11
1 Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 [email protected] Traditional BCP/ DR Approach Recovery Time Objective Recovery Point Objective Lost Data Resume Business Return Home Notifications Restore Communications Restore Technology Capability Restore Business Functions Move to Alternate Site Vital Records Data Synchronization Systems Applications Data Relocate Office Equipment / Supplies Work Flow Arriving at BRM Significant growth created a complex and interdependent business and IT systems environment. Analysis concluded that unacceptable loss would occur from a significant outage lasting more than 24 hours. Proposed external vendor solutions could not mitigate the problem and meet recovery requirements. Required an integrated, sustaining, all-encompassing approach. Determined an internal recovery solution would meet requirements, create a lower CODB, and provid additional benefits: Addressed day-to-day impacts up to catastrophic versus catastrophic only Minimize vendor contractual limitations Process enhancements: change management, testing, service delivery, Incident Response etc.

Business Resilience End-to-End - Plastics Technology PowerP… · Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 [email protected]

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Business Resilience End-to-End - Plastics Technology PowerP… · Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 Chuck.Wachter@gmacrfc.com

1

Business Resilience End-to-End

GMAC-RFCCase Study

Chuck Wachter, CDRP

BRM Program Manager

952-857-6384

[email protected]

Traditional BCP/ DR Approach

Recovery Time Objective

Recovery Point Objective

Lost DataResumeBusiness

ReturnHomeNotifications

Restore Communications

Restore Technology Capability

Restore Business Functions

Move toAlternateSiteVital Records

Data Synchronization

Systems Applications Data

Relocate Office Equipment /Supplies

Work Flow

Arriving at BRM

• Significant growth created a complex and interdependent business and IT systems environment.

• Analysis concluded that unacceptable loss would occur from a significant outage lasting more than 24 hours.

• Proposed external vendor solutions could not mitigate the problem and meet recovery requirements.

• Required an integrated, sustaining, all-encompassing approach.

• Determined an internal recovery solution would meet requirements, create a lower CODB, and provid additional benefits:

– Addressed day-to-day impacts up to catastrophic versus catastrophic only– Minimize vendor contractual limitations– Process enhancements: change management, testing, service delivery,

Incident Response etc.

Page 2: Business Resilience End-to-End - Plastics Technology PowerP… · Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 Chuck.Wachter@gmacrfc.com

2

Industry Best Practices

• Over 60% of G2000 organizations are implementing a dual data center strategy to support continuous availability

• Business and IT availability classification requirements aligned with associated cost, application and system architecture requirements

• Companies that manage resilience internally achieve a greater degree of maturity and business process alignment with their supporting IT systems

• Financial services industry is under increased scrutiny by regulatory agencies due to the critical nature and impact of its services to the economy. Their response includes:

– Investment in failover capabilities to significantly reduce the time for recovery and to respond to widespread/regional disruptions

– A realignment from the traditional approach of recovering technology and facilities toward a full business resumption model

– Increased frequency of exercising business and IT resilience capabilities

As real-time business requirements become more pervasive, business continuity must be integrated throughout the corporate culture and

business processes, with clear accountability and measurement defined to align with acceptable corporate risk.

Business Resilience Defined

Resilience is the ability and capacity to withstand and adapt to new risk environments. A resilient organization effectively aligns its strategy, operations, business systems, governance structure, and decision-support capabilities so that it can uncover and adjust to continually changing risks, endure disruptions to its primary earnings drivers, and create advantages over less adaptive competitors.

Program MissionThe Business Resiliency program manages the organizations capabilities to continue to provide services at anytime, regardless of the event and impact. Prioritization of investments in people, processes, technology and facilities are based on business risk and criticality. Comprehensive testing continuously validates the recovery capabilities and an integrated governance model assures transparent coordination and reporting.

