AmerenUE P0 Box 620 Cal/away Plant Fulton, MO 65251 July 24, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC-05529 g meen Ladies and Gentlemen: DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 10CFR50.55a REQUEST: PROPOSED ALTERNATIVE TO ASME SECTION XI REQUIREMENTS FOR REPLACEMENT OF CLASS 3 BURIED PIPING - (TAC NUMBER MD6792) References: 1. ULNRC-05434 dated August 30, 2007 2. ULNRC-05490 dated April 17, 2008 3. ULNRC-05517 dated July 10, 2008 In Reference 1 cited above, Union Electric Company (AmerenUE) submitted Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI. The relief request, which is still under review by the NRC staff, was requested to support the planned replacement of buried steel piping in Callaway's essential service water (ESW) system with high-density polyethylene (HDPE) piping. In References 2 and 3, AmerenUE responded to various questions and requests for additional information received from various NRC Branch reviewers. More recently, during a teleconference between AmerenUE and the NRC held on July 17, 2008, the NRC reviewers requested additional clarifying information. In responding to these requests, AmerenUE has revised a few pages of Enclosure 5 that was transmitted to the NRC as part of the letter submitted on July 10, 2008 (Reference 3). In the July 10, 2008 letter, Enclosure 5 provided the NRC with an updated and final version of the relief request document itself, 1OCFR50.55a Request Number I3R-10, that had been provided in the initial relief request letter submitted to the NRC on August 30, 2007 (Reference 1). As agreed upon in the July 17, 2008 teleconference (and in lieu a subsidiary of Ameren Corporation

Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

AmerenUE P0 Box 620Cal/away Plant Fulton, MO 65251

July 24, 2008

U.S. Nuclear Regulatory CommissionAttn: Document Control DeskMail Stop P1-137Washington, DC 20555-0001

ULNRC-05529

g meen Ladies and Gentlemen:

DOCKET NUMBER 50-483CALLAWAY PLANT UNIT 1

UNION ELECTRIC CO.FACILITY OPERATING LICENSE NPF-30

10CFR50.55a REQUEST: PROPOSED ALTERNATIVETO ASME SECTION XI REQUIREMENTS FOR

REPLACEMENT OF CLASS 3 BURIED PIPING - (TAC NUMBER MD6792)

References: 1. ULNRC-05434 dated August 30, 20072. ULNRC-05490 dated April 17, 20083. ULNRC-05517 dated July 10, 2008

In Reference 1 cited above, Union Electric Company (AmerenUE) submittedRelief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society ofMechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI. Therelief request, which is still under review by the NRC staff, was requested to supportthe planned replacement of buried steel piping in Callaway's essential service water(ESW) system with high-density polyethylene (HDPE) piping.

In References 2 and 3, AmerenUE responded to various questions and requests foradditional information received from various NRC Branch reviewers. More recently,during a teleconference between AmerenUE and the NRC held on July 17, 2008, theNRC reviewers requested additional clarifying information. In responding to theserequests, AmerenUE has revised a few pages of Enclosure 5 that was transmitted tothe NRC as part of the letter submitted on July 10, 2008 (Reference 3). In the July10, 2008 letter, Enclosure 5 provided the NRC with an updated and final version ofthe relief request document itself, 1OCFR50.55a Request Number I3R-10, that hadbeen provided in the initial relief request letter submitted to the NRC on August 30,2007 (Reference 1). As agreed upon in the July 17, 2008 teleconference (and in lieu

a subsidiary of Ameren Corporation

Page 2: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

ULNRC-05529July 24, 2008Page 2

of resubmitting Enclosure 5 in its entirety), only the revised pages are herebyprovided as Attachment 1 to this letter. Note that the revisions on each page havebeen highlighted.

Subsequent to the teleconference held on July 17, 2008, AmerenUE received an e-mail dated July 21, 2008 from the NRC requesting an additional clarifyinginformation item. The response to this e-mail is also attached to this current letter asAttachment 2.

There are no additional commitments made within this submittal.

