NOISE IMPACT STUDY - Project: 13209

Canaan Quarry Noise Impact Study Geographic Township of Cumberland City of Ottawa, Ontario

Prepared for:

Cornwall Gravel Co. Ltd. 390 Eleventh Street West Cornwall, Ontario K6H 5R9 Prepared by:

Derek Flake, M.Sc., P.Eng.

Bob Rimrott, M.A.Sc., P.Eng.

May 3, 2016

Page 2: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Page 2

Table of Contents

1 Introduction 3

2 Site Description 3

3 Noise Criteria 4

Acoustical Classification .................................................................................. 4

MOECC Sound Level Limits .............................................................................. 4

4 Aggregate Quarry Operation 4

Hours of Operation ............................................................................................ 5

Site Preparation and Rehabilitation .................................................................. 5

Extraction and Processing & Transport ........................................................... 6

Equipment .......................................................................................................... 6

5 Noise Predictions & Controls 6

Noise Prediction Methodology ......................................................................... 6

Aggregate Quarry Noise Sources ..................................................................... 7

Recommended Noise Controls ......................................................................... 7

Predicted Sound Levels with Controls ........................................................... 10

6 Truck Traffic Noise on Haul Route 11

7 Conclusions 11

Page 3: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Page 3

1 Introduction Cornwall Gravel Co. Ltd. (Cornwall Gravel) is applying for a new licence to replace the existing Canaan Quarry licence (ARA Licence Number: 4124) to a Category 2 Class “A” licence for the proposed Canaan Quarry extension, located at East Half of Lot 14, Concession 1, Geographic Township of Cumberland, City of Ottawa. The existing area of operation within the licensed area consists of approximately 19.2 HA. The applicant proposes to increase the existing area of operation to approximately 32.1 HA.

Aercoustics Engineering Limited (Aercoustics) has been retained to prepare a Noise Impact Study. The purpose of this study is to provide noise control recommendations in order that the operation within the aggregate quarry will satisfy the Ontario Ministry of the Environment and Climate Change (MOECC) noise guidelines.

Sound level limits for the aggregate quarry noise on the residential receptors were first established. These were based on the noise guidelines of the MOECC. Next, the noise predictions of the aggregate quarry operations were performed at these residential receptors. Where the predicted levels were found to exceed the MOECC sound level limits, noise control measures were recommended to satisfy these limits.

Figure 1 provides a key plan showing the location of the aggregate quarry. A site plan is provided as Figure 2, illustrating the aggregate quarry area and the locations of local residences (receptors).

2 Site Description Figure 1 provides a key plan showing the location of the quarry and the surrounding area. The site is located about 600 m north of Magladry Road and about 700 m west of Nolan Road, in the Geographic Township of Cumberland. The site is in a rural area where aggregate extraction, and agriculture are the dominant land uses. The existing Canaan Quarry (different quarry from the subject licence, ARA Licence Number 4143) and the existing Canaan II Quarry (ARA Licence Number 608401), both operated by R.W. Tomlinson Limited, are located immediately northwest and west of the subject site.

The aggregate quarry addressed by this noise impact study consists of operations within the lands outlined in Figure 2. These operations include excavation, rock drilling, aggregate haulage/shipping, and processing with a portable processing plant (crushing, screening and washing). There are several existing single family residential dwellings in the vicinity of the quarry area. These are identified as Receptors R01 to R16. Receptors VL17 to VL20 have been used to identify potential noise receptors on noise sensitive zoned lots. The location of these receptors has been assigned on the basis of guidance provided in NPC-300 and the applicable municipal zoning by-law. Receptor locations R01 to R16 and VL17 to VL20 are shown in Figure 2.

Page 4: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Page 4

3 Noise Criteria

Acoustical Classification

The appropriate noise criteria for the receptors in the vicinity of the Canaan Quarry were based on the MOECC Noise Pollution Control publication NPC-300 “Environmental Noise Guideline – Stationary and Transportation Sources – Approval and Planning” (MOE, August 2013).

Points of reception R01 to R16 and VL17 to VL19 are located in an ambient acoustical environment consistent with the Class 3 (Rural) designation as defined by the MOECC Publication NPC-300. This is reserved for a rural area with a prevailing acoustical environment that is dominated by natural sounds with little or no road traffic. There is some existing aggregate activity and steady road traffic near some of these residences, but for conservatism and simplicity these were assumed to be Class 3.

Point of reception VL20 is considered to be located in a Class 2 area, since the dwelling would front onto the current established haul route for the existing quarry license. As such, the construction of a new dwelling here should reflect the Class 2 sound level limits. The location of the vacant lot receptor VL20 has been chosen based on the planned location of a future dwelling.

MOECC Sound Level Limits

The applicable limits for noise from a stationary source at a noise sensitive point of reception (receptor) in a Class 2 (Urban) area and a Class 3 (Rural) area are outlined in Table 1.

Table 1 : Sound Level Limits for Stationary Sources – Hourly LEQ (dBA)

Time of Day Class 2 Area (Urban) Class 3 Area (Rural)

Daytime (07:00 to 19:00) 50* 45*

Evening and Nighttime (19:00 to 07:00) 45* 40*

*or background sound level if higher

The noise from a stationary source should not exceed these limits in any hour. At some points of reception in the vicinity of the subject quarry, the lowest background sound level may be higher than the exclusion limits listed above due to existing activities and road traffic. Regardless, the minimum exclusion limits were used to define the sound level criteria.

4 Aggregate Quarry Operation The site plans outline the sequence and direction of operations in each phase. In general terms, the types of work consist of site preparation and rehabilitation, extraction and processing, and shipment off-site.

Page 5: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Page 5

Hours of Operation

The proposed hours of normal operation are from 7:00 a.m. to 7:00 p.m. seven days per week, excluding statutory holidays. At no time shall crushing, rock breaking or blasting take place on a statutory holiday. Shipping and loading is permitted outside the normal hours of operation. Equipment maintenance may take place outside of the normal operating hours. The proposed hours of operation are summarized below in Table 2.

Table 2 : Operating Hours

Time of Day Day of Week Operations

07:00 to 07:00 (24 hours)

Monday to Sunday Loading & Shipping Only

07:00 to 19:00 Monday to Sunday Full Operation – Extraction, Processing, Rock Drilling, Loading & Shipping

Site Preparation and Rehabilitation

Site preparation includes the construction of acoustic barriers and any required visual screens specified on the site plan. Topsoil and overburden will be removed. This work will be done primarily with bulldozers, scrapers, trucks, loaders and excavators. Rehabilitation phases will involve similar equipment in establishing the final grading for the site.

The site preparation and rehabilitation work described above is not part of the daily operation of the quarry and is of short duration. These construction activities are not considered in the noise control analysis. The equipment used for these activities must satisfy the noise emission requirements of the MOECC document NPC-115 “Construction Equipment”. By defining a maximum permissible noise emission for construction equipment rather than directly limiting the noise impact at a sensitive point of reception, the MOECC is recognizing that construction is a temporary and largely unavoidable source of noise.

In order to minimize the noise impact associated with the construction activities, it is suggested that:

Operations should be restricted to the daytime hours. When possible, site preparation should be conducted during the fall, winter, or spring months when there is a reduced level of extraction and when residential windows are more likely to remain closed.

Perimeter berms or fences should be constructed as soon as practical during site preparation so as to provide the surrounding residences with some acoustical shielding for the remaining overburden stripping and extraction operations.

Page 6: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Page 6

Extraction and Processing & Transport

The maximum annual tonnage to be removed is 2,000,000 tonnes. The quarry will operate with a portable processing plant which follows the working face. The west extraction limit has no setback from the property line because extraction along that property line is to be coordinated with the neighbouring quarry operator (R.W. Tomlinson Limited; ARA Licence Numbers 4143 and 608401).

Aggregate will be extracted using up to two (2) front end loaders at the working face. Material will be transported directly into the primary processing plant. Processed material will be stored in stockpiles in the vicinity of the processing area. Two shipping loaders will be used in the processing area to load highway trucks with finished aggregate product for transport to market.

Equipment

The extraction, processing and shipment equipment operating in the quarry is limited to:

One (1) Processing Plant

Two (2) Extraction Loaders

Two (2) Shipment Loaders

One (1) Rock Drill

40 Highway truck trips/hr – assumed worst case 1 hr volume

5 Noise Predictions & Controls

Noise Prediction Methodology

The aggregate quarry operations described in the previous section were modelled. Noise predictions were conducted based on the predictable worst case noise impact for each of the aggregate quarry operation areas at each of the receptors. This represents a design case where the quarry is running at full capacity with all of the equipment operating simultaneously and at locations where noise impact is highest for each receptor. The majority of the time, work would be occurring in other areas of the site with lower associated noise impacts.

