Caldwell County, North Carolina
Capital Improvement Plan
BUILDING A BETTER FUTURE FOR
THE CITIZENS OF CALDWELL
COUNTY
PROGRESS THROUGH PLANNING
Water Fund Summary
General Fund Summary
Water Fund Detail pages 7-14
Buildings and Grounds Detail pages 15-29
Emergency Services pages 30-36
Animal Shelter pages 37-38
Sheriff's Office pages 39-40
Information Technology pages 41-42
TABLE OF CONTENTS
TODAY WE LAY THE
FOUNDATIONS FOR A BETTER
TOMORROW
CALDWELL COUNTY, NORTH CAROLINA
SUMMARY OF CAPITAL IMPROVEMENT PLAN
Project Description Source of Funds 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 Five Year Total
Water - Cedar Rock Tank Water Fund - - - - 528,000 528,000
Water - Draco Tank Water Fund - - 200,000 - - 200,000
Water - Electronic Read Meters Water Fund 410,000 410,000 410,000 - - 1,230,000
Water - Equipment Replacement Water Fund - - - 170,000 - 170,000
Water - Temple Hill Tank Water Fund 1,182,000 - - - - 1,182,000
Water - West Tank Water Fund - 1,078,800 - - - 1,078,800
Water - Vehicle Replacements Water Fund 142,000 - - 35,000 - 177,000
1,734,000$ 1,488,800$ 610,000$ 205,000$ 528,000$ 4,565,800$
Cash Balance as of 06/30/2016 (projected) 6,800,000$
Add Cash Flow from Operations 600,000 600,000 600,000 600,000 600,000
Deduct CIP Spending (1,734,000) (1,488,800) (610,000) (205,000) (528,000)
Running Cash Balance 5,666,000$ 4,777,200$ 4,767,200$ 5,162,200$ 5,234,200$
CALDWELL COUNTY, NORTH CAROLINA
SUMMARY OF CAPITAL IMPROVEMENT PLAN
Project Description Source of Funds 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 Five Year Total
Buildings and Grounds
Convenience Site Mount Herman General Fund 70,000 - - - - 70,000
Convenience Site Railings General Fund - 15,000 15,000 15,000 - 45,000
Court House Boiler General Fund 185,000 - - - - 185,000
Court House HVAC General Fund 10,000 - - - - 10,000
Cook Building HVAC General Fund - 5,000 - - - 5,000
Courthouse Holding Cells General Fund 425,000 - - - - 425,000
Cook Building Gutters General Fund - 10,000 - - - 10,000
Court House Door Locks General Fund 15,000 5,000 5,000 5,000 - 30,000
Health and Human Services Buildng HVAC General Fund - 90,000 90,000 90,000 - 270,000
Health and Human Services Buildng Road General Fund 350,000 - - - - 350,000
Lenoir Library Elevator General Fund - 5,000 - - - 5,000
Library - Lenoir (boiler replacement) General Fund 23,000 - - - - 23,000
Library - Lenoir (painting) General Fund - 30,000 - - - 30,000
Library - Lenoir (HVAC controls) General Fund - 25,000 25,000 25,000 - 75,000
Library - Lenoir (floor tiles) General Fund - 20,000 10,000 10,000 - 40,000
Library - Hudson (carpet) General Fund - 15,000 - - - 15,000
Total Buildings and Grounds 1,078,000 220,000 145,000 145,000 - 1,588,000
EMS
EMS Base Borrowing 1,200,000 - - - - 1,200,000
EMS Power Stretchers General Fund 210,834 - - - - 210,834
EMS - Heart Monitor General Fund 37,000 37,000 37,000 37,000 37,000 185,000
EMS- Lucas Device General Fund 16,000 16,000 16,000 16,000 16,000 80,000
Emergency Management Vehicle Replacement General Fund - - - 60,000 - 60,000
Fire Marshal Vehicle Replacements General Fund 57,972 - - 60,000 - 117,972
EMS Ambulance Replacements General Fund 380,000 230,000 230,000 250,000 250,000 1,340,000
EMS Vehicle Replacements General Fund - 60,000 - - 60,000 120,000
Total EMS 1,901,806 343,000 283,000 423,000 363,000 3,313,806
CALDWELL COUNTY, NORTH CAROLINA
SUMMARY OF CAPITAL IMPROVEMENT PLAN
Project Description Source of Funds 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 Five Year Total
Animal Shelter Borrowing - 3,000,000 - - - 3,000,000
Sheriff's Office
Sheriff Evidence Room Expansion General Fund 100,000 - - - - 100,000
Sheriff Camera System for Jail General Fund 77,190 - - - - 77,190
Sheriff Vehicle Replacements General Fund 289,100 295,000 300,000 305,000 310,000 1,189,100
Total Sheriff 466,290 295,000 300,000 305,000 310,000 1,366,290
General Government
Board of Elections Voting Machines General Fund 181,563 - - - - 181,563
Building Inspections General Fund 48,800 - - - - 48,800
Communications Radio Consolettes General Fund 50,000 - - - - 50,000
Social Services Vehicle Replacements General Fund 36,080 - - - - 36,080
xl 316,443 - - - - 316,443
Information Technology
Information Technology - Vehicle General Fund - 24,000 - - - 24,000
Information Technology - HHS Phone System General Fund - 315,000 - - - 315,000
