    Quality Control Plan Electrical

    Utility Services Department

    500 George Street North,

    Peterorough, !ntario, "#$ %

    'ransportation Division

    'elephone( )05*)+*)))-

    .a/( )05*)1*+1-

    Electrical

    2Quality Control Plan34

    arch 0-% E6ition

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    2/36

    City of PeterboroughQuality Control Plan Electrical

    Page 2

    ELECTRICAL QUALITY CONTROL

    'he 7ollo8ing speci7ications outline the electrical inspections that the Contractor shall carry out

    7or all City o7 Peterorough electrical operations4 9nspections shall e un6erta:en in accor6ance

    8ith the re;uirements o7 the !PSS speci7ications4 9t 8ill e the responsiility o7 the Contractor

    to un6erta:e the re;uire6 inspections an6 complete, sign an6 6ate the relevant chec:lists4 'he

    Contractor 8ill 8or: in conQS,

    shall e sumitte6 to the City o7 Peterorough3s Contract >6ministrator prior to initiation o7

    construction4 >ll inspection results 8ill e 6ocumente6 7or revie8 y the Contract

    >6ministrator upon re;uest an6 shall e sumitte6 to the Contract >6ministrator three ?%@

    usiness 6ays prior to signal turn*on4

    Upon installation o7 electrical items, the Contractor shall carry out Proof of Performance

    inspections in con6ministrator three ?%@ usiness 6ays prior to signal turn*on4

    All Electrical Items

    Prior to installation an6 construction, the Contractor shall veri7y that the materials 6elivere6 to

    the site are supplie6 as per contract speci7ications4 aterials 8ill e inspecte6 7or evi6ence o7

    physical 6amage an6 to ensure that the part an6 mo6el numers match the material purchase

    or6ers4 'he Contractor shall also ensure that all accessories an6 associate6 materials have eenprovi6e6 in correct ;uantities an6 are in 8or:ing or6er4

    'he Contractor shall test electrical items to ensure they are in proper 8or:ing or6er an6 that

    there is no physical 6amage as a result o7 construction4

    'he Contractor shall :eep 6etaile6 recor6s inclu6ing Pre*9nstallation an6 9nstallation Chec: Aists

    ?>ppen6i/ >@ 8hich 8ill e signe6 an6 6ate64 'hese signe6 chec: lists must e ma6e rea6ily

    availale to the Contract >6ministrator4

    >t the completion o7 construction, three ?%@ usiness 6ays prior to signal turn*on, a Proo7 o7

    Per7ormance certi7icate 7or each o7 the electrical components ?>ppen6i/ B@ shall e given to the

    Contract >6ministrator4 'hese 7orms shall e signe6 y the Electrical Contractor4 'he 7ormsshall also e stampe6 an6 signe6 y a ;uali7ie6 Electrical =eri7ication Engineer4

    Electrical Chambers

    >ll electrical chamer relate6 inspections shall e un6erta:en in accor6ance 8ith the

    re;uirements o7 the Contract Documents an6 !PSS 10 speci7ications4

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    3/36

    City of PeterboroughQuality Control Plan Electrical

    Page 3

    Prior to installation, the Contractor shall visually inspect electrical han6holes to ensure that

    6elivere6 materials are supplie6 as per contract speci7ications4 Placement shall e con7irme6prior to installation o7 the electrical chamers inclu6ing alignment, o77set an6 gra6e4

    Upon installation, the Contractor shall chec: the electrical chamers to ensure that the correct

    numer o7 sleeves an6 openings are installe6 as 8ell as pulling irons, 6uct sleeves an6 7rames

    an6 covers4 Ducts entering han6holes shall e chec:e6 to ensure proper orientation4 .rames

    shall e chec:e6 to ensure that they are connecte6 to the system groun64

    Ducts

    >ll 6uct relate6 inspections shall e un6erta:en in accor6ance 8ith the re;uirements o7 the

    Contract Documents an6 !PSS 10% speci7ications4

    Prior to installation, the Contractor shall inspect the 6uct materials to ensure that sie, colour,

    pipe materials, an6 ;uantities con7orm to the contract speci7ications an6 that there are no ovious

    imper7ections4 'rench e/cavation, alignment an6 6epth 8ill e inspecte6 prior to installation4

    Ducts 8ill e chec:e6 to ensure that they are 7ree o7 6eris, 8ater, rea:age or 6istortion y

    pulling a man6rel through the 6ucts4 'he man6rel shall e soli6, roun6 an6 have a 6iameter o7

    1mm less that the nominal 6uct 6iameter4

    Upon installation ut prior to ac:7illing, the Contractor shall con7irm that the installe6 6ucts are

    the correct sie an6 numer an6 that they are installe6 at the correct 6epth4 > visual inspection

    shall e un6erta:en to ensure that 6ucts are 7ree o7 6eris, are properly secure6 an6 terminate6

    an6 meet contract re;uirements4 ole ll 8iring relate6 inspections shall e un6erta:en in accor6ance 8ith the re;uirements o7 the

    Contract Documents an6 !PSS 10+ speci7ications4

    Prior to installation, the Contractor shall chec: material 6elivere6 to the site to ensure that it is

    supplie6 as per contract speci7ications an6 that there are no ovious imper7ections4

    Upon installation, the Contractor shall chec: the cales to ensure that they are installe6 an6

    splice6 in accor6ance 8ith contract re;uirements4 =oltage testing shall e un6erta:en 7or a

    ran6om selection o7 -0 o7 the lo8 voltage an6 e/tra lo8 cale systems in con7ormance 8ith

