17
BOULEVARD PARK SHORELINE IMPROVEMENTS CITY OF BELLINGHAM SURVEY NOTES PROJECT DATUM VICINITY MAP INDEX TO DRAWINGS SHEET DATE SCALE OF JOB NUMBER CHECKED BY DRAWN BY DESIGNED BY C1.0 C5.1 AS SHOWN COVER SHEET 2011-129A SJW SJW MFM WASHINGTON BELLINGHAM BOULEVARD PARK SHORELINE IMPROVEMENTS CITY OF BELLINGHAM 2/28/2013 C1.0 - COVER SHEET C1.1 - LEGEND C1.2 - GENERAL NOTES C1.3 - TESC PLAN & TRAFFIC PLAN C1.4 - TESC PLAN DETAILS C1.5 - TESC PLAN NOTES C2.0 - EXISTING CONDITIONS C2.1 - EXISTING BEACH COVERAGE C2.2 - DEMOLITION PLAN C3.0 - SITE PLAN - PROPOSED CONDITIONS C3.1 - GRADING PLAN C3.2 - SITE RESTORATION PLAN C4.0 - SITE DETAILS A, B, C C4.1 - SITE DETAILS D, E C4.2 - SITE DETAILS F, G, H, I, J C5.0 - CROSS SECTIONS 1 - 7 C5.1 - CROSS SECTIONS 8-13 MEAN LOWER LOW WATER (MLLW) BENCH MARKS: 1) NGS TIDAL BENCHMARK V-454 ELEVATION = 16.47 FT MLLW (16.00 NAVD88) 2) BRASS PLUG MONUMENT (CITY OF BELLINGHAM ID#538) ELEVATION = 24.62 FT MLLW (24.15 FT NAVD88) NOTE: TIDE DATUMS WERE OBTAINED FROM NATIONAL OCEAN SERVICE DATA SHEET 9449211 DATED 12/12/2003 2009 NORTH BOULEVARD PARK AND SHORELINE BASEMAPPING SURVEY BY LARRY STEELE & ASSOCIATES LAND SURVEYORS FOR THE CITY OF BELLINGHAM PARKS & RECREATION DEPARTMENT EELGRASS MAPPING CHRIS FAIRBANKS OF FAIRBANKS ENVIRONMENTAL AND ALEXIS BLUE, PE OF COASTAL GEOLOGIC SERVICES MAPPED THE INNER MARGIN OF EELGRASS ON JUNE 6, 2012 DURING A LOWTIDE EVENT BETWEEN 11:30AM AND 1:15PM WITH A HANDHELD TRIMBLE GEO-HX 6000 CITY OF BELLINGHAM CITY OF BELLINGHAM MAYOR KELLI LINVILLE PARKS DIRECTOR JAMES KING PROJECT ENGINEER GINA GOBO AUSTIN, PE BELLINGHAM BAY BOULEVARD PARK CONTACTS CITY OF BELLINGHAM PROJECT ENGINEER GINA GOBO AUSTIN, PE PARKS & RECREATION DEPARTMENT CITY OF BELLINGHAM (360) 778-7000 BEACH RESTORATION ENGINEER ALEXIS BLUE, PE COASTAL GEOLOGIC SERVICES 1711 ELLIS ST., SUITE 103 BELLINGHAM, WA 98225 (360) 647-1845 CIVIL ENGINEER SCOTT WILSON, PE WILSON ENGINEERING, LLC 805 DUPONT ST. SUITE 7 BELLINGHAM, WA 98225 (360) 733-6100 W:\2011\2011-129 Coastal Geological Services - Blvd Park Beach Restoration\Dwg\C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF.pc3