Total Information Technology - 339,000 - - - 339,000
General Fund Items Total 3,762,539$ 4,197,000$ 728,000$ 873,000$ 673,000$ 9,923,539$
School System - Granite Falls Middle School Borrowing -$ -$ 17,000,000$ -$ -$ 17,000,000$
Water Fund Items Total (see previous page) 1,734,000$ 1,488,800$ 610,000$ 205,000$ 528,000$ 4,565,800$
Grand Total 5,496,539$ 5,685,800$ 18,338,000$ 1,078,000$ 1,201,000$ 31,489,339$
Water Fund
DIVISION: Public Utilities
DEPARTMENT: Water
PROJECT TITLE: Cedar Rock Tank & Pump Station
PROJECT LOCATION: Cedar Rock / Eagle Heights
Cedar Rock Tank.
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
Water Fund / Grants 528,000 528,000
TOTAL -$ -$ -$ -$ 528,000$ 528,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
1. Upgrade to Cedar Rock pump station and ground storage tanke
2. Installation of air release valves on the higher points of elevation. This will assist and maximizing the usage of
page 8 of 42
DIVISION: Public Utilities
DEPARTMENT: Water
PROJECT TITLE: Draco Tank Improvements
PROJECT LOCATION: Draco Road
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
Water Fund / Grants 200,000 200,000
TOTAL -$ -$ 200,000$ -$ -$ 200,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
1. installation of automatic valves at the master meters which will allow the system to float off the Draco Tank. The automatic
timeres would elminate stagnant water or in the event of a fire in the system to maximize the use of the water tank
page 9 of 42
DIVISION: Public Utilities
DEPARTMENT: Water
PROJECT TITLE: Electronic Read Meters
PROJECT LOCATION: County Water System
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
Water Fund / Grants 410,000 410,000 410,000 1,230,000
TOTAL 410,000$ 410,000$ 410,000$ -$ -$ 1,230,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
1. Converting all water meters to electronic read capability would improve the accuracy of the utility billing and meter reading
process. With the installation of radio read meters the liability for accidents is reduced.
page 10 of 42
DIVISION: Public Utilities
DEPARTMENT: Water
PROJECT TITLE: Equipment
PROJECT LOCATION: Water Department
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
Water Fund / Grants 170,000 170,000
TOTAL -$ -$ -$ 170,000$ -$ 170,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
1. Replacement of a 1970 Trackhoe
page 11 of 42
DIVISION: Public Utilities
DEPARTMENT: Water
PROJECT TITLE: Vehicles
PROJECT LOCATION: Water Department
2. Replace service truck given to maintenance department
4. Replace service truck
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
Water Fund 102,000 102,000
Water Fund 40,000 35,000
TOTAL 142,000$ -$ -$ 35,000$ -$ 102,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
1. Replace a heavy duty service truck
3. Replace small service truck
page 12 of 42
DIVISION: Public Utilities
DEPARTMENT: Water
PROJECT TITLE: Temple Hill Tank (southeast)
PROJECT LOCATION: Water Department
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
Water Fund / Grants 1,182,000 1,182,000
TOTAL 1,182,000$ -$ -$ -$ -$ 1,182,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Install new tank at the Temple Hill site to serve the southeastern portion of the water sysm
page 13 of 42
DIVISION: Public Utilities
DEPARTMENT: Water
PROJECT TITLE: West Tank
PROJECT LOCATION: Water Department
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
Water Fund / Grants 1,078,800 1,078,800
TOTAL -$ 1,078,800$ -$ -$ -$ 1,078,800$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Installation of a new tank to serve the western portion of the water system
page 14 of 42
Buildings and Grounds
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Lenoir Library Boiler
PROJECT LOCATION: Lenoir
Replace Boiler at Library
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 23,000 23,000
TOTAL 23,000$ -$ -$ -$ -$ 23,000$
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
PLANNED FINANCING OF PROJECT
page 16 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Lenoir Library Paint
PROJECT LOCATION: Lenoir
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 30,000 30,000
TOTAL -$ 30,000$ -$ -$ -$ 30,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Painting of the main floor of the Lenoir Library. This will need to be completed by a professional painting company that can do the work
quickly to avoid closing the library.
