202.57 3.38 4.99

Marter 103 2081 May 10% 68.7 0.39 180.12 54.58 57.91 197.58 202.43 3.30 4.85

Marter 103 2081 Jun 10% 25.2 0.18 143.92 44.69 47.78 197.58 201.72 3.22 4.14

Marter 103 2081 Jul 10% 15.5 0.11 134.93 44.03 47 197.58 201.52 3.06 3.94

Marter 103 2081 Aug 10% 8.81 0.07 127.74 43.49 46.37 197.58 201.35 2.94 3.77

Marter 103 2081 Sep 10% 9.14 0.07 128.12 43.52 46.4 197.58 201.36 2.94 3.78

Marter 103 2081 Oct 10% 18.1 0.13 137.47 44.22 47.22 197.58 201.58 3.11 4

Marter 103 2081 Nov 10% 20.6 0.15 139.75 44.39 47.42 197.58 201.63 3.15 4.05

Marter 103 2081 Dec 10% 15.4 0.11 134.84 44.02 46.99 197.58 201.52 3.06 3.94

Marter 103 2081 Jan 90% 3.02 0.03 119.92 42.89 45.66 197.58 201.17 2.80 3.59

Marter 103 2081 Feb 90% 2.52 0.02 119.11 42.82 45.59 197.58 201.15 2.78 3.57

Marter 103 2081 Mar 90% 2.55 0.02 119.16 42.83 45.59 197.58 201.15 2.78 3.57

Marter 103 2081 Apr 90% 4.3 0.04 121.93 43.04 45.84 197.58 201.22 2.83 3.64

Marter 103 2081 May 90% 14.5 0.11 133.94 43.95 46.91 197.58 201.5 3.05 3.92

Marter 103 2081 Jun 90% 6.49 0.05 124.93 43.27 46.11 197.58 201.29 2.89 3.71

Marter 103 2081 Jul 90% 2.86 0.02 119.66 42.86 45.64 197.58 201.17 2.79 3.59

Marter 103 2081 Aug 90% 1.86 0.02 117.9 42.73 45.48 197.58 201.13 2.76 3.55

Marter 103 2081 Sep 90% 1.86 0.02 117.9 42.73 45.48 197.58 201.13 2.76 3.55

Marter 103 2081 Oct 90% 2.59 0.02 119.23 42.83 45.6 197.58 201.16 2.78 3.58

Marter 103 2081 Nov 90% 5.9 0.05 124.12 43.21 46.04 197.58 201.27 2.87 3.69

Marter 103 2081 Dec 90% 4.32 0.04 121.96 43.04 45.85 197.58 201.22 2.83 3.64

Marter 2061 Jan 10% 7.14 0.06 127.03 43.52 45.5 197.56 201.31 2.92 3.75

Marter 2061 Feb 10% 5.1 0.04 124.36 43.22 45.18 197.56 201.25 2.88 3.69

Marter 2061 Mar 10% 7.76 0.06 127.8 43.61 45.59 197.56 201.32 2.93 3.76

Page 80: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2061 Apr 10% 78.7 0.44 188.32 53.27 55.63 197.56 202.57 3.54 5.01

Marter 2061 May 10% 68.7 0.4 180.96 52.42 54.74 197.56 202.43 3.45 4.87

Marter 2061 Jun 10% 25.2 0.18 145.56 46.79 48.9 197.56 201.72 3.11 4.16

Marter 2061 Jul 10% 15.5 0.11 136.31 44.56 46.62 197.56 201.52 3.06 3.96

Marter 2061 Aug 10% 8.81 0.07 129.06 43.75 45.74 197.56 201.35 2.95 3.79

Marter 2061 Sep 10% 9.14 0.07 129.45 43.79 45.79 197.56 201.36 2.96 3.8

Marter 2061 Oct 10% 18.1 0.13 138.89 44.94 47.01 197.56 201.58 3.09 4.02

Marter 2061 Nov 10% 20.6 0.15 141.23 45.84 47.93 197.56 201.63 3.08 4.07

Marter 2061 Dec 10% 15.4 0.11 136.23 44.54 46.6 197.56 201.52 3.06 3.96

Marter 2061 Jan 90% 3.02 0.02 121.23 42.87 44.8 197.56 201.17 2.83 3.61

Marter 2061 Feb 90% 2.52 0.02 120.41 42.78 44.7 197.56 201.15 2.81 3.59

Marter 2061 Mar 90% 2.55 0.02 120.46 42.79 44.7 197.56 201.15 2.82 3.59

Marter 2061 Apr 90% 4.3 0.03 123.24 43.1 45.04 197.56 201.22 2.86 3.66

Marter 2061 May 90% 14.5 0.11 135.31 44.43 46.48 197.56 201.5 3.05 3.94

Marter 2061 Jun 90% 6.49 0.05 126.24 43.44 45.4 197.56 201.29 2.91 3.73

Marter 2061 Jul 90% 2.86 0.02 120.96 42.84 44.76 197.56 201.17 2.82 3.61

Marter 2061 Aug 90% 1.86 0.02 119.21 42.64 44.55 197.56 201.13 2.80 3.57

Marter 2061 Sep 90% 1.86 0.02 119.21 42.64 44.55 197.56 201.13 2.80 3.57

Marter 2061 Oct 90% 2.59 0.02 120.54 42.79 44.71 197.56 201.16 2.82 3.6

Marter 2061 Nov 90% 5.9 0.05 125.43 43.34 45.31 197.56 201.27 2.89 3.71

Marter 2061 Dec 90% 4.32 0.04 123.27 43.1 45.04 197.56 201.22 2.86 3.66

Marter 1865 Jan 10% 7.14 0.06 124.68 39.39 41.2 196.91 201.31 3.17 4.4

Marter 1865 Feb 10% 5.1 0.04 122.27 38.96 40.75 196.91 201.25 3.14 4.34

Marter 1865 Mar 10% 7.76 0.06 125.38 39.52 41.32 196.91 201.32 3.17 4.41

Marter 1865 Apr 10% 78.7 0.46 180.07 48.38 50.56 196.91 202.56 3.72 5.65

Marter 1865 May 10% 68.7 0.41 173.46 47.56 49.7 196.91 202.42 3.65 5.51

Marter 1865 Jun 10% 25.2 0.18 141.56 42.68 44.59 196.91 201.72 3.32 4.81

Marter 1865 Jul 10% 15.5 0.12 133.12 40.91 42.77 196.91 201.52 3.25 4.61

Marter 1865 Aug 10% 8.81 0.07 126.52 39.72 41.53 196.91 201.35 3.19 4.44

Marter 1865 Sep 10% 9.14 0.07 126.87 39.78 41.6 196.91 201.36 3.19 4.45

Marter 1865 Oct 10% 18.1 0.13 135.48 41.44 43.32 196.91 201.57 3.27 4.66

Marter 1865 Nov 10% 20.6 0.15 137.62 41.89 43.78 196.91 201.63 3.29 4.72

Marter 1865 Dec 10% 15.4 0.12 133.04 40.89 42.75 196.91 201.52 3.25 4.61

Marter 1865 Jan 90% 3.02 0.03 119.46 38.44 40.21 196.91 201.17 3.11 4.26

Marter 1865 Feb 90% 2.52 0.02 118.73 38.3 40.07 196.91 201.15 3.10 4.24

Marter 1865 Mar 90% 2.55 0.02 118.77 38.31 40.08 196.91 201.15 3.10 4.24

Marter 1865 Apr 90% 4.3 0.04 121.26 38.78 40.56 196.91 201.22 3.13 4.31

Marter 1865 May 90% 14.5 0.11 132.21 40.71 42.57 196.91 201.49 3.25 4.58

Marter 1865 Jun 90% 6.49 0.05 123.97 39.27 41.06 196.91 201.29 3.16 4.38

Page 81: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 1865 Jul 90% 2.86 0.02 119.22 38.4 40.16 196.91 201.17 3.10 4.26

Marter 1865 Aug 90% 1.86 0.02 117.65 38.1 39.86 196.91 201.13 3.09 4.22

Marter 1865 Sep 90% 1.86 0.02 117.65 38.1 39.86 196.91 201.13 3.09 4.22

Marter 1865 Oct 90% 2.59 0.02 118.84 38.33 40.09 196.91 201.16 3.10 4.25

Marter 1865 Nov 90% 5.9 0.05 123.24 39.13 40.93 196.91 201.27 3.15 4.36

Marter 1865 Dec 90% 4.32 0.04 121.29 38.78 40.56 196.91 201.22 3.13 4.31

Marter 104 1818 Jan 10% 7.14 0.06 120.44 38.45 40.81 196.91 201.31 3.13 4.4

Marter 104 1818 Feb 10% 5.1 0.04 118.09 37.99 40.34 196.91 201.25 3.11 4.34

Marter 104 1818 Mar 10% 7.76 0.06 121.12 38.58 40.95 196.91 201.32 3.14 4.41

Marter 104 1818 Apr 10% 78.7 0.48 172.32 43.66 46.69 196.91 202.56 3.95 5.65

Marter 104 1818 May 10% 68.7 0.43 166.36 43.15 46.11 196.91 202.42 3.86 5.51

Marter 104 1818 Jun 10% 25.2 0.19 136.89 41.01 43.53 196.91 201.72 3.34 4.81

Marter 104 1818 Jul 10% 15.5 0.12 128.7 40.16 42.58 196.91 201.52 3.20 4.61

Marter 104 1818 Aug 10% 8.81 0.07 122.23 38.81 41.18 196.91 201.35 3.15 4.44

Marter 104 1818 Sep 10% 9.14 0.08 122.58 38.89 41.26 196.91 201.36 3.15 4.45

Marter 104 1818 Oct 10% 18.1 0.14 131.01 40.41 42.86 196.91 201.57 3.24 4.66

Marter 104 1818 Nov 10% 20.6 0.16 133.09 40.64 43.11 196.91 201.63 3.27 4.72

Marter 104 1818 Dec 10% 15.4 0.12 128.62 40.16 42.58 196.91 201.51 3.20 4.6

Marter 104 1818 Jan 90% 3.02 0.03 115.35 37.46 39.78 196.91 201.17 3.08 4.26

Marter 104 1818 Feb 90% 2.52 0.02 114.64 37.31 39.63 196.91 201.15 3.07 4.24

Marter 104 1818 Mar 90% 2.55 0.02 114.68 37.32 39.64 196.91 201.15 3.07 4.24

Marter 104 1818 Apr 90% 4.3 0.04 117.11 37.8 40.14 196.91 201.22 3.10 4.31

Marter 104 1818 May 90% 14.5 0.11 127.81 40.04 42.45 196.91 201.49 3.19 4.58

Marter 104 1818 Jun 90% 6.49 0.05 119.75 38.32 40.67 196.91 201.29 3.13 4.38

Marter 104 1818 Jul 90% 2.86 0.02 115.12 37.41 39.73 196.91 201.17 3.08 4.26

Marter 104 1818 Aug 90% 1.86 0.02 113.59 37.11 39.42 196.91 201.13 3.06 4.22

Marter 104 1818 Sep 90% 1.86 0.02 113.59 37.11 39.42 196.91 201.13 3.06 4.22

Marter 104 1818 Oct 90% 2.59 0.02 114.75 37.34 39.66 196.91 201.16 3.07 4.25

Marter 104 1818 Nov 90% 5.9 0.05 119.03 38.18 40.53 196.91 201.27 3.12 4.36

Marter 104 1818 Dec 90% 4.32 0.04 117.14 37.81 40.15 196.91 201.22 3.10 4.31

Marter 1775 Jan 10% 7.14 0.19 41.82 25.71 28.32 198.66 201.3 1.63 2.64

Marter 1775 Feb 10% 5.1 0.14 40.27 25.54 28.08 198.66 201.24 1.58 2.58

Marter 1775 Mar 10% 7.76 0.21 42.27 25.76 28.38 198.66 201.32 1.64 2.66

Marter 1775 Apr 10% 78.7 1.35 73.75 29.07 32.92 198.66 202.47 2.54 3.81

Marter 1775 May 10% 68.7 1.23 70.2 28.71 32.42 198.66 202.35 2.45 3.69

Marter 1775 Jun 10% 25.2 0.57 52.25 26.82 29.85 198.66 201.7 1.95 3.04

Marter 1775 Jul 10% 15.5 0.38 47.14 26.28 29.1 198.66 201.51 1.79 2.85

Marter 1775 Aug 10% 8.81 0.23 43 25.84 28.49 198.66 201.35 1.66 2.69

Page 82: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 1775 Sep 10% 9.14 0.24 43.22 25.86 28.53 198.66 201.36 1.67 2.7

Marter 1775 Oct 10% 18.1 0.44 48.59 26.43 29.31 198.66 201.56 1.84 2.9

Marter 1775 Nov 10% 20.6 0.49 49.89 26.57 29.5 198.66 201.61 1.88 2.95

Marter 1775 Dec 10% 15.4 0.38 47.09 26.27 29.09 198.66 201.51 1.79 2.85

Marter 1775 Jan 90% 3.02 0.09 38.44 25.33 27.8 198.66 201.17 1.52 2.51

Marter 1775 Feb 90% 2.52 0.07 37.96 25.28 27.73 198.66 201.15 1.50 2.49

Marter 1775 Mar 90% 2.55 0.07 37.99 25.28 27.73 198.66 201.15 1.50 2.49

Marter 1775 Apr 90% 4.3 0.12 39.62 25.46 27.98 198.66 201.22 1.56 2.56

Marter 1775 May 90% 14.5 0.36 46.57 26.21 29.01 198.66 201.49 1.78 2.83

Marter 1775 Jun 90% 6.49 0.18 41.37 25.66 28.25 198.66 201.29 1.61 2.63

Marter 1775 Jul 90% 2.86 0.08 38.28 25.32 27.78 198.66 201.17 1.51 2.51

Marter 1775 Aug 90% 1.86 0.06 37.25 25.2 27.62 198.66 201.13 1.48 2.47

Marter 1775 Sep 90% 1.86 0.06 37.25 25.2 27.62 198.66 201.13 1.48 2.47

Marter 1775 Oct 90% 2.59 0.08 38.03 25.29 27.74 198.66 201.16 1.50 2.5

Marter 1775 Nov 90% 5.9 0.16 40.89 25.61 28.18 198.66 201.27 1.60 2.61

Marter 1775 Dec 90% 4.32 0.12 39.63 25.47 27.99 198.66 201.22 1.56 2.56

Marter 1743 Jan 10% 7.14 0.11 96.47 33.76 36.21 196.25 201.31 2.86 5.06

Marter 1743 Feb 10% 5.1 0.08 94.41 33.55 35.96 196.25 201.24 2.81 4.99

Marter 1743 Mar 10% 7.76 0.12 97.06 33.82 36.29 196.25 201.32 2.87 5.07

Marter 1743 Apr 10% 78.7 0.94 138.65 36.73 40.13 196.25 202.5 3.77 6.25

Marter 1743 May 10% 68.7 0.84 134 36.44 39.74 196.25 202.37 3.68 6.12

Marter 1743 Jun 10% 25.2 0.36 110.31 34.97 37.7 196.25 201.71 3.15 5.46

Marter 1743 Jul 10% 15.5 0.23 103.52 34.48 37.06 196.25 201.51 3.00 5.26

Marter 1743 Aug 10% 8.81 0.14 98.02 33.92 36.4 196.25 201.35 2.89 5.1

Marter 1743 Sep 10% 9.14 0.14 98.31 33.95 36.44 196.25 201.36 2.90 5.11

Marter 1743 Oct 10% 18.1 0.27 105.44 34.62 37.24 196.25 201.57 3.05 5.32

Marter 1743 Nov 10% 20.6 0.3 107.17 34.75 37.41 196.25 201.62 3.08 5.37

Marter 1743 Dec 10% 15.4 0.23 103.45 34.47 37.05 196.25 201.51 3.00 5.26

Marter 1743 Jan 90% 3.02 0.05 92 33.29 35.66 196.25 201.17 2.76 4.92

Marter 1743 Feb 90% 2.52 0.04 91.37 33.23 35.58 196.25 201.15 2.75 4.9

Marter 1743 Mar 90% 2.55 0.04 91.41 33.23 35.59 196.25 201.15 2.75 4.9

Marter 1743 Apr 90% 4.3 0.07 93.55 33.46 35.85 196.25 201.22 2.80 4.97

Marter 1743 May 90% 14.5 0.22 102.76 34.41 36.98 196.25 201.49 2.99 5.24

Marter 1743 Jun 90% 6.49 0.1 95.86 33.7 36.14 196.25 201.29 2.84 5.04

Marter 1743 Jul 90% 2.86 0.05 91.8 33.27 35.64 196.25 201.17 2.76 4.92

Marter 1743 Aug 90% 1.86 0.03 90.44 33.13 35.47 196.25 201.13 2.73 4.88

Marter 1743 Sep 90% 1.86 0.03 90.44 33.13 35.47 196.25 201.13 2.73 4.88

Marter 1743 Oct 90% 2.59 0.04 91.47 33.24 35.6 196.25 201.16 2.75 4.91

Marter 1743 Nov 90% 5.9 0.09 95.24 33.63 36.06 196.25 201.27 2.83 5.02

Page 83: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 1743 Dec 90% 4.32 0.07 93.58 33.46 35.86 196.25 201.22 2.80 4.97

Marter 105 1683 Jan 10% 7.14 0.04 195.96 51.3 54.07 196.71 201.31 3.82 4.6

Marter 105 1683 Feb 10% 5.1 0.03 192.82 51.13 53.85 196.71 201.24 3.77 4.53

Marter 105 1683 Mar 10% 7.76 0.04 196.85 51.35 54.13 196.71 201.32 3.83 4.61

Marter 105 1683 Apr 10% 78.7 0.34 260.2 54.5 58.27 196.71 202.52 4.77 5.81

Marter 105 1683 May 10% 68.7 0.31 253.08 54.18 57.83 196.71 202.39 4.67 5.68

Marter 105 1683 Jun 10% 25.2 0.13 216.96 52.42 55.51 196.71 201.71 4.14 5

Marter 105 1683 Jul 10% 15.5 0.08 206.66 51.89 54.82 196.71 201.51 3.98 4.8

Marter 105 1683 Aug 10% 8.81 0.05 198.32 51.43 54.23 196.71 201.35 3.86 4.64

Marter 105 1683 Sep 10% 9.14 0.05 198.77 51.46 54.26 196.71 201.36 3.86 4.65

Marter 105 1683 Oct 10% 18.1 0.1 209.59 52.05 55.02 196.71 201.57 4.03 4.86

Marter 105 1683 Nov 10% 20.6 0.11 212.2 52.18 55.19 196.71 201.62 4.07 4.91

Marter 105 1683 Dec 10% 15.4 0.08 206.56 51.89 54.81 196.71 201.51 3.98 4.8

Marter 105 1683 Jan 90% 3.02 0.02 189.13 50.92 53.58 196.71 201.17 3.71 4.46

Marter 105 1683 Feb 90% 2.52 0.01 188.17 50.85 53.5 196.71 201.15 3.70 4.44

Marter 105 1683 Mar 90% 2.55 0.01 188.23 50.86 53.51 196.71 201.15 3.70 4.44

Marter 105 1683 Apr 90% 4.3 0.02 191.51 51.05 53.75 196.71 201.22 3.75 4.51

Marter 105 1683 May 90% 14.5 0.08 205.52 51.83 54.74 196.71 201.49 3.97 4.78

Marter 105 1683 Jun 90% 6.49 0.04 195.03 51.25 54 196.71 201.29 3.81 4.58

Marter 105 1683 Jul 90% 2.86 0.02 188.82 50.9 53.56 196.71 201.17 3.71 4.46

Marter 105 1683 Aug 90% 1.86 0.01 186.74 50.75 53.38 196.71 201.13 3.68 4.42

Marter 105 1683 Sep 90% 1.86 0.01 186.74 50.75 53.38 196.71 201.13 3.68 4.42

Marter 105 1683 Oct 90% 2.59 0.02 188.31 50.86 53.52 196.71 201.16 3.70 4.45

Marter 105 1683 Nov 90% 5.9 0.03 194.08 51.2 53.93 196.71 201.27 3.79 4.56

Marter 105 1683 Dec 90% 4.32 0.02 191.54 51.05 53.75 196.71 201.22 3.75 4.51

Marter 1628 Jan 10% 7.14 0.02 443.31 87.25 90.11 195.38 201.31 5.08 5.93

Marter 1628 Feb 10% 5.1 0.01 437.97 87.03 89.86 195.38 201.24 5.03 5.86

Marter 1628 Mar 10% 7.76 0.02 444.83 87.31 90.18 195.38 201.32 5.09 5.94

Marter 1628 Apr 10% 78.7 0.16 552.1 91.65 95.19 195.38 202.52 6.02 7.14

Marter 1628 May 10% 68.7 0.14 540.06 91.18 94.65 195.38 202.39 5.92 7.01

Marter 1628 Jun 10% 25.2 0.06 478.96 88.75 91.83 195.38 201.71 5.40 6.33

Marter 1628 Jul 10% 15.5 0.04 461.5 87.98 90.96 195.38 201.51 5.25 6.13

Marter 1628 Aug 10% 8.81 0.02 447.32 87.41 90.3 195.38 201.35 5.12 5.97

Marter 1628 Sep 10% 9.14 0.02 448.09 87.44 90.33 195.38 201.36 5.12 5.98

Marter 1628 Oct 10% 18.1 0.04 466.46 88.17 91.19 195.38 201.57 5.29 6.19

Marter 1628 Nov 10% 20.6 0.05 470.9 88.35 91.39 195.38 201.62 5.33 6.24

Marter 1628 Dec 10% 15.4 0.04 461.33 87.97 90.95 195.38 201.51 5.24 6.13

Marter 1628 Jan 90% 3.02 0.01 431.69 86.78 89.56 195.38 201.17 4.97 5.79

Page 84: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 1628 Feb 90% 2.52 0.01 430.04 86.71 89.49 195.38 201.15 4.96 5.77