    !PSS 10+ re;uirements4

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    4/36

    City of PeterboroughQuality Control Plan Electrical

    Page 4

    'he 7ollo8ing tests shall e carrie6 out,

    Continuity Testing

    '8o ?@ runs o7 8ire shall e connecte6 together at one en64 >t the opposite en6, an ohmmeter

    shall e use6 to measure the resistance in the resulting loop4 'he measure6 resistance 8ill e

    6eeme6 acceptale i7 it 6oes not e/cee6 the nominal resistance o7 the cale, plus 0 per splice

    or connection4

    Resistance to Ground Test

    'he resistance to groun6 test 8ill e con6ucte6 8ith the 8ire run not connecte64 > megger shall

    e connecte6 8ith one lea6 to a suitale groun6, an6 the other lea6 connecte6 to the 8ire un6er

    test4 -000 volts shall e applie6 to the 8ire, an6 the measurement ta:en4

    'he cales shall e visually inspecte6 to ensure that 8ires are properly secure6 an6 terminate64

    Grounin!

    >ll groun6ing relate6 inspections shall e un6erta:en in accor6ance 8ith the re;uirements o7 the

    Contract Documents an6 !PSS 10# speci7ications4

    Prior to installation, the Contractor shall chec: that the material 6elivere6 to the site has een

    supplie6 as per the contract speci7ications an6 that they are o7 the correct colour an6 type4

    Groun6ing an6 on6ing materials an6 connections 8ill e chec:e6 to ensure that they are CS>

    approve6 an6 comply 8ith the Electrical Co6e4 Groun6ing lugs 8ill e chec:e6 to ensure that

    they are the correct sie an6 type4

    Upon installation, the Contractor shall per7orm testing as per the re;uirements o7 !PSS 10#4

    'he resistance to groun6 et8een e;uipment enclosures an6 the groun6ing gri6 shall e teste6 at

    all po8er supply locations to ensure that the groun6ing system complies 8ith the re;uirements o7

    !PSS 10#4 &ea6ings shall not e/cee6 5 ohms4 9n soils o7 lo8 con6uctivity, a66itional groun6

    electro6es an6 groun6 8ires shall e a66e6 as re;uire64 'hese measurements 8ill e un6erta:en

    8hen 7rost penetration 6oes not e/cee6 -50 mm4 Continuity tests 8ill e un6erta:en to ensure

    that the groun6ing is connecte6 properly4 Pole han6holes an6 electrical chamers shall e

    chec:e6 to ensure they have een properly groun6e64

    Luminaries

    >ll luminaire relate6 inspections shall e un6erta:en in accor6ance 8ith the re;uirements o7 the

    Contract Documents an6 !PSS 1-) speci7ications4

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    5/36

    City of PeterboroughQuality Control Plan Electrical

    Page 5

    Prior to construction, the Contractor shall chec: the material 6elivere6 to the site to ensure that

    they are supplie6 7rom the approve6 list, an6 that they have the correct lamp, photometrics,allast an6 ratings as per speci7ications4 >lso, ensure that they are properly laelle6 an6 6ate64

    Upon installation, the Contractor shall carry out a visual inspection to ensure that luminaries are

    aligne6 correctly, that placement an6 con6ition o7 luminaries an6 associate6 har68are an6

    materials are goo6, an6 that the luminaries operate properly 8hen the system is energie64 Ao8

    voltage tests shall e per7orme6 on associate6 8iring system to ensure it meets contract

    re;uirements4 .uses shall e chec:e6 to ensure that they are o7 the correct amperage an6 type as

    per electrical 6esign4

    Po"er #u$$l% E&ui$ment

    >ll po8er supply e;uipment relate6 inspections shall e un6erta:en in accor6ance 8ith the

    re;uirements o7 the Contract Documents an6 !PSS 1-+ speci7ications4

    Prior to construction, the Contractor shall chec: the material 6elivere6 to the site to ensure that it

    con7orms to contract speci7ications4 'he Contractor shall also ensure that ES> lael o7 approval

    is otaine6 prior to installation4

    Upon installation, the Contractor shall inspect the po8er supplies to ensure that they are

    mounte6 at the correct height using speci7ie6 rac:ets4 > visual inspection shall e carrie6 out to

    ensure that the speci7ie6 groun6ing is complete an6 a continuity test 8ill e un6erta:en to ensure

    the groun6ing is connecte6 properly4

    Poles

    >ll pole relate6 inspections shall e un6erta:en in accor6ance 8ith the re;uirements o7 the

    Contract Documents an6 !PSS 1-5 speci7ications4

    Prior to their installation, the Contractor shall chec: all poles 7or 6ents, scratches an6 other

    imper7ections4 'he contract 6ra8ings an6 layout o7 poles shall e revie8e6 an6 the pole

    locations inclu6ing elevations, stations an6 o77sets chec:e6 on site to ensure that they are correct4

    Upon installation, the Contractor shall carry out an inspection to ensure that poles have een

    properly installe6, that the han6holes are correctly orientate6, that the poles are plum an6 that

    anchorage assemlies an6 7rangile ases are installe6 an6 tightene6 in compliance 8ith contract

    re;uirements4

    'ootin!s an Pas for Electrical E&ui$ment

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    6/36

    City of PeterboroughQuality Control Plan Electrical

    Page 6

    >ll 7ootings an6 pa6s 7or electrical e;uipment relate6 inspections shall e un6erta:en inaccor6ance 8ith the re;uirements o7 the Contract Documents an6 !PSS 1-1 speci7ications4

