Business planning toolkit

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Business planning toolkit

© Together for Children 2007 Page 1 of 20 Version 1 July 2007

Version 1July 2007

Page 2: Business planning toolkit

Contents

Contents.............................................................................................................................................2

Introduction........................................................................................................................................3

How to use the Business Planning Toolkit.........................................................................................6

1. Getting Started: Planning Checklist..............................................................................................9

2. Developing a Service/Centre Business Plan..............................................................................14

3. Resourcing the Business Plan....................................................................................................16

Ten Top Tips for children’s centre Business Planning.....................................................................18

4. Reviewing and Measuring the Impact.........................................................................................19

Document PropertiesDocument Owner Pat Gale

Organisation Together for Children

Title Business Planning toolkit

Version History10th July 2007 v1 Pat Gale First Release

© Together for Children 2007 Page 2 of 20 Version 1 July 2007

Page 3: Business planning toolkit

Introduction

The business planning toolkit has been developed to help support local authorities, their stakeholder partners and individual children’s centres in considering different approaches to service and business plan development. It is based on a range of experience gathered from across England and should be considered as part of a continuous improvement process, learning from experience and promising practice.

Together for Children thank all the contributors for their advice and input into this evolving resource, the intention being to add to the business planning toolkit on an ongoing basis to reflect the different stages of children’s centre development across the country.

It takes account of the Department for Children, Schools and Families (DCSF) guidance on:

the Sure Start children’s centres Practice Guidance (November 2006) the Planning and Performance Management Guidance (November 2006) the Governance and Management of Extended Schools and Sure Start children’s centre

Guidance (May 2007)

Why was the resource developed?

Together for Children identified service or business planning as an area for potential development in response to a number of developments.

In December 2006, the National Audit Office report on children’s centres identified a number of areas for development, such as:

The need to ensure that the most excluded and needy families access their services from children’s centres

The need to plan effective working partnerships with other agencies that can deliver services through children’s centres, such as Health and Jobcentre Plus

The sharing of resources across areas to avoid gaps and duplication and make delivery more cost effective and efficient

The collection of hard and soft data on performance A better understanding of costs and measurable outcomes and outputs Mechanisms in place to establish the costs of services, how well they are being used and

what is the impact Staff capability with financial expertise is developed at a range of levels

In January 2007, DCSF discussions with a sample of local authorities identified the following:

Many local authorities are not allocating funding on the basis of the costs of delivery, as many of those costs are not known

There was a diverse range of approaches, from complex formula funding to simply dividing the total budget by the numbers of centres

© Together for Children 2007 Page 3 of 20 Version 1 July 2007

Page 4: Business planning toolkit

That a number of local authorities are demonstrating economies of scale through shared resources and locality delivery

That there was still a “grant culture” in resourcing children’s centres, with centre managers driven by “staying within budget” rather than delivering value for money

The recording of income and expenditure at centre level differed widely, and there was little consistency in approach

Limited evidence of business planning and financial forecasting being systematically carried out

In November 2006, Together for Children carried out a self-evaluation of children’s centre development with local authorities, which highlighted the following key areas for support:

How to start the business planning process and involve all partners at a range of levels Designing a business plan schedule and delivery plan to meet the children’s centre

guidance How to ensure synergy between commissioning, service planning and performance

management. Sharing examples of different approaches to financial planning and value for money How to plan and develop appropriate and affordable early years learning and childcare

through children’s centres

In April 2007, Together for Children carried out a survey with a sample of local authorities on what specific support and development resources would be useful:

66% of the sample were unsure about business planning, but the rest confident and happy to share their emerging practice

More support needed on how to link business planning with commissioning services and performance management

Advice on how to cost services other than childcare Advice on how to ensure sufficient and sustainable childcare Advice on risk management Models from different contexts, such as authority-wide, centre level, rural, urban and in both

70% and 30% areas A web based support product that would evolve over time and be amended and enhanced

to reflect emerging promising practice and changes in policy or focus A resource that would stimulate the opportunity to ask for advice from peers and encourage

a dynamic interchange and sharing of practice across the country A resource to recognise and celebrate the achievements of children’s centre developments

and the expertise and successes of professionals in the field

How was the resource developed?

