SAN ANTONIO WATER SYSTEM 1 of 6 Cagnon Ground Storage Tank Replacement Project - RFCSP | ADDENDUM 4
Cagnon Ground Storage Tank Replacement Project Solicitation Number: CO-00436-SM
Job No.: 20-6010
ADDENDUM 4 10/1/2021
To Respondent of Record:
This addendum, applicable to work referenced above, is an amendment to the bid proposal, plans and specifications and as such will be a part of and included in the Contract Documents. Acknowledge receipt of this addendum by entering the Addendum number and issue date on the space provided in submitted copies of the Respondent Questionnaire.
RESPONSES TO QUESTIONS
1. Has this tank been painted with lead based paint? Is there a paint analysis for the GST? I see there was one donefor the EST.Response: The soil and paint analysis of the GST is contained in a Cagnon Ground Storage Tank report dated May 7,2020 which will be made available for download on the SAWS website under this Solicitation. See "Changes to theSpecifications" note 4, Special Conditions.
2. Was an asbestos inspection done for the GST?Response: An asbestos inspection for the GST was performed on July 30, 2021, and results are contained in a reportwhich will be available for download on the SAWS website under this solicitation. See "Changes to the Specifications"note 4, Special Conditions.
3. Is there an inspection report on the old GST?Response: Yes, an inspection was completed for the old GST. Refer to the answer to Question 1.
4. Electronic Proposal Instructions states that proposal will be accepted any time before October 11, 2021 at 1 AM(CDT). Please confirm this should be 1 PM CDT.Response: Yes, the proposal will be accepted any time before October 11, 2021 at 1:00 PM (CDT). See "Changes tothe Specifications" note 1, Electronic Proposal Instructions.
5. Supplementary Instructions to Respondents, Page 8, 'Project Schedule and Unforeseen Conditions', Article iv.States that we should provide details for the procurement and delivery of 5-MG pre-stressed concrete groundstorage tank. Please confirm that this is a typo and should reference a 2-MG pre-stressed concrete ground storagetank.Response: Yes, the new Cagnon tank will be a 2 MG pre-stressed GST. Refer to Addendum 3 dated September 21,2021 under “Changes to the Specifications” note 3, Supplementary Instructions to Respondents.
6. Please provide the permits that will be required to be obtained by the contractor and their associated cost for thisproject.Response: The Bexar County Building Permit application along with the associated City of San Antonio (COSA) permitapplication as required for work within the COSA ETJ have been submitted to the respected agencies along withpayment of the permit fees. The Contractor is required to secure the associated Building Permit construction phasepermits, work authorizations, inspection requests, and applicable trade permits. The Contractor will be responsiblefor completing and maintaining the construction phase permitting required by the Bexar County Right-of-Way permitand Post-Construction Storm Water Control Measure permit along with all required inspections. The PermitAllowance may be used to pay for Building Permit fees. The Contractor is responsible for any applicable contractor
SAN ANTONIO WATER SYSTEM 2 of 6 Cagnon Ground Storage Tank Replacement Project - RFCSP | ADDENDUM 4
trade permit fees. The Contractor is responsible for compliance with all Building Permit requirements during construction such as storm water quality measures, silt fence, right-of-way traffic control, etc.
7. Specification Section 13207, Article 1.01.C, please prequalify DN Tanks, LLC in lieu of DN Tanks, Inc.
Response: The language is revised to update to DN Tank, LLC. See “Changes to the Specifications” note 10, Section 13207.
8. Specification Section 13207, Article 2.02.B, indicates non-prestressed reinforcement bar size shall not be greater than a #5 bar. Please confirm the tank designer may utilize up to a #6 bar size in accordance with AWWA D110. Response: Maximum reinforcement bar size shall remain unchanged per Section 13207.
9. Specification Section 13207, Article 2.04.E, states a horizontal barrier, consisting of flowable fill, flatwork and/or pavement, should be constructed at least 5-feet beyond the “over-build” zone. Sheet D-503, Detail 3, shows a 10-foot-wide clay cap as the horizontal barrier from the edge of the tank footing. Please confirm this is acceptable and a different horizontal barrier does not need to be constructed. Response: The 18-inch deep, 10-foot wide clay cap serves as the horizontal barrier. See “Changes to the Specifications” note 10, Section 13207.
10. Specification Section 13207, Article 2.06.B, calls for an 18-inch overflow pipe. Please confirm the design overflow
and venting rates for this tank. Response: The tank fill and tank drain rates are 20,500 gpm each. See “Changes to the Specifications” note 10, Section 13207.
11. Specification Section 13207, Article 2.06.D, calls for the exterior ladder to have an intermediate and top platform as shown on the Drawings. Sheet D-201, Detail A, shows only a top platform on the exterior ladder. Please confirm an intermediate platform is not required. Response: An intermediate platform is NOT required. See “Changes to the Specifications” note 10, Section 13207.
12. Specification Section 13207, Article 2.06.G, indicates the AST vent screen shall be made of PTFE. Please note that
AST cannot provide this screen material. Please confirm a 316 S.S. screen is acceptable. Response: 16 x 16 mesh woven wire, 0.018 inch min. dia. Type 316 stainless steel screens are acceptable on AST vents. See “Changes to the Specifications” note 10, Section 13207.
13. Specification Section 33 16 13.18, Article 2.12.C, indicates the overflow must be as indicated on the drawings
(which shows a partially concrete encased overflow with an exposed 4-feet zone of pipe and weir). Additionally, this section indicates that pipe supports must be 316 stainless steel. Please confirm that the tank manufacturer can design the overflow as shown on the drawings with the concrete encasement or with 316 stainless steel supports in lieu of the concrete encasement. Response: The overflow pipe shall be supported to tank’s interior wall using either concrete encasement or stainless steel pipe supports.
14. Please confirm the Engineer’s intent for the CFD analysis of the inlet pipe orientation (Article 2.06.A.1.b). Based
on the tank dimensions and pipe layout, the flow will not reach the top and a mixing system should be considered if complete mixing is required. Response: The requirement for the CFD is to be removed from Section 13207. See “Changes to the Specifications” note 10, Section 13207.
15. Please consider extending the deadline for questions to 5 pm October 1st, 2021.
Response: The deadline for questions was extended to September 28, 2021 until 4:00 PM (CDT) as detailed in Addendum 3 dated September 21, 2021.
16. Sheet D-501, Detail 1, shows the 316L stainless steel overflow pipe concrete encased to above the 316 stainless
steel weir cone flange. It has been typical seen in the overflow pipe detail for SAWS that the concrete encasement is terminated approximately 4-feet down from the overflow weir cone, please confirm this is required. Additionally, can the overflow pipe that is fully encased in concrete be plain steel in lieu of the stainless steel material shown.
SAN ANTONIO WATER SYSTEM 3 of 6 Cagnon Ground Storage Tank Replacement Project - RFCSP | ADDENDUM 4
Response: The flange on the weir cone can be exposed. The overflow pipe including the overflow weir cone shall be stainless steel whether encased in concrete or supported by stainless steel pipe supports.
17. Sheet D-501, Detail 3, shows a steel “silt-stop” on the outlet. Please confirm that all interior, non-concrete
encased piping, must by 316 stainless steel. Response: All interior piping shall be 316 stainless steel. See “Changes to the Plans” note 1, Sheet D-501.
18. Sheet D-503, Detail 1, please confirm if the use of Hollaender joints for the dome handrail is acceptable for this
project. Response: Hollaender joints are not acceptable for the handrail.
19. Sheet D-503, Detail 1, shows the ladder extending through the top platform. Please confirm a side-step platform
is acceptable for this project. Response: The ladder and platform shall be as shown on Sheet D-503, Detail 1.
20. Sheet D-505, Detail 1, calls for the tank floor reinforcement to be #4@8” o.c.e.w. Please confirm the tank floor
reinforcing shown is just a representative example and the tank contractor may determine the size and spacing of reinforcing in the design. Response: The minimum tank foundation reinforcement shall be #5@6” O.C.E.W. The tank Contractor is responsible for the final design of the tank. See “Changes to the Plans” note 2, Sheet D-505 and note 3, Sheet S-102.
21. Ref D-003 – Pipe Material Schedule. Pipe A is calling for Max Working Pressure of 250 PSI. Spec 15141 – 1.01 D. “Flanges shall be Class F…” Please verify if all flanges shall be 250# Drilling Class “F” or just the required line A with 250 PSI Pressure. Response: Pipe flanges are specified in Section 15065 – Steel Process Piping. Flanges for couplings, connectors and adapters shall match the corresponding flanges on the piping, valves, etc. See “Changes to the Specifications” note 12, Section 15141.
22. Ref D-202 - Can the 14” Gate Valves be provided with 125# Flanges (Gate Valves Rated for 250 PSI) and Class “E”
Steel Flanges Response: ASME B16.1 Class 125 flanges are acceptable on Class 250 valves.
23. Ref C-302. Does the existing 24” BFV have 125# Drilling or 250# Drilling Pattern?
Response: The pipeline is currently under construction. The Contractor shall field verify and match the drilling pattern of the existing 24 inch BFV during the construction phase of this project.
24. Ref C-302. BFV-109. Can a Class 250B with 125# Flanges be provided for this valve? It will have a 250 PSI Rating.
Class “E” flanges can be used with are rated at 275 PSI. Response: Yes, ASME B16.1 Class 125 flanges on Class 250B butterfly valves are acceptable. “Changes to the Specifications” note 11, Section 15101.
25. Are the proposal forms available in an editable format (i.e. Microsoft Word) or should we plan on including editing
with an adobe.pdf typewriter feature and include attachments or appendices as needed to adequately respond to the questions? Response: The Evaluation Criteria Forms are now available in Word format and can be found on the SAWS website.
26. Regarding the Key Subcontractor forms, with us bidding as prime, we will be self-performing the tank
construction; however, we will carry a site work sub (i.e. dirt work and yard piping). Typically when we are sub, the GC’s self-perform the site work but carry us as a Key Subcontractor. There is not key subcontractor form for a Site Work Subcontractor. Should we manually edit the tank builder form to be a Site Work Subcontractor Form or should we copy one of the forms to add a Site Work Subcontractor? Site Work will be a sizable portion of the project scope. Response: Respondents can manually edit the top of the forms to indicate the correct name of the sub-contractors. The forms are available in Word format and can be found on the SAWS website.
