Report BUILDING SURVEY FOR ASBESTOS CONTAINING MATERIALS Subject Property: Single-Family Residence Address: 1057 Taughannock Boulevard Ithaca, New York Date of Survey: August 25, 2018 Prepared by: Lakeland Environmental Inc. 12 South Main Street, Suite 301 Homer, NY 13077 www.lakelandenvironmental.com

BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

Report BUILDING SURVEY FOR ASBESTOS CONTAINING MATERIALS

Subject Property: Single-Family Residence

Address: 1057 Taughannock Boulevard Ithaca, New York

Date of Survey: August 25, 2018

Prepared by:

Lakeland Environmental Inc. 12 South Main Street, Suite 301 Homer, NY 13077 www.lakelandenvironmental.com

Page 2: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

1057 Taughannock Boulevard, Ithaca, NY – Pre-Demolition Survey

CONTENTS

I. Executive Summary ..................................................................................................................... 3

A. Overview ........................................................................................................................... 3

B. Significant Findings ............................................................................................................ 3

II. General Information ................................................................................................................... 5

A. Description of Structure .................................................................................................... 5

B. Purpose of Survey ............................................................................................................. 5

C. General Procedure ............................................................................................................ 6

D. Limits of Survey ................................................................................................................. 7

III. Asbestos Survey Procedures ..................................................................................................... 7

A. Inspection & Sampling ...................................................................................................... 7

B. Laboratory Testing ............................................................................................................ 7

IV. Findings ...................................................................................................................................... 8

A. Laboratory Results ............................................................................................................ 8

B. Summary of Findings ......................................................................................................... 8

C. Transmittal of Survey Information .................................................................................... 9

V. Recommendations ................................................................................................................... 10

TABLES – FIGURES

Table 1 -- Asbestos Survey Results Table 2 – Summary of Homogeneous Areas Figure 1 -- Site Location Map Figure 2 -- Building and Sampling Diagram Photos

APPENDICES

Appendix A - Laboratory Analytical Data Appendix B - Inspector & Laboratory Accreditation Appendix C - Glossary Of Terms, Abbreviations, And Acronyms

Page 3: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

1057 Taughannock Boulevard, Ithaca, NY – Pre-Demolition Survey

I. Executive Summary

This Section is a summary only and the user must refer to the entire contents of this report including Appendices.

A. Project Background

Project Background

Purpose of Survey: Pre-demolition

Asbestos Survey Contractor: Lakeland Environmental Inc.

Date of Survey: August 25, 2018

Inspector(s): Stephen Major

NYSDOL Certificate(s): 03-01809

Client: Latipac Builders

Site Name: Single-Family Residence

Site Address: 1057 Taughannock Boulevard, Ithaca, New York

Brief Building Description: The subject structure is a wood-framed house

Property Owner: Linda Ruth

Owner Mailing Address: 1061 Taughannock Boulevard, Ithaca, NY 14850

Occupancy: Vacant

This building survey was performed on the subject building as part of the requirements for demolition and/or renovation under the New York State Department of Labor (NYSDOL) Industrial Code Rule 56, to determine if asbestos containing materials (ACMs) were used to build the structure. Suspect building materials were categorized into homogeneous areas and then inspected and sampled in order to be identified as ACMs or non-asbestos containing materials (NACMs).

B. Significant Findings

The findings of this asbestos survey are listed below. Additional details are presented in Section IV.

Page 4: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

1057 Taughannock Boulevard, Ithaca, NY – Pre-Demolition Survey

The following materials were found to contain asbestos in concentrations greater than 1%:

Friable ACMs

• Friable fabric duct tape on ducts in the basement (approximately 5 square feet visible; additional material may exist in hidden cavities within the structure).

• Friable joint compound in the second floor mid bathroom (approximately 100 square feet estimated). This material may exist in other rooms. A joint compound study is necessary to properly delineate the extent of this ACM within the structure. Otherwise, all joint compound in the structure must be assumed to be ACM.

Non-Friable ACMs

• Non-friable green 9x9 floor tiles in the second floor corridor and the first floor kitchen and vestibule (approximately 300 square feet estimated). This material is largely hidden beneath other flooring and may be located in additional rooms; therefore, the listed quantity is a rough estimate. The associated mastic is non-ACM.

• Non-friable blue 9x9 floor tiles in the second floor laundry room (approximately 150 square feet estimated). This material is largely hidden beneath other flooring and may be located in other rooms; therefore, the listed quantity is a rough estimate. The associated mastic is non-ACM.

