32
Volume 36 Issue 2 Spring/Printemps 2016 PM#40063056 JOURNAL OF CANADIAN HEALTHCARE ENGINEERING SOCIETY HealthcareFacilities Canadian Nanaimo Regional General Hospital's new emergency department designed to deliver sustainable care BREAKTHROUGH PERFORMANCE BREAKTHROUGH PERFORMANCE Nanaimo Regional General Hospital's new emergency department designed to deliver sustainable care

Canadian Healthcare Facilities | Spring 2016

Embed Size (px)

DESCRIPTION

Canadian Healthcare Facilities | Spring 2016

Citation preview

Page 1: Canadian Healthcare Facilities | Spring 2016

Volume 36 Issue 2 Spring/Printemps 2016

PM#

4006

3056

JOURNAL OF CANADIAN HEALTHCARE ENGINEERING SOCIETY

HealthcareFacilitiesCanadian

Nanaimo Regional General Hospital's new emergency department designed to deliver sustainable care

BREAKTHROUGH PERFORMANCEBREAKTHROUGH PERFORMANCENanaimo Regional General Hospital's new emergency department designed to deliver sustainable care

Page 2: Canadian Healthcare Facilities | Spring 2016

ASCO Power Switching & ControlsJust another reason why Emerson Network Power is a global leader in maximizing availability, capacity and efficiency of critical infrastructure.

Emerson and ASCO are trademarks of Emerson Electric Co. or one of its affiliated companies. ©2015 Emerson Electric Co. CS101 ASCO Power Technologies

88%* of engineers agree — Selective coordination requires choice, not compromise

E M E R S O N . C O N S I D E R I T S O L V E D.™

ASCO invites you to explore3 to 18 cycle and 30 cycle power transfer switches

Selective coordination demands the ability to choose. After all, since no two emergency and backup power systems are alike, why settle for a cookie-cutter selective coordination design?

www.EmersonNetworkPower.com/ASCO, (800) 800-ASCO (2726), ascoapu.com, [email protected]

ASCO Power Transfer Switches:• Achieved industry first 3-cycle rating • Qualified 18-cycle performance on core 3-cycle switch, another industry first• Satisfy the demands of unique applications with a 30-cycle option

• Truly optimize selective coordination for what the application requires (typically an 18-cycle transfer switch)• Provide a cost effective solution by utilizing 3 to 18 cycle ratings• Are certified to UL-1008, 6th edition (April, 2011) test criteria

Compare power transfer switches for selective coordination applications. Then, select ASCO.

* Results reflect the opinions of more than 300 engineers polled in a recent Webcast exit survey.

DIVERSIFIEDCONSTRUCTION

CONTRACTORSCONTRACTORS

ASPHALT PAVINGBUILDING RESTORATION

CONCRETEINTERLOCKING STONE

LANDSCAPE CONSTRUCTION SITE SERVICING

WINTER SNOW SERVICES24-HOUR EMERGENCY SERVICE

We offer a wide range ofservices, from pothole lling

to reconstruction of parking lots

www.forestcontractors.com

Page 3: Canadian Healthcare Facilities | Spring 2016

ASCO Power Switching & ControlsJust another reason why Emerson Network Power is a global leader in maximizing availability, capacity and efficiency of critical infrastructure.

Emerson and ASCO are trademarks of Emerson Electric Co. or one of its affiliated companies. ©2015 Emerson Electric Co. CS101 ASCO Power Technologies

88%* of engineers agree — Selective coordination requires choice, not compromise

E M E R S O N . C O N S I D E R I T S O L V E D.™

ASCO invites you to explore3 to 18 cycle and 30 cycle power transfer switches

Selective coordination demands the ability to choose. After all, since no two emergency and backup power systems are alike, why settle for a cookie-cutter selective coordination design?

www.EmersonNetworkPower.com/ASCO, (800) 800-ASCO (2726), ascoapu.com, [email protected]

ASCO Power Transfer Switches:• Achieved industry first 3-cycle rating • Qualified 18-cycle performance on core 3-cycle switch, another industry first• Satisfy the demands of unique applications with a 30-cycle option

• Truly optimize selective coordination for what the application requires (typically an 18-cycle transfer switch)• Provide a cost effective solution by utilizing 3 to 18 cycle ratings• Are certified to UL-1008, 6th edition (April, 2011) test criteria

Compare power transfer switches for selective coordination applications. Then, select ASCO.

* Results reflect the opinions of more than 300 engineers polled in a recent Webcast exit survey.

DIVERSIFIEDCONSTRUCTION

CONTRACTORSCONTRACTORS

ASPHALT PAVINGBUILDING RESTORATION

CONCRETEINTERLOCKING STONE

LANDSCAPE CONSTRUCTION SITE SERVICING

WINTER SNOW SERVICES24-HOUR EMERGENCY SERVICE

We offer a wide range ofservices, from pothole lling

to reconstruction of parking lots

www.forestcontractors.com

Page 4: Canadian Healthcare Facilities | Spring 2016

Committed to service excellence � Structural Restoration � Structural Engineering � Building Science � Parking Facility Design

rjc.caRead Jones Christoffersen Ltd. Engineers

CONTENTS

INNOVATION

12 Where Sustainability Supports Care Inside Nanaimo Regional General

Hospital’s new emergency department

16 Extending the Hospital Walls New approach to critical care knocks down

distance barriers for patients in northeastern Ontario

TECHNOLOGY

20 Robots in Disguise Hospital automated guided carts

increase efficiency, reduce operating costs

26 A Winnable Battle Canadian invention wages war on

superbugs like never before

REGULATORY UPDATE

28 Raising the Bar Revised CSA standards provide

updated guidance to healthcare facilities

PUBLISHER/ÉDITEUR Kevin Brown [email protected]

ASSOCIATE PUBLISHER/ Stephanie PhilbinÉDITRICE ASSOCIÉE [email protected]

EDITOR/RÉDACTRICE Clare Tattersall [email protected]

SENIOR DESIGNER/ Annette CarlucciCONCEPTEUR [email protected] GRAPHIQUE SENIOR

PRODUCTION MANAGER/ Rachel SelbieDIRECTEUR DE [email protected]

CIRCULATION MANAGER/ Maria SiassiniDIRECTEUR DE LA [email protected]

CANADIAN HEALTHCARE FACILITIES IS PUBLISHED BY UNDER THE PATRONAGE OF THE CANADIAN HEALTHCARE ENGINEERING SOCIETY.

SCISS JOURNAL TRIMESTRIEL PUBLIE PAR SOUS LE PATRONAGE DE LA SOCIETE CANADIENNE D'INGENIERIE DES SERVICES DE SANTE.

CHES SCISSCanadian HealthcareEngineering Society

Société canadienne d'ingénieriedes services de santé

PRESIDENT Mitch WeimerVICE-PRESIDENT Preston KosturaPAST PRESIDENT Peter WhitemanTREASURER Craig. B DoerksenSECRETARY Sarah ThornEXECUTIVE DIRECTOR Donna Dennison

CHAPTER CHAIRS Newfoundland & Labrador: Brian Kinden Maritimes: Robert BarssOntario: Roger HollissManitoba: Craig B. DoerksenSaskatchewan: Al F. KriegerAlberta: Tom HowardBritish Columbia: Steve McEwan

FOUNDING MEMBERS H. Callan, G.S. Corbeil, J. Cyr, S.T. Morawski

CHES 4 Cataraqui St., Suite 310, Kingston, Ont. K7K 1Z7Telephone: (613) 531-2661 Fax: (866) 303-0626E-mail: [email protected] www.ches.org

Canada Post SalesProduct Agreement No. 40063056ISSN # 1486-2530

CANADIAN HEALTHCARE FACILITIESVolume 36 Issue 2

12

DEPARTMENTS

6 Editor's Note 8 President's Message

10 Chapter Reports

4 CANADIAN HEALTHCARE FACILITIES

Page 5: Canadian Healthcare Facilities | Spring 2016

Committed to service excellence � Structural Restoration � Structural Engineering � Building Science � Parking Facility Design

rjc.caRead Jones Christoffersen Ltd. Engineers

Page 6: Canadian Healthcare Facilities | Spring 2016

6 CANADIAN HEALTHCARE FACILITIES

IT SEEMS LIKE EVERY OTHER week Canada’s healthcare infrastructure is in the news. Stories run the gamut from the cancellation of a week’s worth of surgeries at Eastern Health due to contaminated equipment, to the recent flooding and subsequent shutdown of St. Michael’s Hospital’s emergency department in Toronto, to the ‘long list of ills’ — Legionella, heating failures and bedbugs, to name a few — at Halifax’s Victoria General Hospital. But not all news is bad; it just happens to dominate mainstream media headlines.