    Prior to construction, the Contractor shall revie8 the contract 6ra8ings an6 layout o7 concrete

    pole 7ootings an6 pa6s 7or electrical e;uipment an6 the locations inclu6ing station an6 o77set

    chec:e6 on site to ensure that they are correct4

    Upon installation, 7ooting an6 pa6 elevations 8ill e chec:e6 to ensure they are level, at the

    correct elevation, station an6 o77set, an6 in con7ormance 8ith pro visual

    inspection 8ill e un6erta:en to ensure that anchorage assemlies are properly oriente6 an6

    teste6 to ensure they are in 8or:ing or6er4 'he 7inishe6 sur7ace o7 the concrete 8ill e inspecte6

    7or 6e7iciencies4

    Traffic #i!nal E&ui$ment

    >ll tra77ic signal e;uipment relate6 inspections shall e un6erta:en in accor6ance 8ith the

    re;uirements o7 the Contract Documents an6 !PSS 10 speci7ications4

    Prior to installation, the Contractor shall chec: all tra77ic signal e;uipment to ensure that the

    e;uipment is as per the contract 6ocuments, it is the correct sie, type an6 ;uantity4

    Upon completion o7 installation, components shall e teste6 an6 proven as in6icate6 in the

    contract4 'he tra77ic signals shall e 7lashe6 out three ?%@ usiness 6ays prior to activation in the

    presence o7 the Contract >6ministrator an6 a ;uali7ie6 veri7ication engineer4 'he Contractor

    shall con7irm that the location an6 orientation o7 the mast arms, tra77ic signal hea6s an6

    pe6estrian hea6s are correct4 Cales are to e visually inspecte6 to ensure that the appropriate

    riser 8ires have een installe6 an6 that the 8ires are properly secure6 an6 terminate6 an6

    laele64

    egger testing is to e per7orme6 on cales to chec: that insulation values o7 con6uctors are in

    accor6ance 8ith !PSS re;uirements, an6 to ensure that they are energie6 an6 in 8or:ing or6er

    8ithout activating the tra77ic signals 7or pulic 6isplay4 >ll lo8 voltage an6 e/tra lo8 voltage

    testing shall con7orm to !PSS 10+4

    Traffic #i!nal Controller

    >ll tra77ic signal controller relate6 inspections shall e un6erta:en in accor6ance 8ith the

    re;uirements o7 the Contract Documents an6 !PSS 1% speci7ications4

    Prior to installation, the Contractor shall inspect the tra77ic signal controller to ensure that the

    manu7acturer3s certi7icate 7or pre*installation testing o7 e;uipment has een receive6 an6 is

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    7/36

    City of PeterboroughQuality Control Plan Electrical

    Page 7

    acceptale4 'he e;uipment shall e chec:e6 to ensure that it is the correct sie, type an6

    ;uantity as per the contract 6ocuments4

    Upon completion o7 installation, components shall e teste6 an6 proven as in6icate6 in the

    contract4 'he Contractor shall per7orm a con7lict monitor test an6 chec: the signal operation to

    ensure that it con7orms to the timing plan an6 operation parameters4 >ll loop 6etectors shall e

    teste6 to ensure that they are in 8or:ing or6er an6 in con7ormance 8ith the contract

    re;uirements4 .inal testing an6 inspection o7 the tra77ic signal controller shall e in the presence

    o7 the Electrical =eri7ication Engineer4

    Traffic Actuation E&ui$ment

    >ll tra77ic actuation e;uipment relate6 inspections shall e un6erta:en in accor6ance 8ith there;uirements o7 the Contract Documents an6 !PSS 1% speci7ications4

    Prior to installation, the Contractor shall inspect the e;uipment an6 shall chec: to ensure that it is

    the correct sie, type an6 ;uantity as per the contract 6ocuments4

    Upon installation, ut prior to sealing o7 slots, the loop 8iring shall e teste6 7or continuity, 7or

    lea:age to groun6 an6 7or in6uctance4 &esistance to groun6 shall e -0F or greater4

    9n6uctance shall e 8ithin 5 o7 the value in6icate6 in the contract using a -00:$ signal at

    5=4

    Upon completion o7 installation, the Contractor shall repeat the test at the controller cainet toensure that they are in 8or:ing or6er an6 con7orm to the contract re;uirements4 'he Cales shall

    e visually inspecte6 to ensure that all 8ires are properly secure6 an6 terminate64 E/tra lo8

    voltage testing results con7orm to !PSS re;uirements4

    IN#PECTION TA#(# C)EC(LI#T #U**ARY

    All Electrical Items OP## +,-

    Chec: 6elivere6 material to veri7y that it is eing supplie6 as per the contract speci7ications4 Chec: 7or evi6ence o7 physical 6amage4

    Ensure part an6 mo6el numers match the material purchase or6ers4

    Ensure ;uantities match the purchase or6ers an6 accessories an6 associate6 material have een provi6e64

    Prepare as*uilt 6ra8ings4

    Electrical Chambers OP## -,.