If you have any questions on this letter or its attachments, please contact Mr. ScottMaglio at (573) 676-8719.

Very truly yours,

Luke H. GraessleManager, Regulatory Affairs

DJW/TBE/nls

Attachments: 1- Revised Pages of Enclosure 5 to letter ULNRC-05517dated July 10, 2008

2 - Improved Hydraulic Performance Attributed to Use of HDPEPiping

Page 3: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

ULNRC-05529July 24, 2008Page 3

cc: U.S. Nuclear Regulatory Commission (Original and 1 copy)Attn: Document Control DeskMail Stop P1-137Washington, DC 20555-0001

Mr. Elmo E. Collins, Jr.Regional AdministratorU.S. Nuclear Regulatory CommissionRegion IV611 Ryan Plaza Drive, Suite 400Arlington, TX 76011-4005

Senior Resident InspectorCallaway Resident OfficeU.S. Nuclear Regulatory Commission8201 NRC RoadSteedman, MO 65077

Mr. Mohan C. Thadani (2 copies)Licensing Project Manager, Callaway PlantOffice of Nuclear Reactor RegulationU. S. Nuclear Regulatory CommissionMail Stop O-8G14Washington, DC 20555-2738

Page 4: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

ULNRC-05529July 24, 2008Page 4

Index and send hardcopy to QA File A160.0761

Hardcopy:Certrec Corporation4200 South Hulen, Suite 630Fort Worth, TX 76109(Certrec receives ALL attachments as long as they are non-safeguards and may be publiclydisclosed.)

Electronic distribution for the following can be made via Responses and ReportsULNRC Distribution:

A. C. HeflinF. M. DiyaT. E. HerrmannS. M. MaglioT. B. ElwoodL. H. GraessleS. L. GallagherL. M. Belsky (NSRB)R. D. Myatt w/oC. R. Kiefer w/oM. D. Brandes w/oJ. E. O'Sullivan w/oG. G. Yates w/oD. J. Walker w/oMr. Ron Reynolds, Director (SEMA)Mr. Edward Gray, Senior REP Planner (SEMA)Mr. John Campbell, REP Planner (SEMA)Ms. Diane M. Hooper (WCNOC)Mr. Dennis Buschbaum (TXU)Mr. Scott Bauer (Palo Verde)Mr. Stan Ketelsen (PG&E)Mr. Scott Head (STP)Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)Mr. Floyd Gilzow (DNR)

Page 5: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

Attachment 1to ULNRC-05529

ATTACHMENT 1

REVISED PAGES OF ENCLOSURE 5TO LETTER ULNRC-05517 DATED JULY 10, 2008

Page 6: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

P = internal gage pressure coincident with given service level or loading, psiPD= internal design gage pressure at the specified design temperature. psiPE = vertical soil pressure loads due to weight cover of earth, lb/ft2

Phydro = external hydrostatic pressure, equal to earth plus groundwater pressure plus surchargeload, psiPL = vertical soil pressure due to surcharge loads, lb/ft2

R = buoyancy reduction factorS = allowable stress, psi, Table 3021-1TD= Design Temperature, deg Ft = nominal pipe wall thickness, intdesign = minimum required wall thickness, int fab min = minimum thickness in accordance with ASTM F-714tmin = pressure design thickness, inW, = weight of contents (equals 0 when empty), lb/ftWp = weight of pipe per unit length, lb/ft (exclude weight of contained liquid to represent theworst case of an empty pipe)Ww = weight of water displaced by pipe, per unit length, lb/ftc = coefficient of thermal expansion, 1/°FCSW= circumferential compressive stress in the sidewalls, psiAP = differential pressure due to negative internal pressure, psiATeq = equivalent temperature rise, deg.FEsoil = maximum soil strain due to seismic wave passageQ = ring deflection

= maximum allowable change in diameter as a per cent of the original diameter,commonly called the change in ring diameter, Table 3031-1Psaturated = density of saturated soil, lb/ft3

Pdry = density of dry soil, lb/ft3

v = Poisson ratio (0.35 for short duration loads (5 min. or less) to 0.45 for long durationloads(greater than 5 min.))