Best Practice: Resiliency Model

BusinessProcesses

Suppliers

Infrastructure

IT Services

BCDRProgram

BCDR Framework

Operational Management

Internal Sponsorship& Governance

Capabilities

Page 3: Business Resilience End-to-End - Plastics Technology PowerP… · Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 Chuck.Wachter@gmacrfc.com

3

Business/IT Alignment Model

� Business define

requirements & strategy

� Focus is on making “today’s

and future business better”

� Accomplished in

conjunction with

Governance, business

process improvements and

capabilities

� BCDR requirements are

understood and integrated

in business process,

valuable and cost effective

� IT aligns and offers BCDR

strategic capabilities to

enable new growth,

products/services, channels

� Creates BCDR “portfolio

visibility” for business

leverage

� Provides responsive, flexible

technology environment

� IT BCDR Services are cost

effective, responsive and

measured

Business-Driven Strategy IT-Enabled Strategy

Leadership needs to ensure that business and IT BCDR

strategies are continuously aligned to create value

Approach

ORGANIZATION

• Roles

• Responsibilities

• Skills

• Cross Organizational Cooperation

PROCESS

• BUSINESS PROCESS

– BCP Mgmt

– Risk Mgmt

– Product Delivery & Mgmt

– Information Mgmt

• IT PROCESS

– Application Development

– Application Operations Mgmt

– Operations Service Delivery

– Operations Service Mgmt IT

• CROSS-FUNCTIONAL PROCESS

– Business Process Integration

– Partner Controls & Integration

– Overall Life-cycle Integration

STRATEGY

• Governance

• Continuity Strategy

• Availability Strategy

• Recovery Strategy

• Communications

• Risk Management

APPLICATIONS and DATA

• Application Architecture / Design

• Application Availability / Recovery

• Application Integration

• Data Backup/Recovery

• Data Security

ARCHITECTURE & TECHNOLOGY

• Platforms & Networks

• Systems Software

• Storage

• Middleware

• Standards

FACILITIES

• Data Center Infrastructure

• Workspace Infrastructure

• Physical Security

• Environmental (Power, HVAC)

Business resiliency is incorporated through-out the corporate culture and business processes. Every level of the organization has been evaluated, with new models and methodologies developed and integrated into daily processes, ensuring resiliency and compliance with regulatory requirements at every layer.

Program Vision

• The vision for Business Resilience Management is:

– Establish BRM processes and services that are well-integrated with business and IT planning, development and operational processes such that enterprise-wide BRM implementation, testing and compliance are ensured, and support business objectives.

• Our Strategy for accomplishing this is:

– Adopt an internal strategy to deploy BRM solutions and develop industry partnerships to support business expansion and growth.

– Deploy a dual data center infrastructure, storage and data architecture to support business continuous availability needs and flexible, scalable and agile BRM solutions.

– Eliminate BRM gaps through investment into development of internal capabilities.

Page 4: Business Resilience End-to-End - Plastics Technology PowerP… · Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 Chuck.Wachter@gmacrfc.com

4

BRM Building Blocks

BRM Governance & Coordination

Sy

ste

m R

em

ed

iati

on

BRM Building Blocks

Details behind the Building Blocks

BRM Gov ernance & Coordina tion

Sys

tem

Re

me

dia

tio

n

BRM Program Framework

Page 5: Business Resilience End-to-End - Plastics Technology PowerP… · Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 Chuck.Wachter@gmacrfc.com

5

RReessoouurrcceess

20xx200520042003

Vendor Solution

• Does not address BRM requirements

$MM

Industry Recommended BRM Spend Based on IT Budget

BRM Strategic Investments

BRM Program• Driven by Business Requirements• Aligning Business and IT

• Value based BRM Investments

BRM Strategic Investment

Projected BRM spend

TIER 0 TIER 1 TIER 2 TIER 3Vital

Availability

Critical

Availability

Important

Availability

Deferred

Availability

8 Hrs 24 Hrs 48 Hrs 72 Hrs

Vital Data

(A)4 Hrs TIER 0A TIER 1A TIER 2A TIER 3A

Dual DC Remote

Data Replication

Critical

Data

(B)