C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

BOULEVARD PARK SHORELINE IMPROVEMENTSCITY OF BELLINGHAM

SURVEY NOTES

PROJECT DATUM

VICINITY MAP INDEX TO DRAWINGS

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

Y

C1.0

C5.1

AS S

HO

WN

COVE

R SH

EET

2011

-129

A

SJW

SJW

MFM

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

C1.0 - COVER SHEET

C1.1 - LEGEND

C1.2 - GENERAL NOTES

C1.3 - TESC PLAN & TRAFFIC PLAN

C1.4 - TESC PLAN DETAILS

C1.5 - TESC PLAN NOTES

C2.0 - EXISTING CONDITIONS

C2.1 - EXISTING BEACH COVERAGE

C2.2 - DEMOLITION PLAN

C3.0 - SITE PLAN - PROPOSED CONDITIONS

C3.1 - GRADING PLAN

C3.2 - SITE RESTORATION PLAN

C4.0 - SITE DETAILS A, B, C

C4.1 - SITE DETAILS D, E

C4.2 - SITE DETAILS F, G, H, I, J

C5.0 - CROSS SECTIONS 1 - 7

C5.1 - CROSS SECTIONS 8-13

MEAN LOWER LOW WATER (MLLW)

BENCH MARKS:

1) NGS TIDAL BENCHMARK V-454

ELEVATION = 16.47 FT MLLW (16.00 NAVD88)

2) BRASS PLUG MONUMENT (CITY OF BELLINGHAM ID#538)

ELEVATION = 24.62 FT MLLW (24.15 FT NAVD88)

NOTE: TIDE DATUMS WERE OBTAINED FROM NATIONAL OCEAN SERVICE DATA SHEET

9449211 DATED 12/12/2003

2009 NORTH BOULEVARD PARK AND SHORELINE BASEMAPPING SURVEY BY

LARRY STEELE & ASSOCIATES LAND SURVEYORS FOR THE CITY OF BELLINGHAM

PARKS & RECREATION DEPARTMENT

EELGRASS MAPPING

CHRIS FAIRBANKS OF FAIRBANKS ENVIRONMENTAL AND ALEXIS BLUE, PE OF COASTAL

GEOLOGIC SERVICES MAPPED THE INNER MARGIN OF EELGRASS ON JUNE 6, 2012

DURING A LOWTIDE EVENT BETWEEN 11:30AM AND 1:15PM WITH A HANDHELD TRIMBLE

GEO-HX 6000

CITY OF BELLINGHAM

CITY OF BELLINGHAM MAYOR

KELLI LINVILLE

PARKS DIRECTOR

JAMES KING

PROJECT ENGINEER

GINA GOBO AUSTIN, PE

BELLINGHAM

BAY

B

O

U

L

E

V

A

R

D

P

A

R

K

CONTACTS

CITY OF BELLINGHAM PROJECT ENGINEER

GINA GOBO AUSTIN, PE

PARKS & RECREATION DEPARTMENT

CITY OF BELLINGHAM

(360) 778-7000

BEACH RESTORATION ENGINEER

ALEXIS BLUE, PE

COASTAL GEOLOGIC SERVICES

1711 ELLIS ST., SUITE 103

BELLINGHAM, WA 98225

(360) 647-1845

CIVIL ENGINEER

SCOTT WILSON, PE

WILSON ENGINEERING, LLC

805 DUPONT ST. SUITE 7

BELLINGHAM, WA 98225

(360) 733-6100

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

1.0 - C

OV

ER

SH

EET.d

wg

, 3/4/2013 2:14:46 P

M, D

WG

To

P

DF.p

c3

Page 2: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

Y

C1.1

C5.1

AS S

HO

WN

LEG

END

2011

-129

A

SJW

SJW

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

TT

SB

IP

CD

EC34

EC22C22

1C22C22

1C34

LEGEND_&_ABBREVIATIONS

SJW

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

1.0 - C

OV

ER

SH

EET.d

wg

, 3/4/2013 2:14:53 P

M, D

WG

To

P

DF.p

c3

Page 3: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

Y

C1.2

C5.1

AS S

HO

WN

GEN

ERAL

NO

TES

2011

-129

A

SJW

SJW

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

NOTES & SPECIFICATIONS

1. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OFCONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL APPLYCONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, ANDHOLD THE CITY OF BELLINGHAM AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITHTHE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE CITY OFBELLINGHAM OR THE ENGINEER.