• Non-friable red vinyl flooring in the first floor kitchen and vestibule (approximately 150 square feet). This material is located beneath other flooring.

• Non-friable asphaltic roll roofing on the low-slope roof hidden in the attic (approximately 150 square feet). This material is located beneath non-ACM roll roofing.

• Non-friable asphaltic flashing cement at joints and penetrations in the roof (approximately 20 square feet). This material is located on roofing hidden in the attic as well as exposed on the main roof at chimneys, pipes, etc. Some of this material may be located beneath the top layer of metal roofing; therefore, the listed quantity is a rough estimate.

Page 5: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

1057 Taughannock Boulevard, Ithaca, NY – Pre-Demolition Survey

II. General Information A. Description of Structure

Description of Structure

Number of Stories: 2 stories

Superstructure: Wood framed

Foundation: Basement and crawl space

Roofing: Asphaltic, metal

Exterior Walls / Siding: Wood

Interior Floors: Floor tiles, wood flooring, resilient flooring, carpet, ceramic tile, concrete

Interior Walls: Drywall, plaster, fiberboard

Interior Ceilings: Drywall, ceiling tiles, ceiling panels

Heating System: Forced air

Heating Plant Location: Basemen

Other Features: N/A

Outbuildings: N/A

B. Purpose of Survey

This survey was conducted in order to determine whether asbestos-containing materials (ACMs) and/or asbestos materials are present in the structure. Asbestos can cause debilitating or fatal illnesses. When disturbed, as during demolition or renovation activities, asbestos fibers can become airborne whereupon they can create a health hazard. ACMs and asbestos materials in buildings, and the disturbance of same, are regulated under federal, state, and local laws. As part of asbestos surveys, suspect ACMs are identified and, where appropriate, sampled for analysis by an accredited laboratory. The suspect materials are also grouped into two categories: friable (able to be crushed or pulverized by hand pressure) and non-friable. Materials that are typically non-friable in their normal state, such as asphalt roofing or resilient floor tile, may become friable when subjected to mechanical abrasion activities (e.g. dry cutting or floor sanding). The physical disintegration of the material could cause asbestos fibers to be dispersed into the air.

Page 6: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

1057 Taughannock Boulevard, Ithaca, NY – Pre-Demolition Survey

C. General Procedure Suspect ACMs are targeted for identification by (1) a review of pertinent building plans and other records, where available, and (2) by the sampling of suspect materials for certified laboratory analysis. The following list (excerpted from 12NYCRR Part 56-5) summarizes typical ACMs and suspect materials in buildings; it is not all-inclusive:

Typical ACMs / Suspect Materials

Surfacing Treatments:

• Fireproofing • Finish plasters

• Acoustical plaster • Skim coats of joint compound

Thermal System Insulation:

• Equipment insulation • Cement or mortar used for boilers & refractory brick

• Boiler breeching, rope, duct, or tank insulation • Piping and fitting insulations

Roofing and Siding Miscellaneous Materials:

• Insulation board • Cementitious board (transite)

• Vapor barriers • Flashing

• Coatings • Shingles

• Non-metallic or non-wood roof decking • Galbestos

• Felts

Other Miscellaneous Materials:

• Dust and debris • Fire blankets

• Floor tile • Fire doors

• Cove base • Brakes and clutches

• Floor leveler compound • Mastics, adhesives and glues

• Ceiling tile • Caulks

• Vermiculite insulation • Sheet flooring (linoleum)

• Gaskets, seals, sealants • Wallpaper

• Vibration isolators • Drywall

• Laboratory tables and hoods • Plasterboard

• Chalkboards • Spackling/joint compound

• Pipe penetration packing / firestopping materials • Textured paint

• Cementitious board • Grout

• Electrical wire insulation • Glazing compound

• Fire curtains • Terrazzo

Page 7: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

1057 Taughannock Boulevard, Ithaca, NY – Pre-Demolition Survey

D. Limits of Survey

It is the belief of the inspector that the survey was comprehensive in nature. However, certain materials could exist within the survey area that were not exposed even though destructive techniques were authorized. Accessible areas were visually inspected and covering surfaces were removed as safety concerns and the limits of the survey permitted. The described locations of ACMs may not be all-inclusive. Quantities of ACMs are estimated and are not intended to be used for abatement project bidding/pricing. The abatement contractor, project designer, and others are advised to verify all site parameters including material quantities.