-3012 Design Life

(a) The Design Specification shall specify the design life of the system, not to exceed 50 years.

(b) The duration of load shall be specified for each load case, and the HDPE pipe physical andmechanical properties shall be based on the duration of load.

-3016 Design and Service Loading

Design loads shall be as defined in ASME Section III, ND-3112.1 through ND-3112.3, exceptthe design factor shall be 0.50. Miner's Rule in accordance with ISO 13760 shall be used toaccount for operation for 30 days at post-accident conditions and normal operating conditionsfor the balance of the 40 year design life. Loads applied to buried HDPE pipe shall be definedin the Design Specification, and shall include, as a minimum, the following:

6

Page 7: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

FaE = axial force range due to the combined effects of seismic wave passage, seismic soilmovement, and building seismic anchor motion effects, lbA = cross-section area of pipe at the pipe section where the force is calculated, inME = resultant moment range due to the combined effects of seismic wave passage, seismic soilmovement, and building seismic anchor motion effects, in-lbZ = section modulus of pipe cross section at the pipe section where the moment is calculated,in'S = allowable stress, psi, Table 3021-1

Seismic wave passage, seismic soil movement, and building seismic anchor motions shall becombined by square root sum of the squares or by algebraic sum.

Supplement 3 provides a non-mandatory method for the analysis of seismic wave passage,seismic soil movement, and building seismic anchor motion effects,

-3060 Design for Future Internal Access

Removable spools will be installed that would provide future access to the ID surfaces ineach replacement line should suitable remote examination equipment be developed.

-4000 FABRICATION AND INSTALLATION-4100 GENERAL REQUIREMENTS-4110 Scope

This Article provides the requirements for the installation of PE piping and fittings. Methodsof installation shall be by thermal fusion and flanged fittings. Use of threaded or adhesivejoints with HDPE material is not permitted. All metallic interface components will beinstalled following the requirements of ASME Section III, Subsection ND.

-4120 Examinations

[Deleted]

-4130 REPAIR OF MATERIAL

HDPE material originally accepted on delivery in which defects exceeding the limits of -2300are known or discovered during the process of fabrication or installation is unacceptable. TheHDPE material may be used provided the defective area can be physically removed from thematerial or repaired in accordance with -2300.

15

Page 8: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

AmerenUE shall maintain records of qualified fusing procedures and the fusion machineoperators qualified by them, showing the date and results of tests and the identificationmark assigned to each fusing operator. These records shall be reviewed, verified, andsigned by an authorized individual and they shall be accessible to the Authorized NuclearInspector.

-4323 Fusing Prior to Qualification

Fusing Procedure Specification (FPS) shall be qualified as required by Supplement 9 priorto their use. Only fusing operators who are qualified in accordance with -4320 andSupplement 9 shall be used.

-4324 Transferring Qualifications

The FPS qualifications and performance qualification tests for fusion machine operatorsshall not be transferred to another organization.

-4330 Requirements for Fusing Procedure Qualification Tests

-4331 Conformance to Supplement 9 Requirements

All fusing procedure qualification tests shall be in accordance with the requirements ofSupplement 9 as supplemented or modified by the requirements of this document.

-4332 Preparations of Test Coupons and Specimens

Removal of test coupons from the fusion test coupons and the dimensions of specimensmade from them shall conform to the requirements of Supplement 9.

-4340 Performance Demonstration

-4341 AmerenUE will produce six (6) fusion joint test coupons of 36NPS DR 9.5 and six(6) fusion joint test specimens of 4NPS DR 9 material on each model of fusion machinecarriage expected to be used in production for the respective size of piping as aperformance demonstration. Three (3) of these fusions on each machine will targetminimum temperature and interfacial pressure using maximum heater removal times, andthree (3) will target maximum temperature and interfacial pressure using minimal heaterremoval times - considering production limits, machine capabilities and the limits of theAmerenUE Fusion Procedure Specification.