From east to west, health authorities across the country are embarking on ambitious multi-million dollar revitalization projects. They’re investing in their communities, creating innovative and sustainable places that will provide quality patient care well into the future. Many projects are currently in the early stages of development, while others are well underway and a number are already complete. One such project is Nanaimo Regional General Hospital’s new emergency department, which is our lead story this issue. Located on Vancouver Island, the 35,000-square-foot hospital addition is triple the size of the old emergency wing. But its size isn’t what makes this project truly remarkable. The LEED (Leadership in Energy and Environmental Design) gold building is designed to improve the health, healthcare and quality of life of its users. You can read all about the ‘generative space’ beginning on pg. 12.

From here we move east to Ontario, where we continue our innovation journey. At Health Sciences North, video conferencing technology connects a team of intensive care physicians, specially trained nurses and respiratory therapists with smaller hospital critical care units and emergency departments across northeastern Ontario. Extending the Hospital Walls delves into this virtual critical care model, which enhances the diagnosis and treatment of patients.

Ontario is also the birthplace of Asepticsure (pg. 26). Developed by Dr. Dick Zoutman, chief of staff at Quinte Health Care, and Dr. Michael Shannon, former deputy surgeon general of Canada, the hospital room disinfection system is virtually 100 per cent effective and safe.

Rounding out this issue, we look at the rise of robots in hospitals and provide a regulatory update on two CSA standards, Z317.1 and Z317.2.

Clare Tattersall [email protected]

EDITOR'S NOTE

Reproduction or adoption of articles appearing in Canadian Healthcare Facilities is authorized subject to acknowledgement of the source. Opinions expressed in articles are those of the authors and are not necessarily those of the Canadian Healthcare Engineering Society. For information or permission to quote, reprint or translate articles contained in this publication, please write or contact the editor.

Canadian Healthcare Facilities Magazine RateExtra Copies (members only) $25 per issueCanadian Healthcare Facilities (non members) $30 per issueCanadian Healthcare Facilities (non members) $80 for 4 issues A subscription to Canadian Healthcare Facilities is included in yearly CHES membership fees.

La reproduction ou l’adaptation d’articles parus dans le Journal trimestriel de la Société canadienne d’ingénierie des services de santé est autorisée à la condition que la source soit indiquée. Les opinions exprimées dans les articles sont celles des auteurs, qui ne sont pas nécessairement celles de la Société canadienne d’ingénierie des services de santé. Pour information ou permission de citer, réimprimer ou traduire des articles contenus dans la présente publication, veuillez vous adresser à la rédactrice.

Prix d’achat du Journal trimestrielExemplaires additionnels (membres seulement) 25 $ par numéroJournal trimestriel (non-membres) 30 $ par numéroJournal trimestriel (non-membres) 80 $ pour quatre numérosL’abonnement au Journal trimestriel est inclus dans la cotisation annuelle de la SCISS.

INNOVATION NATION

Page 7: Canadian Healthcare Facilities | Spring 2016

Solving safety. For healthcare.

For life.

Healthcare facilities need to deliver outstanding care for patients.

Tyco Integrated Fire & Security partners with institutions of all sizes to meet that challenge, with our advanced fire and life-safety solutions. We focus on protecting people and property and help you achieve your goals: providing a safe and secure environment for care; enabling greater patient well-being; and minimizing noise and disruptions to patients and staff.

See how Tyco Integrated Fire & Security solutions allow you to succeed in your core mission of caring for patients. Visit our healthcare page at www.TycoIFS.ca or call 1-800-565-5400.

RBQ 3050-7412-83. Tyco © 2016. ALL RIGHTS RESERVED. Tyco is a trade/service mark of Tyco International Services GmbH and is used under licence. All other marks are the property of their respective owners.

Fire Alarm | Sprinkler | Suppression | Monitoring | Access | Video | Intrusion | Emergency Communications

SIMP0296_Healthcare_Ad-TIFS_CanadianHealthFac.indd 1 2/19/16 10:56 AM

Page 8: Canadian Healthcare Facilities | Spring 2016

AS I WRITE THIS MESSAGE the days are getting longer and the nights shorter, signalling the coming of spring. The season is a time of growth and most chapters are working diligently to bring their spring conferences and education days to fruition. Planning and running these events requires hundreds of volunteer hours. When you attend your local chapter event this year, please take a few moments to thank the hardworking people who made it a reality.

As we move further into 2016, the pace of work for most of us in the healthcare sector will not diminish, leaving little “free” time. Most organizations emphasize the importance of continuing education but formal programs require a significant commitment. Self-directed learning is a key component of professional development, and it provides an alternative for those who are time-strapped. Reading Canadian Healthcare Facilities will help you keep pace with changes in the healthcare industry. The CHES website and, in particular, our webinar series are also valuable resources. The professional development committee has put together a series of informative webinars for 2016, with webinars scheduled for March, April, October and November. They are great group events, where you can educate an entire team for the price of just one registration. The two-day Canadian Healthcare Construction Course (CanHCC) is also being offered by CHES several times this year.

CHES is ramping up the Canadian Certified Healthcare Facility Manager (CCHFM) program. The certification program was established to help set a national workplace standard for those responsible for the operations and maintenance of Canada’s healthcare facilities. I would like to congratulate Manitoba Chapter chair, Craig Doerksen, as the first person to complete the program and earn the CCHFM designation.

CSA Group is publishing several new standards this year, including Z317.1 (Special Requirements for Plumbing Installations in Health Care Facilities) and Z317.2 (Special Requirements for HVAC Systems in Health Care Facilities). Familiarizing yourself with them will help you stay current. As well, CSA is currently looking for a CHES representative for its Special Requirements for Illumination in Health Care Facilities standard. The partnership and advocacy subcommittee will run a process to select a volunteer to serve as the CHES representative on that committee. As always, CHES membership provides free access to the “top 10” CSA standards.

2016 marks a return of the CHES National Conference to the West Coast. The British Columbia chapter last hosted the conference in the shadow of the 2010 Winter Olympics in Whistler. This year, I am honoured to welcome all CHES members to my hometown of Vancouver, to experience all that the world-class city has to offer. Conference chair Norbert Fischer and B.C. Chapter chair Steve McEwan have been whipping the conference team into action. This year’s conference, to be held at the spectacular Vancouver Convention Centre Sept. 11-13, is shaping up to be a fantastic event. Following the conference, on Sept. 14-15, there will be a two-day session of the CanHCC.

As you read this edition of Canadian Healthcare Facilities, please remember the journal relies heavily on information and articles submitted by our membership. I encourage you to take some time to submit your editorial pitches to the MediaEdge team.

Mitch WeimerPresident, CHES National

PRESIDENT'S MESSAGE

8 CANADIAN HEALTHCARE FACILITIES

SPRING INTO LEARNING

Page 9: Canadian Healthcare Facilities | Spring 2016

www.reliablecontrols.com

professional performance reports

Extract intelligence from your archived building data and make informed operational decisions with Reliable Controls® RC-Reporter®. This fully customizable, server-based application allows you to analyse the trend data from any BACnet Internet-connected building, and generate professional performance reports, quickly and accurately.

. . . people and technology you can rely on.™

ChartingProfessional looking charts

Nov 04, 2014 rev-HReliable Controls CorporationCHES 2010 Conference Program - full color Ad (single page full [8.5” x 11”]+1/8” bleeds)

Member

C

M

Y

CM

MY

CY

CMY

K

CHCF-AD-RCR-2015.pdf 1 14-12-12 3:14 PM

Untitled-2 1 15-03-02 12:10 PM

Page 10: Canadian Healthcare Facilities | Spring 2016

CHAPTER REPORTS

ONTARIO CHAPTER

Even though we’re still in the thick of winter, the days are getting longer — a good indication spring isn’t too far off. With it comes warmer weather and a fresh set of exciting challenges and opportunities.

Our CSA Z8002 Education Day was held March 2. The all-day training session guided attendees through this nationally recognized baseline for the operation and maintenance of healthcare facilities. Since the standard contains numerous discipline-specific training modules, the Ontario Chapter is assessing the success of the education day to determine if and how future CSA Z8002 sessions should be facilitated.

The Ontario Chapter’s annual conference and trade show is coming together nicely. To be held May 29-31, in Kitchener, Ont., it will have an interesting blend of high-tech, leading edge sessions. The companion program includes a Mennonite horse-drawn wagon ride tour to the mini Oktoberfest keg opening at the gala. Conference particulars should be finalized shortly, after which chapter members will receive a notification package.

Ontario Chapter secretary John Marshman and I have received positive feedback about the seminar we hosted Dec. 2, 2015, at PM Expo. Our presentation addressed the unique aspects of designing, tendering and undertaking hospital renovation and construction projects in Ontario. Topics covered included: recent new guidelines for procurement in the broader public sector, which includes schools, universities and hospitals, among others; the pace of medical advancement and its impact on hospital infrastructure; and CSA Group’s standards on infection control.

