YINSON PRODUCTION
Ghana OCTP Development Project OCTP Offshore
FPSO
A1 EX-DE 00 24.07.2015 Issued For Review LC TR JS
YP Rev.
Validity status
ENI Rev.
Date Reason for issue Prep. Checked Accepted
Yinson Production Pte. Ltd.
3 Church Street, Samsung Hub #17-05 Singapore 049483
Contract no. :
AR/PROC/2013/08/0508 Purchase order no.:
(PO issued by YP to supplier) Doc. title :
BUNDLE DRAWING FOR TEST SEPARATOR HEATER (26HA2004) MO1
Tag No.: 26HA2004 Supplier document no._Rev. HJ-15-2185-DWG-01-02_A1
ENI document ID
Facility Subfacility Phase Disc. code Type & subtype Sequence no. ENI Rev
3514 01 B YP document number
Project no. Origin. code System code Disc. code Doc. type Sequence no. Rev Total no. of Pages
1305 - VM - 26 - R - XX - 00011 A1 2
A
9 10
B
C
D
E
F
H
9 10
G
7 84 5 621 3
A
B
C
D
7 84 5 6
E
F
G
21 3
H HJ-15-2185-DWG-01-02
GHANA OCTP DEVELOPMENT PROJECT
CLIENT DOC. NO.
VENDOR DOC. NO.
TO BE ADVISED BY CLIENT
REV.NO. DESCRIPTION PREP. BY CHK. BY APPR. BYVALIDITY
STATUS
A1 ISSUE FOR REVIEW LI CHENG THURAIN JENSON-
BUNDLE DRAWING FORTEST SEPARATOR HEATER (26HA2004)
YINSON DWG. NO. SHEET: REV:
SIZE:
SCALE:
TITLE :
PROJECT :
COMPANY : CLIENT :
1 OF 1 A1
A3
NTS
THE ORIGINAL AND ALL COPIES OF THISDRAWING TOGETHER WITH THE COPY RIGHT
THEREOF ARE THE SOLE PROPERTY OFYINSON PRODUCTION PTE LTD
VME.REV.
24.07.2015
DTAE
-
VENDOR :
HEATEC JIETONG PTE LTD
TO BE ADVISED BY CLIENT
BUNDLE ASSEMBLYVIEW A-A
CHANNEL SIDE VIEWTUBESHEET 1 & 2
SHELL SIDE VIEW
O 550BCD
O 428,7OTL
435
O
498
O
595
OD O
20-O22
268-O19.25u0.05
96 96
183
202
8-1/2"-13UNC-`20FOR TUBESHEET 1 ONLY
DETAIL E
34
4,8
6,4
4,8
TUBE HOLE DETAIL
TUBE
WAL
L TH
ICKN
ESS
REDU
CTIO
N 2%
~3%
1.5
1
0.5mm g45vCHAMFER
32TUBE EXP. LENGTH
1TUBE PROTRUSION
19,05
O TUBE
OD
19,25
O
DETAIL G
R 1,5
DETAIL H
24
24
20,8
SEE DETAIL E
SEE DETAIL GSEE DETAIL H
4242
202
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED. 2. ALL BOLT HOLES SHALL STRADDLE TO THE CENTRE LINE UNLESS OTHERWISE SPECIFIED. 3. ALL GASKET SEATING FACE SHALL HAVE SERRATED CONCENTRIC SURFACE FINISH. 4. B.C.D. - BOLT CIRCLE DIAMETER O.T.L. - OUTER TUBE LIMIT. WOL - WELD OVER LAY. TBA - TO BE ADVISED BY CLIENT. 5. TUBE EXPANSION SHALL START A DISTANCE OF 14mm MEASURED FROM THE TUBESHEET SURFACE. 6. WELD OVERLAY MATERIAL SHALL BE S31803.
MATERIAL LISTMARK ITEM DESCRIPTION MATERIAL QTY REMARK
1 TUBESHEET 1 AS SHOWN SA266 Gr2 (WOL) 12 TUBESHEET 2 AS SHOWN SA266 Gr2 (WOL) 13 BAFFLE PLATE AS SHOWN SA240 316/316L 24 TIE ROD 1 AS SHOWN SS316L 65 TIE ROD 2 AS SHOWN SS316L 26 TIE ROD NUT 1/2"-13 UNC SA194 Gr.8 16
7 TUBEOD=19.05,
MIN. THK=1.651, L=1500SA 789 S31803 268
8 SPACER TUBE 1OD=19.05,
THK=1.651, L=460SA213 TP316L 10
9 SPACER TUBE 2OD=19.05,
THK=1.651, L=930SA213 TP316L 2
TIE ROD
524 FOR TIE ROD 2990 FOR TIE ROD 1
50 20TO TUBESHEET
1/2" -13UNC 1/2" -13UNC
1498 (TUBESHEET SURFACE TO TUBESHEET SURFACE)
50 460 470 10
A
A
0v
90v
180v
270v
BAFFLE PLATE
4242
183
96 96
O435
O19.5
6-O14
10
SEE DETAIL I
DETAIL I
10
90°
3D VIEW
183
8 (S31803 WOL)
GENERAL NOTES
1 2
3
4
5
6 7
8
9
1 2
3
4 5
202 202
83
710
1314
1516
1716
1718
1716
1716
1514
1310
7