Marter 1628 Mar 90% 2.55 0.01 430.15 86.72 89.49 195.38 201.15 4.96 5.77

Marter 1628 Apr 90% 4.3 0.01 435.73 86.94 89.75 195.38 201.22 5.01 5.84

Marter 1628 May 90% 14.5 0.03 459.56 87.89 90.86 195.38 201.49 5.23 6.11

Marter 1628 Jun 90% 6.49 0.02 441.74 87.18 90.03 195.38 201.29 5.07 5.91

Marter 1628 Jul 90% 2.86 0.01 431.16 86.76 89.54 195.38 201.17 4.97 5.79

Marter 1628 Aug 90% 1.86 0 427.61 86.61 89.37 195.38 201.13 4.94 5.75

Marter 1628 Sep 90% 1.86 0 427.61 86.61 89.37 195.38 201.13 4.94 5.75

Marter 1628 Oct 90% 2.59 0.01 430.29 86.72 89.5 195.38 201.16 4.96 5.78

Marter 1628 Nov 90% 5.9 0.01 440.12 87.12 89.96 195.38 201.27 5.05 5.89

Marter 1628 Dec 90% 4.32 0.01 435.8 86.94 89.76 195.38 201.22 5.01 5.84

Marter 106 1589 Jan 10% 7.14 0.02 347.51 78.17 80.9 195.64 201.31 4.45 5.67

Marter 106 1589 Feb 10% 5.1 0.02 342.73 77.68 80.39 195.64 201.24 4.41 5.6

Marter 106 1589 Mar 10% 7.76 0.03 348.87 78.31 81.05 195.64 201.32 4.45 5.68

Marter 106 1589 Apr 10% 78.7 0.21 448.26 89.57 92.62 195.64 202.52 5.00 6.88

Marter 106 1589 May 10% 68.7 0.19 436.59 87.96 90.98 195.64 202.39 4.96 6.75

Marter 106 1589 Jun 10% 25.2 0.08 379.73 80.72 83.59 195.64 201.71 4.70 6.07

Marter 106 1589 Jul 10% 15.5 0.05 363.9 79.64 82.44 195.64 201.51 4.57 5.87

Marter 106 1589 Aug 10% 8.81 0.03 351.11 78.54 81.28 195.64 201.35 4.47 5.71

Marter 106 1589 Sep 10% 9.14 0.03 351.8 78.61 81.35 195.64 201.36 4.48 5.72

Marter 106 1589 Oct 10% 18.1 0.06 368.39 79.95 82.77 195.64 201.57 4.61 5.93

Marter 106 1589 Nov 10% 20.6 0.06 372.41 80.22 83.06 195.64 201.62 4.64 5.98

Marter 106 1589 Dec 10% 15.4 0.05 363.74 79.63 82.43 195.64 201.51 4.57 5.87

Marter 106 1589 Jan 90% 3.02 0.01 337.14 77.15 79.84 195.64 201.17 4.37 5.53

Marter 106 1589 Feb 90% 2.52 0.01 335.67 77.02 79.71 195.64 201.15 4.36 5.51

Marter 106 1589 Mar 90% 2.55 0.01 335.77 77.03 79.72 195.64 201.15 4.36 5.51

Marter 106 1589 Apr 90% 4.3 0.01 340.74 77.47 80.18 195.64 201.22 4.40 5.58

Marter 106 1589 May 90% 14.5 0.05 362.14 79.51 82.31 195.64 201.49 4.55 5.85

Marter 106 1589 Jun 90% 6.49 0.02 346.1 78.03 80.75 195.64 201.29 4.44 5.65

Marter 106 1589 Jul 90% 2.86 0.01 336.67 77.11 79.8 195.64 201.17 4.37 5.53

Marter 106 1589 Aug 90% 1.86 0.01 333.52 76.84 79.51 195.64 201.13 4.34 5.49

Marter 106 1589 Sep 90% 1.86 0.01 333.52 76.84 79.51 195.64 201.13 4.34 5.49

Marter 106 1589 Oct 90% 2.59 0.01 335.9 77.04 79.73 195.64 201.16 4.36 5.52

Marter 106 1589 Nov 90% 5.9 0.02 344.65 77.88 80.6 195.64 201.27 4.43 5.63

Marter 106 1589 Dec 90% 4.32 0.01 340.79 77.48 80.18 195.64 201.22 4.40 5.58

Marter 1550 Jan 10% 7.14 0.02 339.14 60.55 64.39 194.23 201.31 5.60 7.08

Marter 1550 Feb 10% 5.1 0.02 335.44 60.28 64.09 194.23 201.24 5.56 7.01

Marter 1550 Mar 10% 7.76 0.02 340.2 60.62 64.47 194.23 201.32 5.61 7.09

Page 85: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 1550 Apr 10% 78.7 0.21 419.71 70.82 75.2 194.23 202.52 5.93 8.29

Marter 1550 May 10% 68.7 0.19 410.47 69.98 74.3 194.23 202.39 5.87 8.16

Marter 1550 Jun 10% 25.2 0.08 364.49 65.07 69.1 194.23 201.71 5.60 7.48

Marter 1550 Jul 10% 15.5 0.05 351.82 63.22 67.16 194.23 201.51 5.57 7.28

Marter 1550 Aug 10% 8.81 0.03 341.93 60.75 64.61 194.23 201.35 5.63 7.12

Marter 1550 Sep 10% 9.14 0.03 342.46 60.79 64.65 194.23 201.36 5.63 7.13

Marter 1550 Oct 10% 18.1 0.06 355.39 63.75 67.71 194.23 201.57 5.57 7.34

Marter 1550 Nov 10% 20.6 0.06 358.61 64.22 68.21 194.23 201.62 5.58 7.39

Marter 1550 Dec 10% 15.4 0.05 351.7 63.2 67.14 194.23 201.51 5.56 7.28

Marter 1550 Jan 90% 3.02 0.01 331.09 59.96 63.74 194.23 201.17 5.52 6.94

Marter 1550 Feb 90% 2.52 0.01 329.96 59.87 63.65 194.23 201.15 5.51 6.92

Marter 1550 Mar 90% 2.55 0.01 330.03 59.88 63.65 194.23 201.15 5.51 6.92

Marter 1550 Apr 90% 4.3 0.01 333.89 60.16 63.96 194.23 201.22 5.55 6.99

Marter 1550 May 90% 14.5 0.04 350.44 61.27 65.21 194.23 201.49 5.72 7.26

Marter 1550 Jun 90% 6.49 0.02 338.05 60.47 64.3 194.23 201.29 5.59 7.06

Marter 1550 Jul 90% 2.86 0.01 330.73 59.93 63.71 194.23 201.17 5.52 6.94

Marter 1550 Aug 90% 1.86 0.01 328.28 59.75 63.51 194.23 201.13 5.49 6.9

Marter 1550 Sep 90% 1.86 0.01 328.28 59.75 63.51 194.23 201.13 5.49 6.9

Marter 1550 Oct 90% 2.59 0.01 330.13 59.89 63.66 194.23 201.16 5.51 6.93

Marter 1550 Nov 90% 5.9 0.02 336.93 60.38 64.21 194.23 201.27 5.58 7.04

Marter 1550 Dec 90% 4.32 0.01 333.93 60.17 63.97 194.23 201.22 5.55 6.99

Marter 107 1494 Jan 10% 7.14 0.02 435.15 76.11 80.18 194.03 201.31 5.72 7.28

Marter 107 1494 Feb 10% 5.1 0.01 430.49 75.87 79.91 194.03 201.24 5.67 7.21

Marter 107 1494 Mar 10% 7.76 0.02 436.47 76.18 80.26 194.03 201.32 5.73 7.29

Marter 107 1494 Apr 10% 78.7 0.17 539.24 89.94 94.48 194.03 202.52 6.00 8.49

Marter 107 1494 May 10% 68.7 0.15 527.46 89.34 93.83 194.03 202.39 5.90 8.36

Marter 107 1494 Jun 10% 25.2 0.06 467.94 85.75 89.97 194.03 201.71 5.46 7.68

Marter 107 1494 Jul 10% 15.5 0.04 451.16 84.19 88.35 194.03 201.51 5.36 7.48

Marter 107 1494 Aug 10% 8.81 0.02 438.65 76.3 80.39 194.03 201.35 5.75 7.32

Marter 107 1494 Sep 10% 9.14 0.02 439.32 76.33 80.43 194.03 201.36 5.76 7.33

Marter 107 1494 Oct 10% 18.1 0.04 455.91 84.63 88.81 194.03 201.57 5.39 7.54

Marter 107 1494 Nov 10% 20.6 0.05 460.17 85.03 89.22 194.03 201.62 5.41 7.59

Marter 107 1494 Dec 10% 15.4 0.04 450.99 84.17 88.33 194.03 201.51 5.36 7.48

Marter 107 1494 Jan 90% 3.02 0.01 425.02 75.58 79.59 194.03 201.17 5.62 7.14

Marter 107 1494 Feb 90% 2.52 0.01 423.58 75.51 79.5 194.03 201.15 5.61 7.12

Marter 107 1494 Mar 90% 2.55 0.01 423.68 75.51 79.51 194.03 201.15 5.61 7.12

Marter 107 1494 Apr 90% 4.3 0.01 428.54 75.76 79.79 194.03 201.22 5.66 7.19

Marter 107 1494 May 90% 14.5 0.04 449.35 78.02 82.17 194.03 201.49 5.76 7.46

Marter 107 1494 Jun 90% 6.49 0.02 433.78 76.04 80.1 194.03 201.29 5.70 7.26

Page 86: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

��������8��

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 107 1494 Jul 90% 2.86 0.01 424.56 75.56 79.56 194.03 201.17 5.62 7.14

Marter 107 1494 Aug 90% 1.86 0 421.47 75.4 79.38 194.03 201.13 5.59 7.1

Marter 107 1494 Sep 90% 1.86 0 421.47 75.4 79.38 194.03 201.13 5.59 7.1

Marter 107 1494 Oct 90% 2.59 0.01 423.8 75.52 79.52 194.03 201.16 5.61 7.13

Marter 107 1494 Nov 90% 5.9 0.02 432.36 75.97 80.02 194.03 201.27 5.69 7.24

Marter 107 1494 Dec 90% 4.32 0.01 428.6 75.77 79.79 194.03 201.22 5.66 7.19

Marter 1429 Jan 10% 7.14 0.03 242.55 47.86 51.63 194.25 201.31 5.07 7.06

Marter 1429 Feb 10% 5.1 0.02 239.63 47.5 51.25 194.25 201.24 5.04 6.99

Marter 1429 Mar 10% 7.76 0.04 243.38 47.96 51.73 194.25 201.32 5.07 7.07

Marter 1429 Apr 10% 78.7 0.31 304.3 53.95 58.21 194.25 202.52 5.64 8.27

Marter 1429 May 10% 68.7 0.28 297.3 53.32 57.52 194.25 202.39 5.58 8.14

Marter 1429 Jun 10% 25.2 0.11 262.37 50.02 53.95 194.25 201.71 5.25 7.46

Marter 1429 Jul 10% 15.5 0.07 252.6 49.01 52.86 194.25 201.51 5.15 7.26

Marter 1429 Aug 10% 8.81 0.04 244.75 48.12 51.9 194.25 201.35 5.09 7.1

Marter 1429 Sep 10% 9.14 0.04 245.18 48.17 51.96 194.25 201.36 5.09 7.11

Marter 1429 Oct 10% 18.1 0.08 255.36 49.3 53.17 194.25 201.57 5.18 7.32

Marter 1429 Nov 10% 20.6 0.09 257.84 49.56 53.44 194.25 201.62 5.20 7.37

Marter 1429 Dec 10% 15.4 0.07 252.5 49 52.85 194.25 201.51 5.15 7.26

Marter 1429 Jan 90% 3.02 0.01 236.21 47.1 50.82 194.25 201.17 5.02 6.92

Marter 1429 Feb 90% 2.52 0.01 235.32 46.99 50.71 194.25 201.15 5.01 6.9

Marter 1429 Mar 90% 2.55 0.01 235.38 47 50.72 194.25 201.15 5.01 6.9

Marter 1429 Apr 90% 4.3 0.02 238.41 47.36 51.1 194.25 201.22 5.03 6.97

Marter 1429 May 90% 14.5 0.07 251.52 48.9 52.73 194.25 201.49 5.14 7.24

Marter 1429 Jun 90% 6.49 0.03 241.69 47.75 51.52 194.25 201.29 5.06 7.04

Marter 1429 Jul 90% 2.86 0.01 235.92 47.06 50.78 194.25 201.17 5.01 6.92

Marter 1429 Aug 90% 1.86 0.01 234 46.85 50.55 194.25 201.13 4.99 6.88

Marter 1429 Sep 90% 1.86 0.01 234 46.85 50.55 194.25 201.13 4.99 6.88

Marter 1429 Oct 90% 2.59 0.01 235.46 47.01 50.73 194.25 201.16 5.01 6.91

Marter 1429 Nov 90% 5.9 0.03 240.8 47.65 51.4 194.25 201.27 5.05 7.02

Marter 1429 Dec 90% 4.32 0.02 238.45 47.36 51.1 194.25 201.22 5.03 6.97

Marter 108 1411 Jan 10% 7.14 0.03 287.66 58.26 62.21 194.51 201.31 4.94 6.8

Marter 108 1411 Feb 10% 5.1 0.02 284.11 57.88 61.81 194.51 201.24 4.91 6.73

Marter 108 1411 Mar 10% 7.76 0.03 288.68 58.37 62.32 194.51 201.32 4.95 6.81

Marter 108 1411 Apr 10% 78.7 0.27 361.96 64.65 69.09 194.51 202.52 5.60 8.01

Marter 108 1411 May 10% 68.7 0.24 353.55 63.94 68.33 194.51 202.39 5.53 7.88

Marter 108 1411 Jun 10% 25.2 0.1 311.69 60.24 64.36 194.51 201.71 5.17 7.2

Marter 108 1411 Jul 10% 15.5 0.06 299.88 59.47 63.5 194.51 201.51 5.04 7

Marter 108 1411 Aug 10% 8.81 0.04 290.35 58.55 62.51 194.51 201.35 4.96 6.84

Page 87: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 108 1411 Sep 10% 9.14 0.04 290.86 58.6 62.57 194.51 201.36 4.96 6.85

Marter 108 1411 Oct 10% 18.1 0.07 303.23 59.69 63.74 194.51 201.57 5.08 7.06

Marter 108 1411 Nov 10% 20.6 0.08 306.23 59.89 63.96 194.51 201.62 5.11 7.11

Marter 108 1411 Dec 10% 15.4 0.06 299.77 59.47 63.49 194.51 201.51 5.04 7

Marter 108 1411 Jan 90% 3.02 0.01 279.94 57.44 61.34 194.51 201.17 4.87 6.66

Marter 108 1411 Feb 90% 2.52 0.01 278.85 57.32 61.22 194.51 201.15 4.86 6.64

Marter 108 1411 Mar 90% 2.55 0.01 278.92 57.33 61.23 194.51 201.15 4.87 6.64

Marter 108 1411 Apr 90% 4.3 0.02 282.62 57.73 61.65 194.51 201.22 4.90 6.71

Marter 108 1411 May 90% 14.5 0.06 298.57 59.37 63.38 194.51 201.49 5.03 6.98

Marter 108 1411 Jun 90% 6.49 0.03 286.62 58.15 62.09 194.51 201.29 4.93 6.78

Marter 108 1411 Jul 90% 2.86 0.01 279.59 57.4 61.3 194.51 201.17 4.87 6.66

Marter 108 1411 Aug 90% 1.86 0.01 277.25 57.15 61.04 194.51 201.13 4.85 6.62

Marter 108 1411 Sep 90% 1.86 0.01 277.25 57.15 61.04 194.51 201.13 4.85 6.62

Marter 108 1411 Oct 90% 2.59 0.01 279.02 57.34 61.24 194.51 201.16 4.87 6.65

Marter 108 1411 Nov 90% 5.9 0.02 285.54 58.04 61.97 194.51 201.27 4.92 6.76

Marter 108 1411 Dec 90% 4.32 0.02 282.66 57.73 61.65 194.51 201.22 4.90 6.71

Marter 1358 Jan 10% 7.14 0.01 640.02 99.32 102.55 192.68 201.31 6.44 8.63

Marter 1358 Feb 10% 5.1 0.01 633.95 99.06 102.27 192.68 201.24 6.40 8.56

Marter 1358 Mar 10% 7.76 0.01 641.75 99.39 102.63 192.68 201.32 6.46 8.64

Marter 1358 Apr 10% 78.7 0.12 764.16 104.76 108.6 192.68 202.52 7.29 9.84

Marter 1358 May 10% 68.7 0.1 750.45 104.3 108.07 192.68 202.39 7.20 9.71

Marter 1358 Jun 10% 25.2 0.04 680.62 101.35 104.77 192.68 201.71 6.72 9.03

Marter 1358 Jul 10% 15.5 0.03 660.73 100.21 103.55 192.68 201.51 6.59 8.83

Marter 1358 Aug 10% 8.81 0.02 644.59 99.51 102.77 192.68 201.35 6.48 8.67

Marter 1358 Sep 10% 9.14 0.02 645.46 99.55 102.81 192.68 201.36 6.48 8.68

Marter 1358 Oct 10% 18.1 0.03 666.37 100.54 103.89 192.68 201.57 6.63 8.89

Marter 1358 Nov 10% 20.6 0.03 671.43 100.83 104.2 192.68 201.62 6.66 8.94

Marter 1358 Dec 10% 15.4 0.03 660.53 100.2 103.53 192.68 201.51 6.59 8.83

Marter 1358 Jan 90% 3.02 0.01 626.8 98.76 101.92 192.68 201.17 6.35 8.49

Marter 1358 Feb 90% 2.52 0 624.92 98.68 101.83 192.68 201.15 6.33 8.47

Marter 1358 Mar 90% 2.55 0 625.05 98.68 101.84 192.68 201.15 6.33 8.47

Marter 1358 Apr 90% 4.3 0.01 631.4 98.95 102.14 192.68 201.22 6.38 8.54

Marter 1358 May 90% 14.5 0.02 658.51 100.1 103.42 192.68 201.49 6.58 8.81

Marter 1358 Jun 90% 6.49 0.01 638.24 99.24 102.47 192.68 201.29 6.43 8.61

Marter 1358 Jul 90% 2.86 0.01 626.19 98.73 101.9 192.68 201.17 6.34 8.49

Marter 1358 Aug 90% 1.86 0 622.16 98.56 101.7 192.68 201.13 6.31 8.45

Marter 1358 Sep 90% 1.86 0 622.16 98.56 101.7 192.68 201.13 6.31 8.45

Marter 1358 Oct 90% 2.59 0 625.21 98.69 101.85 192.68 201.16 6.34 8.48

Marter 1358 Nov 90% 5.9 0.01 636.4 99.17 102.38 192.68 201.27 6.42 8.59

Page 88: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 1358 Dec 90% 4.32 0.01 631.47 98.96 102.15 192.68 201.22 6.38 8.54