2. IF THERE ARE ANY DISCREPANCIES BETWEEN DIMENSIONS IN DRAWING AND EXISTING CONDITIONS WHICH WILL AFFECT THE WORK, THECONTRACTOR SHALL BRING SUCH DISCREPANCIES TO THE ATTENTION OF THE ENGINEER FOR ADJUSTMENT BEFORE PROCEEDING WITH THEWORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER FITTING OF ALL WORK AND FOR THE COORDINATION OF ALL TRADES,SUBCONTRACTORS, AND PERSONS ENGAGED UPON THIS CONTRACT.

3. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR OR REPLACE ANY EXISTING IMPROVEMENTS OR UNDERGROUND FACILITIES DAMAGED BYHIM, HIS SUBCONTRACTORS, OR HIS MATERIAL SUPPLIERS WITHIN 48 HOURS OF THE DAMAGE OCCURRENCE AND/OR AS REQUIRED BY THECONSTRUCTION INSPECTOR.

4. EXISTING UTILITIES AND UNDERGROUND FACILITIES INDICATED ARE FOR INFORMATION ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITYTO VERIFY THE LOCATION AND DEPTH. NEITHER THE CITY OF BELLINGHAM NOR THE ENGINEER ASSUMES RESPONSIBILITY THAT THEUTILITIES AND UNDERGROUND FACILITIES INDICATED WILL BE THE UTILITIES AND UNDERGROUND FACILITIES ENCOUNTERED.

5. ALL TRENCHES AND EXCAVATIONS SHALL BE CONSTRUCTED IN STRICT COMPLIANCE WITH THE APPLICABLE SECTIONS OF FEDERAL OSHAREQUIREMENTS AND OTHER APPLICABLE SAFETY ORDINANCES. CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR TRENCH SHORINGDESIGN AND INSTALLATION.

6. THE CONTRACTOR IS RESPONSIBLE FOR MATCHING EXISTING STREETS, SURROUNDING LANDSCAPE, AND OTHER IMPROVEMENTS WITH ASMOOTH TRANSITION IN PAVING, CURBS, GUTTERS, SIDEWALKS, GRADING, ETC, AND TO AVOID ANY ABRUPT OR APPARENT CHANGES INGRADES OR CROSS SLOPES, LOW SPOTS, OR HAZARDOUS CONDITIONS.

7. A 48-HOUR NOTIFICATION TO THE CITY OF BELLINGHAM IS REQUIRED PRIOR TO ANY UTILITY SERVICE DISRUPTION. MAXIMUM ALLOWABLESERVICE DISRUPTION IS 4-HOURS.

GENERAL NOTES

CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR OBTAINING PERMITS FROM THE WASHINGTON STATE DEPARTMENT OFNATURAL RESOURCES FOR REMOVING AND REPLACING ALL SURVEY MONUMENTATION THAT MAY BE AFFECTED BYCONSTRUCTION ACTIVITY, PURSUANT TO WAC 332-120. APPLICATIONS MUST BE COMPLETED BY A REGISTERED LANDSURVEYOR. APPLICATIONS FOR PERMITS TO REMOVE MONUMENTS MAY BE OBTAINED FROM THE WASHINGTON STATEDEPARTMENT OF NATURAL RESOURCES (DNR), OR BY CONTACTING THEIR OFFICE BY TELEPHONE AT (206) 902-1190.

WASHINGTON STATE DEPARTMENT OF NATURAL RESOURCESPUBLIC LAND SURVEY OFFICE1111 WASHINGTON STREET S.E.OLYMPIA, WASHINGTON 98504-7060

UPON COMPLETION OF CONSTRUCTION, ALL MONUMENTS DISPLACED, REMOVED, OR DESTROYED SHALL BE REPLACED BYA REGISTERED LAND SURVEYOR, AT THE COST OF THE CONTRACTOR, PURSUANT TO THESE REGULATIONS. THEAPPROPRIATE FORMS FOR REPLACEMENT OF SAID MONUMENTS SHALL BE COMPLETED AND FILED WITH DNR AT THECONTRACTOR'S EXPENSE.