SAN ANTONIO WATER SYSTEM 4 of 6 Cagnon Ground Storage Tank Replacement Project - RFCSP | ADDENDUM 4
CHANGES TO THE SPECIFICATIONS
1. ELECTRONIC PROPOSAL INSTRUCTIONS
• Second paragraph, first sentence; DELETE “1:00 AM (CDT)” and REPLACE with “1:00 PM (CDT)”.
2. INSTRUCTIONS TO RESPONDENTS
• Page IR-5, DELETE paragraph 9.b. in its entirety and REPLACE with the following: “Contractor agrees that, unless it is a sole proprietorship or a company with fewer than 10 full-time employees and the value of this Contract is less than $100,000, it:
a. does not boycott Israel and will not do so during the term of this Contract; b. does not boycott energy companies and will not do so during the term of this Contract; c. does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or
firearm trade association and will not discriminate during the term of the Contract against a firearm entity or firearm trade association.
This provision is in compliance with Chapters §2271 and 2274 of the Texas Government Code. SAWS agrees to comply with the United States and Texas Constitutions in consideration of whether to enforce this provision.”
3. PRICE PROPOSAL
• REMOVE the Price Proposal in its entirety and REPLACE with attached.
4. SPECIAL CONDITIONS
• ADD to Special Conditions immediately following SC16 the following paragraph: “SC17. A Cagnon Ground Storage Tank report dated May 7, 2020 is made available for Contractors for informational purposes only. SAWS will require the execution of a SAWS disclaimer form by the Contractor as a condition of and prior to the release of the report. To complete the disclaimer form and obtain the report, please go to the following link on SAWS website: https://www.saws.org/business_center/ContractSol/. SC18. An Asbestos Survey Report dated July 30, 2021 is made available for Contractors for informational purposes only. SAWS will require the execution of a SAWS disclaimer form by the Contractor as a condition of and prior to the release of the report. To complete the disclaimer form and obtain the report, please go to the following link on SAWS website: https://www.saws.org/business_center/ContractSol/.”
5. SECTION 01270 – MEASUREMENT AND PAYMENT
• 1.12A Item No. 1, first sentence: ADD “old fiberglass chlorine building,” immediately after “hydro tank foundation,”.
• 1.12A Item No. 10; DELETE in its entirety and REPLACE with the followings: “Item No. 10: Supporting Special Inspections 1. Description – This item is provided for the work associated with the Supporting Special Inspections per
Section 01416 and shall be all inclusive of the work associated with coordinating, documenting, and facilitating the Special Inspections.
2. Measurement – Measurement of Item No. 10 will be lump sum with partial payments in accordance with the progress of the Special Inspections.
3. Payment for Item No. 10 is provided for expenses incurred to support Special Inspections.”
6. SECTION 01416 – CODE REQUIRED SPECIAL INSPECTIONS AND PROCEDURES
• ADD the attached Section 01416 – Code Required Special Inspections and Procedure to Contract Documents under Division 1.
7. SECTION 02210 – EXCAVATING, BACKFILL AND COMPACTION FOR STRUCTURES
• ADD the following language immediately after paragraph 1.02.C: “Hire a contractor that is specialized in Subsurface Utility Engineering quality levels A, B, C and D to locate, identify, and provide depths and sizes of existing utilities to identify conflicts with proposed improvements and provide for the protection of existing utilities or structures during construction. SAWS personnel will not mark any utilities on the site.”
SAN ANTONIO WATER SYSTEM 5 of 6 Cagnon Ground Storage Tank Replacement Project - RFCSP | ADDENDUM 4
8. SECTION 02220 – TRENCH EXCAVATION, BACKFILL AND COMPACTING FOR UTILITIES
• ADD the following language immediately after paragraph 1.02.A: “Hire a contractor that is specialized in Subsurface Utility Engineering quality levels A, B, C and D to locate, identify, and provide depths and sizes of existing utilities to identify conflicts with proposed improvements and provide for the protection of existing utilities or structures during construction. SAWS personnel will not mark any utilities on the site.”
9. SECTION 09820 – PRESTRESSED CONCRETE TANK COATING
• ADD the following language immediately after 2.01.B and renumber the subsequent: “C. Third Coat: Sealing and curing compound:
1. Diamond Clear Vox by The Euclid Chemical Company or Engineer-approved equal.”
10. SECTION 13207 – WIRE-WOUND, PRESTRESSED CONCRETE TANK WITH STEEL DIAPHRAGM
• Paragraph 1.01.C; REMOVE “DN Tanks, Inc.” and REPLACE with “DN Tanks, LLC”.
• Paragraph 1.03.D; DELETE in its entirety and renumber the subsequent.
• ADD the following language at the end of Section 2.01: “Tank Fill Rate 20,500-gpm Tank Drain Rate 20,500-gpm”
• ADD the following language immediately after the second sentence in paragraph 2.02.A: “The minimum tank foundation reinforcement shall be #5@6” O.C.E.W. The tank Contractor is responsible for the final design of the tank foundation.”
• Paragraph 2.04.E; DELETE in its entirety and renumber the subsequent.
• Paragraph 2.06.A.1.b.; DELETE the second sentence in its entirety.
• Paragraph 2.06.B; DELETE “J&S Valve model DBV-09-FL or Onyx Valve series DBF or approved equal” from the fourth paragraph and REPLACE with “Tideflex model Series 37 or Engineer approved equal”.
• Paragraph 2.06.B; DELETE “Duckbill check valve by J&S Valve model DBV-09-FL or Onyx Valve series DBF or approved equal” from the fifth paragraph and REPLACE with “Waterman PF-25 flap valve or Engineer approved equal”.
• Paragraph 2.06.D; DELETE “Ladder intermediate platform and” from the third paragraph.
• Paragraph 2.06.G; DELETE “16 x 16 mesh PTFE” in the second paragraph and REPLACE with “16 x 16 mesh woven wire, 0.018 inch min. dia. Type 316 stainless steel”.
11. SECTION 15101 – BUTTERFLY VALVES
• Paragraph 2.1.B.5; DELETE in its entirety and REPLACE with the following language: “5. Valve body ends: flat faced flanges per AWWA C207
a. Class 150B valves: ASME B16.1, class 125 or ASME B16.1, class 150. b. Class 250B valves: ASME B16.1 class 125 or ASME B16.1 class 150. c. Class 300 valves: ASME B16.5 class 300. d. Valve laying length: AWWA C504, Table 2.”
12. SECTION 15141 – COUPLINGS, CONNECTORS, AND ADAPTERS
• Paragraph 1.01.D.5; DELETE in its entirety and REPLACE with the following language: “5. Flanges shall be designed to match the working pressure and drilling pattern of the pipe, valves,
and other equipment being joined.”
SAN ANTONIO WATER SYSTEM 6 of 6 Cagnon Ground Storage Tank Replacement Project - RFCSP | ADDENDUM 4
CHANGES TO THE PLANS
1. DRAWING C-103 – DEMOLITION PLAN
• REMOVE and REPLACE in its entirety with attached.
2. DRAWING D-501 – STANDARD PROCESS DETAIL I
• REMOVE and REPLACE in its entirety with attached.
3. DRAWING D-505 – STANDARD PROCESS DETAIL V
• REMOVE and REPLACE in its entirety with attached.
4. DRAWING S-102 – CAGNON GST FOUNDATION PLAN AND ELEVATION
• Concrete Tank Slab – Section B-B; REPLACE “0.8%” with “0.86%” in the callout for the foundation reinforcement.
5. DRAWING E-108 – EXTERIOR LIGHTING & HEAT TRACE PNL CONTROLS
• ADD the following notes to Detail E: “5. FIXTURE: LITHONIA KAD LED 60C 700 40K R4 MVOLT SPD 06 PER5 HS DDBXD DLL12751.5JU OR APPROVED
EQUAL FOR COMPLIANCE WITH THE MILITARY LIGHT OVERLAY DISTRICT 6. LITONIA LIGHTING ANCHOR BASE POLE, SQUARE STRAIGHT ALLUMINUM SSA205GDM19VDDDB”
CLARIFICATIONS
1. The revised Price Proposal includes the latest Statement on President’s Executive Orders. Failure to use the updated Price Proposal in this Addendum could result in the proposal being non-responsive.
END OF ADDENDUM
This Addendum, including these six (6) pages, is forty (40) pages with attachments in its entirety.
_____________________________________ Sina Arjmand, P.E.
Tetra Tech
Attachments: 1. Price Proposal 2. Section 01416 – Code Required Special Inspection and Procedures 3. Drawings C-103, D-501 and D-505
ATTACHMENT 1
PRICE PROPOSAL
Solicitation Name: Cagnon Ground Storage Tank Replacement Project
Solicitation No. CO-00436
Rev. 091021 ADDENDUM 4
PP-1
PRICE PROPOSAL
PROPOSAL OF , a corporation
a partnership consisting of ______________________________________________________________
an individual doing business as ___________________________________________________________
THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitation for Competitive Sealed Proposals, the undersigned proposes to furnish all labor and materials as specified and perform the work required for the project as specified, in accordance with the Plans and Specifications for the following prices in the bid proposal to wit:
PLEASE SEE ATTACHED LIST OF BID ITEMS.
RESPONDENT’S SIGNATURE & TITLE FIRM’S NAME (TYPE OR PRINT) FIRM’S ADDRESS FIRM’S PHONE NO. /FAX NO. FIRM’S EMAIL ADDRESS The Contractor herein acknowledges receipt of the following: Addendum Nos.___________________ OWNER RESERVES THE RIGHT TO ACCEPT THE OVERALL MOST RESPONSIBLE BID. The Respondent offers to construct the Project in accordance with the Contract Documents for the contract price, and to complete the Project within 530 calendar days after the start date, as set forth in the Authorization to Proceed. The Respondent understands and accepts the provisions of the contract Documents relating to liquidated damages of the project if not completed on time. Complete the additional requirements of the Proposal which are included on the following pages.
