Upload
iqbal-singh-parmar
View
213
Download
0
Embed Size (px)
Citation preview
8/22/2019 c Term Paper
1/23
TERM PAPERON
HOSTELMANAGEMENT
NAME : Rakesh kumar ranjanCOURSE: btech (hons.)Roll NO: r260-b39
SUBMITTED TO: MRS. SUMIT KAUR
MEHTA
1
8/22/2019 c Term Paper
2/23
ACKNOWLEDGEMENTThis project is a welcome and challenging experience for us as it took
a great deal of hard work and dedication for its successful completion.
Its our pleasure to take this opportunity to thank all those who help
us directly or indirectly in preparation of this report.
We would also like to very sincere thank to our project guide Lecturer
Mr. Mohantesh who supported us technically as well as morally in
every stage of the project. Without their guidance and support, thisproject would not have seen light of the day.
It gives us immense in expressing a deep sense of gratitude and
sincere thanks to Lovely Professional University.
There times in such project when clock beats you again and again and
you run out of energy and you want to finish it once and forever. Last
but not the least we thank our family for their boost and support in
every sphere. Their vital push infused a sense of insurgency in us.
RAKESH KUMAR RANJAN
2
8/22/2019 c Term Paper
3/23
Table of contents:-
#Introduction 3#SOURCE OF INFORMATION
5#PROPOSED SYSTEM
6#FEATURES OF THEPROPOSED SYSTEM:
7
#System design8
#source code10#Out put of program17
#Testing of program18
#IMPLEMENTATION20
#scope of improvement22
#Future scope of project 23
3
8/22/2019 c Term Paper
4/23
INTRODUCTION
In understand the Problem and its Context. Suchanalysis typically requires a thoroughunderstanding of the existing system, parts ofwhich have to be automated. A clearunderstanding is needed of the important dataentities in the system, major centers whereaction is taken, the purpose of the different
actions that are performed, and the inputs andoutputs.The problem that my software systemhas to solve is automating an existing HOSTELMANAGEMENT SYSTEM manual process. Alongwith the automation, the automated systemshould provide to an organization with additionalreports, keeping records of all transactions, etc.
4
8/22/2019 c Term Paper
5/23
Source of InformationThe basic aim of problem analysis is to obtain a clear .Understanding of the
needs of the client and the user, what is exactly Desired from the software, and
what the constraints on the solution are Analysis leads to actual specification.
Analysis involves interviewing the client and end users. These people and the
existing document about the client mode of operation are the basic sources of
information for the analysts search a problem by asking question of the clients
and the users and by reading existing documents. Once the problem
analyzed and these understood, the requirements must be specified
in the requirement specification document. The Requirements document
must specify all the Functional and performance requirements. A basic
purpose of software requirement Specification is to bridge the
communication gap between the clients and developers. SRS is the medium
through which the client and user needs are accurately specified.
SRS forms the basis software development.
5
8/22/2019 c Term Paper
6/23
PROPOSED
SYSTEM
The proposed system for HOSTEL
MANAGEMENT SYSTEM is computerized. Today is
the era of computers. This software project solves
all the problems discussed above in the present
system. The main objective of developing this
project is to save time and money. The proposed
system provides the following features on different
tasks.
6
8/22/2019 c Term Paper
7/23
FEATURES OF THE
PROPOSED SYSTEM:
. User -friendly package.
. Efficient retrieval time.
. Efficient linkage of Information.
. Validation checks to ensure accuracy.
. Query facility for instant information.
. Error messages or better user Interface.
7
8/22/2019 c Term Paper
8/23
SYSTEM DESIGNThe design activity begins when the requirements document
for the software to be developed is available .While the
requirements specification activity is entirely in the problem
domain toward the solution domain. Design is essentially the
bridge between requirements specifications and final solution
for satisfying the Requirements. The design of a system
essentially ablueprint or a plan for a solution for the system.
The design process for software systems often has to Levels.