SURVEY MONUMENTATION:

PROTECTION OF THE ENVIRONMENT

NO CONSTRUCTION RELATED ACTIVITY SHALL CONTRIBUTE TO THE DEGRADATION OF THE ENVIRONMENT,ALLOW MATERIAL TO ENTER SURFACE OR GROUND WATERS, OR ALLOW PARTICULATE EMISSIONS TO THEATMOSPHERE, WHICH EXCEED STATE OR FEDERAL STANDARDS. ANY ACTIONS THAT POTENTIALLY ALLOW ADISCHARGE TO STATE WATERS MUST HAVE PRIOR APPROVAL OF THE STATE OF WASHINGTON, DEPARTMENT OFECOLOGY

GENERAL NOTES, CONT.

MFM

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

1.0 - C

OV

ER

SH

EET.d

wg

, 3/4/2013 2:14:57 P

M, D

WG

To

P

DF.p

c3

Page 4: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

Y

C1.3

C5.1

AS S

HO

WN

TESC

PLA

N &

TRA

FFIC

PLA

N20

11-1

29A

SJW

SJW

MFM

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

CONSTRUCT TEMPORARY

CONSTRUCTION ENTRANCE

PER BMP C105

INSTALL STEEL SHEETS

AS REQUIRED TO PROTECT

EXISTING UTILITIES

PROVIDE FLAGGER AT TRAIL CROSSING

CONSTRUCT TEMPORARY PATH 8-FT

WIDTH WITH 4 INCHES OF FINE WOOD CHIPS

OVER GEOTEXTILE PER DETAIL SHEET C1.4

CONTRACTOR TO REPLENISH AND MAINTAIN

THROUGHOUT PROJECT.

DESIGNATED STAGING AREA

NO STOCKPILING AGGREGATES

ON PAVEMENTS.

INSTALL 6-FT TEMPORARY

CHAINLINK FENCE AROUND

WORK AREA.

EXTENTS OF FENCING REQUIRES

PRIOR APPROVAL BY ENGINEER.

CONSTRUCTION STOCKPILE AREA

USE PLASTIC COVERING

BMP C123 AS NEEDED.

INSTALL SILT FENCE

PER DETAIL SHEET C1.4

PLACE CATCH BASIN INSERTS

IN ALL CATCH BASINS

THROUGHOUT PROJECT

PER DETAIL SHEET C1.4

WIDEN TRAIL AS NEEDED

WITH CONSTRUCTION

ENTRANCE MATERIAL

TEMPORARILY REMOVE, SAVE, AND REPLACE

PARKING SIGNS AT ENTRANCE

LARGE TRUCK

TURNING RADIUS = 39 -FT

FENCE AND PROTECT ARTWORK BOULDERS

PLACE CATCH BASIN INSERTS

IN ALL CATCH BASINS

THROUGHOUT PROJECT

PER DETAIL SHEET C1.4

TREE PROTECTION FENCING (TYP.)

INSTALL PER DETAIL SHEET C1.4

EXTENTS OF FENCING REQUIRES

PRIOR APPROVAL BY ENGINEER.

EXTENTS OF FENCING REQUIRES

PRIOR APPROVAL BY ENGINEER.

25 LF OPENING,

COMPOST BERM ONLY

COMPOST BERM,

REBUILD AND REFRESH

REGULARLY TO MAINTAIN

EFFECTIVENESS.

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

1.2 - TESC

P

LA

N &

D

ETA

ILS.d

wg

, 3/4/2013 2:15:05 P

M, D

WG

To

P

DF.p

c3

Page 5: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

Y

C1.4

C5.1

AS S

HO

WN

TESC

PLA

N D

ETAI

LS20

11-1

29A

SJW

SJW

MFM

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

4 INCHES OF FINE WOOD CHIPS OVER GEOTEXTILE.

CONTRACTOR TO REPLENISH AND MAINTAIN

THROUGHOUT PROJECT.

WOVEN GEOTEXTILE LINER

PER SPEC. EXTEND 1-FT

BEYOND EDGE OF TRAIL.