8 Hrs TIER 0B TIER 1B TIER 2B TIER 3BDual DC Remote

Data Replication

Important

Data

( C )

24 Hrs TIER 0C TIER 1C TIER 2C TIER 3C

Virtual Vault

Storage

Backup/Restore

Deferred

Data

( D )

48 Hrs TIER 0D TIER 1D TIER 2D TIER 3DOffsite Tape

Backup/Restore

Dual DC

Automated

Failover

Dual DC

Manual

Failover

Dual DC

Standby Cold

Restore

Dual DC

Drop Ship

Cold Restore

Recovery Time Objective (RTO)

Reco

very

Po

int O

bje

ctive (R

PO

)

RP

O M

inim

um

Resilie

ncy

RTO Minimum Resiliency

Resiliency Tier Framework (RTF)

Provides a common dialogue for Business & IT recoverability

(3) Remediation and Resiliency Solutions

Tier 0-A Applications:High Availability/Redundant Platforms,

Data Replication/Recovery RPO,DDC automated recovery,

Full Application Recovery Plan & Test

BRM Tier Application Recovery

Categorization FrameworkTIER 0-A

ENTERPRISE SYSTEMS CLASSIFICATIONSFACILITIES ENVIRONMENT

Application & Data Deployment Across DDCs

Full Application & Data

DDC Deploy

Office Recovery Site Fixed Secondary Office

Site, or Commercial

Hotsite

XSP Data Center Site Resiliency Resilient SLAs

NETWORK ENVIRONMENT

Site/Campus & Edge Data Network Resiliency HA Redundancy

XSP WAN/VAN/MAN/ISP/Voice Network Resiliency HA Redundancy

Voice & TCOMM Network HA Redundancy

PLATFORM ENVIRONMENT

App & DB Server Platform Resiliency HA Redundancy

Workstation Recovery Prebuilt Spares

STORAGE ENVIRONMENT

Online SAN Replication/Restore Local & Remote DDC

Offline Tape Backup/Restore In Failover Mode

DATA MGMT ENVIRONMENT

Database Resiliency Local & Remote DDC

File Storage Resiliency Local & Remote DDC

APPLICATION ENVIRONMENT

Application Architecture Resiliency Local & Remote DDC

APPLICATION INTEGRATION ENVIRONMENT

Middleware Architecture Resiliency Local & Remote DDC

SECURITY MGMT ENVIRONMENT

Security Controls & Process Highest

(2) Business Process, Application andSystem Resiliency Requirements

TIER 0 TIER 1 TIER 2 TIER 3Vital

Availability

Critical

Availability

Important

Availability

Deferred

Availability

8 Hrs 24 Hrs 48 Hrs 72 Hrs

Vital Data

(A)4 Hrs TIER 0A TIER 1A TIER 2A TIER 3A

Dual DC Remote

Data Replication

Critical

Data

(B)

8 Hrs TIER 0B TIER 1B TIER 2B TIER 3BDual DC Remote

Data Replication

Important

Data

( C )

24 Hrs TIER 0C TIER 1C TIER 2C TIER 3C

Virtual Vault

Storage

Backup/Restore

Deferred

Data

( D )

48 Hrs TIER 0D TIER 1D TIER 2D TIER 3DOffsite Tape

Backup/Restore

Dual DC

Automated

Failover

Dual DC

Manual

Failover

Dual DC

Standby Cold

Restore

Dual DC

Drop Ship

Cold Restore

Recovery Time Objective (RTO)

Re

co

very

Po

int O

bje

ctiv

e (R

PO

)

RP

O M

inim

um

Res

ilien

cy

RTO Minimum Resiliency

RTF Certification Standard: Tier Alignment

(1) BusinessRTO/RPO

Requirements

Page 6: Business Resilience End-to-End - Plastics Technology PowerP… · Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 Chuck.Wachter@gmacrfc.com

6

Business Exposure and Impact Analytics

GMAC-RFC consistently assesses and determines required recovery capabilities for processes and new initiatives. The assessment is based on an analytical model consisting of quantitative and qualitative measures. The assessment and analysis process is structured in four phases, designed to conduct a comprehensive analysis for people, process, technology, facilities and interdependencies.