    Chec: 6elivere6 material to veri7y that it is eing supplie6 as per the contract speci7ications4

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    8/36

    City of PeterboroughQuality Control Plan Electrical

    Page 8

    Chec: the type, alignment, o77set an6 gra6e o7 the han6holes prior to installation4

    Ensure that the correct numer o7 sleeves an6 openings are installe64 Ensure correct positioning an6 installation o7 pulling irons, 6uct sleeves, an6 7rames an6 covers4

    Ensure that ac:7ill material is place6 in accor6ance 8ith contract 6ocuments4

    Ensure that ac:7ill material is compacte6 to re;uire6 target 6ensities4

    Chec: that 6ucts entering han6holes are installe6 in the proper orientation4

    Chec: that 7rames an6 covers are connecte6 to the s stem roun64

    Ducts OP## -,/

    Chec: 6elivere6 material to veri7y that it is eing supplie6 as per the contract speci7ications4

    Ensure that the sie, type an6 colour o7 the con6uit are as speci7ie6 in the contract4

    Ensure that locations an6 ;uantities are as per contract 6ocuments4

    Ensure that 6ucts are 7ree o7 6eris, 8ater, rea:age or 6istortion4

    Chec: that unuse6 6ucts are plugge6, that unuse6 6ucts contain tracer 8ire an6 mule tape4

    Chec: trench e/cavation 7or sie an6 6epth prior to installation4

    Ensure that 6ucts are lace6 at the correct elevation rior to ac:7illin 4

    Cables OP## -,0

    Chec: 6elivere6 material to veri7y that it is eing supplie6 as per the contract speci7ications4

    Chec: material 7or ovious imper7ections4

    Chec: that cales are installe6, teste6 an6 splice6 as in6icate6 in the contract4

    Chec: that cales have een properly laele64

    &evie8 lo8 voltage an6 e/tra lo8 voltage testing results 7or con7ormance to !PSS 10#4

    Chec: that 6ucts terminating in po8er supplies 8ith 8iring are seale64

    Grounin! OP## -,1

    Chec: 6elivere6 material to veri7y that it is eing supplie6 as per the contract speci7ications4

    Chec: that insulate6 groun6 8ire is o7 the correct colour an6 type, as speci7ie6 in the contract4

    Ensure groun6ing an6 on6ing materials an6 connections are CS> approve6 an6 comply 8ith the

    Contract Documents4

    Ensure groun6 lugs are the correct sie an6 type4

    &evie8 testing results on groun6ing e;uipment 7or con7ormance to !PSS 10#4

    Chec: that inaccessile groun6 connections are installe6 as speci7ie64

    &evie8 resistance to groun6 testing results an6 ensure that the groun6ing system complies 8ith the

    contract speci7ications4

    Chec: that metal com onents throu hout the contract are roun6e64

    Luminaries OP## -+2

    Chec: 6elivere6 material to veri7y that it is eing supplie6 as per the contract speci7ications4

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    9/36

    City of PeterboroughQuality Control Plan Electrical

    Page 9

    Chec: that the luminaries 6elivere6 have the correct lamp, photometrics an6 allast an6 that they are

    6ate64 Chec: that luminaries are aligne6 correctly in relation to the roa68ay, that the lamp4

    Chec: that the lamp soc:et is properly set an6 that the luminaire housing is properly hinge6 an6 seale64

    Chec: that connections are clearly mar:e6 an6 i6enti7ie6 an6 that nameplates an6 laels are clearly

    mar:e64

    Ensure that the manu7acture3s name, catalogue numer an6 8attage are on the e/terior o7 the luminaire4

    Chec: that the supply voltage an6 7re;uency, an6 nominal operating voltage o7 the lamp are on the

    interior o7 the luminaire4

    Chec: that the soc:et position is in6icate6 on the interior o7 the luminaire4

    Chec: that the schematic 8iring 6iagram is attache6 to the allast4

    Per7orm visual chec: o7 placement an6 con6ition o7 luminaries an6 associate6 har68are an6 materials4

    Chec: that luminaries operate properly 8hen the system is energie64

    &evie8 lo8 voltage testing results on 8iring system to ensure it meets contract re;uirements4

    Po"er #u$$l% E&ui$ment OP## -+0

    Chec: 6elivere6 material to veri7y that it is eing supplie6 as per the contract speci7ications4

    Ensure that the ES> lael o7 approval is otaine6 prior to installation4

    Per7orm visual inspection on the installe6 po8er supply e;uipment to ensure that all parts are as per

    contract 6ocuments an6 correspon6 8ith shop 6ra8ings4

    Chec: that the speci7ie6 groun6 is complete4 &evie8 the cale an6 groun6ing system testing results 7or con7ormance to contract re;uirements4

    &evie8 lo8 voltage testing results on 8iring 7or con7ormance to contract re;uirements4

    Poles OP## -+3

    Chec: 6elivere6 material to veri7y that it is eing supplie6 as per the contract speci7ications4

    Chec: poles 7or 6ents, scratches an6 other imper7ections4

    9nspect the 8or: to ensure that poles have een properly installe6, that the poles are plum an6 that

    anchorage assemlies an6 7rangile ases are installe6 an6 tightene6 in compliance 8ith contractre;uirements4

    Chec: that pole 7oun6ations an6 poles are installe6 to the correct elevation, station an6 o77set4

    'ootin!s an Pas for Electrical E&ui$ment OP## -+-

    Upon installation, 7ooting an6 pa6 elevations 8ill e chec:e6 to ensure they are level an6 in

    con7ormance 8ith pro

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    10/36

    City of PeterboroughQuality Control Plan Electrical

    Page 10

    Chec: material to ensure that it is the correct sie, type an6 ;uantity4

    Chec: that the signal hea6s an6 mast arms are the correct sie an6 type4

    Chec: that the signal hea6s have een orientate6 correctly4

    Components have een teste6 an6 proven as in6icate6 in the contract4

    'ra77ic signals have een 7lashe6 out three ?%@ 6ays prior to activation in the presence o7 the Contract

    >6ministrator an6 a ;uali7ie6 veri7ication engineer4

    Cales have een visually inspecte6 to ensure that the appropriate riser 8ires have een installe6 an6

    that the 8ires are properly secure6 an6 terminate64

    Carry out megger testing on cales to ensure that insulation values o7 con6uctors are in accor6ance 8ith

