91
FRASER VALLEY REGIONAL DISTRICT 45950 Cheam Avenue, Chilliwack, British Columbia V2P 1N6 Ptone: 604-702-5000 ToIl Free: 1-800-528-0061 (BC only) Fax: 604-792-9684 1\I RD website: www.tvrd.bc.ca e-mail: [email protected] By Courier July 8, 2013 JUL 1 2013 File: 9050-20-099 Jim Hofweber, Executive Director MI ___o’d.s_ DLD...__.. 1 Environmental Management Branch Kflo —1:: and Director of Waste Management Ministry of Environment I :.. - PC BOX 9342 Stn Prov Govt 1insoco: Victoria BC V8W9M1 1 FtleNo I CÁO Tra*e(NO, Dear Mr. Hofweber: I am writing with reference to the Minister’s letter of July 22, 2011 granting conditional approval to Metro Vancouver’s Integrated Solid Waste and Resource Management Plan (ISWRMP), and to the procurement process that Metro Vancouver purports to be carrying out under that conditional approval. I am writing to you in your capacity as the Director delegated by the Minister in his July 22, 2011 conditional approval. Based upon the publicly available evidence to date, Fraser Valley Regional District is concerned that Metro Vancouver’s procurement process is not consistent with the conditions set by the Minister. In his July 22, 2011 letter, the Minister stated: .the SWMP as submitted does not fully meet my requirements. Therefore pursuant to Section 24(5) of the Environmental Management Act, I hereby approve Metro Vancouver’s SWMP. . . subject to the following conditions: 2. Metro Vancouver must ensure, to the satisfaction of the Director, that the competitive process for establishing any new or upgrading any existing waste-to-energy (W2E) capacity and/or establishing contingency landfill as identified in the SWMP for up to 500,000 tonnes of additional disposal capacity considers the full range of possible options both in and out of region in an equal and fair manner. Furthermore, Metro Vancouver must provide a consultation plan on the selected option(s).’ The Minister also stated: Any new in-province W2E facility and/or landfill must comply with the Environmental Assessment Act.” I am writing to you to request a determination as to whether the competitive process undertaken by Metro Vancouver meets the Minister’s Condition #2, In particular, the Minister required that the process consider the full range of possible options.’ The range the Condition contemplates is between establishing any new or upgrading any existing waste-to-energy (W2E) capacity Doc 227847-1

By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

FRASER VALLEY REGIONAL DISTRICT45950 Cheam Avenue, Chilliwack, British Columbia V2P 1N6

Ptone: 604-702-5000 ToIl Free: 1-800-528-0061 (BC only) Fax: 604-792-96841\IRD website: www.tvrd.bc.ca e-mail: [email protected]

By Courier

July 8, 2013JUL 1 2013 File: 9050-20-099

Jim Hofweber, Executive Director MI ___o’d.s_ DLD...__..1

Environmental Management Branch Kflo —1::and Director of Waste Management —

Ministry of Environment I :.. -

PC BOX 9342 Stn Prov Govt 1insoco:Victoria BC V8W9M1 1FtleNo

I CÁO Tra*e(NO,Dear Mr. Hofweber:

I am writing with reference to the Minister’s letter of July 22, 2011 granting conditional approvalto Metro Vancouver’s Integrated Solid Waste and Resource Management Plan (ISWRMP), andto the procurement process that Metro Vancouver purports to be carrying out under thatconditional approval. I am writing to you in your capacity as the Director delegated by theMinister in his July 22, 2011 conditional approval.

Based upon the publicly available evidence to date, Fraser Valley Regional District is concernedthat Metro Vancouver’s procurement process is not consistent with the conditions set by theMinister. In his July 22, 2011 letter, the Minister stated:

.the SWMP as submitted does not fully meet my requirements. Therefore pursuant toSection 24(5) of the Environmental Management Act, I hereby approve MetroVancouver’s SWMP. . . subject to the following conditions:

2. Metro Vancouver must ensure, to the satisfaction of the Director, that the competitiveprocess for establishing any new or upgrading any existing waste-to-energy (W2E)capacity and/or establishing contingency landfill as identified in the SWMP for up to500,000 tonnes of additional disposal capacity considers the full range of possibleoptions both in and out of region in an equal and fair manner. Furthermore, MetroVancouver must provide a consultation plan on the selected option(s).’

The Minister also stated:

Any new in-province W2E facility and/or landfill must comply with the EnvironmentalAssessment Act.”

I am writing to you to request a determination as to whether the competitive process undertakenby Metro Vancouver meets the Minister’s Condition #2, In particular, the Minister required thatthe process consider the full range of possible options.’ The range the Condition contemplatesis between establishing any new or upgrading any existing waste-to-energy (W2E) capacity

Doc 227847-1

Page 2: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Jim Hofweber, Executive DirectorEnvironmental Management Branch

and Director of Waste ManagementMinistry of EnvironmentJuly8,2013 Page2

and/or establishing contingency landfill”. The process must consider this full range of options forup to 500,000 tonnes of additional disposal capacity both in region and out of region in an equaland fair manner.

However, despite the condition that Metro Vancouver must fairly and equally consider the fullrange of options between upgrading existing W2E, establishing new W2E and/or establishingcontingency landfill, and must consider each possible option both in region and out of region,Metro Vancouver appears to have circumscribed its procurement process from the outset.Review of Metro Vancouver’s “New Waste-to-Energy Procurement Process”, approved by theGreater Vancouver Sewerage and Drainage District (GVS&DD) Board of Directors October 26,2012 and review of recent public notices issued by Metro Vancouver reveal that MetroVancouver is g considering “new... waste-to-energy capacity” in its competitive process.

The evidence of this can be found on the face of Metro Vancouver’s documents. For instance:

1) The only procurement process of which we are aware that has been approved by theGVS&DD is set out in a September 24, 2012 staff report whose subject is “New Waste-to-Energy Procurement Process”. Page 2 of the Report states: “As per the Board’sdirection, staff have prepared the following recommended procurement process for theBoard’s consideration. The process is a multi-stage process designed to ensure acompetitive process in developing new WTE capacity.” The process is based solelyupon seeking new W2E capacity, and does not consider upgrading existing W2Ecapacity, nor establishing contingency landfill, or any combination thereof.

2) The RFQI, posted November 23, 2012 issues a request for statements of qualificationsonly for “the provision of a suitable technology for the processing of post-diversionmunicipal solid waste (“MSW”) in a new waste-to-energy (“WTE”) facility or facilities.”

3) The May 22, 2013 posting for the New Waste-to-Energy Capacity (NWTEC) potentialsite identification (PSI) phase of the procurement process announces an opportunity “forpublic and private landowners to self-identify properties for consideration as sites for thedevelopment of NWTEC. The posting states: “To more effectively manage the region’swaste, MV and its municipalities have determined that additional WTE capacity is thebest solution for managing the residual waste—a decision that was supported byprovincial approval of the MV’s Integrated Solid Waste and Resource ManagementPlan.”

However, the plain language of the Minister’s Condition #2 establishes that the Minister has notin fact approved Metro Vancouver’s position in favour of establishing additional WTE capacity.In fact, the Minister has expressly required a process that would require Metro Vancouver toconsider the full range of possible options for residual waste in an equal and fair manner. Theprocess required by the Minister is meant to ensure that the best solution for managing residualwaste is determined by an equal and fair consideration of all of the possible options, and itprohibits a pre-determination in favour of additional WTE capacity.

Doc 227847-1

Page 3: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Jim Hofweber, Executive DirectorEnvironmental Management Branch

and Director of Waste ManagementMinistry of EnvironmentJuly8,2013 Page3

Under Condition #2 the Minister tasks the Director with an ultimate assessment of whether theprocurement process was equal and fair. However, where the process is based upon a flawedpremise and assumes a pre-determined outcome, it cannot be equal and fair, and does notaccord with the Minister’s conditional approval. Accordingly, FVRD is requesting a determinationfrom the Director now, rather than awaiting the outcome of the procurement process.

Thank you for your attention to this matter. We look forward to receiving notice of yourdetermination.

Since rely,

Paul GippsChief Administrative Officer

Director Greg Moore, Chair, Greater Vancouver Sewage and Drainage District Board

Attachments:1) July 2010, Integrated Solid Waste Management Plan, Metro Vancouver2) July 22, 2011, Minister of Environment conditional approval3) October 26, 2012, GVS&DD Approval of New Waste-to-Energy Procurement Process (with

attachments: October 15, 2012 Zero Waste Committee Recommendation; September 24, 2012Staff Report)

4) November23, 2012 Metro Vancouver RFQ1 for Waste-to-Energy Technology5) May 22, 2013 Metro Vancouver NWETC PSI

JUL 172013

uZ

Doc 227847-1

Page 4: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental
Page 5: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

www.metrovancouver.org

JULY 20104284355

a Solid Waste Management Plan for the Greater Vancouver Regional District

and Member Municipalities

Integrated Solid Waste and

Resource Management

TBowen
Text Box
4374739
Page 6: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental
Page 7: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Table of Contents

Vision Statement 4

Goals and Targets 5

A. Integrated Solid Waste and Resource Management Plan

Guiding Principles 6

Sustainability 6

Integrated Resource Recovery 6

Resource Management Principles: The 5Rs 6

Public Health Principles 6

Process and Consultation 7

Aligning with Provincial Initiatives 7

Aligning with Federal Initiatives 8

Coordinating with other Metro Vancouver Plans 9

Governance, Roles and Responsibilities 11

Geographic Scope 12

Approved Facilities 13

New Facilities 14

Flow Control 15

First Nations Lands 15

B. Goals, Strategies, Actions and Measures

Goal 1: Minimize Waste Generation 16

Goal 2: Maximize Reuse, Recycling and Material Recovery 18

Goal 3: Recover Energy from the Waste Stream after Material Recycling 24

Goal 4: Dispose of all Waste in Landfill After Material Recycling and Energy Recovery 27

Performance Measures and Adaptive Management 29

Financial Implications 31

Appendix A

Long Term Monitoring Requirements for the Waste-To-Energy Facility in Burnaby 35

Figure 1 Metro Vancouver Sustainability Framework 9

Figure 2 Key Connections with other Metro Vancouver Plans 10

Figure 3 Map of Plan Area 13

Figure 4 Map of Approved Facilities 14

Table 1 Regional Waste Management – Net Expenditures 33

Page 8: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

4 Solid Waste Management Plan July, 2010

Metro Vancouver has a vision to achieve what humanity aspires to on a global basis – the highest quality of life embracing cultural vitality, economic prosperity, social justice and compassion, all nurtured by a beautiful and healthy natural environment

We will achieve this vision by embracing the principles of sustainability, not least of which is an unshakeable commitment to the well-being of current and future generations and the health of our planet, in everything we do

As we share our efforts in achieving this vision, we are confident that the inspiration and mutual learning we gain will become vital ingredients in our hopes for a sustainable common future

Building a Sustainable Livable Region Building a sustainable, livable region is the overarching regional vision Social, environmental and economic sustainability is, therefore, a fundamental objective in all Metro Vancouver activities: from the services we deliver through the management and strategic plans we develop and administer, to the various outreach activities we engage in pursuit of collaborative governance

As we build and facilitate collaborative processes, including those that engage citizens, and enhance understanding of other levels of government, we are confident that the inspiration and mutual learning we gain will become vital ingredients in our hopes for a sustainable common future

Vision Statement

Page 9: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 5

Goals The overriding principle of the Integrated Solid Waste and Resource Management Plan is the avoidance of waste through an aggressive waste reduction campaign and through the recovery of materials and energy from the waste that remains In line with this principle, the Integrated Solid Waste and Resource Management Plan (ISWRMP) has four goals:

Goal 1: Minimize waste generation

Goal 2: Maximize reuse, recycling and material recovery

Goal 3: Recover energy from the waste stream after material recycling

Goal 4: Dispose of all remaining waste in landfill, after material recycling

and energy recovery The key strategies and actions to achieve the goals of the ISWRMP are set out in Part B, Goals, Strategies, Actions and Measures

Targets Reaching the primary goal of waste avoidance requires a reduction in the generation of waste Metro Vancouver has few levers to directly control the volume of waste generated So the target for waste reduction is one for the community as a whole to aspire to, rather than one the Greater Vancouver Sewerage & Drainage District (GVS&DD) can be held wholly responsible for achieving This Plan therefore sets a target for the Metro Vancouver region to reduce the quantity of waste generated per capita within the region, calculated on a rolling 5 year average, to 90% or less of 2010 volumes by 2020

To reach the second goal of waste reuse, recycling and material recovery, as much as possible must be diverted away from the waste disposal stream and into programs aimed at reuse, recycling and material recovery The second target of the ISWRMP is to increase the regional diversion rate from an average of 55% to a minimum of 70% by 2015 and an aspirational target of achieving 80% by 2020 assuming there will be sustained markets for all diverted material

The overall 70% diversion target implies the following approximate diversion rates by sector:

•Multi-family 30%

•Single-family 65%

•Institutional, commercial and industrial 70%

•Demolition, land clearing and construction 80%

Conventionally it has been assumed that the 5Rs hierarchy approximates the sequence of processes in waste management and the goal of reducing, reusing or recycling waste to the maximum extent possible has been measured as the rate of ‘diversion’ of waste from reaching the fifth step in the hierarchy – the disposal of residues Modern reality is more complex As a result, using the conventionally defined ‘diversion rate’ includes some source separated material utilized as fuel being considered ’recycled’ while some material that is recycled after incineration is still considered ‘disposed’

This Plan is driven by the underlying principles of sustainability but, for the sake of historic comparability, continues to use the conventional definition of ‘diversion rate’

Goals and Targets

Page 10: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

6 Solid Waste Management Plan July, 2010

Guiding Principles The Plan follows the sustainability principles set out in Metro Vancouver’s Sustainability Framework, the principles of Integrated Resource Recovery and the 5R hierarchy of resource management

Sustainability Sustainability encompasses a long-term commitment to economic prosperity, community well-being and environmental integrity It is at the core of Metro Vancouver’s vision for the future, and provides the foundation for the development of the region’s management plans

The Metro Vancouver Sustainability Framework identifies three overarching principles which state that decision making must:

•Have regard for both local and global consequences, and long-term impacts

•Recognize and reflect the interconnectedness and interdependence of systems

•Be collaborative

These provide the foundation for the three operating principles that guide Metro Vancouver:

•Protect and enhance the natural environment (Conserve and develop natural capital)

•Provide for ongoing prosperity (Conserve and develop economic capital)

•Build community capacity and social cohesion (Conserve and develop social capital)

A solid waste management plan which follows these principles will seek to ensure our individual and collective behaviour does not generate avoidable or unnecessary material waste and will seek systems and technologies which recover and recycle materials and recover energy

Where investment or reinvestment in infrastructure is required, that infrastructure will be resilient, be adaptable to climate change, lessen the region’s dependence on non-renewable energy sources, and protect the environment

Integrated Resource Recovery Integrated Resource Recovery is an approach to designing and managing urban systems, particularly utilities, to generate synergies which enable the ‘waste’ from one system to become ‘resources’ for another

These traditional wastes are untapped resources If accessed and used appropriately, they can help preserve non-renewable resources, stretch the capacity of existing infrastructure, save energy, generate revenue, protect the environment and reduce greenhouse gas (GHG) emissions

Resource Management Principles: The 5Rs The principles of the internationally recognized 5R hierarchy also emphasize the value of waste as a resource The hierarchy sets out the relative value of different methods of waste management:

•Reduce waste at source

•Reuse where possible

•Recycle products at the end of their useful life

•Recover energy or materials from the waste stream

•Manage Residuals in an environmentally sound manner

Public Health Principles•Emphasis on investing in upstream preventative

solutions as opposed to downstream problem management In the case of managing the waste stream, this principle requires increasing investment towards reducing waste generation

•Fairness and equity The costs and benefits of the Plan will be distributed fairly among population groups

•Transparency Decisions are made through processes that enable meaningful public input throughout the planning and implementation phases, including final decisions on waste management facility, technology and site selections

A. Integrated Solid Waste and Resource Management Plan

Page 11: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 7

•Sustainability The Plan will sustain population health and wellness not only for residents of Metro Vancouver but also for all British Columbians and globally

Process and Consultation All actions included in this Plan will be undertaken in consultation and cooperation with municipalities, senior government, First Nations, health authorities, the business community, and the public

As the population grows and circumstances change, the ISWRMP will be reviewed and revised An ISWRMP progress report will be made every two years and a comprehensive performance review of the Plan undertaken every five years, with a full plan review and update every ten years

Aligning With Provincial Initiatives This is a provincially mandated plan The objectives set out in the 1995 Greater Vancouver Regional District Solid Waste Management Plan were set by the Provincial Government These objectives were:

•To reduce per capita garbage disposal in the year 1995 by at least 30% from 1990 levels

•To similarly reduce per capita garbage disposal in the year 2000 by at least 50% from 1990 levels

•To responsibly manage residuals

These objectives have been met

The updated ISWRMP is guided by principles that are aligned with current provincial policies and positions, ensuring that Metro Vancouver’s and senior governments’ environmental and fiscal objectives and actions are mutually supportive and successful

Key provincial plans and policies supported by the ISWRMP include the:

•BC Air Action Plan The Air Action Plan seeks to improve air quality across British Columbia by promoting clean transportation, clean industry and clean communities

The ISWRMP will contribute to meeting the goals of this program by managing waste locally, imposing the strictest air quality standards on all facilities and reducing emissions in the community through district energy systems

•BC Climate Action Plan This Plan sets a provincial target of 33% less greenhouse gas emissions by 2020, and 80% fewer by 2050

The ISWRMP will contribute to meeting these targets by facilitating waste reduction and by treating waste as a resource to be reused, recycled or recovered

•BC Energy Plan – A Vision for Clean Energy Leadership The Energy Plan sets goals for clean, self-sufficient electricity production including “clean energy leadership” and energy self-sufficiency by 2016

The ISWRMP seeks to expand the generation of electricity and biofuels from municipal solid waste as well as the recovery of heat for use in industrial or district heating systems

•BC Recycling Regulation This regulation provides a legal framework for establishing extended producer responsibility (EPR) programs managed by industry to promote product stewardship within the province of British Columbia The underlying goal of this regulation is for producers to accept full life-cycle cost accounting for their products This would see costs of the end-of-life management of products treated similarly to other factors of production and incorporated into product prices Successful EPR shifts the expenses associated with product end-of-life management from taxpayers to producers and consumers

The ISWRMP supports the principles of EPR and includes numerous actions to accelerate EPR program development and implementation