At the first level the focus is on deciding which modules are
needed for the system, the specifications of these modules,
and how the modules should be interconnected. This is what
is called the system design or top-level design. In the second
level, the internal design of the modules, or how the
specifications of the modules can be satisfied, is decided. This
design level is often called detailed design or logic design.
Detailed design essentially expands to contain a more
8
8/22/2019 c Term Paper
9/23
detailed description of the processing logic and data structures
so that the design is sufficiently complete for coding.
System design focuses on the detailed implementation
of the system recommended in the feasibility study. It is not a
step-by-step implementation of clear procedure and
guidelines; much of the design work.
9
8/22/2019 c Term Paper
10/23
HARDWARE
SPECIFICATIONS
PROCESSOR PENTIUM AND
ABOVE
MOTHERBOARD 845 OR 915,945
RAM 512 MB RAM
HARD DISK 40 GB
CD ROM DRIVE DVD/COMBO
FLOPPY DRIVE 1.44 MB
MONITOR 15 INCH
MEMORY 80 GB
DISPLAY COLORS 32 BIT
KEYBOARD
MOUSE
10
8/22/2019 c Term Paper
11/23
SOFTWARESPECIFICATIONS
Software: C language
11
8/22/2019 c Term Paper
12/23
SOURCE CODE
#include
#include
#include
struct hos{ char name[20];
int phno;
char address[50];
char fathername[50];
char sex;
char bloodgroup[5];
int registrationno;
}s[100];
void view();
void search();
void delete();
void add();
void menu()
{ int ch;
clrscr();
printf("\n
*************************************************");
printf("\n *
*");
printf("\n * WELCOME TO HOSTEL
MANAGEMENT SYSTEM *");
printf("\n *
*");
12
8/22/2019 c Term Paper
13/23
printf("\n
***********************************************
**");
printf("\n\n\tWELCOME TO LPU HOSTEL ");
printf("\n\n\t1.ADD NEW STUDENT");printf("\n\n\t2.SEARCH STUDENT INFORMATION");
printf("\n\n\t3.REMOVE STUDENT");
printf("\n\n\t4.exit ");
printf("\n\n\tEnter your choice(1,2,3or4)");
scanf("%d",&ch);
switch(ch)
{ case 1: add();
getch();menu();
break;
case 2: search();
getch();
menu();
break;
case 3:delete();
getch();menu();
break;
case 4:exit();
break;
}}
void search()
{int i,regno;char ch;
clrscr();
printf("\nEnter the regno no");
scanf("%d",®no);
for(i=0;i
8/22/2019 c Term Paper
14/23
fflush(stdin);
//printf("\nPHONE NO:");
//printf(s[i].phno);
fflush(stdin);
printf("\nBLOOD GROUP:");fflush(stdin);
printf(s[i].bloodgroup);
fflush(stdin);
printf("\nFATHER NAME:");
fflush(stdin);
printf(s[i].fathername);printf("\nADDRESS:");
printf(s[i].address);
fflush(stdin);
i=100;
}
else{printf("\nregistration no not matched");
getch();
menu();
}}
void add()
{char ch;
int i;
clrscr();// printf("how much record you want to enter");
for( i=0;i
8/22/2019 c Term Paper
15/23
printf("\nEnter the sex:");
scanf("%d",&s[i].sex);
fflush(stdin);
printf("\nEnter the phone number:");
scanf("%d",&s[i].phno);fflush(stdin);
printf("\nEnter the address:");
scanf("%s",&s[i].address);
fflush(stdin);
printf("\n\Enter the blood group:");
scanf("%d",&s[i].bloodgroup);
fflush(stdin);
printf("\nEnter the registration no:");scanf("%d",&s[i].registrationno);
fflush(stdin);
printf("\nDo you want to add more record");
scanf("%c",&ch);
if(ch!='y')
goto xy;
xy:break;
}
}
void delete()
{int i, regno;
char ch;
clrscr();
Printf ("enter the regno no");Scanf ("%d",®no);
for (i=0;i
8/22/2019 c Term Paper
16/23
menu();
}
else
{printf("registration no not matched");
getch();menu();
}}
void main()
{
clrscr();
getch();
menu();}
16
8/22/2019 c Term Paper
17/23
OUTPUT OF THE PROGRAM
****************************************
WELCOME TO HOSTEL MANAGEMENT
SYSTEM
******************************************
WELCOME TO LPU HOSTEL
1. ADD NEW STUDENT
2. SEARCH STUDENT INFORMATION
3. REMOVE STUDENT
4..exit
Enter your choice (1, 2, 3or4) 1
Enter the name: DINKAR
Enter the father's name: HARISH CHHABRA
17
8/22/2019 c Term Paper
18/23
Enter the sex: M
Enter the phone number: 9910614521
Enter the address: 6, GEETA COLONY,
DELHI
Enter the blood group: A+
Enter the registration no: 10801770
Do you want to add more record N
Enter the Reg no. 10801770
!!!!!!!!RECORD FOUND!!!!!!!!!