Business Application Resilience (BAR) Planning Methodology

TIER 0 TIER 1 TIER 2 TIER 3Vital

Availability

Critical

Availability

Important

Availability

Deferred

Availability

8 Hrs 24 Hrs 48 Hrs 72 Hrs

Vital Data

(A)4 Hrs TIER 0A TIER 1A TIER 2A TIER 3A

Dual DC Remote

Data Replication

Critical

Data

(B)

8 Hrs TIER 0B TIER 1B TIER 2B TIER 3BDual DC Remote

Data Replication

Important

Data

( C )

24 Hrs TIER 0C TIER 1C TIER 2C TIER 3C

Virtual Vault

Storage

Backup/Restore

Deferred

Data

( D )

48 Hrs TIER 0D TIER 1D TIER 2D TIER 3DOffsite Tape

Backup/Restore

Dual DC

Automated

Failover

Dual DC

Manual

Failover

Dual DC

Standby Cold

Restore

Dual DC

Drop Ship

Cold Restore

Recovery Time Objective (RTO)

Re

co

ve

ry P

oin

t O

bje

cti

ve

(RP

O)

RP

O M

inim

um

Re

silie

nc

y

RTO Minimum Resiliency

1 2 3 4 5

6 7 810

9

1

2

3

4

5

6

7

8

9

10

Application Suite 1

Application Suite 1

Application Suite 1

Application Suite 1

Application Suite 1

Application Suite 1

Application Suite 1

Application Suite 1

Application Suite 1

Application Suite 1

Business Resiliency Planning

1

2

3

4

5 6

7

8 9 10

Target State

Planned

Best Effort

1 2 3 4

5 6 7 8

9 10 11 12

Systems Availability & Recovery Gaps

Application 1 BRM Gap Scorecard

0%

20%

40%

60%

80%

100%

High Availabilty

Capability

Data and Application

Recovery Capability

RTF C

om

pliance

Application 3 BRM Gap Scorecard

0%

20%

40%

60%

80%

100%

High Availabilty

Capability

Data and Application

Recovery Capability

RT

F C

om

plian

ce

Application 2 BRM Gap Scorecard

0%

20%

40%

60%

80%

100%

High Availabilty

Capability

Data and Application

Recovery Capability

RTF C

om

plia

nce

Application 4 BRM Gap Scorecard

0%

20%

40%

60%

80%

100%

High Availabilty

Capability

Data and Application

Recovery Capability

RT

F C

om

plia

nc

e

Page 7: Business Resilience End-to-End - Plastics Technology PowerP… · Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 Chuck.Wachter@gmacrfc.com

7

Critical Service Portfolio

The Vital and Critical portfolio management process has been established to prioritize resiliency requirements and enhancements for business processes based on criticality. It is also designed to eliminate a functional, silo-view, by combining process components into one integrated profile known as a ‘Recovery Domain’. Recovery Domains enable a structured process to continuously enhance resiliency capabilities and provide a strong foundation to provide highest availability for our business processes.

Why Use Recovery Domains?

The volume and complexity of business systems require that recovery parameters are understood to ensure recoverability.

What is a Recovery Domain?

A method for aligning business functions and supporting applications and infrastructure into logical groups that enable resumption of target business or systems functions.