The noise prediction model was generated using Datakustik’s Noise Prediction Software, CadnaA (Version 4.5). This model is based on established noise prediction methods outlined in the ISO 9613-2 standard entitled “Acoustics – Attenuation of sound during propagation outdoors – Part 2: General method and calculation”.

Page 7: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Page 7

Noise levels were predicted using existing topography under conditions of downwind propagation, generally with hard ground modelled in the quarry area and soft ground conditions near the points of reception. There is some foliage surrounding the site, but this was not modelled for conservatism. Appendix A contains sample stationary source calculations.

As the lands in the adjacent Canaan II Quarry (ARA Licence Number 608401) to the west are extracted, some of the shielding provided by those lands will be reduced. However, this adjacent quarry has been designed in accordance with the MOECC guidelines as per the noise study titled “Acoustical Study of the Proposed Canaan II Quarry”, prepared by Hugh Williamson Associates Inc., dated December 19, 2005. The perimeter earth berms specified in this study are predicted to replace the shielding lost by the removal of the natural topography.

The drill elevation was modelled with a base elevation located on the top of the bench during any given lift.

The noise impact of the operation was predicted. Where the MOECC sound level limits were calculated to be exceeded, noise control measures were modelled and the noise impact recalculated. This process was repeated until the sound level limits were satisfied.

Aggregate Quarry Noise Sources

The reference sound pressure levels used for the aggregate quarry equipment are outlined in Table 3. These were based on similar equipment from the Aercoustics database.

Table 3: Reference Sound Pressure Levels of Aggregate Quarry Equipment

Equipment Reference Sound Pressure Level at 30m

(dBA)

Portable Processing Plant (crushing, screening & washing)

86

Extraction Loader 74

Shipment Loader 711

Rock Drill 76

Highway Truck – 25 km/hr 65

1 - The shipment loaders were assumed to operate at a 50 % duty cycle.

Recommended Noise Controls

The recommended noise controls presented in this section have been determined through noise impact predictions to be effective in controlling the noise generated by the aggregate quarry activity, satisfying the MOECC sound level limits. It should be noted that there may be other effective noise controls that could replace or revise some of the recommended controls of this report. Prior to implementing any changes to the noise controls,

Page 8: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Page 8

appropriate studies should be undertaken to demonstrate that the MOECC sound level limits will be satisfied.

No additional noise controls are required to address receptors on vacant noise sensitive zoned lots.

An acoustic barrier is required to be solid, with no gaps or openings, and shall satisfy a minimum area density of 20 kg/m2.

Refer to Figures 3 to 11 for the noise prediction model at various scenarios and an illustration of the timing and implementation of noise controls such as acoustic barriers and administrative requirements.

The following list presents a comprehensive summary of the recommended noise controls:

1. The hours of operation shall be as described in Table A.

Table A: Operating Hours

Time of Day Day of Week Operations

07:00 to 07:00 (24 hours)

Monday to Sunday Loading & Shipping Only

07:00 to 19:00 Monday to Sunday Full Operation – Extraction, Processing, Rock Drilling, Loading & Shipping

2. The extraction, processing and shipment equipment operating in the quarry is limited to:

a. One (1) Processing Plant

b. Two (2) Extraction Loaders

c. Two (2) Shipment Loaders

d. One (1) Rock Drill

e. 40 Highway truck trips/hr – assumed worst case 1 hr volume

3. The aggregate quarry equipment shall satisfy the noise emission levels listed in Table B.

Page 9: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Page 9

Table B: Reference Sound Pressure Levels of Aggregate Quarry Equipment

Equipment Reference Sound Pressure Level at 30m

(dBA)

Portable Processing Plant (crushing, screening & washing)

86

Extraction Loader 74

Shipment Loader 711

Rock Drill 76

Highway Truck – 25 km/hr 65

1 - The shipment loaders were assumed to operate at a 50 % duty cycle.

4. The sound emissions of all construction equipment involved in site preparation and rehabilitation activities shall comply with the sound level limits specified in the MOECC publication NPC-115 “Construction Equipment”.

5. Any proposed changes to the aspects of the extraction and processing operations relating to noise control shall be reviewed by a qualified acoustical consultant for compliance with the relevant noise criteria.

6. Prior to extraction of the newly licensed area of extraction, an acoustic barrier shall be installed to a height of 106 m a.s.l. along the south property line, returning 100 m north along the east property line, and shall remain for the project lifetime.

7. The north escarpment shall not be extracted until the first and second lifts are completed such that the entire remainder of the site has been extracted down to a quarry floor of 84 m a.s.l.

8. During the first and second lifts, a local acoustic barrier with a minimum height of 10 m shall be located on the west, south and east sides of the processing plant, between the processing equipment and receptors R01 to R14. This barrier shall be within 50 m of the processing equipment. It could take the form of a working face, a stockpile, ISO containers, a combination of these, or any other construction satisfying the requirements of an acoustic barrier. During the first lift, when the processing plant is within 250 m of the south extraction limit, the south local acoustic barrier between the processing equipment and receptors R05 to R09 shall be within 30 m of the processing equipment.

9. During the first lift, the portable processing plant shall not operate when the rock drill is operating within 150 m of the south extraction limit.

10. During the second lift, once extraction of the north escarpment has begun, the portable processing plant shall not operate when the rock drill is operating within 100 m of the north extraction limit.

Page 10: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Page 10

11. During the second lift, once extraction of the north escarpment has begun, the portable processing plant shall remain within 50 m of the north working face.

12. During the third lift, a local acoustic barrier with a minimum height of 10 m shall be located on the east side of the processing plant, between the processing equipment and receptors R09 to R14. This barrier shall be within 50 m of the processing equipment. It could take the form of a working face, a stockpile, ISO containers, a combination of these, or any other construction satisfying the requirements of an acoustic barrier.

Predicted Sound Levels with Controls

The predicted worst case noise levels produced by operations within the Canaan Quarry area are summarized in Table 4 below.

Table 4 : Worst Case Predicted Sound Levels and Criteria – Hourly LEQ (dBA)

Point of Reception

Shipping Only (05:00 to 07:00)

Extraction, Processing & Shipping (07:00 to 19:00)

Sound Level Limit Predicted

Maximum Sound Level

Sound Level Limit Predicted

Maximum Sound Level

R01 40 27 45 45

R02 40 23 45 43

R03 40 24 45 43

R04 40 23 45 43

R05 40 25 45 45

R06 40 25 45 43

R07 40 24 45 44

R08 40 25 45 45

R09 40 28 45 45

R10 40 31 45 44

R11 40 30 45 43

R12 40 31 45 43

R13 40 35 45 44

R14 40 40 45 45

R15 40 32 45 45

R16 40 28 45 44

VL17 40 34 45 44

VL18 40 24 45 44

VL19 40 26 45 45

VL20 45 34 50 47

With the incorporation of the recommended noise controls, the predicted noise impact will satisfy the MOECC sound level limits.

Page 11: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Page 11

6 Truck Traffic Noise on Haul Route The noise impact of truck traffic on public roadways is not addressed by the MOECC in their noise guidelines. However, the MOECC requires consideration of noise impact in choosing the off-property haul route.

The annual tonnage limit and general operation of the existing Canaan Quarry is not expected to change materially. Shipment trucks will continue to exit north onto Canaan Road and proceed to Colonial Road. This is the haul route that is currently being used by the existing quarry. Therefore, the off property haul route noise is not expected to change. With this, the existing haul route is the preferred route with respect to noise.

7 Conclusions Aercoustics has conducted a noise impact study for the Canaan Quarry. The purpose of this noise impact study was to provide noise control recommendations in order that the operation within the quarry will satisfy the Ontario Ministry of the Environment and Climate Change (MOECC) noise guidelines. Figure 2 provides a site plan outlining the aggregate quarry areas and the locations of local residences (receptors).

To this end, sound level limits, based on the MOECC noise guidelines, were developed. Calculations were then carried out to determine the worst case noise for each of the aggregate quarry operation areas at each of the receptors. Where noise was predicted to exceed the MOECC sound level limits, noise control recommendations and required equivalent source reference sound levels were provided.

Refer to Appendix B for a summary of the qualifications of the authors.

With the implementation of the recommended noise controls, the proposed aggregate quarry operation is predicted to satisfy the MOECC noise guidelines.