TEMPORARY WOOD CHIP TRAIL

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

1.2 - TESC

P

LA

N &

D

ETA

ILS.d

wg

, 3/4/2013 2:15:16 P

M, D

WG

To

P

DF.p

c3

Page 6: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

Y

C1.5

C5.1

AS S

HO

WN

TESC

PLA

N N

OTE

S20

11-1

29A

SJW

SJW

MFM

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

T

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

1.2 - TESC

P

LA

N &

D

ETA

ILS.d

wg

, 3/4/2013 2:15:22 P

M, D

WG

To

P

DF.p

c3

Page 7: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

Y

C2.0

C5.1

AS S

HO

WN

EXIS

TIN

G C

ON

DIT

ION

S20

11-1

29A

SJW

SJW

MFM

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

2.0 - EX

ISTIN

G C

ON

DITIO

NS.d

wg

, 3/4/2013 2:15:35 P

M, D

WG

To

P

DF.p

c3

Page 8: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

Y

C2.1

C5.1

AS S

HO

WN

EXIS

TIN

G B

EACH

CO

VERA

GE

2011

-129

A

SJW

SJW

MFM

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

AREA 1 - MOSTLY ROCKS AND SPALLS

COVERS 70% OF NATURAL SURFACE

DISTRIBUTION: 30% ROCKS, 10% CONCRETE, 20% SPALLS, 10% BRICKS, 30% NATURAL

GRADATION: ROCKS 12"-24", CONCRETE 12"-24", SPALLS 4"-8"

AREA 2 - MOSTLY SPALLS WITH BRICKS

COVERS 60% OF NATURAL SURFACE

DISTRIBUTION: 5% ROCKS, 5% CONCRETE, 40% SPALLS, 10% BRICKS, 40% NATURAL

GRADATION: ROCKS 12"-24", CONCRETE 12"-24", SPALLS 4"-8"

AREA 3 - MOSTLY CONCRETE RUBBLE

COVERS 90% OF NATURAL SURFACE

DISTRIBUTION: 5% ROCKS, 80% CONCRETE, 5% SPALLS, 10% NATURAL

GRADATION: ROCKS 12"-24", CONCRETE 36"-60" (FLAT), SPALLS 4"-8"

AREA 4 - MOSTLY CONCRETE AND ROCK

COVERS 70% OF NATURAL SURFACE

DISTRIBUTION: 40% ROCKS, 10% CONCRETE, 15% SPALLS, 5% BRICK, 30% NATURAL

GRADATION: ROCKS 12"-36", CONCRETE 12"-36", SPALLS 4"-8"

AREA 5 - MOSTLY CONCRETE AND SMALL COBBLES

COVERS 20% OF NATURAL SURFACE

DISTRIBUTION: 5% ROCKS, 10% CONCRETE, 5% SPALLS, 70% NATURAL

GRADATION: ROCKS 12"-24", CONCRETE 12"-48", SPALLS 4"-8"

AREA 6 - ROCK, SPALLS, AND CONCRETE

COVERS 60% OF NATURAL SURFACE

DISTRIBUTION: 40% ROCKS, 5% CONCRETE, 15% SPALLS, 40% NATURAL

GRADATION: ROCKS 12"-32", CONCRETE 12"-24", SPALLS 4"-8"

AREA 8 - LARGE BOULDERS

COVERS 40% OF NATURAL SURFACE

DISTRIBUTION: 25% ROCKS, 10% CONCRETE, 5% SPALLS, 60% NATURAL

GRADATION: ROCKS 36"-48", CONCRETE 24"-36", SPALLS 4"-8"

AREA 9 - MOSTLY PEBBLES WITH SOME ROCK COVERAGE

COVERS 10% OF NATURAL SURFACE

DISTRIBUTION: 10% ROCKS, 90% NATURAL

GRADATION: ROCKS 12"-36"

AREA 10 - MOSTLY SPALLS

COVERS 50% OF NATURAL SURFACE

DISTRIBUTION: 10% ROCKS, 5% CONCRETE, 35% SPALLS, 50% NATURAL

GRADATION: ROCKS 12"-24", CONCRETE 12"-24", SPALLS 4"-8"

RIP RAP REVETMENT - RIP RAP AND CONCRETE

COVERS 100% OF NATURAL SURFACE

DISTRIBUTION WITHIN AREA 1:

70% ROCKS, 30% CONCRETE

AREA 7 - ROCKS AND SPALLS OVER SMALL COBBLES

COVERS 20% OF NATURAL SURFACE

DISTRIBUTION: 10% ROCKS, 10% SPALLS, 80% NATURAL

GRADATION: ROCKS 12"-36", SPALLS 4"-8"

EXPOSED BEDROCK WOOD DEBRIS

EXPOSED PILES, TYP.

