20
Subsea Wellhead Systems For deepwater and shallow-water applications SUBSEA SYSTEMS

Cameron Subsea System

Embed Size (px)

DESCRIPTION

Subsea System

Citation preview

  • Subsea Wellhead SystemsFor deepwater and shallow-water applications

    SUBSEA SYSTEMSSUBSEA SYSTEMS

  • 4

    CAMERON TECHNOLOGY LEADERSHIP LEADS TO WELLHEAD ADVANCEMENTS

    Cameron has a long history of product innovation, and the evolution of the subsea wellhead product line is a

    prime example of the continuation of this heritage.

    Camerons experience in pressure control can be traced

    back to 1922 and the introduction of the first BOP.

    Other Cameron innovations through the years include

    the first subsea wellhead completion, introduction of the

    legendary U BOP, the first hydraulic production control

    system, the first guidelineless drilling system and the first

    free-standing drilling riser.

    In the late 1980s, Cameron introduced two new wellhead

    system designs the STC-10 and the STM-15. Since

    then, nearly 1000 STC-10 and STM-15 subsea wellhead

    systems have been installed successfully throughout

    the world.

    More advances are on the horizon. As the industry moves

    forward, Cameron is here with the latest technology.

    Table of Contents

    STM-15 Type DW5 Deepwater High-Capacity Subsea Wellhead System

    STM-15 Type XL5 Deepwater Large-Bore Subsea Wellhead System

    STM-15 Type XL7 High-Capacity Ultra-Deepwater Subsea Wellhead System Wellhead Connection Profiles

    STC-10 Compact Subsea Wellhead System

    Casing Hanger Seal Assembly Running Tools for STM Subsea Wellhead Systems

    High-Capacity Running Tools for STM-15 Subsea Wellhead Systems

    STM Parallel Bore Metal-to-Metal (PBM) Seal

    Optional Trip-Saving Running Tools

    Supplemental Hanger Systems for STM-15 and STC-10 Subsea Wellhead Systems

    STM Large Diameter Shoulder-Type Supplemental Hangers

    Innovation and Quality

    4

    6

    8

    8

    10

    12

    14

    16

    16

    17

    17

    18

    2

  • 3

    5

    STC-10 Subsea WellheadWS2 Subsea WellheadWS1 Subsea Wellhead STM-15 Subsea Wellhead

    To 1980 1980 - 1988 1989 - Present 1992 - Present

    CAMERONS WELLHEAD HISTORY

    The offshore Equatorial Guinea development is located in water

    depths to 2400 ft (732 m). The initial development included more

    than fifteen STM-15 subsea wellheads, and expansion of the field

    is ongoing with six additional installations scheduled for 2011.

    The South China Sea development is located in approximately

    2700-ft (823 m) water depths. The initial development included

    five STM-15 subsea wellhead systems with subsequent additions

    of two STM-15 subsea wellheads and completion systems.

    South China Sea DevelopmentEquatorial Guinea Development

    Camerons wellhead systems are offered as part of our total subsea drilling and production systems. Installed in producing fields

    around the world, these systems consist of wellheads, subsea Christmas trees, flowline connection systems, production manifolds

    and production controls systems. Cameron systems have been installed at various water depths as well as in operating pressures

    up to and including 15,000 psi.

    FIELD ExPERIENCE

    SUBSEA SYSTEMS

  • STM-15 Type DW5 Deepwater High-Capacity Subsea Wellhead System

    Camerons STM-15 Type DW5 15,000 psi WP Subsea Wellhead

    System delivers up to 5.25 MM ft-lb bending capacity for

    enhanced performance for drilling and completion in water

    depths up to 10,000 ft (3048 m).

    Active pre-load lockdown at 2 MM lb

    5.25 MM ft-lb bending capacity

    Standard and high-capacity 16 supplemental hangers and adapters are available

    Machined from F-22, 85 ksi yield forged material

    Available for H2S service

    7 MM lb end-load carrying capacity on single- landing shoulder for deep wells with complex casing programs

    18.63 Bore17.83 Min. ID7 MM lb End-Load Capacity Landing Shoulder

    High-Pressure Housing Joint Wellhead on CNC MachineSTM-15 TYPE DW5 DEEPWATER

    HIGH-CAPACITY SUBSEA WELLHEAD SYSTEM

    Camerons deepwater STM wellheads meet the requirements

    for most subsea drilling operations with deepwater semisubmers-

    ibles and drillships, as well as production applications such as

    tension-leg platforms, deep-draft caisson vessels and all types

    of subsea trees.