Statement on President’s Executive Orders Has your firm previously performed work subject to the President’s Executive Orders Numbers 11246 and 11375 or any preceding similar executive orders (Numbers 10925 and 11114)? Yes No (1) Are you, Contractor, held or controlled by individuals who are citizens of China, Iran, North Korea, Russia or a
country designated by the Governor of the State of Texas pursuant to Texas Government Code Chapter 2274? Yes No
(2) Are you, Contractor, held or controlled by a company or other entity, including a governmental entity, that is
owned or controlled by citizens of or directly controlled by the government of China, Iran, North Korea, Russia or a country designated by the Governor of the State of Texas pursuant to Texas Government Code Chapter 2274? Yes No
(3) Are you, Contractor, headquartered in China, Iran, North Korea, Russia or a country designated by the
Governor of the State of Texas pursuant to Texas Government Code Chapter 2274? Yes No
Solicitation Name: Cagnon Ground Storage Tank Replacement Project
Solicitation No. CO-00436
Rev. 091021 ADDENDUM 4
PP-2
BASE UNIT PRICES FOR:
Item No. Description Unit Quantity Unit Price Total Price
1 Demolition LS 1 $ $
2 2 MG Prestressed Concrete Ground Storage Tank (GST)
LS 1 $ $
3 1 MG Elevated Storage Tank (EST) Overcoat
LS 1 $ $
4 Yard Piping LS 1 $ $
5 WRIP Interconnect and EST Control Valve Assemblies
LS 1 $ $
6 Site Civil Work LS 1 $ $
7 Electrical and Instrumentation LS 1 $ $
8 Additional Structural Excavation and Fill for GST
CY 1000 $ $
9 Trench Excavation Safety Protection
LF 700 $ $
10 Supporting Special Inspections LS 1 $ $
11 Permitting Allowance ALW 1 $10,000 $10,000
12 Start-up and Commissioning Allowance.
ALW 1 $15,000 $15,000
SUBTOTAL (ITEMS 1 – 12) $
100 MOBILIZATION AND DEMOBILIZATION,
MAX 7% OF LINE ITEMS 1 – 10 LS 1 $
101 INTERMEDIATE DEMOBILIZATION
AND REMOBILIZATION EA 1 $
Mobilization shall be limited to the maximum percentage shown. If the percentage exceeds the allowable maximum stated for mobilization, SAWS reserves the right to cap the amount at the percentages shown and adjust the extensions of the bid items accordingly.
TOTAL BID PRICE (TO INCLUDE LINE ITEMS 1 – 12, 100 AND 101) $
ATTACHMENT 2
SECTION 01416
CODE REQUIRED SPECIAL INSPECTION AND PROCEDURES
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 1/26 Code Required Special Inspections and Procedures ADDENDUM 4
SECTION 01416
CODE REQUIRED SPECIAL INSPECTIONS AND PROCEDURES
PART 1 GENERAL
1.01 DESCRIPTION
A. Scope:
1. CONTRACTOR shall provide all labor, materials, tools, equipment, and incidentals as
shown, specified, and required to cooperate with the Registered Design Professional in
Responsible Charge (RDPiRC), individual special inspectors, and testing agencies
employed by OWNER, to facilitate special inspections.
2. Supplement A, Statement of Special Inspections, included with this Section, lists testing and
inspections required.
1.02 DEFINITIONS
A. Terminology used in this Specification shall comply with Chapter 17 of the International
Building Code and the City of San Antonio Development Services Informational Bulletin 132
for definitions of terms related to special inspections, and the following.
B. Registered Design Professional in Responsible Charge (RDPiRC): A registered design
professional in the State of Texas, engaged by the OWNER to review the activities of the
CONTRACTOR to assure compatibility with the design of the building or structure and the
requirements of the contract documents, including submittal documents prepared by others,
deferred submittal documents and phased submittal documents. Responsible for coordinating
and verifying the inspection and testing required by the Determination of Required Special
Inspections included in this Section.
C. Special Inspections: Inspection of construction requiring the expertise of an approved Special
Inspector to ensure compliance with approved Contract Documents and referenced standards as
required by the IBC.
D. Special Inspections – Continuous: Full time observation of Work requiring Special Inspection
by the Special Inspector who is present continuously when and where the work to be inspected
is being performed.
E. Special Inspections – Periodic: Special Inspection by the Special Inspector who is intermittently
present where the work to be inspected has been or is being performed.
F. Special Inspectors: Qualified person employed or retained by OWNER or RDPiRC, having the
competence necessary to inspect a particular type of construction requiring Special Inspection.
1.03 QUALITY ASSURANCE
A. Qualifications:
1. OWNER will employ and pay for services of the Registered Design Professional in
Responsible Charge, who will have not less than five years of experience in managing,
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 2/26 Code Required Special Inspections and Procedures ADDENDUM 4
monitoring, and inspecting building construction.
2. Inspectors will be qualified in the responsibilities of the Special Inspection for which each
is responsible, as well as being approved by the City of San Antonio Building Official as
required by the City of San Antonio Development Services Informational Bulletin 132.
B. Regulatory Requirements:
1. Special Inspections will be in accordance with applicable building code and other Laws and
Regulations, including City of San Antonio Special Inspection Program Policies,
Procedures, and Guidelines, Information Bulletin 132, latest revision.
1.04 SUBMITTALS
A. Action Submittals: Submit the following:
1. Samples:
a. Samples: Representative Samples of materials when required by ENGINEER.
B. Informational Submittals: Submit the following:
1. Completed Supplement E, Fabricator’s Certificate of Compliance, as attached to this
Section, for each fabricator of shop assembled structural systems which are exempt from
Special Inspection of shop fabrication.
1.05 OWNER’S RESPONSIBILITIES
A. Special Inspections are the OWNER’s responsibility.
B. OWNER is responsible for employing or contracting the RDPiRC.
C. OWNER is responsible for special inspections fees/costs. There fees/costs are not included in
any permit or plan review fees.
1.06 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
RESPONSIBILITIES
A. Registered Design Professional in Responsible Charge will:
1. Complete, stamp, and sign Supplement A, Determination of Required Special Inspections,
of this Section to provide names of each inspector and testing agency for each Special
Inspection required. Providing supplement A to OWNER, CONTRACTOR, ENGINEER,
and Building Official.
2. Engage services of inspectors and testing agencies for Special Inspections in accordance
with Supplement A, Determination of Required Special Inspections, of this Section and as
required by Laws and Regulations.
3. Assigning only trained, experienced, qualified special inspectors and technicians.
4. Coordinate activities of individual inspectors and testing agencies with CONTRACTOR.
5. Submitting associated special inspector field reports to the building official with a copy of
the special inspector, OWNER, CONTRACTOR and ENGINEER, indicating compliance
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 3/26 Code Required Special Inspections and Procedures ADDENDUM 4
for any non-complying items reported and advising Building Official to allow work to
continue.
6. Complete and provide to the Building Official, OWNER, CONTRACTOR and ENGINEER
Supplement B, Final Report of Special Inspections, of this Section, documenting completion
of Special Inspections and correction of discrepancies noted in the Special Inspections.
1.07 CONTRACTOR’S RESPONSIBILITIES
A. Provide safe access to the Work to be tested and inspected.
B. Provide assistance in obtaining and handling test samples at the Site.
C. Facilitate inspections and tests.
D. Provide access to Suppliers’ and Subcontractors’ operations as required.
E. Coordinate and schedule for all the necessary Special Inspections and Special Inspections
testing.
F. Notify Registered Professional in Responsible Charge and ENGINEER sufficiently in advance
of the Work for the Registered Professional in Responsible Charge and ENGINEER to
coordinate their personnel at the Site. Do not cover the Work to be inspected until Special
Inspection has been completed and the results thereof are acceptable.
G. CONTRACTOR shall keep a Special Inspections logbook readily available for both the special
inspectors and the city building inspector. The special inspections logbook shall include a copy
of the following:
1. Determination Letter of Required Special Inspections.
2. The special inspections log and sign in sheet (see Information Bulletin 132 for approved
status log format).
3. A copy of all special inspection reports from the special inspector.
4. Any changes that may apply to special inspections on the project.
H. CONTRACTOR shall be responsible for each approved fabricator that is exempt from Special
Inspection of shop fabrication and implementation procedures per section 1704.2.5.1 of the
International Building Code filling out and submitting a Fabricator’s Certificate of Compliance
per Supplement E.
I. Special Inspections required in this Section do not supersede or make unnecessary inspections
and tests required under other Specification Sections or standard inspections required by Laws
and Regulations.
1.08 INSPECTOR’S RESPONSIBILITIES
A. Perform specified inspections, sampling, and testing of materials and methods of construction;
review and ascertain compliance with Laws and Regulations.
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 4/26 Code Required Special Inspections and Procedures ADDENDUM 4
B. All special inspectors are required to be approved by the Building Official for the City of San
Antonio (refer to Information Bulletin 132 for qualifications and application submittal
requirements). Registered design professional, principal engineers, and architects in the State of
Texas are exempt from submitting qualifications requirements. Individuals acting as Special
Inspectors will be required to provide their license number on the Special Inspection Log Sheet.
C. Promptly notify RDPiRC, OWNER, ENGINEER and CONTRACTOR of irregularities or
deficiencies in the Work observed during Special Inspections. Corrective action, if required, will
be determined by ENGINEER.
D. If correction of non-complying items is not performed in a timely manner, the special inspector
shall sign and submit a “Notice of Non-Compliance” as included in Supplement D of this Section
to the Registered Design Professional in Responsible Charge, CONTRACTOR, and OWNER.
In receiving the notice of non-compliance, OWNER may suspend all future work in the areas of
such non-compliance until the non-compliant items are corrected and the RDPiRC issues a field
report to the Special Inspector, OWNER, and CONTRACTOR indicating compliance.