page 17 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Lenoir Library Electronic Controls
PROJECT LOCATION: Lenoir
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 25,000 25,000 25,000 75,000
TOTAL -$ 25,000$ 25,000$ 25,000$ -$ 75,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
In order to maximize the operations of the chiller and boiler, the controls and thermostats need upgrading. The controls that are operating
the heating and air conditioning are approximately 40 years old. Throughout the years, various HVAC changes have been but no work has
been done to renovate the controls.
page 18 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Lenoir Library Tile Flooring
PROJECT LOCATION: Lenoir
1. Replace tile flooring in Entry Way of Library
2. Replace tile flooring Downstairs of Library
3. Replace tile in both Women’s and Men’s restrooms
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 20,000 10,000 10,000 40,000
TOTAL -$ 20,000$ 10,000$ 10,000$ -$ 40,000$
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Flooring is worn and needs replacing. The restrooms are original to the building. Upgrades are needed to insure the bathrooms are clean.
The restrooms at the Library have been overlooked for years.
PLANNED FINANCING OF PROJECT
page 19 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Lenoir Library Elevator
PROJECT LOCATION: Lenoir
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 5,000 5,000
TOTAL -$ 5,000$ -$ -$ -$ 5,000$
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Upgrade elevator doors to replace the existing obsolete mechanical door edge with the newest technology, infrared door scanner
PLANNED FINANCING OF PROJECT
page 20 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Library Carpet - Hudson Branch
PROJECT LOCATION: Hudson
Replace carpet in the Hudson Library.
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 15,000 15,000
TOTAL -$ 15,000$ -$ -$ -$ 15,000$
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
PLANNED FINANCING OF PROJECT
page 21 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Cook Building Gutters
PROJECT LOCATION: Cook Building
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 10,000 10,000
TOTAL -$ 10,000$ -$ -$ -$ 10,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Gutters have rusted and fallen off. New gutters need to be added to protect the building.
page 22 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Cook Building HVAC
PROJECT LOCATION: Cook Building
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 5,000 5,000
TOTAL -$ 5,000$ -$ -$ -$ 5,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Add heat in areas where employees work to stack electronics
page 23 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Convenience Site Railings
PROJECT LOCATION: Convenience Sites
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 15,000 15,000 15,000 45,000
TOTAL -$ 15,000$ 15,000$ 15,000$ -$ 45,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Installation of guard posts and safety railings at all the convenience sites
page 24 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Courthouse Boiler
PROJECT LOCATION: Courthouse
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 185,000 185,000
TOTAL 185,000$ -$ -$ -$ -$ 185,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Replace boiler at the Courthouse
page 25 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Courthouse HVAC
PROJECT LOCATION: Courthouse
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 10,000 10,000
TOTAL 10,000$ -$ -$ -$ -$ 10,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Replace HVAC at the Courthouse
page 26 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Courthouse Holding Cells
PROJECT LOCATION: Courthouse
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 425,000 425,000
TOTAL 425,000$ -$ -$ -$ -$ 425,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Renovate a portion of the courthouse to create additional holding cells for inmates ready for trial.
page 27 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Health and Human Services Building HVAC
PROJECT LOCATION: Health and Human Services Building
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 90,000 90,000 90,000 270,000
TOTAL -$ 90,000$ 90,000$ 90,000$ -$ 270,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Replacement of HVAC Unit
page 28 of 42
DIVISION: Public Utilities
DEPARTMENT: Buildings and Grounds
PROJECT TITLE: Health and Human Services Building Entrance Road
PROJECT LOCATION: Health and Human Services Building
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 350,000 350,000
TOTAL 350,000$ -$ -$ -$ -$ 350,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Construct new entrance road for the Health and Human Services Building that will connect with the existing stoplight.