III. Asbestos Survey Procedures A. Inspection & Sampling

The physical inspection of the property was conducted on August 25, 2018. The inspection consisted of the examination of accessible suspect materials (which may contain asbestos) in interior and exterior installations within the structure, in accordance with 12NYCRR Part 56-1.9. Asbestos records: No records were provided that indicate the presence of ACMs in the building. The structure was visually inspected to identify potential ACMs. The inspector assessed each suspect material to determine whether the material was friable or non-friable. Quantities and condition of suspect ACMs were recorded. The suspect materials in this inspection were flooring, mastics, drywall, joint compound, plaster, ceiling tiles, fiberboard and gypsum panels, thinset mortar, grout, clay block mortar, window glazing compound, roofing, felts, insulation, and thermal system insulation. A total of 67 samples were collected and submitted for analysis. Certain building materials that were obviously not ACMs, such as wood, concrete, glass, and metal, were not sampled.

B. Laboratory Testing

Collected samples were sealed for transport under chain-of-custody documentation to AmeriSci Laboratories in New York, NY, NYS ELAP #11480. Samples were received at the laboratory on August 29, 2018. The analytical data were received from the laboratory on September 5, 2018. A copy of the laboratory’s certification is included in Appendix B.

Page 8: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

1057 Taughannock Boulevard, Ithaca, NY – Pre-Demolition Survey

Either Polarized Light Microscopy (PLM) with Dispersion Staining or Gravimetric Matrix Reduction and PLM with Transmission Electron Microscopy (TEM), used for negative confirmation, were performed. Non-friable organically bound samples (NOBs) such as vinyl floor tile or asphalt-based roofing material are required, in NYS, to be analyzed utilizing gravimetric reduction protocols. NOB samples testing negative under the PLM portion of this examination underwent TEM analysis. Multiple samples were taken of most homogeneous suspect materials. In order to minimize analytical costs the laboratory was instructed to forego additional analyses if and when one sample of a multiple homogeneous group or a layered system tested positive (positive stop).

IV. Findings A. Laboratory Results

The laboratory analytical results are attached as Appendix A. B. Summary of Findings

The following materials were found to contain asbestos in concentrations greater than 1%:

Friable ACMs

• Friable fabric duct tape on ducts in the basement (approximately 5 square feet visible; additional material may exist in hidden cavities within the structure).

• Friable joint compound in the second floor mid bathroom (approximately 100 square feet estimated). This material may exist in other rooms. A joint compound study is necessary to properly delineate the extent of this ACM within the structure. Otherwise, all joint compound in the structure must be assumed to be ACM.

Non-Friable ACMs

• Non-friable green 9x9 floor tiles in the second floor corridor and the first floor kitchen and vestibule (approximately 300 square feet estimated). This material is largely hidden beneath other flooring and may be located in additional rooms; therefore, the listed quantity is a rough estimate. The associated mastic is non-ACM.

• Non-friable blue 9x9 floor tiles in the second floor laundry room (approximately 150 square feet estimated). This material is largely hidden beneath other

Page 9: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

1057 Taughannock Boulevard, Ithaca, NY – Pre-Demolition Survey

flooring and may be located in other rooms; therefore, the listed quantity is a rough estimate. The associated mastic is non-ACM.

• Non-friable red vinyl flooring in the first floor kitchen and vestibule (approximately 150 square feet). This material is located beneath other flooring.

• Non-friable asphaltic roll roofing on the low-slope roof hidden in the attic (approximately 150 square feet). This material is located beneath non-ACM roll roofing.

• Non-friable asphaltic flashing cement at joints and penetrations in the roof (approximately 20 square feet). This material is located on roofing hidden in the attic as well as exposed on the main roof at chimneys, pipes, etc. Some of this material may be located beneath the top layer of metal roofing; therefore, the listed quantity is a rough estimate.

Survey Data Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any), and asbestos content are summarized in Table 1. Homogeneous Areas Homogeneous areas of ACM and non-ACM materials are summarized in Table 2. Building Diagrams Diagrams of the building showing locations of positive and negative samples are presented in Figure 2. Photos of ACMs are in the Photos section after Figure 2.

C. Transmittal of Survey Information

In accordance with 12NYCRR Part 56, the results of the building/structure asbestos survey shall be immediately transmitted by the building/structure owner as follows:

1. “One copy of the completed asbestos survey shall be sent by the owner or their

agent to the local government entity charged with issuing a permit for such demolition, renovation, remodeling or repair work under applicable State or local laws.”

