RJ45-RJ45
BITS/Router
ODF
TOR DDF
5xE1 cable (12 E1s per cable)
2xDB9 Ethernet cables
8xSingle Mode Fiber cables
4x1G Copper 4x1G Fiber
TS
Genband G9 Physical Connectivity
RJIL provided
Genband provided
GB India Sourcing
Genband Factory
Genband Factory
Genband Factory
GB India Sourcing
6xGigE Copper cables
TOR 1xDB9-RJ45
TS
Genband C3 Physical Connectivity
Genband Factory
RJIL provided
Genband provided
GB India Sourcing
RJIL Responsibility RACK POWER & GROUND TILL RACK GROUND BAR ON RACK MCB / DCDB / PDU on RACK as per requirement DDF / MDF / ODF / Patch panel etc. TOR / L2 switch Router (BITS CLOCK) Cable between DDF to MDF / MUX etc.
GENBAND Responsibility MGCF (Delhi, Mumbai, Kolkata and Bangalore 32 servers in active standby mode) MGW (1 in each circle + Ranchi + Raipur) TS (terminal server) for C3 (MGCF) and G9 (MGW) E1 cable (5x12E1 cables) between G9 and DDF Cable between TS and C3 / TS and G9 Cable between G9 and Router for BITS clock Power and ground cable from C3/G9 to top of rack.
Power & Space Requirements Per C3 & G9
Per C3: 2x15 Amps Per G9: 2x80 Amps Per TS: 2x2Amps
Location wise requirements : FINAL
Locations with both C3 and G9 Delhi Mumbai Bangalore Kolkata
32xC3: 64x15Amps 1xG9: 2x80Amps 1xTS for C3: 2x2Amps 1xTS for G9: 2x2Amps
Locations with only G9 One city in 22 circles Raipur & Ranchi 1xG9: 2x80Amps 1xTS for G9: 2x2Amps
Per C3: 2RU Per G9: 15RU Per TS: 1RU
Genband Deployment Pan India
Genband Deployment : Soft Launch