Phase 1: Designing the structure and initial content: Together for Children designed a specification building on the recommendations from local authorities, and children’s centre staff in

© Together for Children 2007 Page 4 of 20 Version 1 July 2007

Page 5: Business planning toolkit

providing a bank of resources, based on contributions from the field. Some resources were also produced where there were gaps or where a number of products could be brought together in a generic template.

Phase 2: Reviewing the draft products and structure: A sample of draft products and the structure were shared for review and feedback with a range of individual authority and children’s centre colleagues, regional clusters and a network event on the emerging toolkit across two regions. Version 1 of the business planning toolkit can be accessed at: www.childrens-centres.org.

Phase 3: Ongoing review and identification of further materials: This phase will be ongoing, to meet changing needs and developments. There will be updates to reflect feedback and contributions from individuals, local authorities and other agencies, along with regional or cluster meetings and events that will focus on children’s centre service and business planning.

Please help by sending your contributions, advice and comments Pat Gale, care of :[email protected].

© Together for Children 2007 Page 5 of 20 Version 1 July 2007

Page 6: Business planning toolkit

How to use the Business Planning Toolkit

The business planning toolkit is designed as a web-based electronic resource, intending to encourage a dynamic learning exchange between local authorities, children’s centres and their delivery partners, such as PCT’s, SHA’s and Jobcentre Plus in progressing, improving and resourcing all four stages of the children’s centre model. (Please see section 1.3)

It includes:

Signposting to other support and advice agencies, websites and resources References to guidance and policy documents Sample case studies Planning and review checklists Templates and schedules

The structure of the toolkit is based on the following cyclical model which has emerged from consideration of emerging practice in the field, and reflects the importance of ensuring all key delivery partners and customers are involved in getting started and monitoring impact, regardless of whether this is at stage one or stage four of centre development.

The phases of business planning development:

© Together for Children 2007 Page 6 of 20 Version 1 July 2007

Getting Started

1

Resourcing The Plan

3

Measuring the impact

4

Who needs to be

involved?1.1

What is Happening

Now?1.2

What Needs To Happen?

1.3

Developing The Plan

2

Page 7: Business planning toolkit

Phases of the business planning process:Each phase is supported by tools and templates that may be down loaded and modified to best meet the needs of a local authority, individual centre or locality. It is based on the following assumptions.

Assumptions

1. DCSF guidanceThe stages and suggested actions reflect the recommendations from the Governance and Management of Extended Schools and Sure Start children’s centre Guidance (May 2007) that:

“The local authority has overall responsibility for managing the programme in their area and for the distribution of core funding, and for co-ordinating and accounting for resources provided “in kind” or on a “quid pro quo” basis. Local authorities should work with advisory boards to ensure Sure Start children’s centres are working effectively to meet their set objectives through clear performance management mechanisms” (page 4)

The guidance goes on to state in more detail:

“Children’s centre budgets should be devolved in line with objectives and a delivery plan developed by the manager and agreed with the advisory board, local authority and children’s trust partners”. (page 27) and: “the manager is responsible for the budget devolved to them from the local authority and will need to involve advisory board members actively when taking decisions about the prioritisation and use of resources, and help the board develop its understanding of value for money issue”. Where the management of a centre has been contracted out to another lead agency, responsibility for managing the budget should be set out in the terms of the contract”. (Page 44)

Recognition is given to Sure Start Children’s Centres Practice Guidance (Nov 2006)www.surestart.gov.uk; all children’s centre Guidance can also be downloaded from the Together for Children website www.childrens-centres.org.

2. Children’s Trust arrangements are in placeMuch of the process and many of the planning tools assume that joint commissioning arrangements are being planned or are in place.

Case studies and toolkits to support joint commissioning can be found online at www.everychildmatters.gov.uk/planningandcommissioning. The resources also assume that most local authorities have or are piloting performance management and self-evaluation processes particularly in line with Sure Start Children’s Centres Planning and Performance Management Guidance www.surestart.gov.uk.

