Butte Silver Bow Transportation Development Plan Update

Lisa Ballard, P.E.Barb BeckKimberly Brown

1

Page 2: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

Project Goal/Purpose

• Assessment of existing services and guidance over five years• Project advisory

committee • Census data• Focus groups and

interviews• Rider and community

surveys• Drivers and BSBT

management• Ridership and budget data 2

Page 3: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

Public Transportation is vital to Butte-Silver Bow…

• Access to jobs, school, medical facilities, shopping, and recreation

• Part of a multi-modal network that can enhance livability

3

Page 4: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

… and the community supports transit

4

Page 5: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

BSBT compares well to other Montana systems

5

Ridership (FY10)

Mileage (FY10)

Population (2009 city

limits)

Rides per Capita

Rides per Mile

Bozeman 238,800 393,165 39,282 6.1 0.6Helena 149,521 364,155 29,939 5.0 0.4Butte (total)

123,817 201,145 32,949* 3.8 0.6

Fixed Route

110,356 (89%)

157,085 (78%)

Big Sky Local

60,690 90,675 1,148 52.9 0.7

Kalispell 58,271 181,274 19,927 2.9 0.3

Page 6: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

Issues identified

• Improve on-time performance• Later service and more weekend service desired• Respect and understand needs of people with disabilities• Energize system with improved marketing and

coordination• Options constrained by budget

6

Page 7: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

Five Year Goals

• Increase ridership and community support for BSBT• Maximize coordination to benefit riders• Practice sound financial management

7

Page 8: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

Short Term Objectives

• Designated stops with signs, schedules• Adjust schedules to improve on-time performance• Adjust routes to better serve traveling public needs• Hire a mobility manager to focus on rider needs and

coordination• Consider creating an Urban Transportation District

8

Page 9: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

9

MT

375

2

Cobban St

N

Ma

i n S

t

Ro

we R

d

S M

ain

St

Grand Ave S

Mo

nta

na

St

Co

nti n

en

tal D

r

Dewey Blvd

Hil

l A

ve

W I ron St

Ore

go

n A

ve

E 2Nd S t

C e n t ennial Ave

S E

xc

els i

or

Av

e

W Gran ite St

E Park St

Te

xa

s A

ve

W Daly St

Ca sey S t E

Front St

N

Em

me

tt A

ve

Ir ene St

Le

xin

gto

n S

t

Ha

r ri s

on

Av

e

Har rison A

ve

Co

nti

ne

nt a

l D

r

Transfer Station

0 1 20.5 Miles

Legend

Harrison- Montana Tech Route

Walkerville- Harrison Route

Oregon- Racetrack Route

Service Route

Page 10: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

10

Walkerville/ Racetrack

31%

Montana St/ Oregon Ave

17%

Montana Tech/ Harrison

42%

Service Route10%

Ridership by Route (CY 2010)

Page 11: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

Annual Ridership

1119971998

19992000

20012002

20032004

20052006

20072008

20092010

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

Annual Ridership

Page 12: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

12

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000Ridership by Category Over Time

ElderlyDisabledStudentCommuterD&L

Annu

al R

ides

Page 13: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

Proposed Routing Changes

• Goal – adjust service to demand within budget• Consider suggestions as starting point• Needs to be timed and refined in winter conditions after

completion of Harrison Avenue construction

13

Page 14: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

Summary and Implementation

• 16 objectives under three goals• Short term (1-year) objectives

14

Page 15: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

Five Year Goals

• Increase ridership and community support for BSBT• Maximize coordination to benefit riders• Practice sound financial management

15

Page 16: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

Final Document

• Draft plan posted at:• http://co.silverbow.mt.us/transit/• http://www.currenttransportation.com/projects/

• Comments received by September 2 will be addressed in final document (targeted to September 9)

• Thank you, Gary!

16

Page 17: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1

17

Lisa Ballard, P.E.Bozeman, MT406-581-4601

[email protected]