Recovery Domain Definition Standard

Servicer

Compass

DMS

Workflow

DF Letters

Newly funded loansand changes

for selected fields

HomecomingsDefault data(San Diego)

Daily HCF Interface feed

PC Seller/ServicerSystem(2ndmtg)

Daily Home Equitytransactions from GMAC,

HCF and MFI

IMS

ServicerTransmission

HIP

Month-endInitialization files

Scrubbed servicer cutoffdata fi les

Servicersand Service

Bureaus

Monthly servicercutoff data files

HIP

LoanAccounting

PenaltyTracker

CSS

LoanAccountingDistribution

ListLoan Accountant

assignments (manual)

HIPWorkingTables

EOM initialization forHE Loans

EOM initialization forHE Loans

Initialization fornew HE Loans

7th B.D. comparison"Upload Proof"

Reconciledloan data

ACQ

IDR Feed

Bank

$$$

Servicers

Manual checks

DRTDistribution data(for MULSCR

reported deals)

GL infofor reconciliation Peoplesoft

MULSOR(agg, calc,

credinst files)

DDS

MULSOR

INTEX

Liquidations andexpenses

Foreclosure, REO,SSCRA, Bankruptcy

Active loans,payoffs, repurchase s

Loan level info,pool level aggregation

Distribution calculationresults

Loan level info,pool level aggregation

VISION

Loan leveldistribution results

HEStructured

HE WholeLoan

SharedExecution

HIP HSS

All Loans,Payoff files,SOD tables

Potential expenses,REO Amortization

Distribution calculationresults

MULREO

BOS

EAGLE

Servicer advances(manually entered

from report)

DMS

Nightly uploads ofDLQ, FCL, LM,BK, REO info

REO, 3PS,SPO, WO

COLOAN

Snapshot

REO funds

Close ofEscrow

Recovery Domains

Remittances and payoffs

Midnet

FHLMC reporting data(manual process)

Monet

FNMA reporting data

Distribution data

REO liquidation activity(expense s, proceeds)

CurtailmentsREO loans

Liquidations(manually entered

from report)Newly funded loans

Daily changes, payoffs,index values, se rvicer tran sfers,

monthly loan updates

Distribution calculationresults

GL entries

Other

default

reporting

IDR Feed

Manual checks

REO Amortization

Legend

Interface / Data feed

Data dependency

$$$

Trustee(Investors)

Bond payment

InvestorPortal

Auto

PoolingPRNfiles

Original loan info

Recovery Domain Boundary

Excluded from Recovery Boundary

1

2

3

3

4

5

5

1

PROD

“Ca sh In” data

Process Integration and Improvement

• Integrate BRM Resiliency oversight, standards and best practicesinto RCG People, Process & Technology areas:

– New Application Development (SDLC)

– Business Impact Assessment and Planning

– Existing Business and IT System remediation

– Annual Operating Planning

– IT Frameworks

– Delivery Assurance Processes and procedures

– IT Operations Service Management

– Education and cross-training

– Improve resiliency maturity and metrics scorecards

– Etc.

Page 8: Business Resilience End-to-End - Plastics Technology PowerP… · Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 Chuck.Wachter@gmacrfc.com

8

Deploy

P roject Contro ls

E stim ates Issue & R isk T rackin g W ork P lan ning &Tracking

Sta tus & Cost Repor t ing Ch ange Con trol R esource P lann ing

TestConstru ctDef in eP lan

Project Ch arter

Project Pla n / SOW

Busin ess R equirem ents

Syste m Re quirem ents

Requ irem entsTraceability

Architectu re D esignDocum ent

R equired R C G-IT Deliverables

Define Te st Stra tegy/Approach

S ystem DesignD ocum ent

U AT Te st Plan

S ystem Deployme ntP lan

S ource C ode/Unit Te st

S ystem Test P lan

O perat ions & Supp ortP lan

S ystem Test C ases

S ystem Test R eadinessR eview

S ystem T est Su mm aryR epor t

U AT Sum m ary R epor t

S ystem T est De fect Log

R elease No tes

In stallat ion G uide

O perat ions Gu ide

D elivery A ss ura nce T ollgates

Project SOW,Review Checklist

Rqmts DefinitionChecklist

Failover Test Plan,Application Recovery Plan (ARP)Infrastructure

Recovery Plan(IRP)