It has been almost a year since I became chapter chair and I’d like to thank everyone I’ve crossed paths with during this time. I’ve been conscious of trying to balance the demands on people to contribute to the chapter and the demands of their regular jobs. But to date, I’ve had nothing but full support by all, which has been greatly appreciated.

—Roger Holliss, Ontario Chapter chair

10 CANADIAN HEALTHCARE FACILITIES

SASKATCHEWAN CHAPTER

Planning is well underway for this year’s conference. It will be held in Saskatoon at TCU Place, Oct. 23-25. Invitations will be sent out soon and registration forms will be posted to the website in due course. The conference theme is

“Technological Change in Healthcare.” The focus isn’t just on facilities but also includes the clinical side, and the infrastructure that is required to support such change.

Location scouting has begun for the 2019 CHES National Conference. The dates have been set and a venue should be finalized within the next couple months.

The chapter hosted the Canadian HealthCare Construction Course (CanHCC) Jan. 26-27, at the newly built Courtyard by Marriott at the Saskatoon airport. More than 20 people attended the course. Participants included contractors, consultants and senior administration from healthcare organizations. Presenting faculty included Mike Hickey, Gordon Burrill and Jeff Smith. Feedback has been positive.

—Alan F. Krieger, Saskatchewan Chapter chair

NEWFOUNDLAND & LABRADOR CHAPTER

The chapter recently called for nominations for the secretary position. Four names were put forward and Randy Cull was chosen by acclamation. I would like to thank all nominees for their continued

support of the chapter and congratulate Randy in particular.Planning has been ongoing for the 2016 Newfoundland &

Labrador Professional Development Day. It will be held May 15-16, at Capital Hotel in St. John’s, Nfld. — not May 29-30, as indicated in the last chapter report. We are in the final stage of booking speakers for the event. It is shaping up to be a very informative couple of days.

Those interested in taking the Canadian Certified Healthcare Facility Manager (CCHFM) exam can do so now at one of 14 testing centres located across the country. College of the North Atlantic was selected as the testing centre for our region. The exam can be written at various campuses throughout the province. Upon successful completion of the program, the chapter will provide a $150 bursary to the paid member. Information on the program can be found on the CHES website. Should you have any questions, please feel free to e-mail me directly at [email protected].

—Brian Kinden, Newfoundland & Labrador Chapter chair

MANITOBA CHAPTER

Two events in Manitoba will shape the future of healthcare in the province. Late last year, the Manitoba government committed to introducing a cap-and-trade system to reduce greenhouse gas emissions. The program will

impact many healthcare facilities, resulting in cost penalties or spurring energy and environmental improvements. In less than two months, the fixed-date provincial election (April 19) will either extend the current government’s 17-year term in office or bring change. By the time the Manitoba 2016 Education Day arrives, one of these matters will be settled.

This year’s education day will take place April 28, at the Canad Inns Destination Centre Polo Park in Winnipeg. The theme is “Energy Savings: Building on Past Success.” Session topics include: the Winnipeg Health Region’s energy measurement and benchmarking system; Manitoba Hydro’s measurement tools; energy awareness programs; energy-saving maintenance practices for air-handling systems; lighting improvements; and water savings in healthcare. The University of Manitoba will also report on its long history of energy management practices.

Calls for nominations to the chapter board went out in December and January, as we will be electing new officers at the annual meeting (held in conjunction with the education day). The more involved members are in the chapter, the better the chapter can serve its membership.

There are proposed revisions to chapter bylaws to reflect current management practices. These have been shared via e-mail for member review. They can also be found at www.ches.org/chapters/manitoba.html. Members will have the opportunity to vote on the proposed revisions at the annual meeting on the education day.

—Craig B. Doerksen, Manitoba Chapter chair

Page 11: Canadian Healthcare Facilities | Spring 2016

CHAPTER REPORTS

SPRING/PRINTEMPS 2016 11

ALBERTA CHAPTER

Spring hasn’t quite made it to Alberta yet but it is trying. The chapter executive is scheduled to meet to make a final decision on the next Clarence White Conference & Trade Show, including the possibility of moving

the conference from fall to spring. At this time, we will also discuss hosting some training sessions or seminars this year. As well, the national board has offered the services of a logo designer for the CHES webpage. The chapter executive will review and consider making some changes.

—Tom Howard, Alberta Chapter chair

BRITISH COLUMBIA CHAPTER

Planning continues for the 2016 CHES National Conference in Vancouver. Sponsorship has exceeded expectations and more than 75 per cent of the trade show booths have been booked. The chapter held its

third quarter executive meeting at the Vancouver Convention Centre to review the site and layout. We are excited to host this year’s event in an amazing facility and to have the opportunity to showcase this world-class city.

In lieu of our provincial conference, the education committee is reviewing the possibility of each health authority hosting an education day in spring. The chapter will support the events once details are finalized. As well, the B.C. Chapter has agreed to cover the costs for three applicants from each health authority to take the CHES online medical gas piping course.

—Steve McEwan, British Columbia Chapter chair

MARITIME CHAPTER

The 2016 CHES Maritime Chapter Spring Conference & Trade Show planning committee is working diligently to produce another successful event. The conference will be held May 15-17, in Moncton,

N.B., at the Delta Beausejour. This year’s theme is “Challenges and Opportunities in Healthcare Facilities.” Gordon Burrill, president of Teegor Consulting Inc., has accepted an invitation to provide the keynote address. The trade show will promote the latest advancements in healthcare facilities technology. This year it will be open to front line maintenance staff from across the Maritimes. For more information on the upcoming event, please go to www.ches.org/chapters/maritime.html.

Following the conference, the chapter will host the Canadian Healthcare Construction Course (CanHCC) May 18-19. Members are encouraged to speak to their contractors about attending the two-day course and sending staff that require orientation in healthcare facilities.

The Maritime Chapter continues to balance its books while offering several financial incentives to its members. The present bank balance is approximately $42,000.

The chapter’s associate chair, Kerry Fraser, has been busy reviewing the work of the CHES National corporate/associate member advisory council, which has great potential to improve and promote the associate membership within the organization. We are the only chapter with a corporate/associate member on its executive team. The hope is that this will eventually result in a liaison with the National board.

—Robert Barss, Maritime Chapter chair

CALL FOR NOMINATIONS FOR AWARDS

2016 Hans Burgers Award

For Outstanding Contribution to Healthcare Engineering

DEADLINE: April 30, 2016

To nominate:

Please use the nomination form posted on the CHES website and refer to the Terms of Reference.

Purpose The award shall be presented to a resident of Canada as a mark of recognition of outstanding achievement in the field of healthcare engineering. Award sponsored by

2016 Wayne McLellan Award of Excellence

In Healthcare Facilities Management

DEADLINE: April 30, 2016

To nominate: Please use the nomination form posted on

the CHES website and refer to the Terms of Reference.

Purpose To recognize hospitals or long-term care

facilities that have demonstrated outstanding success in completion of a major capital project, energy efficiency program, environmental stewardship program, or team building exercise.

Award sponsored by

For Nomination Forms, Terms of Reference, criteria, and past winners

www.ches.org / About CHES / Awards

Send nominations to; CHES National Office [email protected]

Fax: 613-531-0626

For nomination forms, Terms of Reference, criteria and past winners: www.ches.org / About CHES / AwardsSend nominations to: CHES National Office [email protected] Fax: 613-531-0626

CALL FOR NOMINATIONS FOR AWARDS

2016 Hans Burgers Awardfor Outstanding Contribution to Healthcare Engineering

DEADLINE: April 30, 2016

To nominate: Please use the nomination form posted on the CHES website and refer to the Terms of Reference.

Purpose: The award shall be presented to a resident of Canada as a mark of recognition of outstanding achievement in the field

of healthcare engineering.Award sponsored by

2016 Wayne McLellan Award of Excellencein Healthcare Facilities Management

DEADLINE: April 30, 2016

To nominate: Please use the nomination form posted on the CHES website and refer to the Terms of Reference.

Purpose:To recognize hospitals or long-term care facilities that

have demonstrated outstanding success in completion of a major capital project, energy efficiency program, environmental

stewardship program, or team building exercise.Award sponsored by

CHES SCISSCanadian HealthcareEngineering Society

Société canadienne d'ingénieriedes services de santé

Page 12: Canadian Healthcare Facilities | Spring 2016

WHERE SUSTAINABILITY SUPPORTS CARE

Nanaimo Regional General Hospital’s new emergency department has transformed the

way staff and patients experience urgent care. The 35,000-square-foot facility has been designed for functionality, indoor environmental quality and sustainability. The ambulance and walk-in entries as well as all clinical functions are on the second floor, matching existing grade and the hospital’s main level. The new addition is set apart from the original structure to preserve existing windows and provide daylight to staff work areas along the inside of the L-shaped wing on both floors.

COURTING CALM

The hospital’s four values underlie the project’s design principles — timely, respectful, quality care and a place people would want to come to work. The well-being of patients, their families and staff was carefully weighted with the well-functioning of care processes.