Marter 109 1324 Jan 10% 7.14 0.01 560.11 86.2 90.64 192.48 201.31 6.50 8.83

Marter 109 1324 Feb 10% 5.1 0.01 554.84 85.98 90.39 192.48 201.24 6.45 8.76

Marter 109 1324 Mar 10% 7.76 0.01 561.61 86.26 90.71 192.48 201.32 6.51 8.84

Marter 109 1324 Apr 10% 78.7 0.13 668.34 92.14 97.14 192.48 202.52 7.25 10.04

Marter 109 1324 May 10% 68.7 0.11 656.3 91.48 96.42 192.48 202.39 7.17 9.91

Marter 109 1324 Jun 10% 25.2 0.05 595.37 88.16 92.79 192.48 201.71 6.75 9.23

Marter 109 1324 Jul 10% 15.5 0.03 578.08 87.03 91.58 192.48 201.51 6.64 9.03

Marter 109 1324 Aug 10% 8.81 0.02 564.08 86.36 90.82 192.48 201.35 6.53 8.87

Marter 109 1324 Sep 10% 9.14 0.02 564.83 86.39 90.86 192.48 201.36 6.54 8.88

Marter 109 1324 Oct 10% 18.1 0.03 582.98 87.35 91.92 192.48 201.57 6.67 9.09

Marter 109 1324 Nov 10% 20.6 0.04 587.38 87.64 92.23 192.48 201.62 6.70 9.14

Marter 109 1324 Dec 10% 15.4 0.03 577.91 87.02 91.56 192.48 201.51 6.64 9.03

Marter 109 1324 Jan 90% 3.02 0.01 548.63 85.73 90.1 192.48 201.17 6.40 8.69

Marter 109 1324 Feb 90% 2.52 0 547.01 85.66 90.02 192.48 201.15 6.39 8.67

Marter 109 1324 Mar 90% 2.55 0 547.12 85.67 90.03 192.48 201.15 6.39 8.67

Marter 109 1324 Apr 90% 4.3 0.01 552.63 85.89 90.29 192.48 201.22 6.43 8.74

Marter 109 1324 May 90% 14.5 0.03 576.16 86.9 91.44 192.48 201.49 6.63 9.01

Marter 109 1324 Jun 90% 6.49 0.01 558.56 86.13 90.56 192.48 201.29 6.49 8.81

Marter 109 1324 Jul 90% 2.86 0.01 548.11 85.71 90.07 192.48 201.17 6.39 8.69

Marter 109 1324 Aug 90% 1.86 0 544.61 85.57 89.91 192.48 201.13 6.36 8.65

Marter 109 1324 Sep 90% 1.86 0 544.61 85.57 89.91 192.48 201.13 6.36 8.65

Marter 109 1324 Oct 90% 2.59 0.01 547.26 85.67 90.03 192.48 201.16 6.39 8.68

Marter 109 1324 Nov 90% 5.9 0.01 556.96 86.07 90.49 192.48 201.27 6.47 8.79

Marter 109 1324 Dec 90% 4.32 0.01 552.69 85.89 90.29 192.48 201.22 6.43 8.74

Marter 976 Jan 10% 7.14 0.02 465.55 85.62 88.49 191.71 201.31 5.44 9.6

Marter 976 Feb 10% 5.1 0.01 460.32 85.34 88.19 191.71 201.24 5.39 9.53

Marter 976 Mar 10% 7.76 0.02 467.04 85.7 88.58 191.71 201.32 5.45 9.61

Marter 976 Apr 10% 78.7 0.18 572.94 91.56 94.91 191.71 202.52 6.26 10.81

Marter 976 May 10% 68.7 0.16 561 90.9 94.2 191.71 202.39 6.17 10.68

Marter 976 Jun 10% 25.2 0.06 500.61 87.6 90.63 191.71 201.71 5.71 10

Marter 976 Jul 10% 15.5 0.04 483.42 86.63 89.58 191.71 201.51 5.58 9.8

Marter 976 Aug 10% 8.81 0.02 469.49 85.83 88.72 191.71 201.35 5.47 9.64

Marter 976 Sep 10% 9.14 0.02 470.24 85.86 88.76 191.71 201.36 5.48 9.65

Marter 976 Oct 10% 18.1 0.05 488.3 86.91 89.88 191.71 201.57 5.62 9.86

Marter 976 Nov 10% 20.6 0.05 492.67 87.16 90.15 191.71 201.62 5.65 9.91

Marter 976 Dec 10% 15.4 0.04 483.25 86.62 89.57 191.71 201.51 5.58 9.8

Marter 976 Jan 90% 3.02 0.01 454.16 85.01 87.83 191.71 201.17 5.34 9.46

Page 89: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 976 Feb 90% 2.52 0.01 452.55 84.93 87.73 191.71 201.15 5.33 9.44

Marter 976 Mar 90% 2.55 0.01 452.66 84.93 87.74 191.71 201.15 5.33 9.44

Marter 976 Apr 90% 4.3 0.01 458.13 85.22 88.06 191.71 201.22 5.38 9.51

Marter 976 May 90% 14.5 0.04 481.51 86.51 89.46 191.71 201.49 5.57 9.78

Marter 976 Jun 90% 6.49 0.02 464.01 85.54 88.4 191.71 201.29 5.42 9.58

Marter 976 Jul 90% 2.86 0.01 453.64 84.99 87.8 191.71 201.17 5.34 9.46

Marter 976 Aug 90% 1.86 0.01 450.17 84.8 87.6 191.71 201.13 5.31 9.42

Marter 976 Sep 90% 1.86 0.01 450.17 84.8 87.6 191.71 201.13 5.31 9.42

Marter 976 Oct 90% 2.59 0.01 452.8 84.94 87.75 191.71 201.16 5.33 9.45

Marter 976 Nov 90% 5.9 0.02 462.43 85.45 88.31 191.71 201.27 5.41 9.56

Marter 976 Dec 90% 4.32 0.01 458.19 85.23 88.06 191.71 201.22 5.38 9.51

Marter 864 Jan 10% 7.14 0.02 746.19 136.25 139.93 191.12 201.31 5.48 10.19

Marter 864 Feb 10% 5.1 0.01 737.85 135.97 139.62 191.12 201.24 5.43 10.12

Marter 864 Mar 10% 7.76 0.02 748.56 136.33 140.01 191.12 201.32 5.49 10.2

Marter 864 Apr 10% 78.7 0.15 914.43 141.63 145.86 191.12 202.52 6.46 11.4

Marter 864 May 10% 68.7 0.14 895.94 140.84 145.02 191.12 202.39 6.36 11.27

Marter 864 Jun 10% 25.2 0.05 801.7 137.91 141.78 191.12 201.71 5.81 10.59

Marter 864 Jul 10% 15.5 0.03 774.56 137.2 140.96 191.12 201.51 5.65 10.39

Marter 864 Aug 10% 8.81 0.02 752.45 136.46 140.16 191.12 201.35 5.51 10.23

Marter 864 Sep 10% 9.14 0.02 753.64 136.5 140.2 191.12 201.36 5.52 10.24

Marter 864 Oct 10% 18.1 0.04 782.27 137.4 141.2 191.12 201.57 5.69 10.45

Marter 864 Nov 10% 20.6 0.05 789.18 137.59 141.41 191.12 201.62 5.74 10.5

Marter 864 Dec 10% 15.4 0.03 774.29 137.19 140.95 191.12 201.51 5.64 10.39

Marter 864 Jan 90% 3.02 0.01 728.03 135.64 139.26 191.12 201.17 5.37 10.05

Marter 864 Feb 90% 2.52 0.01 725.46 135.56 139.16 191.12 201.15 5.35 10.03

Marter 864 Mar 90% 2.55 0.01 725.63 135.56 139.17 191.12 201.15 5.35 10.03

Marter 864 Apr 90% 4.3 0.01 734.36 135.86 139.49 191.12 201.22 5.41 10.1

Marter 864 May 90% 14.5 0.03 771.53 137.11 140.86 191.12 201.49 5.63 10.37

Marter 864 Jun 90% 6.49 0.02 743.74 136.17 139.84 191.12 201.29 5.46 10.17

Marter 864 Jul 90% 2.86 0.01 727.2 135.62 139.23 191.12 201.17 5.36 10.05

Marter 864 Aug 90% 1.86 0 721.66 135.43 139.03 191.12 201.13 5.33 10.01

Marter 864 Sep 90% 1.86 0 721.66 135.43 139.03 191.12 201.13 5.33 10.01

Marter 864 Oct 90% 2.59 0.01 725.85 135.57 139.18 191.12 201.16 5.35 10.04

Marter 864 Nov 90% 5.9 0.01 741.21 136.09 139.74 191.12 201.27 5.45 10.15

Marter 864 Dec 90% 4.32 0.01 734.46 135.86 139.5 191.12 201.22 5.41 10.1

Marter 705 Jan 10% 7.14 0.02 660.82 119.41 122.34 190.86 201.31 5.53 10.45

Marter 705 Feb 10% 5.1 0.01 653.52 118.94 121.86 190.86 201.24 5.49 10.38

Marter 705 Mar 10% 7.76 0.02 662.89 119.54 122.48 190.86 201.32 5.55 10.46

Page 90: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 705 Apr 10% 78.7 0.15 810.78 127.64 130.95 190.86 202.52 6.35 11.66

Marter 705 May 10% 68.7 0.13 794.13 126.75 130.02 190.86 202.39 6.27 11.53

Marter 705 Jun 10% 25.2 0.05 709.78 122.51 125.55 190.86 201.71 5.79 10.85

Marter 705 Jul 10% 15.5 0.03 685.75 121.04 124.03 190.86 201.51 5.67 10.65

Marter 705 Aug 10% 8.81 0.02 666.31 119.76 122.71 190.86 201.35 5.56 10.49

Marter 705 Sep 10% 9.14 0.02 667.36 119.83 122.78 190.86 201.36 5.57 10.5

Marter 705 Oct 10% 18.1 0.04 692.57 121.46 124.47 190.86 201.57 5.70 10.71

Marter 705 Nov 10% 20.6 0.04 698.68 121.84 124.86 190.86 201.62 5.73 10.76

Marter 705 Dec 10% 15.4 0.03 685.52 121.02 124.01 190.86 201.51 5.66 10.65

Marter 705 Jan 90% 3.02 0.01 644.94 118.39 121.29 190.86 201.17 5.45 10.31

Marter 705 Feb 90% 2.52 0.01 642.69 118.24 121.14 190.86 201.15 5.44 10.29

Marter 705 Mar 90% 2.55 0.01 642.84 118.25 121.15 190.86 201.15 5.44 10.29

Marter 705 Apr 90% 4.3 0.01 650.46 118.74 121.66 190.86 201.22 5.48 10.36

Marter 705 May 90% 14.5 0.03 683.09 120.87 123.85 190.86 201.49 5.65 10.63

Marter 705 Jun 90% 6.49 0.01 658.67 119.27 122.2 190.86 201.29 5.52 10.43

Marter 705 Jul 90% 2.86 0.01 644.22 118.34 121.24 190.86 201.17 5.44 10.31

Marter 705 Aug 90% 1.86 0 639.38 118.04 120.93 190.86 201.13 5.42 10.27

Marter 705 Sep 90% 1.86 0 639.38 118.04 120.93 190.86 201.13 5.42 10.27

Marter 705 Oct 90% 2.59 0.01 643.04 118.26 121.16 190.86 201.16 5.44 10.3

Marter 705 Nov 90% 5.9 0.01 656.46 119.13 122.05 190.86 201.27 5.51 10.41

Marter 705 Dec 90% 4.32 0.01 650.55 118.75 121.66 190.86 201.22 5.48 10.36

Marter -3 497 Jan 10% 7.14 0.02 565.9 98.89 103.05 191.38 201.31 5.72 9.93

Marter -3 497 Feb 10% 5.1 0.01 559.86 98.56 102.7 191.38 201.24 5.68 9.86

Marter -3 497 Mar 10% 7.76 0.02 567.62 98.98 103.15 191.38 201.32 5.73 9.94

Marter -3 497 Apr 10% 78.7 0.17 690.07 106.26 110.84 191.38 202.52 6.49 11.14

Marter -3 497 May 10% 68.7 0.15 676.23 105.45 109.98 191.38 202.39 6.41 11.01

Marter -3 497 Jun 10% 25.2 0.06 606.38 101.2 105.51 191.38 201.71 5.99 10.33

Marter -3 497 Jul 10% 15.5 0.04 586.53 100.04 104.28 191.38 201.51 5.86 10.13

Marter -3 497 Aug 10% 8.81 0.02 570.45 99.13 103.31 191.38 201.35 5.75 9.97

Marter -3 497 Sep 10% 9.14 0.02 571.32 99.18 103.36 191.38 201.36 5.76 9.98

Marter -3 497 Oct 10% 18.1 0.04 592.16 100.37 104.63 191.38 201.57 5.90 10.19

Marter -3 497 Nov 10% 20.6 0.05 597.21 100.67 104.94 191.38 201.62 5.93 10.24

Marter -3 497 Dec 10% 15.4 0.04 586.34 100.03 104.26 191.38 201.51 5.86 10.13

Marter -3 497 Jan 90% 3.02 0.01 552.74 98.18 102.29 191.38 201.17 5.63 9.79

Marter -3 497 Feb 90% 2.52 0.01 550.88 98.07 102.18 191.38 201.15 5.62 9.77

Marter -3 497 Mar 90% 2.55 0.01 551 98.08 102.19 191.38 201.15 5.62 9.77

Marter -3 497 Apr 90% 4.3 0.01 557.32 98.43 102.55 191.38 201.22 5.66 9.84

Marter -3 497 May 90% 14.5 0.04 584.32 99.91 104.14 191.38 201.49 5.85 10.11

Marter -3 497 Jun 90% 6.49 0.02 564.12 98.79 102.95 191.38 201.29 5.71 9.91

Page 91: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -3 497 Jul 90% 2.86 0.01 552.14 98.14 102.25 191.38 201.17 5.63 9.79

Marter -3 497 Aug 90% 1.86 0 548.13 97.92 102.02 191.38 201.13 5.60 9.75

Marter -3 497 Sep 90% 1.86 0 548.13 97.92 102.02 191.38 201.13 5.60 9.75

Marter -3 497 Oct 90% 2.59 0.01 551.17 98.09 102.19 191.38 201.16 5.62 9.78

Marter -3 497 Nov 90% 5.9 0.01 562.29 98.69 102.84 191.38 201.27 5.70 9.89

Marter -3 497 Dec 90% 4.32 0.01 557.39 98.43 102.56 191.38 201.22 5.66 9.84

Marter -2 294 Jan 10% 7.14 0.02 590.43 106.75 110.95 190.72 201.31 5.53 10.59

Marter -2 294 Feb 10% 5.1 0.01 583.9 106.42 110.6 190.72 201.24 5.49 10.52

Marter -2 294 Mar 10% 7.76 0.02 592.29 106.83 111.04 190.72 201.32 5.54 10.6

Marter -2 294 Apr 10% 78.7 0.18 723.28 112.47 117.18 190.72 202.52 6.43 11.8

Marter -2 294 May 10% 68.7 0.16 708.62 111.91 116.56 190.72 202.39 6.33 11.67

Marter -2 294 Jun 10% 25.2 0.06 634.01 108.66 113.03 190.72 201.71 5.83 10.99

Marter -2 294 Jul 10% 15.5 0.04 612.67 107.74 112.03 190.72 201.51 5.69 10.79

Marter -2 294 Aug 10% 8.81 0.02 595.34 106.97 111.19 190.72 201.35 5.57 10.63

Marter -2 294 Sep 10% 9.14 0.02 596.27 107.01 111.23 190.72 201.36 5.57 10.64

Marter -2 294 Oct 10% 18.1 0.05 618.73 108 112.31 190.72 201.57 5.73 10.85

Marter -2 294 Nov 10% 20.6 0.05 624.17 108.23 112.57 190.72 201.62 5.77 10.9

Marter -2 294 Dec 10% 15.4 0.04 612.46 107.73 112.02 190.72 201.51 5.69 10.79

Marter -2 294 Jan 90% 3.02 0.01 576.22 106 110.15 190.72 201.17 5.44 10.45

Marter -2 294 Feb 90% 2.52 0.01 574.21 105.89 110.03 190.72 201.15 5.42 10.43

Marter -2 294 Mar 90% 2.55 0.01 574.34 105.89 110.04 190.72 201.15 5.42 10.43

Marter -2 294 Apr 90% 4.3 0.01 581.17 106.27 110.44 190.72 201.22 5.47 10.5

Marter -2 294 May 90% 14.5 0.04 610.3 107.64 111.92 190.72 201.49 5.67 10.77

Marter -2 294 Jun 90% 6.49 0.02 588.51 106.66 110.86 190.72 201.29 5.52 10.57

Marter -2 294 Jul 90% 2.86 0.01 575.57 105.96 110.11 190.72 201.17 5.43 10.45

Marter -2 294 Aug 90% 1.86 0.01 571.24 105.72 109.86 190.72 201.13 5.40 10.41

Marter -2 294 Sep 90% 1.86 0.01 571.24 105.72 109.86 190.72 201.13 5.40 10.41

Marter -2 294 Oct 90% 2.59 0.01 574.52 105.9 110.05 190.72 201.16 5.43 10.44

Marter -2 294 Nov 90% 5.9 0.02 586.53 106.57 110.76 190.72 201.27 5.50 10.55

Marter -2 294 Dec 90% 4.32 0.01 581.24 106.27 110.45 190.72 201.22 5.47 10.5

Marter -1 112 Jan 10% 7.14 0.02 769.61 143.2 147.23 191.5 201.31 5.37 9.81

Marter -1 112 Feb 10% 5.1 0.01 760.85 142.86 146.87 191.5 201.24 5.33 9.74

Marter -1 112 Mar 10% 7.76 0.02 772.1 143.29 147.33 191.5 201.32 5.39 9.82

Marter -1 112 Apr 10% 78.7 0.15 948.35 154.19 158.6 191.5 202.52 6.15 11.02

Marter -1 112 May 10% 68.7 0.13 928.31 152.38 156.76 191.5 202.39 6.09 10.89

Marter -1 112 Jun 10% 25.2 0.05 828.01 145.46 149.63 191.5 201.71 5.69 10.21

Marter -1 112 Jul 10% 15.5 0.03 799.43 144.34 148.44 191.5 201.51 5.54 10.01

Marter -1 112 Aug 10% 8.81 0.02 776.19 143.45 147.5 191.5 201.35 5.41 9.85

Page 92: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -1 112 Sep 10% 9.14 0.02 777.45 143.5 147.55 191.5 201.36 5.42 9.86

Marter -1 112 Oct 10% 18.1 0.04 807.54 144.66 148.79 191.5 201.57 5.58 10.07

Marter -1 112 Nov 10% 20.6 0.04 814.82 144.94 149.09 191.5 201.62 5.62 10.12

Marter -1 112 Dec 10% 15.4 0.03 799.15 144.33 148.43 191.5 201.51 5.54 10.01

Marter -1 112 Jan 90% 3.02 0.01 750.54 142.45 146.44 191.5 201.17 5.27 9.67

Marter -1 112 Feb 90% 2.52 0.01 747.84 142.34 146.32 191.5 201.15 5.25 9.65

Marter -1 112 Mar 90% 2.55 0.01 748.01 142.35 146.33 191.5 201.15 5.25 9.65

Marter -1 112 Apr 90% 4.3 0.01 757.18 142.71 146.71 191.5 201.22 5.31 9.72

Marter -1 112 May 90% 14.5 0.03 796.25 144.21 148.31 191.5 201.49 5.52 9.99

Marter -1 112 Jun 90% 6.49 0.01 767.04 143.1 147.12 191.5 201.29 5.36 9.79

Marter -1 112 Jul 90% 2.86 0.01 749.67 142.42 146.4 191.5 201.17 5.26 9.67

Marter -1 112 Aug 90% 1.86 0 743.85 142.19 146.15 191.5 201.13 5.23 9.63

Marter -1 112 Sep 90% 1.86 0 743.85 142.19 146.15 191.5 201.13 5.23 9.63

Marter -1 112 Oct 90% 2.59 0.01 748.25 142.36 146.34 191.5 201.16 5.26 9.66

Marter -1 112 Nov 90% 5.9 0.01 764.38 142.99 147.01 191.5 201.27 5.35 9.77

Marter -1 112 Dec 90% 4.32 0.01 757.28 142.72 146.72 191.5 201.22 5.31 9.72

Marter 94 Jan 10% 7.14 0.01 868.44 162.51 166.72 191.41 201.31 5.34 9.9

Marter 94 Feb 10% 5.1 0.01 858.49 162.21 166.4 191.41 201.24 5.29 9.83

Marter 94 Mar 10% 7.76 0.02 871.26 162.6 166.81 191.41 201.32 5.36 9.91

Marter 94 Apr 10% 78.7 0.14 1068.87 168.41 173.1 191.41 202.52 6.35 11.11

Marter 94 May 10% 68.7 0.12 1046.9 167.77 172.41 191.41 202.39 6.24 10.98

Marter 94 Jun 10% 25.2 0.05 934.59 164.47 168.84 191.41 201.71 5.68 10.3

Marter 94 Jul 10% 15.5 0.03 902.25 163.51 167.81 191.41 201.51 5.52 10.1

Marter 94 Aug 10% 8.81 0.02 875.9 162.73 166.96 191.41 201.35 5.38 9.94

Marter 94 Sep 10% 9.14 0.02 877.33 162.78 167.01 191.41 201.36 5.39 9.95

Marter 94 Oct 10% 18.1 0.04 911.43 163.79 168.11 191.41 201.57 5.56 10.16

Marter 94 Nov 10% 20.6 0.04 919.67 164.04 168.37 191.41 201.62 5.61 10.21

Marter 94 Dec 10% 15.4 0.03 901.93 163.51 167.8 191.41 201.51 5.52 10.1

Marter 94 Jan 90% 3.02 0.01 846.78 161.86 166.02 191.41 201.17 5.23 9.76

Marter 94 Feb 90% 2.52 0.01 843.7 161.77 165.92 191.41 201.15 5.22 9.74

Marter 94 Mar 90% 2.55 0.01 843.91 161.77 165.92 191.41 201.15 5.22 9.74

Marter 94 Apr 90% 4.3 0.01 854.32 162.09 166.26 191.41 201.22 5.27 9.81

Marter 94 May 90% 14.5 0.03 898.64 163.41 167.69 191.41 201.49 5.50 10.08

Marter 94 Jun 90% 6.49 0.01 865.51 162.42 166.63 191.41 201.29 5.33 9.88

Marter 94 Jul 90% 2.86 0.01 845.78 161.83 165.99 191.41 201.17 5.23 9.76

Marter 94 Aug 90% 1.86 0 839.17 161.63 165.77 191.41 201.13 5.19 9.72

Marter 94 Sep 90% 1.86 0 839.17 161.63 165.77 191.41 201.13 5.19 9.72

Marter 94 Oct 90% 2.59 0.01 844.17 161.78 165.93 191.41 201.16 5.22 9.75

Marter 94 Nov 90% 5.9 0.01 862.5 162.33 166.53 191.41 201.27 5.31 9.86

Page 93: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 94 Dec 90% 4.32 0.01 854.44 162.09 166.27 191.41 201.22 5.27 9.81