    !PSS re;uirements4

    Certi7icate o7 Con7ormance has een sumitte6 to the Contract >6ministrator three ?%@ 6ays prior totra77ic si nal activation

    Traffic #i!nal Controller OP## -./

    Ensure that the manu7acturer3s certi7icate 7or pre*installation testing o7 e;uipment has een receive6 an6

    is acceptale prior to installation4

    Chec: e;uipment to ensure that it is the correct sie, type an6 ;uantity4

    Upon completion, ensure that components have een teste6 an6 proven as in6icate6 in the contract4

    Chec: signal operation to ensure that it con7orms to the timing plan an6 operational parameters4

    Chec: con7lict monitor4

    Chec: loop 6etectors to ensure that they are in 8or:ing or6er an6 con7orm 8ith the contract

    re;uirements4

    Carry out megger testing on cales to ensure that insulation values o7 con6uctors are in accor6ance 8ith

    contract re;uirement4

    =isually inspect cales to ensure that 8ires are properly secure6 an6 terminate64

    Certi7icate o7 Con7ormance has een sumitte6 to the Contract >6ministrator three ?%@ 6ays prior to

    tra77ic si nal activation

    Traffic Actuation E&ui$ment OP## -./

    Chec: e;uipment to ensure that it is the correct sie, type an6 ;uantity4

    'est loops to ensure that they are in 8or:ing or6er4

    =isually inspect cales to ensure that 8ires are properly secure6 an6 terminate64

    &evie8 e/tra lo8 voltage testing results to ensure they are in con7ormance 8ith !PSS 10# re;uirements4

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    11/36

    City of PeterboroughQuality Control Plan Electrical

    Page 11

    APPENDI4A

    IN#PECTION 'OR*#

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    12/36

    Contractor(

    9nspecte6 By(

    Date(

    Ins$ection #ta!e

    Pre*installation

    9nstallation

    T%$e of Ins$ection Date of

    Ins$ection

    *eets

    Criteria

    Notes

    aterial has een supplie6 as per the

    contract speci7ications4

    Chamer type is as per contract4

    Correct numer o7 sleeves an6 openings

    are installe64

    Pulling irons, 6uct sleeves an6 7rames an6

    covers are correctly positione6 an6

    installe64

    Prior to installation( alignment, o77set an6

    gra6e o7 han6holes are installe6 as per

    contract4

    Ducts entering han6holes are installe6 in

    the proper orientation4

    Bac:7ill eing place6 is in accor6ance

    8ith 8hat is in6icate6 in the contract

    Bac:7ill material is compacte6 to re;uire6

    target 6ensities4

    >ll unuse6 holes are 7ille6 an6 8ater

    proo7ing is applie6 8here applicale

    .rames are connecte6 to the system

    groun64

    City of PeterboroughQuality Control Plan Electrical

    Page 12

    Chec5 List for Electrical Chambers

    Contract No: Item No.:

    Identification of Chambers Inspected:

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    13/36

    Ins$ection #ta!e

    Pre*installation

    9nstallation

    T%$e of Ins$ection Date of

    Ins$ection

    *eets

    Criteria

    Notes

    aterial has een supplie6 as per the

    contract speci7ications4

    Sie, type an6 colour o7 the con6uit is as

    speci7ie6 in the contract4

    Ducts are 7ree o7 6eris, 8ater, rea:age

    or 6istortion4

    an6rel has een pulle6 through 6uct

    system4

    Unuse6 6ucts are plugge64

    Ducts terminating in po8er supplies are

    seale64

    Aocations an6 ;uantities o7 6ucts are as

    per contract 6ocuments4

    Ducts are place6 at the correct 6epth ?toe 6one prior to ac:7illing@4

    Connection to poles, chamers an6 other

    6evices meet the re;uirements o7 the

    contract4

    Contractor(

    9nspecte6 By(

    Date(

    City of PeterboroughQuality Control Plan Electrical

    Page 13

    Chec5 List for Ducts

    Contract No: Item No.:

    Identification of Ducts Inspected:

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    14/36

    City of PeterboroughQuality Control Plan Electrical

    Page 14

    Ins$ection #ta!e

    Pre*installation

    9nstallation

    Chec5 List for Cables

    Contract No: Item No.:

    Identification of Cables Inspected:

    T%$e of Ins$ection Date of

    Ins$ection

    *eets

    Criteria

    Notes

    aterial has een supplie6 as per the

    contract speci7ications4

    No ovious imper7ections in the cales4

    Cales are installe6, teste6 an6 splice6 as

    in6icate6 in the contract4

    >ll 8ires are properly secure6 an6

    terminate64

    Chart for Lo" 6olta!e Cable Testin!

    Cable T%$e 'rom To Distance Resistance 7ohms8

    7Continuit%8

    Resistance to

    Groun

    Contractor(

    9nspecte6 By(

    Date(

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    15/36

    City of PeterboroughQuality Control Plan Electrical

    Page 15

    Ins$ection #ta!e

    Pre*installation

    9nstallation

    Chec5 List for Grounin!