-4342 A minimum of four (4) specimens will be cut from each fusion joint couponapproximately 90 degrees apart and tensile-tested to verify that the fusion joint is strongerthan the pipe. Testing will be performed by commercial plastics industry suppliers withouta 10 CFR 50 Appendix B quality program, but all testing will be overseen by AmerenUErepresentatives, and the test records will be retained in permanent Callaway records.

17

Page 9: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

-4343 High speed impact tensile testing for the 4NPS and 36 NPS specimens will beperformed in accordance with QF-131. If this testing is determined to be inconclusive forthe 36NPS specimens due to fast tensile machine capability and the need to test segmentedspecimens, tensile testing for the 36 NPS specimens will be performed with full-sectionspecimens consistent with ASTM Specification D638, "Standard Test Method for tensileProperties of Plastic."

-4400 RULES GOVERNING MAKING FUSED JOINTS-4410 General requirements

-4411 Identification, Storage, and Handling of HDPE Materials

AmerenUE is responsible for control of the HDPE materials that are used in the fabricationand installation of components (-4120). Suitable identification, storage, and handling ofHDPE material shall be maintained.

-4412 Cleanliness and Protection of Surfaces to Be Fused

The surfaces of the heater used for fusing shall be free of scale, rust, oil, grease, and otherdeleterious material. The work shall be protected from deleterious contamination and from rain,snow, and wind during fusing operations. Fusing shall not be performed on wet surfaces.Fusing will not be performed below 50 deg F. Any fusing performed below ambienttemperature of 50'F will require an environmental enclosure to be placed over the work area tocontrol temperature.

-4420 Rules For Making Fused Joints

-4421 Fused Joint Fit-up Requirements

(a) Components of different outside diameters shall not be fused together.

(b) The alignment of components for open butt fusion joints will be held in position bythe fusing machine, allowable surface mismatch shall be less than 10% of the minimumwall thickness of the components being fused, and the remaining joint thickness shall notbe less than the required as-fabricated minimum wall thickness per ASTM F714 - unlessevaluated and determined to be acceptable considering the remaining wall thickness

c) To fuse components with differing DR's, the component with the smaller DR shall becountered-bored and tapered to meet the wall thickness of the component with the largerDR and shall comply with Figure -4421.3-1

18

Page 10: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

dimensions and relative locations, simulating flaws expected to occur in unacceptablejoints.

(c) Personnel performing TOFD examinations will be qualified in accordance withSNT-TC-1A (Level II, minimum) or equivalent, as determined by AmerenUE.

(d) Acceptance criteria will be evaluated and refined by AmerenUE, and will bebased on industry standards (e.g. B31 piping codes). The current acceptance criteriarequire that any unbonded area in the joint, found as a result of the TOFD, is cause forrejection.

(e) All TOFD joint examination records shall be retained as permanent records.

-5300 ACCEPTANCE STANDARDS

-5310 General Requirements

Unacceptable joints shall be removed. Repair of unacceptable joints is not permitted.

-5320 VisualExamination Acceptance Criteria of external surfaces

-5321 Thermal fusion butt joints shall meet the following:

(a) Joints shall exhibit proper fusion bead configuration, see Supplement 5.

(b) There shall be no evidence of cracks or incomplete fusion.

Except for mitered joints, joints shall not be visually angled or off-set. The ovality offset shallbe less than 10% of the minimum wall thickness of the fused components provided theremaining joint thickness is not be less than the required as-fabricated minimum wall thicknessper ASTM F714 - unless evaluated and determined to be acceptable considering the remainingwall thickness.

(c) The cleavage between fusion beads shall not extend to or below the outside diameterpipe surface (see Figure -5321-1).

(d) For mitered joints, the beads may flare out instead of roll back to the pipe surface,and/or may exhibit multiple beads or heavy beads with no cleavage. In either case,there must be evidence of melt flow around the complete interior and exteriorcircumference of the joint. Refer to Supplement 5.