2. “The completed asbestos survey for controlled demolition (as per Subpart 56-11.5) or pre-demolition asbestos projects shall also be submitted to the appropriate

Page 10: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

1057 Taughannock Boulevard, Ithaca, NY – Pre-Demolition Survey

Asbestos Control Bureau District Office.” The local New York State Asbestos Control Bureau District Office is provided below.

3. “The completed asbestos survey shall be kept on the construction site with the asbestos notification and variance, if required, throughout the duration of the asbestos project and any associated demolition, renovation, remodeling or repair project.” SYRACUSE DISTRICT (Counties: Allegany, Broome, Cayuga, Chemung, Chenango, Cortland, Delaware, Franklin, Hamilton, Herkimer, Jefferson, Lewis, Madison, Oneida, Onondaga, Oswego, Otsego, St. Lawrence, Schuyler, Seneca, Steuben, Tioga, Tompkins)

▪ 450 S. Salina Street, Syracuse, NY 13202; (315) 479-3215

V. Recommendations Prior to demolition, asbestos containing materials should be removed in accordance with 12NYCRR Part 56. A joint compound study is necessary to properly delineate the extent of this ACM within the structure. Otherwise, all joint compound in the structure must be assumed to be ACM. If hidden or otherwise suspect ACMs are discovered during demolition activities (or within the debris pile) they should be sampled and analyzed according to the procedures herein, and the scope of the demolition or removal altered as necessary based on the findings. This survey report should be filed by the building owner with the appropriate governmental agencies, as noted in Section IV.C of this report. The inspector will retain a copy of this report in accordance with 12 NYCRR Part 56. Questions related to this survey should be directed to the Inspector at 607-299-4818. Respectfully Submitted, LAKELAND ENVIRONMENTAL INC.

Stephen Major N.Y. Asbestos Inspector No. 03-01809

Page 11: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

1057 Taughannock Boulevard, Ithaca, NY – Pre-Demolition Survey

Tables

Page 12: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

p. 1 of 3

Date

Lakeland

Sample # Layer

Diagram

location

number Building area

Location (refer to

diagrams) Suspect material Friability

Condition

of Friable

ACM H.A.

Estimated

Quantity of

Homogeneous

ACM % asbestos

8/25/18 H2518-101 1 1 2FL Hall Green 9x9 floor tile Non-friable n/a A 300 s.f. 10.6%

8/25/18 H2518-101 2 1 2FL Hall Felt mastic @ 9x9 floor tile Non-friable n/a A n/a Trace

8/25/18 H2518-102 1 2 1FL Kitchen Green 9x9 floor tile Non-friable n/a A same as loc. 1 PS

8/25/18 H2518-102 2 2 1FL Kitchen Felt mastic @ 9x9 floor tile Non-friable n/a A n/a Trace

8/25/18 H2518-103 1 3 2FL Laundry Blue 9x9 floor tile Non-friable n/a B 150 s.f. 8.9%

8/25/18 H2518-103 2 3 2FL Laundry Felt mastic @ 9x9 floor tile Non-friable n/a B n/a NAD

8/25/18 H2518-104 1 4 2FL Laundry Blue 9x9 floor tile Non-friable n/a B same as loc. 3 PS

8/25/18 H2518-104 2 4 2FL Laundry Felt mastic @ 9x9 floor tile Non-friable n/a B n/a NAD

8/25/18 H2518-105 n/a 5 2FL Laundry White 12x12 P&S floor tile Non-friable n/a C n/a NAD

8/25/18 H2518-106 n/a 6 2FL Laundry White 12x12 P&S floor tile Non-friable n/a C n/a NAD

8/25/18 H2518-107 n/a 7 2FL Mid bath Wall glue Non-friable n/a D n/a NAD

8/25/18 H2518-108 n/a 8 2FL Mid bath Wall glue Non-friable n/a D n/a NAD

8/25/18 H2518-109 n/a 9 2FL Rear LR Insulation paper Non-friable n/a E n/a NAD

8/25/18 H2518-110 n/a 10 2FL Rear LR Insulation paper Non-friable n/a E n/a NAD

8/25/18 H2518-111 n/a 11 2FL Front bath Floor thinset mortar Non-friable n/a F n/a NAD

8/25/18 H2518-112 n/a 12 2FL Front bath Floor thinset mortar Non-friable n/a F n/a NAD