•A Guide to Green Choices – Ideas and Practical Advice for Land Use Decisions in BC Communities This guide expressed the need for “sustainable infrastructure” The long-term sustainable management of existing and future infrastructure investments requires integrated, innovative solutions

Page 12: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

8 Solid Waste Management Plan July, 2010

The ISWRMP contains actions that support sustainable infrastructure, such as clean energy from district energy systems

•BC Bioenergy Strategy The Strategy encourages the production of fuel from biomass

The ISWRMP builds upon existing efforts involving the recovery of methane from landfills It also promotes additional diversion of biomass, such as food residuals and treated wood, for use as renewable sources of energy Opportunities to integrate liquid and solid waste management also support the BC Bioenergy Strategy

•Landfill Gas Management Regulation This regulation requires landfills to consider designs that optimize methane capture, reducing greenhouse gas emissions

Existing and any future Metro Vancouver landfills under the ISWRMP will follow this regulation, contributing to the climate change solution

In partnership with municipalities and the private sector, Metro Vancouver’s initiatives in all of these areas will reduce greenhouse gas emissions, diversify the region’s sources of energy, increase renewable energy sources, and increase the region’s energy independence

Aligning with Federal Initiatives•CCME Canada-wide Action Plan for Extended

Producer Responsibility The Canadian Council of Ministers of the Environment (CCME) have adopted a waste management approach which extends the responsibility of producers for management of products to the end of the product life Through the Canada-wide Action Plan for EPR, the CCME and the province of British Columbia are working towards the development and implementation of additional EPR programs intended to have producers accept full life-cycle cost accounting for their products This would see the costs of the end-of-life management of products treated similarly to other factors of production and incorporated into product prices

The draft ISWRMP supports the principles of EPR and includes numerous actions to accelerate EPR program development and implementation

Page 13: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 9

Coordinating with other Metro Vancouver Plans The Sustainable Region Initiative provides a framework for linking the ISWRMP with the region’s other plans, as shown in Figure 1 It also establishes links across regionally mandated plans and with initiatives that are executed by other partners

The ISWRMP identifies synergies with Metro Vancouver’s other utilities and plans, to make the best use of society’s resources, and to minimize the region’s impact on the environment Figure 2 shows the connections between the ISWRMP and other regional plans

The ISWRMP includes coordinated actions with the Integrated Liquid Waste and Resource Management Plan, chosen to identify opportunities to make best use of the resources generated from the two waste streams For example, organic municipal solid waste, like waste food, can potentially be co-digested with sewage sludge

The principles guiding the ISWRMP and the connected goals and actions will also help achieve objectives in the Air Quality Management Plan and Metro Vancouver 2040, the region’s Regional Growth Strategy The ISWRMP will minimize Metro Vancouver’s contribution to climate change by reducing the disposal of untreated waste in landfills, by recovering energy in the form of heat for district heating, and by reducing the use of fossil fuels for space heating These steps will assist in building compact, complete communities using clean energy for district heating

FIGuRE 1: METRO VANCOuVER SuSTAINABILITy FRAMEWORK

METRICS, TARGETS and KEY DELIVERABLES

REGIONAL VISION

METRO VANCOUVER ROLE AND MISSION

VALUES

SUSTAINABILITY IMPERATIVES AND PRINCIPLES

Vision, mission, values, imperatives and principles are the foundation for Metro Vancouver’s

three interconnected roles:

Progress towards a sustainable region is measured by

which establish Strategic Priorities and key activities within Metro Vancouver’s three roles

Policy•Plans•Strategies•Regulations

Political Forum•Outreach•Advocacy•Education•Collaborative processes

Core Services• Infrastructure management•Administration

Page 14: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

10 Solid Waste Management Plan July, 2010

FIGuRE 2: KEy CONNECTIONS BETWEEN METRO VANCOuVER’S INTEGRATED SOLID WASTE AND RESOuRCE MANAGEMENT PLAN AND OTHER METRO VANCOuVER PLANS

Page 15: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 11

Governance, Roles and ResponsibilitiesSolid waste management plans are authorized and regulated through the BC Environmental Management Act Once each updated plan is approved, it becomes a regulatory document for solid waste management

Metro Vancouver and member municipalities work collaboratively to provide waste management services to the region Metro Vancouver coordinates the long-range planning process for recycling and disposing of solid waste in the region Metro Vancouver also funds and manages the operating contracts for the transfer stations, waste-to-energy facility and landfill (with the exception of the Vancouver South Transfer Station and the Vancouver Landfill which are owned and operated by the City of Vancouver) that make up the region’s integrated solid waste management system

In conjunction with regulations and operational certificates that may apply, this Plan regulates the operation of these facilities Where conflicts may exist between agreements related to such facilities and this Plan, including the Tri-Partite Agreement between Delta, Vancouver and Metro Vancouver, this Plan takes precedence

Municipal solid waste (MSW) includes refuse that originates from residential, commercial, institutional, demolition, land clearing or construction sources as outlined in the Environmental Management Act

For management purposes, waste is generated from three sectors: residential (from both single-family units and multi-family units); industrial, commercial and institutional (ICI); and demolition, land clearing and construction (DLC) Member municipalities operate or coordinate the collection of recyclables and garbage and in some cases yard and garden waste from the single-family residential sector and some ICI and multi-family residential sources Recycling from multi-family residences is also collected by municipalities, but much of the ICI and multi-family residential garbage collection services are provided by the private sector ICI recycling is collected almost exclusively by private haulers The third sector, DLC,

is primarily self-managed with businesses and non-profit societies providing recycling, transferring and/or disposal services

The management of household hazardous wastes is carried out by the Province primarily through Extended Producer Responsibility (EPR) programs and the Hazardous Waste Regulation Provided financial and liability issues are satisfied, Metro Vancouver and member municipalities will cooperate with the Province and industry groups to provide a comprehensive household hazardous waste management program

Recycling processing facilities in the region are primarily privately run businesses, as are the brokers who facilitate the movement of recyclables to end markets inside and outside of the region

The extent and complexity of the solid waste systems require close coordination among the following groups:

FEDERAL GOVERNMENT •The Federal Government regulates waste

management facilities under federal jurisdiction

PROVINCIAL GOVERNMENT •Various ministries have regulatory authority related

to waste management

FIRST NATIONS •First Nations are an order of government with

rights and responsibilities

LOCAL HEALTH AuTHORITIES•Local health authorities have various interests and

responsibilities related to the waste management process

LOCAL GOVERNMENT •Metro Vancouver is responsible for developing and

ensuring that the ISWRMP is implemented and is required to report on ISWRMP progress

•Member municipalities provide local waste management services and implement municipal actions in the ISWRMP

Page 16: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

12 Solid Waste Management Plan July, 2010

PRIVATE SECTOR •Private sector businesses generate waste which

requires management under the ISWRMP

•Private sector haulers, material brokers, recyclers and others provide services which make the implementation of an integrated waste management system possible

NON-PROFIT SECTOR •Provides voluntary services to segments of the

waste generating public

RESIDENTS •Generate waste either as private individuals or as

contributors to institutional, commercial, industrial, demolition, land clearing or construction activities

•Responsible for carrying out proper waste reduction, recycling and disposal activities

Geographic Scope The ISWRMP applies to the geographic area of Metro Vancouver (see Figure 3) All strategies and actions in the ISWRMP apply to the following members of the Greater Vancouver Regional District

Village of Anmore

Village of Belcarra

Bowen Island Municipality

City of Burnaby

City of Coquitlam

Corporation of Delta

City of Langley

Township of Langley

Village of Lions Bay

District of Maple Ridge

City of New Westminster

City of North Vancouver

District of North Vancouver

City of Pitt Meadows

City of Port Coquitlam

City of Port Moody

City of Richmond

City of Surrey

Tsawwassen First Nation

City of Vancouver

District of West Vancouver

City of White Rock

Electoral Area A – which includes the west side of Pitt Lake, the northern portion of Indian Arm, a portion of land between the District of West Vancouver and Squamish Lillooet Regional District, Bowyer, Passage and Barnston islands, the university Endowment Lands (including Pacific Spirit Regional Park), and the university of British Columbia

In addition, solid waste management services are provided to the City of Abbotsford through contract

Page 17: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 13

FIGuRE 3: MAP OF PLAN AREA

Approved Facilities Municipal solid waste in the region can be directed for management to any approved disposal facility identified in the ISWRMP

Approved disposal facilities include the:

•Waste-to-Energy facility in Burnaby

•Vancouver Landfill

•Cache Creek Landfill

•Any disposal facility licensed by Metro Vancouver under the Greater Vancouver Sewerage and Drainage District Municipal Solid Waste and Recyclable Material Regulatory Bylaw No 181, 1996 as amended by Bylaw No 183, 1996

Metro Vancouver will work with the Province to map and catalogue both operating and closed, private and public landfills in the Metro Vancouver region

In addition to the approved disposal facilities, the following publicly owned transfer stations are an integral part of the Metro Vancouver integrated waste management system:

•North Shore Transfer Station

•Vancouver South Transfer Station

•Coquitlam Transfer Station

•Surrey Transfer Station

•Langley Residential Transfer Station

•Maple Ridge Residential Transfer Station

•Matsqui Transfer Station

The locations of the Metro Vancouver and City of Vancouver facilities are shown in Figure 4

Bowen Island West

Vancouver

North Vancouver District

Burnaby

Coquitlam

Anmore

Surrey

Richmond

Vancouver

New Westminster

White Rock

Langley Township

Langley City

Maple Ridge

Lions Bay

Belcarra

Port Moody

Pitt Meadows

Howe Sound

Boundary Bay

Fraser River

Stra i t o f Georg ia

North Vancouver City

Port Coquitlam

Burrard In let

CANADA

Tsawwassen

Delta

Electoral Area A

Page 18: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

14 Solid Waste Management Plan July, 2010

FIGuRE 4: MAP OF APPROVED FACILITIES

New Facilities Municipal solid waste in the region may be directed for management to any new facility contemplated by this Plan provided the new facility follows the process for development as outlined herein

New facilities specifically contemplated in this Plan include:

•Any new organics processing facility established pursuant to Goal 2 of this Plan

•Any new waste-to-energy facility located within the region established pursuant to Goal 3 of this Plan

•Any new waste-to-energy facility located outside the region established pursuant to Goal 3 of this Plan

•Any additional landfill pursuant to Goal 4 of this Plan

Process for development of new facilities shall include but not be limited to:

•Appropriate procurement process

•Environmental assessment, including an assessment of human health risk acceptable to the applicable health authority, as may be required by provincial and federal regulations

•Suitable public consultation program as may be required by environmental assessment process

The Ministry of Environment and health authorities will be informed and consulted as appropriate regarding the addition of new waste management facilities

Establishment of new facilities may also be performed with consideration for provincial requirements in addition to Metro Vancouver’s regional needs If new facilities are established to service Metro Vancouver and any other regional district, references in this Plan to waste flows and contingency plans, refer only to quantities of waste from Metro Vancouver The Ministry of Environment may vary these provisions

Page 19: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 15

to accommodate, and only accommodate, waste management requirements of other regional districts

The addition of new disposal facilities not contemplated in this Plan will require an amendment to the Plan The addition of new facilities which are not disposal facilities will not necessitate an amendment to this Plan

Flow ControlTo ensure the sustainability principles embodied within this Plan are fulfilled, Metro Vancouver will retain management control of regional disposal facilities By retaining management control, all waste reduction and diversion goals can be applied uniformly at all regional disposal facilities to ensure equity for all residents and businesses within the region while attaining the goals of this Plan

In addition to the requirement for waste to be directed to facilities approved under this Plan, Metro Vancouver may choose to act to reduce the flow of waste to unauthorized facilities which may undermine the waste reduction and diversion goals of this Plan These flow control initiatives include but are not limited to:

•Split fee bylaw

•Franchising of waste collection services

•Licensing of waste collection service providers

If total waste flows are below the capacity of existing and planned facilities, waste disposal facilities will be utilized as follows:

•Total waste flows in excess of 780,000 tonnes per year: the Vancouver Landfill will be operated to absorb flows in excess of 780,000 tonnes;

•Waste flows in excess of 500,000 tonnes per year but less than 780,000 tonnes per year: the Vancouver Landfill be operated only to absorb residuals from the waste-to-energy plants and as an emergency system in the event that the waste-to-energy plants cannot absorb waste flows, and the Burnaby facility would have the three furnace lines progressively shut down or converted to alternate fuels as waste flows declined;

•Waste flows below 500,000 tonnes per year: the Vancouver Landfill would continue to operate to absorb residuals from the waste-to-energy plants and as an emergency system in the event that the waste-to-energy plants cannot absorb waste flows, the waste-to-energy facility in Burnaby would be decommissioned or converted to alternate fuels and the new waste-to-energy facilities would be progressively downscaled or converted to alternate fuels as waste flows decline

First Nations Lands unknown quantities of waste from Metro Vancouver, primarily from the DLC sector, are disposed in landfills located on First Nations lands both outside and inside the Metro Vancouver geographical area Metro Vancouver has no jurisdiction for these landfills

Page 20: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

16 Solid Waste Management Plan July, 2010

Goal 1: Minimize Waste Generation

The following strategies and actions are proposed to achieve this goal:

STRATEGy 1 1

Advocate that senior governments transfer additional waste management responsibilities to producers and consumers

The costs and responsibilities of waste management

have historically been borne by local governments and

taxpayers. The responsibility for the costs and risks

to manage end-of-life products should progressively

transfer to the manufacturers of goods and the

consumers that use them to provide the appropriate

market mechanism to encourage more sustainable

manufacturing and consumer choices.

METRO VANCOUVER WILL:

1 1 1 Advocate that senior governments progressively move towards the prohibition of the manufacture and distribution of non-essential, non-recyclable materials and products 2011

1 1 2 Advocate that senior governments prohibit the manufacture and distribution of non-recyclable packaging 2011

1 1 3 Strongly advocate for EPR programs to reduce waste disposal through implementation of design-for-environment principles, and best management practices that focus on waste reduction, reuse, and recycling Offer staffing support for and partnership with Ministry of Environment to help accelerate EPR 2011

1 1 4 Work with other municipalities and regions across BC, Canada, and internationally, to advocate for more development by senior governments in encouraging and developing incentives, including regulation, that promote design of products with an emphasis on reuse and recycling (cradle-to-cradle design) 2011

1 1 5 Participate on Federal EPR initiatives such as the Canadian Council of Ministers of Environment (CCME) Extended Producer Responsibility Task Force, to develop national guidelines for sustainable packaging Ongoing

1 1 6 Participate on industry stewardship advisory committees Ongoing

1 1 7 Participate on the BC Product Stewardship Council to assist in evaluating existing and developing new EPR programs Ongoing

1 1 8 Waste projections will consider future trends in population, generation, and management, including EPR Ongoing

MUNICIPALITIES WILL:

1 1 9 Partner with Metro Vancouver in support of actions 1 1 1 through 1 1 8 2011 and Ongoing

ACTIONS REQUESTED OF OTHER GOVERNMENTS

AND AGENCIES:

1 1 10 Ministry of Environment to accelerate EPR program development and implementation Ongoing

1 1 11 Include Metro Vancouver and its member municipalities in the negotiations with producers regarding future EPR programs to ensure that appropriate consideration is given to the existing convenient curb-side collection systems 2010

1 1 12 Ensure that the waste recovered under EPR programs will be properly managed in the region and that such materials will not be exported without adequate knowledge of and control over its eventual destination Ongoing

B. Goals, Strategies, Actions and Measures

Page 21: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 17

STRATEGy 1 2

Reduce or eliminate materials entering the solid waste system which hinder or limit the opportunities to achieve reuse, recycling, or energy recovery, or that may exacerbate environmental impacts of disposed residuals

Some inputs to the solid waste stream may hinder or

limit the opportunities to achieve reuse, recycling, or

energy recovery, or may exacerbate environmental

impacts of disposed residuals. These inputs will be

identified and programs developed to reduce or

eliminate them. This strategy also applies to Goal 2.

METRO VANCOUVER WILL:

1 2 1 Work with facility operators, local municipalities and the recycling industry to introduce material bans after alternatives are identified and suitable public information programs Ongoing

STRATEGy 1 3

Provide information and education on options to reduce waste

The amount of waste we produce is directly linked to the

amount and type of goods and services we consume.

Providing the public and businesses with an awareness

of the consequences of unsustainable behaviour and

tools and incentives to change will assist in reducing

the generation of waste. Information and education

will seek forms of communication which address the

barriers created by multiple languages.

METRO VANCOUVER WILL:

1 3 1 Develop and deliver a community-based social marketing program to inform and educate citizens on waste reduction opportunities including schools Ongoing

(a) Target a minimum of 70% diversion goal by 2015 over all sectors and an aspirational goal of 80% by 2020 to be featured in communication materials Ongoing

1 3 2 Develop and deliver a community-based social marketing business education plan, including business guides and other outreach programs to inform and educate businesses on waste reduction opportunities 2011

1 3 3 Develop a national zero waste marketing council so that cities across Canada can pool resources and develop common messaging, with national impact, on the need to reduce waste, resulting in informed and educated citizens on waste reduction opportunities 2011

MUNICIPALITIES WILL:

1 3 4 Partner with and assist Metro Vancouver in the development and delivery of public and business information and education programs Ongoing

Page 22: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

18 Solid Waste Management Plan July, 2010

Goal 2: Maximize Reuse, Recycling and Material Recovery Strategies to achieve this goal focus on proactive approaches to reuse, increased recycling effort and implementation of a region-wide food waste composting program

STRATEGy 2 1

Increase the opportunities for reuse

Increasing the opportunities for individuals to reuse

more materials involves increasing convenience and

reducing impediments.

METRO VANCOUVER WILL:

2 1 1 Investigate financial and regulatory barriers which prevent or discourage the reuse of Materials 2011

2 1 2 Investigate the effectiveness and adequacy of existing material exchange networks 2011

2 1 3 Bring forward appropriate measures which respond to the findings of 2 1 1 and 2 1 2 2011

2 1 4 Enhance partnerships with the Province, industry, academia and community groups to research and develop solutions to overcome barriers to reuse and recycling and new opportunities to re-engineer recycled material 2011

MUNICIPALITIES WILL:

2 1 5 Work with Metro Vancouver to give effect to Strategy 2 1 Ongoing

STRATEGy 2 2

Increase the effectiveness of existing recycling programs

Use the existing infrastructure effectively to achieve

higher recycling rates.