Marter 63 Jan 10% 7.14 0.02 773.46 141.19 144.9 191.23 201.31 5.48 10.08

Marter 63 Feb 10% 5.1 0.01 764.82 140.89 144.58 191.23 201.24 5.43 10.01

Marter 63 Mar 10% 7.76 0.02 775.91 141.27 144.99 191.23 201.32 5.49 10.09

Marter 63 Apr 10% 78.7 0.16 947.86 146.77 151.12 191.23 202.52 6.46 11.29

Marter 63 May 10% 68.7 0.14 928.75 146.01 150.29 191.23 202.39 6.36 11.16

Marter 63 Jun 10% 25.2 0.06 830.97 143.13 147.02 191.23 201.71 5.81 10.48

Marter 63 Jul 10% 15.5 0.04 802.84 142.16 145.96 191.23 201.51 5.65 10.28

Marter 63 Aug 10% 8.81 0.02 779.95 141.41 145.14 191.23 201.35 5.52 10.12

Marter 63 Sep 10% 9.14 0.02 781.18 141.45 145.19 191.23 201.36 5.52 10.13

Marter 63 Oct 10% 18.1 0.04 810.83 142.43 146.26 191.23 201.57 5.69 10.34

Marter 63 Nov 10% 20.6 0.05 818 142.68 146.53 191.23 201.62 5.73 10.39

Marter 63 Dec 10% 15.4 0.04 802.56 142.15 145.95 191.23 201.51 5.65 10.28

Marter 63 Jan 90% 3.02 0.01 754.65 140.54 144.2 191.23 201.17 5.37 9.94

Marter 63 Feb 90% 2.52 0.01 751.98 140.45 144.1 191.23 201.15 5.35 9.92

Marter 63 Mar 90% 2.55 0.01 752.16 140.45 144.11 191.23 201.15 5.36 9.92

Marter 63 Apr 90% 4.3 0.01 761.2 140.77 144.45 191.23 201.22 5.41 9.99

Marter 63 May 90% 14.5 0.03 799.71 142.06 145.85 191.23 201.49 5.63 10.26

Marter 63 Jun 90% 6.49 0.02 770.92 141.1 144.81 191.23 201.29 5.46 10.06

Marter 63 Jul 90% 2.86 0.01 753.79 140.51 144.17 191.23 201.17 5.36 9.94

Marter 63 Aug 90% 1.86 0 748.05 140.31 143.95 191.23 201.13 5.33 9.9

Marter 63 Sep 90% 1.86 0 748.05 140.31 143.95 191.23 201.13 5.33 9.9

Marter 63 Oct 90% 2.59 0.01 752.39 140.46 144.12 191.23 201.16 5.36 9.93

Marter 63 Nov 90% 5.9 0.01 768.3 141.01 144.71 191.23 201.27 5.45 10.04

Marter 63 Dec 90% 4.32 0.01 761.3 140.77 144.45 191.23 201.22 5.41 9.99

Marter 0 22 Jan 10% 7.14 0.02 542.02 89.67 94.75 191.06 201.31 6.04 10.25

Marter 0 22 Feb 10% 5.1 0.01 536.54 89.4 94.45 191.06 201.24 6.00 10.18

Marter 0 22 Mar 10% 7.76 0.02 543.58 89.75 94.83 191.06 201.32 6.06 10.26

Marter 0 22 Apr 10% 78.7 0.18 653.88 95.67 101.32 191.06 202.52 6.83 11.46

Marter 0 22 May 10% 68.7 0.16 641.45 94.86 100.45 191.06 202.39 6.76 11.33

Marter 0 22 Jun 10% 25.2 0.06 578.65 91.39 96.66 191.06 201.71 6.33 10.65

Marter 0 22 Jul 10% 15.5 0.04 560.71 90.57 95.75 191.06 201.51 6.19 10.45

Marter 0 22 Aug 10% 8.81 0.02 546.15 89.88 94.97 191.06 201.35 6.08 10.29

Marter 0 22 Sep 10% 9.14 0.02 546.93 89.91 95.02 191.06 201.36 6.08 10.3

Marter 0 22 Oct 10% 18.1 0.05 565.81 90.8 96.01 191.06 201.57 6.23 10.51

Marter 0 22 Nov 10% 20.6 0.05 570.37 91.01 96.24 191.06 201.62 6.27 10.56

Marter 0 22 Dec 10% 15.4 0.04 560.54 90.56 95.74 191.06 201.51 6.19 10.45

Marter 0 22 Jan 90% 3.02 0.01 530.09 89.08 94.09 191.06 201.17 5.95 10.11

Page 94: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 0 22 Feb 90% 2.52 0.01 528.4 88.99 94 191.06 201.15 5.94 10.09

Marter 0 22 Mar 90% 2.55 0.01 528.51 89 94 191.06 201.15 5.94 10.09

Marter 0 22 Apr 90% 4.3 0.01 534.24 89.28 94.32 191.06 201.22 5.98 10.16

Marter 0 22 May 90% 14.5 0.04 558.72 90.48 95.65 191.06 201.49 6.18 10.43

Marter 0 22 Jun 90% 6.49 0.02 540.41 89.59 94.66 191.06 201.29 6.03 10.23

Marter 0 22 Jul 90% 2.86 0.01 529.54 89.05 94.06 191.06 201.17 5.95 10.11

Marter 0 22 Aug 90% 1.86 0.01 525.9 88.87 93.86 191.06 201.13 5.92 10.07

Marter 0 22 Sep 90% 1.86 0.01 525.9 88.87 93.86 191.06 201.13 5.92 10.07

Marter 0 22 Oct 90% 2.59 0.01 528.66 89 94.01 191.06 201.16 5.94 10.1

Marter 0 22 Nov 90% 5.9 0.02 538.74 89.51 94.57 191.06 201.27 6.02 10.21

Marter 0 22 Dec 90% 4.32 0.01 534.31 89.29 94.32 191.06 201.22 5.98 10.16

Marter 0 Jan 10% 7.14 0.04 204.55 71.68 32.16 191 201.31 2.85 10.31

Marter 0 Feb 10% 5.1 0.03 202.72 71.28 32.16 191 201.24 2.84 10.24

Marter 0 Mar 10% 7.76 0.05 205.07 71.79 32.16 191 201.32 2.86 10.32

Marter 0 Apr 10% 78.7 0.43 240.64 84.13 32.16 191 202.51 2.86 11.51

Marter 0 May 10% 68.7 0.38 236.77 83.06 32.16 191 202.38 2.85 11.38

Marter 0 Jun 10% 25.2 0.15 216.66 75.74 32.16 191 201.71 2.86 10.71

Marter 0 Jul 10% 15.5 0.09 210.77 73.08 32.16 191 201.51 2.88 10.51

Marter 0 Aug 10% 8.81 0.06 205.93 71.97 32.16 191 201.35 2.86 10.35

Marter 0 Sep 10% 9.14 0.06 206.19 72.03 32.16 191 201.36 2.86 10.36

Marter 0 Oct 10% 18.1 0.11 212.45 73.8 32.16 191 201.57 2.88 10.57

Marter 0 Nov 10% 20.6 0.12 213.95 74.49 32.16 191 201.62 2.87 10.62

Marter 0 Dec 10% 15.4 0.09 210.71 73.06 32.16 191 201.51 2.88 10.51

Marter 0 Jan 90% 3.02 0.02 200.55 70.78 32.16 191 201.17 2.83 10.17

Marter 0 Feb 90% 2.52 0.02 199.98 70.65 32.16 191 201.15 2.83 10.15

Marter 0 Mar 90% 2.55 0.02 200.02 70.66 32.16 191 201.15 2.83 10.15

Marter 0 Apr 90% 4.3 0.03 201.95 71.1 32.16 191 201.22 2.84 10.22

Marter 0 May 90% 14.5 0.09 210.1 72.87 32.16 191 201.49 2.88 10.49

Marter 0 Jun 90% 6.49 0.04 204.01 71.56 32.16 191 201.29 2.85 10.29

Marter 0 Jul 90% 2.86 0.02 200.37 70.74 32.16 191 201.17 2.83 10.17

Marter 0 Aug 90% 1.86 0.01 199.14 70.45 32.16 191 201.13 2.83 10.13

Marter 0 Sep 90% 1.86 0.01 199.14 70.45 32.16 191 201.13 2.83 10.13

Marter 0 Oct 90% 2.59 0.02 200.07 70.67 32.16 191 201.16 2.83 10.16

Marter 0 Nov 90% 5.9 0.04 203.46 71.44 32.16 191 201.27 2.85 10.27

Marter 0 Dec 90% 4.32 0.03 201.97 71.11 32.16 191 201.22 2.84 10.22

Marter -0.001 Inl

Struct

Marter -6 Jan 10% 7.14 0.18 40.21 22.59 24.08 191 193.66 1.78 2.66

Page 95: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -6 Feb 10% 5.1 0.14 37.29 22.13 23.55 191 193.53 1.69 2.53

Marter -6 Mar 10% 7.76 0.19 41.03 22.71 24.23 191 193.7 1.81 2.7

Marter -6 Apr 10% 78.7 0.89 88.54 29.31 31.9 191 195.53 3.02 4.53

Marter -6 May 10% 68.7 0.82 83.56 28.55 31.02 191 195.36 2.93 4.36

Marter -6 Jun 10% 25.2 0.44 57.61 25.17 27.07 191 194.39 2.29 3.39

Marter -6 Jul 10% 15.5 0.31 49.76 24.02 25.75 191 194.07 2.07 3.07

Marter -6 Aug 10% 8.81 0.21 42.38 22.92 24.47 191 193.76 1.85 2.76

Marter -6 Sep 10% 9.14 0.21 42.79 22.98 24.54 191 193.78 1.86 2.78

Marter -6 Oct 10% 18.1 0.35 52.15 24.38 26.16 191 194.17 2.14 3.17

Marter -6 Nov 10% 20.6 0.38 54.23 24.68 26.51 191 194.26 2.20 3.26

Marter -6 Dec 10% 15.4 0.31 49.66 24.01 25.74 191 194.07 2.07 3.07

Marter -6 Jan 90% 3.02 0.09 33.75 21.73 23.03 191 193.37 1.55 2.37

Marter -6 Feb 90% 2.52 0.08 32.75 21.62 22.89 191 193.33 1.51 2.33

Marter -6 Mar 90% 2.55 0.08 32.81 21.63 22.9 191 193.33 1.52 2.33

Marter -6 Apr 90% 4.3 0.12 36.03 21.96 23.34 191 193.48 1.64 2.48

Marter -6 May 90% 14.5 0.3 48.77 23.88 25.58 191 194.03 2.04 3.03

Marter -6 Jun 90% 6.49 0.17 39.32 22.45 23.92 191 193.62 1.75 2.62

Marter -6 Jul 90% 2.86 0.09 33.44 21.69 22.99 191 193.36 1.54 2.36

Marter -6 Aug 90% 1.86 0.06 31.3 21.47 22.69 191 193.26 1.46 2.26

Marter -6 Sep 90% 1.86 0.06 31.3 21.47 22.69 191 193.26 1.46 2.26

Marter -6 Oct 90% 2.59 0.08 32.9 21.64 22.91 191 193.33 1.52 2.33

Marter -6 Nov 90% 5.9 0.15 38.48 22.32 23.77 191 193.59 1.72 2.59

Marter -6 Dec 90% 4.32 0.12 36.06 21.96 23.35 191 193.48 1.64 2.48

Marter -35 Jan 10% 7.14 1.92 3.72 8.72 8.89 192.93 193.46 0.43 0.53

Marter -35 Feb 10% 5.1 1.82 2.8 8.03 8.16 192.93 193.35 0.35 0.42

Marter -35 Mar 10% 7.76 1.93 4.02 8.94 9.11 192.93 193.49 0.45 0.56

Marter -35 Apr 10% 78.7 3.6 21.89 16.71 17.37 192.93 194.83 1.31 1.9

Marter -35 May 10% 68.7 3.47 19.79 16.16 16.77 192.93 194.7 1.22 1.77

Marter -35 Jun 10% 25.2 2.38 10.59 13.25 13.59 192.93 194.08 0.80 1.15

Marter -35 Jul 10% 15.5 2.02 7.68 11.69 11.96 192.93 193.85 0.66 0.92

Marter -35 Aug 10% 8.81 1.94 4.55 9.38 9.57 192.93 193.55 0.49 0.62

Marter -35 Sep 10% 9.14 1.94 4.72 9.52 9.72 192.93 193.57 0.50 0.64

Marter -35 Oct 10% 18.1 2.08 8.71 12.34 12.63 192.93 193.93 0.71 1

Marter -35 Nov 10% 20.6 2.16 9.54 12.85 13.16 192.93 194 0.74 1.07

Marter -35 Dec 10% 15.4 2.02 7.64 11.66 11.93 192.93 193.84 0.66 0.91

Marter -35 Jan 90% 3.02 1.6 1.88 7.27 7.36 192.93 193.23 0.26 0.3

Marter -35 Feb 90% 2.52 1.52 1.65 7.07 7.15 192.93 193.2 0.23 0.27

Marter -35 Mar 90% 2.55 1.53 1.67 7.08 7.17 192.93 193.2 0.24 0.27

Marter -35 Apr 90% 4.3 1.77 2.43 7.74 7.85 192.93 193.3 0.31 0.37

Page 96: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

��������8��

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -35 May 90% 14.5 2 7.25 11.4 11.66 192.93 193.81 0.64 0.88

Marter -35 Jun 90% 6.49 1.9 3.42 8.51 8.66 192.93 193.42 0.40 0.49

Marter -35 Jul 90% 2.86 1.58 1.81 7.21 7.3 192.93 193.22 0.25 0.29

Marter -35 Aug 90% 1.86 1.4 1.33 6.78 6.84 192.93 193.15 0.20 0.22

Marter -35 Sep 90% 1.86 1.4 1.33 6.78 6.84 192.93 193.15 0.20 0.22

Marter -35 Oct 90% 2.59 1.54 1.69 7.1 7.18 192.93 193.2 0.24 0.27

Marter -35 Nov 90% 5.9 1.87 3.15 8.3 8.45 192.93 193.39 0.38 0.46

Marter -35 Dec 90% 4.32 1.77 2.44 7.74 7.86 192.93 193.3 0.32 0.37

Marter -61 Jan 10% 7.14 1.94 3.67 7.27 7.56 192.4 193.11 0.50 0.71

Marter -61 Feb 10% 5.1 1.67 3.05 6.94 7.18 192.4 193.02 0.44 0.62

Marter -61 Mar 10% 7.76 2.02 3.84 7.36 7.65 192.4 193.13 0.52 0.73

Marter -61 Apr 10% 78.7 3.7 21.29 17.9 18.72 192.4 194.46 1.19 2.06

Marter -61 May 10% 68.7 3.49 19.68 17.38 18.17 192.4 194.37 1.13 1.97

Marter -61 Jun 10% 25.2 2.58 9.78 13.62 14.19 192.4 193.73 0.72 1.33

Marter -61 Jul 10% 15.5 2.64 5.87 8.35 8.78 192.4 193.39 0.70 0.99

Marter -61 Aug 10% 8.81 2.15 4.1 7.49 7.81 192.4 193.17 0.55 0.77

Marter -61 Sep 10% 9.14 2.19 4.17 7.53 7.85 192.4 193.18 0.55 0.78

Marter -61 Oct 10% 18.1 2.42 7.49 12.54 13.05 192.4 193.55 0.60 1.15

Marter -61 Nov 10% 20.6 2.53 8.16 12.87 13.39 192.4 193.61 0.63 1.21

Marter -61 Dec 10% 15.4 2.64 5.84 8.33 8.76 192.4 193.39 0.70 0.99

Marter -61 Jan 90% 3.02 1.32 2.29 6.51 6.68 192.4 192.91 0.35 0.51

Marter -61 Feb 90% 2.52 1.22 2.07 6.38 6.54 192.4 192.87 0.32 0.47

Marter -61 Mar 90% 2.55 1.22 2.09 6.39 6.55 192.4 192.88 0.33 0.48

Marter -61 Apr 90% 4.3 1.54 2.79 6.79 7.01 192.4 192.98 0.41 0.58

Marter -61 May 90% 14.5 2.6 5.58 8.22 8.63 192.4 193.35 0.68 0.95

Marter -61 Jun 90% 6.49 1.86 3.49 7.18 7.45 192.4 193.08 0.49 0.68

Marter -61 Jul 90% 2.86 1.29 2.22 6.47 6.64 192.4 192.9 0.34 0.5

Marter -61 Aug 90% 1.86 1.09 1.7 6.15 6.28 192.4 192.81 0.28 0.41

Marter -61 Sep 90% 1.86 1.09 1.7 6.15 6.28 192.4 192.81 0.28 0.41

Marter -61 Oct 90% 2.59 1.23 2.1 6.4 6.56 192.4 192.88 0.33 0.48

Marter -61 Nov 90% 5.9 1.78 3.32 7.09 7.34 192.4 193.06 0.47 0.66

Marter -61 Dec 90% 4.32 1.55 2.8 6.8 7.01 192.4 192.98 0.41 0.58

Page 97: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Table A-6: Downstream HEC-RAS Results for Monthly Q10 and Q90 Flows – Existing Conditions

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 0 22 Jan 10% 7.14 0.13 53.03 26.57 28.16 191.06 193.66 2.00 2.6

Marter 0 22 Feb 10% 5.1 0.1 49.61 25.77 27.31 191.06 193.53 1.93 2.47

Marter 0 22 Mar 10% 7.76 0.14 54 26.8 28.4 191.06 193.7 2.01 2.64

Marter 0 22 Apr 10% 78.7 0.71 111.08 35.24 37.73 191.06 195.55 3.15 4.49

Marter 0 22 May 10% 68.7 0.65 104.98 34.29 36.72 191.06 195.38 3.06 4.32

Marter 0 22 Jun 10% 25.2 0.34 73.9 29.69 31.69 191.06 194.4 2.49 3.34

Marter 0 22 Jul 10% 15.5 0.24 64.48 28.83 30.61 191.06 194.08 2.24 3.02

Marter 0 22 Aug 10% 8.81 0.16 55.6 27.16 28.79 191.06 193.76 2.05 2.7

Marter 0 22 Sep 10% 9.14 0.16 56.1 27.27 28.91 191.06 193.78 2.06 2.72

Marter 0 22 Oct 10% 18.1 0.27 67.37 29.09 30.94 191.06 194.18 2.32 3.12

Marter 0 22 Nov 10% 20.6 0.29 69.86 29.32 31.23 191.06 194.26 2.38 3.2

Marter 0 22 Dec 10% 15.4 0.24 64.37 28.82 30.6 191.06 194.07 2.23 3.01

Marter 0 22 Jan 90% 3.02 0.07 45.47 25.3 26.71 191.06 193.37 1.80 2.31

Marter 0 22 Feb 90% 2.52 0.06 44.31 25.21 26.58 191.06 193.33 1.76 2.27

Marter 0 22 Mar 90% 2.55 0.06 44.38 25.22 26.58 191.06 193.33 1.76 2.27

Marter 0 22 Apr 90% 4.3 0.09 48.13 25.51 27.01 191.06 193.48 1.89 2.42

Marter 0 22 May 90% 14.5 0.23 63.29 28.72 30.47 191.06 194.04 2.20 2.98

Marter 0 22 Jun 90% 6.49 0.12 51.98 26.33 27.9 191.06 193.63 1.97 2.57

Marter 0 22 Jul 90% 2.86 0.06 45.11 25.28 26.67 191.06 193.36 1.78 2.3

Marter 0 22 Aug 90% 1.86 0.04 42.61 25.08 26.38 191.06 193.26 1.70 2.2

Marter 0 22 Sep 90% 1.86 0.04 42.61 25.08 26.38 191.06 193.26 1.70 2.2

Marter 0 22 Oct 90% 2.59 0.06 44.48 25.22 26.6 191.06 193.33 1.76 2.27

Marter 0 22 Nov 90% 5.9 0.12 51 26.1 27.66 191.06 193.59 1.95 2.53

Marter 0 22 Dec 90% 4.32 0.09 48.17 25.52 27.02 191.06 193.48 1.89 2.42

Marter -6 Jan 10% 7.14 0.18 40.21 22.59 24.08 191 193.66 1.78 2.66

Marter -6 Feb 10% 5.1 0.14 37.29 22.13 23.55 191 193.53 1.69 2.53

Marter -6 Mar 10% 7.76 0.19 41.03 22.71 24.23 191 193.7 1.81 2.7

Marter -6 Apr 10% 78.7 0.89 88.54 29.31 31.9 191 195.53 3.02 4.53

Marter -6 May 10% 68.7 0.82 83.56 28.55 31.02 191 195.36 2.93 4.36

Marter -6 Jun 10% 25.2 0.44 57.61 25.17 27.07 191 194.39 2.29 3.39

Marter -6 Jul 10% 15.5 0.31 49.76 24.02 25.75 191 194.07 2.07 3.07

Marter -6 Aug 10% 8.81 0.21 42.38 22.92 24.47 191 193.76 1.85 2.76

Marter -6 Sep 10% 9.14 0.21 42.79 22.98 24.54 191 193.78 1.86 2.78

Marter -6 Oct 10% 18.1 0.35 52.15 24.38 26.16 191 194.17 2.14 3.17

Marter -6 Nov 10% 20.6 0.38 54.23 24.68 26.51 191 194.26 2.20 3.26

Marter -6 Dec 10% 15.4 0.31 49.66 24.01 25.74 191 194.07 2.07 3.07

Marter -6 Jan 90% 3.02 0.09 33.75 21.73 23.03 191 193.37 1.55 2.37

Page 98: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -6 Feb 90% 2.52 0.08 32.75 21.62 22.89 191 193.33 1.51 2.33