Early feedback from local authority colleagues is that they have interpreted the “objectives and delivery plan” (page 27 Governance Guidance) into a centre and/or locality business plan that feeds into an overarching authority-wide children’s centre service plan, which in turn feeds into the children and young people’s plan, reporting to the Children’s Trust or other arrangements.

Diagram showing the relationship between the business plan and other plans in a local authority.

© Together for Children 2007 Page 7 of 20 Version 1 July 2007

Page 8: Business planning toolkit

3. The toolkit resources are based on:

New children’s centres at stage 1 of development in planning services for designation Children’s centres at stage 2 who need to review how they develop their “plans in place” to

become fully operational at stage 3 Children’s centres at stage 3 and 4 who need to ensure their resources are being

effectively targeted to reach the most needy and to make the most impact Planning services with revenue funding

It is assumed that at each stage there will be different levels of resource and impact monitoring. See section 1.3 for further information on the four stages of children’s centre development.

4. Terminology

Together for Children have established that local authorities use a range of terms for what can be described as a Business Plan, for instance:

Service Plan Action Plan Operational Plan Delivery Plan

In this toolkit it is assumed that all terms are interchangeable.

To utilise the documents and resources in this toolkit, please double click on the icons, this will open the document in another window, which you are then able to save, amend and use.

Please tell us how you have used parts of the toolkit, how it has helped and how it can be enhanced. Talk to your regional Together for Children team or alternatively email us at : [email protected].

© Together for Children 2007 Page 8 of 20 Version 1 July 2007

Page 9: Business planning toolkit

1. Getting Started: Planning Checklist

1.1. Who needs to be involved?

Strategically this stage needs considerable investment in ensuring Children’s Trust, Governance, and existing or planned commissioning arrangements are agreed and understood before service and business planning can take place effectively at authority, locality and centre level. It is an equally important process for both new and existing children’s centres.

Tools to Facilitate(Double click on document icon

to open)

Who will govern, lead and manage at authority, locality or centre level? Once there is confidence in a structure and process, service and business planning can start.This development planning pro forma from Harrow Council provides a useful schedule for getting started and identifying roles, responsibilities and timeframes. It can be used as the basis of initial discussions or as a review of what is already happening, or what needs to happen by whom and by when.

Which agencies need to be invited to join the planning process? The Harrow Council “wheel” of partners and services highlights the complexities and interlinkage of planning service delivery at all stages of children’s centre developments in meeting the Every Child Matters outcomes. A blank wheel can be downloaded for team planning purposes.

Has sufficient time been built into the process to support partnership and interagency working?This vital issue needs to be planned for from the very start and cannot be overemphasised as an important initial investment in time. The Harrow Council planning schedule can be used as a basis for planning and prioritising.

(Please see above)

Is there appropriate financial capacity and capability to support and offer advice to all stakeholders at local authority, locality and centre level? This diagnostic checklist could provide a useful status report on what is available, what needs to be developed and by whom?

© Together for Children 2007 Page 9 of 20 Version 1 July 2007

Page 10: Business planning toolkit

What commissioning arrangements are in place or planned which can support or lead this process?This will depend on the local area, and the status and maturity will impact on all other stages of business development and service planning.

Refer to joint commissioning guidance

for development ideas

Have you considered developing a stakeholder communications strategy, in ensuring all partners from the private, voluntary and maintained sectors are engaged, informed and involved in the planning process?The strategy would develop from an earlier stage of identifying who needs to be involved and for what purpose; from advice and consultation to delivery and support. This plan should be regularly reviewed and updated to assure quality communications are in place.

1.2. What is happening now?

This stage is particularly important where there are existing stage 2 and 3 centres, which may be delivering less or more than expected or required by the guidance. In planning new stage 1 centres, this will provide a basis of what needs to happen in taking the business plan forward.

Has a review of what is currently being delivered or planned to be delivered from each centre been carried out, to reflect and meet the delivery requirements of the four stages of children’s centre development? This review tool can be used at centre level to determine what is and what needs to happen to meet designation and full core offer. It is recommended that the authority children’s centre Lead carries out the review with the centre manager and or advisory board. It may result in making decisions about what can no longer be funded through GSSG, and what can be funded from other sources.Consideration of all centre reviews can then inform the overarching local authority delivery and development plan. (see below).