    Contract No: Item No.:

    Identification of Grounding Inspected:

    T%$e of Ins$ection Date of

    Ins$ection

    *eets

    Criteria

    Notes

    aterial has een supplie6 as per the

    contract speci7ications4

    9nsulate6 groun6 8ire is the colour an6

    type speci7ie6 in the contract4

    Groun6ing, on6ing materials an6

    connections are CS> approve6 an6

    comply 8ith the Electric Co6e4

    Groun6 lugs are the correct sie an6 type4

    'esting results on groun6 e;uipment

    con7orm to !PSS 10#4

    >ll inaccessile groun6 connections are

    installe6 as speci7ie64

    &esistance to groun6 testing results

    comply 8ith the re;uirements o7 the

    contract speci7ications

    'he groun6ing system complies 8ith the

    re;uirements o7 the contract

    speci7ications

    >ll metal components throughout the

    contract are groun6e64

    Groun Tests

    Location Groun Ros Resistance

    Contractor(

    9nspecte6 By(

    Date(

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    16/36

    City of PeterboroughQuality Control Plan Electrical

    Page 16

    Ins$ection #ta!e

    Pre*installation

    9nstallation

    Chec5 List for Roa " a% Luminaires

    Contract No: Item No.:

    Identification of Luminaires Inspected:

    T%$e of Ins$ection Date of

    Ins$ection

    *eets

    Criteria

    Notes

    aterial is as per contract 6ocuments4

    'here is no physical 6amage to the unit4

    Aamp soc:et is properly set4

    Auminaire housing is properly hinge6 an6seale64

    Auminaries have the correct lamp,

    photometrics an6 allast an6 are 6ate64

    >ll connections are clearly mar:e6 an6

    i6enti7ie6 an6 all nameplates an6 laels

    are clearly mar:e64

    Auminaries are correctly aligne6 in

    relation to the roa68ay4

    anu7acture3s name, catalogue numer

    an6 8attage are on the e/terior o7 the

    luminaire4

    Supply voltage an6 7re;uency, an6

    nominal operating voltage o7 lamp is on

    the interior o7 the luminaires

    Soc:et position is in6icate6 on the

    interior o7 the luminaire4

    Schematic 8iring 6iagram is attache6 to

    the allast4

    Auminaries operate properly 8hen the

    system is energie64

    .uses are o7 the correct amperage an6

    type4

    Contractor(

    9nspecte6 By(

    Date(

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    17/36

    City of PeterboroughQuality Control Plan Electrical

    Page 17

    Ins$ection #ta!e

    Pre*installation

    9nstallationChec5 List for Po"er #u$$l% E&ui$ment

    Contract No: Item No.:

    Identification of Power Supplies Inspected:

    T%$e of Ins$ection Date of

    Ins$ection

    *eets

    Criteria

    Notes

    >ll material has een supplie6 as per the

    contract speci7ications4

    'here is no ovious physical 6amage4

    Enclosure is properly seale64

    Con6uit an6 8iring is properly mounte6

    an6 route64

    E;uipment is properly laele6 an6

    mounte6 an6 the numer an6 sies are as

    speci7ie6 in the contract4

    Speci7ie6 groun6 is complete4

    9nstalle6 e;uipment has een visually

    inspecte64

    Ao8 voltage testing results on 8iringcon7orm to contract re;uirements4

    Contractor(

    9nspecte6 By(

    Date(

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    18/36

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    19/36

    City of PeterboroughQuality Control Plan Electrical

    Page 19

    Ins$ection #ta!e

    Pre*installation

    9nstallationChec5 List for 'ootin!s an Pas

    Contract No: Item No.:

    Identification of Footings Inspected:

    T%$e of Ins$ection Date of

    Ins$ection

    *eets

    Criteria

    Notes

    >nchorage assemlies are properly

    oriente6 an6 teste6 to ensure they are in

    8or:ing or6er4

    Concrete pa6s an6 7ootings have eenoriente6 as per contract 6ocuments4

    >ll 7ooting an6 pa6 elevations are level

    an6 in con7ormance 8ith pro

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    20/36

    City of PeterboroughQuality Control Plan Electrical

    Page 20

    Ins$ection #ta!e

    Pre*installation

    9nstallationChec5 List for Traffic #i!nal E&ui$ment

    Contract No: Item No.:

    Identification of raffic Signal !"uipment Inspected:

    T%$e of Ins$ection Date of

    Ins$ection

    *eets

    Criteria

    Notes

    >ll e;uipment is the correct sie, type an6

    ;uantity4

    >ll components have een teste6 an6

    proven as in6icate6 in the contract4

    ast arms an6 rac:ets are the correct

    sie as per contract re;uirements4

    Signal hea6s are the correct type an6 sie

    as per contract re;uirements4

    Signal hea6s are properly oriente64

    >ppropriate riser 8ires have een

    installe64

    Cales have een visually inspecte6 to

    ensure that all 8ires are properly secure6

    an6 terminate64

    Ao8 voltage test results con7orm 8ith

    !PSS re;uirements4

    Contractor(

    9nspecte6 By(

    Date(

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    21/36

    City of PeterboroughQuality Control Plan Electrical

    Page 21

    Ins$ection #ta!e

    Pre*installation

    9nstallationChec5 List for Traffic #i!nal Controller

    Contract No: Item No.:

    Identification of raffic Signal Controller Inspected:

    T%$e of Ins$ection Date of

    Ins$ection

    *eets

    Criteria

    Notes

    Ensure that the manu7acturerHs certi7icate

    7or pre*installation testing has een

    receive6 an6 is acceptale4

    >ll e;uipment is the correct sie, type an6;uantity4

    >ll components have een teste6 an6

    proven as in6icate6 in the contract4

    Signal operation has een chec:e6 to

    ensure that it con7orms to the timing plan

    an6 operational parameters

    >ll tra77ic loops in 8or:ing or6er an6

    con7orm 8ith the contract re;uirements4

    Contractor(

    9nspecte6 By(

    Date(

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    22/36

    City of PeterboroughQuality Control Plan Electrical

    Page 22

    Ins$ection #ta!e

    Pre*installation

    9nstallation

    Chec5 List for Traffic Actuation E&ui$ment

    Contract No: Item No.:

