CAMPUS WEDDING CASE

Anusha Bansal

Himani Wadhwa

Madhav Dixit

Priyanka Khatri

Ranjeeta Kumari

Presented By:

Page 2: campus wedding

CASE SUMMARY

• Marriage date: 22 April • Start Date: 31st March• Remaining Days: 23 days• Remaining Days for wedding rehearsal: 21 days

So as to complete the activities in given schedule, we have to pay cost, called as crash cost to complete it in given time called crash time.

Page 3: campus wedding

THE ACTIVITIES AND PRECEDENCE RELATIONSHIPS

Page 4: campus wedding

Activity Name Precedence Days Crash days Crash cost Per day CC Book church & Reception A - 1 - -

Notice church B A 17 10 100 14.28Decorate church C B 3

Made of Honour Reach D - 10 2 500 62.5Choose Cake E - 2

Catering F E 10 Choose Dress Pattern G 3

Dress Material H G 8 5 25 8.33Sewing Dress I H 11 6 120*5 120

Final fitting dress J D,I 2 Cleaning Dress K J 2 1 30 30

Choose Invitation Style L 3 Invitation print M L 12 5 35 5

Guest list preparation N - 4 Addressing Invitation O N,M 4 2 25*2 25

Mailing Invitation f O 1 Invitation reach to guest Q P 10

Gift for Bridesmaids R - 1 Wedding Rehearsal S C,F,K,Q,S 1

Wedding T S 1

Page 5: campus wedding

NETWORK DAIGRAM FOR THE WEDDING PLANS

Page 6: campus wedding

DB C

SG T

A

E

K

L

H

J

I

F

QM PO

RN

1

1

17 3

1

1

10

13

2

4

3

22

8 11

10

1012 4

21

26

22

22

1

30

12

Before Crashing

Page 7: campus wedding

DB C

SG T

A

E

K

L

H

J

I

F

QM PO

RN

1

1

17 3

1

1

10

13

2

4

3

22

8 11

10

1012 4

21

21

1

18

1

21

12

5

105

2

2

After Crashing

Page 8: campus wedding

THE MINIMUM-COST PLAN THAT MEETS THE APRIL 22 DATE

Activity Activity Name

Crashed Days Total Crash Cost

Invitation Print M 5 $35

Material H 5 $ 25

Cleaner downtown K 1 $ 30

Using 3rd party O 2 $ 50

Sewing Dress I 1 $ 120

Total Cost $ 260

Page 9: campus wedding

WEDDING PLANS OF EACH INCIDENTS NOTED IN CASE (B)

Page 10: campus wedding

Question. 1

On April 1 the chairman of the Vestry Committee at the church was left unimpressed by the added donation and sais he would not reduce the notice period from 17 to 10 days.

Answer

There will not be any changes or problem, as this path is of exactly 21 days i.e. the time required for wedding, without crashing any activity.

Page 11: campus wedding

DB C

SG T

A

E

K

L

H

J

I

F

QM PO

RN

1

1

17 3

1

1

10

13

2

4

3

22

8 11

10

1012 4

21

21

1

18

1

21

12

5

105

2

2

After CrashingAns 1 Path

Page 12: campus wedding

Question. 2

A call to Guatemala revealed that the potential bridesmaid had several commitments and could not possibly leave the country until April 10

Answer

Normally, the bridesmaid requires 10 days to reach. If she cannot leave before April 10, that means 10 + 10 days extra + 2 days dress fitting + 2 days dress cleaning = 24 days. Even if we crash ‘dress cleaning’ activity (i.e. 1 day crash) still it’ll be 23 days whereas it should be 21 days before rehearsals. So, no use crashing this activity. Therefore, we’ll have to fly the bridesmaid in 2 days, thus incurring $500 cost.

Page 13: campus wedding

DB C

SG T

A

E

K

L

H

J

I

F

QM PO

RN

1

1

17 3

1

1

10

13

2

4

3

22

8 11

10

1012 4

21

14

1

18

1

21

12

5

105

2

2

After Crashing

Ans 2 Path

+10 loss

Page 14: campus wedding

Question. 3

Mother came down with four day flu just as she started on the guest list.

Answer

If her mother came down with flu, the ‘guest list preparation’ activity will require 4 + 4 days extra. That’ll make the total time of the path to be 23 days. The ‘addressing’ activity will have to be crashed to 2 days instead of 4 days incurring $25 cost. Thus, the path time will become 21 days.

Page 15: campus wedding

DB C

SG T

A

E

K

L

H

J

I

F

QM PO

RN

1

1

17 3

1

1

10

13

2

4

3

22

8 11

10

1012 4

21

21

1

18

1

21

12

5

105

2

2

After Crashing

Ans 3 Path

+4 loss

Page 16: campus wedding

Question. 4

The lace and dress materials were lost in transit. Notice of the loss was delivered to the Jackson home early on April 10.

Answer

After April 10, the family has 11 days to complete the remaining activities. If ‘material procuring’ activity be crashed to 5 days, ‘sewing dress’ to 6 days, ‘dress cleaning’ to 1 day, it’ll still be 5+6+1+2 = 14 days. Therefore, the wedding won’t be able to take place by April 22. Eloping is the only option.

Page 17: campus wedding

DB C

SG T

A

E

K

L

H

J

I

F

QM PO

RN

1

1

17 3

1

1

10

13

2

4

3

22

8 11

10

1012 4

21

27

1

18

1

21

12

5

65

2

2

After Crashing

Ans 4 Path

+10 loss

Page 18: campus wedding

Question. 5

There was small fire at the caterer's shop on April 8. It was estimated that the shop would be closed two or three days for repair.

Answer

This path requires 12 days, so a delay of 2-3 days won’t affect the proceedings at all.

Page 19: campus wedding

DB C

SG T

A

E

K

L

H

J

I

F

QM PO

RN

1

1

17 3

1

1

10

13

2

4

3

22

8 11

10

1012 4

21

21

1

18

1

21

14/15

5

105

2

2

After Crashing

Ans 5 Path

+2/3 loss

Page 20: campus wedding