    4

    Camerons unique PBM metal-to-metal seal is standard in all 15,000 psi WP systems and has delivered superior performance in nearly 20 years of installation history.

  • STM-15DW Wellhead System 36 X 20 X 16 X 13-3/8 X 9-5/8 X 7

    16 Casing Hanger System

    18-3/4 15,000 psi WP High-Pressure Wellhead

    w/Active Pre-Load Lockdown,Gasket Seal and Hydrate Seal

    36 Conductor Housingw/Eight 3 Flow-By Holes

    18-3/4 Wellhead Housing20 x 0.812 Wall Extension

    13-3/8 Casing

    9-5/8 Casing

    Seal Assembly (Typical)

    Hydrate Deflectorw/Bullseye

    16 Seal Assembly

    16 Receptacle

    16 Casing Hanger

    20 x 0.812 WT Wellhead Housing Joint

    36 x 2.0 WT Conductor Housing Joint

    STM-15 Type DW5 Deepwater High-Capacity Subsea Wellhead System 36 x 20 x 16 x 13-3/8 x 9-5/8 x 7

    3 Ball Valvew/Pipe Extension(Typical Installation)

    7 Casing

    5

    STM-15DW Wellhead System 36 X 20 X 16 X 13-3/8 X 9-5/8 X 7

    16 Casing Hanger System16 Casing Hanger System

    SUBSEA SYSTEMS

  • STM-15 Type XL5 Deepwater Large Bore Subsea Wellhead System

    Camerons STM-15 Type XL5 Deepwater Large Bore Subsea

    Wellhead System is rated at a full 15,000 psi WP for drilling

    and completion operations in water depths up to 10,000 ft

    (3048 m). This system is used when it is necessary to run 18

    casing in addition to 16. The wellhead has an 18-1/2 mini-

    mum ID bore in the bottom to pass 18 casing. As with the 16

    casing hanger, the 18casing hanger has a landing adapter

    that is welded into the 22 (instead of 20) casing below the

    high-pressure housing and the 16 adapter, allowing installa-

    tion through the riser and BOP stack. This wellhead system is

    an ideal solution for shallow-water flows and to accommodate

    small bore-pressure/fracture gradient differentials.

    Active pre-load lockdown at 2 MM lb

    5.25 MM ft-lb bending capacity

    3 MM lb tensile capacity

    Machined from F-22, 85 ksi yield forged material

    Available for H2S service

    Multiple-landing shoulder with 7 MM lb end-load carrying capacity

    18.63 Bore18.510 Min. ID7 MM lb End-Load Capacity Landing Shoulder

    STM-15 Type XL5 Wellhead Housing

    STM-15 TYPE XL5 DEEPWATER LARGE BORE SUBSEA WELLHEAD SYSTEM

    6

    Camerons unique PBM metal-to-metal seal is standard in all 15,000 psi WP systems and has delivered superior performance in nearly 20 years of installation history.

    The STM-15 Type XL5 Deepwater Large Bore Subsea Wellhead

    System is used with the STM-15 trip-reducing, high-capacity

    running tools and is available with the three most common

    wellhead connection profiles. A standard 4130 extension joint is

    added to the bottom of the high-pressure housing for

    increased weld compatibility with various casing grades, and

    other materials for the extension can be

    supplied when required. Guide bases and

    mud mats with hydrate seals and flow rings

    are available upon request.

  • STM-15 Active Lockdown XL Bore Wellhead System 36 X 28 X 22 X 18 X 16 X 13-3/8 X 9-5/8

    16 Casing Hanger System

    18 Casing Hanger System

    18-3/4 Wellhead HousingSTM-15 Large Bore

    Wellhead HousingRunning Tool

    Active LockdownAssembly - Unlocked

    16 Landing Sub22 OD x 18.38 ID

    16 PBM Seal Assembly

    16 Casing Hanger

    16 Casing Flush orNear Flush Casing Connections

    18 Landing Sub22 OD x 18.25 ID

    18 Casing Hanger18.43 OD x 16.60 ID

    18 Casing FlushCasing Connections

    18 Seal Assembly

    18-3/4 Seal Assembly

    9-5/8 Casing Hanger

    Active LockdownAssembly - Locked

    18-3/4 Typical Seal Assembly

    36 Conductor Housing

    13-3/8 Casing Hanger

    36 Conductor Pipe

    22 Extension Pipe

    13-3/8 Casing

    10-3/4 Casing

    28 Receptaclew/Vertical Flow-By

    28 SupplementalCasing Hanger

    28 Supplemental Casing

    12 x 12 Mud Matw/Split Lock Ring Lip

    and Hydrate Seal

    STM-15 Type XL5 Deepwater Large Bore Subsea Wellhead System 36 x 28 x 22 x 18 x 16 x 13-3/8 x 9-5/8