METRO VANCOUVER WILL:

2 2 1 Implement disposal bans on materials that limit opportunities to achieve reuse, recycling, or energy recovery Ongoing

(a) Work with facility operators, local municipalities, senior governments and the recycling industry to determine the impact and source of components of the waste stream, the consequence and feasibility of banning the disposal of materials with the most negative impacts and the most suitable recycling options for those materials Ongoing

(b) Expand the monitoring and enforcement of disposal bans and enhance with effective communications to raise awareness of the bans 2011

(c) Analyze the effectiveness of disposal bans and possible alternative enforcement models including enforcement at source 2010

(d) After suitable public information programs, expand disposal bans to include materials encompassed by new EPR programs and material for which new recycling markets are developed Ongoing

2 2 2 Provide ongoing information for businesses and residents of recycling opportunities Ongoing

(a) Continue and upgrade a regional web-based source of information on recycling opportunities for businesses and residents Ongoing

(b) Keep municipalities fully informed as to recycling collection and drop-off facilities and changes to policies and facilities Ongoing

(c) Provide outreach services Ongoing

Page 23: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 19

(d) Work with other information sources to achieve maximum harmonization possible Ongoing

2 2 3 Increase the efficiency and consistency of recycling collection services across the region 2012

(a) Work with municipalities to review materials accepted for recycling from residential and ICI sources 2012

(b) In collaboration with municipalities, undertake a business case review of the residential and ICI waste and recycling collection services over the region to determine and implement the appropriate level of consistency between municipalities Where appropriate, Metro Vancouver will develop model policies or bylaws to assist municipalities in achieving consistency 2012

(c) Analyze the effectiveness of pricing strategies and other economic instruments to encourage additional recycling 2012

2 2 4 Establish Eco-Centres Ongoing

(a) Establish a stakeholder and municipal work group to determine the scope, terms and conditions including the responsibility for funding and operating, and the relationship to existing and planned EPR programs and municipal recycling depots for participating municipalities and industries 2010

(b) Develop the model of Eco-Centres to include numerous, small scale, one-stop-drop centres for recycling and small quantity drop-off disposal Ongoing

(c) With municipalities, determine the terms and conditions for participating municipalities and industries and develop appropriate business cases Ongoing

(d) After determining terms and conditions, including the responsibility for funding and operating, establish the first Eco-Centre in Surrey to replace commitment for residential drop-off facility in the 1995 Plan 2011

(e) Progressively expand the Eco-Centre system across the region as municipal business cases determine Ongoing

2 2 5 Promote recycling at festivals and events Ongoing

(a) Develop a Zero Waste toolkit for festivals and events Ongoing

(b) Continue to work with municipalities, EPR groups and local community groups to implement waste minimization and recycling at community festivals and events, including conferences and tradeshows Ongoing

(c) Provide outreach services Ongoing

2 2 6 Work with school districts and individual schools to promote waste reduction and recycling Ongoing

(a) Develop instructional programs that encourage waste reduction and recycling both within the schools and at home Ongoing

MUNICIPALITIES WILL:

2 2 7 Work with Metro Vancouver on actions designed to:

(a) Implement effective disposal bans for collection of municipal waste at source Ongoing

(b) Inform businesses and residents of recycling opportunities Ongoing

(c) Increase the efficiency and consistency of recycling collection services across the region Ongoing

(d) Establish Eco-Centres Ongoing

(e) Promote recycling at community events and festivals Ongoing

(f) Work with school districts and individual schools to promote waste reduction and recycling Ongoing

Page 24: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

20 Solid Waste Management Plan July, 2010

STRATEGy 2 3

Provide opportunities to increase private sector recycling

There is a shortage of recycling processing capacity

for many materials within the region. Metro Vancouver

and member municipalities can assist in addressing

this shortage by using tools at their disposal to change

the business environment so that the private sector can

increase capacity.

METRO VANCOUVER WILL:

2 3 1 Facilitate the siting of private sector recycling activities 2012

(a) Review the GVS&DD Solid Waste Regulatory Bylaw to facilitate the siting of municipal solid waste facilities that meet municipal bylaws 2012

2 3 2 Foster research and market development for recycled materials Ongoing

(a) Evaluate a business case for a regional scale recyclable service delivery model 2010

(b) Review desirability, feasibility and opportunity for establishing a non-profit organization to facilitate the development of recycling businesses and markets, along the lines of the ‘London Remade’ model in the u K 2012

(c) Subject to the results of 2 3 2 (a) and (b), establish a regional role in processing and marketing of recycled materials, a land acquisition strategy for required recycling facilities, and enhanced policy-based initiatives to promote local recycled content in consumer goods Ongoing

MUNICIPALITIES WILL:

2 3 3 Facilitate the siting of private sector recycling activities 2012

(a) Review zoning bylaws to remove unnecessary impediments and encourage recycling and material recovery activities in appropriately zoned areas 2012

2 3 4 Work with Metro Vancouver on the evaluation of regional scale recycling facilities and development of recycling markets Ongoing

ACTIONS REQUESTED OF OTHER GOVERNMENTS

AND AGENCIES:

2 3 5 Provincial and Federal Governments to identify and establish minimum post-consumer recycled content requirements for consumer goods 2012

STRATEGy 2 4

Target demolition, land clearing and construction (DLC) sector for increased reuse and recycling

Although the DLC sector has very high recycling rates

due to high levels of concrete and asphalt recycling,

there are significant opportunities to improve with

respect to a variety of other materials such as wood

and roofing.

METRO VANCOUVER WILL:

2 4 1 In collaboration with municipalities and industry groups, develop a process to require DLC recycling at construction/demolition sites 2011

2 4 2 Implement waste diversion strategies directed toward diverting DLC waste from disposal while supporting opportunities for beneficial use Ongoing

(a) Encourage the role of building supply retailers and producers in the collection of DLC material for recycling Ongoing

(b) Provide areas for separated recyclable DLC materials at Eco-Centres and at transfer stations as they are upgraded Ongoing

2 4 3 Review existing DLC recycling and processing capacity, project future needs and develop a strategy to address any identified gaps 2012

Page 25: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 21

MUNICIPALITIES WILL:

2 4 4 Work with Metro Vancouver to develop a process to require DLC recycling at construction/demolition sites Ongoing

(a) Review municipal DLC permitting processes with a view to requiring waste management plans as a condition of such permits Ongoing

(b) Review the desirability and feasibility of deposit systems or other financial incentives to increase enforcement of DLC waste management plans Ongoing

STRATEGy 2 5

Reduce paper and paperboard being disposed

Paper and paperboard make up 19% of the disposed

waste stream, and much of it should be included in

the existing recycling programs. Food contaminated

paper, which cannot be recycled, can be composted

along with other organics to produce a reusable and

beneficial product.

METRO VANCOUVER WILL:

2 5 1 In collaboration with municipalities, businesses and non-profit organizations, conduct pilot programs to determine the most effective method of reducing unwanted junk mail and other publications and act accordingly on the results Ongoing

2 5 2 Promote reduced paper use and increase paper recycling opportunities in the community and businesses Ongoing

(a) Carry out a community-based social marketing campaign to determine and overcome barriers to reducing the use of and increasing the recycling of paper in schools and community facilities Ongoing

(b) Carry out a targeted outreach campaign to business to determine and overcome barriers to reducing the use of and increasing the recycling of paper Ongoing

MUNICIPALITIES WILL:

2 5 3 Collaborate with Metro Vancouver in junk mail reduction pilot programs and community-based social marketing programs in community facilities Ongoing

STRATEGy 2 6

Target organics for recycling and energy recovery

Food waste comprises 21% of the waste disposed.

This, along with yard and garden waste and some

paper and paperboard, can be composted together in

a source separated stream to produce a beneficial and

marketable product which includes compost and bio-fuel.

METRO VANCOUVER WILL:

2 6 1 Evaluate options for processing of organics with biosolids and other utility residuals 2011

2 6 2 Divert organics from the waste stream 2015

(a) Establish additional organics processing facilities 2011 and ongoing

i establish a system for monitoring emissions from organics processing facilities including bioaerosols 2011 and ongoing

(b) Determine which paper and paperboard products are suitable for processing at an organics management facility 2011

(c) In collaboration with municipalities, develop and implement a work plan for the diversion of organic waste, including food waste, from:

i single-family residences 2012

ii multi-family residences 2015

iii the ICI sector 2015

(d) Develop and implement supporting communication programs for 2 6 2 (c) Ongoing

(e) Ban all compostable organics allowed in residential green bins from disposal to landfills and all forms of waste-to-energy, except anaerobic digestion 2015

Page 26: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

22 Solid Waste Management Plan July, 2010

MUNICIPALITIES WILL:

2 6 3 In collaboration with Metro Vancouver, develop and implement a work plan, including appropriate communication programs for the diversion of organic waste from:

i single-family residences 2012

ii multi-family residences 2015

iii the ICI sector 2015

(a) Municipalities will divert organics from the waste stream to a Metro Vancouver or alternative licensed organics processing facility 2015

(b) Municipalities will report the tonnage of diverted organic waste to Metro Vancouver in the event that organics are delivered to licensed non-regional processing facilities Annually

STRATEGy 2 7

Target wood for reuse, recycle, and energy recovery

Encouraging the reuse, recycling and energy recovery

from wood should follow the waste management

hierarchy to ensure highest and best use of wood.

METRO VANCOUVER WILL:

2 7 1 Encourage reuse of wood 2010

(a) Examine and, where feasible, implement incentives for reuse and remove barriers to re-use of wood waste 2010

(b) Develop and implement information and education programs on the reuse and effective recycling of wood and other DLC waste 2010

2 7 2 Collect wood for reuse, recycling, and energy recovery at regional transfer stations and Eco-Centres Ongoing

2 7 3 Encourage highest and best use for wood following the waste management hierarchy in the following priority: Ongoing

(a) Reuse wood for comparable structural and non-structural applications

(b) Recycle wood fibre into other fibre based products

(c) Compost wood with other organic materials

(d) Digest wood to produce biofuels

(e) Process wood as a fuel for energy production

2 7 4 Pass by-laws as required to support highest and best use of wood as outlined in 2 7 3 Ongoing (as required).

2 7 5 Ban all wood from disposal 2015

ACTIONS REQUESTED OF OTHER GOVERNMENTS

AND AGENCIES:

2 7 6 Provincial Government to expand the inclusion of the reuse of wood in building codes Ongoing

STRATEGy 2 8

Target plastics for increased recycling

Many plastics can be used to create new products.

Recycling plastics reduces the amount of waste that

must be transported, treated, and landfilled and

conserves a non-renewable resource.

METRO VANCOUVER WILL:

2 8 1 Expand the recycling of plastics in the residential and commercial sectors 2011

(a) Establish a standard for municipal programs for collection of plastics based on market strength 2011

(b) In cooperation with retail partners and municipalities, undertake social marketing pilot programs to reduce the use of disposable take-out food and beverage packaging including plastic and other disposable bags 2011

Page 27: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 23

MUNICIPALITIES WILL:

2 8 2 Work with Metro Vancouver on programs to reduce the use of disposable take-out food and beverage packaging including plastic and other disposable bags 2011

ACTIONS REQUESTED OF OTHER GOVERNMENTS AND

AGENCIES:

2 8 3 The Provincial Government to develop EPR programs for all plastics, that provide incentives for alternatives to non-recyclable plastics Ongoing

2 8 4 The Provincial and Federal Governments to require all plastic material sold in BC to have a material code identifying its composition Ongoing

STRATEGy 2 9

Target multi-family and industrial, commercial and institutional (ICI) sectors to improve diversion rates

Multi-family residences and the commercial sector

have relatively low diversion rates, in part because

many premises do not have adequate facilities to

accommodate recycling.

METRO VANCOUVER WILL:

2 9 1 Develop bylaws to require recycling in all multi-family and commercial buildings and complexes 2011

(a) Develop a model bylaw and enforcement model to require recycling in multi-family and commercial buildings 2011

(b) Create an advisory service for recycling programs for multi-family and commercial buildings 2011

MUNICIPALITIES WILL:

2 9 2 Work with Metro Vancouver to implement recycling in multi-family and commercial buildings 2011

ACTIONS REQUESTED OF OTHER GOVERNMENTS AND AGENCIES:

2 9 3 The Provincial Government to modify the BC Building Code to require that space be provided for recycling collection, sorting and pick-up in multi-family residential and commercial buildings 2014

STRATEGy 2 10

Develop contingency plans for the loss of recycling markets

Changes in the local and global economies occasionally

affect the demand for recovered and recycled materials.

METRO VANCOUVER WILL:

2 10 1 Manage diverted materials in accordance with the requirements of the Environmental Management Act and regulations in that materials will not be disposed unless all feasible opportunities for higher uses of the materials have been taken 2011

MUNICIPALITIES WILL:

2 10 2 Manage diverted materials in accordance with the requirements of the Environmental Management Act and regulations in that materials will not be disposed unless all feasible opportunities for higher uses of the materials have been taken 2011

STRATEGy 2 11

Integrated utility Management Advisory Committee

An interagency committee would advise Metro

Vancouver on the integration of utility systems.

METRO VANCOUVER WILL:

2 11 1 Establish a new overarching committee, the Integrated utility Management Advisory Committee (IuMAC), to advise Metro Vancouver on plan implementation, particularly from the perspectives of integrated planning and resource recovery across utility systems 2011

Page 28: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

24 Solid Waste Management Plan July, 2010

Goal 3: Recover energy from the waste stream after material recycling The following strategies will increase processing of the waste remaining after recycling in order to provide the highest beneficial use to society

STRATEGy 3 1

use waste-to-energy to provide electricity and district heating

Waste-to-energy facilities most effectively and

efficiently extract energy from the waste stream

remaining after recycling and when combined with

district heating can reduce the environmental impacts

of energy use. The planned capacity of such facilities

should be compatible with waste diversion targets and

initiatives, and projected waste flows which remain

after such diversion.

All waste-to-energy facilities must meet or exceed the

minimum energy efficiency required to be classified

under the 4th R - Recovery as outlined in European

Union standard (PE-CONS 3646/08) and accepted by

the Province of BC.

METRO VANCOUVER WILL:

3 1 1 Continue use of existing waste-to-energy facility in Burnaby

(a) Subject to the limitations established in the section titled “Flow Control”, use the facility at its current usage and capacity of 280,000 tonnes per year to recover available energy in the waste remaining after recycling for district energy and electricity generation Ongoing

(b) Continue to meet the monitoring and emission requirements in Appendix A Ongoing

(c) Continue to improve environmental performance of the facility with improved technologies and monitor performance to ensure compliance with applicable legislation and regulations Ongoing

(d) Operating performance will continue to be reported on a regular and timely basis and will also be available on the Metro Vancouver web site Ongoing

(e) The waste-to-energy facility in Burnaby will comply with applicable legislation and operating contracts may include penalties for any violations of performance criteria Ongoing

3 1 2 Expand the use of waste-to-energy 2015

Waste-to-energy means any process that converts waste material to energy and heat, including the production of fuel which is subsequently combusted for these purposes All options will be considered and evaluated fairly and transparently including a public health cost/benefit lens

(a) Establish up to 500,000 tonnes per year of new waste-to-energy capacity in one or more facilities

(b) Ensure implementation of new waste-to-energy capacity maximizes energy recovery for use in district heating, production of alternative fuels, industrial applications and electricity generation

(c) Monitor trends in waste reduction, recycling and waste flows and implement additional waste-to-energy capacity if, and only if, justified on the basis of these trends

(d) Scale any additional waste-to-energy capacity so that total waste-to-energy capacity does not exceed the most probable minimum waste flow projected over the economic life of those facilities

(e) Operating performance will be reported on a regular and timely basis and will also be available on the Metro Vancouver web site Any new waste-to-energy facility will comply with applicable legislation and operating contracts may include penalties for any violations of performance criteria

Page 29: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 25

3 1 3 Locate new waste-to-energy capacity on the basis of: site availability; suitability of site for providing district heating from recovered energy; potential for site to optimize network of transfer stations; results of local screening level impact assessment and triple bottom line analysis; and results of community consultation process for each potential site

3 1 4 Ensure that new waste-to-energy facilities are designed to maximize the environmental, financial and social benefits of facilities

(a) Evaluate cost/benefits of proposed new facilities over their lifetime, including construction, commissioning, operation and maintenance, future retrofits and decommissioning impacts, and ownership structure

(b) Conduct an environmental impact assessment of a waste-to-energy facility(ies), based on applicable provincial and federal government requirements, including an assessment of human health risk acceptable to the applicable health authority

(c) Evaluation criteria will include: cost; use of best available commercial technology; air emission and health impacts; GHG emissions; alignment with sustainability principles; electricity, district heating and alternative fuel production; beneficial use of ash; metals recovery; potential local job creation; and opportunities for research and education

3 1 5 Recover metals, ash or other residues from new and existing waste-to-energy facilities for beneficial use Ongoing

(a) Work with regulatory agencies to identify and remove barriers to beneficial use of ash

(b) Maximize metal recovery from the waste stream after recycling

(c) Process bottom and fly ash to generate products for beneficial use

(d) use processed bottom and fly ash beneficially for highest value applications available

(e) If beneficial use of a residue is not reasonably available, dispose of the residue in accordance with applicable legislation

3 1 6 Recover energy from regional utility materials that cannot be recycled, including liquid waste and water utilities Ongoing

(a) Recover energy from drinking water treatment processes, such as organic filter media that cannot be recycled

(b) use waste-to-energy to process grit and screenings from wastewater treatment for beneficial uses, where appropriate

(c) use reclaimed water from wastewater treatment plants in waste-to-energy steam generation or district heating, if viable

STRATEGy 3 2

Recover energy from other solid waste management facilities

Valuable methane in landfill gas will be captured and

used to generate clean electricity or heat.

MUNICIPALITIES (CITY OF VANCOUVER) WILL:

3 2 1 Recover landfill gas from Vancouver Landfill and strive to maximize the beneficial use of the recovered gas Ongoing

Page 30: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

26 Solid Waste Management Plan July, 2010

STRATEGy 3 3

utilize non-recyclable material as fuel

Some materials cannot be recycled. However, such

materials can provide a valuable source of fuel,

replacing virgin fossil fuels.

METRO VANCOUVER WILL:

3 3 1 Direct recoverable loads of combustible material received at transfer stations to public or private energy recovery facilities 2012

MUNICIPALITIES (CITY OF VANCOUVER) WILL:

3 3 2 Collaborate with Metro Vancouver in ensuring action 3 3 1 is carried out at solid waste management facilities operated by the City of Vancouver 2012

ACTIONS REQUESTED OF OTHER GOVERNMENTS AND

AGENCIES:

3 3 3 Provincial Government to develop material and energy requirements for existing and future stewardship programs to use the non-recyclable portion of returned material as fuel rather than landfilling 2012

Page 31: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 2727

Goal 4: Dispose of all remaining waste in landfill, after material recycling and energy recovery

STRATEGy 4 1

utilize the Vancouver Landfill as a disposal site

Waste will remain after recycling and energy recovery.

