Calibration Order Scenario: PM – QM Integration Calibration Equipment

CalibrationOrderScenario_ZPM5

  • Upload
    rama-y

  • View
    10

  • Download
    1

Embed Size (px)

Citation preview

Page 1: CalibrationOrderScenario_ZPM5

Calibration Order Scenario: PM – QM Integration

Calibration Equipment

Page 2: CalibrationOrderScenario_ZPM5

General task List (IA06)

Page 3: CalibrationOrderScenario_ZPM5

QM Data – Inspection points setup in the Header as shown above

Page 4: CalibrationOrderScenario_ZPM5

MIC assigned for the Operation as displayed.

Now create a Maintenance plan – For the Calibration Equipment (IP01)

Page 5: CalibrationOrderScenario_ZPM5

Assign the General task list for the Plan (We can also Equipment task lists as well)

Page 6: CalibrationOrderScenario_ZPM5

Scheduling overview: (IP24)

Now lets simulate Calibration orders for future dates for running IP30.

Page 7: CalibrationOrderScenario_ZPM5

As I ran the simulation for 400 days – I had got the above order generated.

Lets view the scheduling overview…IP24

Page 8: CalibrationOrderScenario_ZPM5

See orders generated till March 2018.

Lets release the order and do next steps.

IW32

Page 9: CalibrationOrderScenario_ZPM5

Order is in created status and I see no inspection lot generated.

Release the order now..

Save.

Page 10: CalibrationOrderScenario_ZPM5

Open the order again. An inspection lot should be generated. (PM-QM Integration)

Lets view the inspection lot…

Page 11: CalibrationOrderScenario_ZPM5

Inspection lot got generated for the order against the Equipment.

Now We need to do Result Recording and Usage Decision against the Inspection lot.

PM – QM Integration:

There are ways to do the RR & UD:

QE51N

Page 12: CalibrationOrderScenario_ZPM5

Result Recording…

Enter your results against each MIC

Page 13: CalibrationOrderScenario_ZPM5
Page 14: CalibrationOrderScenario_ZPM5
Page 15: CalibrationOrderScenario_ZPM5

We see the lot status as Results confirmed.

Now lets do the UD:

Page 16: CalibrationOrderScenario_ZPM5

Click Save

Page 17: CalibrationOrderScenario_ZPM5

Click OK

Prompts to Order confirmation screen.

Page 18: CalibrationOrderScenario_ZPM5

Enter work hours and save.

Lets go the order and see the status.

Page 19: CalibrationOrderScenario_ZPM5

Order got CNF Confirmed.

See the Inspection Lot status:

Page 20: CalibrationOrderScenario_ZPM5

RR & UD has been made.

Page 21: CalibrationOrderScenario_ZPM5

CASE II : Negative Scenario Test (when my results are out of limits)

Lets take order with inspection lot – 140000000356

Lets do RR & UD

Page 22: CalibrationOrderScenario_ZPM5
Page 23: CalibrationOrderScenario_ZPM5

I had recorded failure results here. As we see above

Page 24: CalibrationOrderScenario_ZPM5

Am selecting – Reject – Out of Tolerance

No do the UD

Page 25: CalibrationOrderScenario_ZPM5
Page 26: CalibrationOrderScenario_ZPM5
Page 27: CalibrationOrderScenario_ZPM5

Save the order.

If you wanna rework on the Order – As we see PCNF.

We can add an another step to install an new Equipment in our operation

Page 28: CalibrationOrderScenario_ZPM5
Page 29: CalibrationOrderScenario_ZPM5
Page 30: CalibrationOrderScenario_ZPM5

Now you can TECO this order.

Note: (order would not be copied to Inspection lot as we the results have failed)