    7STM-15 Active Lockdown XL Bore Wellhead System 36 X 28 X 22 X 18 X 16 X 13-3/8 X 9-5/8

    16 Casing Hanger System

    18 Casing Hanger System

    STM-15 Active Lockdown XL Bore Wellhead System 36 X 28 X 22 X 18 X 16 X 13-3/8 X 9-5/8

    16 Casing Hanger System

    18 Casing Hanger System

    16 Casing Hanger System

    18 Casing Hanger System

    SUBSEA SYSTEMS

  • Wellhead Connection Profiles BOP AND CHRISTMAS TREE CONNECTION PROFILES

    Hub, mandrel or Camerons deepwater high-capacity (DWHC)

    XL7 profiles are available on the high-pressure 18-3/4 housing,

    depending on application requirements. The XL7 profile is an

    ultra-deepwater solution to high bending requirements and is

    applied primarily to the 30 diameter wellhead.

    STM LOAD CAPACITIES

    Hub Mandrel DWHCHub Mandrel DWHC

    STM-15 Type XL7 High- Capacity Ultra-Deepwater Subsea Wellhead System

    Cameron also offers a high-capacity subsea wellhead

    system. The STM-15 Type XL7 Wellhead System features a

    30 diameter high-pressure wellhead housing versus the

    standard 27 housing. The system requires a 38 conductor

    and low-pressure housing in order to receive the larger

    diameter mechanical lockdown mechanism, which is activated

    by the high-capacity mechanical lockdown tool. This system

    was designed for ultra-deepwater drilling and production

    applications using dual-activity dynamically positioned

    drillships and deep-draft caisson vessels primarily, but not

    limited to, water depths up to 10,000 ft (3048 m). This STM-15

    Type XL7 delivers a 7 MM ft-lb bending capacity and 5 MM lb

    tensile capacity, with a multiple-landing shoulder with

    7 MM lb end-load carrying capacity.

    Wellhead Housing Testing Lab

    TypeBending Capacity

    (MM)

    Tensile Capacity

    (MM)PSI

    End- Load

    Carrying Capacity

    (MM)

    Water Depths

    (ft)

    Standard Up to 4 2 15,000 7 2500

    DW5 5.25 3 15,000 7 10,000

    XL5 5.25 3 15,000 7 10,000

    XL7 7 5 15,000 7 10,000

    STM-15 DW5 Wellhead in Moonpool

    8

  • STM/STC SUBSEA WELLHEAD-TO-CONDUCTOR HOUSING LOCkDOWN OPTIONS

    The STC-10 wellhead has a similar passive lockdown mechanism which provides a 1.5 MM ft-lb bending capacity and 0.5 MM lb

    tensile capacity.

    STM-15 Type DW5 and XL5 wellheads are available with an active pre-loaded option using a mechanical lockdown tool. The two

    housings are pre-loaded together using this mechanical tool resulting in a 2 MM lb pre-load which increases the bending capacity

    to 5.25 MM ft-lb with a 3 MM lb tensile capacity.

    The STM-15 Type XL7 is an active pre-loaded wellhead design with a 30 O.D. high-pressure housing which delivers 7 MM ft-lb

    bending capacity and 5 MM lb tensile capacity.

    9

    STC-10 Passive Lockdown

    STM-15 Type DW5, STM-15 Type XL5 and XL7

    2 MM lb Mechanical Lockdown

    SUBSEA SYSTEMS

  • STC-10 Compact Subsea Wellhead System

    The STC-10 Compact Wellhead System is a popular choice for

    low-pressure wells up to 10,000 psi WP and moderate well

    depths. Simplicity and attractive pricing make the STC-10

    wellhead system a cost-effective choice.