8/25/18 H2518-113 n/a 13 2FL Front bath Grout Non-friable n/a F n/a NAD

8/25/18 H2518-114 n/a 14 2FL Front bath Grout Non-friable n/a F n/a NAD

8/25/18 H2518-115 n/a 15 2FL Laundry Fiberboard panel Friable n/a G n/a NAD

8/25/18 H2518-116 n/a 16 2FL Laundry Fiberboard panel Friable n/a G n/a NAD

8/25/18 H2518-117 n/a 17 2FL Mid bath Fiberboard panel Friable n/a H n/a NAD

8/25/18 H2518-118 n/a 18 2FL Mid bath Fiberboard panel Friable n/a H n/a NAD

8/25/18 H2518-119 n/a 19 2FL L mid BR 1.3x1.3 ceiling tile Friable n/a I n/a NAD

8/25/18 H2518-120 n/a 20 2FL L mid BR 1.3x1.3 ceiling tile Friable n/a I n/a NAD

8/25/18 H2518-121 n/a 21 2FL Mid bath Drywall Friable n/a J n/a NAD

8/25/18 H2518-122 n/a 22 2FL Mid bath Joint compound Friable Damaged J 100 s.f. 1.5%

8/25/18 H2518-123 n/a 23 2FL Front LR Drywall Friable n/a K n/a NAD

8/25/18 H2518-124 n/a 24 2FL Front LR Joint compound Friable n/a K n/a NAD

8/25/18 H2518-125 n/a 25 2FL L rear BR Drywall Friable n/a L n/a NAD

8/25/18 H2518-126 n/a 26 2FL L rear BR Joint compound Friable n/a L n/a NAD

8/25/18 H2518-127 n/a 27 2FL L mid BR Fibrous insulation Friable n/a M n/a NAD

8/25/18 H2518-128 n/a 28 2FL L mid BR Fibrous insulation Friable n/a M n/a NAD

NAD = No asbestos

PS = Positive Stop: the sample or layered system is presumed to contain asbestos

Table 1 Notes:

Orange highlighting indicates samples with greater than 1% asbestos - POSITIVE or presumed

H.A. = Homogeneous Area

PROJECT: 1057 TAUGHANNOCK BLVD., ITHACA, NY

Pre-Demolition Asbestos Survey

Table 1 - Summary of Results

Page 13: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

p. 2 of 3

Date

Lakeland

Sample # Layer

Diagram

location

number Building area

Location (refer to

diagrams) Suspect material Friability

Condition

of Friable

ACM H.A.

Estimated

Quantity of

Homogeneous

ACM % asbestos

8/25/18 H2518-129 n/a 29 2FL Mid bath Loose fill insulation Friable n/a N n/a NAD

8/25/18 H2518-130 n/a 30 2FL Mid bath Loose fill insulation Friable n/a N n/a NAD

8/25/18 H2518-131 n/a 31 2FL L mid BR Thin ceiling board Friable n/a O n/a NAD

8/25/18 H2518-132 n/a 32 2FL L mid BR Thin ceiling board Friable n/a O n/a NAD

8/25/18 H2518-133 n/a 33 1FL Kitchen Red vinyl flooring (bot) Non-friable n/a P 12.0%

8/25/18 H2518-134 n/a 34 1FL Kitchen Red vinyl flooring (bot) Non-friable n/a P PS

8/25/18 H2518-135 n/a 35 1FL Kitchen Brown 1.5x1.5 P&S floor tile Non-friable n/a Q n/a NAD

8/25/18 H2518-136 n/a 36 1FL Kitchen Brown 1.5x1.5 P&S floor tile Non-friable n/a Q n/a NAD

8/25/18 H2518-137 n/a 37 1FL Kitchen Wall mastic Non-friable n/a R n/a Trace

8/25/18 H2518-138 n/a 38 1FL Kitchen Wall mastic Non-friable n/a R n/a Trace

8/25/18 H2518-139 n/a 39 1FL Bath Tan 12x12 P&S floor tile Non-friable n/a S n/a NAD

8/25/18 H2518-140 n/a 40 1FL Bath Tan 12x12 P&S floor tile Non-friable n/a S n/a NAD

8/25/18 H2518-141 n/a 41 1FL Kitchen Plaster Friable n/a T n/a NAD

8/25/18 H2518-142 n/a 42 1FL Kitchen Plaster Friable n/a T n/a NAD

8/25/18 H2518-143 n/a 43 1FL Kitchen Plaster Friable n/a T n/a NAD

8/25/18 H2518-144 n/a 44 1FL Porch Carpet mastic Non-friable n/a U n/a NAD

8/25/18 H2518-145 n/a 45 1FL Porch Carpet mastic Non-friable n/a U n/a NAD

8/25/18 H2518-146 n/a 46 Basement Ducts Fabric duct tape Friable Damaged V 66.7%

8/25/18 H2518-147 n/a 47 Basement Ducts Fabric duct tape Friable Damaged V PS

8/25/18 H2518-148 n/a 48 Basement Walls Masonry mortar Non-friable n/a W n/a NAD

8/25/18 H2518-149 n/a 49 Basement Walls (clay block) Masonry mortar Non-friable n/a W n/a NAD

