Dear Resident CITYLINK TULLA WIDENING: PASCOE VALE ROAD NIGHT WORKS AND LANE CLOSURE – SUNDAY 5 JUNE TO THURSDAY 9 JUNE 2016 We are writing to inform you about sewer and drainage night works that will take place from Sunday 5 June to Thursday 9 June as part of the CityLink Tulla Widening project. The lane closure will take place from 8:00pm to 5:00am each night. When works will occur These works will take place between 8pm and 5am on Sunday 5 June to Thursday 9 June 2016. Where we will be Each night we will temporarily close a section of all three northbound lanes on a Pascoe Vale Road, as shown in yellow on the map below. This will allow our crews to safely complete nearby sewer and drainage works, as shown in red on the map below.

citylinktullawidening.vic.gov.aucitylinktullawidening.vic.gov.au/__data/assets/...  · Web viewDigging with excavator. Setting up temporary light towers for our work site. What to

Embed Size (px)

Citation preview

Page 1: citylinktullawidening.vic.gov.aucitylinktullawidening.vic.gov.au/__data/assets/...  · Web viewDigging with excavator. Setting up temporary light towers for our work site. What to

Dear Resident

CITYLINK TULLA WIDENING: PASCOE VALE ROAD NIGHT WORKS AND LANE CLOSURE – SUNDAY 5 JUNE TO THURSDAY 9 JUNE 2016

We are writing to inform you about sewer and drainage night works that will take place from Sunday 5 June to Thursday 9 June as part of the CityLink Tulla Widening project. The lane closure will take place from 8:00pm to 5:00am each night.

When works will occurThese works will take place between 8pm and 5am on Sunday 5 June to Thursday 9 June 2016.

Where we will beEach night we will temporarily close a section of all three northbound lanes on a Pascoe Vale Road, as shown in yellow on the map below. This will allow our crews to safely complete nearby sewer and drainage works, as shown in red on the map below.

Page 2: citylinktullawidening.vic.gov.aucitylinktullawidening.vic.gov.au/__data/assets/...  · Web viewDigging with excavator. Setting up temporary light towers for our work site. What to

What we are doing

General sewer and drainage works. This will involve: Installing stormwater drains Digging with excavator Setting up temporary light towers for our work site

What to expect

While these works will not affect your property you can expect: Noise from heavy equipment during construction activities Construction crews working in the area Traffic management crews safely guiding drivers around the area with diversions in place Lights from the temporary light towers installed in the work area

About the projectAs you may be aware, work on the CityLink Tulla Widening project is underway and involves adding lanes and other measures to improve the flow of traffic across the 24 kilometre section of freeway from the CityLink tunnels to Melbourne Airport. The project will provide travel time savings per trip between Melbourne Airport and the West Gate Freeway during peak periods.

Generally, an additional lane is being added in each direction, as well as upgrades at key interchanges including Bell Street, Mount Alexander Road / Flemington Road and on the Bolte Bridge to West Gate Freeway entry ramp. Once completed, the project will deliver a safer, more reliable freeway.

CPB Contractors (formally Leighton Contractors) is the construction contractor for the Bulla Road to Power Street section of the project.

We apologise for any inconvenience and appreciate your understanding. We are committed to keeping residents informed and minimising the impacts during construction, while keeping the community and our workers safe at all times. Managing and protecting the environment is also important to us and we are working with local and state government adhering to environmental laws to ensure any impact to the natural ecosystem is minimised.

If you have any questions or feedback regarding this notification, please phone 1300 783 947 and select 1 or email us at [email protected] To keep up-to-date with upcoming works and changes to traffic conditions visit citylinktullawidening.vic.gov.au

Interpreter service For an interpreter, please call the Translating Interpreting Service (ITS National) 13 14 50

Yours sincerely,

Community Relations TeamCPB ContractorsCityLink Tulla Widening: Bulla Road to Power Street

30/05/2016, Ref: 0097 N02 PVR night works