Additionally, as a result of ensuring that waste-to-

energy facilities are sized to be compatible with

waste reduction and diversion objectives, there will

be residual (post recycling) waste flows which exceed

the aggregate capacity of the region’s waste-to-

energy facilities. Such waste must be disposed of in

an environmentally sound and economically efficient

manner. The Vancouver Landfill provides a local

solution for remaining waste.

METRO VANCOUVER WILL:

4 1 1 use the Vancouver Landfill to dispose of any remaining waste not directed to waste-to-energy facilities Ongoing

(a) Metro Vancouver will work with the City of Vancouver and Corporation of Delta to reduce the quantity of waste going to the Vancouver Landfill to a maximum of 100,000 tonnes annually, exclusive of waste-to-energy residuals, by 2020 Should these reductions not be achieved because overall waste flows exceed the combined capacity of disposal options, Metro Vancouver will evaluate cost effective alternatives and if appropriate seek an amendment to this Plan to expand waste-to-energy capacity to further reduce waste flows to the Vancouver Landfill

(b) Monitor the Vancouver Landfill to ensure compliance

4 1 2 Report annually on the remaining capacity of the waste management system and prior to the closure of Vancouver Landfill, reassess the region’s waste-to-energy and disposal options Ongoing

MUNICIPALITIES (CITY OF VANCOUVER AND THE

CORPORATION OF DELTA) WILL:

4 1 3 Work with Metro Vancouver to accommodate residual waste flows at the Vancouver Landfill

4 1 4 Where limits in the Operational Certificate, contracts, agreements and regulations appear to conflict with the Plan, review the particular provisions in good faith with the Province, Metro Vancouver and any other involved party to determine if there is a solution acceptable to all affected parties Ongoing

STRATEGy 4 2

Ensure a disposal site is available for DLC waste

Notwithstanding efforts to increase recycling, local

public and private disposal sites for DLC waste are

expected to reach their capacity in the near future

Collaboration with local and out-of-region stakeholders

is necessary to anticipate DLC waste flows and identify

future disposal sites.

METRO VANCOUVER WILL:

4 2 1 Assess long-term disposal of demolition, landclearing, and construction (DLC) waste remaining after recycling in collaboration with the private sector, neighbouring regional districts and First Nations communities Ongoing

4 2 2 Identify disposal sites for DLC waste remaining after recycling that will be available when existing disposal facilities reach their capacity Ongoing

Page 32: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

28 Solid Waste Management Plan July, 2010

STRATEGy 4 3

Establish contingency disposal sites

During the implementation of, or, following the imple-

mentation of Goal 3, if waste-to-energy capacity and/or

local landfill capacity do not provide adequate disposal

capacity, Metro Vancouver will need to use out-of-region

landfill(s) for disposing of non-recyclable waste.

METRO VANCOUVER WILL:

4 3 1 Ensure adequate landfill capacity for:

(a) non-combustible and non-recyclable material; and

(b) municipal solid waste in excess of waste-to-energy and in-region landfill capacity (including allowances for variability in waste flows and short-term operational disruption), and non-recyclable ash Ongoing as required

4 3 2 If sufficient waste-to-energy or in-region landfill capacity is not available, this Plan explicitly permits Metro Vancouver to seek, through an appropriate procurement process, the best available out-of-region landfill(s) for the disposal of remaining waste, subject to that facility having appropriate permits, from the local permitting jurisdiction in which it is located, to accept such waste Ongoing as required

(a) Categories of evaluation for a contingency landfill will include, but not necessarily be limited to cost, air emissions, GHG emissions, energy benefit and, where appropriate, completion of a satisfactory human health impact assessment

(b) Monitor contingency disposal site(s) for performance and compliance Ongoing

Page 33: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 29

PERFORMANCE MEASuRESMetro Vancouver will develop a waste accounting system for the entire solid waste management system, identifying the quantities generated, recycled, composted, used for energy recovery, and disposed in landfill Comparison of per capita disposal values will provide the most accurate assessment of progress of the Plan

The following performance measures will monitor progress in achieving the specific goals Performance should be considered in the context of 2008 waste management data

PERFORMANCE MEASuRES FOR EACH GOAL ARE:

Goal 1: Minimize waste generation •Waste generation quantities for all sectors tracked

year-over-year and on a rolling five-year basis

•Increase of product stewardship initiatives by senior governments to more than two initiatives every three years

•Monitor performance of EPR programs to ensure shift in responsibility from public to private sector achieves a reduction in total waste generated

Goal 2: Maximize reuse, recycling and

material recovery •Overall diversion rate tracked year-over-year

•Diversion rate per-capita tracked year-over-year

•Waste disposed per-capita tracked year-over-year

•Tracking of material recycling tonnage

•Monitor performance of EPR programs to ensure shift in responsibility from public to private sector achieves an increase in materials reused, recycled, and recovered

Goal 3: Recover energy from the waste

stream after material recycling • Energy outputs from solid waste and its beneficial

use tracked year-over-year

• Energy outputs recovered from materials that cannot be recycled through recycling efforts and stewardship programs

•Greenhouse gas production tracked year-over-year

Goal 4: Dispose of all remaining waste in

landfill, after material recycling and energy

recovery• Quantity of treated and untreated waste per capita

going to landfill is tracked year-over-year

In addition, Metro Vancouver will carry out periodic waste composition audits

Performance Measures and Adaptive Management

Page 34: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

30 Solid Waste Management Plan July, 2010

ADAPTIVE MANAGEMENT A key feature of the Plan is adaptive management – monitoring progress, identifying challenges, and finding solutions to overcome challenges Through monitoring, assessment, and collaboration, Metro Vancouver and its members will continue to adapt and evolve their solid waste management operations and infrastructure and create more resilient and adaptable systems Adaptive management will include the following initiatives:

•In the event of circumstances such as an operational disruption or closure at a facility identified in the Plan, the region will be prepared to send surplus waste to an out-of-region landfill until sufficient processing or disposal capacity becomes available in the region Permitted landfill(s) will be selected based on:

(a) ability to provide service on a short-term or interim basis;

(b) sustainability principles

•Continue to assess the success of initiatives outlined in the Plan against the overall trends in waste generation and the performance of waste-to-energy facilities to determine the need for an emphasis of future resource allocations to the various strategies and actions

•Continue to receive advice from the Waste Management Committee

•In collaboration with municipalities, biennially produce a progress report on plan implementation for distribution to the Ministry of Environment that:

(a) summarizes progress from the previous two years on regional and municipal plan implementation, the status of performance measures, and relevant education and outreach programs;

(b) includes summaries and budget estimates for proposed Metro Vancouver and municipal ISWRMP implementation programs for the subsequent two calendar years

• Will obtain public feedback on the report by making the report available through Metro Vancouver’s website and by holding a special meeting of the Metro Vancouver Waste Management Committee to receive public comments and input on the report

•In collaboration with members and the Ministry of Environment, produce an ISWRMP progress report every two years, a comprehensive performance review every five years, and a full plan review and update every ten years

•Municipalities will work with Metro Vancouver to give effect to the adaptive management initiatives

Page 35: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 31

ROLES AND RESPONSIBILITIES Solid waste management services are provided for the region collaboratively by Metro Vancouver, member municipalities, and the private sector While the roles of each party may overlap, primary roles for recycling include: Metro Vancouver establishes policy for waste diversion initiatives, member municipalities implement recycling programs including collection within their municipalities, and the private sector provides collection services, manages material brokerage and physical recycling of materials including provision of infrastructure for recycling facilities

Responsibilities for disposal of the remaining solid waste includes: Metro Vancouver establishes policy for waste disposal, and manages infrastructure and operations of transfer and disposal facilities; member municipalities manage solid waste collection services; and the private sector may provide services for collection, and operation of transfer and disposal facilities The main exception to these roles is the ownership and operation of the Vancouver Transfer Station and Landfill by the City of Vancouver

COST OF SOLID WASTE MANAGEMENT Funding for material recycling is provided by residents and businesses through one of two mechanisms Materials with no associated industry stewardship program, such as paper, are funded from businesses and residents to recycling collectors (municipalities, or private sector contractors) either through municipal taxes or through direct contracts with collectors Materials covered by Extended Producer Responsibility programs, such as beverage containers, are typically funded through deposits paid by consumers to the industry association which then carries responsibility for collection and recycling of the materials

As outlined in Table 1, within Metro Vancouver, net expenditures associated with recycling activities are currently estimated to be $190 million annually This reflects the cost paid to contractors for collection, transportation, and processing of recyclable materials Following implementation of actions within this Plan, regional recycling net expenditures are

projected to increase by 42% to $270 million annually – an increase of $80 million each year The increase in economic activity will result in a corresponding increase in the diversion rate from 55% to 70% - a 27% increase The cost increase of 42% producing a 27% increase in recycling reflects diminishing returns with respect to recycling materials with lower value, or more expensive processes and infrastructure This trend of diminishing returns is anticipated to continue as the 70% diversion target is approached since the remaining materials become more challenging and costly to recycle

Funding for management of the materials remaining after recycling is provided by residents and businesses to solid waste collectors (municipalities or private sector contractors) either through municipal taxes or through direct contracts with the private sector collectors

Within Metro Vancouver, net expenditures associated with solid waste disposal are currently estimated to be $360 million annually This reflects the cost for collection, transportation, and disposal of solid waste remaining after recycling Following implementation of actions within this Plan, regional solid waste disposal net expenditures are projected to decrease by 39% to $220 million annually – a decrease of $140 million each year This decrease is due to the reduction in waste quantities, and increased revenues from energy recovery through actions outlined in Goal 3 of the Plan

The system costs for both recycling and disposal are also expressed in Table 1 on a per-capita basis The per-capita cost for recycling will be higher than disposal, reflecting the greater quantities of recyclable materials However, pricing will be established to ensure a financial incentive to encourage recycling and waste diversion

The costs identified in Table 1 reflect expenditures based upon the actions identified in the Plan which includes additional waste-to-energy capacity provided within the region Alternately, if waste-to-energy capacity is provided out-of-region, net costs are anticipated to increase by $1 5 billion dollars over 35 years, or, $43 million annually Similarly, if out-of-region landfill capacity is pursued, net costs are anticipated to increase by $1 5 billion over the same

Financial Implications

Page 36: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

32 Solid Waste Management Plan July, 2010

time frame, or $43 million annually compared to the proposed plan It is expected that the cost to export waste to the u S would be similar to those presented for out-of-region landfill

While Table 1 identifies the net regional expenditures on waste management, it does not account for the regional economy associated with recycling and disposal There is considerable economic activity that takes place in the process of recycling the collected materials into new goods as an alternative to virgin feedstocks Although difficult to estimate, the economy associated with remanufacturing recycled materials into new products exceeds the costs for collection, transportation and processing Net expenditures associated with disposal more closely reflect the entire disposal economy since there is little economic activity that occurs following disposal While this Plan places much greater emphasis on waste reduction and recycling, and shifts regional net expenditures in alignment with this emphasis, there is an even greater shift in the overall regional economy from disposal to waste reduction and recycling As a result, the regional economy for waste reduction and recycling far exceeds that for waste disposal and therefore is reflective of the priority placed upon waste reduction, reuse and recycling as outlined in this Plan

PRICING STRATEGIES The costs of operating the integrated solid waste and resource recovery system, including initiatives to encourage waste reduction, reuse and recycling, will be funded from revenues from users of the system (principally the tipping fee) and from revenues from recovered resources (recycled materials and recovered energy)

Residents and businesses will have an economic incentive to invest in waste diversion initiatives, arising primarily from the difference between the cost of recycling and the tipping fee for waste disposal at public facilities The regional tipping fee will continue to be set at a rate to recover Metro Vancouver’s cost to manage the solid waste system The tipping fee for many recyclable materials will be reduced or waived at regional facilities to encourage participation

By utilizing this economic incentive of reducing or waiving the tipping fee for recyclable materials, positive behaviour will be encouraged thereby driving an increase in the material diverted from the disposal stream and helping to achieve the 70 percent diversion target Pricing will be established so that the most expensive choice for residents and businesses will be to place materials in garbage cans and dumpsters for disposal

OWNERSHIP AND FINANCING There are options to be considered for facility ownership and the related business model for all new facilities contemplated in this Plan Currently, the existing waste-to-energy facility in Burnaby is owned by Metro Vancouver and operated by a contractor under a long-term operating agreement The benefits of facility ownership include the accrual to Metro Vancouver of debt reduction once debt has been fully serviced, full control of all upgrades associated with the facility, no need for put-or-pay contracts, the ability to fully maximize revenues to offset costs, the control of all indirect costs including royalty payments, the control and negotiation of all operating certificates and the ability to further minimize cost by not requiring a profit margin The consideration of the benefits of ownership was paramount when the decision was made in 2000 by the Board to purchase the Ashcroft Ranch and pursue the development of a Metro Vancouver owned landfill In selecting the ownership and business model for new facilities Metro Vancouver will choose the option that results in the best available financial position for the residents and businesses of the region

Where capital needs to be raised and debt financed, the least expensive alternative is Metro Vancouver ownership with financing provided through the Municipal Finance Authority In addition to this financing structure, Metro Vancouver will explore other structures including Public Private Partnerships (3P) on a facility specific basis, where capital financing may be provided by the private sector partner

Page 37: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 33

As the outcomes of this Plan contribute to the achievement of provincial and federal environmental and energy goals, and as regional and municipal financial resources are limited, and as public investment in the actions set out in this Plan will assist in achieving the goals of this Plan and are in the public interest, financial support from provincial and federal sources will be sought to implement waste diversion programs and develop facilities identified in the Plan

FINANCIAL DETAILS Direct expenditures by Metro Vancouver and member municipalities for Goals 1 and 2 of the draft Plan are estimated to cost $170 million in one-time capital costs, and $40 million in annual operating costs Significant initiatives provided through these expenditures (action number provided for reference) include: establish and progressively expand a network of Eco-Centres (2 2 4); divert organics from the waste stream through separated collection from residential and industrial, commercial and institutional sectors, and establishing one or more organics processing facilities (2 6 2, 2 6 3); provide information and education including social marketing programs (1 2 1, 1 3 1, 1 3 2, 1 3 3, 2 2 2, 2 2 5, 2 2 6, 2 2 7, 2 5 2, 2 5 3, 2 6 2, 2 6 3, 2 7 1); regionally mandate DLC

recycling at jobsites (2 4 4); and regionally mandate recycling in all multifamily and commercial buildings (2 9 1, 2 9 2)

Expenditures for actions identified in Goals 1 and 2 will be funded through tipping fees received for waste disposal and from revenues associated with actions For example, expenditures for Eco-Centres will be partially offset by compensation from industry stewards for EPR material collection at the Eco-Centres and from private sector partners operating at Eco-Centres Revenue from compost or energy sales at organics processing facilities will offset the costs associated with operating these proposed facilities

Direct expenditures by Metro Vancouver and member municipalities for Goals 3 and 4 of the draft Plan are dependent upon the financing and ownership structure for new facilities If new disposal facilities are provided by and owned by Metro Vancouver, costs for Goals 3 and 4 are estimated to be $440 million in one-time capital costs Annual operating costs are projected to be approximately $15 million lower than current costs under this financing and ownership structure, tipping fees for waste disposal will increase initially during the 15 year amortization period Following debt retirement, net expenditures will decrease considerably reflecting the revenue

35 Year Net Cost ($ billion)

Annual Net Cost ($ million)

Per Capita Cost ($)

Total Current SWMP $20 $550 $247

Total Proposed ISWRMP $18 $490 $220

Difference ($2) ($60) ($27)

Current Recycling (55%) $7 $190 $85

Proposed Recycling (70%) $10 $270 $121

Difference $3 $80 $36

Current Disposal $13 $360 $162

Proposed Disposal $8 $220 $99

Difference ($5) ($140) ($63)

TABLE 1 REGIONAL WASTE MANAGEMENT – NET ExPENDITuRES

Page 38: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

34 Solid Waste Management Plan July, 201034

from new waste-to-energy capacity and no debt repayment costs Over a 30 year operating period, total revenues for new waste-to-energy facilities are projected to exceed the total expenditures resulting in a net revenue Profit will continue to increase each subsequent year as revenues are accrued in the absence of any capital repayment costs This is favourable over a 30 year operating period when compared to a $3 1 billion expenditure for an option emphasizing mechanical biological-treatment processing or a $1 5 billion expenditure for an option emphasizing landfilling

Provision of waste-to-energy capacity is estimated on the basis of a single new facility providing 500,000 tonnes capacity annually Distributed systems of waste-to-energy using several smaller facilities will provide social and environmental benefits in the form of additional facilities and the corresponding increased convenience to customers, and reduced emissions and congestion from transportation of waste from regional transfer stations Financially, a distributed system would reduce the need for transfer stations and associated costs, but would also reduce economies of scale provided by a larger capacity facility and result in higher costs

If new waste-to-energy facilities are owned and financed by the private sector, costs for Goals 3 and 4 may be recovered over a longer time frame and the regional tipping fees could increase gradually over time due to inflated contract costs Over a 30 year operating period, privately owned facilities could cost hundreds of millions of dollars more than public ownership if increasing energy revenues accrue to the private sector owner Accordingly, Metro Vancouver will pursue the ownership and financing model that is in the best interest of member municipalities, residents, and businesses within the region

Page 39: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 35

1.0 AIR DISChARGE LIMITS AND MoNIToRING METhoDSWhere applicable, all contaminant concentrations are stated at standard conditions of 293 K, 101 3 kilopascals (1 atmosphere), corrected to 11% oxygen and dry basis unless otherwise noted Discharge specifications apply to each incinerator unit separately A continuous time-shared analyzing system is used for monitoring emissions from all three incineration units

1 1 OPACITy Opacity shall not exceed 5% based on 1-hour averaging of continuous monitoring

1 2 PARTICuLATE MATTER

Particulate matter from each incinerator stack shall not exceed 20 mg/m3 based on manual stack testing methods approved by the Regional Waste Manager

1 3 CARBON MONOxIDE (CO)Carbon monoxide emissions shall not exceed 55 mg/m3 for steady state incinerator operation based on a 4-hour rolling average of continuous monitoring

1 4 SuLPHuR DIOxIDE (SO2)Sulphur dioxide emissions shall not exceed 200 mg/m3 based on a 24-hour average of continuous monitoring This shall be verified by manual stack testing

1 5 NITROGEN OxIDES (NOx)The GVRD will implement a NOx reduction strategy by July 1996 as required by the BC Ministry of Environment to meet or exceed the BC MSW Criteria limit of 350 mg/m3, expressed as NO2 on a 24-hour average of continuous monitoring

Appendix A

1 6 HyDROGEN CHLORIDEHydrogen chloride emissions shall not exceed 55 mg/m3 (wet basis), based on manual stack testing methods approved by the Regional Waste Manager Continuous monitoring of SO2 shall be used as a surrogate for emission monitoring of acid gases, such as HCl and HF Continuous monitoring of HCl (using a 24 hour average) shall be conducted for reporting purposes until the end of the useful life of the HCl analyzer

1 7 HyDROGEN FLuORIDE (HF)Hydrogen fluoride emissions shall not exceed 3 mg/m3 based on manual stack testing methods approved by the Regional Waste Manager

1 8 TOTAL HyDROCARBONS (THC)Total hydrocarbon emissions (measured as methane, CH4) shall not exceed 40 mg/m3 based on manual stack testing methods approved by the Regional Waste Manager Continuous monitoring of carbon monoxide emissions shall be used as a surrogate indicator to monitor combustion efficiencies and the discharge of combustibles, such as total hydrocarbons

Long Term Monitoring Requirements for the Waste-to-Energy Facility in BurnabyThis appendix outlines the long term monitoring requirement for Metro Vancouver’s Waste-to-Energy Facility in

Burnaby as originally outlined in Metro Vancouver’s (formerly Greater Vancouver Regional District) 1995 Solid Waste

Management Plan (SWMP).