Marter -6 Mar 90% 2.55 0.08 32.81 21.63 22.9 191 193.33 1.52 2.33

Marter -6 Apr 90% 4.3 0.12 36.03 21.96 23.34 191 193.48 1.64 2.48

Marter -6 May 90% 14.5 0.3 48.77 23.88 25.58 191 194.03 2.04 3.03

Marter -6 Jun 90% 6.49 0.17 39.32 22.45 23.92 191 193.62 1.75 2.62

Marter -6 Jul 90% 2.86 0.09 33.44 21.69 22.99 191 193.36 1.54 2.36

Marter -6 Aug 90% 1.86 0.06 31.3 21.47 22.69 191 193.26 1.46 2.26

Marter -6 Sep 90% 1.86 0.06 31.3 21.47 22.69 191 193.26 1.46 2.26

Marter -6 Oct 90% 2.59 0.08 32.9 21.64 22.91 191 193.33 1.52 2.33

Marter -6 Nov 90% 5.9 0.15 38.48 22.32 23.77 191 193.59 1.72 2.59

Marter -6 Dec 90% 4.32 0.12 36.06 21.96 23.35 191 193.48 1.64 2.48

Marter -35 Jan 10% 7.14 1.92 3.72 8.72 8.89 192.93 193.46 0.43 0.53

Marter -35 Feb 10% 5.1 1.82 2.8 8.03 8.16 192.93 193.35 0.35 0.42

Marter -35 Mar 10% 7.76 1.93 4.02 8.94 9.11 192.93 193.49 0.45 0.56

Marter -35 Apr 10% 78.7 3.6 21.89 16.71 17.37 192.93 194.83 1.31 1.9

Marter -35 May 10% 68.7 3.47 19.79 16.16 16.77 192.93 194.7 1.22 1.77

Marter -35 Jun 10% 25.2 2.38 10.59 13.25 13.59 192.93 194.08 0.80 1.15

Marter -35 Jul 10% 15.5 2.02 7.68 11.69 11.96 192.93 193.85 0.66 0.92

Marter -35 Aug 10% 8.81 1.94 4.55 9.38 9.57 192.93 193.55 0.49 0.62

Marter -35 Sep 10% 9.14 1.94 4.72 9.52 9.72 192.93 193.57 0.50 0.64

Marter -35 Oct 10% 18.1 2.08 8.71 12.34 12.63 192.93 193.93 0.71 1

Marter -35 Nov 10% 20.6 2.16 9.54 12.85 13.16 192.93 194 0.74 1.07

Marter -35 Dec 10% 15.4 2.02 7.64 11.66 11.93 192.93 193.84 0.66 0.91

Marter -35 Jan 90% 3.02 1.6 1.88 7.27 7.36 192.93 193.23 0.26 0.3

Marter -35 Feb 90% 2.52 1.52 1.65 7.07 7.15 192.93 193.2 0.23 0.27

Marter -35 Mar 90% 2.55 1.53 1.67 7.08 7.17 192.93 193.2 0.24 0.27

Marter -35 Apr 90% 4.3 1.77 2.43 7.74 7.85 192.93 193.3 0.31 0.37

Marter -35 May 90% 14.5 2 7.25 11.4 11.66 192.93 193.81 0.64 0.88

Marter -35 Jun 90% 6.49 1.9 3.42 8.51 8.66 192.93 193.42 0.40 0.49

Marter -35 Jul 90% 2.86 1.58 1.81 7.21 7.3 192.93 193.22 0.25 0.29

Marter -35 Aug 90% 1.86 1.4 1.33 6.78 6.84 192.93 193.15 0.20 0.22

Marter -35 Sep 90% 1.86 1.4 1.33 6.78 6.84 192.93 193.15 0.20 0.22

Marter -35 Oct 90% 2.59 1.54 1.69 7.1 7.18 192.93 193.2 0.24 0.27

Marter -35 Nov 90% 5.9 1.87 3.15 8.3 8.45 192.93 193.39 0.38 0.46

Marter -35 Dec 90% 4.32 1.77 2.44 7.74 7.86 192.93 193.3 0.32 0.37

Marter -61 Jan 10% 7.14 1.94 3.67 7.27 7.56 192.4 193.11 0.50 0.71

Marter -61 Feb 10% 5.1 1.67 3.05 6.94 7.18 192.4 193.02 0.44 0.62

Marter -61 Mar 10% 7.76 2.02 3.84 7.36 7.65 192.4 193.13 0.52 0.73

Page 99: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -61 Apr 10% 78.7 3.68 21.39 17.93 18.76 192.4 194.46 1.19 2.06

Marter -61 May 10% 68.7 3.49 19.71 17.39 18.18 192.4 194.37 1.13 1.97

Marter -61 Jun 10% 25.2 2.58 9.78 13.62 14.19 192.4 193.73 0.72 1.33

Marter -61 Jul 10% 15.5 2.64 5.87 8.35 8.78 192.4 193.39 0.70 0.99

Marter -61 Aug 10% 8.81 2.15 4.1 7.49 7.81 192.4 193.17 0.55 0.77

Marter -61 Sep 10% 9.14 2.19 4.17 7.53 7.85 192.4 193.18 0.55 0.78

Marter -61 Oct 10% 18.1 2.42 7.49 12.54 13.05 192.4 193.55 0.60 1.15

Marter -61 Nov 10% 20.6 2.53 8.16 12.87 13.39 192.4 193.61 0.63 1.21

Marter -61 Dec 10% 15.4 2.64 5.84 8.33 8.76 192.4 193.39 0.70 0.99

Marter -61 Jan 90% 3.02 1.32 2.29 6.51 6.68 192.4 192.91 0.35 0.51

Marter -61 Feb 90% 2.52 1.22 2.07 6.38 6.54 192.4 192.87 0.32 0.47

Marter -61 Mar 90% 2.55 1.22 2.09 6.39 6.55 192.4 192.88 0.33 0.48

Marter -61 Apr 90% 4.3 1.54 2.79 6.79 7.01 192.4 192.98 0.41 0.58

Marter -61 May 90% 14.5 2.6 5.58 8.22 8.63 192.4 193.35 0.68 0.95

Marter -61 Jun 90% 6.49 1.86 3.49 7.18 7.45 192.4 193.08 0.49 0.68

Marter -61 Jul 90% 2.86 1.29 2.22 6.47 6.64 192.4 192.9 0.34 0.5

Marter -61 Aug 90% 1.86 1.09 1.7 6.15 6.28 192.4 192.81 0.28 0.41

Marter -61 Sep 90% 1.86 1.09 1.7 6.15 6.28 192.4 192.81 0.28 0.41

Marter -61 Oct 90% 2.59 1.23 2.1 6.4 6.56 192.4 192.88 0.33 0.48

Marter -61 Nov 90% 5.9 1.78 3.32 7.09 7.34 192.4 193.06 0.47 0.66

Marter -61 Dec 90% 4.32 1.55 2.8 6.8 7.01 192.4 192.98 0.41 0.58

Marter -78 Jan 10% 7.14 2.04 3.5 8.36 8.56 192.25 192.85 0.42 0.6

Marter -78 Feb 10% 5.1 1.84 2.77 8.04 8.19 192.25 192.76 0.34 0.51

Marter -78 Mar 10% 7.76 2.09 3.72 8.46 8.67 192.25 192.88 0.44 0.63

Marter -78 Apr 10% 78.7 3.58 21.97 19.99 20.8 192.25 194.25 1.10 2

Marter -78 May 10% 68.7 3.34 20.55 19.69 20.47 192.25 194.18 1.04 1.93

Marter -78 Jun 10% 25.2 2.89 8.71 10.37 10.85 192.25 193.41 0.84 1.16

Marter -78 Jul 10% 15.5 2.7 5.75 9.28 9.61 192.25 193.11 0.62 0.86

Marter -78 Aug 10% 8.81 2.17 4.07 8.61 8.84 192.25 192.92 0.47 0.67

Marter -78 Sep 10% 9.14 2.19 4.18 8.65 8.89 192.25 192.93 0.48 0.68

Marter -78 Oct 10% 18.1 2.77 6.53 9.58 9.95 192.25 193.19 0.68 0.94

Marter -78 Nov 10% 20.6 2.81 7.34 9.88 10.29 192.25 193.27 0.74 1.02

Marter -78 Dec 10% 15.4 2.69 5.73 9.27 9.6 192.25 193.1 0.62 0.85

Marter -78 Jan 90% 3.02 1.58 1.91 7.65 7.74 192.25 192.65 0.25 0.4

Marter -78 Feb 90% 2.52 1.5 1.68 7.54 7.62 192.25 192.62 0.22 0.37

Marter -78 Mar 90% 2.55 1.51 1.69 7.55 7.62 192.25 192.62 0.22 0.37

Marter -78 Apr 90% 4.3 1.76 2.44 7.9 8.02 192.25 192.72 0.31 0.47

Marter -78 May 90% 14.5 2.62 5.53 9.2 9.51 192.25 193.08 0.60 0.83

Marter -78 Jun 90% 6.49 1.99 3.27 8.26 8.44 192.25 192.82 0.40 0.57

Page 100: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -78 Jul 90% 2.86 1.56 1.83 7.61 7.7 192.25 192.64 0.24 0.39

Marter -78 Aug 90% 1.86 1.3 1.43 7.36 7.42 192.25 192.59 0.19 0.34

Marter -78 Sep 90% 1.86 1.3 1.43 7.36 7.42 192.25 192.59 0.19 0.34

Marter -78 Oct 90% 2.59 1.51 1.71 7.56 7.63 192.25 192.63 0.23 0.38

Marter -78 Nov 90% 5.9 1.94 3.05 8.17 8.33 192.25 192.8 0.37 0.55

Marter -78 Dec 90% 4.32 1.77 2.45 7.9 8.03 192.25 192.72 0.31 0.47

Marter -84 Jan 10% 7.14 2.45 2.92 14.03 14.07 192.2 192.56 0.21 0.36

Marter -84 Feb 10% 5.1 2.07 2.46 13.57 13.6 192.2 192.53 0.18 0.33

Marter -84 Mar 10% 7.76 2.53 3.06 14.22 14.26 192.2 192.57 0.22 0.37

Marter -84 Apr 10% 78.7 5.09 15.46 16.66 17.18 192.2 193.37 0.93 1.17

Marter -84 May 10% 68.7 4.98 13.78 16.36 16.82 192.2 193.27 0.84 1.07

Marter -84 Jun 10% 25.2 4.05 6.22 14.91 15.08 192.2 192.79 0.42 0.59

Marter -84 Jul 10% 15.5 3.37 4.6 14.58 14.69 192.2 192.68 0.32 0.48

Marter -84 Aug 10% 8.81 2.7 3.27 14.31 14.36 192.2 192.58 0.23 0.38

Marter -84 Sep 10% 9.14 2.74 3.33 14.32 14.37 192.2 192.59 0.23 0.39

Marter -84 Oct 10% 18.1 3.58 5.05 14.68 14.8 192.2 192.71 0.34 0.51

Marter -84 Nov 10% 20.6 3.77 5.47 14.76 14.9 192.2 192.74 0.37 0.54

Marter -84 Dec 10% 15.4 3.36 4.58 14.58 14.68 192.2 192.68 0.31 0.48

Marter -84 Jan 90% 3.02 1.52 1.98 12.95 12.98 192.2 192.49 0.15 0.29

Marter -84 Feb 90% 2.52 1.33 1.9 12.73 12.76 192.2 192.48 0.15 0.28

Marter -84 Mar 90% 2.55 1.34 1.91 12.75 12.78 192.2 192.49 0.15 0.29

Marter -84 Apr 90% 4.3 1.87 2.3 13.42 13.46 192.2 192.51 0.17 0.31

Marter -84 May 90% 14.5 3.29 4.41 14.55 14.64 192.2 192.66 0.30 0.46

Marter -84 Jun 90% 6.49 2.33 2.79 13.85 13.89 192.2 192.55 0.20 0.35

Marter -84 Jul 90% 2.86 1.45 1.97 12.92 12.95 192.2 192.49 0.15 0.29

Marter -84 Aug 90% 1.86 1.16 1.6 11.93 11.95 192.2 192.46 0.13 0.26

Marter -84 Sep 90% 1.86 1.16 1.6 11.93 11.95 192.2 192.46 0.13 0.26

Marter -84 Oct 90% 2.59 1.35 1.91 12.77 12.8 192.2 192.49 0.15 0.29

Marter -84 Nov 90% 5.9 2.22 2.65 13.73 13.77 192.2 192.54 0.19 0.34

Marter -84 Dec 90% 4.32 1.88 2.3 13.43 13.46 192.2 192.52 0.17 0.32

Marter -109 Jan 10% 7.14 5.94 1.2 3.49 3.73 188 188.44 0.34 0.44

Marter -109 Feb 10% 5.1 5.93 0.86 3.12 3.31 188 188.34 0.28 0.34

Marter -109 Mar 10% 7.76 5.97 1.3 3.59 3.84 188 188.47 0.36 0.47

Marter -109 Apr 10% 78.7 8.07 9.75 17.18 17.67 188 189.45 0.57 1.45

Marter -109 May 10% 68.7 7.85 8.75 15.85 16.34 188 189.39 0.55 1.39

Marter -109 Jun 10% 25.2 6.65 3.79 7.16 7.57 188 188.94 0.53 0.94

Marter -109 Jul 10% 15.5 6.24 2.48 5.62 5.97 188 188.74 0.44 0.74

Marter -109 Aug 10% 8.81 6 1.47 3.75 4.02 188 188.52 0.39 0.52

Page 101: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -109 Sep 10% 9.14 6.02 1.52 3.8 4.08 188 188.53 0.40 0.53

Marter -109 Oct 10% 18.1 6.35 2.85 6.13 6.5 188 188.8 0.46 0.8

Marter -109 Nov 10% 20.6 6.45 3.19 6.54 6.92 188 188.85 0.49 0.85

Marter -109 Dec 10% 15.4 6.24 2.47 5.6 5.95 188 188.73 0.44 0.73

Marter -109 Jan 90% 3.02 6.3 0.48 2.66 2.77 188 188.21 0.18 0.21

Marter -109 Feb 90% 2.52 6.67 0.38 2.52 2.61 188 188.17 0.15 0.17

Marter -109 Mar 90% 2.55 6.66 0.38 2.53 2.62 188 188.17 0.15 0.17

Marter -109 Apr 90% 4.3 6.02 0.71 2.95 3.11 188 188.29 0.24 0.29

Marter -109 May 90% 14.5 6.2 2.34 5.4 5.74 188 188.71 0.43 0.71

Marter -109 Jun 90% 6.49 5.95 1.09 3.38 3.59 188 188.41 0.32 0.41

Marter -109 Jul 90% 2.86 6.45 0.44 2.61 2.72 188 188.2 0.17 0.2

Marter -109 Aug 90% 1.86 6.78 0.27 2.37 2.44 188 188.13 0.11 0.13

Marter -109 Sep 90% 1.86 6.78 0.27 2.37 2.44 188 188.13 0.11 0.13

Marter -109 Oct 90% 2.59 6.62 0.39 2.54 2.63 188 188.18 0.15 0.18

Marter -109 Nov 90% 5.9 5.93 0.99 3.27 3.48 188 188.38 0.30 0.38

Marter -109 Dec 90% 4.32 6.02 0.72 2.96 3.12 188 188.29 0.24 0.29

Marter -120 Jan 10% 7.14 2.93 2.44 8.37 8.44 187.98 188.37 0.29 0.39

Marter -120 Feb 10% 5.1 2.55 2 7.8 7.87 187.98 188.31 0.26 0.33

Marter -120 Mar 10% 7.76 3.03 2.56 8.51 8.59 187.98 188.38 0.30 0.4

Marter -120 Apr 10% 78.7 6.33 12.43 16.67 16.96 187.98 189.14 0.75 1.16

Marter -120 May 10% 68.7 6.06 11.34 16.38 16.64 187.98 189.08 0.69 1.1

Marter -120 Jun 10% 25.2 4.61 5.46 11.98 12.13 187.98 188.67 0.46 0.69

Marter -120 Jul 10% 15.5 3.88 4 10.22 10.33 187.98 188.54 0.39 0.56

Marter -120 Aug 10% 8.81 3.2 2.75 8.74 8.82 187.98 188.4 0.31 0.42

Marter -120 Sep 10% 9.14 3.26 2.81 8.81 8.89 187.98 188.41 0.32 0.43

Marter -120 Oct 10% 18.1 4.09 4.43 10.77 10.89 187.98 188.58 0.41 0.6

Marter -120 Nov 10% 20.6 4.28 4.81 11.23 11.36 187.98 188.61 0.43 0.63

Marter -120 Dec 10% 15.4 3.87 3.98 10.2 10.31 187.98 188.53 0.39 0.55

Marter -120 Jan 90% 3.02 2.14 1.41 6.97 7.01 187.98 188.23 0.20 0.25

Marter -120 Feb 90% 2.52 2.07 1.22 6.68 6.72 187.98 188.21 0.18 0.23

Marter -120 Mar 90% 2.55 2.07 1.23 6.69 6.74 187.98 188.21 0.18 0.23

Marter -120 Apr 90% 4.3 2.4 1.79 7.52 7.58 187.98 188.29 0.24 0.31

Marter -120 May 90% 14.5 3.79 3.83 10 10.1 187.98 188.52 0.38 0.54

Marter -120 Jun 90% 6.49 2.81 2.31 8.2 8.27 187.98 188.35 0.28 0.37

Marter -120 Jul 90% 2.86 2.13 1.34 6.87 6.91 187.98 188.22 0.20 0.24

Marter -120 Aug 90% 1.86 1.86 1 6.33 6.36 187.98 188.17 0.16 0.19

Marter -120 Sep 90% 1.86 1.86 1 6.33 6.36 187.98 188.17 0.16 0.19

Marter -120 Oct 90% 2.59 2.08 1.25 6.72 6.76 187.98 188.21 0.19 0.23

Marter -120 Nov 90% 5.9 2.7 2.19 8.04 8.11 187.98 188.34 0.27 0.36

Page 102: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -120 Dec 90% 4.32 2.4 1.8 7.53 7.59 187.98 188.29 0.24 0.31

Marter -133 Jan 10% 7.14 4.19 1.71 4.83 5.21 186.57 186.94 0.35 0.37

Marter -133 Feb 10% 5.1 3.96 1.29 4.7 5 186.57 186.86 0.27 0.29

Marter -133 Mar 10% 7.76 4.24 1.83 4.86 5.28 186.57 186.97 0.38 0.4

Marter -133 Apr 10% 78.7 5.59 14.08 9.37 11.62 186.57 188.88 1.50 2.31

Marter -133 May 10% 68.7 5.63 12.21 8.1 10.2 186.57 188.66 1.51 2.09

Marter -133 Jun 10% 25.2 5.21 4.84 5.68 6.68 186.57 187.54 0.85 0.97

Marter -133 Jul 10% 15.5 4.8 3.23 5.26 5.96 186.57 187.25 0.61 0.68

Marter -133 Aug 10% 8.81 4.34 2.03 4.92 5.38 186.57 187.01 0.41 0.44

Marter -133 Sep 10% 9.14 4.36 2.09 4.94 5.41 186.57 187.02 0.42 0.45

Marter -133 Oct 10% 18.1 4.92 3.68 5.38 6.16 186.57 187.33 0.68 0.76

Marter -133 Nov 10% 20.6 5.03 4.09 5.49 6.35 186.57 187.41 0.74 0.84

Marter -133 Dec 10% 15.4 4.8 3.21 5.26 5.95 186.57 187.24 0.61 0.67

Marter -133 Jan 90% 3.02 3.55 0.85 4.57 4.76 186.57 186.76 0.19 0.19

Marter -133 Feb 90% 2.52 3.34 0.75 4.54 4.71 186.57 186.74 0.17 0.17

Marter -133 Mar 90% 2.55 3.35 0.76 4.54 4.71 186.57 186.74 0.17 0.17

Marter -133 Apr 90% 4.3 3.83 1.12 4.65 4.91 186.57 186.82 0.24 0.25

Marter -133 May 90% 14.5 4.75 3.05 5.21 5.87 186.57 187.21 0.59 0.64

Marter -133 Jun 90% 6.49 4.12 1.58 4.79 5.15 186.57 186.92 0.33 0.35

Marter -133 Jul 90% 2.86 3.48 0.82 4.56 4.75 186.57 186.76 0.18 0.19

Marter -133 Aug 90% 1.86 3.11 0.6 4.49 4.63 186.57 186.71 0.13 0.14

Marter -133 Sep 90% 1.86 3.11 0.6 4.49 4.63 186.57 186.71 0.13 0.14

Marter -133 Oct 90% 2.59 3.37 0.77 4.54 4.72 186.57 186.74 0.17 0.17

Marter -133 Nov 90% 5.9 4.06 1.45 4.75 5.08 186.57 186.89 0.31 0.32

Marter -133 Dec 90% 4.32 3.83 1.13 4.65 4.91 186.57 186.82 0.24 0.25

Marter -175 Jan 10% 7.14 2.25 3.17 6.27 6.61 185.76 186.36 0.51 0.6

Marter -175 Feb 10% 5.1 2.03 2.51 5.92 6.2 185.76 186.25 0.42 0.49

Marter -175 Mar 10% 7.76 2.29 3.39 6.38 6.74 185.76 186.4 0.53 0.64

Marter -175 Apr 10% 78.7 5.59 14.08 10.34 11.45 185.76 187.67 1.36 1.91

Marter -175 May 10% 68.7 5.35 12.84 9.95 10.99 185.76 187.55 1.29 1.79

Marter -175 Jun 10% 25.2 3.36 7.51 8.22 8.9 185.76 186.96 0.91 1.2

Marter -175 Jul 10% 15.5 2.79 5.55 7.4 7.94 185.76 186.71 0.75 0.95

Marter -175 Aug 10% 8.81 2.36 3.73 6.56 6.95 185.76 186.45 0.57 0.69

Marter -175 Sep 10% 9.14 2.38 3.84 6.61 7 185.76 186.47 0.58 0.71

Marter -175 Oct 10% 18.1 2.89 6.27 7.71 8.3 185.76 186.81 0.81 1.05

Marter -175 Nov 10% 20.6 3.06 6.74 7.9 8.53 185.76 186.87 0.85 1.11

Marter -175 Dec 10% 15.4 2.81 5.48 7.37 7.9 185.76 186.7 0.74 0.94

Marter -175 Jan 90% 3.02 1.76 1.72 5.47 5.67 185.76 186.12 0.31 0.36

Page 103: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -175 Feb 90% 2.52 1.66 1.52 5.35 5.53 185.76 186.08 0.28 0.32