A spirit of innovation developed around the project, inspired by the early decision to focus each of the five patient care zones around plan-enclosed landscaped courtyards. The goal was to reduce caregiver and patient stress by

providing views of nature in all public and clinical areas.

Extra ceiling height around the courtyards improves daylighting and the ef f icacy of the displacement ventilation system. Staged daylighting controls maximize the calming benefit of the natural light in treatment areas. Operable glazed walls in the psychiatric emergency and intensive care patient lounges fold open to courtyard gardens. The three medical zone upper level courtyards extend down to the lower level, increasing daylight to future workspaces. A staff respite courtyard lies between the existing hospital and emergency department addition.

The project’s small courtyards are landscaped with indigenous vegetation, transforming the phenomenology of the interior experience from ‘nature available from inside’ to that of ‘nature infusing inside.’

Studies concluded that with overall productivity gains conservatively estimated at between one and three per cent of the costs of staffing only the additional daylit area, the daylighting/nature view benefits would pay for the courtyards within three to nine years.

LEEDING THE WAY

Symbiotic sustainability strategies, par t i cu larly those that suppor t improved indoor environmental quality, were prioritized in achieving the LEED ( L e a d e r s h i p i n E n e r g y a n d Environmental Design) gold rating provincially mandated for all healthcare projects in British Columbia, including seven of the 10 energy credits without use of renewables.

The daylit building configuration and other systems integration strategies implemented on the project were supported by Stantec’s ongoing research program into low energy healthcare building design. The displacement ventilation and radiant heating and cooling system was used for the first time on an emergency department project, but only after years of research in collaboration with consulting and engineering firm, Mazzetti, and project specific CFD (computational fluid dynamics) modelling of occupant comfort in a 118-square-foot treatment room with 12 air changes per hour. The displacement system is enhanced by 12-foot ceilings around the courtyards and 10-foot ceilings elsewhere. Both air quality and thermal comfort

Inside Nanaimo Regional General Hospital’s new emergency department

INNOVATION

12 CANADIAN HEALTHCARE FACILITIES

By Ray Pradinuk

Page 13: Canadian Healthcare Facilities | Spring 2016

received high marks on post-occupancy evaluations.

Materially, a ‘wood first’ policy introduced mid-project by the provincial government supported the use of beautiful perforated wood acoustic panels for the higher ceilings around the courtyards within each care zone.

IMPROVING THE INDOOR CLIMATE

The emergency department’s lower level below-grade perimeter is lined with building service rooms and a thermal labyrinth that provides significant pre-cooling of supply air

in summer and the shoulder seasons, and pre-warming in winter. The labyrinth can be operated in three modes: active, storage and flushing. A wind tower with grills in all directions feeds air to the labyrinth during active mode. In summer flushing mode, cool night air pooled above the building’s high albedo roof is drawn down through one of the courtyards and then backwards through the labyrinth and out of the tower, usually using only stack effect and wind.

In the Nanaimo climatic context, the labyrinth delivers the higher supply temperature required for displacement

ventilation, virtually eliminating the need for mechanical cooling. Displacement ventilation necessitated the use of automatic exterior solar shading to avoid excessive solar gains. The exterior solar shades also control glare without the need for cleaning, which indoor blinds require. Natural ventilation is provided for mental health, emergency and intensive care treatment spaces, staff offices, lounges and education spaces.

SOOTHING THE SENSES

The courtyards have had by far the greatest impact of any of the project’s innovations on

INNOVATION

s LEFT: Treatment room sliding glass doors with electronic glazing arranged around urgent/emergent pod courtyard and charting stations. RIGHT: Staff respite courtyard on lower level between existing hospital and the new addition.

SPRING/PRINTEMPS 2016 13

t Opening wall between psychiatric emergency services day lounge and dedicated courtyard.

Page 14: Canadian Healthcare Facilities | Spring 2016

14 CANADIAN HEALTHCARE FACILITIES

the quality of space throughout the facility. Their affect on ongoing emergency care delivery was more difficult to discern. With visibility and quick access to patient treatment rooms from team care stations in urgent/emergent care a high priority for users, rectangular pods with approximately 15 treatment rooms were inevitable. The amount of support space available inside the eight-foot wide treatment room access corridors was a geometrical byproduct of the capacity of the number of treatment

rooms in the pods and the desire for visibility of the full front of each treatment room. After placing open team workspaces at each end of the support space block, the only programmed spaces that could fill the rest were the high-walled support spaces usually found in the core of emergency department pods that visually and acoustically separate the team, and cramp and clutter what can often be a very busy care environment.

The extraordinary daylighting, the spaciousness generated by the additional ceiling height around the courtyards and the ceiling’s wood finish lend serenity to a care area usually associated with high stress and controlled chaos. The use of plan-enclosed courtyards was inspired by the growing body of research linking daylight to building occupant well-being and hospital patient outcomes; years benchmarking day-lit European hospitals; extensive analysis over a number of projects of the virtual non-impact of daylight planning on travel distance; the user’s desire for a day-lit environment; and fortuitously, a visit to the Herzog & de Meuron-designed Rehab Basel in Switzerland, with its five smallest courtyards placed within care areas rather than between them.

DAYLIGHTING THE ED

It is unusual for a healthcare facility program not to encourage the design team to “provide daylight wherever possible.” The hospital’s emergency department challenges the notion that there are areas within hospitals where daylight and nature views are not possible — not even where safety and efficiency matter most, as in the heart of a busy emergency department. The urgent/emergent care pods of the emergency department could be adapted for use in other group treatment areas of the hospital, including the intensive care unit, post-anesthetic recovery in the interventional suite, as well as dialysis and infusion areas. The central courtyard provides connection to the day for patients and clinicians, and patient visibility from the care station.

BUILDING BLOCKS

Admittedly, the project did benefit from having its budget established at the peak of a province-wide building boom and its tender released in the trough of a worldwide recession. The Nanaimo Regional General Hospital’s emergency department is an intrinsically habitable building that will deliver benefits to patients and caregivers over its lifetime, and is an example of the kind of facility that should consistently be built for healthcare delivery, with budgets set and adjusted appropriately to support procurement by whatever means.

Vancouver architect Ray Pradinuk leads healthcare

research and innovation for Stantec. He uses evidence-

based design research and innovation in striving for

the best architectural solutions for healthcare facilities.

Ray can be reached at [email protected].

INNOVATION

Offset drain positionkeeps water from splashing directly into drain and aerosolizing contents of the trap.

Oversized backsplashhas coved edges and helps to keep water contained and flowing toward drain.

Sloped rear basin wall minimizes splashing of water stream and creates circuitous flow to drain.

ADACompliant

WILLOUGHBY WICS SERIES

© 20

14 W

illoug

hby I

ndus

tries

Inc.

Designed specifically to minimize splashing

and reduce the spread of infectious disease.

» Information sheet and REVIT files are available at willoughby-ind.com

Sandstone Grey Granite

Bone Glacier White

Red Coral Nocturnal Blue

White Granite

Black Granite

Sea Green

800.428.4065 | www.willoughby-ind.com

Aquasurf® solid surface color options:

Infection Control Sink

Page 15: Canadian Healthcare Facilities | Spring 2016
Page 16: Canadian Healthcare Facilities | Spring 2016

16 CANADIAN HEALTHCARE FACILITIES

EXTENDING THE HOSPITAL WALLS

Covering nearly 266,000 square kilometres, there is no denying that northeastern Ontario is vast. Couple

the region’s geography with its beautiful yet hilly terrain, hot summers and long cold winters, and it is inevitable that medical transport is ripe with challenges; significant transportation delays of unstable, critically ill patients is one of them. This along with variations in available multidisciplinary healthcare resources across northeastern Ontario led to the creation of a Virtual Critical Care (VCC) unit.

Based at Health Sciences North (HSN), the VCC unit began as a pilot project in 2009, between HSN’s tertiary care centre and three small rural hospitals. The program, which received start-up funding through the North East Local Health Integration Network (North East LHIN) and uses a special software program created by the Ontario Telemedicine Network (OTN), has since expanded to include a total of 22 healthcare facilities, garnering recognition from the

province’s Ministry of Health and Long-Term Care. Last year, the VCC unit team was presented with the Minister’s Medal Honouring Excellence in Health Quality and Safety for putting patients in the centre of the circle of care.

DISTANCE MED PROGRAM

The VCC unit is the first critical care model of its kind in Canada; however, it’s no longer the only one. Since its launch in May 2014, the North West LHIN has instituted a similar program based on the pioneering initiative.

The HSN program uses state-of-the-art video conferencing technology and electronic medical records sharing to connect the VCC unit team with smaller critical care units and emergency departments at participating hospitals across northeastern Ontario. The team is led by an intensivist who works with a group of specially trained nurses and respiratory therapists to provide a 24-7 emergency consultation service for critically ill patients. Video conference consultations

bring the HSN team to the bedside of patients and their primary care providers, allowing for improved assessments and treatment recommendations. Both teams collaborate to establish a plan of care — the patient is admitted to the VCC unit and therefore remains in their home hospital, or is transferred to a higher level of care facility.