Page 12: Canaan Quarry Noise Impact Study Geographic Township of

The scope of the work outlined in this document is limited to the acoustic, noise and/or vibration

control aspects of the design. Contractor to verify all dimensions

Scale: N.T.S. Drawn: DF Eng: DF Date: 2015.05.22 50 Ronson Drive, Suite 165, Toronto, ON P: 416.249.3361 F: 416.249.3613

Project Name:

Canaan Quarry

AEL File: 13209

Drawing Title: Key Plan Showing Site Location

Figure 1

Page 13: Canaan Quarry Noise Impact Study Geographic Township of

R09

R10

R11

R12

R13

R14

R15

R16

R01

R02

R03

R04

R05

R06

R07

R08

VL17

VL18VL19

VL20

Canaan Quarry

Project ID: 13209.00

Scale:Drawn by:

Reviewed by:Date:

Revision:

NTSDFDFMay 2, 20162

Project Name

Canaan Quarry

Figure Title

Site Location Showing Nearby Receptors Figure 2

Page 14: Canaan Quarry Noise Impact Study Geographic Township of

R09

R13

R17R14

R05

R08

R07

R18

Shipment Loaders

Highway Trucks

Project ID: 13209.00

Scale:

Drawn by:

Reviewed by:

Date:

Revision:

NTS

DF

DF

May 22, 2015

1

Project Name

Canaan Quarry

Figure Title

Noise Impact Predictions

Shipping and Loading Only (Nighttime)Figure 3

Page 15: Canaan Quarry Noise Impact Study Geographic Township of

R09

R13

R17R14

R05

R08

R07

R18

Plant

Loaders

Drill

Highway Trucks

Project ID: 13209.00

Scale:

Drawn by:

Reviewed by:

Date:

Revision:

NTS

DF

DF

May 22, 2015

1

Project Name

Canaan Quarry

Figure Title

Noise Impact Predictions

Existing Operation in ComplianceFigure 4

Page 16: Canaan Quarry Noise Impact Study Geographic Township of

R09

R13

R17R14

R05

R08

R07

R18

106 m

Drill

Loaders Plant

106 m

10 m high acoustic barriers

Highway Trucks

Project ID: 13209.00

Scale:

Drawn by:

Reviewed by:

Date:

Revision:

NTS

DF

DF

May 22, 2015

1

Project Name

Canaan Quarry

Figure Title

Noise Impact Predictions

First Lift - Scenario 1Figure 5

Page 17: Canaan Quarry Noise Impact Study Geographic Township of

R09

R13

R17R14

R05

R08

R07

R18

106 m

Drill

106 m

10 m high acoustic barriers

Plant

Loaders

Highway Trucks

Project ID: 13209.00

Scale:

Drawn by:

Reviewed by:

Date:

Revision:

NTS

DF

DF

May 22, 2015

1

Project Name

Canaan Quarry

Figure Title

Noise Impact Predictions

First Lift - Scenario 2Figure 6

Page 18: Canaan Quarry Noise Impact Study Geographic Township of

R09

R13

R17R14

R05

R08

R07

R18

106 m

Drill

Simultaneous Plant and Drill

operation prohibited when plant

is within 150 m of south limit

106 m

10 m high acoustic barriers

PlantSouth local barrier setback of

30 m when plant is within

250 m of south limitLoaders

Highway Trucks

Project ID: 13209.00

Scale:

Drawn by:

Reviewed by:

Date:

Revision:

NTS

DF

DF

May 22, 2015

1

Project Name

Canaan Quarry

Figure Title

Noise Impact Predictions

First Lift - Scenario 3Figure 7

Page 19: Canaan Quarry Noise Impact Study Geographic Township of

R09

R13

R17R14

R05

R08

R07

R18

106 m

106 mPlant

10 m high acoustic barriers

Loaders

Drill

Highway Trucks

Project ID: 13209.00

Scale:

Drawn by:

Reviewed by:

Date:

Revision:

NTS

DF

DF

May 22, 2015

1

Project Name

Canaan Quarry

Figure Title

Noise Impact Predictions

Second Lift - Scenario 1Figure 8

Page 20: Canaan Quarry Noise Impact Study Geographic Township of

R09

R13

R17R14

R05

R08

R07

R18

106 m

106 m

10 m high acoustic barriers

Plant

Loaders

Drill

Simultaneous Plant and Drill

operation prohibited when plant

is within 100 m of north limit

Highway Trucks

Project ID: 13209.00

Scale:

Drawn by:

Reviewed by:

Date:

Revision:

NTS

DF

DF

May 22, 2015

1

Project Name

Canaan Quarry

Figure Title

Noise Impact Predictions

Second Lift - Scenario 2 (Escarpment Extraction)Figure 9

Page 21: Canaan Quarry Noise Impact Study Geographic Township of

R09

R13

R17R14

R05

R08

R07

R18

106 m

106 m

Highway Trucks

10 m high acoustic barrier

Loaders

Plant

Drill

Project ID: 13209.00

Scale:

Drawn by:

Reviewed by:

Date:

Revision:

NTS

DF

DF

May 22, 2015

1

Project Name

Canaan Quarry

Figure Title

Noise Impact Predictions

Third LiftFigure 10

Page 22: Canaan Quarry Noise Impact Study Geographic Township of

R09

R13

R17R14

R05

R08

R07

R18

106 m

106 m

Highway Trucks

Drill

Plant

Loaders

Project ID: 13209.00

Scale:

Drawn by:

Reviewed by:

Date:

Revision:

NTS

DF

DF

May 22, 2015

1

Project Name

Canaan Quarry

Figure Title

Noise Impact Predictions

Fourth LiftFigure 11

Page 23: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Appendices

Appendix A

Sample Stationary Source Noise Calculations

Page 24: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Appendices

Sound Power Data

Source ID 63 125 250 500 1000 2000 4000 8000 A Lin

Portable Processing Plant

128 127 120 121 119 117 114 107 124 132

Rock Drill 111 119 106 106 106 107 107 103 114 121

Extraction/ Shipment Loader 116 114 110 106 109 100 97 97 112 120

Highway Truck 106 100 98 100 100 96 88 78 103 111

Page 25: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 1 of 19

Receiver: R01Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 43

Receiver Name Receiver ID X Y Z

4085 birchgrove R01 945814.6 5046793.4 97.9

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 69.7 0.0 0.4 9.8 3.8 0.0 0.0 0.0 0.0 0.0 40

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 68.3 0.0 0.1 5.0 2.7 0.0 0.0 0.0 0.0 0.0 38

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 70.5 0.0 0.7 4.1 5.7 0.0 0.0 0.0 0.0 0.0 33

Highway Trucks D08_Trucks 946646.3 5047327.0 96.4 0 79 21.7 A 70.9 0.0 -0.4 5.2 3.9 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks D08_Trucks 946593.8 5047269.1 96.4 0 79 8.7 A 70.2 0.0 -0.4 6.1 3.6 0.0 0.0 0.0 0.0 0.0 8

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 71.8 0.0 -0.6 5.3 4.2 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 73.4 0.0 1.5 10.4 4.9 0.0 0.0 0.0 0.0 0.0 7

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 72.2 0.0 -0.6 5.4 4.4 0.0 0.0 0.0 0.0 0.0 13

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 72.7 0.0 -0.6 5.4 4.6 0.0 0.0 0.0 0.0 0.0 13

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 72.4 0.0 -0.6 5.4 4.5 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 73.2 0.0 0.9 13.4 4.8 0.0 0.0 0.0 0.0 0.0 2

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 73.7 0.0 1.6 6.8 5.0 0.0 0.0 0.0 0.0 0.0 7

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 73.3 0.0 1.3 12.1 4.8 0.0 0.0 0.0 0.0 0.0 2

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 73.1 0.0 0.2 9.6 4.7 0.0 0.0 0.0 0.0 0.0 5

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 72.9 0.0 -0.4 12.1 4.7 0.0 0.0 0.0 0.0 0.0 3

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 73.5 0.0 1.6 9.0 4.9 0.0 0.0 0.0 0.0 0.0 3

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 73.3 0.0 1.3 12.7 4.8 0.0 0.0 0.0 0.0 0.0 -1

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 72.8 0.0 -0.7 5.4 4.6 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 72.9 0.0 -0.7 5.5 4.6 0.0 0.0 0.0 0.0 0.0 -1

Page 26: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 2 of 19

Receiver: R02Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 43

Receiver Name Receiver ID X Y Z

4141 birchgrove R02 945905.4 5046616.9 90.4

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 70.0 0.0 0.4 9.5 3.9 0.0 0.0 0.0 0.0 0.0 40

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 68.7 0.0 0.1 5.1 2.8 0.0 0.0 0.0 0.0 0.0 38

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 70.7 0.0 0.6 4.2 5.8 0.0 0.0 0.0 0.0 0.0 32

Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 71.2 0.0 -0.5 5.9 4.0 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 72.1 0.0 -0.6 5.4 4.3 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 73.8 0.0 1.4 10.7 5.1 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 72.5 0.0 -0.6 5.4 4.5 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 73.0 0.0 -0.7 5.5 4.7 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 72.7 0.0 -0.6 5.4 4.6 0.0 0.0 0.0 0.0 0.0 11

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 73.5 0.0 0.8 8.9 4.9 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 74.1 0.0 1.5 9.7 5.2 0.0 0.0 0.0 0.0 0.0 3

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 73.7 0.0 1.3 12.5 5.0 0.0 0.0 0.0 0.0 0.0 1

