CALIFORNIA’S HIGH-SPEED RAIL SYSTEM
Realizing the Vision of a High-Speed Rail System in
California
presented at
UC Berkeley CEPP
by
Roelof van Ark
May 2, 2011
AROUND THE WORLD…HIGH-SPEED RAIL AROUND THE WORLD…
…AND HERE IN CALIFORNIA
THE BASICSCalifornia’s high-speed train project
• First phase of 520 miles; 800 miles when full system is realized
• Operating speeds up to 220 mph; 90-125 mph in urban areas
• 100% clean electric power
• Safely grade-separated
• Reliable, easy way to travel
• Multi-modal transportation hubs
Environment
• Increased transportation without increased air pollution
• Decreased consumption of fossil fuels
• Land-use benefits: anti-sprawl
Mobility
• Experts agree that economic power stems from the ability to move people and goods around the state
Jobs
• 600,000 full-time, one-year, construction-related job equivalents
• 450,000 economy-wide jobs by 2035
WHY WE NEED IT
WHY WE NEED ITPopulation Growth
• California’s population now: 38 million
• By 2035: 50 million
Our state transportation needs will demand either:
• New freeways,
• New airport runways and departure gatesOR
• New modes of transportation
Annecy, 0.1
Lyon,1.4 million
Dijon, 0.2
Paris Region, 10.4 million
Marseille, 1.4 million
Grenoble, 0.4
Valence, 0.1
Geneva, 0.4
Avignon, 0.3
Besancon, 0.1
Macon, 0.1
11
2
11 1
39 8
1 1
22
Briancon, 0.1
P O P U L AT I O N & T R A I N S / H O U R P E A K D I R E C T I O N P A R I S – S E F R A N C E 2 0 0 9 & F O R E C A S T C A L I F O R N I A 2 0 3 0(Population in millions, trains/peak hour/direction in blue)
23118
San Diego, 3.5 million
Greater LA, 19.0 million
11
SF Bay Area, 6.4 million
Merced, 0.3
Fresno, 0.9
Bakersfield, 0.6
511Sacramento, 2.5 million
108
2008 – 31 million riders
2030 – 39 million ridersPhase 1+2 – 74 million riders
COMPARISONS TO INTERNATIONAL HSR SYSTEMS
P O P U L AT I O N & H S T R A I N S / H O U R I N P E A K D I R E C T I O N T O K Y O - O S A K A T O D AY & C A L I F O R N I A 2 0 3 0
High-Speed TrainsParallel Conventional Trains
(Population in millions, trains/peak hour/direction in blue)
9 7-9
Kyoto-Osaka-
Kobe, 17.2Shizuoka,1.0
Hamamatsu,1.0
11Nagoya, 9.211
5 - 9 4 4-1627
Mishima,0.5
Metro Tokyo,34.2 million
Tokyo8.8 million
12
4 - 27
61
Yokohama-Kawasaki,5.0
12
23118
San Diego, 3.5 million Greater LA,
19.0 million 11
SF Bay Area, 6.4 million
Merced, 0.3
Fresno, 0.9
Bakersfield, 0.6
511Sacramento, 2.5 million
108
2008 – 151 million Shinkansen riders, 1.7 billion conventional train riders
2030 – 39 million ridersPhase 1+2 – 74 million riders
COMPARISONS TO INTERNATIONAL HSR SYSTEMS
SUSTAINABILITY GOALSConstruction
• CHSRA is a member of EPA’s Collaborative for Sustainable Transportation and Infrastructure Construction (CSTIC)
• Maximize use of recycled/low-energy materials
• Implement construction waste management plan
• Maximize waste segregation to minimize landfill impacts
• Build energy-efficient facilities (e.g., LEED-certified stations)
• Maximize energy efficiency/GHG emissions reduction measures
SUSTAINABILITY GOALSPolicies
• Board Policy Goal: 100 percent renewable energy
SUSTAINABILITY GOALSStation Area Development Policies
•Harness the transformative power of HSR
•Context-sensitive station design for development
•Solve for a pedestrian scale
•Balance all the access modes
•Plan around the station for TOD
Station Areas
Paris station
Madrid Station
WHERE WE ARE NOWTransitioning from Planning to Implementation
Undergoing NEPA/CEQA review in all project sections• Central Valley sections (Merced-Fresno, Fresno-Bakersfield) are
completing scoping and the analysis of alternative alignments and will publish Draft EIR documents by mid-2011.
• On track to secure environmental clearance by early 2012.
• All seven Phase 1 sections continue to do environmental analyses.
• Receiving public input on all alignments.
Building toward construction• RFEI followed by RFQ by mid-2011
with RFPs in early 2012.
• Begin awarding construction contracts in the second half of 2012
• Authority staffing up for current/future needs.
CURRENT FUNDING SUMMARY
Current funding totals nearly $6 billion plus potential for up to $2 billion additional from Florida reallocation and matching funds
FUNDING SOURCE
FEDERALAWARD
STATEMATCH
TOTAL
ARRAJan. 2010
$1.85 billion
$1.85 billion
$3.7 billion
HSIPRFederal FY 10-11Oct. 2010
$715 million
$306million
$1.02 billion
ARRADec. 2010
$616 million
$616 million
$1.234 billion
INITIAL CONSTRUCTIONStarting in the Central Valley
• Only section where California’s HST system will travel 220-mph maximum operating speed for long periods of time (enabling the two-hour, 40-minute requirement for trip time between LA and San Francisco)
• Initial track in the Central Valley will serve as testing and proving ground for new high-speed train technology in the United States
• Less expensive land and less complex engineering in the Valley
• Near-term job creation benefits (conservative estimate of 100,000 jobs –direct and indirect – over life of the first $5.5 billion in construction)
The foundation for true high-speed rail
FIRST PASSENGER TRAINSBuilding Outward North/South
Must expand initial construction into an “Initial Operating Section” • Will require additional track
built north and south of the Central Valley
Top EIR priority• Fresno-Bakersfield• Merced-Fresno
Next priority• San Jose-Merced• Bakersfield-Palmdale• Palmdale-Los Angeles
Initial Operating Section plans to be reviewed by Legislature
6.4 M current population
4.2 M current population
19 M current population
STAYING UP TO SPEED
Contact Info
– California High-Speed Rail Authority
– 770 L St., Suite 800 Sacramento, CA 95814
– 916-324-1541
– www.cahighspeedrail.ca.gov
– Join the conversation on Twitter, Facebook, Flickr and Posterous