External Calibraration USER MANUAL – PM& QM External Calibration First of all create Maintenance Strategy to use for Instrument Calibration T-code – IP11 Following page will appear. Enter relevant data in the fields as shown below. Title : External Preventive Maintenanc e (Calibration) Page 1 of 29

Calibration External

Embed Size (px)

Citation preview

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 1/29

External Calibraration

USER MANUAL – PM& QM

External Calibration

First of all create Maintenance Strategy to use for Instrument Calibration

T-code – IP11

Following page will appear. Enter relevant data in the fields as shown below.

Title : External Preventive Maintenance (Calibration)  Page 1 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 2/29

External Calibraration

USER MANUAL – PM& QM

Click on New Entries to create new strategy or select any existing strategy bydrilling down the drill key.

Title : External Preventive Maintenance (Calibration)  Page 2 of 29

Click here tomake new entry

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 3/29

External Calibraration

USER MANUAL – PM& QM

 

Create ,newstrategyHARSH asfollow.Duration of 

maintenance or calibration is given in days or months as shown below.

Save the above strategy after creation.

Title : External Preventive Maintenance (Calibration)  Page 3 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 4/29

External Calibraration

USER MANUAL – PM& QM

Create Equipment Task List using T-code IA01, as follw. Assign equipment no bydrill down of the drill key.

Title : External Preventive Maintenance (Calibration)  Page 4 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 5/29

External Calibraration

USER MANUAL – PM& QM

Press Enter, following page will appear. Fill up the appropriate data in the fields like– work center –EXTERNAL, Usage- 4, Status – 4 and Maintenance Strategy, as

shown below.

Click on Operation tab in the header and following page will appear.

Title : External Preventive Maintenance (Calibration)  Page 5 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 6/29

External Calibraration

USER MANUAL – PM& QM

Fill up data like – Cost element, Material group (GP), Purchase group (PG) ,

Vendor, Purchase Organization etc.

Click on Maintenance Package as shown on the left side. It will be

attached to the equipment.

Title : External Preventive Maintenance (Calibration)  Page 6 of 29

MaintenancePackage

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 7/29

External Calibraration

USER MANUAL – PM& QM

Select the Operation and tick in the Maintenance Package field . press Enter and

Save the document.

Title : External Preventive Maintenance (Calibration)  Page 7 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 8/29

External Calibraration

USER MANUAL – PM& QM

System will indicate that the document has been saved as follow.

Title : External Preventive Maintenance (Calibration)  Page 8 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 9/29

External Calibraration

USER MANUAL – PM& QM

Create Maintenance Plan using T-code IP42. Following page will appear. Fill upmaintenance text as shown below.

Fill up the relevant data in the required fields as shown below. Click on Task listsymbol and it will be attached automatically.

Title : External Preventive Maintenance (Calibration)  Page 9 of 29

Click here for Task list

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 10/29

External Calibraration

USER MANUAL – PM& QM

Fill up corresponding data in the fields and Enter. System will demand for Start dateof maintenance work , as shown in the small table.

Following portion is the upper part of the above section of the same page. Fill upStart date, Call date and duration of maintenance package as shown below.

Title : External Preventive Maintenance (Calibration)  Page 10 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 11/29

External Calibraration

USER MANUAL – PM& QM

Enter and Save the Document. System will save it with specific no for themaintenance plan.

Now go to Schedule Maintenance Plan as follows.

T-code – IP10

Title : External Preventive Maintenance (Calibration)  Page 11 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 12/29

External Calibraration

USER MANUAL – PM& QM

Initial page will appear as follow with Plan no.

Press Enter.

Title : External Preventive Maintenance (Calibration)  Page 12 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 13/29

External Calibraration

USER MANUAL – PM& QM

Following page will appear. Click on Start tab in the header on the left side.

Following page will appear and system will ask for Start of cycle date. Enter thedate and Enter.

Title : External Preventive Maintenance (Calibration)  Page 13 of 29

Start tab

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 14/29

External Calibraration

USER MANUAL – PM& QM

Following page will appear showing schedule and schedule calls for the whole year.

Select the Operation line and click on Flag at the bottom to release the call.

Title : External Preventive Maintenance (Calibration)  Page 14 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 15/29

External Calibraration

USER MANUAL – PM& QM

Enter and save the document. Following message will appear with Plan no.

Use T-code IW32, following page will appear, enter P. M. Order by drilling drill

down key against Order.