Highway Trucks A02_Trucks 946839.8 5047552.7 92.2 0 79 11.1 A 73.4 0.0 0.3 11.0 4.9 0.0 0.0 0.0 0.0 0.0 0

Highway Trucks A02_Trucks 946837.8 5047540.0 94.2 0 79 11.1 A 73.4 0.0 0.0 10.0 4.9 0.0 0.0 0.0 0.0 0.0 1

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 73.2 0.0 -0.4 15.4 4.8 0.0 0.0 0.0 0.0 0.0 -1

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 74.0 0.0 1.5 10.3 5.1 0.0 0.0 0.0 0.0 0.0 2

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 73.6 0.0 1.1 14.1 5.0 0.0 0.0 0.0 0.0 0.0 -3

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 73.1 0.0 -0.7 5.5 4.8 0.0 0.0 0.0 0.0 0.0 5

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 73.2 0.0 -0.7 5.5 4.8 0.0 0.0 0.0 0.0 0.0 -1

Page 27: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 3 of 19

Receiver: R03Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 43

Receiver Name Receiver ID X Y Z

4153 birchgrove R03 945927.6 5046544.4 91.1

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 70.3 0.0 -1.7 10.0 4.0 0.0 0.0 0.0 0.0 0.0 42

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 69.1 0.0 -1.5 6.3 2.9 0.0 0.0 0.0 0.0 0.0 38

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 71.0 0.0 -0.9 5.7 5.9 0.0 0.0 0.0 0.0 0.0 32

Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 71.5 0.0 -2.3 7.3 4.1 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 72.4 0.0 -2.5 7.3 4.4 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 74.1 0.0 -0.4 11.8 5.2 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 72.7 0.0 -2.6 7.4 4.6 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 73.2 0.0 -2.7 7.5 4.8 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 73.0 0.0 -2.7 7.4 4.7 0.0 0.0 0.0 0.0 0.0 11

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 73.8 0.0 -1.0 10.8 5.0 0.0 0.0 0.0 0.0 0.0 5

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 74.4 0.0 -0.2 10.3 5.3 0.0 0.0 0.0 0.0 0.0 4

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 73.9 0.0 -0.5 14.0 5.1 0.0 0.0 0.0 0.0 0.0 1

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 73.6 0.0 -1.7 10.5 5.0 0.0 0.0 0.0 0.0 0.0 5

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 73.5 0.0 -2.4 17.4 4.9 0.0 0.0 0.0 0.0 0.0 -1

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 74.2 0.0 -0.3 10.7 5.3 0.0 0.0 0.0 0.0 0.0 3

Highway Trucks A02_Trucks 946832.2 5047602.2 87.0 0 79 11.9 A 73.9 0.0 -0.6 14.5 5.1 0.0 0.0 0.0 0.0 0.0 -3

Highway Trucks A02_Trucks 946834.9 5047594.0 87.6 0 79 2.6 A 73.8 0.0 -0.7 10.2 5.1 0.0 0.0 0.0 0.0 0.0 -7

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 73.4 0.0 -2.7 7.5 4.9 0.0 0.0 0.0 0.0 0.0 5

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 73.4 0.0 -2.7 7.5 4.9 0.0 0.0 0.0 0.0 0.0 -1

Page 28: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 4 of 19

Receiver: R04Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 43

Receiver Name Receiver ID X Y Z

4161 birchgrove R04 945959.2 5046480.7 86.9

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 70.5 0.0 0.4 7.7 4.0 0.0 0.0 0.0 0.0 0.0 41

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 69.5 0.0 0.1 4.8 3.0 0.0 0.0 0.0 0.0 0.0 37

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 71.2 0.0 0.8 4.0 6.0 0.0 0.0 0.0 0.0 0.0 32

Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 71.7 0.0 -0.4 5.4 4.2 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks D08_Trucks 946735.6 5047415.0 96.4 0 79 15.3 A 72.7 0.0 -0.5 5.4 4.6 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks D08_Trucks 946709.6 5047393.1 96.4 0 79 15.4 A 72.4 0.0 -0.6 5.3 4.5 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 74.3 0.0 1.4 10.3 5.3 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 73.4 0.0 -0.6 5.4 4.9 0.0 0.0 0.0 0.0 0.0 11

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 72.9 0.0 -0.6 5.4 4.7 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 73.2 0.0 -0.6 5.4 4.8 0.0 0.0 0.0 0.0 0.0 11

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 73.9 0.0 0.8 10.0 5.1 0.0 0.0 0.0 0.0 0.0 4

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 74.6 0.0 1.5 8.5 5.4 0.0 0.0 0.0 0.0 0.0 4

Highway Trucks A02_Trucks 946817.6 5047633.9 86.7 0 79 5.7 A 74.2 0.0 1.3 11.4 5.2 0.0 0.0 0.0 0.0 0.0 -8

Highway Trucks A02_Trucks 946824.1 5047620.8 86.6 0 79 14.0 A 74.1 0.0 1.3 12.2 5.2 0.0 0.0 0.0 0.0 0.0 0

Highway Trucks A02_Trucks 946839.6 5047551.6 92.3 0 79 11.8 A 73.8 0.0 0.3 9.9 5.1 0.0 0.0 0.0 0.0 0.0 1

Highway Trucks A02_Trucks 946837.6 5047538.9 94.3 0 79 10.3 A 73.8 0.0 0.1 11.6 5.0 0.0 0.0 0.0 0.0 0.0 -2

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 73.7 0.0 -0.4 16.0 5.0 0.0 0.0 0.0 0.0 0.0 -2

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 74.4 0.0 1.5 9.0 5.4 0.0 0.0 0.0 0.0 0.0 2

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 74.0 0.0 1.1 10.1 5.2 0.0 0.0 0.0 0.0 0.0 0

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 73.6 0.0 -0.7 5.5 4.9 0.0 0.0 0.0 0.0 0.0 5

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 73.6 0.0 -0.7 5.5 5.0 0.0 0.0 0.0 0.0 0.0 -2

Page 29: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 5 of 19

Receiver: R05Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 44

Receiver Name Receiver ID X Y Z

4469 Birchgrove R05 946451.8 5046596.4 90.4

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 66.8 0.0 -1.6 15.8 3.0 0.0 0.0 0.0 0.0 0.0 40

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 65.9 0.0 -1.7 8.1 2.1 0.0 0.0 0.0 0.0 0.0 40

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 67.5 0.0 -0.3 5.1 4.8 0.0 0.0 0.0 0.0 0.0 37

Highway Trucks D08_Trucks 946674.9 5047358.5 96.4 0 79 18.1 A 69.0 0.0 -2.4 8.2 3.3 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks D08_Trucks 946630.6 5047309.6 96.4 0 79 18.3 A 68.3 0.0 -2.3 12.6 3.1 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks D08_Trucks 946599.5 5047275.4 96.4 0 79 13.9 A 67.8 0.0 -2.2 11.1 2.9 0.0 0.0 0.0 0.0 0.0 13

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 69.6 0.0 -2.5 7.2 3.4 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946794.7 5047699.8 86.4 0 79 2.5 A 72.3 0.0 -0.5 10.7 4.4 0.0 0.0 0.0 0.0 0.0 -6

Highway Trucks A02_Trucks 946805.9 5047667.2 86.6 0 79 18.3 A 72.0 0.0 -0.7 8.9 4.3 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 70.0 0.0 -2.5 7.3 3.6 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 70.7 0.0 -2.6 7.4 3.8 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 70.3 0.0 -2.6 7.3 3.7 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 71.4 0.0 -1.0 12.3 4.1 0.0 0.0 0.0 0.0 0.0 7

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 71.2 0.0 -1.6 18.1 4.0 0.0 0.0 0.0 0.0 0.0 1

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 72.5 0.0 -0.5 9.4 4.5 0.0 0.0 0.0 0.0 0.0 8

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 71.8 0.0 -0.7 9.9 4.2 0.0 0.0 0.0 0.0 0.0 8

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 71.0 0.0 -2.3 21.3 3.9 0.0 0.0 0.0 0.0 0.0 -2

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 72.3 0.0 -0.5 10.4 4.4 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 71.6 0.0 -0.7 12.6 4.2 0.0 0.0 0.0 0.0 0.0 3

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 70.9 0.0 -2.6 7.4 3.9 0.0 0.0 0.0 0.0 0.0 8

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 70.9 0.0 -2.6 7.4 3.9 0.0 0.0 0.0 0.0 0.0 2

Page 30: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 6 of 19

Receiver: R06Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 42

Receiver Name Receiver ID X Y Z

3741 maglady R06 946695.5 5046425.8 87.8

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 68.9 0.0 -1.4 14.7 3.6 0.0 0.0 0.0 0.0 0.0 38

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 69.1 0.0 -0.1 4.8 5.3 0.0 0.0 0.0 0.0 0.0 34

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 68.7 0.0 -1.5 6.6 2.8 0.0 0.0 0.0 0.0 0.0 38