page 29 of 42
EMERGENCY SERVICES
DIVISION: Emergency Services
DEPARTMENT: EMS
PROJECT TITLE: Ambulance Replacements
PROJECT LOCATION: Various
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 380,000 230,000 230,000 250,000 250,000 1,340,000
(2 GMC) (1 Ford) (1 Int'l) (1 FHL) (1 FHL)
TOTAL 380,000$ 230,000$ 230,000$ 250,000$ 250,000$ 1,340,000$
PLANNED FINANCING OF PROJECT
DESCRIPTION AND JUSTIFICATION
PROJECT DETAIL
In accordance with the vehicle replacement policy made effective July 1, 2015 the vehicles noted below will meet the threshold for
replacement over the next 5 years due to the following:
Ambulances reaching 250,000 mile threshold: FY17/18 - Ambulance 10 (2007 GMC), Ambulance 11 (2007 GMC); FY18/19 -
Ambulance 8 (2007 Ford); FY19/20 – Ambulance 16 (2004 International); FY20/21 Ambulance 9 (2014 Freightliner); FY21/22
Ambulance 12 (2015 Freightliner)
**Costs below are estimated and shown at new apparatus cost. The potential for remounts remain, and should be utilized when
available. Cost of a remount should reflect a decrease of approx. $20-30k/unit. In FY17/18 the potential for obtaining reserve units
to replace A10 and A11 from Lovelady Rescue Squad will reduce the CIP of Apparatus substantially. Potentially by $380,000+/-
.Decreased downtime in primary units due to efficiency may allow for a break in CIP purchasing in FY19/20 thus decreasing overall
cost of CIP an additional 230,000.
page 31 of 42
DIVISION: Emergency Services
DEPARTMENT: EMS
PROJECT TITLE: Facility Replacement
PROJECT LOCATION: TBD
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
Sales Tax 1,200,000 1,200,000
Reinvestment Fund
TOTAL 1,200,000$ -$ -$ -$ -$ 1,200,000$
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Proceed with facility replacement plan for current Lenoir EMS Base at 616 W. Ave NW, Lenoir, NC at the identified locations on Taylorsville Rd.
in the Lower Creek Community of Lenoir, and on Clarke Dr. in the Valmead Community of Lenoir. Financing of said project an option, reflected
below is a total cost estimate of completing facilities.
**The plan of the Office of Emergency Services is to develop a finance plan with Caldwell County Finance Department to spread the cost of the
project over a period of time TBD by the Finance Officer.
PLANNED FINANCING OF PROJECT
page 32 of 42
DIVISION: Emergency Services
DEPARTMENT: EMS
PROJECT TITLE: Vehicle Replacement
PROJECT LOCATION: Various
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 60,000 60,000 120,000
TOTAL -$ 60,000$ -$ -$ 60,000$ 120,000$
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
In accordance with the vehicle replacement policy made effective July 1, 2015 the vehicles noted below will meet the threshold for
replacement over the next 5 years due to the following:
Quick Response Vehicles reaching the 135,000 mile threshold for emergency use and/or the 150,000 mile surplus threshold: FY19/20 2009
Chevrolet Pickup; FY21/22 2014 Chevrolet Tahoe
PLANNED FINANCING OF PROJECT
page 33 of 42
DIVISION: Emergency Services
DEPARTMENT: EMS
PROJECT TITLE: Stryker Power-LOAD™ Stretchers
PROJECT LOCATION: Various
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 210,834 Included with Included with Included with Included with 210,834
new unit new unit new unit new unit
TOTAL 210,834$ -$ -$ -$ -$ 210,834$
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Requested continuation of replacement plan of current Stryker manual stretchers with the Stryker Power-LOAD™ System in an attempt to
decrease the number of on the job injuries and workload on current pre-hospital emergency staff. The Power-LOAD™ cot fastener system lifts
and lowers the cot into and out of the ambulance, reducing spinal loads and the risk of cumulative trauma injuries.
**The potential exists for completion of project in FY17/18 by financing total cost of project in single year or over multiple years by coupling
with a Capital Improvement Loan.