23

Page 11: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

((b)

Pipe (Cross Section Woew) HPE Pipe (Cross Section View)Visually Acceptable - Uniform Bead around pipe Visually Acceptable - Non-uniform Bead around pipe

(c) (d) Cleavage tip shall 11omeet or extend

t -DPE Pipe (Cross Section Wow) HOPE Pipe (Cross Section View)Visually Acceptable - Non4m[foml Bead around pipe Visually Unacceptable - Now-uniform/Ualform Bead

Localize diameter mismaltct less than 10% ol the wall around pipe - V-Groove too deep at pipe-tangent

FIGURE -5321-1

(e) Review the data acquisition record for the joint and compare it to the FusionProcedure Specification (FPS) to ensure the proper parameters and procedures werefollowed in making the fused joint, see paragraph -5330.

-5330 Process Verification

The data acquisition record for each joint shall be reviewed and compared to the FusionProcedure Specification (FPS) to ensure the proper parameters and procedures werefollowed in making the fused joint.

-5500 QUALIFICATION OF NONDESTRUCTIVE EXAMINATION PERSONNEL

-5510 General Requirements

[Deleted]

-5520 Personnel Qualification Requirements

(a) Personnel performing visual examinations required by -5200 (a) and (b) shall bequalified and certified as a VT-I in accordance with IWA-2000 and shall receive therequired training and evaluation in paragraph -5100(b) & (c).

24

Page 12: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

Attachment 2to ULNRC-05529Page 1 of 2

ATTACHMENT 2

Improved Hydraulic Performance Attributed to Use of HDPE Piping

NRC Request for Additional Clarifying Information:

In the public meeting conducted at the NRC offices on July 1, 2008, there was discussionabout the improved hydraulic performance that would be effected for the ESW system bythe HDPE piping. Provide a summary/explanation of that improved hydraulicperformance.

AmerenUE Response:

The following information is extracted from publicly available documentation (PlasticsPipe Institute - PPI- http://plasticpipe.org). The information supports the improvedhydraulic performance of HDPE pipe.

1) From the PPI Handbook for HDPE piping: "Hydraulically Efficient - For waterapplications, HDPE pipe's Hazen Williams C factor is 150 and does not changeover time. The C factor for other typical pipe materials such as PVC or ductileiron systems declines dramatically over time due to corrosion and tuberculation orbiological build-up. Without corrosion, tuberculation, or biological growth HDPEpipe maintains its smooth interior wall and its flow capabilities indefinitely toinsure hydraulic efficiency over the intended design life."

2) From PPI Technical Report TR-14, "Water Flow Characteristics OfThermoplastic Pipe":

a. "During the past 30 years, the use of thermoplastic piping in water andsewer systems has increased significantly. There are many reasons for thiswide acceptance, but one of the primary characteristics which makesthermoplastic piping attractive to designers is the low resistance to flowthat this piping offers."

b. "...a Hazen-Williams Flow Factor of 150 is recommended forthermoplastic pipes. This value is based upon laboratory tests and fieldexperience. Test results have yielded higher values in the range of 155 to165, but the use of a value of 150 is conservative in nature and, therefore,aids in providing a further factor of safety to the design."

Page 13: Callaway, Unit 1, 10CFR50.55a Request: Proposed ... · Relief Request 13R- 10 regarding paragraph IWA-422 1(b) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure

Attachment 2to ULNRC-05529Page 2 of 2

c. "Contrary to the experience with some other piping products, noallowance for corrosion and, therefore, subsequent lowering of flowcapacity, has to be included in the Tables that are used in this report. Fieldexperience in North America and Europe over the past 30 years indicatesthat the flow characteristics in older thermoplastic lines are essentiallyunchanged over time.

The use of a higher Hazen-Williams coefficient of 150 for HDPE, versus theHazen Williams coefficient of 100 for new steel piping (older piping withcorrosion typically has a lower Hazen Williams coefficient of 80-90), and the lackof corrosion for the HDPE reveals the decreased resistance to flow afforded bythe HDPE material.