Highway Trucks D08_Trucks 946659.1 5047341.0 96.4 0 79 20.4 A 70.2 0.0 -2.0 6.8 3.7 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks D08_Trucks 946612.7 5047289.9 96.4 0 79 14.3 A 69.8 0.0 -2.0 9.9 3.5 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks D08_Trucks 946601.6 5047277.7 96.4 0 79 7.7 A 69.7 0.0 -1.9 17.9 3.5 0.0 0.0 0.0 0.0 0.0 -3

Highway Trucks D08_Trucks 946595.5 5047270.9 96.4 0 79 10.9 A 69.6 0.0 -1.9 9.7 3.4 0.0 0.0 0.0 0.0 0.0 9

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 70.8 0.0 -2.1 6.9 3.9 0.0 0.0 0.0 0.0 0.0 17

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 72.9 0.0 -0.3 6.3 4.7 0.0 0.0 0.0 0.0 0.0 13

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 71.6 0.0 -2.3 7.0 4.1 0.0 0.0 0.0 0.0 0.0 14

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 71.1 0.0 -2.2 6.9 4.0 0.0 0.0 0.0 0.0 0.0 14

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 71.3 0.0 -2.2 7.0 4.0 0.0 0.0 0.0 0.0 0.0 13

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 72.3 0.0 -0.5 16.1 4.4 0.0 0.0 0.0 0.0 0.0 2

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 72.1 0.0 -1.2 20.0 4.3 0.0 0.0 0.0 0.0 0.0 -3

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 73.4 0.0 -0.3 5.6 4.9 0.0 0.0 0.0 0.0 0.0 10

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 72.6 0.0 -0.4 9.0 4.5 0.0 0.0 0.0 0.0 0.0 7

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 71.9 0.0 -1.9 21.8 4.3 0.0 0.0 0.0 0.0 0.0 -4

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 73.2 0.0 -0.3 5.8 4.8 0.0 0.0 0.0 0.0 0.0 9

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 72.5 0.0 -0.3 12.0 4.5 0.0 0.0 0.0 0.0 0.0 2

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 71.8 0.0 -2.3 7.0 4.2 0.0 0.0 0.0 0.0 0.0 7

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 71.8 0.0 -2.3 7.1 4.2 0.0 0.0 0.0 0.0 0.0 1

Page 31: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 7 of 19

Receiver: R07Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 42

Receiver Name Receiver ID X Y Z

3799 maglady R07 946807.0 5046531.9 84.7

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 68.0 0.0 0.5 14.1 3.3 0.0 0.0 0.0 0.0 0.0 38

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 68.1 0.0 1.2 3.7 5.0 0.0 0.0 0.0 0.0 0.0 36

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 68.1 0.0 0.0 5.6 2.6 0.0 0.0 0.0 0.0 0.0 38

Highway Trucks D08_Trucks 946650.2 5047331.2 96.4 0 79 21.4 A 69.2 0.0 -0.3 5.2 3.3 0.0 0.0 0.0 0.0 0.0 22

Highway Trucks D08_Trucks 946600.7 5047276.7 96.4 0 79 10.0 A 68.8 0.0 -0.2 11.6 3.2 0.0 0.0 0.0 0.0 0.0 5

Highway Trucks D08_Trucks 946594.3 5047269.7 96.4 0 79 9.5 A 68.7 0.0 -0.2 5.3 3.2 0.0 0.0 0.0 0.0 0.0 11

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 69.9 0.0 -0.4 5.2 3.5 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 72.1 0.0 1.3 7.1 4.3 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 70.6 0.0 -0.4 5.2 3.8 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 70.1 0.0 -0.4 5.2 3.6 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 70.4 0.0 -0.4 5.2 3.7 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 71.4 0.0 1.1 16.8 4.1 0.0 0.0 0.0 0.0 0.0 1

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 71.1 0.0 0.5 19.6 4.0 0.0 0.0 0.0 0.0 0.0 -3

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 71.8 0.0 1.2 10.7 4.2 0.0 0.0 0.0 0.0 0.0 5

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 70.9 0.0 -0.1 21.2 3.9 0.0 0.0 0.0 0.0 0.0 -4

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 72.7 0.0 1.3 4.9 4.6 0.0 0.0 0.0 0.0 0.0 11

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 72.4 0.0 1.3 5.3 4.5 0.0 0.0 0.0 0.0 0.0 9

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 71.6 0.0 1.2 14.6 4.1 0.0 0.0 0.0 0.0 0.0 -1

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 70.8 0.0 -0.5 5.2 3.9 0.0 0.0 0.0 0.0 0.0 9

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 70.8 0.0 -0.5 5.2 3.9 0.0 0.0 0.0 0.0 0.0 2

Page 32: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 8 of 19

Receiver: R08Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 45

Receiver Name Receiver ID X Y Z

(untitled) R08 946718.7 5046751.7 89.8

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 64.5 0.0 0.1 16.8 2.5 0.0 0.0 0.0 0.0 0.0 40

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 64.7 0.0 0.7 4.5 4.0 0.0 0.0 0.0 0.0 0.0 40

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 64.6 0.0 -0.3 7.9 1.9 0.0 0.0 0.0 0.0 0.0 40

Highway Trucks D08_Trucks 946653.1 5047334.4 96.4 0 79 21.1 A 66.4 0.0 -0.7 6.6 2.5 0.0 0.0 0.0 0.0 0.0 25

Highway Trucks D08_Trucks 946603.9 5047280.2 96.4 0 79 12.5 A 65.7 0.0 -0.6 15.0 2.4 0.0 0.0 0.0 0.0 0.0 9

Highway Trucks D08_Trucks 946595.9 5047271.4 96.4 0 79 7.8 A 65.6 0.0 -0.6 7.3 2.3 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks D08_Trucks 946592.6 5047267.8 96.4 0 79 5.8 A 65.5 0.0 -0.6 14.1 2.3 0.0 0.0 0.0 0.0 0.0 3

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 67.3 0.0 -0.8 6.1 2.8 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 70.3 0.0 0.8 9.5 3.7 0.0 0.0 0.0 0.0 0.0 13

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 67.7 0.0 -0.9 6.0 2.9 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 68.4 0.0 -0.9 5.9 3.1 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 68.1 0.0 -0.9 5.9 3.0 0.0 0.0 0.0 0.0 0.0 17

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 69.4 0.0 0.6 18.1 3.4 0.0 0.0 0.0 0.0 0.0 3

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 69.1 0.0 0.0 21.2 3.3 0.0 0.0 0.0 0.0 0.0 -1

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 68.8 0.0 -0.7 22.3 3.2 0.0 0.0 0.0 0.0 0.0 -1

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 69.9 0.0 0.7 12.7 3.5 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 70.9 0.0 0.9 7.8 3.9 0.0 0.0 0.0 0.0 0.0 10

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 70.7 0.0 0.9 8.4 3.8 0.0 0.0 0.0 0.0 0.0 9

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 69.7 0.0 0.7 14.8 3.5 0.0 0.0 0.0 0.0 0.0 2

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 68.7 0.0 -0.9 5.8 3.2 0.0 0.0 0.0 0.0 0.0 11

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 68.7 0.0 -0.9 5.8 3.2 0.0 0.0 0.0 0.0 0.0 5

Page 33: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 9 of 19

Receiver: R09Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 43

Receiver Name Receiver ID X Y Z

147 Belvedere R09 947215.2 5047131.9 90.8

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 67.2 0.0 -0.4 13.6 3.1 0.0 0.0 0.0 0.0 0.0 40

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 66.1 0.0 0.2 4.8 4.4 0.0 0.0 0.0 0.0 0.0 38

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 68.6 0.0 -0.8 11.4 2.7 0.0 0.0 0.0 0.0 0.0 33

Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 66.6 0.0 -1.1 6.9 2.6 0.0 0.0 0.0 0.0 0.0 25

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 66.0 0.0 -0.8 6.8 2.5 0.0 0.0 0.0 0.0 0.0 22

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 67.6 0.0 1.9 3.8 2.9 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 65.7 0.0 -0.1 11.6 2.4 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks A02_Trucks 946763.0 5047438.2 96.4 0 79 15.2 A 65.7 0.0 -0.5 6.8 2.4 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946749.5 5047426.6 96.4 0 79 4.4 A 65.8 0.0 -0.6 7.4 2.4 0.0 0.0 0.0 0.0 0.0 8

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 66.3 0.0 1.9 9.1 2.5 0.0 0.0 0.0 0.0 0.0 14

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 65.7 0.0 -0.3 6.5 2.4 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 66.0 0.0 1.8 12.4 2.4 0.0 0.0 0.0 0.0 0.0 10

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 65.8 0.0 1.5 20.7 2.4 0.0 0.0 0.0 0.0 0.0 2

