C3 and G9 Connectivity

Embed Size (px)

DESCRIPTION

good

Citation preview

  • RJ45-RJ45

    BITS/Router

    ODF

    TOR DDF

    5xE1 cable (12 E1s per cable)

    2xDB9 Ethernet cables

    8xSingle Mode Fiber cables

    4x1G Copper 4x1G Fiber

    TS

    Genband G9 Physical Connectivity

    RJIL provided

    Genband provided

    GB India Sourcing

    Genband Factory

    Genband Factory

    Genband Factory

    GB India Sourcing

  • 6xGigE Copper cables

    TOR 1xDB9-RJ45

    TS

    Genband C3 Physical Connectivity

    Genband Factory

    RJIL provided

    Genband provided

    GB India Sourcing

  • RJIL Responsibility RACK POWER & GROUND TILL RACK GROUND BAR ON RACK MCB / DCDB / PDU on RACK as per requirement DDF / MDF / ODF / Patch panel etc. TOR / L2 switch Router (BITS CLOCK) Cable between DDF to MDF / MUX etc.

    GENBAND Responsibility MGCF (Delhi, Mumbai, Kolkata and Bangalore 32 servers in active standby mode) MGW (1 in each circle + Ranchi + Raipur) TS (terminal server) for C3 (MGCF) and G9 (MGW) E1 cable (5x12E1 cables) between G9 and DDF Cable between TS and C3 / TS and G9 Cable between G9 and Router for BITS clock Power and ground cable from C3/G9 to top of rack.

  • Power & Space Requirements Per C3 & G9

    Per C3: 2x15 Amps Per G9: 2x80 Amps Per TS: 2x2Amps

    Location wise requirements : FINAL

    Locations with both C3 and G9 Delhi Mumbai Bangalore Kolkata

    32xC3: 64x15Amps 1xG9: 2x80Amps 1xTS for C3: 2x2Amps 1xTS for G9: 2x2Amps

    Locations with only G9 One city in 22 circles Raipur & Ranchi 1xG9: 2x80Amps 1xTS for G9: 2x2Amps

    Per C3: 2RU Per G9: 15RU Per TS: 1RU

  • Genband Deployment Pan India

  • Genband Deployment : Soft Launch