If a patient is admitted to the VCC unit, multidisciplinary follow-up rounds are conducted daily with the primary care team, patient and/or their family. The VCC unit team is also available around-the-clock to answer questions or address concerns about the patient, and can facilitate access to other allied health team members, such as a respiratory therapist, pharmacist and dietitian.

VIRTUAL BEDSIDE BUY-IN

HSN undertook a campaign of engagement with partner hospitals to communicate the VCC unit mission, the need for a VCC program in the North

New approach to critical care knocks down distance barriers for patients in northeastern Ontario

INNOVATION

By Renée Fillier

Page 17: Canadian Healthcare Facilities | Spring 2016

We are pleased to announce that Ventcare now monitors 100 plus hospitals in the Ontario region.

Labour Canada has fully “acknowledged” the scope of work provided in the semi-annual inspection program. In addition, the written documentation contributes greatly to the hospital accreditation programs.

Further we are always pooling the knowledge resources of Infection Control and Engineering Groups like CHES, the ventilation inspection program is in a constant evolution to meet future healthcare needs for patients and staff.

The location and inspection of the hospital

your building audit this year. Some of you have already taken advantage

of our new software program which in conjunction with our patented robotics, allows us to minimize ceiling access requirements.

To date, of the thousands of fire dampers inspected approximately 30% are not humanly accessible from traditional ceiling

access points. Our patented robot overcomes

this obstacle, allowing complete documentation of all

fire dampers within the ventilation system. Further, of the total, 15%

have been found defective, blocked with wood, wired up, or simply closed

shutting off airflow.

Ventilation MonitoringBandy II

“Setting the Standard for Commercial Ventilation Care”

Fire Door Inspection

HEALTHCAREVENTILATION SYSTEMS

What’s really in yours?

176 Bullock Drive, Unit 14, Markham, ON L3P 7N1 Tel: 905-201-7887 Fax: 905-201-1340www.ventcare.com

We are pleased to announce that Ventcare now monitors 50 plus hospitals in the Ontario region.

Labour Canada has fully “acknowledged” the scope of work provided in the semi-annual inspection program. In addition, the written documentation contributes greatly to the hospital accreditation programs.

Further we are always pooling the knowledge resources of Infection Control and Engineering Groups like CHES, the ventilation inspection program is in a constant evolution to meet future healthcare needs for patients and staff.

The location and inspection of the hospital

your building audit this year. Some of you have already taken advantage

of our new software program which in conjunction with our patented robotics, allows us to minimize ceiling access requirements.

To date, of the thousands of fire doors inspected approximately 30% are not humanly accessible from traditional ceiling

access points. Our patented robot overcomes

this obstacle, allowing complete documentation of all

fire doors within the ventilation system. Further, of the total, 7%

have been found defective, blocked with wood, wired up, or simply closed

shutting off airflow.

Ventilation MonitoringBandy II

“Setting the Standard for Commercial Ventilation Care”

Fire Dampers Inspection

HEALTHCAREVENTILATION SYSTEMS

What’s really in yours?

ventilation fire dampers may be part of

Ventcare_CHF_Fall_2015_FINAL.pdf 1 2015-09-15 4:06 PM

Page 18: Canadian Healthcare Facilities | Spring 2016

East LHIN, and how it benefits patients and the healthcare facilities that take part. Not only does the program enhance the diagnosis and treatment of patients, with a goal of improving patient outcomes, but it also provides timely second opinions, potentially expediting the transfer of patients from their local hospital to a larger healthcare facility or avoiding unnecessary transfers altogether. Caring for patients within their community maintains contact with family and local support networks, leading to improved patient satisfaction.

Involving all potential stakeholders early on was key to successful buy-in. An introductory video conference was held for medical directors, administrators, p r i v a c y o f f i c e r s , i n f o r m a t i o n technologists, diagnostic imaging consultants, and emergency department and intensive care unit/medical step

down unit managers, with telemedicine coordinators in attendance. This meeting created an open forum where questions and/or concerns could be addressed. It also presented an opportunity for partner hospitals to identify any potential barriers early on in the process.

To help prepare the remote sites for implementation, the VCC program coordinator met with management teams every two weeks for a three-month period. Training sessions were provided and a one-stop shop VCC program resource guide was developed to support the remote site managers.

Once installed, video conferencing equipment was made available to both day and night shift workers for educational training. A ‘super-user’ training session was recorded for manager use to train new hires and sustain education with refresher sessions. Periodic practice calls

are ongoing with low call volume sites to ensure staff remain comfortable using the equipment and activating a VCC unit consultation.

To ensure transference of information, communication pathways were established at both the senior level and front line. The VCC program newsletter also creates a forum where processes and outcome metrics may be shared.

To date, the VCC unit has been used to treat 310 patients. It has recorded 455 follow-up visits, for a total of 24,875 v i d e o c o n f e r e n c i n g m i n u t e s . Consultations provided through the VCC program have prevented 97 patient transfers by air ambulance, resulting in an estimated savings of $1.65 million to the healthcare system and 420 hours of real-time education.

Renée Fillier is a registered nurse with more than 23

years of experience in the intensive care unit. She is

currently the nurse clinician for the virtual critical care

unit and the critical care response team at

Health Sciences North in Sudbury, Ont. Renée

can be reached at 1-705-523-7100 ext. 1579 or

[email protected].

INNOVATION

18 CANADIAN HEALTHCARE FACILITIES

CONSULTATIONS PROVIDED THROUGH THE VCC PROGRAM HAVE PREVENTED 97 PATIENT TRANSFERS BY AIR AMBULANCE.

INFECTION CONTROL WITH PROACTIVEINFECTION CONTROL WITH PROACTIVE

“Dedicated to Abatement Excellence”

Proactive is the industry leader in infection control containments at healthcare facilities across the Lower Mainland.

We have constructed various types of hoarding enclosures that have successfully protected Hospital Staff, Patients, and the Public from risks of airborne pathogens and dust.

Our hoarding structures are built to the CSA Standards for Infection Control primarily to facilitate our Hazardous Materials Abatement and to control dust during construction activities.

Proactive has built mobile containment units to facilitate smaller types of abatements. Confi ning the work and avoiding disruption of movement in essential high traffi c areas in your healthcare facility.

778 298 2268www.proactivehazmat.ca

Proactive_CHF_Spring_2016.indd 1 2016-03-01 10:58 AM

Page 19: Canadian Healthcare Facilities | Spring 2016

Follow us on Twitter! @CHES_SCISS

CHES NATIONAL CONFERENCE

“ : Is Healthcare Sustainable?”

This promises to be an exciting and jam-packed program. Please check the website www.ches.org in the coming weeks as the full education program will be posted and the online registration will open soon!

Some of the EXCITING topics:

· Designing green & sustainable buildings · IAHSS Guidelines · LEAN Methodology · Healthcare Emergencies – Best practice solutions · High Rise Hospital Design · Hybrid LEAN Process · Infrastructure upgrades & Energy renewal · Owner project Requirements (Commissioning) · Decision risks – A Scientific Model · Air Quality & Reliability is vital

And Much More!

The 2016 Program will kick off with Keynote Speaker Tony Dagnone. He has more than 38 years’ experience in the Health Care sector, 25 of which have been as Chief Executive Officer of academic hospitals. His career achievements include the visioning, planning and redevelopment of over $500 million of new healthcare facilities.

Join us in in !

Follow us on Twitter! @CHES_SCISS

CHES NATIONAL CONFERENCE

“ : Is Healthcare Sustainable?”

This promises to be an exciting and jam-packed program. Please check the website www.ches.org in the coming weeks as the full education program will be posted and the online registration will open soon!

Some of the EXCITING topics:

· Designing green & sustainable buildings · IAHSS Guidelines · LEAN Methodology · Healthcare Emergencies – Best practice solutions · High Rise Hospital Design · Hybrid LEAN Process · Infrastructure upgrades & Energy renewal · Owner project Requirements (Commissioning) · Decision risks – A Scientific Model · Air Quality & Reliability is vital

And Much More!

The 2016 Program will kick off with Keynote Speaker Tony Dagnone. He has more than 38 years’ experience in the Health Care sector, 25 of which have been as Chief Executive Officer of academic hospitals. His career achievements include the visioning, planning and redevelopment of over $500 million of new healthcare facilities.

Other Conference Highlights Include: • The Great CHES Golf Game at Northview Golf & Country Club! • A Companion Program with visits to local attractions. • A great kick-off Opening Reception. • A Gala Banquet honoring CHES’ award winners, fine dining, and great entertainment!

Join us in in !

