34
7/21/2019 Building Technology Construction Video Contents http://slidepdf.com/reader/full/building-technology-construction-video-contents 1/34  1  BUILDING TECHNOLOGY- CONSTRUCTION TECHNOLOGY DRAFTS FOR 10 VIDEOS ( 10ft X 10ft Guard Room with seven windows, three doors, toilet, and wash basin. Please see appendix for detail) INTRODUCTION TO CONSTRUCTION VIDEOS ESSENTIAL CONTENT OUTLINE AND SUPPORT MATERIAL

Building Technology Construction Video Contents

Embed Size (px)

DESCRIPTION

this book is reader friendly with lots of pictures for illustration.

Citation preview

Page 1: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 1/34

  1

 

BUILDING TECHNOLOGY-CONSTRUCTION TECHNOLOGY

DRAFTS FOR 10 VIDEOS

( 10ft X 10ft Guard Room

with seven windows, three doors, toilet, and wash basin.Please see appendix for detail)

INTRODUCTION TO CONSTRUCTION VIDEOS

ESSENTIAL CONTENT OUTLINE

AND SUPPORT MATERIAL

Page 2: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 2/34

  2

 

INTRODUCTION TO CONSTRUCTION

TECHNOLOGY VIDEOS

INTRODUCTION AND NOTE:

The main objective of these ten videos is to acquire the knowledge,

understanding, and application of essential concepts in construction

technology. For this purpose, these videos should not only explain

essential concepts and theory but also, should, practically demonstrate

the step by step procedures in the construction of an actual 10ft by 10 ft

guard house with seven windows, three doors, toilet and wash basin.

The goal is that these videos should transfer essential practical skill in

construction technology to participants.

The format below should be considered as a guideline for the

development of videos.

MAIN TOPIC:

SUB TOPICS:

Everyday Applications:

Essential Content:

Practical Examples/Demonstrations:

Purpose/Application/TheoryApparatus/Equipment required

Skill of individuals to perform specific tasks

Proper use of equipment (Demonstrate)

Precautions/Safety Measures

Results/End Products

Discussion/Conclusion

Examples of trends in Technology/New equipment, and

Innovations in Construction domain

Summary of important conceptsAssessment of skills learnt(Short Quiz, interactive questions/answers)

NOTES:

The intention for developing the outlines for the content, and the

support material for videos, is not to provide the transcript but to

provide guidelines for essential content of the videos. Even though

Page 3: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 3/34

  3

practical examples have been given in the material below, these should

not block the creativity of video producers to add examples, additional

theory, and illustrations, to meet the requirements for the essential

content for each video, as well as to meet the necessary terms of

reference for the production of videos.

The associated support material given below should serve to provide

direction and where necessary, should be supplemented according to the

requirements of the essential content of the videos. Further, where

applicable, the content of videos could be arranged such as to best fit the

needs of the users, and the intended application of the videos.

Apart from using the Subject Specialist to assist in writing video

scripts, the producers should hire the individuals with technical and

practical skills in order to create quality output.

ESSENTIAL CONTENT OUTLINE

VIDEO 1 – PREPARATION OF SITE FOR GUARD

HOUSE Identification and selection of site.

Site Plan and drawings. Interpretation of Drawings.Stripping of Site.

Step by step procedures for lining of the Building.

VIDEO 2 – LAYOUT OF BUILDING

Steps used in laying out of a building

Bearing capacity of soil. Factors affecting the depth and width of the

foundation trench.

Excavation / digging of foundation trenchLayout of foundation- Steel work

Concrete strength and mixing ratios. Apply appropriate mixing ratio

for the footing of the Guard House.

Page 4: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 4/34

  4

VIDEO 3 – BLOCK LAYING, CONDUITS, AND PIPES

Prepare mortar with appropriate ratio for Block laying.

Block laying. Cutting and positioning blocks, filling pockets, setting

mortar joints.

Laying of first row of Blocks.Lay electrical conduits, water and drainage pipes.

VIDEO 4 – SETTING BEAMS, COLUMNS, AND

STIFFENERSProcedures for setting beams, columns, and stiffeners. Erecting form

works.

Steel work for beams, columns, and stiffeners. J-Bold placement.

Casting form work with appropriate mortar.

Setting time/duration for all castings.Complete the block work for the Guard house.

VIDEO 5 – WALL CASTING AND FINISHES, AND

FLOOR CASTING FOR THE GUARD HOUSE Types of different wall finishes. Advantages and disadvantages.