Press Enter and following page will appear. System will show status of P. M Ordercreation. Enter short text for equipment maintenance as shown follow.

Title : External Preventive Maintenance (Calibration)  Page 15 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 16/29

External Calibraration

USER MANUAL – PM& QM

Release the Order, by clicking on Flag icon in the header on the left side. Systemwill show status of the order as released as shown in the following page.

Title : External Preventive Maintenance (Calibration)  Page 16 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 17/29

External Calibraration

USER MANUAL – PM& QM

Now save the P. M Order, following message will appear with P. M. Order.

Title : External Preventive Maintenance (Calibration)  Page 17 of 29

Released

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 18/29

External Calibraration

USER MANUAL – PM& QM

Again enter T-code IW32 for P. M. Order over view. Click on Operation tab andselect Operation line. Now click on Activate Data at the bottom as shown below.

Title : External Preventive Maintenance (Calibration)  Page 18 of 29

Activate data

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 19/29

External Calibraration

USER MANUAL – PM& QM

Following page will appear, which shows Requisition no 100000168.

Title : External Preventive Maintenance (Calibration)  Page 19 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 20/29

External Calibraration

USER MANUAL – PM& QM

Create Purchase Order as follow.

T-code – ME21N

Following page appear. Now enter Purchase Order type and Vendor name asshown.

Select Document Overview tab in the header on the left side in the above table.Hierarchy tab will appear on the left side. Click on Variant symbol above Hierarchyand following page will appear

As shown in the following page, Purchase Requisition no and Operation no willappear on the left side.

Select Operation no 10 and click on Adopt symbol. System will ask to fill up taxcode, as shown at the bottom of the page.

Title : External Preventive Maintenance (Calibration)  Page 20 of 29

Variant symbol

Symbol of Adopt

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 21/29

External Calibraration

USER MANUAL – PM& QM

Press Enter and save the Document. P. O. has been created with no as shownfollow.

Title : External Preventive Maintenance (Calibration)  Page 21 of 29

Operation no.

Tax code

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 22/29

External Calibraration

USER MANUAL – PM& QM

Create Service Entry sheet using T-code ML81N. Click on Other Purchase Orderin the Header on the left side. A small table will appear as shown on the left side.

Now enter Purchase Order no. by drilling down key against Purchase Order.

So Now select Operation line and double click on Services in the header on the leftside.

Title : External Preventive Maintenance (Calibration)  Page 22 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 23/29

External Calibraration

USER MANUAL – PM& QM

Following page will appear. It will show Entry sheet no., Purchase Order no withstatus of No acceptance, as shown below.

Now press F1 or Click on Flag icon in the header for acceptance of Entry sheet.

Title : External Preventive Maintenance (Calibration)  Page 23 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 24/29

External Calibraration

USER MANUAL – PM& QM

Status will change from No acceptance to Will be accepted as shown below.

Now save using Control + S or click on Save icon. System will save it and followingmessage will appear with the Document no.

Title : External Preventive Maintenance (Calibration)  Page 24 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 25/29

External Calibraration

USER MANUAL – PM& QM

To check Service entry sheet no. and verification of FI Document (Invoice), createMIRO using T-code MIRO as follow.

T- code – MIRO

Enter Invoice date, Tick on Calculate tax tab and enter Amount on the left handside .also enter Bracket symbol as shown.

Press enter and Save the Document. It will be saved and Document no. will appearat the bottom as shown below.

Title : External Preventive Maintenance (Calibration)  Page 25 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 26/29

External Calibraration

USER MANUAL – PM& QM

Title : External Preventive Maintenance (Calibration)  Page 26 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 27/29

External Calibraration

USER MANUAL – PM& QM

To verify document in MIGO , create the same using T-code MIGO as follow. Nowenter Material Document no. as shown below.

Now create MIGO

T-code – MIGO

Now to see detail of account. Click on FI Document as shown below.

Title : External Preventive Maintenance (Calibration)  Page 27 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 28/29

External Calibraration

USER MANUAL – PM& QM

Title : External Preventive Maintenance (Calibration)  Page 28 of 29

8/3/2019 Calibration External

http://slidepdf.com/reader/full/calibration-external 29/29

External Calibraration

USER MANUAL – PM& QM

To see actual cost document , select in List of Documents in Accounting and double

click on Controlling Document. Following page will appear, depicting actual amountused.