Page 20: Canadian Healthcare Facilities | Spring 2016

ROBOTS IN DISGUISE

Manual cart transportation is not only wasteful and inefficient but also completely avoidable today

thanks to mobile robots. These battery-powered machines, commonly referred to as automatic guided vehicles (AGVs), are capable of performing a wide variety of tasks within healthcare facilities.

AGVs drive under carts, automatically taking them to specified destinations. They safely traverse hospital corridors and interface with elevators to move patient meals, linens, medical supplies, trash and other materials as needed.

AGVs have an operational speed of approximately 200 feet per minute, which i s the speed o f wa lk ing pedestrians. They can s lowdown automatically in areas as desired, and are equipped with audible devices and flashing lights. Most units are outfitted with a laser bumper sensor to detect objects in their path. Typically, the sensor can be programmed for range and width of coverage. Anything detected in the path of the AGV will

slow and stop the unit. The AGV will only resume its travel when the object is clear of the detection range.

AGVs communicate with a central system controller, which provides their ‘missions’ — for example, where to pick up and deliver a cart — and keeps track of their locations so logistics management know where the units are and what they are doing at all times.

The units can be readily removed or rerouted since no physical ‘tracks’ are required for pathways. AGVs have a virtual set of coordinates stored in their computer memories, allowing routes and station locations to be changed by simply modifying the CAD (computer-aided design) path drawing. This ‘virtual’ path navigation means they can be easily installed in both new and existing facilities.

PLIGHT OF THE NAVIGATOR

Several types of navigation technologies are used to guide AGVs in a facility. Some of the most popular forms of

AGV guidance are proximity sensor, laser and inertial navigation.

Proximity sensor navigation uses multiple sensors (sonic, infrared and laser, for example) to determine the vehicle’s position relative to walls and other physical objects in order to guide it through an area.

Laser target navigation makes use of fixed reflective targets mounted on walls and columns in the AGV operating area. Equipped with a rotating laser transmitter/receiver, the AGV emits a laser beam that is reflected back by multiple targets along its path. The unit then calculates the beam’s angle and distance in relation to the targets to triangulate its position and guide it on its way.

Inertial navigation utilizes an electronic chip, called an inertial sensor, in the AGV. The sensor detects the slightest change in the left-right movement of the vehicle as it travels. With the aid of small reference markers, this information is used to correct the vehicle’s position and keep it on the right path.

Both laser and inertial navigation systems are accurate within plus or minus one inch.

Hospital automated guided carts increase efficiency, reduce operating costs

By Garry A. Koff

TECHNOLOGY

20 CANADIAN HEALTHCARE FACILITIES

Page 21: Canadian Healthcare Facilities | Spring 2016

Our software employs machine intelligence and situational awareness to drive smart automation and real-time interactions between the people, systems and devices that matter to your business.

• Real-time workfl ow• Engage people on any device• Smart alerting and notifi cations • Patient and equipment fl ow and logistics• Closed loop team communications • Integrates all of your connected “things”

The Intelligent Hospital Platform

ThoughtWire’s Ambiant™ software platform is making the world we live and work in smarter and more connected.

166 King Street East, Suite 200Toronto, ON M5A 1J3

Phone: 647.351.9473 (WIRE)Email: [email protected]

www.thoughtwire.com

Ambiant™ is the purest expression of our vision and the latest version of the ThoughtWire platform.

am•bi•ant (‘æm bi ent)

adj.

1. of the surrounding area or environment;2. completely surrounding; encompassing;3. machine intelligence by ThoughtWire.

ThoughtWire_CHF_Spring_2016.indd 1 2016-02-12 4:21 PM

Page 22: Canadian Healthcare Facilities | Spring 2016

CALL OF DUTY

AGV systems typically employ some type of ‘call and remote dispatch’ operation. Staff can call for an AGV by pressing a button or using a touchscreen, for example, when a cart is ready to be picked up. The central controller stores these calls and then assigns an available AGV to perform the pickup and associated delivery mission. Systems with this capability do not require an operator to be present when the AGV arrives, allowing staff to place a cart for pickup and then resume their regular responsibilities.

Idle AGVs will go to automatic battery charging stations periodically, eliminating the need to change batteries. The vehicles even ‘go to sleep’ during off shifts or low volume periods to conserve the charge level in their batteries.

There are various ways to alert maintenance when there is a problem or notify staff when a cart is delivered to their area. The central controller can send text messages to designated personnel, for example. Graphic displays of the system path, vehicle locations and system status are also available on monitors networked with the system.

HANDLE WITH CARE

AGVs require periodic maintenance. This typically involves a simple inspection, cleaning, and mechanical and electronic adjustments. Preventive maintenance is generally performed quarterly and requires one to two hours per vehicle. The skill level required to maintain an AGV is similar to that of an electrician/mechanical facility engineer.

AGV uptime is quite high. With proper maintenance vehicles sustain 97 to 99 per cent uptime. Fleet sizing for larger systems includes spare AGVs to allow for planned maintenance and unplanned vehicle downtime. System-wide failure is extremely

rare because the central controller normally includes a backup controller.

INVESTING IN THE FUTURE

While AGVs have been widely used in the industrial sector for more than 40 years (where company survival is tightly coupled with operating costs), they have been mostly overlooked in the healthcare industry; that is, until now. Tightening budgets and rising healthcare costs have prompted hospitals to look at new ways to reduce non-value added labour. AGVs not only increase productivity, improve cart delivery response times, eliminate lost/delayed cart deliveries and help cut operating costs, but newer technologies have greatly lowered the investment cost of these systems, making them a viable option for nearly all facilities. Today, the payback period for vehicle automation can often be less than two years.

Hospitals that employ AGV cart transportation systems have seen a positive return on investment of 1.25 to 1.5 full-time equivalents (FTEs) per AGV per shift. Even a system with just a few AGVs can reduce labour by three to five people per shift.

The price of an AGV system can vary widely, depending on its size and vendor. A small system with three vehicles will cost between $300,000 and $400,000 US, while a larger system with approximately 15 vehicles will range from $1.5 million to $2.5 million US. The cost includes the AGVs, system controls, system engineering services, and system installation and startup.

If the initial cost of a small system of three AGVs is approximately $350,000 US, for example, it provides a FTE reduction of three per shift, two shifts per day and a FTE cost of $45,000 per year. A hospital could see a reduction in its operating budget of $270,000 per year. This would result in an investment payback of less than 18 months. More importantly, the savings per year continues every year the system is in operation.

Garry A. Koff is president of Savant

Automation Inc. He has more than 35

years ’ exper ience in the automat ic

guided vehicle system business. Garry

can be reached at 616-485-6300 or

[email protected].

22 CANADIAN HEALTHCARE FACILITIES

TECHNOLOGY

s Automatic guided vehicles drive under carts, automatically taking them to specified destinations. They safely traverse hospital corridors to move trash and other materials as needed.

Page 23: Canadian Healthcare Facilities | Spring 2016

IS YOUR BOTTOM LINE FEELING THE HEAT?

TAKE AIM ON ENERGY AND HEAT LOSS. 

IS YOUR BOTTOM LINE FEELING THE HEAT?

TAKE AIM ON ENERGY AND HEAT LOSS. 

Properly installed mechanical insulation

saves energy and tons of money. Schedule

an energy audit with one of our techs.

We can quickly show you the savings and

payback using data from the thermal

imaging gun which is uploaded to the

3e Plus Energy Software.

IS YOUR FACILTY WASTING MONEY?

PAYBACKS IN AS LITTLE AS 3 MONTHS!

WE’RE SHOVEL READY TO SAVE, ARE YOU?

INSULATION SAVES AMERICA VALUABLE ENERGY 855-88-ISAVE www.iSAVETEAM.org

The Team

0114 isave ad.qxp_Layout 1 1/14/15 2:38 PM Page 1

Page 24: Canadian Healthcare Facilities | Spring 2016

24 CANADIAN HEALTHCARE FACILITIES24 CANADIAN HEALTHCARE FACILITIES

SUSTAINABILITY

Ad: Rx For Hospital Security Publication: Canadian Healthcare Facilities Size: Half page horizontal, Live area: 7.125” x 4.75” + trim and bleed THIS IS FOR PLACEMENT AT TOP OF PUBLICATIONLanguage: English Print: CMYK Created: January 2015 • Insertion date: Spring issue, 2015Please contact Utopia Communications Inc. 613 837 5201 or [email protected] if there are any problems.

Rx FoR Hospital secuRityProtect your hospital environment. Keep your patients, property, staff and visitors safe with Commissionaires team of dedicated security professionals.

Commissionaires offers: • Security guarding • Parking control • Mobile patrol • Access control/reception • Courteous, professional customer assistance

You can count on Commissionaires. Many are former military and ex-RCMP, superbly trained and experienced to respond to your security needs.