Apply rough casting, and rendering/plastering of the walls of the Guard

House.

Demonstrate wall fine finishes using different methods andappropriate ratio for mortar.

Apply appropriate final finishes to the Guard House inside and outside

walls

Casting the floor with appropriate mortar mix for the Guard house.

VIDEO 6 – INSTALLATION OF ROOF

Definition of roof elements.

Installation of wall plates.Calculation of Rafter size and Roof Members.

Installation of Ridge, Rafters, Laths etc.

Installation of hurricane straps.

Page 5: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 5/34

  5

 

VIDEO 7 – ROOF COVERING

Show different types of roof coverings.

State advantages and disadvantages.

Demonstrate using step by step procedure of installing the clay type

roof cover on the Guard House.

VIDEO 8 – INSTALLATION OF WINDOWS AND

DOORS

Different types of Windows and Doors. Advantages and disadvantages .Select appropriate type of Windows and Doors for the Guard House.

Select the correct type of latches, hinges, locks etc.

Step by step procedures of installing Windows and Doors, and locks at

the Guard House.

VIDEO 9 –FINAL FLOOR FINISHES AND USE OF

CERAMIC TILES

Identify different types of floor finishes with essential features.Example: demonstrate Steel Float finishing for the floor.

Install Toilet and Wash Basin.

Selection, procedures, materials , equipment and precautions for the

application of ceramic tiles.

Apply ceramic tiles for the floor of Guard House.

VIDEO 10 – STAIRS

Identification of different types of stairs – Quarter turn, Half turn,Spiral turn, and Straight stairs etc.

Calculation of Riser, Run, and Head Room clearance for stairs.

Demonstrate step by step procedure for setting up reinforcement using

steel for concrete stairs case. Complete the concrete stairs.

Demonstrate step by step procedure for constructing a straight wooden

stairs case. Complete the wooden stairs.

Page 6: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 6/34

  6

Note: The video on stairs is a stand alone video, as the Guard house will

have no stairs. The rise of the both type of stairs stated above, should

be equivalent to the height of the walls of the guard house.

SUPPORT  MATERIAL FORCONSTRUCION TECHNOLOGY VIDEOS

(Using Guard House Project)

IDENTIFICATION, SELECTION AND PREPARATION OF SITE(Steps to be observed)

Preliminary Site investigation:

1  - Establish land ownership – Check with TITLE’S OFFICE for details.

2  - Access to the property - The site should have clear means ( roads, pathways)-  Access to the property.

3  - Perform Soil Test - A soil test must be done to determine the nature and the

load bearing capacity of the soil.4  - Availability of services - The availability of electricity and water service, is

an important factor to consider. The distance from other facilities such as

hospital, bank, supermarkets etc are also factors to be considered.5  - Area Specification: determine Zone Limitations and. Building Code for the

zones6  - Topography and Land history - The topography and history of any siteis important. It will aid in determining the equipment needs

to get the site ready for construction. The history of the site will also aid in

determining the effect of weather, flooding, water resources, landslide issues

etc.7  - Environmental Standards : The Site and construction must meet the

environmental standards.

Site Plan and Interpretation of Drawings:

The drawings should include; (APPENDIX A)i.  Site

ii.  Floor

iii.  Foundationiv.  Roof

v.  Drainage

vi.  ElectricalAll the above drawings should be in accordance with the standard code used by the

local authority.

Page 7: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 7/34

  7

Stripping of Site

•  Strip top soil to remove vegetation, trees etc.

•  Create a surface for building to be laid out

The striping of the site and creating a hardcore layer for construction is a standard

procedure.

•  Acquire relevant tools or machines neededi.  Backhoe

ii.  Roller

iii.  Shovelsiv.  Pick Ox

The equipment should be stored at a safe place and retrieved as desired.

•  Obtain relevant skilled personsi.  Operator for the Backhoe and Roller

ii.  Labourers

Where necessary, one may acquire relevant skills outside the area.

Lining of the proposed building•  Erect profile board (batter board) at the corner of the building

Fig. 1

(From the internet)

•  Establish Foundation footing trench

Page 8: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 8/34

  8

 Fig. 2

(From the internet)

•  Establish wall trench

2.  Excavation of Trench

•  Acquire relevant tools or machines neededi.  The Backhoe

ii.  Roller

iii.  Shovels

iv.  Pick ox

•  Obtain relevant skilled personsi.  Operator for the Backhoe and Roller

ii.  Labourers

•  Excavate foundation in accordance with building codei.  Reference from building code

ii.  Area specification to environmental standards

3.  Bending and Forming of Steel work for foundation

•  Acquire relevant tools or machines neededi.  steel bender

Fig 3 – Steel Benders

Page 9: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 9/34

  9

 

•  Obtain relevant skilled persons

•  Bend steel to create the foundation reinforcement

•  Assemble steel to create foundation reinforcement

•  Place reinforcement in foundation trenchThere are many tools designed for the bending of steel, and many tradesmen design

make-stiff tool that will get the job done like the one see in the photo above.