Who is resourcing what? Which agency is funding what service(s) now and in the future?Does this need to change? And why?

See Review Tool Above

Where are the gaps in delivery? Does this reflect the stage of development or gaps in service? Why are there gaps?

© Together for Children 2007 Page 10 of 20 Version 1 July 2007

Page 11: Business planning toolkit

And what needs to be done? Who will lead?

Is there any duplication of services?If yes, who can deliver most effectively and efficiently?How will you assess and measure that?How will you decommission services?Have any of the actions got political, staffing or other implications to be managed?Who will oversee that?

Does the mapping of services show any additional priority needs or outreach capacity that will require resourcing?How will this be taken forward?Who by?When?

How are children’s centre finances currently managed and reviewed? Is this delegated or centrally managed?What should happen?By When?What are the training implications for staff and advisory boards?

See Business Planning Healthcheck 1.1.

See Sure Start Governance Guidance

Is there an advisory board in place to advise and review financial planning and reporting? How will this be monitored?Who will offer training and support?

See Sure Start Governance Guidance

Chapter 5

Who receives financial reports and how regularly? What happens to the reports? Who gives feedback?

See Sure Start Governance Guidance

Chapter 4

1.3. What needs to happen?

This stage is the most critical in taking forward the service delivery. It should consider all the Sure Start Guidance and the Together for Children, management information tool – the children’s centres tracker www.childrens-centres.org

© Together for Children 2007 Page 11 of 20 Version 1 July 2007

Page 12: Business planning toolkit

1.3.1 What services and support are required to be resourced at each of the four stages of children’s centres development?

a) For children’s centres in 30% areas: Summary attach

b) For children’s centres in 70% areas see www.childrens-centres.org;

1.3.2 Summary of processes that local authorities thought may be useful to consider before a Business Plan is developed.

An authority wide review, self-evaluation and review of individual children’s centres and service developments.Many authorities have already started to use the Sure Start performance management self evaluation form, and often this process has resulted in both authority wide and individual centre or locality action plans, which can be incorporated into the business plan.

Sure Start Performance Management SEF

Children’s Trusts have identified that governance arrangements, key responsibilities and accountabilities and consultation with all stakeholders has led to the development of a communication plan.A number of authorities identified the need for a stakeholder communication plan, which would complement their work on contestability and involvement of the private, voluntary and maintained sectors. Sure Start Performance

Management Contestability Checklist

Develop a risk register of issues that may impact on the development of Centres and services at authority, locality and centre level. This needs to be regularly reviewed, updated and reported on at all levels.

Rigorous and consistent monitoring, reviewing and reporting arrangements are in place linked to performance management. (Section 4)Most authorities were considering how to link business plans with their performance monitoring arrangements.

Sure Start Performance Management SEF

See section 4.

Arrangements in place for review and refocusing of the service/business plan on a regular quarterly/annual basis. Some centres may wish to review on a monthly basis, to

See templates in section 4

© Together for Children 2007 Page 12 of 20 Version 1 July 2007

Page 13: Business planning toolkit

ensure actions on target particularly in the early stages of development. Staff and advisory board training may be needed.

Financial monitoring and support systems in place. These may be at centre, locality and authority level.

Does everyone know who is responsible for doing what Have staff and Advisory Board members been trained?

See templates in section 4

Strategic placing of the service and business plan in the wider corporate policy context of the local authority, linking in and reporting to the Children’s Trust, and partnerships and contributing to the outputs and outcomes of the Children and Young People’s Plan and other reporting requirements.The Harrow Borough Council approach to this can be seen in the attached Action Plan for 2007-2008.

© Together for Children 2007 Page 13 of 20 Version 1 July 2007

Page 14: Business planning toolkit

2. Developing a Service/Centre Business Plan

Feedback from local authorities has recommended that there is an overarching authority-wide children’s centre service or business plan, with individual centre and locality-based business plans feeding into and contributing to it.

Many authorities have service plans, but not always at individual children’s centre level. However, with the requirement to manage performance through self-evaluation and as children’s centres are maturing through stages 2 and 3 this situation is likely to change.