E. Promptly prepare, sign, and submit each report of inspections and tests to OWNER, RDPiRC,
ENGINEER, and CONTRACTOR. This report shall be prepared on the Report of Required
Special Inspections form included in Supplement C.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.01 FAILURE TO COMPLY
A. Second or more inspections: All costs for reinspection of work requiring special inspection shall
be billed to OWNER by ENGINEER for actual hours required to reinspect, and travel time to
and from the job site, by ENGINEER. CONTRACTOR shall pay cost for second and
subsequent inspections to OWNER at the completion of the project out of “retainage” as billed
by OWNER.
3.02 SUPPLEMENTS
A. The supplements listed below, following the “End of Section” designation, are part of this
Section. Additional forms may be obtained directly for the City of San Antonio. Refer to City
of San Antonio “Special Inspections Programs Policies, Procedures, and Guidelines.”
1. Supplement A – Determination of Required Special Inspections.
2. Supplement B – Final Report of Special Inspections.
3. Supplement C – Report of Required Special Inspections
4. Supplement D – Notice of Non-Compliance.
5. Supplement E – Fabricator’s Certificate of Compliance.
END OF SECTION
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 5/26 Code Required Special Inspections and Procedures ADDENDUM 4
SUPPLEMENT A
DETERMINATION OF REQUIRED SPECIAL
INSPECTIONS
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 6/26 Code Required Special Inspections and Procedures ADDENDUM 4
Registered Design Professional in Responsible Charge Letterhead
[Date]
San Antonio Water System
[Owner address1]
[Owner address 2]
[City, State, Zip]
Determination of Required Special Inspections Section 1704
Project: [Project Name]
[Project Address]
San Antonio, Texas
Section 1704 of the International Building Code, as amended by the City of San Antonio, has been reviewed. The
following is a list of the required special inspections applicable for this project A detailed list may be found at the end
of this document under the “Statement of Special Inspections.”
2018 IBC Section Type of Special Inspections and Extent Applicable Non Applicable
Continuous or Periodic
1705.1.1 Special Cases X
1705.2 Steel construction X
1705.3 Concrete construction X Continuous
1705.4 Masonry construction X Continuous
1705.5 Wood construction X
1705.6 Soils X Continuous
1705.7 Driven deep foundations X
1705.8 Cast-in-place deep foundations X
1705.9 Helical pile foundations X
1705.10 Fabricated Items X
1705.11 Special Inspections for wind resistance X
1705.12 Special Inspections for seismic resistance X
1705.13 Testing for seismic resistance X
1705.14 Sprayed fire-resistant materials X
1705.15 Mastic and intumescent fire-resistant coatings X
1705.16 Exterior insulation and finish systems (EIFS) X
1705.17 Fire-resistant penetrations and joints X
1705.18 Special inspection for smoke control X
2018 IBC Section Type of Special Inspections and Extent Applicable Not Applicable
Details
1706 Design Strength of Materials X
1707 Alternative Test Procedures X
1708 In-Situ Load Tests X
1709 Preconstruction Load Tests X
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 7/26 Code Required Special Inspections and Procedures ADDENDUM 4
At the completion of construction, a final report written by the Registered Design Professional in
Responsible Charge that documents all of the special inspections required will be submitted to the Owner
and Contractor.
Respectfully,
[RDPiRC Firm Name]
[Signature of RDPiRC]
[Name of Registered Design Professional in Responsible Charge]
cc: General Contractor, Owner, Engineer
RDPiRC Seal
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 8/26 Code Required Special Inspections and Procedures ADDENDUM 4
Statement of Special Inspections
General
1. The statement of Special Inspections provides compliance with the provisions of the 2018 International Building Code (IBC) Chapter 17 for Special Inspections and tests.
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 9/26 Code Required Special Inspections and Procedures Addendum 4
SYSTEM OR MATERIAL
2018 IBC CODE
REFERENCE
REFERENCED
STANDARD
REFERENCE
SPECIFICATION
SECTION
PERIODIC
OWNER
FURNISHED
SPECIAL
INSPECTION
CONTINUOUS
OWNER
FURNISHED
SPECIAL
INSPECTION
COMMENTS
SOILS
1. VERIFY MATERIALS
BELOW SHALLOW
FOUNDATIONS ARE
ADEQUATE TO
ACHIEVE THE DESIGN BEARING CAPACITY
1705.6
SECTION 02210,
EXCAVATING,
BACKFILL AND
COMPACTION FOR
STRUCTURES
X
PROFESSIONAL
OBSERVATION BY
GEOTECHNICAL
ENGINEER SERVING
AS SPECIAL INSPECTOR
2. VERIFY EXCAVATIONS
ARE EXTENDED TO
PROPER DEPTH AND
HAVE REACHED
PROPER MATERIAL
1705.6
SECTION 02210,
EXCAVATING,
BACKFILL AND
COMPACTION FOR
STRUCTURES
X
PROFESSIONAL
OBSERVATION BY
GEOTECHNICAL
ENGINEER SERVING
AS SPECIAL INSPECTOR
3. PERFORM
CLASSIFICATION AND
TESTING OF
COMPACTED FILL
MATERIALS
1705.6
SECTION 02210,
EXCAVATING,
BACKFILL AND
COMPACTION FOR
STRUCTURES
X
PROFESSIONAL OBSERVATION BY
GEOTECHNICAL ENGINEER SERVING
AS SPECIAL INSPECTOR
4. VERIFY USE OF PROPER
MATERIALS,
DENSITIES, AND LIFT
THICKNESSES DURING
PLACEMENT AND
COMPACTION OF COMPACTED FILL
1705.6
SECTION 02210,
EXCAVATING,
BACKFILL AND
COMPACTION FOR
STRUCTURES
X
PROFESSIONAL
OBSERVATION BY
GEOTECHNICAL
ENGINEER SERVING
AS SPECIAL
INSPECTOR
5. PRIOR TO PLACEMENT
OF COMPACTED FILL,
INSPECT SUBGRADE
AND VERIFY THAT
SITE HAS BEEN PREPARED PROPERLY
1705.6
SECTION 02210,
EXCAVATING,
BACKFILL AND
COMPACTION FOR
STRUCTURES
X
PROFESSIONAL
OBSERVATION BY
GEOTECHNICAL
ENGINEER SERVING
AS SPECIAL INSPECTOR
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 10/26 Code Required Special Inspections and Procedures Addendum 4
SYSTEM OR MATERIAL
2018 IBC CODE
REFERENCE
REFERENCED
STANDARD
REFERENCE
SPECIFICATION
SECTION
PERIODIC
OWNER
FURNISHED
SPECIAL
INSPECTION
CONTINUOUS
OWNER
FURNISHED
SPECIAL
INSPECTION
COMMENTS
CONCRETE CONSTRUCTION
1. INSPECT
REINFORCEMENT,
INCLUDING
PRESTRESSING
TENDONS, AND VERIFY PLACEMENT
1705.3
1908.4
ACI 318: Ch. 20,
25.2, 25.3, 26.5.1-
26.5.3
SECTION 03300
CAST-IN-PLACE
CONCRETE
X
2. REINFORCING BAR
WELDING:
AWS D1.4
ACI 318: 26.6.4
NOT ALLOWED
UNLESS APPROVED
BY ENGINEER. SEE STEEL CONSTRUCTION FOR WELDING INSPECTION REQUIREMENTS
A. VERIFY
WELDABILITY OF
REINFORCING BARS
OTHER THAN ASTM
A706.
1705.3
AWS D1.4
ACI 318: 26.6.4
SECTION 03300
CAST-IN-PLACE
CONCRETE
X
B. INSPECT SINGLE-
PASS FILLET WELDS,
MAXIMUM 5/16”
1705.3
AWS D1.4
ACI 318: 26.6.4
SECTION 03300
CAST-IN-PLACE
CONCRETE
X
C. INSPECT ALL
OTHER WELDS
1705.3 AWS D1.4
ACI 318: 26.6.4
SECTION 03300 CAST-IN-PLACE
CONCRETE
X
3. INSPECT ANCHORS CAST IN CONCRETE
1705.3 ACI 318: 17.8.2 SECTION 03300 CAST-IN-PLACE
CONCRETE
X
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 11/26 Code Required Special Inspections and Procedures Addendum 4
SYSTEM OR MATERIAL
2018 IBC CODE
REFERENCE
REFERENCED
STANDARD
REFERENCE
SPECIFICATION
SECTION
PERIODIC
OWNER
FURNISHED
SPECIAL
INSPECTION
CONTINUOUS
OWNER
FURNISHED
SPECIAL
INSPECTION
COMMENTS
4. INSPECT ANCHORS
POST-INSTALLED IN
HARDENED CONCRETE MEMBERS
A. ADHESIVE ANCHORS
INSTALLED IN HORIZONTALLY OR UPWARDLY INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS
1705.3
ACI 318: 17.8.2.4
SECTION 05051
ANCHOR SYSTEMS
X
X
B. MECHANICAL ANCHORS
AND ADHESIVE ANCHORS
NOT DEFINED IN 4. A.
1705.3
ACI 318: 17.8.2 SECTION 05051
ANCHOR SYSTEMS
X
X
5. VERIFY USE OF
REQUIRED DESIGN MIX
1705.3
1904.1,
1904.2, 1908.2, 1908.3
ACI 318: Ch. 19,
26.4.3, 26.4.4
SECTION 03300
CAST-IN-PLACE
CONCRETE
X
6. PRIOR TO CONCRETE
PLACEMENT, FABRICATE
SPECIMENS FOR
STRENGTH TESTS,
PERFORM SLUMP AND
AIR CONTENT TESTS,
AND DETERMINE THE
TEMPERATURE OF THE CONCRETE.