TEST PIT LOCATIONS, TYP.

EXPOSED BEDROCK, TYP.

WOOD DEBRIS

NOTES:

*SURVEY COMPLETED BETWEEN 13:00 AND 16:00 HOURS

ON MARCH 26TH, 2012 - A LOW TIDE OF 0.45 FT AT 14:30 WAS PREDICTED

**ONLY EXPOSED AND VISIBLE PILES WERE LOCATED

POSSIBLE BEDROCK

E

X

T

E

N

T

O

F

G

R

A

D

A

T

IO

N

T

O

W

E

S

T

U

N

K

N

O

W

N

, S

U

R

V

E

Y

E

D

T

O

W

A

T

E

R

S

E

D

G

E

DCP8

DCP5

DCP4

DCP7

DCP6

DCP3

DCP2

DCP1

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

2.0 - EX

ISTIN

G C

ON

DITIO

NS.d

wg

, 3/4/2013 2:15:43 P

M, D

WG

To

P

DF.p

c3

Page 9: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

Y

C2.2

C5.1

AS S

HO

WN

DEM

OLI

TIO

N P

LAN

2011

-129

A

SJW

SJW

MFM

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

R

E

M

O

V

E

E

X

I

S

T

I

N

G

T

R

A

I

L

REMOVE EXISTING TRAIL

RE

MO

VE

E

XIS

TIN

G T

RA

IL

SALVAGE BENCHES AND SIGNS MARKED WITH X

RELOCATE AS SHOWN ON LANDSCAPING PLAN

REMOVE CONCRETE PADS

REMOVE LANDSCAPED AREA

SALVAGE EXISTING SIGNS AND

RELOCATE AS DIRECTED BY OWNER

EXISTING GRANITE BOULDERS TO REMAIN

DO NOT DISTURB.

FENCE AND PROTECT.

REMOVE EXISTING

CONCRETE WALL

REMOVE EXISTING CONCRETE, BRICK, WOOD

QUARRY SPALLS, OR OTHER NON-NATIVE BEACH

MATERIAL WITHIN CLEARING LIMITS

*SEE NOTE 1

REMOVE EXISTING TREES

AND LANDSCAPING

LOCATED PILINGS (TYP.)

*ONLY EXPOSED AND VISIBLE PILINGS LOCATED*

REMOVE ALL PILINGS WITHIN

DEFINED PROJECT LIMITS

EELGRASS LANDWARD EXTENT

JUNE 2012

*DO NOT DISTURB*

REMOVE EXISTING TREES

AND LANDSCAPING

CONCRETE PAD AND

PICNIC TABLE TO REMAIN

REMOVE EXISTING TREES

AND LANDSCAPING

RE

MO

VE

P

ILE

S T

O S

OU

TH

R

E

M

O

V

E

P

I

L

E

S

T

O

N

O

R

T

H

NOTES:

1. REMOVE THE EXISTING CONCRETE, BRICK, WOOD, QUARRY SPALLS,

OR OTHER NON-NATIVE BEACH MATERIAL WITHIN EXCAVATION AREA

FOR BEACH NOURISHMENT, DRIFT SILL, PERCHED BEACH, AND BEACH

NOURISHMENT MOUNDS. DEBRIS CAN REMAIN WITHIN FILL AREAS

BENEATH BEACH NOURISHMENT GRAVEL PLACEMENT.

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

2.0 - EX

ISTIN

G C

ON

DITIO

NS.d

wg

, 3/4/2013 2:15:48 P

M, D

WG

To

P

DF.p

c3

Page 10: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

BELLINGHAM BAY

PETE'S BEACH

1

2

2'

1

0

-

F

T

T

R

A

I

L

BOULEVARD PARK

COFFEE SHOP

PLAYGROUND

10-FT T

RAIL

1

2

13

7

'

6

'

4'

1

9

8

7

8

'

1

1

1

2

'

13'

1

1

'

1

0

6

1'

4

9

'

1

0

'

REMOVE 2 FT OF RUBBLE

REPLACE WITH 2 FT OF COBBLE

3

.