The sample business planning template draws from a range of plans being developed around the country and can be adapted and modified to suit the needs of different contexts.

2.1 A sample business plan structureThis has been developed from a number of different plans from a range of authorities.

2.2 This provides guidance on what potentially could be included in each section of the above sample Plan.Most local authorities establish a working group to take responsibility for developing each section, and then someone would edit the whole product to give a consistent approach.It needs to be owned by all partners and so time needs to be built into the process to ensure ownership and understanding.

The format can be used at authority, locality and centre level.Feedback suggests that the context sections could be produced at authority level, with additions to reflect local situations, through Area Advisory Board contributions and approval.

2.3 A template for a delivery plan linked to the Every Child Matters outcomes and children’s centre core offer services taken from the Devon Delivery Plan. The Delivery or Action Plan reflects the operational delivery of the Business Plan, and is often referred to as the operational plan.The Delivery Plan will change more than the main body of the Business Plan, and mechanisms should be in place to regularly monitor progress against targets and timescales.

2.4. Marketing children’s centresThis aspect was identified as a potential area for development in raising the profile and impact of children’s centre investment. Some authorities had Sure Start wide marketing plans, but few

Link to Sure Start Branding Guidelines

© Together for Children 2007 Page 14 of 20 Version 1 July 2007

Page 15: Business planning toolkit

had children’s centre specific plans. This is an area that may need further contributions.

2.5. This section shows examples of completed business, delivery and action plans from local authorities around the country, providing some useful ideas and different approaches to consider.

2.5.1 Bradford business plan This provides a useful structure with appendices for a five year plan.

2.5.2. Harrow service plan This shows how the wider policy area and the ECM outcomes are being delivered through children’s centres.

2.5.3. Devon service and delivery plans This selection of plans cover local authority wide and individual children’s centre plans, with guidance on how to complete.

2.5.4. Durham business plan Provides guidance on how to complete a Business Plan which incorporates a section on marketing.

2.5.5. A Harrow children’s centre action plan Provides clear links to the ECM outcomes.

© Together for Children 2007 Page 15 of 20 Version 1 July 2007

Page 16: Business planning toolkit

3. Resourcing the Business Plan

Together for Children carried out a sample survey of local authorities in April 2007 to identify the potential areas of support that were needed for children’s centre business planning. The responses were varied, but the following themes for development and support emerged:

Advice on formula funding A number of authorities have devised formulae for funding centres to reflect:

o Differences in reach and size of centre

o Differences in disadvantage based on IMD statistics

o Differences in the nature of the community served

o Differences in stage of development

o Rurality

The Devon model gives guidance on how the funding formula has been calculated on the basis of rurality.

The Leeds model, reflects initial planning for children’s centres, and reflects the importance of consultation and information sharing on the proposed rationale for future funding of centres based on IMD data and knowledge of local areas.

Devon

___________________Leeds

Unit costs, value for money and cost effectivenessA number of authorities have developed approaches for calculating unit costs and measuring cost effectiveness, but the Together for Children sample survey showed that this was an area for further development, and work has started on identifying emerging good practice.

Research In Practice is leading the DCSF research overview on costs and outcomes for social care, and some useful and transferable guidance can be found atwww.everychildmatters.gov.uk/costsandoutcomes.

© Together for Children 2007 Page 16 of 20 Version 1 July 2007

Page 17: Business planning toolkit

Sample five year financial forecast spreadsheets A number of local authorities felt that sample schedules would be helpful in shaping their planning.A sample five year financial forecast with assumptions is attached. It can be used to calculate costs over time to reflect the different levels of input needed at each stage of a children’s centre development. It also includes reference toservices being delivered by other partners, but in order to establish the real costs of delivering a children’s centre, then these need to be included, even though the resourcing may not be from the general Sure Start grant.

Childcare sufficiency and sustainability This issue was raised by many local authorities as an issueand area of concern; both for those children’s centres directly delivering childcare or by those providing the core offer requirement through a third party. All local authorities recognised this as significant in meeting the outcomes duty by April 2008.