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 67.0 0.0 1.9 5.8 2.7 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 68.4 0.0 2.0 3.5 3.1 0.0 0.0 0.0 0.0 0.0 17

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 68.1 0.0 2.0 3.5 3.0 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 66.6 0.0 1.9 7.5 2.6 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 65.8 0.0 0.1 14.2 2.4 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 65.8 0.0 0.1 13.9 2.4 0.0 0.0 0.0 0.0 0.0 0

Page 34: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 10 of 19

Receiver: R10Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 41

Receiver Name Receiver ID X Y Z

3002 Nolan R10 947626.8 5047368.9 85.3

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 71.6 0.0 -1.9 10.9 4.4 0.0 0.0 0.0 0.0 0.0 39

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 70.8 0.0 -0.6 5.4 5.8 0.0 0.0 0.0 0.0 0.0 32

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 72.5 0.0 -2.2 9.2 3.9 0.0 0.0 0.0 0.0 0.0 31

Highway Trucks D08_Trucks 946648.3 5047329.1 96.4 0 79 21.6 A 70.8 0.0 -2.0 6.8 3.9 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks D08_Trucks 946595.8 5047271.2 96.4 0 79 11.2 A 71.3 0.0 -2.2 6.9 4.0 0.0 0.0 0.0 0.0 0.0 10

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 70.1 0.0 -1.8 7.0 3.6 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 69.8 0.0 0.6 0.0 3.5 0.0 0.0 0.0 0.0 0.0 23

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 69.4 0.0 -1.3 11.5 3.4 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 69.2 0.0 0.6 0.0 3.3 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 69.8 0.0 -1.6 8.8 3.5 0.0 0.0 0.0 0.0 0.0 14

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 69.6 0.0 -1.5 10.9 3.4 0.0 0.0 0.0 0.0 0.0 11

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 70.3 0.0 0.6 0.0 3.7 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 69.5 0.0 0.6 0.0 3.4 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 69.1 0.0 0.6 0.0 3.3 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 69.2 0.0 0.6 4.4 3.3 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 70.1 0.0 0.6 0.0 3.6 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 69.4 0.0 0.6 0.0 3.4 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 69.3 0.0 0.1 21.3 3.3 0.0 0.0 0.0 0.0 0.0 -6

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 69.2 0.0 0.5 22.9 3.3 0.0 0.0 0.0 0.0 0.0 -14

Page 35: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 11 of 19

Receiver: R11Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 41

Receiver Name Receiver ID X Y Z

(untitled) R11 947659.7 5047546.0 82.9

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 72.1 0.0 0.5 7.6 4.6 0.0 0.0 0.0 0.0 0.0 39

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 71.4 0.0 1.0 3.8 6.1 0.0 0.0 0.0 0.0 0.0 31

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 73.0 0.0 -0.3 6.5 4.1 0.0 0.0 0.0 0.0 0.0 31

Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 71.3 0.0 -0.1 4.9 4.0 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 70.5 0.0 0.1 5.6 3.8 0.0 0.0 0.0 0.0 0.0 17

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 69.7 0.0 2.1 0.0 3.5 0.0 0.0 0.0 0.0 0.0 22

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 69.6 0.0 0.9 10.1 3.5 0.0 0.0 0.0 0.0 0.0 10

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 69.3 0.0 2.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 70.1 0.0 0.2 7.4 3.6 0.0 0.0 0.0 0.0 0.0 13

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 70.0 0.0 2.1 0.0 3.6 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 69.5 0.0 2.1 0.0 3.4 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 69.9 0.0 0.3 7.4 3.5 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 69.3 0.0 2.0 0.0 3.3 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 69.4 0.0 2.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 69.9 0.0 2.1 0.0 3.6 0.0 0.0 0.0 0.0 0.0 17

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 69.4 0.0 2.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 69.5 0.0 1.8 20.0 3.4 0.0 0.0 0.0 0.0 0.0 -7

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 69.5 0.0 2.0 21.1 3.4 0.0 0.0 0.0 0.0 0.0 -14

Page 36: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 12 of 19

Receiver: R12Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 40

Receiver Name Receiver ID X Y Z

(untitled) R12 947480.7 5047908.3 86.2

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 72.2 0.0 0.4 8.1 4.6 0.0 0.0 0.0 0.0 0.0 39

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 71.6 0.0 1.0 3.8 6.1 0.0 0.0 0.0 0.0 0.0 31

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 73.1 0.0 -0.3 7.0 4.1 0.0 0.0 0.0 0.0 0.0 31

Highway Trucks D08_Trucks 946657.1 5047338.9 96.4 0 79 20.7 A 71.0 0.0 0.0 4.8 3.9 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks D08_Trucks 946604.6 5047281.0 96.4 0 79 16.0 A 71.6 0.0 -0.2 5.0 4.2 0.0 0.0 0.0 0.0 0.0 14

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 70.2 0.0 0.1 5.0 3.6 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 68.1 0.0 2.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 24

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 68.1 0.0 2.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 68.2 0.0 2.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 69.0 0.0 1.2 12.8 3.3 0.0 0.0 0.0 0.0 0.0 8

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 68.1 0.0 2.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 69.7 0.0 0.3 6.3 3.5 0.0 0.0 0.0 0.0 0.0 14

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 68.3 0.0 2.0 0.0 3.1 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 68.1 0.0 2.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 69.3 0.0 0.3 9.7 3.4 0.0 0.0 0.0 0.0 0.0 11

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 68.6 0.0 2.0 0.0 3.1 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 68.1 0.0 2.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 68.7 0.0 1.8 16.1 3.2 0.0 0.0 0.0 0.0 0.0 -2

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 68.7 0.0 2.0 17.1 3.2 0.0 0.0 0.0 0.0 0.0 -9

Page 37: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 13 of 19

Receiver: R13Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 42

Receiver Name Receiver ID X Y Z

(untitled) R13 947342.2 5047989.4 93.0

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 71.8 0.0 -1.9 9.4 4.5 0.0 0.0 0.0 0.0 0.0 40

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 71.2 0.0 -0.7 5.5 6.0 0.0 0.0 0.0 0.0 0.0 32

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 72.7 0.0 -2.2 8.0 4.0 0.0 0.0 0.0 0.0 0.0 32

Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 70.7 0.0 -2.0 6.8 3.8 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 69.6 0.0 -1.7 6.7 3.5 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 66.9 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 27

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 66.7 0.0 0.5 0.0 2.6 0.0 0.0 0.0 0.0 0.0 24

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 67.3 0.0 0.5 0.0 2.8 0.0 0.0 0.0 0.0 0.0 23

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 68.3 0.0 -0.3 11.8 3.1 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 67.1 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 23

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 66.8 0.0 0.5 0.0 2.6 0.0 0.0 0.0 0.0 0.0 23

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 67.5 0.0 0.5 0.0 2.8 0.0 0.0 0.0 0.0 0.0 22

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 69.1 0.0 -1.5 8.4 3.3 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 68.7 0.0 -1.3 10.1 3.2 0.0 0.0 0.0 0.0 0.0 13

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 67.8 0.0 0.5 0.0 2.9 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 67.1 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 68.0 0.0 0.3 17.4 3.0 0.0 0.0 0.0 0.0 0.0 -1

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 68.0 0.0 0.5 18.7 3.0 0.0 0.0 0.0 0.0 0.0 -8

Page 38: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 14 of 19

Receiver: R14Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 45

Receiver Name Receiver ID X Y Z

2838 Nolan R14 947071.2 5047846.5 86.0

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 69.2 0.0 -0.2 8.8 3.7 0.0 0.0 0.0 0.0 0.0 43

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 68.4 0.0 0.4 4.5 5.1 0.0 0.0 0.0 0.0 0.0 35

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 70.3 0.0 -0.9 5.8 3.2 0.0 0.0 0.0 0.0 0.0 36

Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 67.6 0.0 -0.6 5.3 2.9 0.0 0.0 0.0 0.0 0.0 25

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 66.0 0.0 -0.2 5.0 2.5 0.0 0.0 0.0 0.0 0.0 24

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 61.1 0.0 1.6 0.0 1.5 0.0 0.0 0.0 0.0 0.0 33

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 60.6 0.0 1.6 0.0 1.4 0.0 0.0 0.0 0.0 0.0 30

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 62.1 0.0 1.7 0.0 1.7 0.0 0.0 0.0 0.0 0.0 29

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 61.5 0.0 1.7 0.0 1.6 0.0 0.0 0.0 0.0 0.0 28

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 60.8 0.0 1.6 0.0 1.5 0.0 0.0 0.0 0.0 0.0 29

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 64.0 0.0 1.0 10.4 2.0 0.0 0.0 0.0 0.0 0.0 17

Highway Trucks A02_Trucks 946839.3 5047549.4 92.7 0 79 13.0 A 62.5 0.0 1.7 0.0 1.7 0.0 0.0 0.0 0.0 0.0 26

