CAISO Update
JSIS MeetingMarch, 2015
Infrastructure
• 92 Connected PMUs • 64 Substations• 7 PDCs reporting (BPA, PG&E, SCE, SDG&E,
APS, SRP and NVP)• Redundant PDCs/Servers – 5 PDCs connected
to both sites• Redundant PI servers for real-time historian
Data Management
• Streaming data in C37.118 at 30 frames/sec.• Archiving – PI Historian – 90 Days – 30 f/s – Raw Phasor Data
(redundant, dedicated to synchrophasors only)– PI Historian – Calculated Data – Down-sampled
(redundant production PI Servers/collectives)– Long term storage (less expensive) – Comtrade – 3
years plus all events
Engineering Applications
• Angle Difference - sent to EMS• Backup Frequency Source – sent to EMS• MW Flow – Backup for Tie Line measurement
– sent to EMS• Post-Event Analysis• Dynamic Model validation – DSA model
verification• Benchmarking – comparison to SE for Kv and angle ’s
Control Room Applications
• Phase Angle Difference on EMS one-line displays
• Island Detection• Frequency Event Detection• Event analysis/locator (Future)• Oscillation detection (Future)
Expectations from WISP, JSIS, NASPI
• Data availability and quality information, support with PMU issues
• Exchange of tools and applications• Exchange of lessons learned– Installations, applications, data management, etc.