1705.3
1908.10
ASTM C 172,
ASTM C 31, ACI 318: 26.5,
26.12
SECTION 03300
CAST-IN-PLACE
CONCRETE
X
7. INSPECT CONCRETE
AND SHOTCRETE
PLACEMENT FOR
PROPER APPLICATION
TECHNIQUES
1908.6
1908.7
1908.8
ACI 318: 26.6.5
SECTION 03300
CAST-IN-PLACE
CONCRETE
X
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 12/26 Code Required Special Inspections and Procedures Addendum 4
SYSTEM OR MATERIAL
2018 IBC CODE
REFERENCE
REFERENCED
STANDARD
REFERENCE
SPECIFICATION
SECTION
PERIODIC
OWNER
FURNISHED
SPECIAL
INSPECTION
CONTINUOUS
OWNER
FURNISHED
SPECIAL
INSPECTION
COMMENTS
8. VERIFY MAINTENANCE OF
SPECIFIED CURING
TEMPERATURE AND TECHNIQUES
1908.9
ACI 318: 26.5.3-
26.5.5
SECTION 03300
CAST-IN-PLACE
CONCRETE
X
9. INSPECT PRESTRESSED CONCRETE FOR:
A. APPLICATION OF
PRESTRESSING FORCES: AND
ACI 318: 26.10
X
REVIEW OF PCI CERTIFICATION IN
LIEU OF CONTINUOUS
SPECIAL INSPECTION.
B. GROUTING OF BONDED
PRESTRESSING TENDONS
ACI 318: 26.10
X
REVIEW OF PCI
CERTIFICATION IN
LIEU OF
CONTINUOUS
SPECIAL INSPECTION.
10. INSPECT ERECTION OF
PRECAST CONCRETE
MEMBERS
ACI 318: 26.9
X
11. VERIFY IN-SITU
CONCRETE STRENGTH,
PRIOR TO STRESSING OF
TENDONS IN POST-
TENSIONED CONCRETE AND
PRIOR TO REMOVAL OF
SHORES AND FORMS FROM
BEAMS AND STRUCTURAL SLABS
ACI 318: 26.11.2
SECTION 03300
CAST-IN-PLACE
CONCRETE
X
12. INSPECT FORMWORK FOR
SHAPE, LOCATION AND
DIMENSIONS OF THE
CONCRETE MEMBER BEING
FORMED
ACI 318:
26.11.1.2(b)
SECTION 03300
CAST-IN-PLACE
CONCRETE
X
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 13/26 Code Required Special Inspections and Procedures Addendum 4
SYSTEM OR MATERIAL
2018 IBC CODE
REFERENCE
REFERENCED
STANDARD
REFERENCE
SPECIFICATION
SECTION
PERIODIC
OWNER
FURNISHED
SPECIAL INSPECTION
CONTINUOUS
OWNER
FURNISHED
SPECIAL INSPECTION
COMMENTS
MASONRY CONSTRUCTION
1. AS MASONRY
CONSTRUCTION BEGINS,
VERIFY THAT THE
FOLLOWING ARE IN COMPLIANCE:
A. PROPORTIONS OF SITE-
PREPARED MORTAR
1705.4 TMS 602-16:
Table 3
X
B. GRADE AND SIZE OF
PRESTRESSING TENDONS
AND ANCHORAGES.
1705.4 TMS 602-16:
Table 3
X
C. GRADE, TYPE AND SIZE OF REINFORCEMENT, CONNECTORS, ANCHOR BOLTS AND PRESTRESSING TENDONS AND ANCHORAGES
1705.4
TMS 602-16:
Table 3
X
D. PRESTRESSING TECHNIQUE 1705.4 TMS 602-16:
Table 3 X
E. PROPERTIES OF THIN-BED
MORTAR FOR AAC MASONRY
1705.4
TMS 602-16:
Table 3
X
F. SAMPLE PANEL
CONSTRUCTION
1705.4 TMS 602-16: Table 3
X
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 14/26 Code Required Special Inspections and Procedures Addendum 4
SYSTEM OR MATERIAL
2018 IBC CODE
REFERENCE
REFERENCED
STANDARD
REFERENCE
SPECIFICATION
SECTION
PERIODIC
OWNER
FURNISHED
SPECIAL
INSPECTION
CONTINUOUS
OWNER
FURNISHED
SPECIAL
INSPECTION
COMMENTS
2. PRIOR TO GROUTING,
VERIFY THAT THE
FOLLOWING ARE IN COMPLIANCE:
1705.4
A. GROUT SPACE
1705.4 TMS 602-16:
Table 3
X
B. PLACEMENT OF
PRESTRESSING
TENDONS AND
ANCHORAGES
1705.4
TMS 602-16: Table 3
X
C. PLACEMENT OF REINFORCEMENT, CONNECTORS, AND ANCHOR BOLTS
1705.4
TMS 602-16:
Table 3
X
D. PROPORTIONS OF SITE-
PREPARED GROUT AND
PRESTRESSING GROUT FOR BONDED TENDONS
1705.4
TMS 602-16:
Table 3
X
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 15/26 Code Required Special Inspections and Procedures Addendum 4
SYSTEM OR MATERIAL
2018 IBC
CODE
REFERENCE
REFERENCED
STANDARD
REFERENCE
SPECIFICATION
SECTION
PERIODIC
OWNER
FURNISHED
SPECIAL
INSPECTION
CONTINUOUS
OWNER
FURNISHED
SPECIAL
INSPECTION
COMMENTS
3. VERIFY COMPLIANCE OF
THE FOLLOWING DURING
CONSTRUCTION:
A. MATERIALS AND
PROCEDURES WITH THE
APPROVED SUBMITTALS
1705.4 TMS 602-16:
Table 3
X
B. PLACEMENT OF MASONRY UNITS AND MORTAR JOINT CONSTRUCTION
1705.4 TMS 602-16:
Table 3
X
C. SIZE AND LOCATION
STRUCTURAL MEMBERS
1705.4
TMS 602-16:
Table 3
X
NOT ALLOWED
UNLESS APPROVED
BY ENGINEER.
SEE STEEL
CONSTRUCTION
FOR WELDING
INSPECTION REQUIREMENTS
D. TYPE, SIZE, AND LOCATION
OF ANCHORS, INCLUDING
OTHER DETAILS OF
ANCHORAGE OF MASONRY
TO STRUCTURAL
MEMBERS, FRAMES OR OTHER CONSTRUCTION.
1705.4
TMS 602-16:
Table 3
X
E. WELDING OF REINFORCEMENT
1705.4 NOT APPLICABLE
X
F. PREPARATION,
CONSTRUCTION, AND
PROTECTION OF MASONRY
DURING COLD WEATHER
(TEMPERATURE BELLOW
40F) OR HOT WEATHER
TEMPERATURE ABOVE 90F)
1705.4
TMS 602-16:
Table 3
X
G. APPLICATION AND
MEASUREMENT OF
PRESTRESSING FORCE
1705.4 TMS 602-16:
Table 3
X
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 16/26 Code Required Special Inspections and Procedures Addendum 4
H. PLACEMENT OF GROUT
AND PRESTRESSING GROUT
FOR BONDED TENDONS IS IN COMPLIANCE
1705.4
TMS 602-16:
Table 3
X
I. PLACEMENT OF AAC
MASONRY UNITS AND
CONSTRUCTION OF THIN BED MORTAR JOINTS
1705.4
TMS 602-16:
Table 3
X
4. OBSERVE PREPARATION
OF GROUT SPECIMENS,
MORTAR SPECIMENS
AND/OR PRISMS.
1705.4
TMS 602-16:
Table 3
X
NOTES:
1. PERIODIC INSPECTION IS DEFINED AS INSPECTION BY THE SPECIAL INSPECTOR OF ALL MATERIALS AND SYSTEMS, IN SOME CASES
PERFORMED DURING THEIR PLACEMENT AND IN ALL CASES PERFORMED UPON COMPLETION OF THEIR PLACEMENT. THE COMPLETION
INSPECTION SHALL BE PERFORMED SO THAT WORK CAN BE CORRECTED PRIOR TO OTHER RELATED WORK PROCEEDING.
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 17/26 Code Required Special Inspections and Procedures Addendum 4
SUPPLEMENT B
FINAL REPORT OF REQUIRED SPECIAL
INSPECTIONS
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 18/26 Code Required Special Inspections and Procedures Addendum 4
Registered Design Professional in Responsible Charge Letterhead
[Date]
San Antonio Water System
[Owner address1]
[Owner address 2]
[City, State, Zip]
Final Report of Required Special Inspections
Project: [Project Name]
[Project Address] San Antonio,
Texas
The appropriate design professionals prepared and submitted a list of required special inspections (as required by the International Building Code Section 1704.1).
As the registered design professional in responsible charge for all required inspections for this project
during construction, to the best of my information, knowledge and belief, the listed required inspections
and tests for this project have been performed and all discovered discrepancies have been resolved.
Inspections and tests performed, either periodically or continuously, represent all the work for the item
inspected.
Respectfully,
[RDPiRC Firm Name]
[Signature of RDPiRC]
[Name of Registered Design Professional in Responsible Charge]
cc: General Contractor, Owner, Engineer
All Special Inspectors listed below
RDPiRC Seal
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 19/26 Code Required Special Inspections and Procedures Addendum 4
[Project Name, Address]
The following is a complete list of all of the required inspections listed on the permitted construction
documents along with the names of each of the inspectors that inspected this project:
Inspection Required Special Inspector Name / Firm Name
Geotechnical / Structural Related Inspections
1) Section 1705.2 Steel construction
2) Section 1705.3 Concrete construction
3) Section 1705.4 Masonry construction
4) Section 1705.5 Wood construction 5) Sextion 1705.6 Soils
6) Section 1705.7 Driven deep foundations
7) Section 1705.8 Cast-in-place deep foundations
8) Section 1705.9 Helical pile foundations
9) Section 1705.10 Fabricated Items
10) Section 1705.11 Special Insp. for Wind resistance 11) Section 1705.12 Special Insp. for seismic resistance 12) Section 1705.13 Testing for seismic resistance
13) Section 1705.1.1 Special Cases
Architectural Related Inspections
14) Section 1705.14 Sprayed fire-resistant materials 15) Section 1705.15 Mastic & intumescent fire-
resistant coatings
16) Section 1705.16 EIFS
17) Section 1705.17 Fire resistant penetrations and joints
Mechanical Related Inspections
18) Section 1705.18 Special inspections/smoke control Tests
19) Section 1706 Design Strengths of Materials
20) Section 1707 Alternative Test Procedures
21) Section 1708 In-Situ load tests
22) Section 1709 Preconstruction load tests
Notes:
● Inspectors for inspections not required for this project are listed as “not required”.