8/25/18 H2518-150 n/a 50 Exterior 2FL R window Glazing compound Non-friable n/a X n/a Trace

8/25/18 H2518-151 n/a 51 Exterior 2FL R window Glazing compound Non-friable n/a X n/a Trace

8/25/18 H2518-152 n/a 52 Exterior Rear bsmt window Glazing compound Non-friable n/a Y n/a NAD

8/25/18 H2518-153 n/a 53 Exterior Rear bsmt window Glazing compound Non-friable n/a Y n/a NAD

8/25/18 H2518-154 n/a 54 Roof Main Asphaltic shingle (top) Non-friable n/a Z n/a NAD

8/25/18 H2518-155 n/a 55 Roof Main Asphaltic shingle (top) Non-friable n/a Z n/a NAD

8/25/18 H2518-156 n/a 56 Roof In attic Asphaltic shingle (top) Non-friable n/a AA n/a NAD

150 s.f.

5 s.f.

NAD = No asbestos

PS = Positive Stop: the sample or layered system is presumed to contain asbestos

H.A. = Homogeneous Area

PROJECT: 1057 TAUGHANNOCK BLVD., ITHACA, NY

Pre-Demolition Asbestos Survey

Table 1 - Summary of Results

Table 1 Notes:

Orange highlighting indicates samples with greater than 1% asbestos - POSITIVE or presumed

Page 14: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

p. 3 of 3

Date

Lakeland

Sample # Layer

Diagram

location

number Building area

Location (refer to

diagrams) Suspect material Friability

Condition

of Friable

ACM H.A.

Estimated

Quantity of

Homogeneous

ACM % asbestos

8/25/18 H2518-157 n/a 57 Roof In attic Asphaltic shingle (top) Non-friable n/a AA n/a NAD

8/25/18 H2518-158 n/a 58 Roof In attic Asphaltic shingle (bot) Non-friable n/a AA n/a NAD

8/25/18 H2518-159 n/a 59 Roof In attic Asphaltic shingle (bot) Non-friable n/a AA n/a NAD

8/25/18 H2518-160 n/a 60 Roof In attic Asphaltic felt Non-friable n/a AA n/a NAD

8/25/18 H2518-161 n/a 61 Roof In attic Asphaltic felt Non-friable n/a AA n/a NAD

8/25/18 H2518-162 n/a 62 Roof In attic - flat Asphaltic roll roofing (top) Non-friable n/a BB n/a Trace

8/25/18 H2518-163 n/a 63 Roof In attic - flat Asphaltic roll roofing (top) Non-friable n/a BB n/a Trace

8/25/18 H2518-164 n/a 64 Roof In attic - flat Asphaltic roll roofing (bot) Non-friable n/a BB 1.8%

8/25/18 H2518-165 n/a 65 Roof In attic - flat Asphaltic roll roofing (bot) Non-friable n/a BB PS

8/25/18 H2518-166 n/a 66 Roof In attic Asphaltic flashing cement Non-friable n/a CC 4.1%

8/25/18 H2518-167 n/a 67 Roof In attic Asphaltic flashing cement Non-friable n/a CC PS

150 s.f.

20 s.f.

NAD = No asbestos

PS = Positive Stop: the sample or layered system is presumed to contain asbestos

H.A. = Homogeneous Area

PROJECT: 1057 TAUGHANNOCK BLVD., ITHACA, NY

Pre-Demolition Asbestos Survey

Table 1 - Summary of Results

Table 1 Notes:

Orange highlighting indicates samples with greater than 1% asbestos - POSITIVE or presumed

Page 15: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

p. 1 of 2

Area Material Locations Friability

ACM?

Y/N

Quantity of

ACM*

A Green 9x9 floor tile and felt/mastic

2nd floor corridor and other rooms;

1st floor kitchen and vestibule. Most

of this material is located beneath

other flooring, including vinyl and

carpet. Non-friable Y** 300 s.f.

B Blue 9x9 floor tile and felt/mastic

2nd floor laundry; may be located in

other rooms. This material is located

beneath other flooring. Non-friable Y** 150 s.f.

