Build safety against flooding withNature
From concepts to practical BwN solutionsApril 2011
Mindert de Vries
Specialist eco-engineering at DeltaresProfessor Building with Living Nature Hogeschool Zeeland
Building with Naturechallenge =
Building with Naturechallenge =
use the
dynamics and services of the ecosystem
to
realize safety, function combinationswith economic feasibility
use the
dynamics and services of the ecosystem
to
realize safety, function combinationswith economic feasibility
Building with nature by reef, marsh, dune creation andhard structures….
Not safe enough?
safe
Long term safety:Marshes growwith SLR
safe
reefs
marshes
Marshland kwelders
Foto paesens-moddergat
Effective low costlow tech saltmarshproduces safety& large natural value
Dutch historical large scale land reclamation =building with nature
Delivers continuum of concepts and designsmulti partner, multi system
Soft solutions Hybrid hard-soft mix Hard solutions
more space, more BwN, no dikemore flexible, cost-effective (?)
less space, more BfN, more dikeless flexible, extra investment
forest-dike combi
Wadden SeaMarkermeer/Friese
IJsselmeerkust
Rich ‘Levees’Oosterschelde!
non
tidal
/ tid
al
oysterreef-dike combi
Examples of practical solutions 2007-2010
• They are generic and practical,• They are cost-effective,• They fit within legal constraints.• They have been realized with numerous partners from
government, engineering and construction andresearch organizations
• Main sponsors: RWS-WINN, Ecoshape consortium
Examples of soft solutions 2009-2010
Vegetatie als golfremmer
Debate:•Technical feasibility•Cost-benefit•Conflict with Natura 2000
Scale 500m wide30km long
Saltmarsh grows with sea level and maintains stability and safetyFlexible, low tech, low maintenance cost, longshore connectivity
LakeIJsselmeer
Afsluitdijk
WaddenSea
Wave reducingsaltmarsh
Super stormstable vegetated
dune
WaddenWadden SeaSea Soft SafeSoft Safe DikeDike: saltmarsh/: saltmarsh/dunedune//dikedike hybridhybrid
Existing dike
2010, HHNK, RWS-WD, Deltares, Haskoning: ‘bankdike’,soft safe green flexible dike
50m wide, many km, large wave reduction, high nature value, along lake shore
Nature developmentwith longshore connectivity andregional relevance depth and material variations
along and perpendicular tothe dike create diversity,enhanced by natural settlingand compaction.
Examples of hybrid hard-soft solutions 2007-2010
2010, Ecoshape: foreshore protection with reeflarge scale oyster reef experiment (2x 200m x 20m)
Reduce erosion of intertidal areasin Eastern Scheldt
2009 RfR programme NoordwaardWavereducing forest-dike combi ‘fort Steurgat’
Deltares/RWS concept achievesrequired 1/2000 safety standards andwill be constructed before 2015
Wave reducingwillow-tree plantationsLow cost low tech
Clay dikewill be lower thantraditional design
100m wide
Application: Floating wavereducing marsh, Houtribsinking marsh for Zeeburg, EVZ (NMIJ, gem Amsterdam)
We need an improved floating design!
Dare to try!
Examples of hard solutions 2007-2010
2007-2010 Rich Revetment ‘Rijke Dijk’ pilots
1. IJmuiden2. Haven van Rotterdam3. Oosterschelde4. Westerschelde
1
2
3
4
Hula’s in the harbour of Rotterdam(Deltares, HbR, EcoConsult)
Monitoring shows that biomass enbiodiversity is enhanced a lot whencompared to smooth structures.Wave action in a harbour can be a problemthat is reduced by using the hanging hulastructures.
Applications: Rijke Dijk Maasvlakte 2
Applications: underwater forests harbors
Application beyond pilot scale
monitor,analyzeand adapt
5-10yrcycle?
Cyclic approach with co-operating partnersis effective, urgent need for more pilots and applications
Conceptualdesign
Pilotsmall scale
Real scaleapplication
Testproof principle
systemmanagers
researchers consultantsbuilders
incentives &alliances
Approach and process: integrate thinkers, do’ers andmanagers, stimulate interactions
RijkswaterstaatWater BoardsProjectbureau ZeeweringenRoom for River NoordwaardPort of RotterdamHeijmansBAM-infraSMITSHELLHogeschoolZeeland
Ecoshape consortium
(Van Oord, Boskalis, DHV,Arcadis, Witteveen en Bos,Imares, Deltares)
NIOO-CEME
RUNijmegen
TU Delft
UTwente
Vandermeerconsulting
Ecoconsult
GiMaRis
Dare to Share!
Research must go on, we want proof of principle andpredictive capability
New thinkers and do-ers: The next generation beingtrained at Delta Academy in Zeeland
Building with Nature projects overview
2009
2008
2007
USA!?SNG
The Netherlands are leading ineco-engineering applied forsafety against flooding
2010
Linked to WWF/Conservation International
Green Adaptation concepts:
• make use of ecosystem functioning to enhancesafety, food and freshwater security, andprotect livelihoods
• include and enhance ecosystem functions in anintegrated approach to adapt to climatethreats
We can build cost-effective safety with nature!
Need for different thinking and different acting = GreenAdaptation
• What can the project do for the ecosystem, what can theecosystem do for the project? Think beyond compensation andmitigation;
• Allow dynamics and accept site specific nature of the BwNsolutions;
• Think in cycles and allow adaptive designs and management;• Accept and manage involvement of new parties into the
development, implementation and maintenance process;• Provide adequate training, tools, guidelines and protocols;• SLR/Climate Change: We have time and space to work with nature
and increasing knowledge/experience: use it!