    Identification of Loop Inspected:

    T%$e of Ins$ection Date of

    Ins$ection

    *eets

    Criteria

    Notes

    >ll e;uipment is the correct sie, type an6

    ;uantity4

    Upon installation, ut prior to sealing o7

    slots, the loop 8iring has een teste6 7or

    continuity, lea:age to groun6 an6in6uctance4

    >ll tra77ic loops have een teste6 at the

    controller to ensure that they are in

    8or:ing or6er an6 con7orm 8ith contract

    re;uirements4

    Cales have een visually inspecte6 to

    ensure that all 8ires are properly secure6

    an6 terminate64

    E/tra lo8 voltage testing results con7orm

    !PSS re;uirements4

    Loo$ Detector Tests

    Loo$ No9 Location Inuctance

    7)8

    Resistance

    7Ohms8

    Notes

    Contractor(

    9nspecte6 By(

    Date(

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    23/36

    City of PeterboroughQuality Control Plan Electrical

    Page 23

    APPENDI4 :

    PROO' O' PER'OR*ANCE CERTI'ICATE#

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    24/36

    City of PeterboroughQuality Control Plan Electrical

    Page 24

    Proof of Performance Certificate for Electrical Chambers

    Contract No: Item No.: Date:

    Description:

    Identification of Chambers Inspected:

    T%$e of Ins$ection *eets Criteria

    Chamer type is as per contract4

    Correct numer o7 sleeves an6 openings are installe64

    Pulling irons, 6uct sleeves, an6 7rames an6 covers are correctly positione6

    an6 installe64

    >lignment, o77set an6 gra6e o7 chamers are installe6 as per contract4

    Ducts entering manholes are installe6 in the proper orientation4

    Bac:7ill eing place6 is in accor6ance 8ith 8hat is in6icate6 in the contract4

    >ll unuse6 holes are 7ille6 an6 8ater proo7ing is applie6 8here applicale4

    .rames are connecte6 to the system groun64

    Notes(

    9nspecte6 By(

    Date(

    'he aove note6 inspection is herey certi7ie6 y

    , P4Eng4P4Eng4 Stamp

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    25/36

    City of PeterboroughQuality Control Plan Electrical

    Page 25

    Proof of Performance Certificate for Ducts

    Contract No: Item No.: Date:

    Description:

    Identification of Chambers Inspected:

    T%$e of Ins$ection *eets Criteria

    Sie, type an6 colour o7 the con6uit is as speci7ie6 in the contract4

    Ducts are 7ree o7 6eris, 8ater, rea:age or 6istortion4

    Unuse6 6ucts are plugge64

    Ducts terminating in po8er supplies are properly seale64

    Aocations an6 ;uantities o7 6ucts are as per contract 6ocuments4

    Ducts are place6 at the correct 6epth prior to ac:7illing4

    ar:er tape an6 con6uit mar:ers are as per speci7ications4

    Connection to poles, chamers an6 other 6evices meet the re;uirements o7

    the contract4

    Notes(

    9nspecte6 By(

    Date(

    'he aove note6 inspection is herey certi7ie6 y

    , P4Eng4

    P4Eng4 Stamp

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    26/36

    City of PeterboroughQuality Control Plan Electrical

    Page 26

    .Proof of Performance Certificate for Cables

    Contract No: Item No.: Date:

    Description:

    Identification of Chambers Inspected:

    T%$e of Ins$ection *eets Criteria

    'ype, sie an6 numer o7 cales are as speci7ie6 in the contract4

    No ovious imper7ections4

    Cales are installe6, teste6 an6 splice6 as in6icate6 in the contract4

    ires are properly secure6 an6 terminate64

    Notes(

    9nspecte6 By(

    Date(

    'he aove note6 inspection is herey certi7ie6 y

    , P4Eng4

    P4Eng4 Stamp

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    27/36

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    28/36

    City of PeterboroughQuality Control Plan Electrical

    Page 28

    Proof of Performance Certificate for Grounin!

    Contract No: Item No.: Date:

    Description:

    Identification of Chambers Inspected:

    T%$e of Ins$ection *eets Criteria

    'ype an6 sie o7 groun6 8ire is as speci7ie6 in the contract4

    'ype an6 numer o7 groun6 electro6es is as speci7ie6 in the contract4

    Groun6 lugs are the correct sie an6 type4

    'esting results on groun6 e;uipment con7orm to !PSS 10#4

    &esistance to groun6 testing results have een revie8e6 an6 the groun6ing

    system complies 8ith the contract speci7ications4

    >ll components re;uire6 to e groun6e6 are groun6e64

    Notes(

    9nspecte6 By(

    Date(

    'he aove note6 inspection is herey certi7ie6 y

    , P4Eng4

    P4Eng4 Stamp

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    29/36

    City of PeterboroughQuality Control Plan Electrical

    Page 29

    Groun Tests

    Location Groun Ros Resistance

    Notes(

    9nspecte6 By(

    Date(

    'he aove note6 testing 8as 8itnesse6 an6 is herey

    certi7ie6 y , P4Eng4

    P4Eng4 Stamp

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    30/36

    City of PeterboroughQuality Control Plan Electrical

    Page 30

    Proof of Performance Certificate for Roa"a% Luminaires

    Contract No: Item No.: Date:

    Description:

    Identification of Chambers Inspected:

    T%$e of Ins$ection *eets Criteria

    No physical 6amage to the unit4

    Aamp soc:et is properly set4Auminaire housing is properly hinge6 an6 seale64

    Auminaries have the correct lamp, photometrics an6 allast an6 are 6ate64

    >ll connections are clearly mar:e6 an6 i6enti7ie6 an6 that all nameplates

    an6 laels are clearly mar:e64

    Auminaries are correctly aligne6 in relation to the roa68ay4

    5anu7acture3s name, catalogue numer an6 8attage are on e/terior o7 luminaire4

    Supply voltage an6 7re;uency, an6 nominal operating voltage o7 lamp is on

    the interior o7 the luminaires

    Soc:et position is in6icate6 on the interior o7 the luminaire4

    Schematic 8iring 6iagram is attache6 to the allast4

    Auminaries operate properly 8hen the system is energie64

    .uses are o7 the correct amperage an6 type4

    Notes(

    9nspecte6 By(

    Date(

    'he aove note6 inspection is herey certi7ie6 y

    , P4Eng4

    P4Eng4 Stamp

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    31/36

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    32/36

    9nspecte6 By(

    Date(

    'he aove note6 inspection is herey certi7ie6 y

    , P4Eng4

    P4Eng4 Stamp

    City of PeterboroughQuality Control Plan Electrical

    Page 32

    Proof of Performance Certificate for Poles

    Contract No: Item No.: Date:

    Description:

    Identification of Chambers Inspected:

    T%$e of Ins$ection *eets Criteria

    Poles are installe6 to the correct elevation, station an6 o77set4

    No 6ents, scratches an6 other imper7ections4

    Poles have een properly installe6 an6 are plum4

    >nchorage assemlies an6 7rangile ases are installe6 an6 tightene6 in

    compliance 8ith contract re;uirements4

    Pole han6holes are properly oriente64

    Notes(

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    33/36

    'he aove note6 inspection is herey certi7ie6 y

    , P4Eng4

    P4Eng4 Stamp

    City of PeterboroughQuality Control Plan Electrical

    Page 33

    Proof of Performance Certificate for 'ootin!s an Pas

    Contract No: Item No.: Date:

    Description:

    Identification of Chambers Inspected:

    T%$e of Ins$ection *eets Criteria

    >nchorage assemlies have een visual inspection an6 are properly oriente64

    Pa6s an6 7ootings have een oriente6 as per contract 6ocuments4

    Depth an6 location o7 7ooting or pa6 is correct4

    Numer an6 orientation o7 con6uit is correct4

    .ooting an6 pa6 elevations have een chec:e6 an6 are level an6 in

    con7ormance 8ith ro ect re uirements4

    .inishe6 sur7ace o7 concrete has een groove6 an6 an 2I3 place6 8here

    6ucts enter4

    .inishe6 sur7ace o7 the concrete has een inspecte6 7or 6e7iciencies4

    Notes(

    9nspecte6 By(

    Date(

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    34/36

    'he aove note6 inspection is herey certi7ie6 y

    , P4Eng4

    P4Eng4 Stamp

    City of PeterboroughQuality Control Plan Electrical

    Page 34

    Proof of Performance Certficiate for Traffic #i!nal E&ui$ment

    Contract No: Item No.: Date:

    Description:

    Identification of Chambers Inspected:

    T%$e of Ins$ection *eets Criteria

    Sie an6 type o7 signal hea6s is as speci7ie6 in contract4

    Signal hea6s are properly oriente64

    ast arms an6 rac:ets are the correct sie as per contract re;uirements4

    Spacing an6 mounting heights o7 tra77ic signal hea6s is correct4

    Pe6estrian pushutton location is as speci7ie6 in contract4

    Pe6estrian pushuttons operate correctly4

    >ll components have een teste6 an6 proven as in6icate6 in the contract4

    Cales are energie6 an6 in 8or:ing or6er 8ithout activating the tra77ic

    si nals 7or ulic 6is la 4Cales have een visually inspecte6 to ensure that all 8ires are properly

    secure6 an6 terminate6 correctly4

    Notes(

    9nspecte6 By(

    Date(

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    35/36

    'he aove note6 inspection is herey certi7ie6 y

    , P4Eng4

    P4Eng4 Stamp

    City of PeterboroughQuality Control Plan Electrical

    Page 35

    Proof of Performance Certficiate for Traffic #i!nal Controller

    Contract No: Item No.: Date:

    Description:

    Identification of Chambers Inspected:

    T%$e of Ins$ection *eets Criteria

    >ll components have een teste6 an6 proven as in6icate6 in the contract4

    Cales are energie6 an6 in 8or:ing or6er 8ithout activating the tra77ic

    si nals 7or ulic 6is la 4Cales have een visually inspecte6 to ensure that all 8ires are properly

    secure6 an6 terminate6 correctly4

    Controller has een visually inspecte6 to ensure that controller an6 con7lict

    monitor ro rammin is installe6 correctl 4

    Setting o7 timing controls, s8itches an6 programming controls is correct4

    Con7lict monitor 8as teste64

    Prior to turn*on, the intersection 8as 7lashe6 out4

    Aoop 6etectors 8ere teste6 an6 are as speci7ie6 in the contract4

    Notes(

    9nspecte6 By(

    Date(

  • 8/10/2019 C - Electrical Quality Control Plan - March 2013

    36/36

    City of PeterboroughQuality Control Plan Electrical

    Page 36

    Proof of Performance Testin! for Loo$ Detectors

    Contract No: Item No.: Date:

    Description:

    Identification of Chambers Inspected:

    Loo$ No9 Location Inuctance 7)8 Resistance 7Ohms8

    Notes(

    9nspecte6 By(

    Date(

    'he aove note6 testing 8as 8itnesse6 an6 is herey

    i7i 6