C White 12x12 peel & stick floor tile 2nd floor laundry (top layer) Non-friable N N/A

D Wall glue/mastic 2nd floor mid bathroom Non-friable N N/A

E Asphaltic insulation backing

2nd floor living room and other

rooms, in wall/ceiling cavities Non-friable N N/A

F

Ceramic tile thinset mortar and

grout 2nd floor front bathroom Non-friable N N/A

G Fiberboard panel 1st floor mid bath and other rooms Friable N N/A

H Fiberboard panel 2nd floor laundry and other rooms Friable N N/A

I 1.3x1.3 ceiling tile 2nd floor bedrooms Friable N N/A

J Drywall and joint compound

2nd floor mid bathroom; only joint

compound is ACM Damaged Y*** 100 s.f.

K Drywall and joint compound 2nd floor front living room Friable N N/A

L Drywall and joint compound 2nd floor left rear bedroom Friable N N/A

M Fibrous insulation 2nd floor left mid bedroom Friable N N/A

N Loose fill insulation 2nd floor mid bathroom Friable N N/A

O Thin layered gypsum ceiling board 2nd floor mid bathroom Friable N N/A

* Quantities are estimated and approximate: s.f. = square feet; l.f. = linear feet

**Felt/mastic is non-ACM

***ACM joint compound may exist in other rooms

PROJECT: 1057 TAUGHANNOCK BLVD., ITHACA, NY

Pre-Demolition Asbestos Survey

Table 2 - Summary of Homogeneous Areas

Table 2 Notes:

Orange highlighting indicates Asbestos Containing Materials

Page 16: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

p. 2 of 2

Area Material Locations Friability

ACM?

Y/N

Quantity of

ACM*

P Red vinyl flooring

1st floor kitchen and vestibule,

bottom layer Non-friable Y 150 s.f.

Q Brown 1.5x1.5 peel & stick floor tile

1st floor kitchen & vestibule, top

layer Non-friable N N/A

R Wall mastic 1st floor kitchen Non-friable N N/A

S Tan 12x12 peel & stick floor tile 1st floor bathroom Non-friable N N/A

T Plaster 1st floor kitchen Friable N N/A

U Carpet mastic 1st floor porch Non-friable N N/A

V Fabric duct tape Basement ducts Friable Y 5 s.f.

W Masonry mortar at clay blocks Basement Non-friable N N/A

X Glazing compound

All old-style wood and metal window

sash Non-friable N N/A

Y Asphaltic shingle Main roof, top layer Non-friable N N/A

Z Asphaltic shingle

Main roof, mid layer; hidden roof,

top layer Non-friable N N/A

BA Asphaltic shingle

Main roof, bottom layer; hidden

roof, bottom layer Non-friable N N/A

BB Asphaltic roll roofing

Hidden low-slope roof in attic, top

layer Non-friable N N/A

BB Asphaltic roll roofing

Hidden low-slope roof in attic,

bottom layer Non-friable Y 150 s.f.

CC Asphaltic flashing cement

Roof joints and penetrations,

ncluding hidden attic roof Non-friable Y 20 s.f.

Table 2 - Summary of Homogeneous Areas

PROJECT: 1057 TAUGHANNOCK BLVD., ITHACA, NY

Pre-Demolition Asbestos Survey

* Quantities are estimated and approximate: s.f. = square feet; l.f. = linear feet

**Felt/mastic is non-ACM

***ACM joint compound may exist in other rooms

Table 2 Notes:

Orange highlighting indicates Asbestos Containing Materials

Page 17: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

Figures

Page 18: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

FIGURE 1: SITE LOCATION

Project: Pre-Demolition

Asbestos SurveySite: 1057 Taughannock Blvd., Ithaca, NY

Source: USGS 7.5-min. Quadrangle

Ithaca West, New York (2016)

1057 Taughannock Blvd.

Ithaca, NY

Page 19: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

FIGURE 2: BUILDING AND SAMPLING DIAGRAM

Project: Pre-Demolition

Asbestos SurveySite: 1057 Taughannock Blvd., Ithaca, NY

Approximate scale: 1” = 12’

Sheet 1 of 4

Sampling Locations

Positive or

Presumed Samples

Negative Samples

ROOF

TAUGHANNOCK BOULEVARD

5455

56 57 58

59 60 61

62 63 64

65 66 67

HIDDEN ROOFS

IN ATTIC

CAYUGA LAKE

Page 20: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

MID

BATH

FIGURE 2: BUILDING AND SAMPLING DIAGRAM

Project: Pre-Demolition

Asbestos SurveySite: 1057 Taughannock Blvd., Ithaca, NY

Approximate scale: 1” = 12’