O

F

T

G

R

A

V

E

L

N

O

U

R

I

S

H

M

E

N

T

2

.

0

F

T

G

R

A

V

E

L

N

O

U

R

I

S

H

M

E

N

T

9

"

T

H

I

C

K

C

O

B

B

L

E

INTERTIDAL BOULDER

CLUSTERS DETAIL G

BACKSHORE

SANDSTONE AND

ERRATIC BOULDERS

DETAIL I

1.0 FT GRAVEL

NOURISHMENT

1.5 FT GRAVEL

NOURISHMENT

2

5

DRIFT SILL

DETAIL G

PERCHED BEACH

DETAIL H

REMOVE 2.0 FT THICK AVERAGE OF

BEACH DEBRIS AND CONCRETE

LARGER THAN 6". NO EXCAVATION INTO GRAVEL.

MAINTAIN CURRENT SUBSTRATE.

REPLACE WITH 1.5 FT OF BEACH NOURISHMENT GRAVEL

FROM 2.5FT MLLW ELEVATION TO NEW REVETMENT

REMOVE 1 FT THICK AVERAGE OF BEACH DEBRIS

LARGER THAN 6". NO EXCAVATION INTO GRAVEL.

MAINTAIN CURRENT GRAVEL SUBSTRATE

REPLACE WITH 1 FT OF BEACH NOURISHMENT GRAVEL

BEACH NOURISHMENT

STABILIZATION MOUND

DETAIL J

SOUTHERN EXTENT OF 1 FT

BEACH DEBRIS REMOVAL AND

GRAVEL IMPORT:

18 FT FROM NORTHERN

EXTENT OF CONCRETE STAIRS

WESTERN EXTENT OF 1 FT

BEACH DEBRIS REMOVAL AND

GRAVEL IMPORT:

ABOVE 3 FT MLLW ELEVATION

EXTENT OF

BEACH DEBRIS REMOVAL AND

GRAVEL IMPORT:

3 FT WATERWARD OF

EXISTING, NON-REPAIRED ROCKERY TOE OR

TIE-IN TO NEW REVETMENT TOE

3

3

'

RECONSTRUCTED

REVETMENT

Existing Contours

Proposed Gravel

Beach Nourishment

Proposed Structures (Drift

sill and revetment) SEE

4.0 DETAILS A,B,C

Proposed Cobble

Nourishment

Proposed Trail

Realignment

Proposed Sand Beach

Nourishment

Perched Beach - Detail H

Existing Tree- Deciduous

To Remain

Existing Tree- Conifer

To Remain

Legend

Eelgrass landward

extent June 2012

Do not disturb

Low intertidal boulder

clusters - Detail G

MHHW

Legend

Beach Nourishment

Stabilization Mound -

Detail J

Upland sandstone and

erratic boulders - Detail I

REHABILITATE

SHORELINE REVETMENT

PER S-16B

C3.0

C5.1

AS S

HO

WN

SITE

PLA

N -

PRO

POSE

D CO

NDI

TIO

NS

----

2/28

/13

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

YAC

B

ACB

JWJ

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

GS SITEP

LA

N.d

wg

, 3/4/2013 2:44:32 P

M, D

WG

To

P

DF.p

c3

Page 11: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

1

2

2'

1

2

13

7

'

6

'

4'

1

9

8

7

8

'

1

1

1

2

'

13'

1

1

'

1

0

6

1'

4

9

'

1

0

'

2

5

3

3'

C3.1

C5.1

AS S

HO

WN

GRA

DIN

G P

LAN

----

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

YAC

B

ACB

JWJ

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

GS SITEP

LA

N.d

wg

, 3/4/2013 2:42:07 P

M, D

WG

To

P

DF.p

c3

Page 12: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

Y

C3.2

C5.1

AS S

HO

WN

SITE

RES

TORA

TIO

N P

LAN

2011

-129

A

SJW

SJW

MFM

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

INSTALL 4"

PLANTING SOIL AND SOD

PER SPEC.