PLANNED FINANCING OF PROJECT
Suggested implementation plan is to continue to purchase three (3) systems in FY17/18, and two (2) systems in FY18/19 for a total of seven (7)
systems to outfit current apparatus. The system will also be included in apparatus specs to complete the process in all transport units within
the fleet.
page 34 of 42
DIVISION: Emergency Services
DEPARTMENT: Fire Marshal
PROJECT TITLE: Vehicle Replacement
PROJECT LOCATION: Various
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 57,972 60,000 117,972
TOTAL 57,972$ -$ -$ 60,000$ -$ 117,972$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
In accordance with the vehicle replacement policy made effective July 1, 2015 the vehicles noted below will meet the threshold for
replacement over the next 5 years due to the following:
Quick Response Vehicles reaching the 135,000 mile threshold for emergency use and/or the 150,000 mile surplus threshold: FY17/18 2000
Ford; FY19/20 2009 Chevrolet Pickup;
page 35 of 42
DIVISION: Emergency Services
DEPARTMENT: Emergency Management
PROJECT TITLE: Vehicle Replacement
PROJECT LOCATION: Various
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 60,000 60,000
TOTAL -$ -$ -$ 60,000$ -$ 60,000$
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
In accordance with the vehicle replacement policy made effective July 1, 2015 the vehicles noted below will meet the threshold for
replacement over the next 5 years due to the following:
Quick Response Vehicles reaching the 135,000 mile threshold for emergency use and/or the 150,000 mile surplus threshold: FY17/18
requested Capital for new position; FY20/21 Ford Expedition;
PLANNED FINANCING OF PROJECT
page 36 of 42
ANIMAL SHELTER
DIVISION: Health Department
DEPARTMENT: Animal Control
PROJECT TITLE: Animal Shelter Facility
PROJECT LOCATION: TBD
Managing volume of animals
Holding period for strays
Ambient temperature control
Cleaning and maintenance (walls are deteriorating and floors are cracked in current facility)
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
TBD 3,000,000 3,000,000
TOTAL -$ 3,000,000$ -$ -$ -$ 3,000,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
Current facility requires significant repair and/or renovation with the addition of 10 kennels in order to meet NCDA requirements including:
Separation of adoption area would help reduce risk of disease transmission and promote safety. Additional kennels for rescues and other
adoptable animals. Improved design would promote efficiency re: animal intake, vaccinations, grooming/bathing, transports and euthanasia.
Current property lease expires January 10, 2025.
page 38 of 42
SHERIFF'S OFFICE
DIVISION: Sheriff's Office
DEPARTMENT: Patrol
PROJECT TITLE: Vehicle Replacement Schedule
PROJECT LOCATION: Sheriff's Office
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 289,100 295,000 300,000 305,000 310,000 1,499,100
TOTAL 289,100$ 295,000$ 300,000$ 305,000$ 310,000$ 1,499,100$
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
In order to maintain a safe and effective fleet of emergency response vehicles at the sheriff’s office it is necessary to replace older high
mileage units on a regular basis. To meet that goal we propose to replace an average of 7 vehicles per year. This number may fluctuate
from year to year and will be based on the existing vehicle policy so that only vehicles that meet the current threshold are replaced each
year. The funding for this program will come from the general fund and be a part of the annual appropriation.
PLANNED FINANCING OF PROJECT
page 40 of 42
INFORMATION TECHNOLOGY
FOR DEPARTMENT OF SOCIAL SERVICES
DIVISION: Information Technology
DEPARTMENT: Health and Human Services Building
PROJECT TITLE: Phone System Replacement
PROJECT LOCATION: Health and Human Services Building
FIVE YEAR
SOURCE OF FUNDS 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 TOTAL
General Fund 212,625 212,625
-
DSS 50% -
Reimbursement 102,375 102,375
TOTAL -$ 315,000$ -$ -$ -$ 315,000$
PLANNED FINANCING OF PROJECT
PROJECT DETAIL
DESCRIPTION AND JUSTIFICATION
This project is the replacement of our current EON phone system that services the DHHS
Our current system has been in place for 16 years, which is 7 years past its expected life cycle of 9 years. The total would allow us to
replace the current system, as well as all the phones, and network switches, with a modern IP based system with more functionality. Our
department’s main fear is that the old system will die and getting a replacement system on short notice would be even more expensive.
As DSS utilizes 65% of the phone system, their portion of the system would be $204,750. The state 50% reimbursement would pay
$102,375. The remaining $212,625 would come from general funds.
page 42 of 42