Call Commissionaires today877 322 6777 | commissionaires.ca/healthcare

Untitled-3 1 15-02-26 11:24 AM

SteriPro is Canada’s expert in Sterilization and Reprocessing of Medical Devices and Instruments

How It Works:• We pickup your sets/instruments in

special transport carts• Reprocess them based on your recipes• Sets are delivered back in Sterile Trucks

or via Air based on Priority• CSA Guidelines requires your hospital

to have a Contingency Plan in place

Our Facility:• Accredited by Accreditation Canada• ISO 9001:2008 Certifi ed• Purpose Built for High Tech Medical

Device Reprocessing• Built and Operated following all CSA

guidelines• Services O� ered Across Canada• Quick Turn Around 24/7 365 Days a Year

Reprocessing ContingencyFOR YOUR

CPD/MDR DepartmentDon’t Worry about Code Greys (Infrastructure Failures/Sterilization Compromise), Bio Spills,

Labour Disputes, Utility Failure, Wet Loads, Spotting/Staining on Instruments & Trays etc.

Contact us today to be your Sterile Contingency Partner 905-766-4051 | [email protected]

SteriProCanada.comACCREDITED

Steripro_CHF_Spring_2016.indd 1 2016-02-25 9:49 AM

Page 25: Canadian Healthcare Facilities | Spring 2016

2016 Webinar Series

Time: 0900 BC/1000 AB & SK*/1100 MB/1200 ON & QC/1300 NS & NB/1330 NL

One hour in length *SK – 1000 during Daylight Savings time; otherwise 1100

Wednesday March 23, 2016

Energy Exchange Opportunities Leveraging Building & Municipal Wastewater Speaker: Rick Lawlor, International Waste Water Systems Inc.

Wednesday April 27, 2016

Infection Prevention & Control: Underscoring its Importance for Healthcare Engineers Speaker: Kim Allain, BScN RN MHS CIC, Nova Scotia Health & Wellness Speaker: Suzanne Rhodenizer Rose RN BScN MHS CIC, Nova Scotia Health & Wellness

Wednesday October 26, 2016

Expectations for the Physical Plant - Top 10 items cited during surveys Speaker: TBD

Wednesday November 23, 2016

ASHRAE’s Standard 188, Managing Waterborne Pathogens, What Facility manager need to know Speaker: Steve Cutter Speaker: Linda Dickey, RN, MPH, CIC, Director, Epidemiology & Infection Prevention, UC Irvine Health

Registration

CHES Member: Non-Member: Single: $30 (per webinar) Single: $40 (per webinar)

Series: $90 (per series) Series: $120 (per series)

Register online:

www.ches.org Professional Development

Page 26: Canadian Healthcare Facilities | Spring 2016

26 CANADIAN HEALTHCARE FACILITIES

TECHNOLOGY

26 CANADIAN HEALTHCARE FACILITIES

A WINNABLE BATTLECanadian invention wages war on superbugs like never before

By Dick Zoutman

Hospitals can spend up to five per cent of their operating budget

trying to clean away nasty pathogens. Those costs

increase substantially dur ing an infection outbreak. The challenges associated with using current hospital cleaning methods are the costliness of the products, the amount of time and effort it takes to apply them

properly, and the required contact time to achieve an

a p p ro p r i a t e l eve l o f disinfection in a healthcare

setting where time pressures are significant. A recently published Canada-wide study has revealed that when short

staffed and pressed for time, environmental services teams

struggle to achieve the level of cleanliness that is necessary to keep a hospital safe.

TECHNOLOGY AT WORK

In recent years, a number of automated technologies have been developed to complement traditional cleaning methods.

Among the latest advancements are no-touch room disinfection systems, which use moderate (five to six per cent) to high (35 per cent) concentrations of hydrogen peroxide. The systems release the hydrogen peroxide into the air as a vapour or dry mist. High concentrations of hydrogen peroxide vapour does produce a high-level of disinfection but clinical studies indicate it can take as long as between two-and-a-half and five hours of treatment to achieve. In addition, the Environmental

Protection Agency (EPA) recommends surfaces treated with 35 per cent hydrogen peroxide be thoroughly rinsed following disinfection. The duration to process a single patient room may not be nearly fast enough given the demands for rapid turnover to meet patient flow requirements in a busy hospital.

Then there are ultraviolet (UV) light systems, which use mercury-vapour or pulse xenon lamps, with the theoretical potential to disinfect patient rooms possibly more quickly. However, published evaluation using careful microbiological methods to assess the effectiveness of the UV lights in a hospital setting have demonstrated a disappointingly low level of bacteria and spore kill.

SQUEAKY CLEAN

The ideal automated room disinfection system would be fast enough to work within the workflow requirements of a busy hospital, and be able to achieve a high-level of bacterial and spore kill using a methodology that is both reliable and safe.

Two re s ea rche r s a t Queen’s Univers i ty ’s Innovat ion Park in Kingston, Ont., created such a system. The Canadian invention, known as AsepticSure, uses a combination of ozone gas and hydrogen peroxide vapour to produce trioxidane gas, which is lethal to bacteria, spores and viruses, among other pathogens.

Extensive testing has demonstrated that AsepticSure has a very high efficacy and effectiveness rate. It can kill 99.9999 per cent (or 6 log) of bacteria, bacterial spores and viral pathogens. The system was deployed d u r i n g M e t h i c i l l i n - r e s i s t a n t

People expect hospitals to be places where they can go to receive treatment and recover

from an illness. Certainly a hospital is the last place anyone would expect to pick up a serious infection that could delay recovery, or worse, cause serious comp l i ca t i on s and even death . Unfortunately, modern healthcare facilities are associated with just such outcomes as a result of hospital-acquired infections (HAIs).

While there is no national surveillance system that comprehensively measures the frequency of HAIs, best estimates indicate that up to 10 per cent of persons that go to hospital acquire an infection. According to Canada’s Public Health Agency, more than 200,000 patients get infections every year while receiving healthcare. Of these cases, more than 8,000 die as a result.

Research has shown that the hospital environment plays an important role in the transmission of HAIs. Telephones, washrooms, bedrails, bedside tables, commode cha i r s , IV po le s and wheelchairs, among other surfaces and medical equipment, are a reservoir of bacteria capable of infecting patients, visitors and staff.

Page 27: Canadian Healthcare Facilities | Spring 2016

A WINNABLE BATTLE

Fast, Effective, Easy

ASEPTIX2

• World’s fastest mobile UVC disinfection system

• Disinfects rooms in 5 minutes

• Ideal for terminal cleaning in patient rooms and ORs

Find out more at www.class1inc.com oremail us at [email protected]

Ask us about leasing!

Class1_CHF_Spring_2016_FINAL.pdf 1 2016-02-11 3:31 PM

Staphylococcus aureus (MRSA) and C. difficile outbreaks at Quinte Health Care in 2013 and 2014, respectively. Each outbreak was rapidly terminated within a day with no subsequent cases — a response not previously seen when manual cleaning procedures were used.

BRINGING HOME THE BENEFITS

AsepticSure stands to benefit patients, healthcare workers and the organizations that employ the disinfection and decontamination technology.

The use of low levels of ozone (80 parts per million) derived from the room air and hydrogen peroxide (one to two per cent) makes AsepticSure economical to operate. It also means the system does not cause damage to the healthcare environment or medical devices/instruments in the treated rooms.

The system itself is both portable and easily operable. It can be brought into patient care areas in any healthcare setting and deployed to achieve a high-level of disinfection of the room and all its contents. This includes mobile patient care equipment

(such as wheelchairs and IV poles) that is notoriously hard to clean by hand, and privacy curtains, which can be left in place as long as they are not grossly soiled.

Run wirelessly, AsepticSure signals a base computer when it is turned on, which then records all of the data throughout the cycle process. This provides a level of quality assurance and risk management support that has never before been available in the environmental services industry. Until now, hospitals have had to rely upon visual checks of room cleanliness. Furthermore, if a healthcare facility so desires, paper strips inoculated with spores of Bacillus stearothermophilus (indicators routinely used to monitor the effectiveness of steam sterilization) can be placed in the room to provide unequivocal evidence that high-level disinfection has been achieved.

AsepticSure is much faster and more efficient than manual cleaning. Terminal cleaning four rooms contaminated with C. difficile for 90 minutes per room requires six hours of continuous labour. Two AsepticSure machines operated by one environmental services worker can complete the task in 40

per cent less time (three hours and 40 minutes), using only 25 per cent of the labour effort of manual cleaning. The labour effort is greatly reduced because once the room has been pre-cleaned (with a neutral cleaner to remove any dirt) and the machine has been placed in the room, the environmental services worker is free to prepare other areas for disinfection or perform other tasks.

Once disinfection is complete, carbon filters remove all the ozone and hydrogen peroxide gas in the room. It may then be immediately returned to service, as it is a completely safe environment in which to provide care. In fact, at that moment, it will be the safest room in the hospital, absolutely free of pathogens on both soft and hard surfaces.