RE-SOD GRASS ALONG TRAIL EDGE

DISTURBED DURING CONSTRUCTION

PLACE PLANTING SOIL AND SOD PER SPEC.

RELOCATE EXISTING BENCHES

ON NEW CONCRETE PADS

PER DETAIL THIS SHEET

NOTES:

1. RE-SOD ALL GRASS DISTURBED

DURING CONSTRUCTION PER SPEC.

RE-SOD GRASS UNDER TEMPORARY TRAIL

PLACE PLANTING SOIL AND SOD PER SPEC.

PLANTER ISLAND

W/ 1-FT THICK CONCRETE HEADER

PER DETAIL THIS SHEET.

PLANTINGS BY OTHERS

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

6.0 - LA

ND

SC

AP

IN

G.d

wg

, 3/4/2013 2:16:02 P

M, D

WG

To

P

DF.p

c3

Page 13: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

Y

C4.0

C5.1

AS S

HO

WN

SITE

DET

AILS

A, B

, C20

11-1

29A

CBW

SJW

CBW

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

DRIFT SILL TYPICAL CROSS SECTIONAC3.1

REVETMENT TYPICAL CROSS SECTIONBC3.1

DRIFT SILL TYPICAL PROFILE SECTIONCC3.1

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

4.0 - SITE D

ETA

ILS.d

wg

, 3/4/2013 2:16:25 P

M, D

WG

To

P

DF.p

c3

Page 14: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

Y

C4.1

C5.1

AS S

HO

WN

SITE

DET

AILS

H, I

2011

-129

A

SJW

SJW

MFM

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

TRAIL TYPICAL SECTIOND-

TRAIL SECTION - AT REVETMENTE-

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

4.0 - SITE D

ETA

ILS.d

wg

, 3/4/2013 2:16:33 P

M, D

WG

To

P

DF.p

c3

Page 15: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

C4.2

C5.1

AS S

HO

WN

Desig

n De

tails

F, G

, H, I

, & J

----

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

YAC

B

ACB

JWJ

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

2/28

/201

3

BEACH NOURISHMENT AND BACKSHORE SAND TYPICAL PROFILE SECTIONF-

LOW INTERTIDAL BOULDER CLUSTERS G-

PERCHED BEACH TOE TYPICAL SECTIONH-

BACKSHORE SANDSTONE AND ERRATIC BOULDERSI-

-

BEACH NOURISHMENT STABILIZATION MOUND TYPICAL SECTIONJ--

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

GS SITEP

LA

N.d

wg

, 3/4/2013 2:47:52 P

M, D

WG

To

P

DF.p

c3

Page 16: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

YAC

B

ACB

JWJ

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

C5.0

C5.1

AS S

HO

WN

PRO

FILE

S 1-

7--

--

2/28

/201

3

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

GS SITEP

LA

N.d

wg

, 3/4/2013 2:47:13 P

M, D

WG

To

P

DF.p

c3

Page 17: C1.0 - COVER SHEET.dwg, 3/4/2013 2:14:46 PM, DWG To PDF · 4 inches of fine wood chips over geotextile. contractor to replenish and maintain throughout project. woven geotextile liner

C5.1

C5.1

AS S

HO

WN

PRO

FILE

S 8-

13--

--

2/28

/201

3

SHEE

TD

ATE

SCAL

E

OF

JOB

NUM

BER

CHEC

KED

BY

DRA

WN

BY

DES

IGN

ED B

YAC

B

ACB

JWJ

WAS

HIN

GTO

NBE

LLIN

GH

AM

BOUL

EVAR

D P

ARK

SHO

RELI

NE

IMPR

OVE

MEN

TS

CITY

OF

BELL

ING

HAM

W:\2011\2011-129 C

oastal G

eo

lo

gical Services - B

lvd

P

ark B

each

R

esto

ratio

n\D

wg

\C

GS SITEP

LA

N.d

wg

, 3/4/2013 2:48:16 P

M, D

WG

To

P

DF.p

c3