(HCl)

Page 40: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

36 Solid Waste Management Plan July, 2010

1 9 TRACE METALSTrace metal emissions shall not exceed the following limits based on manual stack testing methods approved by the Regional Waste Manager:

METALS LIMITMETALS LIMIT

Total of Cadmium, Mercury, and Thallium

200 μg/m3

Total of Arsenic, Cobalt, Nickel, Selenium, and Tellurium

1000 μg/m3

Total of Antimony, Lead, Chromium, Copper, Manganese, Vanadium and Zinc

5000 μg/m3

Mercury 200 μg/m3

Cadmium 100 μg/m3

Lead 50 μg/m3

Continuous monitoring of opacity shall be used as a surrogate indicator for trace metal discharges

1 10 TRACE ORGANICSTrace organic emissions shall not exceed 0 5 ng/m3 for the sum of PCDD and PCDF as toxicity equivalents, and 5 μg/m3 for polyaromatic hydrocarbons based on manual stack testing methods approved by the Regional Waste Manager Frequency of manual stack testing shall be as required by the Regional Waste Manager

1 11 FREQuENCy OF MANuAL STACK TESTINGManual stack testing for trace organics shall be performed as required by the Regional Waste Manager HF and THC testing shall be conducted annually SO2, HCl, particulates and trace metals shall be conducted three times in both 1995 and 1996 If the results of these tests are satisfactory, frequency will be reduced to annual testing

2.0 ADDITIoNAL MoNIToRING AND REPoRTING

2 1 FuRNACE TEMPERATuREFurnace reference temperature for each incinerator unit shall be monitored and reported with a minimum of 800oC based on a 1-hour averaging time during normal operating conditions

2 2 EMISSION CONTROL DEVICE TEMPERATuREEmission control device temperature shall not exceed a temperature of 190oC based on a 1-hour averaging time

2 3 MONITORING OF OxyGENOxygen shall be continuously monitored and reported as a percentage of stack gas on a 1-hour averaging basis

2 4 FLOWRATE AND OPERATING PERIODThe flue gas flow rate for each incinerator unit shall not exceed 1200 m3/minute for a continuous operating period

2 5 AVAILABILITyThe monthly availability of the SO2 continuous monitor shall be at least 90% Opacity, oxygen, carbon monoxide, reference furnace temperature, and emission control device outlet temperature shall have a monthly availability of at least 95%

The Regional Waste Manager shall be notified of any continuous monitor failure for a period which may result in non-attainment of the recommended availability If immediate corrective action was taken to return the monitor to service, compliance shall be granted providing the District can supply evidence (operating and emission data) indicating that the facility was in normal continuous operation

Page 41: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Solid Waste Management Plan July, 2010 37

2 7 MONTHLy REPORTINGMonthly reports shall include compliance summaries for all parameters with specified limits Tabulated hourly averaged data and data based on required averaging periods of all continuously monitored parameters, including availability and data capture information, shall be available for inspection but not included in the monthly report Raw data shall be maintained and available for inspection at the incinerator site for a minimum period of two years

2 8 ANNuAL REPORTINGAn annual report shall be provided within 90 days following the end of the calendar year The report shall consolidate and summarize the monthly data as well as briefly summarize the topics itemized in Section 6 3 of the BC MSW Criteria

2 9 START-uP, SHuTDOWN AND uPSET CONDITIONSDuring start-up, shutdown, equipment malfunction and operating upsets requiring shutdown (i e ash discharge or feed chute plugging), emission data recorded by the CEMS shall be excluded from the regulatory emission averaging calculations When required, the time, duration, and reason for an occurrence during transient conditions shall be reported to the Ministry The corrective action taken by the operator in attempting to return the operation to steady-stateconditions shall be included in the report

Page 42: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

PRINTED IN CANADA ON RECyCLED PAPER

4200936

TBowen
Text Box
Page 43: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental
Page 44: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental
Page 45: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental
Page 46: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental
Page 47: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Minutes of the Regular Meeting of the Greater Vancouver Sewerage and Drainage District (GVS&DD) Board of Directors held on Friday, October 26, 2012

Page 1 of 11

GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT BOARD OF DIRECTORS

Minutes of the Regular Meeting of the Greater Vancouver Sewerage and Drainage District (GVS&DD) Board of Directors held at 9:14 a.m. on Friday, October 26, 2012 in the 2nd Floor Boardroom, 4330 Kingsway, Burnaby, British Columbia. MEMBERS PRESENT: Chair, Director Greg Moore, Port Coquitlam Vice Chair, Director Raymond Louie, Vancouver Director Malcolm Brodie, Richmond Director Mike Clay, Port Moody Director Derek Corrigan, Burnaby Director Ernie Daykin, Maple Ridge Director Heather Deal, Vancouver Director Sav Dhaliwal, Burnaby Director Helen Fathers, White Rock Director Jack Froese, Langley Township Director Maria Harris, Electoral Area A Director Linda Hepner, Surrey Alternate Director Robin Hicks, North Vancouver District, for Richard Walton Director Marvin Hunt, Surrey Director Lois Jackson, Delta Director Colleen Jordan, Burnaby Director Gayle Martin, Langley City Director Geoff Meggs, Vancouver Director Darrell Mussatto, North Vancouver City Director Mae Reid, Coquitlam Director Andrea Reimer, Vancouver Director Gregor Robertson, Vancouver Director Michael Smith, West Vancouver Alternate Director Barbara Steele, Surrey, for Dianne Watts Director Harold Steves, Richmond Director Richard Stewart, Coquitlam Director Judy Villeneuve, Surrey Director Deb Walters, Pitt Meadows Director Wayne Wright, New Westminster Commissioner Carol Mason*

MEMBERS ABSENT: Director Tim Stevenson, Vancouver STAFF PRESENT: Klara Kutakova, Assistant to Regional Committees, Board Secretariat and Corporate

Information Department Paulette Vetleson, Corporate Secretary/Manager, Board Secretariat and Corporate Information Department

* Non-voting member.

Page 48: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Minutes of the Regular Meeting of the Greater Vancouver Sewerage and Drainage District (GVS&DD) Board of Directors held on Friday, October 26, 2012

Page 2 of 11

A. ADOPTION OF THE AGENDA

1. October 26, 2012 Regular Meeting Agenda It was MOVED and SECONDED That the Board: a) amend the agenda for its regular meeting scheduled for October 26, 2012

by adding to item E2.2 an on-table memorandum from the Fraser Valley Regional District, titled “Metro Vancouver Waste to Energy Consultation Process, dated October 11, 2012; and

b) adopt the agenda as amended. CARRIED

B. ADOPTION OF THE MINUTES

1. September 21, 2012 Regular Meeting Minutes It was MOVED and SECONDED That the Board adopt the minutes for its regular meeting held September 21, 2012 as circulated.

CARRIED C. DELEGATIONS

No items presented. D. INVITED PRESENTATIONS

No items presented.

E. CONSENT AGENDA At the request of Directors, the following items were removed from the Consent Agenda for consideration under Section F Items Removed from Consent Agenda: 2.3 New Waste-to-Energy Capacity – Third Party Expert Panel 2.1 New Waste-to-Energy Procurement Process 2.2 New Waste-to-Energy Capacity: Proposed Engagement and Consultation

Program It was MOVED and SECONDED That the Board adopt the recommendations contained in the following items presented in the October 26, 2012 GVS&DD Board Consent Agenda: 1.1 Draft Metro Vancouver Districts’ 2013 Budget 1.2 GVS&DD Temporary Borrowing Authority 2.4 Metro Vancouver Waste Composition and Energy Content Projections 2.5 Sample Municipal Bylaw for the Management of Waste and Recyclable

Materials from Demolition Work 2.6 Metro Vancouver 2012 Zero Waste Conference 2.7 National Zero Waste Marketing Council – Inaugural Roundtable

CARRIED

Page 49: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Minutes of the Regular Meeting of the Greater Vancouver Sewerage and Drainage District (GVS&DD) Board of Directors held on Friday, October 26, 2012

Page 3 of 11

The items and recommendations referred to above are as follows: 1.1 Draft Metro Vancouver Districts’ 2013 Budget

Report dated October 17, 2012 from Jim Rusnak, Chief Financial Officer, Finance and Administration Department, seeking approval of the 2013 Revenue and Expenditure Budgets, use of Reserves, and Capital Expenditures. Recommendation: That the Board approve the 2013 Revenue and Expenditure Budgets, use of Reserves, and Capital Expenditures as shown in the following schedules: Schedule 1 Revenue and Expenditure Summary Schedule 2 2013 Budget - Proposed Application of Reserves Schedule 3 GVS&DD Liquid Waste 2013 Budget Schedule 4 GVS&DD Liquid Waste Capital Programs & Project Details –

Non-Discretionary Schedule 5 GVS&DD Liquid Waste Capital Programs & Project Details –

Discretionary – In Design Schedule 6 GVS&DD Liquid Waste Capital Programs & Project Details –

Discretionary – Conceptual Schedule 7 Solid Waste 2013 Budget Schedule 8 Solid Waste Capital Programs & Project Details – Non-

Discretionary Schedule 9 Solid Waste Capital Programs & Project Details –

Discretionary – In Design Schedule 10 Solid Waste – Wastech Services Capital Plan

Adopted on Consent

1.2 GVS&DD Temporary Borrowing Authority Report dated September 15, 2012 from Phil Trotzuk, Financial Planning and Operations Division Manager, Finance and Administration Department, seeking Board authorization to renew the authority for 2013 permitting temporary borrowing, should it be required, in anticipation of revenues during the year. Recommendation: That the Board authorize the borrowing from the District’s Banker or others in the course of the calendar year 2013 in anticipation of the collection of its revenue, of a sum or sums of money, the outstanding total of which shall not exceed $12 million at any one time, by the issue of promissory notes or by such other means as are appropriate.

Adopted on Consent 2.4 Metro Vancouver Waste Composition and Energy Content Projections

Report dated September 24, 2012, from Kris La Rose, Project Engineer, Solid Waste Department, providing an update on an analysis estimating future Metro Vancouver waste composition and heating value.

Page 50: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Minutes of the Regular Meeting of the Greater Vancouver Sewerage and Drainage District (GVS&DD) Board of Directors held on Friday, October 26, 2012

Page 4 of 11

Recommendation: That the Board receive the report dated September 24, 2012, titled “Metro Vancouver Waste Composition and Energy Content Projections” for information.

Adopted on Consent 2.5 Sample Municipal Bylaw for the Management of Waste and Recyclable

Materials from Demolition Work Report dated September 12, 2012, from Esther Bérubé, Project Engineer, Solid Waste Department, seeking the Board’s support for a municipal approach to encourage diversion of demolition materials from disposal, which is recommended to be applied through municipal demolition permits. The proposed municipal approach is based on the sample bylaw presented in Attachment 1, which municipalities may tailor and implement as appropriate.

Recommendation: That the Board approve the proposed municipal permit approach to encourage demolition material recycling, and refer the attached sample municipal bylaw to member municipalities for consideration in their demolition permit processes.

Adopted on Consent 2.6 Metro Vancouver 2012 Zero Waste Conference

Report dated September 20, 2012 from Heather Schoemaker, Manager, and David Hocking, Corporate Communications Division Manager, Corporate Relations Department, providing an overview of Metro Vancouver’s second annual Zero Waste Conference and outlining the outcomes. Recommendation: That the Board: a. Share the report dated September 20, 2012 titled “Metro Vancouver

2012 Zero Waste Conference,” with member municipalities; and b. Direct staff to investigate an enhancement of the Design Challenge in its

planning for the 2013 Zero Waste Conference. Adopted on Consent

2.7 National Zero Waste Marketing Council – Inaugural Roundtable

Report dated September 20, 2012 from Heather Schoemaker, Manager, and David Hocking, Corporate Communications Division Manager, Corporate Relations Department, providing an update on the September 15 inaugural roundtable discussion that took place regarding the feasibility of the proposed National Zero Waste Marketing Council. Recommendation: That the Board receive for information the September 20 report titled, “National Zero Waste Marketing Council – Inaugural Roundtable”, and direct staff to continue efforts to establish a National Zero Waste Marketing Council.

Adopted on Consent

Page 51: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Minutes of the Regular Meeting of the Greater Vancouver Sewerage and Drainage District (GVS&DD) Board of Directors held on Friday, October 26, 2012

Page 5 of 11

F. ITEMS REMOVED FROM THE CONSENT AGENDA The items removed from the Consent Agenda were considered in numeric order.

2.1 New Waste-to-Energy Procurement Process

Report dated October 15, 2012, from the Zero Waste Committee, together with report dated September 24, 2012 from Paul Henderson, Manager, Solid Waste Department, providing an update on the development of the new Waste-to-Energy (WTE) capacity and recommending a procurement process and evaluation criteria for RFQ1.

It was MOVED and SECONDED That the Board approve: 1. Proceeding with the recommended procurement process described in the

report dated September 24, 2012, titled “New Waste-to-Energy Procurement Process, commencing with a technology only request for qualifications (RFQ1), with an operational date for new waste-to-energy capacity no later than mid 2018.

2. Requiring in RFQ1 that proponents demonstrate that at a minimum the proposed technology solution has operated continuously for one year in the last five years processing a minimum of 25,000 tonnes per year of municipal solid waste.

CARRIED Director Steves voted in the negative.

2.2 New Waste-to-Energy Capacity: Proposed Engagement and

Consultation Program Report dated October 15, 2012, from the Zero Waste Committee, together with report dated October 2, 2012 from Marie Griggs, Public Involvement Division Manager, Engineering and Construction Department, summarizing the proposed overall engagement and consultation program for the development of new waste-to-energy capacity for Metro Vancouver and identifying specific activities for the early phases of the process. On-table memorandum from the Fraser Valley Regional District, titled “Metro Vancouver Waste to Energy Consultation Process”, dated October 11, 2012, is retained with the October 26, 2012 GVS&DD Board agenda. Main Motion It was MOVED and SECONDED 1. That the Board approve the proposed engagement and consultation

program for new waste-to-energy capacity, as described in the report titled “New Waste-to-Energy Capacity: Proposed Engagement and Consultation Program” dated October 2, 2012.

2. That the Board Chair write the Minister of Environment asking for confirmation that Board approval of the procurement process for new WTE capacity will trigger the requirement to initiate consultation with the FVRD, and send a copy of the correspondence to the FVRD.

Page 52: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Minutes of the Regular Meeting of the Greater Vancouver Sewerage and Drainage District (GVS&DD) Board of Directors held on Friday, October 26, 2012

Page 6 of 11

It was suggested that Fraser Valley Regional District Board representatives be invited to a future Zero Waste Committee meeting to hear their feedback on the proposed consultation program.

Amendment to the Main Motion It was MOVED and SECONDED That the Board amend the Main Motion by adding section 3. as follows “3. That the Board invite the Chair and Vice Chair of the Fraser Valley

Regional District Board to a future Zero Waste Committee meeting to hear their feedback on the proposed engagement and consultation program for the development of new waste-to-energy capacity for Metro Vancouver.”

CARRIED Question on the Main Motion as Amended Question was called on the Main Motion as amended and it was

CARRIED

The Main Motion as amended now reads as follows: 1. That the Board approve the proposed engagement and consultation

program for new waste-to-energy capacity, as described in the report titled “New Waste-to-Energy Capacity: Proposed Engagement and Consultation Program” dated October 2, 2012.

2. That the Board Chair write the Minister of Environment asking for confirmation that Board approval of the procurement process for new WTE capacity will trigger the requirement to initiate consultation with the FVRD, and send a copy of the correspondence to the FVRD.

3. That the Board invite the Chair and Vice Chair of the Fraser Valley Regional District Board to a future Zero Waste Committee meeting to hear their feedback on the proposed engagement and consultation program for the development of new waste-to-energy capacity for Metro Vancouver.

2.3 New Waste-to-Energy Capacity – Third Party Expert Panel

Report dated September 25, 2012, from Sarah Wellman, Senior Project Engineer, Solid Waste Department, providing an update on the selection of the third party expert panel, supporting the procurement of new Waste-to-Energy (WTE) capacity, as directed by the Board on July 30, 2010. Main Motion It was MOVED and SECONDED That the Board receive for information the report dated September 25, 2012 titled “New Waste-to-Energy Capacity – Third Party Expert Panel”.

Page 53: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Minutes of the Regular Meeting of the Greater Vancouver Sewerage and Drainage District (GVS&DD) Board of Directors held on Friday, October 26, 2012

Page 7 of 11

A suggestion was provided that feedback on the panel selection be sought from the Fraser Valley Regional District. Amendment to the Main Motion It was MOVED and SECONDED That the Board amend the Main Motion by adding section b) that reads as follows: “b) seek input from the Fraser Valley Regional District on selection of the Third Party Expert Panel.”

DEFEATED

Amendment to the Main Motion It was MOVED and SECONDED That the Board amend the Main Motion by adding section b) that reads as follows: “b) refer the selection of the Third Party Expert Panel to the Ministry of Environment and adjoining regional districts for their feedback.”

