Bushfield Camp Key to securing Winchester’s future prosperity
Bushfield Camp Key to securing Winchester’s future prosperity
Bushfield Camp Key to securing Winchester’s future prosperity
Site details
Triangular site, approximately 63 hectares
Surrounded by development on three boundaries
Approximately 20 hectares is brownfield – former army camp
Vehicle access via Badger Farm Road (A3090)
Good access to motorway network (M3)
Close to the park and ride site under construction
Bushfield Camp Key to securing Winchester’s future prosperity
History of Bushfield Camp
Former army camp, requisitioned before WWII (approx. 20 hectares)
In use by MOD until mid 1970s
Returned to the Church Commissioners in 1979
Alternative uses first considered in 1980s – initially considered suitable for recreation/tourism uses
1980-1990s – a number of proposals for development overturned
Site now derelict and unsightly
The site attracts antisocial and criminal activities
Bushfield Camp Key to securing Winchester’s future prosperity
The economic issues
Winchester District Economic and Employment Land Study, November 2007:
The Winchester economy is strong but there is little room for complacency and need to maintain a “competitive edge”
Winchester is sliding down the hierarchy of business communities in the South East
There is a “disjuncture” between the existing restrictive Local Plan and the “direction of travel” in the emerging South East Plan
Employment projections indicate a restructuring of the local economy with a growing focus on higher value added services, eg knowledge-based
A shortage of modern employment sites; demand is restrained by restrictive policies and limited supply of office space
A particular demand for a science or technology park to cater for knowledge-based and creative industries
Bushfield Camp Key to securing Winchester’s future prosperity
The vision for the local and sub-regional economy South East Plan vision for South Hampshire – strong
economic growth, linked to urban regeneration
Partnership for Urban South Hampshire (PUSH) – promotes economic-led growth improving productivity through better knowledge transfer
Winchester Community Strategy – seeks to ensure Winchester maintains its competitive edge and increase the contribution of creative industries
WCC Corporate Strategy Implementation Plan (2007 to 2012) – The Council will focus on providing the environment and facilities for business start up and growth
Winchester District’s Economic Action Plan – promote and build competitiveness of Winchester Town, nurture creative industries, and ensure that business needs are met
Bushfield Camp Key to securing Winchester’s future prosperity
Emerging policy framework
LDF is being introduced in the context of the adopted South East Plan (2006 -2026)
Local Plan to be replaced by a Local Development Framework (LDF)
Core Strategy under preparation
Core Strategy “preferred options” consultation published May 2009
Core Strategy sets out the spatial development strategy over the next 20 years, including identifying strategic development sites
Adoption of Core Strategy programmed for early 2011
Bushfield Camp Key to securing Winchester’s future prosperity
What are the issues?
“Issues and Options” for the spatial strategy (consultation held early 2008)
Nearly 3000 representations
Key issues were:
Commuting – general concern that there is an excess of in-commuting, mainly from Southampton and Eastleigh, for lower income jobs, largely in the public sector, and excess of out-commuting of highly skilled residents
Step change growth – is necessary to meet the South East Plan growth requirements, but concern about the impact on the environment and heritage
Economic potential – Winchester lacks a clear vision about what it can and wants to offer to businesses; Winchester’s environment and property market are better suited to knowledge-based activities
Bushfield Camp Key to securing Winchester’s future prosperity
The options
The Council initially identified two options for “Winchester Town” :
– Option 1: Planned boundaries – restrict development within the existing boundaries and site allocations
– Option 2: Step change – actively seek to raise the profile of the town through a step-change in growth, including a “knowledge park”
An update to the Economic and Employment Land Study concluded that Option 2 (Step Change) is the preferred option for addressing commuting problems and helping to realise the town’s potential
WCC has now identified its “preferred option” as a combination of options 1 and 2
– “Development with a purpose” – combines elements of both options, including allocation of a new site for a knowledge-based business park
Bushfield Camp Key to securing Winchester’s future prosperity
Why a knowledge-based business park?
Latent demand in the Winchester market area for modern office and industrial workspace
Particular demand for a knowledge-based business park for modern knowledge-based and creative industries
Likely to attract businesses looking for a high-quality environment
Likely to attract highly-skilled local people who are seeking to live and work in high quality surroundings, therefore address out-commuting problem
A knowledge based business park would need to complement the Chilworth Science Park and the park proposed at Eastleigh
Despite the economic downturn, “there appears to be sound logic for developing a knowledge-based business park in the Winchester town area”
Is a key component of the “development with a purpose” spatial strategy
Bushfield Camp Key to securing Winchester’s future prosperity
Preferred option
Policy WT3: Strategic Employment Allocation Bushfield Camp
“Approximately 20 hectares of land at Bushfield Camp which has been previously occupied…will be allocated as a ‘knowledge park’, subject to further studies of its suitability and viability…the remainder of the site (approx 23 hectares) is made available and laid out for public use in perpetuity”.
Bushfield Camp Key to securing Winchester’s future prosperity
Image title
Bushfield Camp – the opportunity
“Bushfield Camp has good potential for the development of a knowledge based business park”, Winchester District Economic and Employment Land Study (January 2009)
Bushfield is a brownfield site and WCC has confirmed there are no viable alternatives within the town
Should be a phased development, to provide 650 to 1000 jobs during the LDF plan period, eventually rising to 1,500 jobs
Further feasibility studies and development impact studies are being undertaken
Opportunity for a high-quality, innovative and sustainable business park as the cornerstone for Winchester’s long-term prosperity
Concept option
Bushfield Camp Key to securing Winchester’s future prosperity
Moving forward
WCC will consider representations on the Preferred Option Core Strategy
The LDF Core Strategy is expected to be adopted in early 2011
Further studies are underway
A development concept will evolve in partnership with WCC
A planning application will be prepared and submitted
Phased development of the site is planned to commence in 2012