    The STC-10 wellhead system uses Camerons metal-end cap

    (MEC) seal. This elastomeric sealing element is rated a full

    10,000 psi WP and made of proprietary CAMLAST

    elastomer which is rated for temperatures up to 250o F

    (121o C). It is resistant to H2S, CO2, chlorides, diesel fluid and

    oil- or water-based amine corrosion inhibitors. Stainless

    steel caps on the upper and lower surfaces of the elastomer

    reduce extrusion limit exposure of the elastomers to

    corrosive well fluids and discourage roll off during

    installation. The MEC seal is highly tolerant to seal area

    damage and will often seal when other types of seals will

    not. The seal is radially energized and requires less energy

    to set than other seals.

    Available in a five-string casing program

    Also available in a six-string program utilizing a 16 supplemental hanger system

    Jet-in/drill-ahead tools are available for even faster run times

    STC High-Pressure Housing Joint

    18.69 Bore17.83 Min. ID3.5 MM lb End-Load Carrying Capacity Landing Shoulder

    STC-10 COMPACT SUBSEA WELLHEAD SYSTEM

    10

  • 16 Casing Hanger System

    STC-10 Wellhead System 30 X 20 X 16 X 13-3/8 X 10-3/4

    STC-10 Compact Subsea Wellhead System30 x 20 x 16 x 13-3/8 x 10-3/4

    10-3/4 Casing Hangerw/Inconel 625 Inlay

    16 Casing Hanger System

    13-3/8 Casing Hanger w/Inconel 625 Inlay

    STC-10 Seal Assembly

    13-3/8 Dummy Hanger

    STC-10 30 Conductor Housing w/1.50 BWP Down

    STC-10 18-3/4 Wellhead Housing

    w/H4 Profile,16 Receptacle and

    20 x 0.625 BWP

    Adapter w/ThreadedOutlet Ports

    (Optional)

    16 Receptacle 16 Casing Hanger,16 3000 psi Seal Assembly

    Retrievable/ReinstallableGuide Base w/0-5

    Slope Indicator

    11

    16 Casing Hanger System

    STC-10 Wellhead System 30 X 20 X 16 X 13-3/8 X 10-3/4

    3 Ball Valvew/Pipe Extension(Optional)

    SUBSEA SYSTEMS

  • Casing Hanger Seal Assembly Running Tools for STM Subsea Wellhead Systems

    Casing Hanger Seal Assembly Running Tools (CHSARTs) are

    single-trip tools that allow installation of the casing hanger

    and PBM metal-to-metal seal assembly in a single trip.

    Cameron offers these tools in a variety of load capacities and

    sizes for all of our wellhead systems.

    There are three tools available for the 18-3/4 15,000 psi WP

    wellhead systems depending on the load requirement:

    1 MM lb, 1.5 MM lb, and a special high-capacity tool for the

    first position hanger which provides 2 MM lb load capacity.

    These tools are installed in the casing hanger using left-hand

    makeup and right-hand release. Unlike standard systems,

    which set the seal by closing the BOP rams on the running

    string and pressuring the annulus, Camerons CHSARTs use

    pressure down the drillpipe to hydraulically set the seal.

    Annulus pressure is used only to test the seal. This hydraulic

    system generates 200,000 lb of force to set the seal and only

    requires 3500 psi fluid pressure through the drillpipe.

    Single-trip tools are also available for the XL5 wellhead

    system for the 16 and 18 casing strings and for the DW5

    wellhead system 16 casing string. A 13 CHSART is

    available for the DW5/XL5 slimline drill-through

    conversion system.

    18 CHSART16 CHSART

    Seal AssemblyRunning Tool (SART)

    Mill and Flush Tool

    12

  • Casing Hanger Seal Assembly Running Tool Operation

    13

    1.5 MM lb CHSART1 MM lb CHSART 2 MM lb CHSART

    1 MM lbCHSART

    1.5 MM lbCHSART

    2 MM lbCHSART

    PBM Seal Assembly

    PBM Seal Assembly

    PBM Seal Assembly

    STM-15 Casing Hanger

    STM-15 Casing Hanger

    STM-15 Casing Hanger

    SUBSEA SYSTEMS

  • Drill Ahead Tool

    MechanicalLockdown Tool

    High-Capacity Running Tools for STM-15 Subsea Wellhead Systems

    STM wellhead systems help reduce drilling costs

    by eliminating unnecessary trips while providing

    advanced pressure control technology with advanced,

    trip-reducing, high-capacity running tools.