CARRIED

Question on the Main Motion as Amended Question was called on the Main Motion as amended and it was

CARRIED

The Main Motion as amended now reads as follows: That the Board: a) receive for information the report dated September 25, 2012 titled “New

Waste-to-Energy Capacity – Third Party Expert Panel”; and b) refer the selection of the Third Party Expert Panel to the Ministry of

Environment and adjoining regional districts for their feedback. G. REPORTS FROM COMMITTEE OR STAFF NOT INCLUDED IN CONSENT

AGENDA

1. GVS&DD Food Sector Grease Interceptor Bylaw No. 268, 2012 Report dated September 21, 2012 from Jeff Gogol, Environmental Regulatory Planner, and Ray Robb, Regulation and Enforcement Division Manager, Metropolitan Planning, Environment and Parks Department, recommending adoption of Greater Vancouver Sewerage and Drainage District (“GVS&DD”) Food Sector Grease Interceptor Bylaw No. 268, 2012 and consequential amendments to the GVS&DD Sewer Use Bylaw No. 299, 2007. The Board was requested to amend proposed bylaw 268, on page 1, by adding the name of the district in the bylaw citation. It was MOVED and SECONDED That the Board amend “Greater Vancouver Sewerage and Drainage District Food Sector Grease Interceptor Bylaw No. 268, 2012” on page 1, in section 1, by adding after the phrase “the name of this bylaw is the“ the phrase “Greater Vancouver Sewerage and Drainage District”.

CARRIED

Page 54: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Minutes of the Regular Meeting of the Greater Vancouver Sewerage and Drainage District (GVS&DD) Board of Directors held on Friday, October 26, 2012

Page 8 of 11

It was MOVED and SECONDED That the Board introduce and give first, second and third reading to “Greater Vancouver Sewerage and Drainage District Food Sector Grease Interceptor Bylaw No. 268, 2012”.

CARRIED Director Dhaliwal absent at the vote.

It was MOVED and SECONDED That the Board introduce and give first, second and third reading to “Greater Vancouver Sewerage and Drainage District Sewer Use Amending Bylaw No. 273, 2012”.

CARRIED Director Dhaliwal absent at the vote.

It was MOVED and SECONDED That the Board reconsider, pass and finally adopt “Greater Vancouver Sewerage and Drainage District Food Sector Grease Interceptor Bylaw No. 268, 2012”.

CARRIED Director Dhaliwal absent at the vote.

It was MOVED and SECONDED That the Board reconsider, pass and finally adopt “Greater Vancouver Sewerage and Drainage District Sewer Use Amending Bylaw No. 273, 2012”.

CARRIED Director Dhaliwal absent at the vote.

2. 2013 Tipping Fee Bylaw

Report dated September 21, 2012, from Lyn Ross, Senior Project Engineer, Solid Waste Department, seeking updates to the Greater Vancouver Sewerage and Drainage District Bylaw No. 275, 2012 – A Bylaw to Establish the Tipping Fee and Solid Waste Disposal Regulation, by reducing the Regional tipping fee to $105 (currently $107) per tonne along with some other minor modifications. Discussion ensued on the proposed $2 reduction in the tipping fee. It was MOVED and SECONDED That the Board: 1. Approve a 2013 tipping fee of $105 per tonne, a decrease of $2 per

tonne from the 2012 tipping fee; 2. Introduce and give first, second and third reading to “Greater

Vancouver Sewerage and Drainage District Tipping Fee and Solid Waste Disposal Regulation Bylaw No. 275, 2012”.

Page 55: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Minutes of the Regular Meeting of the Greater Vancouver Sewerage and Drainage District (GVS&DD) Board of Directors held on Friday, October 26, 2012

Page 9 of 11

The Chair called for a recorded vote on the motion:

Director Number of Votes Against For Malcolm Brodie 5 Mike Clay 2 Derek Corrigan 4 Ernie Daykin 4 Heather Deal 5 Sav Dhaliwal 3 Helen Fathers 1 Jack Froese 5 Maria Harris 1 Linda Hepner 5 Marvin Hunt 5 Lois Jackson 5 Colleen Jordan 4 Raymond Louie 5 Gayle Martin 2 Geoff Meggs 4 Greg Moore 3 Darrell Mussatto 3 Mae Reid 3 Andrea Reimer 5 Gregor Robertson 5 Michael Smith 3 Harold Steves 4 Richard Stewart 3 Judy Villeneuve 5 Deb Walters 1 Robin Hicks 5 Barbara Steele 5 Wayne Wright 3

Total Votes 54 54 DEFEATED

It was MOVED and SECONDED That the Board: 1. Approve a 2013 tipping fee of $107 per tonne; 2. Introduce and give first, second and third reading to “Greater

Vancouver Sewerage and Drainage District Tipping Fee and Solid Waste Disposal Regulation Bylaw No. 275, 2012”.

CARRIED It was MOVED and SECONDED That the Board reconsider, pass and finally adopt “Greater Vancouver Sewerage and Drainage District Tipping Fee and Solid Waste Disposal Regulation Bylaw No. 275, 2012”.

CARRIED

Page 56: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

Minutes of the Regular Meeting of the Greater Vancouver Sewerage and Drainage District (GVS&DD) Board of Directors held on Friday, October 26, 2012

Page 10 of 11

3. Greater Vancouver Sewerage and Drainage District (GVS&DD)

Amending Bylaw No. 272, 2012 Report dated October 2, 2012, from Ray Robb, Regulations and Enforcement Division Manager, Metropolitan Planning, Environment and Parks Department, recommending amendments to the Greater Vancouver Sewerage and Drainage District Municipal Solid Waste and Recyclable Material Regulatory Bylaw No. 181, 1996, (the Bylaw) for managing municipal solid waste (MSW) and recyclable material (RM) at private facilities. It was MOVED and SECONDED That the Board introduce and give first, second and third reading to “Greater Vancouver Sewerage and Drainage District Amending Bylaw No. 272, 2012”.

CARRIED It was MOVED and SECONDED That the Board forward “Greater Vancouver Sewerage and Drainage District Amending Bylaw No. 272, 2012” to the Minister of Environment for approval.

CARRIED 4. Greater Vancouver Sewerage and Drainage District 2013 Cost

Apportionment Bylaw 274, 2012 Report dated September 20, 2012 from Phil Trotzuk, Financial Planning and Operations Division Manager, Finance and Administration Department, seeking Board approval of Greater Vancouver Sewerage and Drainage District 2013 Cost Apportionment Bylaw No. 274, 2012. It was MOVED and SECONDED That the Board give leave to introduce “Greater Vancouver Sewerage and Drainage District 2013 Cost Apportionment Bylaw No. 274, 2012”, being a bylaw governing the distribution of the GVS&DD tax levy for 2013, and that it be read a first, second and third time.

CARRIED It was MOVED and SECONDED That the Board reconsider, pass and finally adopt “Greater Vancouver Sewerage and Drainage District 2013 Cost Apportionment Bylaw No. 274, 2012”.

CARRIED

Questions were raised about flow allocation as follows: What changes would be required to next year’s bylaw to provide flow

allocation information for the coming year to the member municipalities by mid July instead of October and November?

Who reviews and verifies the flow measurements and allocations to the member municipality?

Have Metro Vancouver staff ever conducted an independent audit of the flow allocations to each municipality and the flow allocation changes over the past 10 years and if not, would it be possible for staff to do so?

Page 57: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

• Could Metro Vancouver staff provide the next years sewer cost to eachmunicipality by mid September?

It was MOVED and SECONDEDThat the Board refer the questions pertaining to flow allocation, as raised atits October 26, 2012 meeting, to the Utilities Committee and request thatanswers and recommendations be brought back to the Board whenappropriate.

CARRIEDDirector Jordan absent at the vote.

H. MOTIONS FOR WHICH NOTICE HAS BEEN GIVENNo items presented.

OTHER BUSINESSNo items presented.

J. RESOLUTION TO CLOSE MEETING

It was MOVED and SECONDEDThat the Board close its regular meeting scheduled for October 26, 2012 pursuant tothe Community Charter provisions, Section 90 (1) (g) and 90 (2) (b) as follows:“90 (1) A part of a board meeting may be closed to the public if the subject matter

being considered relates to or is one or more of the following:(g) litigation or potential litigation affecting the regional district; and

90 (2) A part of a meeting must be closed to the public if the subject matterbeing considered relates to one or more of the following:(b) the consideration of information received and held in confidence

relating to negotiations between the regional district and aprovincial government or the federal government or both, orbetween a provincial government or the federal government orboth and a third party.”

CARRIED

K. ADJOURNMENT/TERMINATION

It was MOVED and SECONDEDThat the Board adjourn/conclude its regular meeting of October 26, 2012.

CARRIED(Time: 10:05 a.m.)

CERTIFIED CORRECT

Paulette A. Vetleson, Corporate Secretary reg Moore, Chair

6668908 FINAL

Minutes of the Regular Meeting of the Greater Vancouver Sewerage and Drainage District(GVS&DD) Board of Directors held on Friday, October 26, 2012

Page 11 of 11

Page 58: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

6636965

GVS&DD Board Meeting Date: October 26, 2012

To: Board of Directors From: Zero Waste Committee Date: October 15, 2012 Subject: New Waste-to-Energy Procurement Process Zero Waste Committee Recommendation: That the Board approve: 1. Proceeding with the recommended procurement process described in this report

commencing with a technology only request for qualifications (RFQ1), with an operational date for new waste-to-energy capacity no later than mid 2018.

2. Requiring in RFQ1 that proponents demonstrate that at a minimum the proposed technology solution has operated continuously for one year in the last five years processing a minimum of 25,000 tonnes per year of municipal solid waste.

At its October 11, 2012 meeting, the Zero Waste Committee considered the attached report titled “New Waste-to-Energy Procurement Process”, dated September 24, 2012. The Committee subsequently passed the above recommendation. In addition, the Committee requested staff to revise the recommended procurement process outlined in the report as follows: • In the third paragraph of Section 1, by adding “potential revenue streams” under the

evaluation criteria • In Section 3, by replacing the phrase “whether one or more facilities is required” with the

phrase “whether one or more facilities is required or advisable” • In Sections 4 and 5, make reference to a business case rather than cost of the facility

only • In Section 5 – at the end of the sentence, add the phrase “and other revenue streams” Attachment: Report titled “New Waste-to-Energy Procurement Process”, dated September 24, 2012

Section E 2.1

Page 59: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 1 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT

REQUEST FOR QUALIFICATIONS (RFQ) RFQ No. 12-209

RFQ1 FOR WASTE-TO-ENERGY TECHNOLOGY

NOVEMBER 23, 2012

Page 60: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS TABLE OF CONTENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 1 of 2

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

Table of Contents

1. INTRODUCTION ................................................................................................................................ 1 1.1 Purpose of this RFQ1 .......................................................................................................... 1 1.2 Eligibility to Participate in this RFQ1 ................................................................................... 1 1.3 Qualified Respondents ........................................................................................................ 1 1.4 Information Meeting........................................................................................................... 1 1.5 Definitions ........................................................................................................................... 2

2. BACKGROUND .................................................................................................................................. 2 2.1 Required Facilities and Scope ............................................................................................. 2 2.2 Acceptable Technologies .................................................................................................... 3 2.3 Anticipated Competitive Procurement Process .................................................................. 3

3. SUBMISSION REQUIREMENTS ......................................................................................................... 4 3.1 Closing Time and Delivery Address ..................................................................................... 4 3.2 Faxed or Emailed Responses ............................................................................................... 4 3.3 Number of Copies of Responses ......................................................................................... 4

4. ADDITIONAL INFORMATION ON THIS RFQ1 .................................................................................... 4 5. ENQUIRIES AND ADDENDA .............................................................................................................. 5

5.1 Enquiries ............................................................................................................................. 5 5.2 Addenda .............................................................................................................................. 5

6. RESPONSE CONTENT ........................................................................................................................ 5 6.1 Response ............................................................................................................................. 5 6.2 Environmental and Social Practice Declarations ................................................................ 5 6.3 Alternates............................................................................................................................ 5 6.4 Execution ............................................................................................................................ 6

7. EVALUATION .................................................................................................................................... 6 7.1 Evaluation Committee ........................................................................................................ 6 7.2 Disqualification ................................................................................................................... 6 7.3 Evaluation Criteria (total of 100 points) ............................................................................. 6 7.4 References .......................................................................................................................... 7 7.5 Evaluation ........................................................................................................................... 7 7.6 Selection of Qualified Technology Respondents ................................................................ 8 7.7 Communication ................................................................................................................... 8 7.8 Notification of Qualified List ............................................................................................... 8 7.9 Debriefing ........................................................................................................................... 9

8. GENERAL .......................................................................................................................................... 9 8.1 No Obligation to proceed ................................................................................................... 9 8.2 Reservation of Rights .......................................................................................................... 9 8.3 Respondent’s Expenses ...................................................................................................... 9 8.4 Conflict of Interest .............................................................................................................. 9 8.5 Confidentiality ................................................................................................................... 10 8.6 Publicity............................................................................................................................. 10 8.7 Solicitation ........................................................................................................................ 10

Page 61: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 2 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

APPENDICES Appendix A – Response Content Appendix B.1 – Declaration of Environmental Practices Appendix B.2 – Declaration of Social Practices Appendix C – Metro Vancouver Waste Composition – Historic and Anticipated Appendix D – Reference Facility Data (For Each Reference Facility)

Appendix D.1 – Information Request for Reference Facility Appendix D.2 – Mass Balance for Reference Facility Appendix D.3 – Feedstock Composition Data for Reference Facility Appendix D.4 – Environmental Performance for Reference Facility

Appendix E – Proposed Facility Information Appendix E-1 – Mass Balance for Proposed Facility Appendix E.2 – Site Area Requirements for Proposed Facility

Page 62: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 1 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

REQUEST FOR QUALIFICATIONS

1. INTRODUCTION

1.1 Purpose of this RFQ1

The Greater Vancouver Sewerage and Drainage District (the “Corporation”) has issued this request for qualifications (“RFQ1”) to invite interested parties to submit statements of qualifications (each a “Response”) with respect to the provision of a suitable technology for the processing of post-diversion municipal solid waste (“MSW”) in a new waste-to-energy (“WTE”) facility or facilities.

This RFQ1 is the first stage in what the Corporation anticipates will be a multi-stage competitive procurement leading to the award of a contract or contracts (as Design-Build-Operate-Maintain or Design-Build-Finance-Operate-Maintain contract(s)) for the construction of a new facility or facilities and, possibly, the provision of required land. The ownership and delivery models for the new WTE capacity have not yet been decided. The Metro Vancouver Board is expected to make these decisions in early 2013. Details of the models will be communicated in future procurement phases.

1.2 Eligibility to Participate in this RFQ1

Any entity that is either:

(a) the owner or licensee of a specific system (“WTE System”) that utilizes a WTE Technology (a “WTE System Vendor”); or

(b) represents or has a relationship with a WTE System Vendor,

(each a “Respondent”) may submit a Response to this RFQ1.

1.3 Qualified Respondents

The Corporation intends to review the Responses to select qualified Respondents (the “Qualified Technology Respondents”) who will be invited to participate in the next stage of a multi-stage competitive procurement process leading to the award of a contract or contracts for a new WTE facility or facilities as outlined in Section 2.3. Only the Qualified Technology Respondents selected under this RFQ1 will be invited to participate in any further stage of a competitive procurement process to select a successful proponent or proponents for the new facility or facilities.

1.4 Information Meeting

Any interested party is invited to an information session as follows:

Time: 1:00 – 3:00 PM on Wednesday, December 5, 2012

Location: 2nd Floor Boardroom, 4330 Kingsway, Burnaby BC

Page 63: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 2 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

Attendance is not mandatory but all Respondents will be deemed to have received all information provided at the session whether they attend or not.

1.5 Definitions

“Closing Time” has the meaning set out in Section 3.1.

“Contact Person” has the meaning set out in Section 5.1.

“Corporation” has the meaning set out in Section 1.1.

“Evaluation Committee” has the meaning set out in Section 7.1.

“Minimum Requirements” has the meaning set out in Section 2.1 of Appendix A – Response Content.

“MSW” has the meaning set out in Section 1.1.

“Plan” has the meaning set out in Section 2.2.

“Project” has the meaning set out in Section 2.1.

“Respondent” has the meaning set out in Section 1.2.

“Response” has the meaning set out in Section 1.1.

“RFP” has the meaning set out in Section 2.3.

“RFQ1” has the meaning set out in Section 1.1.

“RFQ2” has the meaning set out in Section 2.3.

“Qualified List” has the meaning set out in Section 7.6.

“Qualified Technology Respondent” has the meaning set out in Section 1.3.

“WTE” has the meaning set out in Section 2.2.

“WTE System” has the meaning in Section 1.2.

“WTE System Vendor” has the meaning in Section 1.2.

“WTE Technology” has the meaning set out in Section 2.2.

2. BACKGROUND

2.1 Required Facilities and Scope

The Corporation seeks to establish new WTE capacity through one or more facilities (the “Project”) to process approximately 370,000 tonnes annually of post-diversion MSW. The new WTE capacity may be

Page 64: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 3 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

developed through the siting and construction of either a single facility or multiple facilities. Additionally, the new WTE capacity may be located either in or out of the Metro Vancouver region.

2.2 Acceptable Technologies

The Corporation intends for the development of the new WTE facility or facilities to satisfy the Integrated Solid Waste and Resource Management Plan adopted by the Corporation’s Board on July 30, 2010 (the “Plan”). (See http://www.metrovancouver.org/about/publications/ Publications/ISWRMP.pdf to view the Plan.) The British Columbia Ministry of the Environment granted approval of the Plan on July 22, 2011.

The Plan states that WTE means:

“...any process that converts waste material to energy and heat, including the production of fuel which is subsequently combusted for these purposes”

and states that any process (each a “WTE Technology”) that meets this definition would be acceptable. The Corporation has identified the following potential WTE Technologies. The list should not be considered exhaustive:

(a) Gasification (i.e., conventional gasification, pyrolysis, or plasma-arc-gasification);

(b) Pyrolysis;

(c) Mass burn combustion;

(d) Modular mass burn or starved air systems;

(e) Mechanical biological treatment;

(f) Refuse-derived fuel production and combustion; and

(g) Hydrolysis/Fermentation.

2.3 Anticipated Competitive Procurement Process

The Corporation anticipates that the procurement process will be as follows:

Stage 1: This RFQ1 to identify the Qualified Technology Respondents as defined in this RFQ1.

Stage 2: Identify lands (public or private) that are potential sites for use by the Qualified Technology Respondents for the WTE facility or facilities, either as secured by a Qualified Technology Respondent or as potentially for offer by the land owner.

