CAMP LAYOUT

• The camp will have only ONE entry control point.

• There will be a turn-around area inside the camp.– It will be part of the camp road near entry

control point.

Page 2: CAMP LAYOUT The camp will have only ONE entry control point. There will be a turn-around area inside the camp. –It will be part of the camp road near entry

COC

• Combat Operations Center (COC) and Communications. – Erected at the same time.

• COC– CO is in charge of the COC.– Protective wire around the COC is 35 meters out.– Symbol for protective wire is:

• X---X---X---X

Page 3: CAMP LAYOUT The camp will have only ONE entry control point. There will be a turn-around area inside the camp. –It will be part of the camp road near entry

Communications

• Comm– Battalion main radio is at the antenna site

(ANT FARM).– The maximum distance to the ANT FARM is

2 miles.

• Without comm the NMCB can not talk to each other or the higher chain of command.

Page 4: CAMP LAYOUT The camp will have only ONE entry control point. There will be a turn-around area inside the camp. –It will be part of the camp road near entry

Company Command Post

• Company Command Post (CP) and Alternate COC (ACOC). – Erected at the same time.

• B Co– Responsible for camp maintenance and camp

security.

Page 5: CAMP LAYOUT The camp will have only ONE entry control point. There will be a turn-around area inside the camp. –It will be part of the camp road near entry

Company Command Post

• ACOC – XO is in charge.– ACOC is usually the A Co. CP. – The boards get updated by watch personnel at

the end of each COC watch.– ACOC is maximum of 10 minutes from COC.– Protective wire around ACOC is 35 meters out.

Page 6: CAMP LAYOUT The camp will have only ONE entry control point. There will be a turn-around area inside the camp. –It will be part of the camp road near entry

ECP & ASP

• Rear Security Entry Control Point (ECP)– Has a M2HB.50cal.

• Ammo Supply Point (ASP) – Minimum distance of 350 meters from berthing

and other compounds.– Maximum distance of 2 miles from COC.– Protective wire around ASP is 35 meters out.

Page 7: CAMP LAYOUT The camp will have only ONE entry control point. There will be a turn-around area inside the camp. –It will be part of the camp road near entry

LZ & BAS

• Landing Zone (LZ) – 400 meters from front line.– LZ has (3) landing areas and each landing area

has (4) landing points.

• Base Aid Station (BAS) – 400 meters from front line. – Within close proximity of LZ.

• LZ & BAS will go up at the same time.

Page 8: CAMP LAYOUT The camp will have only ONE entry control point. There will be a turn-around area inside the camp. –It will be part of the camp road near entry

Armory & EPW

• Armory– No closer then 400 meters to front line.– Protective wire around armory is 35 meters out.

• EPW– Protective wire around EPW is 35 meters out.– Near the ECP but not in sight of the ECP.

Page 9: CAMP LAYOUT The camp will have only ONE entry control point. There will be a turn-around area inside the camp. –It will be part of the camp road near entry

M224 & GALLEY

• M224 60MM Mortars– 6 in Battalion TOA. They are all placed in the

same location, approximately 35 meters apart.

• Galley, Showers and Laundry – Located close to one another so they can share

one leech field.– A grease trap will separate the galley and the

leech field.

Page 10: CAMP LAYOUT The camp will have only ONE entry control point. There will be a turn-around area inside the camp. –It will be part of the camp road near entry

Supply & A Co.

• CTR, CSR, MLO & Supply– Will be located near A Co. yard.

• A Co. yard will be located near the ECP.

• Bulk Fuel– Located within the A Co. yard.

Page 11: CAMP LAYOUT The camp will have only ONE entry control point. There will be a turn-around area inside the camp. –It will be part of the camp road near entry

Latrines & Garbage Pits

• Latrines– Will be a minimum of 100 yards from the

galley and water sources.– 50 feet downwind of berthing.

• Garbage Pits– Not less than 100 yards from water sources.– 35 yards from the galley.

Page 12: CAMP LAYOUT The camp will have only ONE entry control point. There will be a turn-around area inside the camp. –It will be part of the camp road near entry

Tents & Generators

• Berthing Tents– At least 200 meters behind the front lines.– 35 meters apart.

• Generators– Will have pits and covers to reduce noise and

protect from weather.– Located in a central area.