Inspections not required remain on the list in order to inform the building official that this
project does not require the specific inspections.
RDPiRC Final Remarks or Comments:
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 20/26 Code Required Special Inspections and Procedures Addendum 4
SUPPLEMENT C
REPORT OF REQUIRED SPECIAL
INSPECTIONS
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 21/26 Code Required Special Inspections and Procedures Addendum 4
Special Inspector Letterhead
[Date]
[Registered Design Professional in Responsible Charge
(RDPiRC)] [Address1]
[Address
2] [CSZ]
Report of Required Special Inspections
Project: [Project Name]
[Project Address] San Antonio, Texas
The appropriate design professionals prepared and submitted a list of required inspections (as required by
the International Building Code Section 1704.2 as amended by the City of San Antonio).
As your special inspector for the specific required inspections listed below for this project during
construction, to the best of my information, knowledge and belief, the listed required inspections and tests
for this project have been performed and all discovered discrepancies have been resolved.
Inspections and tests performed, either periodically or continuously, represent all the work
for the item inspected.
Respectfully,
[RDPiRC Firm Name]
[Signature of RDPiRC]
[Name of Registered Design Professional in Responsible Charge]
cc: General Contractor, Owner, Engineer
All Special Inspectors listed below
RDPiRC Seal
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 22/26 Code Required Special Inspections and Procedures Addendum 4
The following is a list of the required items of construction listed on the construction documents that I inspected:
Inspections Required Special Inspector / Firm
Section 1705.1.1 Special Cases:
Section 1705.2 Steel Construction:
Section 1705.3 Concrete Construction:
Section 1705.4 Masonry Construction:
Section 1705.5 Wood Construction:
Section 1705.6 Soils:
Section 1705.7 Driven Deep Foundations:
Section 1705.8 Cast-In-Place DeepFoundations:
Section 1705.9 Helical Pile Foundations:
Section 1705.10 Fabricated Items:
Section 1705.11 Special Inspections for Wind Resistance:
Section 1705.12 Special Inspections for Seismic Resistance:
Section 1705.13 Testing for Seismic Resistance:
Section 1705.14 Sprayed Fire-Resistant Materials:
Section 1705.15 Mastic and Intumescent Fire-Resistant Coatings:
Section 1705.16 Exterior Insulation and Finish Systems:
Section 1705.17 Fire Resistant Penetrations and Joints:
Section 1705.18 Special Inspections for smoke control (see IB 185):
Section 1706 Design Strength of Materials:
Section 1707 Alternative Test Procedures:
Section 1708 In-Situ Load Tests:
Section 1709 Preconstruction Load Tests:
Notes:
• List includes only the inspections performed by this inspector. Other inspectors for the
other required inspections listed on the construction documents will submit other
statements.
Additional Comments:
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 23/26 Code Required Special Inspections and Procedures Addendum 4
SUPPLEMENT D
NOTICE OF NON-COMPLIANCE
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 24/26 Code Required Special Inspections and Procedures Addendum 4
Seal (if applicable)
Special Inspector Letterhead
[Date]
[Registered Design Professional in Responsible Charge (RDPiRC)]
[Address1]
[Address 2]
[CSZ]
NOTICE OF NON-COMPLIANCE
Project: [Project Name]
[Project Address]
San Antonio, Texas
According to Section 1704.2.4 of the 2018 International Building Code, discrepancies shall be brought
to the attention of the registered design professional in responsible charge.
As a special inspector for the specific required special inspections for this project during construction,
special inspections performed indicate that the construction of the does not comply with the
requirements of the construction documents.
DO NOT COVER OR CONCEAL ANY WORK IN AREAS OF NON-COMPLIANCE UNTIL
CORRECTING THE NON- COMPLIANT WORK AND RECEIVING A FIELD REPORT
INDICATING THE WORK IS CORRECTED.
Attached are test/inspection reports describing the non-compliant construction.
Respectfully,
[RDPiRC Firm Name]
[Signature of RDPiRC]
[Name of Registered Design Professional in Responsible Charge]
cc: General Contractor, Owner, Engineer
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 25/26 Code Required Special Inspections and Procedures Addendum 4
SUPPLEMENT E
FABRICATOR’S CERTIFICATE OF
COMPLIANCE
San Antonio Water System (SAWS) Cagnon Ground Storage Tank Replacement Project
01416 - 26/26 Code Required Special Inspections and Procedures Addendum 4
Fabricator’s Certificate of Compliance
Each approved fabricator that is exempt from Special Inspection of shop fabrication and implementation
procedures per section 1704.2.5.1 of the International Building Code must submit a Fabricator’s Certificate
of Compliance at the completion of fabrication
Project: Fabricator’s Name: Address:
Certification or Approval Agency: Certification Number:
Date of Last Audit or Approval:
Description of structural members and assemblies that have been fabricated:
I hereby certify that items described above were fabricated in strict accordance with the Contract
Documents.
_ _ _
Signature Date
_
Title
Attach copies of fabricator’s certification or building code evaluation service report and fabricator’s quality
control manual.
ATTACHMENT 3
DRAWINGS C-103, D-501 AND D-505
OE OEOE OE
OEOE
OE
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
O
E
OE
0 60 120
SCALE: 1":60'
N
C-103
DE
MO
LIT
IO
N P
LA
N
10
/1
/2
02
1 9
:3
2:3
9 A
M - W
:\W
OR
K\C
-1
55
7 S
AW
S C
AG
NO
N G
ST
R
EP
LA
CE
ME
NT
P
RO
JE
CT
\D
ES
IG
N\C
IV
IL
\C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
\A
DD
EN
DU
M 4
\C
ON
ST
RU
CT
IO
N D
OC
UM
EN
TS
\C
-1
02
D
EM
OL
IT
IO
N (A
DD
4
).D
WG
- M
IC
HA
EL
L
IN
TO
N
1
A
B
C
D
E
F
2 3 4 5 6
Bar measures 1 inch, otherwise drawing is not to scale
Co
pyrig
ht: T
etra
T
ech
PROJ:
CHKD:
DRWN:
DESN:
200-09380-19001-04
CA
GN
ON
R
D G
RO
UN
D S
TO
RA
GE
T
AN
K
SA
N A
NT
ON
IO
W
AT
ER
S
YS
TE
MS
RE
PLA
CE
ME
NT
P
RO
JE
CT
RM
ML
CB
SAN
ANTO
NIO
WAT
ERSY
STEM
MA
RK
DA
TE
DE
SC
RIP
TIO
NB
Y
7
ww
w.te
tra
te
ch
.co
m
7073 S
an P
edro A
venue
San A
ntonio, T
exas 78216
P: (210)494-7223, F
: (210)490-5120
TB
PE
: F
-1712/T
BP
LS
: 10020900
71
1 N
AV
AR
RO
S
TR
EE
T, S
UIT
E 5
60
SA
N A
NT
ON
IO
, T
EX
AS
7
82
05
Pn
: (2
10
) 2
99
-7
90
0 F
ax: (2
10
2
26
-8
49
7
ADDENDUM NO. 4
R.O.W.
R.O.W. R.O.W.
R.O.W.
D
I
R
T
R
O
A
D
D
I
R
T
R
O
A
D
24
"R
CP
FORESTAR (USA) REAL ESTATE GROUP INC.
166.291 ACRES
DOC.# 20190178753
S
3
6
°
4
6
'
0
2
"
E
1
2
4
5
.
8
9
'
S8
9°3
8'5
0"W
7
40
.6
2'
S
A
W
S
P
A
R
C
E
L
P
1
0
-
2
8
0
P
E
R
M
A
N
E
N
T
8
0
'
W
A
T
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D
O
C
.
#
2
0
1
2
0
0
6
6
5
1
4
V
O
L
.
1
5
4
3
9
P
G
.
1
2
3
0
1
3
5
'
C
.
P
.
S
.
E
L
E
C
T
R
I
C
A
L
T
R
A
N
S
M
I
S
S
I
O
N
E
S
M
T
.
V
O
L
.
5
7
8
5
P
G
.
2
9
0
D
.
R
.
B
.
C
.
T
.
2.8
12
A
CR
E T
RA
CT
VA
IR
IA
BL
E W
ID
TH
E
LE
CT
RIC
E
AS
EM
EN
T
DO
C.#
2
01
90
16
59
40
W
M
T
.
N
E
I
L
S
U
R
.
6
2
A
B
S
T
R
A
C
T
N
O
.
5
4
4
C
.
B
.
5
1
9
7
N00°17'37"W 1002.62'
CAGNON ROAD
CITY OF SAN ANTONIO
SAN ANTONIO WATER
SYSTEM BOARD OF
TRUSTEES
VOL. 15414 PG.1147
8.411 ACRES
366,394 SQ. FT.
ASPHALT
DRIVEWAY
STEEL ENTRANCE
GATE
DOUBLE POST
SIGN
E
X
I
S
T
.
G
R
A
V
E
L
A
R
E
A
T
O
R
E
M
A
I
N
16
" D
UC
TIL
E
16
" D
UC
TIL
E
16
" D
UC
TIL
E
W
M
T
.
N
E
I
L
S
U
R
.
6
2
A
B
S
T
R
A
C
T
N
O
.
5
4
4
C
.
B
.
5
1
9
7
EXIST.
GROUND
STORAGE
TANK
FF=791.00
EXIST. CHAIN LINK FENCE
TO BE DEMOLISHED
EXIST. GROUND TANK AND
FOUNDATION TO BE DEMOLISHED
EXIST. WIRE FENCE
TO BE DEMOLISHED
EXIST. CANOPY
TO BE DEMOLISHED
EXIST. DRIVE TO BE
DEMOLISHED
EXIST. CONCRETE
TO BE DEMOLISHED
EXIST. CONCRETE TO
BE DEMOLISHED
EXIST. WIRE FENCE
TO BE DEMOLISHED
EXIST. 16" PIPE INLET TO BE DEMOLISHED.