Fig 4

Page 10: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 10/34

  10

 

Each step stated above should be carried out with quality to ensure that the building isconstructed according to standards.

4.  Pouring concrete

•  Acquire relevant tools or machines neededi.  Mixer

Page 11: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 11/34

  11

 Fig 5

Portable Electric Concrete Mixer

Or Manual

Batching on Site

Fig 6

•  Obtain relevant skilled personsi.  Mixer operator

ii.  Labourers to mix

•  Mix concrete to specifications – state factors effecting the concretestrength

i.  Reference from building code

ii.  Area specification to environmental standards

•  Transport concrete to relevant section of site

i.  Wheel- borrow

Page 12: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 12/34

  12

 Fig. 7

ii.  Shovels

Fig 8

Or use portable concrete mixing system.

•  Pour concrete

Page 13: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 13/34

  13

 Fig. 9

LAYING OF BLOCKS

•  Acquire relevant tools or machines neededi.  Spirit Level

ii.  Plumb Bob

iii.  Concrete floats 

iv.  Buckets 

•  Obtain relevant skilled personsi.  Skilled trades-men

ii.  Labourers

•  Prepare footing for first layer of blocks

Step 1

Demonstrate different types of blocks available. Choose the correct blocks for the job.For the most part, you can use regular-sized cement blocks for the most of the block

wall. To complete the course of blocks, you may need special block sizes. You can also

cut blocks to fit the course as necessary.

Step 2

Lay the proper footing. At the minimum, the footing should be twice as wide as the

blocks and twice as deep.

Page 14: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 14/34

  14

 

Step 3

Purchase your blocks. The standard size block is 8 inches by 16 inches. Remember topurchase any specialty blocks you may need. Also, purchase /prepare your mortar.

Step 4

Build a guideline for your wall. Drive stakes of wood at each corner and tie string to

them. Place the stakes in line where you want the course of block to run.

Step 5

Set blocks in place for the first row of the course. Use a piece of scrap 3/8-inch plywood

as a marker between each block. This is the same thickness as the mortar between the

 joints should be.

Step 6

Adjust the concrete blocks to get the right sizes to complete the first row of blocks. Applythe mortar about 1 inch thick and about 8 inches wide on the footing. Set the blocks on it

in a straight line.

•  Establish level before placing additional layers

•  Laying of electrical conduits, water and drainage pippes

•  Lay required layers

Page 15: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 15/34

  15

 

Erecting walls

Wall terms

i.  Define the term walls.ii.  What purposes do walls serve?

iii.  Identify the types of walls.

1.  Tools for laying Blocks and skills

•  Acquire relevant tools or machines needed

Types of Spirit Level

Page 16: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 16/34

  16

 Pointing Trowel

Bush Hammer

•  Obtain relevant skilled persons

i.  Trained block layer

ii.  Labourers

•  Ensure foundation wall is level to receive blocks

The laying of blocks

Page 17: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 17/34

  17

 

•  Interlock blocks over steel from foundation

•  Ensure that wall openings are in accord with the given drawings

2.  Bending and Forming of Steel work for belt beam (ring beam)

•  Acquire relevant tools or machines needed

•  Obtain relevant skilled persons

•  Bend steel to create the belt beam reinforcement

•  Assemble steel to create belt beam reinforcement

•  Place reinforcement in belt beam

3.  Erect formwork to receive belt beam

•  Acquire relevant tools or machines needed

•  Obtain relevant skilled persons

•  Cut and install formwork

•  Place reinforcement to receive poured concrete

•  Pour concrete and allow to dry

Construction and installation of roof

Roof terms

i.  Define the term roofs.

ii.  The purpose and features of roofs .

1.  To keep out rain, wind snow and dust

2.  To prevent excessive heat loss in winter

3.  To keep the interior of the building cool in the summer4.  To keep unwanted elements out.

5.  designed to accommodate all stresses encountered

Page 18: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 18/34

  18

6.  designed to accept movement due to change in temperature and moisture

content

iii.  Identify the types of roofs and roof members.