Stage 3: A second Request for Qualifications (“RFQ2”) that will invite responses to identify the combination of proposed technology, lands and team (comprised of one or more Qualified Technology Respondents plus additional team members as

Page 65: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 4 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

necessary to, for example, secure the preferred lands or provide long-term financing), for the design and construction of specific facilities on one or more sites.

Stage 4: A Request for Proposals (“RFP”) that will invite proposals from the Proponents that were short-listed from RFQ2, describing the design and price to enter into a contract or contracts for the WTE facility or facilities under a design-build-operate-maintain contract or a design-build-finance-operate-maintain contract. Although the Corporation has not yet determined the delivery model, it has applied to PPP Canada for project funding from the P3 Canada fund.

3. SUBMISSION REQUIREMENTS

3.1 Closing Time and Delivery Address

Responses must be received on or before 4:00 pm local time on the 4th day of January 2013 (the “Closing Time”) at the following location:

Purchasing & Mail Reception Metro Vancouver 5th Floor, 4330 Kingsway Burnaby, British Columbia V5H 4G8

The Closing Time will be established by the time shown on the clock used by the Corporation for that purpose.

It is the Respondent’s sole responsibility to deliver its Response to the delivery place set out in Section 3.1 prior to the Closing Time. The Corporation will not consider or accept any Response received after the Closing Time and will, upon request of the Respondent, return a late Response to the Respondent.

3.2 Faxed or Emailed Responses

Faxed or emailed Responses, or faxed or emailed amendments to Responses, will not be considered or accepted.

3.3 Number of Copies of Responses

Respondents should deliver six (6) copies of each Response, including one unbound clearly-marked original and an electronic readable version on CD or USB key, in a sealed package clearly marked on the outside with the RFQ No. listed on the cover page of this RFQ1 and the name of the Respondent to the delivery address as listed in Section 3.1.

All Responses should be in English.

4. ADDITIONAL INFORMATION ON THIS RFQ1

All subsequent information regarding this RFQ1, including changes made to this RFQ1, will be posted on BC Bid at www.BCBid.gov.bc.ca and the Metro Vancouver website at

Page 66: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 5 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

http://www.metrovancouver.org/bids/Pages/default.aspx. It is the sole responsibility of a Respondent to check these websites to be sure the Respondent has all available information before submitting a Response.

5. ENQUIRIES AND ADDENDA

5.1 Enquiries

All enquiries regarding this RFQ1 should be directed to the person listed below (the “Contact Person”):

Gary Mui, SCMP, CRM Metro Vancouver Purchasing Department 5th Floor, 4330 Kingsway Burnaby, BC V5H 4G8 Telephone: 778-452-2660 Fax: 604-432-6295 Email: [email protected]

5.2 Addenda

If the Corporation, in the Corporation’s sole judgment and discretion, determines that a clarification, addition, deletion or revision of this RFQ1 is required then the Contact Person will issue a written addendum which will be posted on BC Bid and the Metro Vancouver Website.

No written or oral advice, information, instruction or interpretation in any form other than issued addenda (whether provided by the Contact Person or other representative of the Corporation) will alter, affect or amend any provision of this RFQ1, or may be relied on in any way by a Respondent.

All questions regarding this RFQ1 should be submitted to the Contact Person by 04:00 PM local time on the 14th day of December, 2012.

6. RESPONSE CONTENT

6.1 Response

Responses should be submitted in the format described herein, and include the content as described in the appendices. A clear and concise presentation of information is encouraged.

6.2 Environmental and Social Practice Declarations

Respondents should complete, sign and include with its Response the Declaration of Environmental Practices attached as Appendix B.1 and Declaration of Social Practices attached as Schedule B.2.

6.3 Alternates

Respondents may submit more than one Response, each utilizing or based on a different WTE System, except that a Respondent may submit only a single Response for a given WTE System. Each such

Page 67: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 6 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

Response will be evaluated separately. Each Response should be complete, providing all the information requested in the appendices.

6.4 Execution

A Response should be signed by an authorized signatory of the Respondent.

7. EVALUATION

7.1 Evaluation Committee

The evaluation of Responses to identify the Qualified Technology Respondents will be carried out by a committee appointed by the Corporation (the “Evaluation Committee”). The Evaluation Committee may be assisted with the evaluation of Responses by other persons as the Evaluation Committee may decide it requires including other employees of the Corporation and third party consultants and advisors.

7.2 Disqualification

The Evaluation Committee will evaluate Responses and disqualify Responses:

(a) with a WTE System that fails to meet the Minimum Requirements as described in Section 2.1 of Appendix A; or

(b) that fail to receive a score of at least 60 of the available 100 points under Section 7.3.

7.3 Evaluation Criteria (total of 100 points)

The Evaluation Committee will evaluate and score those Responses that have satisfied the Minimum Requirements as described in Section 2.1 of Appendix A applying the following criteria and weighting:

(a) Technical Criteria: (total of 90 points)

(i) Reference Facilities: 50 points

The demonstrated viability of the proposed WTE System based on the information provided as requested in Section 2.2 of Appendix A with respect to the reference facilities listed. (The Evaluation Committee may adjust the points awarded if a listed reference facility operates in a jurisdiction where some or all of the pollutants regulated in British Columbia are not monitored, taking into account evidence that the proposed emissions control technology will, at a minimum, meet the referenced British Columbia Guideline.)

(ii) Applicability of Proposed WTE System to the Corporation’s Project: 25 points

The demonstrated suitability and reliability of the proposed WTE System to satisfy the Corporation’s needs for a new WTE facility or facilities, with particular reference to the information provided as requested in Section 2.3 of Appendix A, (including consideration of factors such as residuals remaining after

Page 68: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 7 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

energy recovery, form and quantity of energy and/or recovered heat, mass and energy balances, and site area requirements).

(iii) Description of the Respondent’s Team: 15 points

The demonstrated capability of the Respondent to deliver a new WTE facility or facilities that satisfy the Corporation’s requirements, with particular reference to the information provided as requested in Section 2.4 of Appendix A, (including qualifications, credentials and experience of the Respondent’s personnel).

While previous experience with the Corporation is not required and does not in any way confer an advantage, the Corporation’s previous experience with the Respondent, or a key member of a Respondent’s team, may be taken into consideration under this evaluation criterion. The Corporation reserves the right to rely upon its records, references and recollection in this regard. The Corporation may also obtain references other than those provided by the Respondent and may use these reference in determining greatest value.

(b) Sustainability Criteria: (total of 10 points)

Respondent’s described environmental and social impacts and practices as provided in response to Section 3.1 of Appendix A, including as provided in completed declarations as set out in Appendix B.1 and Appendix B.2.

Respondents should ensure that any information they wish to be evaluated in the context of this RFQ1 is clearly and completely expressed in the Response.

7.4 References

The Corporation may, at its election, contact the representative(s) of any reference facility listed in a Response and may elect to conduct a site visit of a listed reference facility. The Corporation may request the Respondent to advise the Corporation of key issues that reflect the unique features of the reference facility, in advance of a site visit to a reference facility.

7.5 Evaluation

To assist in evaluation of the Responses, the Evaluation Committee may, in its sole and absolute discretion, but is not required to:

(a) conduct reference checks relevant to the Project with any or all of the references cited in a Response to verify any and all information regarding a Respondent, inclusive of its directors/officers and key individuals, and to conduct any background investigations that it considers necessary, and rely on and consider any relevant information from such cited references and background investigations in the evaluation of Responses;

Page 69: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 8 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

(b) seek clarification of a Response from any or all Respondents and consider the resulting information in the evaluation of Responses; and

(c) request interviews/presentations with any, some or all Respondents to clarify any questions or considerations based on the information included in Responses, and consider any supplementary information from interviews/presentations in the evaluation of Responses.

7.6 Selection of Qualified Technology Respondents

The Corporation will identify a list (the “Qualified List”) made up of:

(a) Responses that are not disqualified under Section 7.2; and

(b) the WTE System on which each qualified Response is based.

For certainty:

(c) a Respondent will only be included on the Qualified List with respect to a specific WTE System; and

(d) a Respondent may be included on the Qualified List with respect to more than one WTE System.

7.7 Communication

The Corporation will endeavour to post the list of all Respondents on the Corporation’s website by 10:00 AM on the business day following the Closing Time. Only the Respondents’ names will be disclosed. All third party inquiries received after the Closing Time regarding the Responses will be referred to the Corporation’s website.

Only the Qualified Technology Respondents will be contacted after selection of the Qualified List. The Corporation has no obligation to communicate with any of the Qualified Technology Respondents’ team members. It is the responsibility of each Respondent to communicate with its team.

7.8 Notification of Qualified List

The Corporation will notify the Qualified Technology Respondents by sending a written notice to the Respondent’s representative. Notice in writing to a Respondent that it has been selected for the Qualified List will not constitute a contract nor give the Respondent any legal or equitable rights or privileges relative to the goods or service requirements set out in this RFQ1 or in any subsequent procurement stage with respect to the Project. Only if a Qualified Technology Respondent and the Corporation enter into a subsequent full written contract, as a result of a subsequent procurement stage with respect to the Project, will a Respondent acquire any legal or equitable rights or privileges.

Page 70: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 9 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

7.9 Debriefing

Unsuccessful Respondents wishing to be debriefed are encouraged to contact the Contact Person within 30 days of the website posting of the Qualified List.

8. GENERAL

8.1 No Obligation to proceed

This RFQ1 does not commit the Corporation in any way to select a Qualified List of any Respondents or proceed to any further procurement stage with respect to the Project and the Corporation reserves the complete right at any time (whether before or after Closing Time) to terminate this RFQ1 and proceed with the Project in some other manner. In addition the Corporation reserves the right to amend the procurement process described in Section 2.3.

8.2 Reservation of Rights

The Corporation reserves the right, in its discretion, to:

(a) amend the scope of the Project, and/or modify, suspend or terminate this RFQ1 or the Project at any time for any reason and reissue a request for qualifications, request for proposals or undertake another procurement process for the same or similar scope of services or work relating to the Project;

(b) waive a defect or irregularity in a Response and accept that Response;

(c) reject, disqualify or not accept any or all Responses without any obligation, compensation or reimbursement to any Respondent or any of its team members;

(d) extend, from time to time, any date, time period or deadline provided in this RFQ1 by addendum.

8.3 Respondent’s Expenses

Respondents are solely responsible for their own expenses in preparing and submitting Responses, and for any meetings, negotiations or discussions with the Corporation or their representatives and consultants relating to or arising from this RFQ1.

8.4 Conflict of Interest

(a) The Respondent declares that it and its team members have no pecuniary interest in the business of any third party that would cause a conflict of interest or be seen to cause a conflict of interest in carrying out the contract contemplated under the RFP. Should such an interest be acquired during the term of the contemplated procurement process, the Respondent shall declare it immediately in writing to the Corporation. If the Respondent does declare a conflict of interest the Corporation may direct the Respondent to resolve the conflict of interest to the Corporation’s satisfaction.

Page 71: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 10 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

(b) Specifically, Respondents should declare potential conflicts of interest with the following:

The Corporation The Greater Vancouver Regional District The Greater Vancouver Water District

Any director, officer or employee of the Corporation, the Greater Vancouver Regional District or the Greater Vancouver Water District

Jeremy O’Brien, P.E. O’Brien Environmental, LLC (Third Party Expert) Dr. Tom Pedersen, University of Victoria (Third Party Expert)

Dr. Paul Gully (Third Party Expert) Dr. Michael Brauer, University of British Columbia (Third Party Expert) Jane Shackell or Miller Thomson LLP (Fairness Advisor) HDR Corporation (Consultant) Deloitte & Touche LLP (Consultant) Morrison Hershfield (Consultant) RWDI Air Inc. (Consultant) LR Power Solutions Inc. (Consultant) Intrinsik Environmental Sciences, Inc. (Consultant)

(c) Respondents and their team members may not retain or consult with any of the named parties in Section 8.4(b) over the duration of the contemplated procurement process, with regard to the Project.

(d) A Response will not be evaluated if the Respondent’s (or the Respondent’s team’s) current or past corporate or other interests may, in the Corporation’s opinion, give rise to a conflict of interest in connection with this RFQ1.

8.5 Confidentiality

All information received by any Respondent through participation in this RFQ1 is confidential and may not be disclosed without the prior written authorization from the Contact Person. Respondents should be aware the Corporation is a “public body” defined by and subject to the Freedom of Information and Protection of Privacy Act (British Columbia). Pursuant to such Act, the Corporation will endeavour to keep all Responses (and their contents) confidential.

8.6 Publicity

Respondents should not make any public releases or announcements or issue any advertising pertaining to this RFQ1 or their involvement with this RFQ1. All media enquiries should be referred to the Corporation’s Communications Department.

8.7 Solicitation

(a) The Respondent and its team members may not make any representations or solicitations to any director, officer or employee of the Corporation with respect to the RFQ1 either before or after submission of the Response except as expressly provided herein. If any director, officer, employee, agent, sub-contractor, supplier or other

Page 72: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 11 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

representative of the Respondent communicates with any director, officer or employee of the Corporation / Greater Vancouver Regional District, any consultant engaged by the Corporation in connection with this RFQ1 about this RFQ1, or members of the Third Party Expert Panel, other than the Contact Person, the Corporation shall have the unfettered right, regardless of the nature of the communication, to reject the Response submitted by the Respondent.

(b) Respondents, their team members, or anyone involved in preparing their Response must not engage in any form of political or other lobbying whatsoever with respect to the Project or seek to influence the outcome of this qualification process. This anti-lobbying restriction, where lobbying is defined as any attempt to influence decisions or decision-makers, applies to Respondents seeking to participate in subsequent phases of the procurement process described herein and extends to all members of the Corporation’s Board, the Board of the Greater Vancouver Regional District and the Greater Vancouver Water District, the Corporation’s Zero Waste Committee, the Corporation/Greater Vancouver Regional District’s employees, the Corporation’s consultant team, the elected councils and employees of the Corporation’s members, their respective appointees, the Third Party Expert Panel, the BC Environmental Assessment Office, and Ministry of the Environment. In the event of any such lobbying, the Corporation may reject any Response by that Respondent without further consideration and terminate that Respondent’s right to continue in the procurement process. All correspondence or contact by interested parties with the Corporation must be direct and only with the Contact Person.

(c) It should be duly noted by all Respondents that this anti-lobbying restriction extends from the release date of this RFQ1 through to the date and time when the Corporation formally awards the contract, i.e., after the RFP evaluations and award. Any lobbying undertaken during this timeframe by any Respondent or their team members, or anyone involved with their Response may result in immediate disqualification from the process. This anti-lobbying restriction applies to respondents seeking to participate in subsequent phases of the procurement process described herein and is not meant to affect the day-to-day operations of the parties listed in section 8.7 (b).

(d) Notwithstanding the aforementioned requirements, the Respondent is hereby advised that the procurement process is envisioned to include a stage during which the Qualified Technology Respondents will engage in direct communications with some members of the Corporation and/or others listed in section 8.7(b). Following the identification of sites in Stage 2 of the process, the Corporation anticipates Stage 3 will include a time during which the Qualified Technology Respondents will be advised to engage in discussions with representatives of the sites identified during the Stage 2 solicitation for site owners, and possibly elected officials, municipal staff from potential host municipalities and/or the BC Environmental Assessment Office and the BC Ministry of Environment. Prior to the implementation of Stage 3, the Corporation will provide a protocol for discussions in this phase of the process.

Page 73: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS INSTRUCTIONS FOR RESPONDENTS GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 12 of 12

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technology

This Section 8.7 shall not be intended to disallow any meetings, interviews or clarifications requested or authorized by the Corporation, the Contact Person, or any authorized designate as expressly permitted by this RFQ1.

Page 74: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX A RESPONSE CONTENT GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 1 of 5

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

APPENDIX A RESPONSE CONTENT

1.0 GENERAL CONTENT

1.1 Title Page

Respondents should include a title page to their response package that includes the following information: The RFQ # referenced on the cover page; the title “RFQ1 for Waste-to-Energy Technologies; Respondent name; address; telephone number; fax number; and email address for the contact person.

1.2 Letter of Introduction

Respondents should include a short letter introducing the Respondent and signed by a person(s) authorized to sign on behalf of the Respondent.

1.3 Table of Contents

Respondents should include a table of contents with page numbers.

1.4 General Corporation Description

Responses should include a general corporate description of the Respondent, a description of the Respondent’s team members (if any) and a description of the relationships between the Respondent’s team members (if any).

1.5 Length of Response

If a Response includes information such as resumes, brochures and other items of relevance, such information should be attached as tabbed appendices to the Response.

2.0 TECHNICAL CONTENT

2.1 Minimum Requirements

Each Response must identify one (1) reference facility in respect of the WTE System identified in the Response that meets the minimum requirements set out below. Provide evidence that the reference facility:

(a) has the proven capability of processing a minimum 25,000 tonnes of MSW over a continuous 12 month period, in the past five calendar years;

(b) has the proven capability of processing post-diversion MSW with a higher heating value (HHV) equivalent to the Corporation’s MSW (11.8 GJ/t), plus or minus twenty-five percent (25%);

Page 75: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX A RESPONSE CONTENT GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 4 of 5

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

(c) has operated at an availability of no less than 80%, calculated by dividing the minutes per year of operating time (when the system was operating at greater than 50% of its rated capacity) in a calendar year by the total number of minutes in a calendar year;

(d) has the capability, based on actual operating data from the reference facility, to meet the European Union R1 Energy Efficiency Formula (EU Directive 2008/98/EC on Waste) requirements to achieve an energy recovery efficiency factor of greater than or equal to sixty-five percent (>=65%); and

(e) generates residuals to be disposed in a landfill that do not exceed a maximum of thirty percent (30%) by weight of the initial post-diversion MSW received at the reference facility,

(collectively, the “Minimum Requirements”).

A Response with a WTE System that fails to meet all the Minimum Requirements will be automatically disqualified from further consideration.

2.2 Reference Facility Information

In addition to the reference facility described for the purposes of satisfying the Minimum Requirements, a Respondent may include in its Response up to two (2) additional reference facilities in respect to the WTE System identified in the Response. The Response should describe the reference facilities, including all the information requested in Appendix D (D.1, D.2, D.3, and D.4) and the following information:

(a) Provide a description of the number of processing lines at each reference facility and the components that make up each line in the reference facility (e.g., pre-processing or separation equipment; furnace, boiler, digester, reactor; energy production units; air pollution control or fuel gas clean-up equipment) as per Appendix D.1.

(b) Provide a description and supporting documentation (including operating data described herein, plans, piping and instrumentation drawings and mass/energy balances) of the design and operations of at least one reference facility, as per Appendix D.2.

