Upload
ramky1973
View
215
Download
0
Embed Size (px)
Citation preview
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
1/20
Overview of CA AutoSys and WCC 11.3New Features
Dan Shannon/ Elizabeth Dexter
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
2/20
Terms of This Presentation
This presentation was based on current information and resource allocations as of October
2009 and is subject to change or withdrawal by CA at any time without notice.
Notwithstanding anything in this presentation to the contrary, this presentation shall not serve
to (i) affect the rights and/or obligations of CA or its licensees under any existing or futurewritten license agreement or services agreement relating to any CA software product; or (ii)
amend any product documentation or specifications for any CA software product. The
development, release and timing of any features or functionality described in this presentation
remain at CAs sole discretion. Notwithstanding anything in this presentation to the contrary,
upon the general availability of any future CA product release referenced in this presentation,
CA will make such release available (i) for sale to new licensees of such product; and (ii) toexisting licensees of such product on a when and if-available basis as part of CA maintenance
and support, and in the form of a regularly scheduled major product release. Such releases
may be made available to current licensees of such product who are current subscribers to CA
maintenance and support on a when and if-available basis. In the event of a conflict between
the terms of this paragraph and any other information contained in this presentation, the
terms of this paragraph shall govern.
2 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
3/20
For Informational Purposes Only
Certain information in this presentation may outline CAs general product direction. All
information in this presentation is for your informational purposes only and may not be
incorporated into any contract. CA assumes no responsibility for the accuracy or completeness
of the information. To the extent permitted by applicable law, CA provides this document asis without warranty of any kind, including without limitation, any implied warranties or
merchantability, fitness for a particular purpose, or non-infringement. In no event will CA be
liable for any loss or damage, direct or indirect, from the use of this document, including,
without limitation, lost profits, lost investment, business interruption, goodwill, or lost data,
even if CA is expressly advised of the possibility of such damages.
3 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
4/20
Agenda
> CA Workload Automation AE r11.3 Enhancements
> CA Workload Automation WCC r11.3 Enhancements
4 August 12, 2009 [Enter presentation title in footer] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
5/20
CA Workload Automation r11.3Enhancements
> CA Spectrum Automation Manager Integration
> Advanced Encryption
> New Job Type Support> Resource Dependencies
> New Alarms
> Forecasting Report
> Cross Platform Support
> Support for IPv6
5 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
6/20
CA Spectrum Automation Manager
Integration
> Machine Pools
> Dynamic Workload Placement
> Real Resource Dependencies
6 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
7/20
Advanced Encryption
> AES 128 bit Encryption
> Instance Wide Encryption
> Agent Encryption> Custom Keys
32 Hexadecimal Digits
16 Character Pass Phrase
7 August 12, 2009 [Enter presentation title in footer] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
8/20
New Job Types Support
> Leverage Job Types Supported by CA WA System Agent
> 51 New Job Types
> Scheduler Support for Legacy Agents> Jil and Autorep for New Job Types
> Schema Based Job Type Definitions
8 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
9/20
Virtual Resource Dependencies> Greater Scheduling Control
Serialisation of Access to Limited Resources
Load Balancing
Better Control
> Resource Types
Renewable
Depletable
Threshold
> Align Capabilities with Other Engines
9 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
10/20
Real Resource Dependencies> CA Spectrum Automation Manager
> Hardware Configuration Metrics
> Software Configuration Metrics
10 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
11/20
Virtual Resource Examples
insert_resource: service_threshold
res_type: t
amount: 1
insert_resource: product_site_license
res_type: r
amount: 3
11 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
12/20
Virtual Resource Examples
12 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
13/20
Virtual Resource Examplesinsert_job: urgent
box_name: res_threshold_box
command: sleep 30
machine: prod_mach1
resources: (service_threshold,quantity=1)
insert_job: normal
box_name: res_threshold_box
command: sleep 30
machine: prod_mach1
resources: (service_threshold,quantity=2)13 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
14/20
Virtual Resource Examples
14 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
15/20
Virtual Resource Examples
15 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
16/20
New Alarms
> Must Start
> Must Complete
> Relative and Absolute Time
16 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
17/20
Forecasting Report
> Batch Report
> Predictive
> Can be run through WCC> Potentially Long Running
17 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
18/20
Forecasting Report
18 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
19/20
Cross Platform Support
> Job Submission
Legacy 4.5 Agents
UUJMA Agents> Job Dependencies with CA Workload Automation EE
> Cross Instance Dependencies with CA Workload
Automation AE
r11, 4.5
19 October 8, 2009 [New Features of CA AutoSys Workload Automation & WCC r11.3] Copyright 2009 CA
7/28/2019 CA_AutoSys_WA_r113_New_Features_Part1_of_2.pdf
20/20
Miscellaneous
> IPv6 Support
> Continuous Monitors
> Machine Definition Supports Node Name> Database Re-indexing Scripts
> Improved Log Maintenance
20 O b 8 2009 [N F f CA A S W kl d A i & WCC 11 3] C i h 2009 CA