Dick Zoutman, MD, is chief of staff at Quinte

Health Care in Bellevil le, Ont. He is

professor emeritus at Queen’s University,

an infectious disease specialist and, along

with his colleague Dr. Michael Shannon,

co-inventor of Medizone International’s

disinfection technology, AsepticSure.

SPRING/PRINTEMPS 2016 27

TECHNOLOGY

Page 28: Canadian Healthcare Facilities | Spring 2016

28 CANADIAN HEALTHCARE FACILITIES28 CANADIAN HEALTHCARE FACILITIES

REGULATORY UPDATE

28 CANADIAN HEALTHCARE FACILITIES

RAISING THE BAR

Standards provide people and organizations with better, safer and more sustainable work

environments. But they must remain current and be technically valid to be truly useful. Canada’s largest standards development organization, the CSA Group, systematically reviews its standards at least every five years. The choices at that point are to reaffirm, replace or withdraw the standard. Here, CSA’s Jeffrey Kraegel discusses the new editions of two standards — one that was recently published and the other that is to be released later this year.

What are the core principles of Z317.1?

Z317.1, Special Requirements for Plumbing Installations in Health Care Facilities, sets out essential requirements for plumbing systems in hospitals, clinics and long-term care facilities. These are in addition to what is already provided in plumbing codes and regulations. The need for additional precautions is driven by the higher risk of

infection, vulnerability of patients (especially those who are infirm or immunocompromised) and the potential health impacts of the wastes generated by these technology-intensive facilities.

The standard addresses the design, construction, operation and maintenance of plumbing systems. Specifically, it focuses on: water supply systems, including domestic cold and hot water systems; plumbing fixtures and fittings; drainage systems; monitoring and maintenance of water systems; infection control; catastrophic event planning; specialized water systems, such as reverse osmosis, deionized and distilled systems; and hydraulic fire protection systems.

Why is the standard being revised?

A new edition of the standard is needed to address advances in technology and increased concerns about legionella and other infectious organisms in water systems. There is also a need to align the standard with Z8000, Canadian Health Care

Facil it ies: Planning, Design and Construction, which was released in 2011.

When will the new edition be published?

Work on the new edition is ongoing; however, it is due to be released this fall. Public review of the draft closed Feb. 16. The CSA subcommittee on plumbing in healthcare faci l i t ies i s currently considering the comments. It will make any necessary changes to the draft before it is finalized for formal approval by the parent technical committee.

What do the revisions entail?

There will be upgraded requirements and recommendations aimed at preventing the spread of legionella and other infectious organisms through the plumbing system. To do this, the standard will use an integrated approach, covering system design, initial system treatment and ongoing maintenance measures.

Z317.1 will also have updated requirements on plumbing fixtures and

Revised CSA standards provide updated guidance to healthcare facilities

Page 29: Canadian Healthcare Facilities | Spring 2016

RAISING THE BARPresented by the

Canadian Healthcare Engineering Societyin partnership with ASHE.

Saskatoon SK – January 26-27, 2016Moncton NB – May 18-19, 2016Vancouver BC – September 14-15, 2016Toronto ON – October 20-21, 2016

Check website www.ches.org for other dates & locations that may be off ered in the future.Registration is available online.

For further information:CHES National Offi ceTel: 613-531-2661 | Fax: [email protected] | www.ches.org4 Cataraqui Street, Suite 310Kingston ON K7K 1Z7 Canada

www.ches.org

Canadian HealthcareConstruction Course

Vancouver BC – September 14-15, 2016Toronto ON – October 20-21, 2016

Check website www.ches.org for other dates & locations that may be off ered in the future.

Tel: 613-531-2661 | Fax: [email protected] | www.ches.org

Page 30: Canadian Healthcare Facilities | Spring 2016

30 CANADIAN HEALTHCARE FACILITIES

REGULATORY UPDATE

fittings, including hand hygiene sinks. The design and location requirements for hand hygiene sinks were first developed in Z8000. The new edition of the standard will adopt the design requirements for these sinks and any future changes will be included.

There will also be a new clause on catastrophic event management. Requirements for catastrophic event preparation are being expanded in most of the new CSA editions for healthcare facilities, in response to an increasing incidence of these events, such as natural disasters and infectious disease outbreaks.

What are the core principles of Z317.2?

Z317.2, Special Requirements for Heating, Ventilation and Air Conditioning Systems in Health Care Facilities, defines the essential requirements for HVAC systems, supplementing what is already speci f ied in bui lding codes and regulations. Temperature, humidity, air exchange and backup requirements are important in any building but they can have life or death significance when it comes to healthcare facilities and vulnerable patient populations.

The standard addresses the planning, design, construction, commissioning, operation and maintenance of HVAC systems. A key objective is to reduce the risk of transmission of infection among building occupants, including patients, staff and visitors.

Why was the standard revised?

A fourth edition of the standard was needed to address advances in technology, increased concerns about airborne infection and catastrophic event planning. There was also a need to align Z317.2 with new CSA standards that had come out since the last edition was published in 2010, including Z8000, Z8001, Commissioning of Health Care Facilities, and Z8002, Operation and Maintenance of Health Care Facilities.

The new edition of Z317.2 was formally approved by the technical committee in 2015, and published in January 2016.

What’s new in the fourth edition of the

standard?

The most significant addition is the introduction of a new subclass in the definition of “healthcare facility.” In earlier

editions, there was one classification — Class C — for doctors’ offices, clinics and any other types of outpatient facilities. With the increased incidence of higher risk medical and surgical procedures taking place out-of-hospital, there was an urgent need to delineate between office settings and higher risk clinics. Class C was divided into C-1 and C-2, with C-1 being a place where patients might not be capable of self-preservation in an emergency.

Additional changes to the standard include: replacement of prescriptive design specifications with performance requirements, particularly with respect to system redundancy; updated values for temperature, humidity and relative pressurization; new provisions for reduced operation of HVAC systems during unoccupied periods; revisions to requirements for system upgrades when renovations or additions are being done; revised requirements for system design capacities to respond to catastrophic events; updated requirements for energy ef f ic iency; and revised acoust ic requirements for HVAC equipment and systems.

Programs that deliver resultsOur data-driven processes will get your water systems operating at the

lowest possible life-cycle cost and proactively maintain them there

ISO 9001 Registered

Pre-Treatment Boiler WaterTreatment

Cooling Water Treatment

WastewaterTreatment

(888) 712-4000 • [email protected] • Klenzoid.com

Programs that deliver resultsOur data-driven processes will get your water systems operating at the

lowest possible life-cycle cost and proactively maintain them there

ISO 9001 Registered

Pre-Treatment Boiler WaterTreatment

Cooling Water Treatment

WastewaterTreatment

(888) 712-4000 • [email protected] • Klenzoid.com

Programs that deliver resultsOur data-driven processes will get your water systems operating at the

lowest possible life-cycle cost and proactively maintain them there

ISO 9001 Registered

Pre-Treatment Boiler WaterTreatment

Cooling Water Treatment

WastewaterTreatment

(888) 712-4000 • [email protected] • Klenzoid.com

Untitled-1 1 2016-02-08 9:07 AM

EARLY 2013

REMI DEVELOPMENT

2013 MONTHLY AVERAGES

5,511 VISITORS 18,028 PAGEVIEWS

2014 MONTHLY AVERAGES

12,483 VISITORS 23,747 PAGEVIEWS

2015 MONTHLY AVERAGES

30,000+ VISITORS 50,000+ PAGEVIEWS

REAL CONTENT. REAL TRAFFIC.

MERGING INDUSTRY LEADING BRANDS

REMI sets the standard for industry coverage. It is informative, timely and trustworthy.

REMI_QP_2015.indd 1 2015-12-21 11:32 AM

Page 31: Canadian Healthcare Facilities | Spring 2016

Chem-Aqua provides water treatment solutions that protect valuable HVAC systems and minimize associated operating costs. We collaborate with leading consulting engineering fi rms and help them write high quality Water Treatment Specifi cations. We take a Total Systems Approach that allows us to fi nd cost saving opportunities other water treatment companies miss. Our highly effective and proven water treatment programs include:

• Field tested, robust & reliable equipment package• Environmentally responsible chemical treatment products• Supervision of installation & commissioning• Program management through monitoring, testing and reporting

Contact Chem-Aqua today for your New Construction/ Renovation projects.Nandan AtreSenior Manager- Business Development253 Orenda RoadBrampton, ON L6T 1E6Telephone: (647) 530-5735E-mail: [email protected]

New ConstructionNeed help to generate Engineering Specifi cations?Need help with selecting Equipment & Products?

www.chemaqua.comwww.watertreatmentspecs.com

Resourcefully Green™HVAC Water Treatment

ChemAqua_CHF_Winter_2013.indd 1 14-01-09 2:59 PM

Page 32: Canadian Healthcare Facilities | Spring 2016