EXIST. MANIFOLD AND BUTTERFLY VALVE TO
REMAIN. CONTRACTOR TO PUT A 16" BLIND
FLANGE ON EXIST. BFV TO PLUG.
EXIST. HIGH
VOLTAGE TOWER
CLEAR ALL
UNDERBRUSH
IN THIS AREA
EXIST. HIGH
VOLTAGE POLES
EXIST. HIGH
VOLTAGE
TOWER
EXIST. HIGH
VOLTAGE
TOWER
ELEVATED
STORAGE TANK
SAWS-DSP-15348
SIGN:
REFLECTOR
SIGN:
REFLECTOR
CONC. DRAIN
FL EL.: 798.64
CONC. DRAIN
FL EL.: 799.36
SIGN
SIGN:
NO PARKING
CONC. DRAIN
FL EL.: 782.27
CONC. DRAIN
FL EL.: 782.20
SAWS-DSP-2261
SIGN:
NO PARKING
EXIST. TREES TO BE
DEMOLISHED. SEE
SHT. C-107
EXIST. 6" STORM DRAIN TO
BE ABANDONED IN PLACE
EXIST. 6" STORM DRAIN
TO BE ABANDONED
IN PLACE
EXIST. GRAVEL ROAD
LEGEND
EXIST. TREE TO BE REMOVED
EXIST. STORM DRAIN TO BE
ABANDONED IN PLACE
EXIST. FENCE TO BE
DEMOLISHED
EXIST. STRUCTURE TO BE
DEMOLISHED
EXIST. CONCRETE TO BE
DEMOLISHED
EXIST. ROCK/CONCRETE
RUBBLE TO BE DEMOLISHED
EXIST. ROCK AND CONCRETE
RUBBLE TO BE DEMOLISHED
EXIST. ROCK AND
CONCRETE RUBBLE
TO BE DEMOLISHED
EXIST. CONCRETE SPLASH PAD
TO BE DEMOLISHED
2361
2360
2359
EXIST. GRAVEL ROAD
TO BE REBUILT
TREE LIST
POINT NO.
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1390
1391
1392
1393
1394
1463
1464
1465
1466
2359
2360
2361
2362
2363
2364
2365
TAG NO. SIZE & TYPE DRIP DIA.
1591 20" MESQUITE 40'
1592 12" MESQUITE 25'
1593 16" MESQUITE 30'
1594 10" CONDALIA 25'
1595 14" PERSIMMON 30'
1596 15" MESQUITE 35'
1597 21" MESQUITE 45'
1598 18" MESQUITE 40'
1599 12" MESQUITE 25'
1600 24" MESQUITE 40'
2989 21" MESQUITE 45'
2990 10" RETAMA 15'
2991 12" MESQUITE 20'
2992 9" HACKBERRY 20'
2993 10" HACKBERRY 20'
2994 10" MESQUITE 15'
2995 13" MESQUITE 30'
2996 12" TWIN MESQUITE 30'
2997 18" MESQUITE 35'
1584 11" MESQUITE 25'
1585 14" ASH 30'
1586 15" TWIN ASH 30'
1587 22" ASH 50'
1588 28" ASH 50'
1589 28" ASH 50'
1590 12" TRIPLE RETAMA 30'
* SHADED TREES TO BE REMOVED.
14"CMP
OLD FIBERGLASS
CHLORINE BUILDING
EXIST. GATE TO BE
DEMOLISHED
(120' TYPICAL)
(VARIABLE WIDTH R.O.W.)
CONTRACTOR TO PROTECT EXIST. PUMPS, VALVES
AND PIPING. EXIST. PUMP STATION TO REMAIN
TRANSFORMER
1 9
/3
0/2
1 A
DD
EN
DU
M N
O. 4
S
A
1
CHEMICAL BLDG.
NOTES:
1. THE UTILITIES SERVING THE EXISTING BUILDING TO BE
DEMOLISHED ARE TO BE CUT/CAPPED AT THE SOURCE
AND REMOVED AS PART OF DEMOLITION OF THE BUILDING.
2. THE OLD FIBERGLASS CHLORINE BUILDING IS TO BE
DISPOSED OF BY THE CONTRACTOR.
1
1
ENCASEMENTREINFORCEMENT PERTANK MANUFACTURER
CONCRETETANK WALL
STEEL FLG x FLGTAPPED HOLES IN STEEL FLG
90° ELBOW,FLG x WLD
2'-0"MIN
TOP OF WALL PANEL DESIGNOVERFLOWELEVATION
CONCRETEENCASEMENTSTAINLESSSTEEL PIPEWELDED STEELCOMPACT BEND
FINISHED FLOOR
DRAINAGESTRUCTURE
WEIR CONE TYPE316 STAINLESSSTEEL
SECTION A-A
REINFORCINGAS REQ'D
TOP VIEW
CONCRETE TANK WALL
CONCRETE TANK FOOTING
12" TANK DRAIN2'-0"
SUMP
℄
1" EXPANSION JOINT
OVERFLOW PIPE
WALL THK12"
7'-0"
SUBGRADE MATERIAL
SELECT FILL
.5% SLOPE
GROUT
F.F. ELEV =791.00 @WALL
2'-0"SUMP
℄3'-0"MIN
OVERFLOW PIPE
2'-0" CLR(MIN)
WELDED STEELCOMPACT BEND
CONCRETE TANK WALL
ADJUSTABLE GALVANIZED PIPESUPPORTS WITH A GASKET
9'-0"
12" WELDED STEEL PIPE
1" EXPANSION JOINT
1'-0" MIN
12" WELDED STEEL90° BEND
CONCRETE ENCASEMENTWITH STEEL REINFORCEMENT
SIDE VIEW
NOTES:
1. SEE STRUCTURAL SHEET S-103.
44 3/4" O.D.
36" I.D.9" 9"
(42) 7/8" DIABOLT HOLES
ZINC COATED GRADEA NUTS AND BOLTS
5/8" DIA RODHANDLES
ITEM 1
2'-0"
DRILL HOLES IN COVER TOMATCH FLANGE BOLTS TOBE INSTALLED AS SHOWN
ITEM 1
14 1/8"
STAINLESS STEEL MANWAYTYPE 316L CLASS D FLANGE
10" 4"
4"
9"2"
2"
4"
12"
6"2"3"
4"
2"
REINF ASREQUIRED
INSIDE FACEOF WALL
1/4" CLOTHINSERTEDRUBBERGASKETS
MANWAY COVER1" THK S.S. PLATE
ITEM 1 ITEM 2
℄
1/2" THK S.S. PLATE
1 5/8" DIA "HOLE SHOP DRILL
ITEM 2
ITEM 2HINGES
1/2" DIAROD RODHANDLE
6"
3"
WATERSTOP
316L STAINLESSSTEEL PIPE
4'-0" DIA SLOPETO SUMP
TOP OF BOXELEV = 791.00'
5"
A A
3'-6" TOFINISH FLOOR
5D-501
2'-0"
2'-0" CLR(MIN)
24" OVERFLOWDISCHARGE PIPE
6D-501
7D-501
48" MIN.
24" STEEL SHORTRADIUS 90° BEND
CONCRETECURB
CONCRETEBLOCKOUT
24" STEEL PIPEFLGxPE W/ WELDEDWALL COLLAR
24" WELDED STEEL PIPEFLGxFLG
S.S. PIPE STRAP
CONCRETE PIPE SUPPORT
24" STEEL SHORTRADIUS 90° BEND
24" WELDEDSTEEL PIPEFLGxFLG DESIGN LIQUID
LEVEL
SHOTCRETEPAD
SUPPORTBRACKET
7'-0"
NOTES:
1. THE INLET RISER AND PIPESUPPORTS BY TANKMANUFACTURER.
3'-0"MIN
OVERFLOW PIPE
12" GATE VALVE,FLANGE
18" STEELBLIND FLANGE
18" x 12"STEEL TEE,WELDED
18" STEEL PIPEWELDED
18" DIA RUN x12" DIABRANCH STEEL TEEPE x PE, WELDED
18" STEEL CAP
SUBGRADE MATERIAL
C5 x 9 GALVANIZEDGRATING SUPPORTS
ADJ. GALV.PIPE
SUPPORTS
1 1/2" x 3/16" GALVANIZED BARGRATING ON1 3/4" x 1 3/4" x 14"
ANGLE W/4" HCS @ 12" OCGRATE TO BE ATTACHED WITH
4 STAINLESS STEEL ANCHORCLIPS PER GRATE.
CONCRETE TANK WALL
SEE DETAIL BELOW
FRONT VIEW
5'-10"
2'-0"
7'-0"3'-0"
12" WALL THK
9'-0"
11'-0"
1 3/4"x1 3/4"x1/4" ANGLEW/CONCRETE ANCHOR
MCNICHOLS GW SERIES 1-1/2"x 3/16" GALVANIZED BARGRATING ON 1 3/4"x1 3/4"x1/4"ANGLE IRON. GRATE TO BEATTACHED WITH STAINLESSSTEEL ANCHOR CLIPS PERGRATE.
C5 x 9 GALVANIZEDGRATING SUPPORTS
GRATING SUPPORT DETAIL
1/4"
12"
2"TYP
2'-0" CLR(MIN)
4D-504
24" OVERFLOWDISCHARGE PIPE
WITH PLUG.