NAME: DINKAR
BLOOD GROUP: A+FATHER NAME: HARISH CHHABRA
ADDRESS: 6, GEETA COLONY, DELHI
Enter the Reg no: 10909090
Registration no not matched
18
8/22/2019 c Term Paper
19/23
Enter the Reg no 10801770
ARE YOU SURE YOU WANT TO DELETE THIS RECORD(Y
OR N) Y
YOUR RECORD IS DELETED
Testing of programWe make this program by properly running.we remove all the
errors with full effort. We test our program in c-language
using ctrl+f9 key combination from the keybord. But before
running we find that in general whether any errors are occur
in our program or not. This can be done by using by itself.
Mainly generally error are are occurred in the field of syntaxor logical eerror. These syntax are generally remove by the
To see the program and analize every thing of the program.
19
8/22/2019 c Term Paper
20/23
IMPLEMENTATION
Once the program has properly finished developing,
Coding and testing the program, the development of the program
is near the end. Now the project team will release the program to
play its part in the overall system-the programmer just has sometidying up to do. How the team will release the program depends
on the installation. In most cases, however, the process will
involve some kind of acceptance test; this is to ensure that the
user to try out the new system to see whether their needs are met.
Of course, the programmer should have produced adequatedocumentation. This will include details of program testing, with
full description on test data used on actual results. Many users
will agree that those records are enough to show the program is
acceptable, where as some way wish to provide a new set of test
data to test the system again. In this case, the project team will
20
8/22/2019 c Term Paper
21/23
run the program with the new data, checking output and
documentation the process as they had done previously. As well
as user documentation, the released program needs an operationsmanual. This may be part of the user manual or separate from it.
Often the programmer will have made some input to this
document, perhaps giving details of the run-time message.
SCOPE OF IMPROVEMENT
21
8/22/2019 c Term Paper
22/23
I have converted almost all of the functionality of the
HOSTEL MANAGEMENT SYSTEM. But due to lack of
time, I have not been able to cover some of the topics that
come under hostel management system. Some poor students
are given a particular concession for the entire year, but due to
lack time I could not include this feature in my project. There
may be so many things in the project that have been left by
me. Despite of these drawbacks, the proposed system
provides several new functionalities and is quite user friendly.
It is easy to extend the system that we have proposed. A
person could see any of the issued, unissued or all the rooms
according to his/her will. Only few coding and design effort is
needed to cover the above told deficiencies. As design is
simple, improvements can be made easily. Coding done in the
project is easy to understand. I have tried my best in covering
the project.
22
8/22/2019 c Term Paper
23/23
FUTURE SCOPE
OF THE PROJECT
In departmental store project we can calculate any item or
product values in which
We can store different type of items that has been considered
by the shops keeper in future. Every shop keeper dos not
faced any type of problem regarding any type of product
calculation and he guesses which product has occupationspace or which boxes consider whose product.
In departmental store project future every
manager those manage everything in the departmental store he
uses this type of project to manage everything in the store.
In the end we can say THE DEPARTEMENTAL STORE is
very effective & efficient.