Highway Trucks A02_Trucks 946837.3 5047536.7 94.7 0 79 7.9 A 62.8 0.0 1.7 0.0 1.8 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 63.1 0.0 1.7 0.0 1.9 0.0 0.0 0.0 0.0 0.0 26

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 61.7 0.0 1.7 0.0 1.6 0.0 0.0 0.0 0.0 0.0 26

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 64.6 0.0 0.2 7.4 2.1 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 65.2 0.0 0.0 5.3 2.3 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 63.5 0.0 1.6 16.7 1.9 0.0 0.0 0.0 0.0 0.0 4

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 63.4 0.0 1.7 17.8 1.9 0.0 0.0 0.0 0.0 0.0 -3

Page 39: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 15 of 19

Receiver: R15Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 43

Receiver Name Receiver ID X Y Z

3765 canaan R15 946595.2 5048399.5 95.2

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 72.6 0.0 -1.6 6.3 4.7 0.0 0.0 0.0 0.0 0.0 42

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 72.4 0.0 -0.4 5.2 6.4 0.0 0.0 0.0 0.0 0.0 30

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 73.0 0.0 -1.7 6.5 4.1 0.0 0.0 0.0 0.0 0.0 33

Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 71.6 0.0 -1.7 6.7 4.2 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 71.0 0.0 -1.5 7.7 3.9 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 68.6 0.0 0.5 0.0 3.1 0.0 0.0 0.0 0.0 0.0 25

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 67.7 0.0 0.5 0.0 2.9 0.0 0.0 0.0 0.0 0.0 23

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 68.1 0.0 0.5 0.0 3.0 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 69.7 0.0 0.6 0.0 3.5 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 70.4 0.0 -0.6 5.4 3.7 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 69.2 0.0 0.6 0.0 3.3 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 70.8 0.0 -1.3 6.8 3.9 0.0 0.0 0.0 0.0 0.0 14

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 70.6 0.0 -1.4 0.0 3.8 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 70.0 0.0 0.6 0.0 3.6 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 70.1 0.0 0.6 0.0 3.6 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 69.4 0.0 0.6 0.0 3.4 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 70.3 0.0 0.3 8.2 3.7 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 70.2 0.0 0.5 18.1 3.7 0.0 0.0 0.0 0.0 0.0 -11

Page 40: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 16 of 19

Receiver: R16Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 41

Receiver Name Receiver ID X Y Z

3744-3750 canaan R16 946374.3 5048561.5 92.3

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 73.8 0.0 0.9 3.9 5.1 0.0 0.0 0.0 0.0 0.0 40

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 73.7 0.0 1.5 3.3 6.9 0.0 0.0 0.0 0.0 0.0 28

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 74.0 0.0 0.3 4.6 4.5 0.0 0.0 0.0 0.0 0.0 31

Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 73.1 0.0 0.4 4.5 4.7 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 72.6 0.0 0.5 5.9 4.6 0.0 0.0 0.0 0.0 0.0 13

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 70.9 0.0 2.2 0.0 3.9 0.0 0.0 0.0 0.0 0.0 20

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 70.3 0.0 2.1 0.0 3.7 0.0 0.0 0.0 0.0 0.0 18

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 72.3 0.0 1.1 0.0 4.4 0.0 0.0 0.0 0.0 0.0 17

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 71.7 0.0 2.2 0.0 4.2 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 70.5 0.0 2.1 0.0 3.8 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 71.3 0.0 2.2 0.0 4.1 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 72.5 0.0 1.0 8.4 4.5 0.0 0.0 0.0 0.0 0.0 8

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 72.4 0.0 0.6 0.0 4.5 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946839.0 5047547.3 93.0 0 79 13.8 A 72.0 0.0 2.2 0.0 4.3 0.0 0.0 0.0 0.0 0.0 14

Highway Trucks A02_Trucks 946836.9 5047534.6 95.0 0 79 2.6 A 72.0 0.0 2.2 0.0 4.3 0.0 0.0 0.0 0.0 0.0 3

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 72.1 0.0 2.2 0.0 4.3 0.0 0.0 0.0 0.0 0.0 14

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 71.5 0.0 2.2 0.0 4.1 0.0 0.0 0.0 0.0 0.0 13

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 72.2 0.0 2.0 3.7 4.4 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 72.1 0.0 2.2 15.9 4.4 0.0 0.0 0.0 0.0 0.0 -13

Page 41: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 17 of 19

Receiver: R17Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 41

Receiver Name Receiver ID X Y Z

Vacant Lot 1 R17 947408.1 5047857.3 89.4

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 71.5 0.0 -1.9 10.9 4.4 0.0 0.0 0.0 0.0 0.0 39

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 70.8 0.0 -0.7 5.5 5.8 0.0 0.0 0.0 0.0 0.0 32

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 72.5 0.0 -2.2 9.3 3.9 0.0 0.0 0.0 0.0 0.0 31

Highway Trucks D08_Trucks 946657.2 5047338.9 96.4 0 79 20.7 A 70.2 0.0 -2.0 6.8 3.6 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks D08_Trucks 946604.7 5047281.1 96.4 0 79 16.0 A 70.9 0.0 -2.2 7.0 3.9 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 69.3 0.0 -1.7 6.9 3.4 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 67.0 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 27

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 67.0 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 24

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 67.1 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 24

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 68.0 0.0 -0.4 15.1 3.0 0.0 0.0 0.0 0.0 0.0 9

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 67.0 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 23

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 67.2 0.0 0.5 0.0 2.8 0.0 0.0 0.0 0.0 0.0 22

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 68.7 0.0 -1.6 8.5 3.2 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 67.0 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 22

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 68.4 0.0 -1.4 12.1 3.1 0.0 0.0 0.0 0.0 0.0 11

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 67.5 0.0 0.5 0.0 2.8 0.0 0.0 0.0 0.0 0.0 22

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 67.0 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 21

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 67.7 0.0 0.3 17.8 2.9 0.0 0.0 0.0 0.0 0.0 -1

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 67.6 0.0 0.5 18.7 2.9 0.0 0.0 0.0 0.0 0.0 -8

Page 42: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 18 of 19

Receiver: R18Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 42

Receiver Name Receiver ID X Y Z

Vacant Lot 2 R18 947288.9 5046747.5 85.2

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 69.6 0.0 -1.5 13.5 3.8 0.0 0.0 0.0 0.0 0.0 39

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 69.0 0.0 -0.2 4.9 5.2 0.0 0.0 0.0 0.0 0.0 35

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 70.3 0.0 -1.6 6.4 3.2 0.0 0.0 0.0 0.0 0.0 36

Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 69.7 0.0 -2.1 6.9 3.5 0.0 0.0 0.0 0.0 0.0 22

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 69.8 0.0 -2.2 7.0 3.5 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 71.3 0.0 0.6 5.0 4.0 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946817.3 5047505.6 96.4 0 79 2.4 A 70.0 0.0 -1.8 6.6 3.6 0.0 0.0 0.0 0.0 0.0 3

Highway Trucks A02_Trucks 946805.6 5047489.6 96.4 0 79 15.8 A 69.9 0.0 -2.0 6.8 3.6 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 69.8 0.0 -2.2 7.0 3.5 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 69.8 0.0 -2.3 7.0 3.5 0.0 0.0 0.0 0.0 0.0 15

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 70.5 0.0 0.6 10.5 3.7 0.0 0.0 0.0 0.0 0.0 9

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 70.2 0.0 0.6 14.1 3.7 0.0 0.0 0.0 0.0 0.0 4

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 70.9 0.0 0.6 6.4 3.9 0.0 0.0 0.0 0.0 0.0 11

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 70.1 0.0 -0.9 22.7 3.6 0.0 0.0 0.0 0.0 0.0 -3

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 71.9 0.0 0.6 4.4 4.3 0.0 0.0 0.0 0.0 0.0 13

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 71.7 0.0 0.6 4.5 4.2 0.0 0.0 0.0 0.0 0.0 11

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 70.7 0.0 0.6 7.3 3.8 0.0 0.0 0.0 0.0 0.0 9

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 70.0 0.0 -1.8 6.6 3.6 0.0 0.0 0.0 0.0 0.0 10

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 70.1 0.0 -1.8 6.6 3.6 0.0 0.0 0.0 0.0 0.0 3

Page 43: Canaan Quarry Noise Impact Study Geographic Township of

ISO 9613-2 Sample CalculationPage 19 of 19

Receiver: R19Project: Caanan Quarry

Project Number: 13209

Time Period Total (dBA)

Day 43

Receiver Name Receiver ID X Y Z

Vacant Lot 3 R19 945845.3 5046722.2 96.8

Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr

Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 69.8 0.0 -1.7 11.4 3.8 0.0 0.0 0.0 0.0 0.0 41

Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 68.5 0.0 -1.5 6.4 2.7 0.0 0.0 0.0 0.0 0.0 38

Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 70.6 0.0 -0.9 5.7 5.8 0.0 0.0 0.0 0.0 0.0 32

Highway Trucks D08_Trucks 946662.8 5047345.1 96.4 0 79 20.0 A 71.2 0.0 -2.3 7.1 4.0 0.0 0.0 0.0 0.0 0.0 19

Highway Trucks D08_Trucks 946610.3 5047287.2 96.4 0 79 17.5 A 70.6 0.0 -2.2 7.6 3.8 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 71.9 0.0 -2.5 7.3 4.3 0.0 0.0 0.0 0.0 0.0 16

Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 73.6 0.0 -0.3 12.3 5.0 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 72.3 0.0 -2.6 7.3 4.4 0.0 0.0 0.0 0.0 0.0 13

Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 72.8 0.0 -2.7 7.5 4.6 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 72.6 0.0 -2.6 7.4 4.5 0.0 0.0 0.0 0.0 0.0 12

Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 73.3 0.0 -0.9 15.4 4.9 0.0 0.0 0.0 0.0 0.0 1

Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 73.9 0.0 -0.1 9.7 5.1 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 73.5 0.0 -0.4 14.8 4.9 0.0 0.0 0.0 0.0 0.0 0

Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 73.2 0.0 -1.6 12.0 4.8 0.0 0.0 0.0 0.0 0.0 4

Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 73.1 0.0 -2.3 15.5 4.7 0.0 0.0 0.0 0.0 0.0 1

Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 73.7 0.0 -0.2 11.2 5.0 0.0 0.0 0.0 0.0 0.0 3

Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 73.4 0.0 -0.5 15.7 4.9 0.0 0.0 0.0 0.0 0.0 -3

Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 73.0 0.0 -2.7 7.5 4.7 0.0 0.0 0.0 0.0 0.0 6

Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 73.0 0.0 -2.7 7.5 4.7 0.0 0.0 0.0 0.0 0.0 -1

Page 44: Canaan Quarry Noise Impact Study Geographic Township of

Cornwall Gravel Co. Ltd. – Canaan Quarry Appendices

Appendix B

Qualifications of the Authors

Page 45: Canaan Quarry Noise Impact Study Geographic Township of

derek flake M.Sc., P.Eng.

Profile

Derek is an employee of Aercoustics Engineering Limited, an engineering consulting company specializing in acoustics, noise and vibration. Prior to that, he worked for several years at another acoustics, noise and vibration firm and he completed a Master of Science in the field of ultrasound transducer design. Derek is a Professional Engineer with the Professional Engineers Ontario.

Employment History

2012 – Present Project Engineer, Aercoustics Engineering Ltd.

2009 – 2012 Engineering Intern, Jade Acoustics Incorporated

Additional Activities / Committees

2014 – Present Member of Training and Development Committee at the Ontario Sand, Stone and Gravel Association (OSSGA)

Professional Registration / Affiliations

Licensed Professional Engineer with the Professional Engineers of Ontario (PEO)

Education

Master of Science (M.Sc.) Medical Biophysics (Ultrasound Physics) University of Toronto

Bachelor of Applied Science (B.A.Sc.) Engineering Physics (Mechanical) Queen’s University

Courses and Speaking Events

Instructor, Municipal Law Enforcement Officers’ Association (MLEOA) Environmental Noise training courses. This is an annual four-day training program which provides the officers with an understanding of sound measurement and its relationship with

Page 46: Canaan Quarry Noise Impact Study Geographic Township of

Derek Flake M.Sc., P.Eng. Page 2

environmental noise impact. The officer is trained in the utilization of technical equipment required in the application of sound measurement theories. This course also covers the unique elements of qualitative noise regulations and is authorized by the Ministry of the Environment and Climate Change.

1-day course on “Aggregates 101 Training,” OSSGA Health and Safety Seminar, Toronto, 2015. Mr. Flake both attended and aided in the development for parts of the course.

Speaker, “The New NPC-300 Noise Guideline: What does it mean for your noise by-law?” MLEOA Annual General Meeting, Kingston, 2014.

Professional Activities

Land Use Planning

In the field of environmental acoustics, Mr. Flake has completed numerous projects involving noise impact from planned stationary sources as well as noise impact studies for proposed residential developments. These projects included conducting studies for proposed operations and developments and addressing noise concerns for existing operations. Peer reviews of noise studies prepared by other acoustic consultants were also completed by Mr. Flake. In the land use planning process, Mr. Flake has completed studies which provide assessments of the noise impact on proposed residential, commercial and industrial developments from the local environment which includes noise from road, rail, and aircraft traffic and stationary noise sources such as industrial and commercial uses. Also, vibration measurements and studies were conducted to assess vibration from rail traffic such as trains, streetcars and subways. The studies include recommendations for noise control of the sources, dwelling building components, wall, window, and door constructions to satisfy the Ministry of Environment and Climate Change noise guidelines.

In addition, Mr. Flake has conducted architectural drawing reviews for residential and commercial developments to ensure the construction plans will meet the requirements set out in environmental noise studies and specifications documents.

Aggregates

Mr. Flake has done work in the aggregates industry which involved the preparation and support of over a dozen noise impact studies to determine technical feasibility of aggregate license applications to the Ministry of Natural Resources. This work included preparing the noise impact studies, supporting the findings at public meetings, and performing acoustic audits to confirm compliance with the noise requirements.

Renewable Energy

Mr. Flake has performed IEC 61400 testing of Wind Turbines and Transformer Station noise audits.

Page 47: Canaan Quarry Noise Impact Study Geographic Township of

Derek Flake M.Sc., P.Eng. Page 3

Environmental Compliance Approvals

Mr. Flake was involved with in several noise and vibration impact studies for industrial uses. He has prepared several Acoustic Assessment Reports for use in applications for Environmental Compliance Approvals. These studies provided conceptual as well as detailed designs of noise mitigation to reduce in-plant noise or noise emission into the environment. In-plant projects generally involved noise surveys, detailed noise/vibration measurements of equipment, data analysis and computer modelling of noise controls to evaluate effectiveness. In some cases, detailed designs and specifications have been provided.

Noise Source Investigations and Room Acoustics

Mr. Flake has completed several projects involving design of spaces where sound privacy and room acoustics were critical. These projects have included noise complaint investigation, room acoustics, mechanical noise, noise measurements to quantify sound isolation, and environmental noise impact. Examples of spaces include cinemas, hospitals and residential condominiums.

Page 48: Canaan Quarry Noise Impact Study Geographic Township of

PROFESSIONAL PROFILE

H. ROBERT RIMROTT, M.A.Sc., P.Eng.

EDUCATION

B.A.Sc., University of Toronto

M.A.Sc., University of Toronto

PROFESSIONAL MEMBERSHIPS

Professional Engineer, Ontario (PEO)

Consulting Engineer, Ontario (PEO)

Acoustical Society of America (ASA)

American Society of Mechanical Engineers (ASME)

PROFESSIONAL BACKGROUND

In 1987, Mr. Rimrott began his work as an acoustics and vibration consultant. In his many years in this field, he has completed many successful projects. In 1992, he joined Aercoustics Engineering Limited. He is a partner and principal engineer with the firm. Mr. Rimrott is recognized as an expert by the Ministry of Environment and Energy and has provided expert testimony in the forum of the Ontario Municipal Board Hearings.

In the field of environmental acoustics, Mr. Rimrott has completed numerous projects involving noise from planned stationary sources as well as noise studies for residential developments. These projects included conducting studies for both proposed operations and developments, studies addressing noise concerns for existing operations, and peer review of noise studies conducted by other acoustic consultants. Projects have included Industrial plants, Aggregate Pits and Quarries, and many other operations.

In the land use planning process Mr. Rimrott has completed studies provide assessments of the noise on the proposed residential development from the local environment which includes noise from road, rail, and aircraft traffic and stationary noise sources such as industries, and gun clubs. The studies include recommendations on noise control of the sources, dwelling building components, wall, window, and door constructions to satisfy the Ministry of Environment and Energy noise guidelines.

Page 49: Canaan Quarry Noise Impact Study Geographic Township of

Bob Rimrott M.A.Sc., P.Eng. Page 2

Partial Listing of Representative Projects

PITS AND QUARRIES INDUSTRIAL

Dufferin Aggregates, many Pits Coutrice Steel

Wimpey, Nolan Quarry Co Steel Lasco

Truax Pit Georga Pacific Flakeboard

United Aggregates, Acton quarry Boise Cascade Oriented Strand Board Plant

Cox Construction, Puslinch Pit Boise Cascade Co-Generation Station

Beamish Construction, Moore Business Forms

Coboconk Quarry Metal Coating

Alcan Foil Products

INCO

Alcan Rolled Products

Townsend Lumber

BLAST / IMPULSE NOISES

Quarry Blasting Noise

Meaford Artillery Range

Walker Dog Kennel

Pioneer Sportsmen Club