(c) Provide feedstock composition data for all of the feedstocks accepted and processed by each reference facility to demonstrate that the feedstock is similar in composition to the Corporation’s post-diversion MSW stream, as per Appendix D.3.

(d) Provide evidence in the form of actual operating data that demonstrates the reference facility’s annual capacity factor (percent of actual tonnes processed compared to the design capacity).

(e) Demonstrate that each reference facility has met the emission levels set forth in the British Columbia Guideline for Emissions of Municipal Solid Waste Combustion (http://www.env.gov.bc.ca/epd/industrial/factsheets/ pdf/combustion-msw.pdf) by completing the form in Appendix D.4 for each reference facility.

Page 76: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX A RESPONSE CONTENT GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 3 of 5

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

(f) Describe the mitigation measures or improvements that were performed in the communities neighboring the reference facility that addressed the health and other consequences of traffic, noise, aesthetics, social or economic impacts, if any.

(g) Describe and provide documentation for the types and quantities (e.g., percent by mass of total throughput or actual quantities) of by-products and residuals, including hazardous and non-hazardous materials generated by each reference facility. Provide test results that demonstrate solid and liquid residuals from each reference facility with respect to their designation as non-hazardous materials (e.g., Toxicity Characteristic Leaching Procedure [TCLP] results).

(h) Provide documentation of the type and quantity of marketable by-products recovered from each reference facility, including but not limited to electricity, thermal energy, fuel, ferrous and non-ferrous metals, chemicals, or other materials or products.

(i) Provide the contact name and contact information of each reference facility representative, host community representative, and regulatory agency representative who can be contacted in order to verify, as necessary, information pertaining to the reference facility and the Respondent’s team.

2.3 Application of Proposed WTE System to the Corporation’s Project

Each Response should include a description of how the proposed WTE System is envisioned to be applied to the Corporation’s solid waste management system, including any differences between the listed reference facility or facilities and the concept proposed for the Corporation, as follows:

a) A description of the design basis for the use of the proposed WTE System to receive and process post-diversion MSW, as well as produce energy and other products from its MSW, including any waste pre-processing requirements.

b) A description of the correlation of the proposed WTE System to the reference facilities, including the scale-up factors that will be required.

c) A mass and energy balance using the form in Appendix E.1 that shows all process inputs and outputs based on the proposed WTE System. Stipulate the proposed processing throughput in terms of tonnes per day of the Corporation’s port-diversion MSW.

d) A description of the type and quantity of energy and/or products that would be produced and recovered.

e) A description of the recovery of marketable and/or beneficial use products such as metals and other materials from the process residues or material streams.

g) The minimum site area requirements for a single facility capable of processing the quantities of post-diversion MSW stipulated in Appendix E.2 using the proposed WTE System. Consideration should be given to landscape buffers, employee and visitor

Page 77: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX A RESPONSE CONTENT GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 4 of 5

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

parking, administration buildings, a community engagement or visitor centre, weigh scales, onsite roads, and other similar features, characteristics or requirements. Appendix E.2 contains a table to be completed in response to this question.

h) A description and generalized process flow drawings of the proposed WTE System, ancillary infrastructure requirements, major facility components, design or architectural elements, processing rates for processing lines, facility scalability, and other information that can demonstrate how the proposed facility would provide an effective solution for the Corporation.

i) A description of how the proposed facility or facilities will exceed the environmental compliance requirements of the British Columbia Ministry of the Environment (e.g., air pollution control equipment). The exact emission requirements and vendor guarantees will be determined prior to Stage 4 [RFP] of the procurement.

j) A description of how the proposed facility or facilities will provide flexibility to be expandable or use modular units to increase capacity to meet possible future demand.

k) Provide a list of atypical MSW material streams that could be handled at the proposed facility or facilities, but may require special handling or processing. Also identify any non-MSW materials that the proposed technology could process. See Table C3 for a listing of materials that the existing Metro Vancouver WTE facility processes.

2.4 Description of the Respondent

The Response should describe the capability of the Respondent’s team to develop and operate a facility or facilities that at a minimum meets the Minimum Requirements described in Section 2.1.

Such capability should include a description of the key personnel and their credentials and experience with the development and operation of other WTE facilities, as well as their roles with respect to the reference facilities described in the Response. Please include an organizational chart illustrating the roles and hierarchy of the Respondent’s team.

Qualified Technology Respondents will not be permitted to substitute their WTE System Vendor at later stages of the procurement process.

3.0 SUSTAINABILITY

3.1 Environmental and Social Practice Declarations

A Respondent should complete and include with a Response a completed Declaration of Environmental Practice and a completed Declaration of Social Practice in the form set out in Schedule B.1 and B.2 respectively.

Respondents are encouraged to submit all applicable evidence and information regarding their organizations’ environmental and social programs, initiatives and policies, and to list the resulting social and environmental impacts. Specifically the Corporation is looking for quantifiable impacts that result from the Respondents’ sustainable initiatives, programs and policies. Responses that disclose the

Page 78: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX A RESPONSE CONTENT GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 5 of 5

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

metrics as well as the dates that the impacts were realized and measured are preferred over those that do not.

For illustrative examples of sustainability submissions, please visit: http://www.metrovancouver.org/bids/Pages/default.aspx (go to metrovancouver.org, select ‘Services’, select ‘Bidding Opportunities’ and link to the document entitled ‘Sustainability Impacts and the Evaluation of Proposals’ .

4.0 OTHER CONTENT

Respondents may include in a Response any other material the Respondent decides is of relevance to the Respondent’s Response.

Page 79: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX B.1 DECLARATION OF ENVIRONMENTAL PRACTICES GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 1 of 1

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

APPENDIX B.1

DECLARATION OF ENVIRONMENTAL PRACTICES

The Corporation expects that each Respondent has and will comply with any applicable legislation pertaining to the environment. In Canada this includes but is not limited to: Canadian Environmental Protection Act, 1999 (Canada), Fisheries Act (Canada), Transportation of Dangerous Goods Act (Canada/BC), Environmental Management Act (BC), GVS&DD Municipal Solid Waste and Recyclable Material Bylaw, GVRD Air Quality Management Bylaw and GVS&DD Sewer Use Bylaw, as amended from time to time.

I declare on behalf of, _____________________________________________________________ that: (Corporate Name of Respondent)

1) The Respondent, or any person who currently holds or has, at any time within the past three years, held the following positions or titles with the Respondent: Officer, Director or Senior Manager, has not been convicted or subject to a determination by a regulatory body, administrative body or other tribunal having jurisdiction over the Respondent, of a violation, within the past three years, under the legislation applicable to the Respondent, other than those set out in the table below:

Title of act or Bylaw Date of violation and

regulatory/adjudication body Description of violation or conviction

Regulatory/Adjudication body document file number

2) All the information contained herein is true, accurate, and complete, and I understand that a false declaration may result in the disqualification of the Response from consideration or termination of the resulting contract, without any cost or penalty to the Corporation.

3) I am authorized by the Respondent to sign this declaration, and to submit with the Response, on behalf of the Respondent.

Additional numbered pages outlining this portion of the Response may be attached to this page and/or separate documents listed above may be submitted with this declaration.

_______________________________________________ Authorized Signatory of Respondent

_____________________________ Date

Page 80: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX B.2 DECLARATION OF SOCIAL PRACTICES GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 1 of 1

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

APPENDIX B.2

DECLARATION OF SOCIAL PRACTICES

The Corporation expects that each Respondent has and will comply with internationally recognized labour conventions and recommendations of the International Labour Organization (ILO), of which Canada is a member, and any applicable legislation pertaining to the work place safety, employment and human rights. In Canada this includes but is not limited to: the Corruption of Foreign Public Officials Act (Canada), Human Rights Act (BC), the Employment Standards Act (BC) and the Workers’ Compensation Act (BC), as amended from time to time.

I declare on behalf of, _____________________________________________________________ that: (Corporate Name of Respondent)

1) The Respondent, or any person who currently holds or has, at any time within the past three years, held the following positions or titles with the Respondent: Officer, Director or Senior Manager, has not been convicted or subject to a determination by a regulatory body, administrative body or other tribunal having jurisdiction over the Respondent, of a violation, within the past three years, under the legislation applicable to the Respondent, other than those set out in the table below:

Title of act or Bylaw Date of violation and

regulatory/adjudication body Description of violation or conviction

Regulatory/Adjudication body document file number

2) All the information contained herein is true, accurate, and complete, and I understand that a false declaration may result in the disqualification of the Response from consideration or termination of the resulting contract, without any cost or penalty to the Corporation.

3) I am authorized by the Respondent to sign this declaration, and to submit with the Response, on behalf of the Respondent.

Additional numbered pages outlining this portion of the Response may be attached to this page and/or separate documents listed above may be submitted with this declaration.

_______________________________________________ Authorized Signatory of Respondent

_____________________________ Date

Page 81: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX C THE CORPORATION’S WASTE COMPOSITION GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 1 of 2

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

APPENDIX C – THE CORPORATION’S WASTE COMPOSITION

Table C1: Historical Waste Composition

Waste Category Historical Waste Composition - Weight %

1995 1998 2001 2004 2007 2009 2010

Metals 2% 3% 5% 4% 4% 5%

Glass 4% 3% 2% 1% 2% 2% 3%

Inorganics & E-Waste 4% 3% 7% 7% n/a 8% 12%

Paper & Paperboard 40% 32% 24% 19% 24% 21% 15%

Plastics 10% 14% 11% 9% 14% 12% 11%

Yard & Food

21% 37% 44% 45% 41% 44% 49% Wood

Mixed Organic Composites

Household Hygiene n/a 4% 4% 3% 4% 3% 4%

Table C2: Anticipated Future Waste Composition and Heating Value

Waste Category Moisture Content

Heating Value (GJ/t)

Composition of Waste %

55% Diversion

70% Diversion

80% Diversion

Metals 0% 0.7 3% 3% 3%

Glass 0% 0.2 1% 2% 2%

Inorganics & E-Waste 8% 1.8 10% 11% 10%

Paper & Paperboard 24% 16.4 19% 18% 17%

Plastics 8% 34.9 15% 18% 16%

Yard & Food 64% 14.7 33% 24% 23%

Wood 15% 17.1 9% 11% 13%

Mixed Organic Composites 12% 20.0 4% 5% 6%

Household Hygiene 25% 15.1 6% 8% 11%

Total % moisture 31% 26% 26%

Heating Value (GJ/t) 11.8 12.8 12.7 Note: The current diversion rate is 55%, meaning 55% of the total waste stream is reused or recycled. The targeted diversion rate for 2015 is 70%, with an aspirational goal of 80% diversion in the future.

Page 82: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX C THE CORPORATION’S WASTE COMPOSITION GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 2 of 2

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

Table C3: List of materials the Corporation’s existing WTE facility located in Burnaby processes that require special processing or handling

i. Bar screenings from the Corporation’s waste water treatment plants

ii. Materials confiscated by the Royal Canadian Mounted Police and Canadian Border Services wastes

iii. International airline and marine wastes (galley waste only)

iv. Cruise ship wastes Detailed 2011 Metro Vancouver waste composition data and the 2010 Metro Vancouver Solid Waste Annual Report can be found by following the following links:

http://www.metrovancouver.org/about/publications/Publications/2011_Waste_Composition_Report.pdf

http://www.metrovancouver.org/about/publications/Publications/2010_Solid_Waste_Management_Annual_Summary.pdf

Page 83: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX D REFERENCE FACILITY DATA GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

Appendix D – Reference Facility Data

Page 84: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX D.1 INFORMATION REQUEST FOR REFERENCE FACILITY GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 1 of 2

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

Appendix D.1 Information Request for Reference Facility

Operating Data Reports

Index Data requested [units] (notes) Quantity (write-in below and attach detailed reports to validate)

1. Tonnes received and processed [tonnes]

2. LHV or HHV data or calculations [GJ/t]

3. Steam quantity [kg/hr] (if applicable)

4. Syngas quantity [kg/hr] and LHV [GJ/t] (if applicable)

5. Residue and/or by-products generation data [tonnes by material stream]

6. Metals recovery data [tonnes/yr] (ferrous and non-ferrous, if applicable)

7. Special waste delivery records [tonnes] (if any)

8. Gross and Net Electricity generation [MW/hr] (if applicable)

9. Fuel generated (if applicable)

10. Major equipment downtime [hrs] (waste conversion equipment, boilers, turbine, engines)

Page 85: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX D.1 INFORMATION REQUEST FOR REFERENCE FACILITY GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT Page 2 of 2

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

Operation and Maintenance Records

Index Data requested (notes) Quantity (populate below and attach detailed reports to validate)

11. Chemical reagent and utility (e.g., auxiliary fuel) usage records

(attach separately)

12. Major equipment replacement schedules

(attach separately)

13. Mobile equipment inventory list (attach separately)

14. Manpower/personnel list/staffing schedules

(attach separately)

Environmental Compliance Data (2007-2012)

Index Data requested [units] (notes) Quantity (populate below and attach detailed reports to validate)

15. Current permit limits (attach separately)

16. Stack Test Reports (attach separately)

17. Any emissions exceedance reports or Notices of Violations (NOVs)

(attach separately)

18. Ash and/or other Residual(s) Testing/Characterization Reports

(attach separately)

Page 86: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX D.2 MASS BALANCE FOR REFERENCE FACILITY GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

Appendix D.2 Mass Balance for Reference Facility

Page 87: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX D.3 FEEDSTOCK COMPOSITION DATA FOR REFERENCE FACILITY GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

Appendix D.3 Feedstock Composition Data for Reference Facility

Reference facility feedstock composition.

Waste Category* Composition of Waste (% by weight)

Metals

Glass

Inorganics & E-Waste

Paper & Paperboard

Plastics

Yard & Food

Wood

Mixed Organic Composites

Household Hygiene

*Detailed breakdown of categories can be found in referenced spreadsheets listed as hyperlinks at the bottom of Appendix C

Page 88: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX D.4 ENVIRONMENTAL PERFORMANCE FOR REFERENCE FACILITY GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

Appendix D.4 Environmental Performance for Reference Facility

Provide actual emissions from the reference facility for the air pollutants shown in

Table 2.D-1.

Table 2.D-1. Reference facility pollutants actual emissions table.

Pollutants Units

Actual Emissions

Daily Average ½ Hour Average

Total Particulate Matter (TPM) mg/m3 @ 11% O2

Carbon Monoxide (CO) mg/m3 @ 11% O2

Sulphur Dioxide (SO2) mg/m3 @ 11% O2

Nitrogen Oxides (NOx as NO2) mg/m3 @ 11% O2

Hydrogen Chloride (HCl) mg/m3 @ 11% O2

Hydrogen Fluoride (HF) mg/m3 @ 11% O2

Total Organic Carbon mg/m3 @ 11% O2

Cadmium (Cd) μg/m3 @ 11% O2 N/A

Mercury (Hg) μg/m3 @ 11% O2 N/A

Sum of Lead (Pb), Arsenic (As), Chromium (Cr)

μg/m3 @ 11% O2 N/A

Chlorophenols μg/m3 @ 11% O2 N/A

Chlorobenzenes μg/m3 @ 11% O2 N/A

Polycyclic Aromatic Hydrocarbons μg/m3 @ 11% O2 N/A

Polychlorinated Biphenyls μg/m3 @ 11% O2 N/A

Total Dioxins and Furans (as PCDD/F TEQ) ng/m3 @ 11% O2 N/A

Opacity % N/A

TABLE 2.D-1 NOTES: Concentration units: Mass per reference cubic metre corrected to 11% oxygen. Reference conditions: 20°C, 101.3 kPa, dry gas N/A = Not Applicable

Page 89: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX E.1 MASS BALANCE FOR PROPOSED FACILITY GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

Appendix E.1 Mass Balance for Proposed Facility

Page 90: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

REQUEST FOR QUALIFICATIONS APPENDIX E.2 SITE AREA REQUIREMENTS FOR PROPOSED FACILITY GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT

RFQ No. 12-209 RFQ1 for Waste-to-Energy Technologies

Appendix E.2 Site Area Requirements for Proposed Facility

Please supply the estimated area required for the graduated levels of throughput capacity for use in the application of the technology proposed for the Corporation.

Annual throughput capacity Minimum Site Area Required (hectares)

25,000

50,000

150,000

250,000

370,000

Page 91: By Courier Jim Hofweber, Executive Director MI o’d.s DLD ......I am writing with reference to the Minister’s letter of July 22, ... Jim Hofweber, Executive Director Environmental

7389951

DRAFT – High Level Potential Site Evaluation Criteria for New Waste-to-Energy Capacity for Metro Vancouver The following initial high level criteria were identified in Metro Vancouver’s Integrated Solid Waste and Resource Management Plan and in the October 2012 Zero Waste Committee report on the new WTE capacity procurement process: 1. Site size

Required site size for a WTE facility depends on a number of variables including: technology, waste quantity processed, number and type of vehicles received at the facility, residual processing requirements, and, buffer areas.

The existing WTE facility in Burnaby processes approximately 285,000 tonnes per year of waste delivered by garbage trucks (no small vehicles) on an approximately 2 hectare site. This site is considered small based on the amount of waste processed with limited buffer area and space for upgrades and ancillary activities.

2. Air quality implications

A screening-level air quality analysis will be conducted of the proposed sites for their suitability to host a WTE facility up to the maximum size considered in the procurement process (370,000 tonnes/year). The analysis will include consideration of any direct emissions from the facility, as well as emissions associated with transportation of materials to and from the facility.

3. Allowed and neighbouring land uses

In North America, WTE facilities are typically located in heavy industrial areas. In Europe and Asia, WTE facilities are often located adjacent to commercial and residential areas to minimize transportation requirements and maximize opportunities for heat use.

4. Transportation logistics and impacts

Waste is typically delivered to WTE facilities by truck, but could be delivered by rail or barge. For transportation purposes, if WTE facilities are located close to waste generators, the waste may be delivered directly from source to facilities without requiring transfer facilities. Sites will be evaluated for transportation logistics as well as community impacts of transportation systems.

5. Suitability for district energy

Depending on the technology, locating a WTE facility near potential heat customers may provide the opportunity to develop a district energy system. A district energy system could provide economic opportunities for the host community, and reduce the overall environmental impact of the WTE facility and district energy system by displacing natural gas normally combusted for heat by those customers.

6. Cost/option cost (the cost to Metro Vancouver to option a potential site to ensure its availability)

Landowners will have the opportunity through a public process to offer sites for potential use for new WTE capacity. Offers will be based on options to purchase by Metro Vancouver. The cost/option cost of the potential sites will be included in the evaluation criteria to determine which sites to shortlist for subsequent procurement stages.