Deployment Review,Production Certification Review,EPT Doc Docs

BusinessRTO/RPO

Rqmts

Design Review, Data Arch review,Sys Arch Review,SysArch Spec,Devlp Review

Checklists

Includes resiliencyscope & costs

Includesresiliencyrequirements

IncludesBusiness availabilityRecoveryrequirements

IncludesRTF Tier requirements,OLAs/SLAs

IncludesLocal HA/Failover& ARP, IRPtest plans

IncludesLocal & DDC Configuration Deployment EPT

Recovery test approach

Process Integration and Improvement:BRM Alignment with DA Framework

Service Management Framework

BRM Alignment with IT Service Mgmt

TechnologyServices Group

IT Service Management

Policy

Incident Management

Problem Management

Change Management

Release Management

Configuration Management

Service Level Management

Availability Management

Capacity Management

IT Financial Management

IT Service Continuity Management

Pro

ce

ss

Sta

nd

ard

s &

Gu

ide

lin

es

(O

ve

rvie

w &

Glo

ss

ary

)

BRM Resiliency Stds BRM Resiliency ( People, process, Tools)

WHY:• Geographically redundant DC reduces risks• Internal self-sufficiency and capabilities enable

business resiliency• Standard availability and recovery solutions reduce

complexity and costs• Standard support and SLAs meet business recovery

objectives• Shared infrastructure enables long-term economies

of scale and reuse

Dallas DDC2

Production/Recovery

Production/Recovery

Dual Data Center (DDC)

Adopted a geographically disperse Dual Data Center (DDC) resiliency strategy. Vital and Critical applications are required to have full fail-over capability within the DDC architecture.

Page 9: Business Resilience End-to-End - Plastics Technology PowerP… · Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 Chuck.Wachter@gmacrfc.com

9

Deploy Tiered Storage Architecture Standard for improved RPO Resiliency and Recovery

• Provide tiered Storage options to support business RPOs

• Provide Local DC and Remote DC Data Replication and Recovery

• Provide Resilient Storage Architecture

• Integrate backup and recovery architecture

• Employ Information Mgmt practices to enable data recovery

Data Resilience

BRM Governance & Coordination

BRM Governance: An established set of methods by which Business Areas address their business resilience needs.

The governance model is designed to provide centralized oversight and to enable business ownership. Consistent program tools allow for prioritized assessment, analysis, evaluation and decision-making processes depending on criticality across the enterprise. Defined roles and responsibilities assure consistent business resiliency planning and execution.

BRM Program- Builds BRM Framework,

-Transitions ownership to the BRM Operations Team

--Enables Business & IT to achieve risk goals

Risk Committee

Business ResilienceManagement Committee (BRMC)

BRM Operations Team-BRM Program Manager

-BRM Architect

-BRM Specialist-BCP Site Coordinator

Business Risk

Business Units- Stakeholders

- Projects

Standards?

• type

Page 10: Business Resilience End-to-End - Plastics Technology PowerP… · Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 Chuck.Wachter@gmacrfc.com

10

Recovery Plans

The plan structure is designed so that all plans are integrated in an efficient manner. Data content flows are documented between plans ensuring that all required data is captured and non-essential data is minimized. Each plan is an assigned an owner.

BRM Program Objectives

Implement BRM practices into way of doing business

BRM Program

Projects

Build Transition SustainingModel

Transition – Consultants

Sustaining Model - Employees

-Operational program supported by RFC associates and integrated into business processes.