Marter -175 Mar 90% 2.55 1.67 1.52 5.35 5.53 185.76 186.08 0.28 0.32

Marter -175 Apr 90% 4.3 1.95 2.21 5.75 6 185.76 186.2 0.38 0.44

Marter -175 May 90% 14.5 2.68 5.41 7.34 7.86 185.76 186.69 0.74 0.93

Marter -175 Jun 90% 6.49 2.18 2.98 6.17 6.49 185.76 186.33 0.48 0.57

Marter -175 Jul 90% 2.86 1.74 1.65 5.43 5.62 185.76 186.1 0.30 0.34

Marter -175 Aug 90% 1.86 1.52 1.23 5.17 5.31 185.76 186.02 0.24 0.26

Marter -175 Sep 90% 1.86 1.52 1.23 5.17 5.31 185.76 186.02 0.24 0.26

Marter -175 Oct 90% 2.59 1.68 1.54 5.36 5.54 185.76 186.08 0.29 0.32

Marter -175 Nov 90% 5.9 2.12 2.79 6.07 6.37 185.76 186.3 0.46 0.54

Marter -175 Dec 90% 4.32 1.94 2.23 5.77 6.02 185.76 186.21 0.39 0.45

Marter -194 Jan 10% 7.14 3.94 1.81 3.44 4.17 184.67 185.24 0.53 0.57

Marter -194 Feb 10% 5.1 3.78 1.35 3.31 3.86 184.67 185.11 0.41 0.44

Marter -194 Mar 10% 7.76 3.99 1.94 3.47 4.26 184.67 185.28 0.56 0.61

Marter -194 Apr 10% 78.7 5.04 15.63 10 12.35 184.67 187.4 1.56 2.73

Marter -194 May 10% 68.7 4.84 14.19 9.52 11.79 184.67 187.26 1.49 2.59

Marter -194 Jun 10% 25.2 4.07 6.19 6.16 7.81 184.67 186.25 1.00 1.58

Marter -194 Jul 10% 15.5 4.15 3.73 3.99 5.37 184.67 185.76 0.93 1.09

Marter -194 Aug 10% 8.81 4.06 2.17 3.54 4.4 184.67 185.35 0.61 0.68

Marter -194 Sep 10% 9.14 4.07 2.24 3.56 4.45 184.67 185.37 0.63 0.7

Marter -194 Oct 10% 18.1 4.14 4.37 4.54 6 184.67 185.91 0.96 1.24

Marter -194 Nov 10% 20.6 4.09 5.04 5.17 6.71 184.67 186.05 0.97 1.38

Marter -194 Dec 10% 15.4 4.14 3.72 3.97 5.35 184.67 185.76 0.94 1.09

Marter -194 Jan 90% 3.02 3.43 0.88 3.17 3.54 184.67 184.96 0.28 0.29

Marter -194 Feb 90% 2.52 3.31 0.76 3.13 3.46 184.67 184.92 0.24 0.25

Marter -194 Mar 90% 2.55 3.3 0.77 3.14 3.46 184.67 184.93 0.25 0.26

Marter -194 Apr 90% 4.3 3.66 1.18 3.26 3.74 184.67 185.05 0.36 0.38

Marter -194 May 90% 14.5 4.19 3.46 3.87 5.18 184.67 185.69 0.89 1.02

Marter -194 Jun 90% 6.49 3.91 1.66 3.4 4.07 184.67 185.2 0.49 0.53

Marter -194 Jul 90% 2.86 3.37 0.85 3.16 3.52 184.67 184.95 0.27 0.28

Marter -194 Aug 90% 1.86 3.07 0.61 3.08 3.34 184.67 184.87 0.20 0.2

Marter -194 Sep 90% 1.86 3.07 0.61 3.08 3.34 184.67 184.87 0.20 0.2

Marter -194 Oct 90% 2.59 3.31 0.78 3.14 3.47 184.67 184.93 0.25 0.26

Marter -194 Nov 90% 5.9 3.86 1.53 3.36 3.98 184.67 185.16 0.46 0.49

Marter -194 Dec 90% 4.32 3.68 1.17 3.26 3.74 184.67 185.05 0.36 0.38

Marter -228 Jan 10% 7.14 3.35 2.13 8.58 8.69 182.71 182.98 0.25 0.27

Marter -228 Feb 10% 5.1 2.74 1.86 8.43 8.53 182.71 182.95 0.22 0.24

Marter -228 Mar 10% 7.76 3.52 2.21 8.62 8.74 182.71 182.99 0.26 0.28

Page 104: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -228 Apr 10% 78.7 8.06 9.76 12.6 12.99 182.71 183.71 0.77 1

Marter -228 May 10% 68.7 7.85 8.75 11.99 12.35 182.71 183.63 0.73 0.92

Marter -228 Jun 10% 25.2 6.19 4.07 9.58 9.78 182.71 183.19 0.42 0.48

Marter -228 Jul 10% 15.5 5.21 2.97 9.03 9.18 182.71 183.07 0.33 0.36

Marter -228 Aug 10% 8.81 3.79 2.32 8.69 8.81 182.71 183 0.27 0.29

Marter -228 Sep 10% 9.14 3.88 2.36 8.7 8.82 182.71 183 0.27 0.29

Marter -228 Oct 10% 18.1 5.54 3.27 9.18 9.34 182.71 183.11 0.36 0.4

Marter -228 Nov 10% 20.6 5.81 3.55 9.32 9.5 182.71 183.14 0.38 0.43

Marter -228 Dec 10% 15.4 5.21 2.96 9.02 9.17 182.71 183.07 0.33 0.36

Marter -228 Jan 90% 3.02 2.07 1.46 8.21 8.29 182.71 182.9 0.18 0.19

Marter -228 Feb 90% 2.52 1.88 1.34 8.14 8.21 182.71 182.88 0.16 0.17

Marter -228 Mar 90% 2.55 1.9 1.34 8.14 8.21 182.71 182.88 0.16 0.17

Marter -228 Apr 90% 4.3 2.5 1.72 8.35 8.45 182.71 182.93 0.21 0.22

Marter -228 May 90% 14.5 5.02 2.89 8.99 9.13 182.71 183.06 0.32 0.35

Marter -228 Jun 90% 6.49 3.16 2.06 8.54 8.65 182.71 182.97 0.24 0.26

Marter -228 Jul 90% 2.86 2.02 1.42 8.18 8.26 182.71 182.89 0.17 0.18

Marter -228 Aug 90% 1.86 1.62 1.15 8.03 8.09 182.71 182.86 0.14 0.15

Marter -228 Sep 90% 1.86 1.62 1.15 8.03 8.09 182.71 182.86 0.14 0.15

Marter -228 Oct 90% 2.59 1.91 1.35 8.15 8.22 182.71 182.88 0.17 0.17

Marter -228 Nov 90% 5.9 2.98 1.98 8.5 8.6 182.71 182.96 0.23 0.25

Marter -228 Dec 90% 4.32 2.5 1.73 8.36 8.45 182.71 182.93 0.21 0.22

Marter -250 Jan 10% 7.14 0.14 50.97 36.98 40.77 180.03 182.91 1.38 2.88

Marter -250 Feb 10% 5.1 0.11 45.07 33.45 37.12 180.03 182.74 1.35 2.71

Marter -250 Mar 10% 7.76 0.15 52.7 37.65 41.48 180.03 182.96 1.40 2.93

Marter -250 Apr 10% 78.7 0.51 154.55 66.13 70.57 180.03 185.11 2.34 5.08

Marter -250 May 10% 68.7 0.49 141.14 59.92 64.31 180.03 184.9 2.36 4.87

Marter -250 Jun 10% 25.2 0.29 85.77 42.8 46.93 180.03 183.79 2.00 3.76

Marter -250 Jul 10% 15.5 0.22 69.7 39.53 43.55 180.03 183.4 1.76 3.37

Marter -250 Aug 10% 8.81 0.16 55.57 37.98 41.83 180.03 183.03 1.46 3

Marter -250 Sep 10% 9.14 0.16 56.33 38.06 41.93 180.03 183.05 1.48 3.02

Marter -250 Oct 10% 18.1 0.24 74.43 40.13 44.2 180.03 183.52 1.85 3.49

Marter -250 Nov 10% 20.6 0.26 78.55 41.12 45.21 180.03 183.62 1.91 3.59

Marter -250 Dec 10% 15.4 0.22 69.51 39.51 43.53 180.03 183.39 1.76 3.36

Marter -250 Jan 90% 3.02 0.08 37.92 31.74 35.3 180.03 182.52 1.19 2.49

Marter -250 Feb 90% 2.52 0.07 35.81 31.12 34.61 180.03 182.45 1.15 2.42

Marter -250 Mar 90% 2.55 0.07 35.93 31.17 34.65 180.03 182.46 1.15 2.43

Marter -250 Apr 90% 4.3 0.1 42.57 32.35 35.98 180.03 182.67 1.32 2.64

Marter -250 May 90% 14.5 0.21 67.77 39.32 43.32 180.03 183.35 1.72 3.32

Marter -250 Jun 90% 6.49 0.13 49.2 35.99 39.75 180.03 182.86 1.37 2.83

Page 105: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -250 Jul 90% 2.86 0.08 37.25 31.6 35.13 180.03 182.5 1.18 2.47

Marter -250 Aug 90% 1.86 0.06 32.61 29.96 33.33 180.03 182.35 1.09 2.32

Marter -250 Sep 90% 1.86 0.06 32.61 29.96 33.33 180.03 182.35 1.09 2.32

Marter -250 Oct 90% 2.59 0.07 36.11 31.23 34.72 180.03 182.46 1.16 2.43

Marter -250 Nov 90% 5.9 0.12 47.63 35.09 38.82 180.03 182.82 1.36 2.79

Marter -250 Dec 90% 4.32 0.1 42.64 32.36 35.99 180.03 182.67 1.32 2.64

Marter 1 -303 Jan 10% 7.14 0.06 124.57 70.15 73.59 179.25 182.91 1.78 3.66

Marter 1 -303 Feb 10% 5.1 0.05 112.97 67.44 70.82 179.25 182.74 1.68 3.49

Marter 1 -303 Mar 10% 7.76 0.06 127.82 70.45 73.91 179.25 182.96 1.81 3.71

Marter 1 -303 Apr 10% 78.7 0.26 306 105.64 109.82 179.25 185.12 2.90 5.87

Marter 1 -303 May 10% 68.7 0.24 283.71 102.66 106.78 179.25 184.9 2.76 5.65

Marter 1 -303 Jun 10% 25.2 0.13 188.95 76.41 80.12 179.25 183.79 2.47 4.54

Marter 1 -303 Jul 10% 15.5 0.1 159.53 73.31 76.9 179.25 183.4 2.18 4.15

Marter 1 -303 Aug 10% 8.81 0.07 133.19 70.94 74.42 179.25 183.03 1.88 3.78

Marter 1 -303 Sep 10% 9.14 0.07 134.61 71.07 74.56 179.25 183.05 1.89 3.8

Marter 1 -303 Oct 10% 18.1 0.11 168.31 74.12 77.75 179.25 183.52 2.27 4.27

Marter 1 -303 Nov 10% 20.6 0.12 175.89 75.02 78.67 179.25 183.62 2.34 4.37

Marter 1 -303 Dec 10% 15.4 0.1 159.17 73.28 76.87 179.25 183.39 2.17 4.14

Marter 1 -303 Jan 90% 3.02 0.03 98.81 60.12 63.39 179.25 182.52 1.64 3.27

Marter 1 -303 Feb 90% 2.52 0.03 94.8 59.71 62.96 179.25 182.45 1.59 3.2

Marter 1 -303 Mar 90% 2.55 0.03 95.02 59.73 62.99 179.25 182.46 1.59 3.21

Marter 1 -303 Apr 90% 4.3 0.04 107.9 65.08 68.42 179.25 182.67 1.66 3.42

Marter 1 -303 May 90% 14.5 0.09 155.94 72.99 76.57 179.25 183.35 2.14 4.1

Marter 1 -303 Jun 90% 6.49 0.05 121.17 69.84 73.26 179.25 182.86 1.73 3.61

Marter 1 -303 Jul 90% 2.86 0.03 97.54 59.99 63.26 179.25 182.5 1.63 3.25

Marter 1 -303 Aug 90% 1.86 0.02 88.57 59.07 62.29 179.25 182.35 1.50 3.1

Marter 1 -303 Sep 90% 1.86 0.02 88.57 59.07 62.29 179.25 182.35 1.50 3.1

Marter 1 -303 Oct 90% 2.59 0.03 95.36 59.77 63.02 179.25 182.46 1.60 3.21

Marter 1 -303 Nov 90% 5.9 0.05 118.08 69.55 72.96 179.25 182.82 1.70 3.57

Marter 1 -303 Dec 90% 4.32 0.04 108.04 65.14 68.49 179.25 182.67 1.66 3.42

Marter -335 Jan 10% 7.14 0.04 172.88 76.43 77.42 178.5 182.91 2.26 4.41

Marter -335 Feb 10% 5.1 0.03 160.19 75.09 76.04 178.5 182.74 2.13 4.24

Marter -335 Mar 10% 7.76 0.04 176.42 76.8 77.8 178.5 182.96 2.30 4.46

Marter -335 Apr 10% 78.7 0.22 362.42 122.52 124.25 178.5 185.12 2.96 6.62

Marter -335 May 10% 68.7 0.2 339.16 91.3 92.96 178.5 184.91 3.71 6.41

Marter -335 Jun 10% 25.2 0.1 243.19 82.74 83.98 178.5 183.79 2.94 5.29

Marter -335 Jul 10% 15.5 0.07 211.08 80.34 81.44 178.5 183.4 2.63 4.9

Marter -335 Aug 10% 8.81 0.05 182.28 77.41 78.43 178.5 183.03 2.35 4.53

Page 106: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

��������8��

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -335 Sep 10% 9.14 0.05 183.83 77.57 78.59 178.5 183.05 2.37 4.55

Marter -335 Oct 10% 18.1 0.08 220.71 81.24 82.38 178.5 183.52 2.72 5.02

Marter -335 Nov 10% 20.6 0.09 229.01 81.8 82.98 178.5 183.62 2.80 5.12

Marter -335 Dec 10% 15.4 0.07 210.69 80.3 81.4 178.5 183.39 2.62 4.89

Marter -335 Jan 90% 3.02 0.02 143.73 73.32 74.21 178.5 182.52 1.96 4.02

Marter -335 Feb 90% 2.52 0.02 138.84 72.78 73.65 178.5 182.45 1.91 3.95

Marter -335 Mar 90% 2.55 0.02 139.12 72.81 73.69 178.5 182.46 1.91 3.96

Marter -335 Apr 90% 4.3 0.03 154.47 74.48 75.41 178.5 182.67 2.07 4.17

Marter -335 May 90% 14.5 0.07 207.15 79.94 81.04 178.5 183.35 2.59 4.85

Marter -335 Jun 90% 6.49 0.04 169.17 76.05 77.02 178.5 182.86 2.22 4.36

Marter -335 Jul 90% 2.86 0.02 142.19 73.15 74.03 178.5 182.5 1.94 4

Marter -335 Aug 90% 1.86 0.01 131.26 71.94 72.79 178.5 182.35 1.82 3.85

Marter -335 Sep 90% 1.86 0.01 131.26 71.94 72.79 178.5 182.35 1.82 3.85

Marter -335 Oct 90% 2.59 0.02 139.53 72.86 73.73 178.5 182.46 1.92 3.96

Marter -335 Nov 90% 5.9 0.04 165.82 75.69 76.65 178.5 182.82 2.19 4.32

Marter -335 Dec 90% 4.32 0.03 154.63 74.5 75.42 178.5 182.67 2.08 4.17

Marter 2 -360 Jan 10% 7.14 0.03 245.95 90.88 94.39 176.19 182.91 2.71 6.72

Marter 2 -360 Feb 10% 5.1 0.02 230.81 90.02 93.47 176.19 182.74 2.56 6.55

Marter 2 -360 Mar 10% 7.76 0.03 250.16 91.11 94.64 176.19 182.96 2.75 6.77

Marter 2 -360 Apr 10% 78.7 0.17 460.23 108.79 113.09 176.19 185.12 4.23 8.93

Marter 2 -360 May 10% 68.7 0.16 437.82 102.42 106.66 176.19 184.91 4.27 8.72

Marter 2 -360 Jun 10% 25.2 0.08 327.98 95.35 99.21 176.19 183.79 3.44 7.6

Marter 2 -360 Jul 10% 15.5 0.05 290.86 93.37 97.07 176.19 183.4 3.12 7.21

Marter 2 -360 Aug 10% 8.81 0.03 257.1 91.5 95.06 176.19 183.03 2.81 6.84

Marter 2 -360 Sep 10% 9.14 0.04 258.93 91.61 95.17 176.19 183.05 2.83 6.86

Marter 2 -360 Oct 10% 18.1 0.06 302.02 93.98 97.73 176.19 183.52 3.21 7.33

Marter 2 -360 Nov 10% 20.6 0.07 311.61 94.49 98.28 176.19 183.62 3.30 7.43

Marter 2 -360 Dec 10% 15.4 0.05 290.4 93.35 97.05 176.19 183.39 3.11 7.2

Marter 2 -360 Jan 90% 3.02 0.01 210.97 88.89 92.25 176.19 182.52 2.37 6.33

Marter 2 -360 Feb 90% 2.52 0.01 205.03 88.55 91.88 176.19 182.45 2.32 6.26

Marter 2 -360 Mar 90% 2.55 0.01 205.36 88.57 91.9 176.19 182.46 2.32 6.27

Marter 2 -360 Apr 90% 4.3 0.02 223.94 89.63 93.05 176.19 182.67 2.50 6.48

Marter 2 -360 May 90% 14.5 0.05 286.28 93.12 96.8 176.19 183.35 3.07 7.16

Marter 2 -360 Jun 90% 6.49 0.03 241.54 90.63 94.12 176.19 182.86 2.67 6.67

Marter 2 -360 Jul 90% 2.86 0.01 209.1 88.78 92.13 176.19 182.5 2.36 6.31

Marter 2 -360 Aug 90% 1.86 0.01 195.78 88.01 91.3 176.19 182.35 2.22 6.16

Marter 2 -360 Sep 90% 1.86 0.01 195.78 88.01 91.3 176.19 182.35 2.22 6.16

Marter 2 -360 Oct 90% 2.59 0.01 205.87 88.59 91.93 176.19 182.46 2.32 6.27

Marter 2 -360 Nov 90% 5.9 0.02 237.54 90.4 93.88 176.19 182.82 2.63 6.63

Page 107: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 2 -360 Dec 90% 4.32 0.02 224.12 89.64 93.06 176.19 182.67 2.50 6.48