Roofs are design taking into consideration the climate of the region, and the

structure of the building.

iv.  Identify and define roof members1. Ridge board This is the spine of the roof, and is a pitching plate for the rafters,

which are nailed to each other through the ridge board. The

depth of the ridge board is determined by the pitch of the roof.

2. Common Rafter The main load-bearing member of the roof  is the common rafter.

It spans between the wall plate and the ridge board.

3. Jack Rafter These are fillers. They serve the same function as the common

rafter but span between the ridge board and valley rafter OR hip

rafter and wall plate.

4. Hip Rafter Similar to the common rafter, as they run from the ridge board to

the wall plate. They are different in that they form the external

angle in a Hip roof.

5. Wall plates These provide the bearing and fixing medium for all the various

roof members and distribute the load equally to the supportingwalls.

6. Eave This is the lowest edge of the roof. It forms the overhang to the

wall and gives protection from rain water. The amount ofprojection from the wall ranges between 300 mm – 450 mm.

(A diagram can be found in Construction Technology Volume 1 By R. Chudley page

105)

Steps to be observed

1.  Install wall plates on the belt beam to receive roofing

•  Secure wall plate to J-bolt

Page 19: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 19/34

  19

 

The J Bolt

•  Tighten J-bolt

•  Install wall plate

Page 20: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 20/34

  20

 

•  Roof members

Page 21: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 21/34

  21

 

•  Roof Designs

Page 22: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 22/34

  22

2.  TO Install roof members

•  Acquire relevant tools or machines needed

•  Obtain relevant skilled persons

Application of finishes

Types of wall finishes

i.  Define the term finishes.

ii.  What purposes do finishes serve?

iii.  Identify the types of wall finishes.iv.  Identify and define wall finishes.

Step to be observed

1.  Preparing wall to receive finish

•  Acquire relevant tools or machines needed

•  Obtain relevant skilled persons

•  Apply desired finish

Flooring

i.  Identify and define the term flooring.

ii.  What purposes does flooring serve?

iii.  Identify the types of flooring.

Steps to be observed

1.  Prepare ground to receive flooring

•  Acquire relevant tools or machines needed

•  Obtain relevant skilled persons

•  Compact ground

•  Bend steelwork

•  Pour concrete and allow to dry

2.  Prepare floor finish

•  Acquire relevant tools or machines needed

•  Obtain relevant skilled persons

•  Select the type of finish to be used and apply to specifications

Page 23: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 23/34

  23

 

Project: Stairs

Title: Designing and constructing stairs

Stairs

i.  What purpose do stairs serve?

ii.  Identify and define the members of, and the terms associated with stairs.

Stairwell: Stairs: Tread, Nosing, Rise, Riser, Going, Run, Flight, Head roomclearance, Newel, Strings, Step, Handrail, Baluster, Pitch line

iii.  Types of Stairs:

Quarter turn, Half turn, Spiral turn, and straight stairs.

Also

a.  Long L stairway

b.  Doudle L stairsc.  Wide L stairsd.  Narrows U Stairs

e.  Wide U stairs

f.  Winding stairs

etc

Page 24: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 24/34

  24

 

Some Examples of types of stairs

Page 25: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 25/34

  25

 

iv.  Further types of stairs ( some examples)

Page 26: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 26/34

  26

 

Elements of stairs

Steps to be observed

1.  Identify area that stairs will be installed

•  Select appropriate area based on availability of space

Stairwell Opening

•  Calculate the total rise, run, and head room clearance.

•  Calculate the required number of treads and risers

Page 27: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 27/34

  27

 

Stairs Design

Demonstrate step by step procedure for setting up reinforcement using steelfor concrete stair case. Perform calculations and construct the stairs.

Demonstrate step by step procedure for constructing a straight wooden stair

case. Perform calculations and construct the stairs.

•  Acquire relevant tools or machines needed

•  Obtain relevant skilled persons

•  Examine construction for accuracy of design

•  Check stairs for safety in accordance with building code

Page 28: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 28/34

  28

 

APPENDIX

(GUARD HOUSE DRAWINGS)

Page 29: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 29/34

  29

 

Page 30: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 30/34

  30

 

Page 31: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 31/34

  31

 

Page 32: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 32/34

  32

 

Page 33: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents

http://slidepdf.com/reader/full/building-technology-construction-video-contents 33/34

  33

 

Page 34: Building Technology Construction Video Contents

7/21/2019 Building Technology Construction Video Contents