- BRM Projectgenerates Artifacts

- RFC staff provides input & approves project work

-RFC Owner & Stakeholders are identified

-Ownership of Artifacts is transferred to the RFC Owner

- BRM Team consults and helps nurture the Artifacts

BRM Artifacts

Production MSP

Burbank

San Diego

Minneapolis

Prod Dal las

Dallas

Redun dant MSP

Redun dant Dal las

Redun dant San Diego

Redun dant Burbank

Productio n Burbank

Productio n San Diego

TIER 0 TIER 1 TIER 2 TIER 3Vital

Availability

Critical

Av ailability

Important

Availability

Deferre d

Availability

8 Hrs 24 Hrs 48 Hrs 72 Hrs

Vital Data

(A)4 Hrs TIER 0A TIER 1A TIER 2A TIER 3A

Dual DC Re mote

Data Replication

Critical

Data

(B)

8 Hrs TIER 0B TIER 1B TIER 2B TIER 3BDual DC Re mote

Data Replication

Important

Data

( C )

24 Hrs TIER 0C TIER 1C TIER 2C TIER 3CVirtual Vault

Storage

Backup/Restore

Deferred

Data

( D )

48 Hrs TIER 0D TIER 1D TIER 2D TIER 3D Offsite Tape

Backup/Restore

Dual DC

Automated

Failov er

Dual DC

Manual

Failover

Dual DC

Standby Cold

Re store

Dual DC

Drop Ship

Cold Restore

Recovery Time Objective (RTO)

Recovery P

oint Objective (R

PO)

RPO M

inim

um R

esilie

ncy

RTO Minimum Resiliency

RTF

BAR Methodology

RecoveryDomains

DDC

SDLC Checklists

BRM Artifacts

Production MSP

Burbank

San Diego

Minneapolis

Prod Dal las

Dallas

Redun dant MSP

Redun dant Dal las

Redun dant San Diego

Redun dant Burbank

Productio n Burbank

Productio n San Diego

TIER 0 TIER 1 TIER 2 TIER 3Vital

Availability

Critical

Av ailability

Important

Availability

Deferre d

Availability

8 Hrs 24 Hrs 48 Hrs 72 Hrs

Vital Data

(A)4 Hrs TIER 0A TIER 1A TIER 2A TIER 3A

Dual DC Re mote

Data Replication

Critical

Data

(B)

8 Hrs TIER 0B TIER 1B TIER 2B TIER 3BDual DC Re mote

Data Replication

Important

Data

( C )

24 Hrs TIER 0C TIER 1C TIER 2C TIER 3CVirtual Vault

Storage

Backup/Restore

Deferred

Data

( D )

48 Hrs TIER 0D TIER 1D TIER 2D TIER 3D Offsite Tape

Backup/Restore

Dual DC

Automated

Failov er

Dual DC

Manual

Failover

Dual DC

Standby Cold

Re store

Dual DC

Drop Ship

Cold Restore

Recovery Time Objective (RTO)

Recovery P

oint Objective (R

PO)

RPO M

inim

um R

esilie

ncy

RTO Minimum Resiliency

RTF

BAR Methodology

RecoveryDomains

DDC

SDLC Checklists

BRM Planning Overview

• Operational Readiness– Establish Governance– Train Staff– Assess and Adopt BRM Framework– Establish BRM Resiliency Baseline

• Execution– Maintain Recovery Plans– Exercise Recovery Plans– Execute Resiliency Risk

Reduction Projects

• Oversight and Compliance

• Annual Operating Plan– Assess– Prioritize– Plan

Page 11: Business Resilience End-to-End - Plastics Technology PowerP… · Business Resilience End-to-End GMAC-RFC Case Study Chuck Wachter, CDRP BRM Program Manager 952-857-6384 Chuck.Wachter@gmacrfc.com

11

Review

• Develop a continuity framework that addresses all levels of the organization; facilities, technology, applications, data, processes, governance, strategy.

• Integrate all elements of the framework.

• Establish a governance committee, placing responsibility within the business.

• BRM Operations maintains the framework, tools, methodologies, artifacts.

• Incorporate BRM processes and capabilities into day-to-day processes.

• Invest internally to improve processes versus externally leavingprocesses as-is.

Value Proposition

• Reduce business risks

• Enable business growth

• Invest in gap reduction

• Take complexity out

• Create choice and flexible BRM options

BRM Program

Business strategy alignment and cost optimization through

implementation of the BRM strategies provides company with a

range of options to improve business value