Marter -391 Jan 10% 7.14 0.02 314.38 122.38 123.58 177.14 182.91 2.57 5.77

Marter -391 Feb 10% 5.1 0.02 294.3 117.44 118.62 177.14 182.74 2.51 5.6

Marter -391 Mar 10% 7.76 0.02 320.08 123.74 124.95 177.14 182.96 2.59 5.82

Marter -391 Apr 10% 78.7 0.13 622.95 147.37 149.49 177.14 185.12 4.23 7.98

Marter -391 May 10% 68.7 0.12 591.59 145.33 147.36 177.14 184.91 4.07 7.77

Marter -391 Jun 10% 25.2 0.06 432.52 140.74 142.19 177.14 183.79 3.07 6.65

Marter -391 Jul 10% 15.5 0.04 377.54 136.74 138.02 177.14 183.4 2.76 6.26

Marter -391 Aug 10% 8.81 0.03 329.56 125.98 127.2 177.14 183.03 2.62 5.89

Marter -391 Sep 10% 9.14 0.03 332.09 126.57 127.79 177.14 183.05 2.62 5.91

Marter -391 Oct 10% 18.1 0.05 394.05 139.8 141.1 177.14 183.52 2.82 6.38

Marter -391 Nov 10% 20.6 0.05 408.29 140.15 141.51 177.14 183.62 2.91 6.48

Marter -391 Dec 10% 15.4 0.04 376.88 136.6 137.87 177.14 183.39 2.76 6.25

Marter -391 Jan 90% 3.02 0.01 268.98 110.91 112.05 177.14 182.52 2.43 5.38

Marter -391 Feb 90% 2.52 0.01 261.63 108.94 110.06 177.14 182.45 2.40 5.31

Marter -391 Mar 90% 2.55 0.01 262.03 109.05 110.17 177.14 182.46 2.40 5.32

Marter -391 Apr 90% 4.3 0.02 285.41 115.19 116.35 177.14 182.67 2.48 5.53

Marter -391 May 90% 14.5 0.04 370.87 135.3 136.57 177.14 183.35 2.74 6.21

Marter -391 Jun 90% 6.49 0.02 308.48 120.95 122.14 177.14 182.86 2.55 5.72

Marter -391 Jul 90% 2.86 0.01 266.66 110.29 111.42 177.14 182.5 2.42 5.36

Marter -391 Aug 90% 1.86 0.01 250.37 105.85 106.96 177.14 182.35 2.37 5.21

Marter -391 Sep 90% 1.86 0.01 250.37 105.85 106.96 177.14 182.35 2.37 5.21

Marter -391 Oct 90% 2.59 0.01 262.66 109.22 110.34 177.14 182.46 2.40 5.32

Marter -391 Nov 90% 5.9 0.02 303.15 119.64 120.83 177.14 182.82 2.53 5.68

Marter -391 Dec 90% 4.32 0.02 285.65 115.25 116.41 177.14 182.67 2.48 5.53

Marter 110 -426 Jan 10% 7.14 0.03 280.31 93.72 94.5 178.95 182.91 2.99 3.96

Marter 110 -426 Feb 10% 5.1 0.02 264.74 92.17 92.91 178.95 182.74 2.87 3.79

Marter 110 -426 Mar 10% 7.76 0.03 284.66 94.15 94.94 178.95 182.96 3.02 4.01

Marter 110 -426 Apr 10% 78.7 0.15 538.78 136.86 138.5 178.95 185.12 3.94 6.17

Marter 110 -426 May 10% 68.7 0.14 509.64 134.84 136.42 178.95 184.91 3.78 5.96

Marter 110 -426 Jun 10% 25.2 0.07 370.21 115.66 116.73 178.95 183.79 3.20 4.84

Marter 110 -426 Jul 10% 15.5 0.05 327.1 98.25 99.13 178.95 183.4 3.33 4.45

Marter 110 -426 Aug 10% 8.81 0.03 291.84 94.86 95.66 178.95 183.03 3.08 4.08

Marter 110 -426 Sep 10% 9.14 0.03 293.74 95.05 95.85 178.95 183.05 3.09 4.1

Marter 110 -426 Oct 10% 18.1 0.05 339.08 111.09 112 178.95 183.52 3.05 4.57

Marter 110 -426 Nov 10% 20.6 0.06 350.48 113.02 113.99 178.95 183.62 3.10 4.67

Marter 110 -426 Dec 10% 15.4 0.05 326.62 98.21 99.09 178.95 183.39 3.33 4.44

Marter 110 -426 Jan 90% 3.02 0.01 244.53 90.11 90.8 178.95 182.52 2.71 3.57

Page 108: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 110 -426 Feb 90% 2.52 0.01 238.52 89.49 90.17 178.95 182.45 2.67 3.5

Marter 110 -426 Mar 90% 2.55 0.01 238.86 89.52 90.2 178.95 182.46 2.67 3.51

Marter 110 -426 Apr 90% 4.3 0.02 257.73 91.46 92.18 178.95 182.67 2.82 3.72

Marter 110 -426 May 90% 14.5 0.04 322.29 97.8 98.67 178.95 183.35 3.30 4.4

Marter 110 -426 Jun 90% 6.49 0.02 275.77 93.27 94.04 178.95 182.86 2.96 3.91

Marter 110 -426 Jul 90% 2.86 0.01 242.64 89.92 90.6 178.95 182.5 2.70 3.55

Marter 110 -426 Aug 90% 1.86 0.01 229.2 88.52 89.17 178.95 182.35 2.59 3.4

Marter 110 -426 Sep 90% 1.86 0.01 229.2 88.52 89.17 178.95 182.35 2.59 3.4

Marter 110 -426 Oct 90% 2.59 0.01 239.37 89.58 90.26 178.95 182.46 2.67 3.51

Marter 110 -426 Nov 90% 5.9 0.02 271.65 92.86 93.62 178.95 182.82 2.93 3.87

Marter 110 -426 Dec 90% 4.32 0.02 257.92 91.48 92.2 178.95 182.67 2.82 3.72

Marter 111 -483 Jan 10% 7.14 0.57 12.56 28.07 29.04 181.59 182.89 0.45 1.3

Marter 111 -483 Feb 10% 5.1 0.65 7.87 24.45 25.31 181.59 182.72 0.32 1.13

Marter 111 -483 Mar 10% 7.76 0.56 13.88 28.28 29.3 181.59 182.94 0.49 1.35

Marter 111 -483 Apr 10% 78.7 0.93 84.7 41.62 44.42 181.59 185.07 2.04 3.48

Marter 111 -483 May 10% 68.7 0.9 76.12 39.41 42.14 181.59 184.86 1.93 3.27

Marter 111 -483 Jun 10% 25.2 0.65 38.53 31.33 33.62 181.59 183.77 1.23 2.18

Marter 111 -483 Jul 10% 15.5 0.58 26.66 29.82 31.54 181.59 183.38 0.89 1.79

Marter 111 -483 Aug 10% 8.81 0.55 16.06 28.63 29.73 181.59 183.02 0.56 1.43

Marter 111 -483 Sep 10% 9.14 0.55 16.63 28.72 29.85 181.59 183.04 0.58 1.45

Marter 111 -483 Oct 10% 18.1 0.6 30.21 30.26 32.22 181.59 183.5 1.00 1.91

Marter 111 -483 Nov 10% 20.6 0.62 33.26 30.62 32.79 181.59 183.6 1.09 2.01

Marter 111 -483 Dec 10% 15.4 0.58 26.52 29.8 31.51 181.59 183.37 0.89 1.78

Marter 111 -483 Jan 90% 3.02 0.83 3.66 10.22 10.91 181.59 182.48 0.36 0.89

Marter 111 -483 Feb 90% 2.52 0.84 2.99 9.17 9.8 181.59 182.42 0.33 0.83

Marter 111 -483 Mar 90% 2.55 0.84 3.03 9.22 9.86 181.59 182.42 0.33 0.83

Marter 111 -483 Apr 90% 4.3 0.72 5.95 22.49 23.29 181.59 182.64 0.26 1.05

Marter 111 -483 May 90% 14.5 0.58 25.22 29.64 31.25 181.59 183.33 0.85 1.74

Marter 111 -483 Jun 90% 6.49 0.58 11.18 27.82 28.75 181.59 182.84 0.40 1.25

Marter 111 -483 Jul 90% 2.86 0.83 3.44 9.89 10.56 181.59 182.46 0.35 0.87

Marter 111 -483 Aug 90% 1.86 0.86 2.16 5.15 5.7 181.59 182.31 0.42 0.72

Marter 111 -483 Sep 90% 1.86 0.86 2.16 5.15 5.7 181.59 182.31 0.42 0.72

Marter 111 -483 Oct 90% 2.59 0.84 3.08 9.32 9.96 181.59 182.42 0.33 0.83

Marter 111 -483 Nov 90% 5.9 0.59 9.93 27.57 28.48 181.59 182.8 0.36 1.21

Marter 111 -483 Dec 90% 4.32 0.72 6 22.54 23.35 181.59 182.64 0.27 1.05

Marter -510 Jan 10% 7.14 0.21 33.35 19.03 20.69 180.77 182.9 1.75 2.13

Marter -510 Feb 10% 5.1 0.17 30.17 18.8 20.29 180.77 182.73 1.60 1.96

Marter -510 Mar 10% 7.76 0.23 34.23 19.09 20.8 180.77 182.95 1.79 2.18

Page 109: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -510 Apr 10% 78.7 0.91 86.88 34.53 37.89 180.77 185.07 2.52 4.3

Marter -510 May 10% 68.7 0.86 80.03 31.59 34.82 180.77 184.86 2.53 4.09

Marter -510 Jun 10% 25.2 0.5 50.35 20.41 23.05 180.77 183.77 2.47 3

Marter -510 Jul 10% 15.5 0.36 42.69 19.59 21.82 180.77 183.38 2.18 2.61

Marter -510 Aug 10% 8.81 0.25 35.68 19.2 20.99 180.77 183.02 1.86 2.25

Marter -510 Sep 10% 9.14 0.25 36.06 19.22 21.04 180.77 183.04 1.88 2.27

Marter -510 Oct 10% 18.1 0.4 45 19.72 22.08 180.77 183.5 2.28 2.73

Marter -510 Nov 10% 20.6 0.44 46.97 19.82 22.31 180.77 183.6 2.37 2.83

Marter -510 Dec 10% 15.4 0.36 42.59 19.58 21.8 180.77 183.38 2.18 2.61

Marter -510 Jan 90% 3.02 0.12 25.95 18.5 19.74 180.77 182.51 1.40 1.74

Marter -510 Feb 90% 2.52 0.1 24.71 18.37 19.55 180.77 182.44 1.35 1.67

Marter -510 Mar 90% 2.55 0.1 24.77 18.38 19.56 180.77 182.44 1.35 1.67

Marter -510 Apr 90% 4.3 0.15 28.7 18.7 20.1 180.77 182.65 1.53 1.88

Marter -510 May 90% 14.5 0.35 41.74 19.54 21.71 180.77 183.34 2.14 2.57

Marter -510 Jun 90% 6.49 0.2 32.43 18.97 20.58 180.77 182.85 1.71 2.08

Marter -510 Jul 90% 2.86 0.11 25.56 18.47 19.69 180.77 182.49 1.38 1.72

Marter -510 Aug 90% 1.86 0.08 22.8 18.03 19.13 180.77 182.33 1.26 1.56

Marter -510 Sep 90% 1.86 0.08 22.8 18.03 19.13 180.77 182.33 1.26 1.56

Marter -510 Oct 90% 2.59 0.1 24.88 18.4 19.58 180.77 182.45 1.35 1.68

Marter -510 Nov 90% 5.9 0.19 31.59 18.91 20.47 180.77 182.81 1.67 2.04

Marter -510 Dec 90% 4.32 0.15 28.74 18.7 20.1 180.77 182.66 1.54 1.89

Marter 3 -571 Jan 10% 7.14 0.06 110.65 36.53 38.21 178.75 182.9 3.03 4.15

Marter 3 -571 Feb 10% 5.1 0.05 104.51 36.11 37.67 178.75 182.73 2.89 3.98

Marter 3 -571 Mar 10% 7.76 0.07 112.34 36.65 38.36 178.75 182.95 3.07 4.2

Marter 3 -571 Apr 10% 78.7 0.39 199.78 48.31 51.24 178.75 185.09 4.14 6.34

Marter 3 -571 May 10% 68.7 0.36 189.95 45.12 47.98 178.75 184.87 4.21 6.12

Marter 3 -571 Jun 10% 25.2 0.17 144.03 39.73 42.03 178.75 183.78 3.63 5.03

Marter 3 -571 Jul 10% 15.5 0.12 128.78 38.34 40.38 178.75 183.39 3.36 4.64

Marter 3 -571 Aug 10% 8.81 0.08 115.13 36.84 38.61 178.75 183.02 3.13 4.27

Marter 3 -571 Sep 10% 9.14 0.08 115.87 36.92 38.71 178.75 183.04 3.14 4.29

Marter 3 -571 Oct 10% 18.1 0.14 133.35 38.99 41.12 178.75 183.51 3.42 4.76

Marter 3 -571 Nov 10% 20.6 0.15 137.29 39.25 41.44 178.75 183.61 3.50 4.86

Marter 3 -571 Dec 10% 15.4 0.12 128.6 38.32 40.36 178.75 183.38 3.36 4.63

Marter 3 -571 Jan 90% 3.02 0.03 96.42 35.16 36.6 178.75 182.51 2.74 3.76

Marter 3 -571 Feb 90% 2.52 0.03 94.06 34.82 36.24 178.75 182.44 2.70 3.69

Marter 3 -571 Mar 90% 2.55 0.03 94.19 34.84 36.26 178.75 182.44 2.70 3.69

Marter 3 -571 Apr 90% 4.3 0.04 101.69 35.84 37.36 178.75 182.65 2.84 3.9

Marter 3 -571 May 90% 14.5 0.11 126.92 38.14 40.14 178.75 183.34 3.33 4.59

Marter 3 -571 Jun 90% 6.49 0.06 108.87 36.41 38.06 178.75 182.85 2.99 4.1

Page 110: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

������������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 3 -571 Jul 90% 2.86 0.03 95.68 35.05 36.49 178.75 182.49 2.73 3.74

Marter 3 -571 Aug 90% 1.86 0.02 90.44 34.3 35.68 178.75 182.33 2.64 3.58

Marter 3 -571 Sep 90% 1.86 0.02 90.44 34.3 35.68 178.75 182.33 2.64 3.58

Marter 3 -571 Oct 90% 2.59 0.03 94.4 34.87 36.29 178.75 182.45 2.71 3.7

Marter 3 -571 Nov 90% 5.9 0.06 107.25 36.3 37.92 178.75 182.81 2.95 4.06

Marter 3 -571 Dec 90% 4.32 0.04 101.76 35.85 37.36 178.75 182.66 2.84 3.91

Marter -674 Jan 10% 7.14 0.14 49.27 33.33 35.03 180.93 182.9 1.48 1.97

Marter -674 Feb 10% 5.1 0.12 43.68 32.98 34.54 180.93 182.73 1.32 1.8

Marter -674 Mar 10% 7.76 0.15 50.82 33.43 35.17 180.93 182.95 1.52 2.02

Marter -674 Apr 10% 78.7 0.62 127.21 39.29 42.48 180.93 185.07 3.24 4.14

Marter -674 May 10% 68.7 0.58 119.03 38.48 41.57 180.93 184.86 3.09 3.93

Marter -674 Jun 10% 25.2 0.32 79.11 35.18 37.59 180.93 183.77 2.25 2.84

Marter -674 Jul 10% 15.5 0.24 65.64 34.36 36.45 180.93 183.38 1.91 2.45

Marter -674 Aug 10% 8.81 0.17 53.35 33.59 35.39 180.93 183.02 1.59 2.09

Marter -674 Sep 10% 9.14 0.17 54.02 33.63 35.45 180.93 183.04 1.61 2.11

Marter -674 Oct 10% 18.1 0.26 69.7 34.61 36.8 180.93 183.5 2.01 2.57

Marter -674 Nov 10% 20.6 0.28 73.18 34.82 37.09 180.93 183.6 2.10 2.67

Marter -674 Dec 10% 15.4 0.24 65.47 34.35 36.44 180.93 183.38 1.91 2.45

Marter -674 Jan 90% 3.02 0.08 36.28 32.5 33.88 180.93 182.51 1.12 1.58

Marter -674 Feb 90% 2.52 0.07 34.09 32.35 33.68 180.93 182.44 1.05 1.51

Marter -674 Mar 90% 2.55 0.07 34.21 32.36 33.69 180.93 182.44 1.06 1.51

Marter -674 Apr 90% 4.3 0.1 41.11 32.81 34.31 180.93 182.65 1.25 1.72

Marter -674 May 90% 14.5 0.23 63.98 34.25 36.31 180.93 183.34 1.87 2.41

Marter -674 Jun 90% 6.49 0.14 47.66 33.23 34.89 180.93 182.85 1.43 1.92

Marter -674 Jul 90% 2.86 0.08 35.59 32.45 33.81 180.93 182.49 1.10 1.56

Marter -674 Aug 90% 1.86 0.06 30.71 32.13 33.37 180.93 182.33 0.96 1.4

Marter -674 Sep 90% 1.86 0.06 30.71 32.13 33.37 180.93 182.33 0.96 1.4

Marter -674 Oct 90% 2.59 0.08 34.4 32.37 33.71 180.93 182.45 1.06 1.52

Marter -674 Nov 90% 5.9 0.13 46.18 33.14 34.76 180.93 182.81 1.39 1.88

Marter -674 Dec 90% 4.32 0.1 41.18 32.81 34.32 180.93 182.66 1.26 1.73

Marter 112 -779 Jan 10% 7.14 0.26 27.38 28.87 31.73 181.36 182.9 0.95 1.54

Marter 112 -779 Feb 10% 5.1 0.23 22.62 27.89 30.62 181.36 182.73 0.81 1.37

Marter 112 -779 Mar 10% 7.76 0.27 28.71 29.11 31.99 181.36 182.94 0.99 1.58

Marter 112 -779 Apr 10% 78.7 0.8 98.9 36.97 41.28 181.36 185.04 2.68 3.68

Marter 112 -779 May 10% 68.7 0.75 91.25 36.36 40.49 181.36 184.84 2.51 3.48

Marter 112 -779 Jun 10% 25.2 0.47 53.89 32.67 36 181.36 183.76 1.65 2.4

Marter 112 -779 Jul 10% 15.5 0.37 41.75 30.73 33.86 181.36 183.38 1.36 2.02

Marter 112 -779 Aug 10% 8.81 0.28 30.92 29.51 32.41 181.36 183.02 1.05 1.66

Page 111: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

������������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 112 -779 Sep 10% 9.14 0.29 31.5 29.61 32.52 181.36 183.04 1.06 1.68

Marter 112 -779 Oct 10% 18.1 0.4 45.36 31.21 34.42 181.36 183.49 1.45 2.13

Marter 112 -779 Nov 10% 20.6 0.42 48.48 31.72 34.98 181.36 183.59 1.53 2.23

Marter 112 -779 Dec 10% 15.4 0.37 41.6 30.71 33.84 181.36 183.37 1.35 2.01

Marter 112 -779 Jan 90% 3.02 0.18 16.48 26.62 28.98 181.36 182.5 0.62 1.14

Marter 112 -779 Feb 90% 2.52 0.17 14.71 26.25 28.49 181.36 182.44 0.56 1.08

Marter 112 -779 Mar 90% 2.55 0.17 14.81 26.27 28.52 181.36 182.44 0.56 1.08

Marter 112 -779 Apr 90% 4.3 0.21 20.46 27.45 30.06 181.36 182.65 0.75 1.29

Marter 112 -779 May 90% 14.5 0.36 40.28 30.59 33.69 181.36 183.33 1.32 1.97

Marter 112 -779 Jun 90% 6.49 0.25 25.99 28.62 31.46 181.36 182.85 0.91 1.49

Marter 112 -779 Jul 90% 2.86 0.18 15.92 26.51 28.83 181.36 182.48 0.60 1.12

Marter 112 -779 Aug 90% 1.86 0.15 12 25.66 27.73 181.36 182.33 0.47 0.97

Marter 112 -779 Sep 90% 1.86 0.15 12 25.66 27.73 181.36 182.33 0.47 0.97

Marter 112 -779 Oct 90% 2.59 0.17 14.96 26.3 28.56 181.36 182.45 0.57 1.09

Marter 112 -779 Nov 90% 5.9 0.24 24.74 28.39 31.21 181.36 182.8 0.87 1.44

Marter 112 -779 Dec 90% 4.32 0.21 20.52 27.46 30.07 181.36 182.65 0.75 1.29

Marter -994 Jan 10% 7.14 0.19 37.91 30.84 31.9 180.87 182.89 1.23 2.02

Marter -994 Feb 10% 5.1 0.16 32.83 30.26 31.21 180.87 182.72 1.08 1.85

Marter -994 Mar 10% 7.76 0.2 39.32 31 32.08 180.87 182.93 1.27 2.06

Marter -994 Apr 10% 78.7 0.69 113.43 40.6 42.68 180.87 185.02 2.79 4.15

Marter -994 May 10% 68.7 0.65 105.13 39.46 41.44 180.87 184.81 2.66 3.94

Marter -994 Jun 10% 25.2 0.38 65.65 34.26 35.8 180.87 183.74 1.92 2.87

Marter -994 Jul 10% 15.5 0.29 53 32.52 33.86 180.87 183.36 1.63 2.49

Marter -994 Aug 10% 8.81 0.21 41.66 31.27 32.39 180.87 183.01 1.33 2.14

Marter -994 Sep 10% 9.14 0.22 42.27 31.34 32.47 180.87 183.03 1.35 2.16

Marter -994 Oct 10% 18.1 0.32 56.79 32.93 34.34 180.87 183.48 1.72 2.61

Marter -994 Nov 10% 20.6 0.34 60.05 33.28 34.75 180.87 183.58 1.80 2.71

Marter -994 Dec 10% 15.4 0.29 52.85 32.5 33.84 180.87 183.36 1.63 2.49

Marter -994 Jan 90% 3.02 0.12 26.15 29.47 30.28 180.87 182.5 0.89 1.63

Marter -994 Feb 90% 2.52 0.1 24.2 29.23 30.01 180.87 182.43 0.83 1.56

Marter -994 Mar 90% 2.55 0.1 24.3 29.25 30.02 180.87 182.44 0.83 1.57

Marter -994 Apr 90% 4.3 0.14 30.5 29.98 30.89 180.87 182.64 1.02 1.77

Marter -994 May 90% 14.5 0.28 51.46 32.35 33.66 180.87 183.32 1.59 2.45

Marter -994 Jun 90% 6.49 0.18 36.44 30.67 31.7 180.87 182.84 1.19 1.97

Marter -994 Jul 90% 2.86 0.11 25.53 29.39 30.2 180.87 182.48 0.87 1.61

Marter -994 Aug 90% 1.86 0.09 21.18 28.87 29.58 180.87 182.33 0.73 1.46

Marter -994 Sep 90% 1.86 0.09 21.18 28.87 29.58 180.87 182.33 0.73 1.46

Marter -994 Oct 90% 2.59 0.11 24.47 29.27 30.05 180.87 182.44 0.84 1.57

Marter -994 Nov 90% 5.9 0.17 35.11 30.52 31.52 180.87 182.8 1.15 1.93

Page 112: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

������������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -994 Dec 90% 4.32 0.14 30.57 29.99 30.9 180.87 182.65 1.02 1.78