A good deal of support has already been developed and can be found at www.surestart.gov.uk.

A number of national organisations have also produced guidance and support for example:

The DTI have produced “supporting childcare makes good business sense”, and is a guide for employers.

The NDNA has produced planning summaries for Sure Start. References can be seen in section 5.

Linking resources to outcomes and outputsA number of authorities have started to develop this through a single plan approach. The Harrow Service Plan incorporates the children’s centre delivery through a wider service plan.

Consultation with colleagues in local authorities has identified this aspect of financial forecasting, monitoring and management as the biggest challenge in moving from a “grant culture” to business resourcing models based on actual service costs.

A number of organisations and local authorities are considering a full cost recovery approach to children’s centre service delivery and this will be developed further in version 2 of the toolkit, planned for Autumn 2007.

© Together for Children 2007 Page 17 of 20 Version 1 July 2007

Page 18: Business planning toolkit

Ten Top Tips for Children’s Centre Business Planning

Together for Children have consulted with a number of local authority finance officers and business support officers, in asking what they felt were the best ways to ensure effective business planning for children’s centres, in improving outcomes for children and families. They recommend the following top tips:

1. Plan for sustainability and reshaping of services from the start.

2. Develop a service or business and delivery plan from stage 1 to stage 4 of children’s centre development. Aim to review every quarter and refresh annually to reflect policy changes and the impact of delivery.

3. Research and identify potential sources of additional funding to meet shared targets such as regeneration, adult and further education at all stages of development and delivery.

4. Work with employers and employer organisations to promote childcare as a mutually beneficial shared agenda. Encourage employers to advocate and support children’s centres to their employees and the wider business community.

5. Focus on delivering high quality services for value for money; ensure every member of staff knows what they cost and what they contribute and add value to.

6. Stress the importance of continuous improvement, reflective practice, evaluation and reward for meeting outcomes and outputs.

7. Consider what is already out there and work together with partner organisations to maximise impact and minimise risk.

8. Ensure that consultation with potential and actual users does take place and that delivery reflects what parents and children really want!

9. Ensure there are effective business support services in place that are appropriately recognised and valued.

10. Children’s centres are here to stay… they are not short term projects, commit and plan accordingly!

What else can help? Please send your contributions to [email protected]

© Together for Children 2007 Page 18 of 20 Version 1 July 2007

Page 19: Business planning toolkit

4. Reviewing and Measuring the Impact

The Together for Children sample survey established that most local authorities believe that the resourcing of services should be linked to performance outcomes and outputs. This recommendation is also supported by the children’s centre SEF http://www.surestart.gov.uk/publications/?Document=1852

Key messages from local authorities:

Ensure that all staff know why activities are being resourced and what the expected outcomes and outputs are right from the start?

Hold a development day to establish what performance can be measured against what activities; try to involve the advisory board members

Identify a monitoring champion in each centre and/or locality who will send returns on a weekly/monthly basis to a central monitoring officer

Ensure that monitoring reports are considered centrally and feedback is given to centres on at least a quarterly basis

Set achievable targets, and identify areas for incentives or bonuses if targets exceeded… make target setting and achieving fun!

Involve your customers in setting and meeting targets, as long as they know why! Ensure that all staff can contribute to the service targets and that this is identified through

personal or individual development plans and assessed through appraisal processes.

Many of the sample delivery plans (section 3) have also incorporated actions against outcomes and outputs, and some have attempted to measure progress and impact over a three or five year period.

Examples:

Northumberland County Council action plan This draft action plan aims to show progress across years in achieving the ECM outcomes and national and local targets.

Devon County Council service planThis demonstrates their approach to “plan, do and review”.

Harrow children’s centre phase 1 and 2 action plan:This shows how an individual Centre can meet the Every Child Matters outcomes, and how this will be measured.

Together for Children recommend that this stage needs to be considered alongside planning for performance monitoring and management guidance www.childrens-centres.org and the performance monitoring toolkit planned for September 2007.

© Together for Children 2007 Page 19 of 20 Version 1 July 2007

Page 20: Business planning toolkit

© Together for Children 2007 Page 20 of 20 Version 1 July 2007