  • 8/8/2019 Cal Ave partial timeline/ flow chart

    1/2

    PTC Council

    CEQAcertication

    prepared by: B Anthony [email protected]

    Art Commissionvotes re

    fountain design

    Public votes refountain design

    California Avenue Transit Hub Corridor Project

    Detailed design of the projectwill not begin until afterCEQA review and approval.

    A mid-year budget adoptionwill be pursued to identify

    local-match funding

    The current trafc studyis funded by the existingCalifornia Avenue CIP.

    12/1612/6

    2011 2012

    Council approves resolutionauthorizing the ling of application

    for Federal funds (via MTC)+ commitment of non-Federalmatching funds + assurance to

    complete the project

    communitymtg to presentthe ndings ofTrafc study

    environmental and design phases

    One of the project elements includes the addition of bulb-outsalong California Avenue for

    - the planting of additional trees,- additional public art, or

    - installation of tables and seating for outside dining.

    The existing California Avenue Park Plaza adjacent to the

    Caltrain Station is also identied for revitalization with thisproject, including enhanced bike rack facilities, information

    kiosks to promote the Citys Bicycle Plan currently under

    development, and seating areas with gaming elements topromote community interest.

    The environmental phase will include a

    1) trafc analysis and

    2) completion of California Environmental Quality Act (CEQA)requirements for the project.

    The trafc analysis will include the collection of trafc data onCalifornia Avenue, Cambridge Avenue, Sherman Avenue, AshStreet, Birch Street, and Park Boulevard so that a 4-lane to 2-lanereduction on California Avenue may be considered.

    Trafc data collection began on November 2, 2010 including trafcvolumes, pedestrian and bike volumes, and vehicle speeds.

    ** DRAFT ** as of: 2/12/11

    1/12 2/14

    1/20

    Excerpts from 12/6/10 Council Resolution re Streetscape Project

    http://www.scribd.com/doc/44684237/Resolution-re-Cal-Ave-Streetscape-Projhttp://www.scribd.com/doc/44684237/Resolution-re-Cal-Ave-Streetscape-Proj
  • 8/8/2019 Cal Ave partial timeline/ flow chart

    2/2

    Citizen360 / Cal Ave online

    discussion forum gathers and

    shares ideas &questions re

    plans and options

    Santa Clara County Valley Transportation Authority (VTA)

    manages the states Surface TransportationProgram (STP) + Congestion Mitigation and AirQuality Improvement (CMAQ) program.

    Metropolitan Transportation Commission (MTC)

    You cant tell the players without a scorecard:

    http://www.mtc.ca.gov/about_mtc/about.htm

    New Surface Transportation Authorization Act:http://www.mtc.ca.gov/funding/STPCMAQ/

    http://www.vta.org/projects/programs.html

    Programs - including Community Design forTransportation (CDT) Capital Grant Program

    VTA Boardrecommends

    funding to MTC

    No

    No

    Yes

    Trafc Studyindicates impact of

    lane re-congurationon Levels of Service

    12/6/10- Councilauthorizes ling for

    Federal funds

    The current trafcstudy is funded by

    the existing CaliforniaAvenue CIP

    (Capital Improvement

    Program).

    MTCapprovesfundingrequest

    highimpact

    low impact

    Cal Ave Area Concept Plan

    (A-F)

    Cal Ave-related Process -- Partial Flow Chart

    prepared by: B Anthony [email protected]

    ** DRAFT ** as of: 2/12/11

    Cal Ave Streetscape/ Transit Hub Corridor Project

    PTC/ City Councilreviews revisedConcept Plan/

    determines what tostudy in EIR

    PTC action -late Feb/ Mar 2011

    Council action -Apr 2011

    12/9/10

    Yes

    re-considerationexpected ??

    12/16/10

    10/27/10 - VTA approves Palo Alto grant requestforCommunity Design for Transportation (CDT)funds

    early 2011 - City staff review

    input and revise design plans

    2/11/11-funding

    request puton hold

    http://www.mtc.ca.gov/about_mtc/about.htmhttp://www.mtc.ca.gov/funding/STPCMAQ/http://%20http//www.vta.org/projects/programs.htmlhttp://%20http//www.vta.org/projects/programs.htmlhttp://www.paloaltoonline.com/news/show_story.php?id=20050http://www.paloaltoonline.com/news/show_story.php?id=20050http://www.paloaltoonline.com/news/show_story.php?id=20050http://www.paloaltoonline.com/news/show_story.php?id=20050http://www.paloaltoonline.com/news/show_story.php?id=20050http://www.paloaltoonline.com/news/show_story.php?id=20050http://www.paloaltoonline.com/news/show_story.php?id=20050http://www.paloaltoonline.com/news/show_story.php?id=20050http://%20http//www.vta.org/projects/programs.htmlhttp://%20http//www.vta.org/projects/programs.htmlhttp://www.mtc.ca.gov/funding/STPCMAQ/http://www.mtc.ca.gov/about_mtc/about.htm