    Camerons Drill Ahead Tool (DAT) allows for jetting in

    the conductor, releasing the single-piece 1 MM lb load

    capacity center stem and drilling ahead for the next

    casing string. The tool permits a two-foot pickup of

    the BHA without releasing the tool from the wellhead,

    has a 6-5/8 standard top connection and drifts

    10 collars.

    Tools for running and handling the low- and

    high-pressure wellhead housings are standard.

    Camerons Mechanical Lockdown Tool (MLT) delivers a

    2 MM lb mechanical pre-load between the low- and

    high-pressure housings with a single 180,000 lb over-

    pull, after running and landing the high-pressure

    housing and 20/22 casing.

    Installation of DW5 Wellhead Housing

    14

  • Jetting Drill Ahead

    Landed Pre-Loaded

    The center stem and BHA are released after jetting to drill ahead and retrieved with the BHA after drill out.

    A 2 MM lb pre-load is achieved with a single 180,000 lb over-pull.

    Mechanical Lockdown ToolDrill Ahead Tool

    15

    SUBSEA SYSTEMS

  • Optional Trip-Saving Running Tools

    Bit or BHA-run wear bushings and wear sleeves are available for

    all of Camerons wellhead systems, in addition to three BOP test

    tools to cover all situations for testing the BOP stack.

    There are special tools for running the primary seal, secondary

    seal and emergency seal assemblies separately from the hanger,

    along with mill and flush tools to clean debris from the seal

    area for all casing hangers.

    Stabilizer and Running Adapters

    STM Parallel Bore Metal-to-Metal (PBM) Seal

    The PBM seal is used for casing hangers in the 18-3/4 15,000 psi

    WP high-pressure housing and is interchangeable on all hangers

    in the wellhead from 13-3/8 down to 7. It is radially engaged,

    bi-directional and provides constant contact pressure on inner

    and outer sealing surfaces. The PBM seal is designed for a

    parallel sealing surface. It provides equal seal protection from

    pressures above or below. Camerons parallel bore seal design

    allows for vertical movement of the seal without affecting

    seal integrity. During laboratory testing, the seal assembly was

    moved as much as 1/4 while maintaining full test pressure of

    15,000 psi. PBM seals are rated for continuous operation in

    temperatures up to 350o F (177o C ) and can be used in H2S

    environments.

    The PBM seal assembly and high-pressure housing design

    provides for two additional contingency seals: an optional

    elastomeric seal and a standard metal-to-metal secondary seal

    that uses a protected, recessed area in the housing bore. The

    lockdown feature for the seal to the wellhead has been physi-

    cally tested to more than 1 MM lb at Camerons Technology

    Development Center in Houston, Texas.

    Standard Seal

    Housing Lock Ring

    Metal-to-MetalSeals

    Actuating Ring

    Hanger Lock Ring

    Retainer Wire

    Standard Elastomer Seal

    Metal-to-Metal Seals

    Metal-to-Metal Seals

    Standard O-Rings

    Wellhead Housing

    Recessed SecondarySeal Area

    Casing Hanger

    B

    B

    BB A

    A

    A A

    Wear Bushing

    Wear SleeveWear Bushing and Wear Sleeve Stabilizer

    Wear Bushing and Wear SleeveRunning Adapter

    16

  • Cameron offers a variety of supplemental

    hangers and running tools. In the 20 or 22

    casing strings below the high-pressure housing,

    individual adapters can be used to suspend

    and seal 16 hangers, both standard (3000 psi

    WP/500,000 lb) and high-capacity (5000 psi WP/

    1 MM lb). The XL high-pressure 16 hanger is

    rated 6500 psi WP with metal-to-metal seals and

    1 MM lb hang-off capacity. An 18 adapter and

    hanger with a 3500 psi WP elastomeric seal and

    1 MM lb hang-off capacity also is available for

    use in Camerons STM-15 Type XL5 large-bore

    subsea wellhead system.

    Supplemental Hanger Systems for STM-15 and STC-10 Subsea Wellhead Systems

    18 Supplemental Hanger

    Locked to Adapter

    Seal Assembly

    LandingShoulder

    Adapter

    Hanger

    16 xL High-PressureSupplemental Hanger

    Locked to Adapter

    Landing Shoulder

    Adapter

    Hanger

    Locked to Hanger

    PBM Seal Assembly

    16 High-CapacitySupplemental Hanger

    Locked to Hanger

    Seals

    Landing Shoulder

    Adapter

    Hanger

    LockdownRing

    STM Large Diameter Shoulder-Type Supplemental Hangers

    17

    Cameron offers a variety of shoulder adapters for

    supplemental hangers and running tools located below

    the low-pressure wellhead in the 30 or 36 conductor

    string. Weld-in shoulder type adapters and hangers can

    be used for suspension and sealing of 26 and 28

    supplemental casing strings.

