Calculating Float Activity Precedenc e Duration Start 0 D Start 4 A Start 6 F D, A 7 E D 8 G F, E 5 B F 5 H G 7 C H 8 End C, B 0 1. What is the duration of the critical A) 32 B) 33 C) 31 D) 35 2. What is the float of activity B? A) 0 B) 16 C) 10 D) 15 3. What is the float of Activity F? A) 0 B) 5 C) 13 D) 7 BEST VIEWED IN SLIDE SHOW MODE www.qvive.biz

Calculating Float

Embed Size (px)

DESCRIPTION

This document describes the processes required to calculate project float

Citation preview

Calculating FloatA) 32
B) 33
C) 31
D) 35
A) 0
B) 16
C) 10
D) 15
A) 0
B) 5
C) 13
D) 7
www.qvive.biz
Activity
Precedence
Duration
Start
0
D
Start
4
A
Start
6
F
4. Critical Path
6. Backward Pass (LF LS)
Calculating Float
Q
A
1
2
3
“A”
“B”
“C”
“D”
“E”
“F”
“G”
“H”
4. Critical Path
6. Backward Pass (LF LS)
Calculating Float
4. Critical Path
6. Backward Pass (LF LS)
Calculating Float
4. Critical Path
6. Backward Pass (LF LS)
6
5
8
4
8
7
5
7
6
4
6
13
4
12
13
18
25
33
13
18
18
25
The latest Late Finish of the preceding activities determines Early Start
6
4
13
12
4. Critical Path
6. Backward Pass (LF LS)
The latest Early Finish of the preceding activities determines Critical Path
12
13
18
33
6
4
4. Critical Path
6. Backward Pass (LF LS)
0
0
0
0
0
Calculating Float
4. Critical Path
6. Backward Pass (LF LS)
0
0
0
0
0
0
6
25
33
6
13
13
18
18
25
Activities on the Critical Path have LS=ES and LF=EF
Calculating Float
4. Critical Path
6. Backward Pass (LF LS)
The earliest Late Start of the following activities determines Late Finish
33 – 5 = 28
28 – 13 = 15
4. Critical Path
6. Backward Pass (LF LS)
Calculating Float
Q
A
1
B
2
D
3
A
4. Critical Path
6. Backward Pass (LF LS)
1
1
Calculating Float