Marter 113 -1088 Jan 10% 7.14 0.24 29.95 27.33 29.05 180.64 182.88 1.10 2.24

Marter 113 -1088 Feb 10% 5.1 0.2 25.54 25.94 27.57 180.64 182.72 0.98 2.08

Marter 113 -1088 Mar 10% 7.76 0.25 31.19 27.7 29.45 180.64 182.93 1.13 2.29

Marter 113 -1088 Apr 10% 78.7 0.83 94.53 33.35 36.71 180.64 184.99 2.83 4.35

Marter 113 -1088 May 10% 68.7 0.78 87.73 32.74 35.97 180.64 184.79 2.68 4.15

Marter 113 -1088 Jun 10% 25.2 0.46 54.78 30.07 32.54 180.64 183.73 1.82 3.09

Marter 113 -1088 Jul 10% 15.5 0.36 43.55 29.43 31.54 180.64 183.36 1.48 2.72

Marter 113 -1088 Aug 10% 8.81 0.26 33.28 28.3 30.1 180.64 183 1.18 2.36

Marter 113 -1088 Sep 10% 9.14 0.27 33.83 28.46 30.27 180.64 183.02 1.19 2.38

Marter 113 -1088 Oct 10% 18.1 0.39 46.95 29.62 31.84 180.64 183.47 1.59 2.83

Marter 113 -1088 Nov 10% 20.6 0.41 49.85 29.78 32.1 180.64 183.57 1.67 2.93

Marter 113 -1088 Dec 10% 15.4 0.35 43.42 29.43 31.53 180.64 183.35 1.48 2.71

Marter 113 -1088 Jan 90% 3.02 0.15 19.98 23.98 25.52 180.64 182.5 0.83 1.86

Marter 113 -1088 Feb 90% 2.52 0.14 18.41 23.4 24.9 180.64 182.43 0.79 1.79

Marter 113 -1088 Mar 90% 2.55 0.14 18.49 23.43 24.94 180.64 182.43 0.79 1.79

Marter 113 -1088 Apr 90% 4.3 0.18 23.57 25.27 26.86 180.64 182.64 0.93 2

Marter 113 -1088 May 90% 14.5 0.34 42.16 29.36 31.42 180.64 183.31 1.44 2.67

Marter 113 -1088 Jun 90% 6.49 0.23 28.66 26.95 28.63 180.64 182.84 1.06 2.2

Marter 113 -1088 Jul 90% 2.86 0.15 19.48 23.8 25.32 180.64 182.47 0.82 1.83

Marter 113 -1088 Aug 90% 1.86 0.12 16.06 20.29 21.75 180.64 182.33 0.79 1.69

Marter 113 -1088 Sep 90% 1.86 0.12 16.06 20.29 21.75 180.64 182.33 0.79 1.69

Marter 113 -1088 Oct 90% 2.59 0.14 18.63 23.48 24.99 180.64 182.44 0.79 1.8

Marter 113 -1088 Nov 90% 5.9 0.21 27.5 26.6 28.26 180.64 182.79 1.03 2.15

Marter 113 -1088 Dec 90% 4.32 0.18 23.62 25.28 26.88 180.64 182.64 0.93 2

Marter -1155 Jan 10% 7.14 0.2 35.89 24.04 26.59 180.51 182.88 1.49 2.37

Marter -1155 Feb 10% 5.1 0.16 31.95 23.75 26.15 180.51 182.72 1.35 2.21

Marter -1155 Mar 10% 7.76 0.21 36.98 24.12 26.71 180.51 182.93 1.53 2.42

Marter -1155 Apr 10% 78.7 0.86 92.4 31.79 35.68 180.51 184.98 2.91 4.47

Marter -1155 May 10% 68.7 0.8 86.03 30.47 34.3 180.51 184.78 2.82 4.27

Marter -1155 Jun 10% 25.2 0.44 56.89 25.68 28.98 180.51 183.73 2.22 3.22

Marter -1155 Jul 10% 15.5 0.33 47.42 24.87 27.85 180.51 183.35 1.91 2.84

Marter -1155 Aug 10% 8.81 0.23 38.78 24.25 26.91 180.51 183 1.60 2.49

Marter -1155 Sep 10% 9.14 0.23 39.25 24.29 26.96 180.51 183.02 1.62 2.51

Marter -1155 Oct 10% 18.1 0.36 50.29 25.07 28.16 180.51 183.47 2.01 2.96

Marter -1155 Nov 10% 20.6 0.39 52.72 25.24 28.42 180.51 183.57 2.09 3.06

Marter -1155 Dec 10% 15.4 0.33 47.31 24.86 27.84 180.51 183.35 1.90 2.84

Marter -1155 Jan 90% 3.02 0.11 26.71 23.37 25.56 180.51 182.5 1.14 1.99

Page 113: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -1155 Feb 90% 2.52 0.1 25.17 23.25 25.38 180.51 182.43 1.08 1.92

Marter -1155 Mar 90% 2.55 0.1 25.25 23.26 25.39 180.51 182.43 1.09 1.92

Marter -1155 Apr 90% 4.3 0.14 30.13 23.62 25.95 180.51 182.64 1.28 2.13

Marter -1155 May 90% 14.5 0.31 46.25 24.79 27.73 180.51 183.31 1.87 2.8

Marter -1155 Jun 90% 6.49 0.19 34.75 23.96 26.47 180.51 182.83 1.45 2.32

Marter -1155 Jul 90% 2.86 0.11 26.23 23.33 25.5 180.51 182.47 1.12 1.96

Marter -1155 Aug 90% 1.86 0.08 22.78 23.07 25.11 180.51 182.33 0.99 1.82

Marter -1155 Sep 90% 1.86 0.08 22.78 23.07 25.11 180.51 182.33 0.99 1.82

Marter -1155 Oct 90% 2.59 0.1 25.39 23.27 25.41 180.51 182.44 1.09 1.93

Marter -1155 Nov 90% 5.9 0.17 33.72 23.88 26.35 180.51 182.79 1.41 2.28

Marter -1155 Dec 90% 4.32 0.14 30.18 23.62 25.95 180.51 182.64 1.28 2.13

Marter -1324 Jan 10% 7.14 0.17 41.96 26.44 29.09 180.61 182.88 1.59 2.27

Marter -1324 Feb 10% 5.1 0.14 37.63 26.22 28.69 180.61 182.72 1.44 2.11

Marter -1324 Mar 10% 7.76 0.18 43.15 26.5 29.2 180.61 182.93 1.63 2.32

Marter -1324 Apr 10% 78.7 0.76 103.04 33.37 37.43 180.61 184.97 3.09 4.36

Marter -1324 May 10% 68.7 0.71 96.33 32.52 36.48 180.61 184.76 2.96 4.15

Marter -1324 Jun 10% 25.2 0.39 64.77 28.11 31.58 180.61 183.72 2.30 3.11

Marter -1324 Jul 10% 15.5 0.28 54.51 27.06 30.23 180.61 183.35 2.01 2.74

Marter -1324 Aug 10% 8.81 0.2 45.12 26.6 29.38 180.61 183 1.70 2.39

Marter -1324 Sep 10% 9.14 0.2 45.63 26.62 29.43 180.61 183.02 1.71 2.41

Marter -1324 Oct 10% 18.1 0.31 57.61 27.21 30.5 180.61 183.46 2.12 2.85

Marter -1324 Nov 10% 20.6 0.34 60.24 27.48 30.85 180.61 183.56 2.19 2.95

Marter -1324 Dec 10% 15.4 0.28 54.39 27.06 30.22 180.61 183.34 2.01 2.73

Marter -1324 Jan 90% 3.02 0.09 31.85 25.93 28.16 180.61 182.49 1.23 1.88

Marter -1324 Feb 90% 2.52 0.08 30.14 25.84 28 180.61 182.43 1.17 1.82

Marter -1324 Mar 90% 2.55 0.08 30.23 25.84 28.01 180.61 182.43 1.17 1.82

Marter -1324 Apr 90% 4.3 0.12 35.62 26.12 28.51 180.61 182.64 1.36 2.03

Marter -1324 May 90% 14.5 0.27 53.25 27 30.11 180.61 183.3 1.97 2.69

Marter -1324 Jun 90% 6.49 0.16 40.71 26.38 28.98 180.61 182.83 1.54 2.22

Marter -1324 Jul 90% 2.86 0.09 31.31 25.9 28.11 180.61 182.47 1.21 1.86

Marter -1324 Aug 90% 1.86 0.07 27.49 25.7 27.75 180.61 182.33 1.07 1.72

Marter -1324 Sep 90% 1.86 0.07 27.49 25.7 27.75 180.61 182.33 1.07 1.72

Marter -1324 Oct 90% 2.59 0.09 30.38 25.85 28.02 180.61 182.44 1.18 1.83

Marter -1324 Nov 90% 5.9 0.15 39.58 26.32 28.87 180.61 182.79 1.50 2.18

Marter -1324 Dec 90% 4.32 0.12 35.68 26.12 28.51 180.61 182.64 1.37 2.03

Marter 114 -1691 Jan 10% 7.14 0.18 40.17 26.84 28.58 180.47 182.87 1.50 2.4

Marter 114 -1691 Feb 10% 5.1 0.14 35.84 26.36 27.98 180.47 182.71 1.36 2.24

Marter 114 -1691 Mar 10% 7.76 0.19 41.37 27.02 28.8 180.47 182.92 1.53 2.45

Page 114: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

�����������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 114 -1691 Apr 10% 78.7 0.79 100.19 33.56 36.76 180.47 184.91 2.99 4.44

Marter 114 -1691 May 10% 68.7 0.73 93.61 32.35 35.49 180.47 184.71 2.89 4.24

Marter 114 -1691 Jun 10% 25.2 0.4 63.26 28.45 31.03 180.47 183.7 2.22 3.23

Marter 114 -1691 Jul 10% 15.5 0.29 52.92 28 30.17 180.47 183.34 1.89 2.87

Marter 114 -1691 Aug 10% 8.81 0.2 43.36 27.32 29.15 180.47 182.99 1.59 2.52

Marter 114 -1691 Sep 10% 9.14 0.21 43.87 27.37 29.21 180.47 183.01 1.60 2.54

Marter 114 -1691 Oct 10% 18.1 0.32 56.07 28.14 30.43 180.47 183.45 1.99 2.98

Marter 114 -1691 Nov 10% 20.6 0.35 58.74 28.25 30.65 180.47 183.54 2.08 3.07

Marter 114 -1691 Dec 10% 15.4 0.29 52.8 28 30.16 180.47 183.33 1.89 2.86

Marter 114 -1691 Jan 90% 3.02 0.1 30.12 25.7 27.15 180.47 182.49 1.17 2.02

Marter 114 -1691 Feb 90% 2.52 0.09 28.44 25.5 26.9 180.47 182.43 1.12 1.96

Marter 114 -1691 Mar 90% 2.55 0.09 28.54 25.51 26.91 180.47 182.43 1.12 1.96

Marter 114 -1691 Apr 90% 4.3 0.13 33.85 26.13 27.69 180.47 182.64 1.30 2.17

Marter 114 -1691 May 90% 14.5 0.28 51.63 27.95 30.06 180.47 183.29 1.85 2.82

Marter 114 -1691 Jun 90% 6.49 0.17 38.92 26.69 28.39 180.47 182.83 1.46 2.36

Marter 114 -1691 Jul 90% 2.86 0.1 29.59 25.64 27.07 180.47 182.47 1.15 2

Marter 114 -1691 Aug 90% 1.86 0.07 25.85 25.19 26.51 180.47 182.32 1.03 1.85

Marter 114 -1691 Sep 90% 1.86 0.07 25.85 25.19 26.51 180.47 182.32 1.03 1.85

Marter 114 -1691 Oct 90% 2.59 0.09 28.68 25.53 26.94 180.47 182.44 1.12 1.97

Marter 114 -1691 Nov 90% 5.9 0.16 37.79 26.58 28.25 180.47 182.78 1.42 2.31

Marter 114 -1691 Dec 90% 4.32 0.13 33.91 26.14 27.7 180.47 182.64 1.30 2.17

Marter 115 -1838 Jan 10% 13.22 0.32 41.37 38.11 39.96 180.93 182.86 1.09 1.93

Marter 115 -1838 Feb 10% 9.44 0.27 35.44 36.09 37.81 180.93 182.7 0.98 1.77

Marter 115 -1838 Mar 10% 14.37 0.33 43.06 38.66 40.54 180.93 182.91 1.11 1.98

Marter 115 -1838 Apr 10% 145.74 0.94 154.74 65.7 68.73 180.93 184.87 2.36 3.94

Marter 115 -1838 May 10% 127.22 0.9 141.78 64.77 67.71 180.93 184.67 2.19 3.74

Marter 115 -1838 Jun 10% 46.67 0.58 80.23 59.16 61.66 180.93 183.68 1.36 2.75

Marter 115 -1838 Jul 10% 28.7 0.48 59.86 46.45 48.76 180.93 183.32 1.29 2.39

Marter 115 -1838 Aug 10% 16.31 0.36 45.87 39.45 41.41 180.93 182.98 1.16 2.05

Marter 115 -1838 Sep 10% 16.93 0.36 46.6 39.65 41.63 180.93 183 1.18 2.07

Marter 115 -1838 Oct 10% 33.52 0.51 65.62 57.08 59.49 180.93 183.43 1.15 2.5

Marter 115 -1838 Nov 10% 38.15 0.54 71 58.32 60.77 180.93 183.52 1.22 2.59

Marter 115 -1838 Dec 10% 28.52 0.48 59.66 45.76 48.07 180.93 183.31 1.30 2.38

Marter 115 -1838 Jan 90% 5.59 0.2 27.86 33.8 35.29 180.93 182.49 0.82 1.56

Marter 115 -1838 Feb 90% 4.67 0.18 25.69 33.1 34.54 180.93 182.42 0.78 1.49

Marter 115 -1838 Mar 90% 4.72 0.18 25.81 33.14 34.58 180.93 182.43 0.78 1.5

Marter 115 -1838 Apr 90% 7.96 0.24 32.77 35.31 36.95 180.93 182.63 0.93 1.7

Marter 115 -1838 May 90% 26.85 0.46 57.88 43.23 45.5 180.93 183.27 1.34 2.34

Marter 115 -1838 Jun 90% 12.02 0.3 39.64 37.55 39.35 180.93 182.82 1.06 1.89

Page 115: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

������������

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter 115 -1838 Jul 90% 5.3 0.2 27.17 33.58 35.05 180.93 182.47 0.81 1.54

Marter 115 -1838 Aug 90% 3.44 0.15 22.39 32.02 33.35 180.93 182.32 0.70 1.39

Marter 115 -1838 Sep 90% 3.44 0.15 22.39 32.02 33.35 180.93 182.32 0.70 1.39

Marter 115 -1838 Oct 90% 4.8 0.18 25.99 33.2 34.64 180.93 182.43 0.78 1.5

Marter 115 -1838 Nov 90% 10.93 0.29 38.09 37.03 38.8 180.93 182.78 1.03 1.85

Marter 115 -1838 Dec 90% 8 0.24 32.84 35.33 36.98 180.93 182.63 0.93 1.7

Marter -2081 Jan 10% 13.22 0.11 119.6 24.91 32.23 177.68 182.87 4.80 5.19

Marter -2081 Feb 10% 9.44 0.08 115.61 24.8 31.89 177.68 182.7 4.66 5.02

Marter -2081 Mar 10% 14.37 0.12 120.69 24.94 32.32 177.68 182.91 4.84 5.23

Marter -2081 Apr 10% 145.74 0.86 170.12 26.32 36.42 177.68 184.84 6.46 7.16

Marter -2081 May 10% 127.22 0.77 165.07 26.18 36.01 177.68 184.65 6.31 6.97

Marter -2081 Jun 10% 46.67 0.33 139.98 25.49 33.95 177.68 183.67 5.49 5.99

Marter -2081 Jul 10% 28.7 0.22 130.95 25.23 33.19 177.68 183.32 5.19 5.64

Marter -2081 Aug 10% 16.31 0.13 122.49 24.99 32.47 177.68 182.98 4.90 5.3

Marter -2081 Sep 10% 16.93 0.14 122.95 25.01 32.51 177.68 183 4.92 5.32

Marter -2081 Oct 10% 33.52 0.25 133.69 25.31 33.42 177.68 183.43 5.28 5.75

Marter -2081 Nov 10% 38.15 0.28 136.02 25.38 33.61 177.68 183.52 5.36 5.84

Marter -2081 Dec 10% 28.52 0.22 130.84 25.23 33.18 177.68 183.31 5.19 5.63

Marter -2081 Jan 90% 5.59 0.05 110.24 24.64 31.43 177.68 182.49 4.47 4.81

Marter -2081 Feb 90% 4.67 0.04 108.64 24.6 31.29 177.68 182.42 4.42 4.74

Marter -2081 Mar 90% 4.72 0.04 108.73 24.6 31.3 177.68 182.43 4.42 4.75

Marter -2081 Apr 90% 7.96 0.07 113.76 24.74 31.73 177.68 182.63 4.60 4.95

Marter -2081 May 90% 26.85 0.21 129.83 25.2 33.09 177.68 183.27 5.15 5.59

Marter -2081 Jun 90% 12.02 0.1 118.45 24.88 32.13 177.68 182.82 4.76 5.14

Marter -2081 Jul 90% 5.3 0.05 109.74 24.63 31.38 177.68 182.47 4.46 4.79

Marter -2081 Aug 90% 3.44 0.03 106.15 24.52 31.07 177.68 182.32 4.33 4.64

Marter -2081 Sep 90% 3.44 0.03 106.15 24.52 31.07 177.68 182.32 4.33 4.64

Marter -2081 Oct 90% 4.8 0.04 108.87 24.6 31.31 177.68 182.43 4.43 4.75

Marter -2081 Nov 90% 10.93 0.09 117.42 24.85 32.04 177.68 182.78 4.73 5.1

Marter -2081 Dec 90% 8 0.07 113.81 24.75 31.73 177.68 182.63 4.60 4.95

Marter -3725 Jan 10% 13.22 0.16 82.92 57.9 58.58 180.9 182.86 1.43 1.96

Marter -3725 Feb 10% 9.44 0.13 73.9 56.82 57.46 180.9 182.7 1.30 1.8

Marter -3725 Mar 10% 14.37 0.17 85.42 58.19 58.89 180.9 182.9 1.47 2

Marter -3725 Apr 10% 145.74 0.74 197.4 68.06 69.61 180.9 184.68 2.90 3.78

Marter -3725 May 10% 127.22 0.69 185.68 67.21 68.67 180.9 184.51 2.76 3.61

Marter -3725 Jun 10% 46.67 0.36 129.4 61.88 62.99 180.9 183.63 2.09 2.73

Marter -3725 Jul 10% 28.7 0.26 108.86 60.2 61.15 180.9 183.3 1.81 2.4

Marter -3725 Aug 10% 16.31 0.18 89.54 58.59 59.33 180.9 182.97 1.53 2.07

Page 116: CANADIAN PROJECTS LIMITED Draft ER 2012 August 30th/Annex I/8-1 … · R.J. Burnside & Associates Limited (Burnside) ... July 10, 2012 Page 2 Canadian Projects Limited Table 1: Flow

���������8��

Reach BPR -

Section River Sta Profile Q Total

Vel Chnl

Flow Area

Top Width

W.P. Total

Min Ch El

W.S. Elev

Ave Depth

Max Depth

(m3/s) (m/s) (m2) (m) (m) (m) (m) (m) (m)

Marter -3725 Sep 10% 16.93 0.19 90.59 58.68 59.43 180.9 182.99 1.54 2.09

Marter -3725 Oct 10% 33.52 0.29 115.1 60.63 61.64 180.9 183.4 1.90 2.5

Marter -3725 Nov 10% 38.15 0.32 120.4 61.06 62.12 180.9 183.49 1.97 2.59

Marter -3725 Dec 10% 28.52 0.26 108.61 60.18 61.13 180.9 183.29 1.80 2.39

Marter -3725 Jan 90% 5.59 0.09 61.86 55.16 55.74 180.9 182.49 1.12 1.59

Marter -3725 Feb 90% 4.67 0.08 58.32 54.66 55.22 180.9 182.42 1.07 1.52

Marter -3725 Mar 90% 4.72 0.08 58.52 54.68 55.25 180.9 182.42 1.07 1.52

Marter -3725 Apr 90% 7.96 0.11 69.72 56.27 56.89 180.9 182.63 1.24 1.73

Marter -3725 May 90% 26.85 0.25 106.29 60.02 60.94 180.9 183.25 1.77 2.35

Marter -3725 Jun 90% 12.02 0.15 80.33 57.59 58.26 180.9 182.81 1.39 1.91

Marter -3725 Jul 90% 5.3 0.09 60.74 55 55.58 180.9 182.47 1.10 1.57

Marter -3725 Aug 90% 3.44 0.07 52.85 53.86 54.4 180.9 182.32 0.98 1.42

Marter -3725 Sep 90% 3.44 0.07 52.85 53.86 54.4 180.9 182.32 0.98 1.42

Marter -3725 Oct 90% 4.8 0.08 58.82 54.73 55.29 180.9 182.43 1.07 1.53

Marter -3725 Nov 90% 10.93 0.14 77.99 57.31 57.97 180.9 182.77 1.36 1.87

Marter -3725 Dec 90% 8 0.11 69.83 56.28 56.9 180.9 182.63 1.24 1.73