    26/ 28 Receptaclew/No Flow-By

    26 Receptaclew/Horizontal Flow-By

    26 Receptaclew/Vertical Flow-By

    26/ 28 Casing Hanger

    26/ 28 Casing HangerRunning Tool

    6-5/8 Box

    4-1/2 Pin

    4-1/2 IF

    Lock Dogs

    SUBSEA SYSTEMS

  • Innovation and Quality

    CAMERON IS A LEADER IN TECHNOLOGY DEVELOPMENTCamerons Technology Development Center is located

    in Houston, Texas, and is equipped with state-of-the art

    analysis and testing equipment. Cameron engineers

    and technicians can perform a wide range of testing

    procedures on new and existing products to help ensure

    performance in the field.

    TEST LABORATORY STATE-OF-THE-ART CAPABILITIES

    Erosion A drilling fluids flow loop simulates the ero-sive effects of cuttings and sand flowing up from the well during drilling. It can circulate up to 6.2 barrels per minute at 5000 psi WP.

    Flow Loop It empirically determines the flow characteristics, Cv, of various flow control devices.

    Fatigue A load frame with a fixed tail stock on one end and a rotating spindle on the other is used for dynamic bend testing with up to 20,000 lb of deflection load to provide simulation of undersea wave action.

    Pull/Push Rams Large hydraulic rams simulate tubing and casing loads on wellhead slips and hangers or drill-pipe suspension loads on ram BOPs.

    Test Pits Two 25-ft deep floodable test pits allow as-sembly of tall equipment such as BOP stacks. With a specially constructed cover in place, they can serve as a blast mitigation chamber for higher-risks tests.

    Corrosion A salt fog cabinet is used for accelerated corrosion testing on samples. It is used for corrosive resistance evaluation of coatings, plating and corrosion inhibitors.

    Subsea Pressure The hyperbaric chamber is rated for pressures of water depths in excess of 10,000 ft (3048 m).

    Pressure Hydrostatic testing is performed with a variety of pumps capable of producing up to 40,000 psig. Gas testing is conducted in reinforced test cells with gas boosters generating up to 36,000 psig.

    Bending Two large test frames are available for structural bending and torsion tests. The larger frame can sustain up to 15 MM ft-lb of bending load.

    Temperature Extremes Several test chambers are utilized for testing at temperatures ranging from -100o F to 500o F (-73o C to 260o C).

    Hot Oil One fixed 106-kw and two portable 30-kw hot-oil circulating units produce internal bore tempera-tures up to 400o F (204o C) on products as large as a subsea BOP or as small as a 2 gate valve.

    Experimental Stress Analysis Hundreds of bonded resistance strain gauges, used primarily for empirical verification of finite element analysis, are available for use during testing.

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    1

    3

    5

    7

    9

    11

    2

    4

    6

    8

    10

    12

    18

  • CAMERON INTERNATIONAL MALAYSIA SYSTEMS CENTER OF SUBSEA WELLHEAD MANUFACTURING ExCELLENCE The Cameron International Malaysia Systems (CIMS) manufacturing facility is Camerons center of excellence for

    the manufacture of subsea wellhead systems worldwide. The plant offers unique and highly efficient systems

    and equipment specifically tailored to the production of subsea wellhead systems.

    19

    SUBSEA SYSTEMS

  • 2SUBSEA SYSTEMS

    PO Box 1212Houston, Texas 77251-1212 USATel 1.713.939.2211

    5 Mondial WayHarlingtonHayes, UB3 5AREngland, UKTel 44.208.990.1800

    Level 11, 12-14The EsplanadePerth, Western Australia6000Tel 61.8.9483.4444

    Learn more about subsea wellhead systems at:www.c-a-m.comor email:[email protected]

    HSE Policy StatementAt Cameron, we are committed ethically, financially and personallyto a working environment where no one gets hurt, nothing gets harmed.

    2011 Cameron | U BOP, STC-10 and STM-15 Subsea Wellhead Systems and PBM Seal are trademarks of Cameron. Inconel is a registered trademark of INCO. | SWP 1M | 08/11, TC9992