SELECT FILL MATERIAL
DUCKBILL CHECK VALVE.(OR EQUAL)
DUCKBILL CHECKVALVE. (OR EQUAL)
DUCKBILLCHECK VALVE
1'-0"
6D-501
5D-501
AD-501
SECTIONA_
SCALE: NTS
ELEVATIONSCALE: NTS2'-0"
MIN
18" DRAIN RISERW/ 18"x12" TEES,
TOP AND BOTTOM
12" STEEL PIPING
12" GATE VALVE, FLG
12" STEEL PIPING
12" 90° BEND DOWN
4" PERFORATEDUNDER DRAIN PIPE
4" PERFORATEDUNDER DRAIN PIPE
4" PERFORATED UNDER DRAINPIPE INV 785.95
TANK WALL SHALLSUPPORT THE PIPE IN
LIEU OF STANCHIONPIPE SUPPORT
NOTE:
1. ALL PIPING INSIDE THE TANK (THAT ISNOT ENCASED) SHALL BE TYPE 316LSTAINLESS STEEL.
2. PROVIDE TEMPORARY PRESSURE TEST CAP.
PIPEDIA
MINDIST
24" 42"30" 48"36" 54"48" 60"54" 66"60" 72"
1
CONSTRUCTIONJOINTS AS REQUIRED
SEE CHART
90° SHORT RADIUSWELD-ELS1'-0" MIN
SUMP
1
FINISHFLOOR
PIPEDIA
MINDIST
24" 42"30" 48"36" 54"48" 60"54" 66"60" 72"
PIPE SAFETYRAILING
℄
6"
℄
COVER PERPLAN
℄
1'-0" MIN
11
SEE CHART
FINISHFLOOR
℄
6"
WATERSTOP
WATERSTOP
CONSTRUCTIONJOINTS AS REQUIRED
WATERSTOP
6"
316 STAINLESSSTEEL PIPE PE
"SILT STOP"
1D-502
PIPE SAFETYRAILING
1D-502
ANGLE AND ORIENTATION ASDETERMINED BY TANKMANUFACTURER MIXING ANALYSIS.SEE SPECIFICATION SECTION 13207FOR DETAIL REQUIREMENT.
COVER PERPLAN
SLOPE PERFINAL GRADING
SLOPE PERFINAL GRADING
NOTE:
1. ALL PIPING INSIDE THE TANK (THAT ISNOT ENCASED) SHALL BE TYPE 316LSTAINLESS STEEL.
2. PROVIDE TEMPORARY PRESSURE TEST CAP.
CONCRETE REINFORCEMENTWITH REBAR
STEEL - PIPE SHOPWELDED TO WELD-ELS
COMPACTED SUBGRADE SOILOR LEVELING BASE MATERIAL
CONCRETE REINFORCEMENTWITH REBAR
STEEL - PIPE SHOPWELDED TO WELD-ELS
COMPACTED SUBGRADE SOILOR LEVELING BASE MATERIAL
3 LAYERS OF 6MIL POLYFILM
3 LAYERS OF 6MIL POLYFILM
90° SHORT RADIUSWELD-ELS
PIPE OUTLET TO BE CENTERED OVERDRAINAGE STRUCTURE OPENING
2-0"
PIPE CENTERLINEELEV TO PROVIDE MIN2' CLEARANCE FROMCHECK VALVE TOGRATING
INSECT SCREEN
6"
WATERSTOP
316 STAINLESS STEEL PIPEPE x FLG W/ 2 - 1" Ø HOLES@ 180° APART, "SILT STOP"
316 STAINLESS STEEL PIPEPE x FLG W/ 2 - 1" Ø HOLES@ 180° APART, "SILT STOP"
1
1
1
DETAIL5- SCALE: NTS
DETAIL6- SCALE: NTS
DETAIL2- SCALE: NTS
DETAIL7- SCALE: NTS
DETAIL3- SCALE: NTS
DETAIL8- SCALE: NTS
DETAIL4- SCALE: NTS
DETAIL1- SCALE: NTS
OVERFLOW PIPE TANK FLOOR INLET
DRAINAGE STRUCTURE - PLAN VIEWDRAINAGE STRUCTURE - FRONT VIEW DRAINAGE STRUCTURE - SIDE VIEW
EXTERIOR INLET RISERTANK FLOOR OUTLET
36" SHELL MANWAY
CHKD:
DRWN:
PROJ:
DESN:
ww
w.te
trate
ch.c
om
MA
RK
DA
TED
ES
CR
IPTI
ON
BY
9/30
/202
1 1:
47:4
0 P
M -
O:\P
RO
JEC
TS\S
AN
AN
TON
IO\0
9308
\200
-093
08-1
9001
-04\
CA
D\S
HE
ETF
ILE
S\D
-501
STA
ND
AR
D P
RO
CE
SS
DE
TAIL
S I.
DW
G -
GU
AR
D, S
TEV
EN
1
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch, otherwise drawing not to scale
Cop
yrig
ht: T
etra
Tec
h
200-09380-19001-04
CA
GN
ON
RD
GR
OU
ND
STO
RA
GE
TA
NK
RE
PLA
CE
ME
NT
PR
OJE
CT
SA
N A
NTO
NIO
WA
TER
SY
STE
MS
711
NA
VA
RR
O S
TRE
ET,
SU
ITE
560
SA
N A
NTO
NIO
, TE
XA
S 7
8205
PH
: (21
0) 2
99-7
900
FA
X: (
210)
226
-849
7
ADDENDUM NO. 4
Texa
s R
egis
tratio
n N
o. F
-392
4
SAN
ANTONIO
WATER
SYSTEM
D-501
STA
ND
AR
DP
RO
CE
SS
DE
TAIL
S I
SASGGMWB
109
/27/
21A
DD
EN
DU
M N
O. 4
SA
WIRES AND SHOTCRETE COVER
HORIZONTAL PRESTRESSING
DO
ME
DOME OVERHANG3"
11" PVC WATERSTOP (CONT.)
0"
1-1/2" CL.
9-1/
2"
9-1/4"
SPONGE FILLER
1" CL.
1-1/2" CL.
26 GAUGE STEEL DIAPHRAGM
ELASTOMERIC BEARING PAD
PRESTRESSED CORE WALL
INSIDE DIAMETER
VERTICAL REINFORCEMENT
RIN
G
1" CL.
1" CL.
SID
E W
ATE
R D
EP
TH (S
WD
)
SPRINGLINE EL 832.50'
DESIGN WATER EL. 831.00'
TYPICAL FLOORREINFORCEMENT#5 @ 6" O.C.E.W
6 MIL POLYETHYLENE FILMUNDER FLOOR AND FOOTING
CONCRETE DOME,RISE 1/10 DIAMETER
1" SHOTCRETE COVEROVER LAST LAYER OF
WIRE
1/4" SHOTCRETE COVERBETWEEN EACH LAYER
OF WIRE
1/2" SHOTCRETE COVEROVER STEEL DIAPHRAGM
STEELDIAPHRAGM
PRESTRESSINGWIRES
PRECAST CONCRETE PANEL+ 1/2" SHOTCRETE
6" (MIN.) CONCRETEMEMBRANE FLOOR
CONCRETE WATERSTOPENCASEMENT
DOME FILLETREINFORCEMENT
DOME SHELLREINFORCEMENT
SPONGEFILLER
PREFORMED HYDROPHILIC WATER STOP,ADHERE TO WALL PRIOR TO PLACINGCONCRETE WATER STOP ENCASEMENT
1'-6
"M
IN.
FOOTINGREINFORCEMENT DETAIL1
_SCALE: NTS
WALL SECTION DETAILSCALE: NTS
TANK SUBGRADE3
D-503
MIN. 1'-0" REINFORCEDFOOTING RING
FLOOR EL. AT WALL 791.00
FLOOR EL. ATCENTER 791.25'
1
3'-0"
6"
8"
3'-6"2 1
4 "3 1
2"
1 38"
4"
2 14 "
8"
3 12 "
3'-6"
INTERIOR LADDER
HANDLE
GASKET(ALL AROUND)
SPRING LATCH WITHINSIDE-OUTSIDE HANDLES
AND PADLOCK HASP
COVER LINERCOVERAUTOMATIC HOLD OPEN ARM
AND COVER RELEASE1" FIBERGLASS INSULATIONTHROUGHOUT COVER.
CURB WITH INTEGRALCAPFLASHING AND BILCLIP
COMBINATION LOCK STRIKEAND PADLOCK HASP
HINGE
1" RIGID FIBERBOARD INSULATIONAROUND OUTSIDE OF CURB
INTERIOR LADDER
RESERVOIR ROOF
NOTES:
1. BILCO (TYPE "S") ROOF SCUTTLE; HALLIDAY F1R SERIES; OR APPROVED EQUAL.
2. ALL HARDWARE FOR HATCHES SHALL BE STAINLESS STEEL.
3. ALL ALUMINUM SHALL BE ISOLATED FROM CONCRETE BY A NEOPRENE GASKET.
4. COVER HATCH WITH POLYETHYLENE FOR PROTECTION DURING CONSTRUCTION.
BOLT TOGETHER ASPER MANUFACTURER
MAY VARY ACCORDINGTO ROOF SLOPESIDE VIEW
TOP VIEW
2" MINIMUM LID
LIFTING MECHANISMHOUSING
70°
DETAIL2_
SCALE: NTS
ACCESS HATCH DETAIL (3'-0" X 3'-6" OPENING)
CHKD:
DRWN:
PROJ:
DESN:
ww
w.te
trate
ch.c
om
MA
RK
DA
TED
ES
CR
IPTI
ON
BY
9/30
/202
1 1:
51:4
4 P
M -
O:\P
RO
JEC
TS\S
AN
AN
TON
IO\0
9308
\200
-093
08-1
9001
-04\
CA
D\S
HE
ETF
ILE
S\D
-505
STA
ND
AR
D P
RO
CE
SS
DE
TAIL
S V
.DW
G -
GU
AR
D, S
TEV
EN
1
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch, otherwise drawing not to scale
Cop
yrig
ht: T
etra
Tec
h
200-09380-19001-04
CA
GN
ON
RD
GR
OU
ND
STO
RA
GE
TA
NK
RE
PLA
CE
ME
NT
PR
OJE
CT
SA
N A
NTO
NIO
WA
TER
SY
STE
MS
711
NA
VA
RR
O S
TRE
ET,
SU
ITE
560
SA
N A
NTO
NIO
, TE
XA
S 7
8205
PH
: (21
0) 2
99-7
900
FA
X: (
210)
226
-849
7
ADDENDUM NO. 4
Texa
s R
egis
tratio
n N
o. F
-392
4
SAN
ANTONIO
WATER
SYSTEM
D-505
STA
ND
AR
DP
RO
CE
SS
DE
TAIL
S V
SASGGMWB
GROUND STORAGE TANK
109
/27/
21A
DD
EN
DU
M N
O. 4
SA