Sheet 2 of 4

Sampling Locations

Positive or

Presumed Samples

Negative Samples

2ND FLOOR

TAUGHANNOCK BOULEVARD

ST

AIR

LIVING

FRONT

BATH

51

1

5

6

7 8

9

10

1112 13

14

15

16

17

18

19

2021

50

23

24

25

26

27

28 29 303132

3

4

BEDROOM

LAUNDRY

BEDROOM

22

CAYUGA LAKE

LIVING

Page 21: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

FIGURE 2: BUILDING AND SAMPLING DIAGRAM

Project: Pre-Demolition

Asbestos SurveySite: 1057 Taughannock Blvd., Ithaca, NY

Approximate scale: 1” = 12’

Sheet 3 of 4

Sampling Locations

Positive or

Presumed Samples

Negative Samples

1ST FLOOR

TAUGHANNOCK BOULEVARD

BATH3536

3738

39

4041 4243

4445

233

34

PORCH

KITCHEN

CAYUGA LAKE

ST

AIR

ST

AIR

Page 22: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

FIGURE 2: BUILDING AND SAMPLING DIAGRAM

Project: Pre-Demolition

Asbestos SurveySite: 1057 Taughannock Blvd., Ithaca, NY

Approximate scale: 1” = 12’

Sheet 4 of 4

Sampling Locations

Positive or

Presumed Samples

Negative Samples

BASEMENT

TAUGHANNOCK BOULEVARD

CRAWL

52 53

48

49

46

47

CAYUGA LAKE

Page 23: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

Photos - 1057 Taughannock Boulevard, Ithaca, NY

Photo 1: Fabric duct tape on ducts in the basement is positive friable ACM.

Photo 2: Fabric duct tape on ducts in the basement is positive friable ACM.

Photo 3: Green 9x9 floor tile beneath other flooring in the second floor corridor and first floor vestibule/kitchen (shown here) is positive non-friable ACM.

Page 24: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

Photos - 1057 Taughannock Boulevard, Ithaca, NY

Photo 4: Blue 9x9 floor tile beneath other flooring in the second floor laundry area is positive non-friable ACM.

Photo 5: Red vinyl flooring beneath other flooring in the first floor kitchen and vestibule is positive non-friable ACM.

Photo 6: The bottom layer of low-slope roll roofing on the roof hidden in the attic is positive non-friable ACM.

Page 25: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

Photos - 1057 Taughannock Boulevard, Ithaca, NY

Photo 7: Asphaltic flashing cement at roof joints and penetrations is positive non-friable ACM. The hidden roof in the attic is shown here.

Photo 8: Asphaltic flashing cement at roof joints and penetrations is positive non-friable ACM. One of the chimneys is shown here.

Page 26: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

Appendix A - Laboratory Analytical Data

Page 27: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 28: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 29: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 30: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 31: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 32: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 33: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 34: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 35: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 36: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 37: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 38: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 39: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 40: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 41: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 42: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 43: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 44: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 45: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 46: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 47: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 48: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

Appendix B - Inspector & Laboratory Accreditation

Page 49: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),
Page 50: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

Appendix C Glossary of Terms, Abbreviations, And Acronyms

12 NYCRR Part 56 A part of the Codes, Rules, and Regulations of New York State intended to control asbestos removal and disturbance activities. Commonly referred to as “Code Rule 56.”

12x12 In inches, a size description of floor tile; width x length.

1x1 In feet, a size description of ceiling tile; width x length.

2x2 In feet, a size description of ceiling tile; width x length.

2x4 In feet, a size description of ceiling tile; width x length.

9x9 In inches, a size description of floor tile; width x length.

ACM Asbestos-containing material.

Air-Cell Thermal pipe insulation comprised of corrugated layers which form air spaces.

Asbestos Any of several naturally-occurring amphibole and serpentine minerals which separate into long threadlike fibers.

Asphaltic Having an asphalt or tar-like matrix, as in a typical roof shingle.

BR Bedroom

BUR Built-up roofing; typically layers of asphaltic felt bonded and sealed with tar or pitch.

Ceil Ceiling

Cementitious Having a lime-cement matrix; such materials are typically hard and rigid.

Code Rule 56 A part of the Codes, Rules, and Regulations of New York State intended to control asbestos removal and disturbance activities. Technically referred to as “12 NYCRR Part 56.”

CT Ceiling tile.

DR Dining room.

Drywall A gypsum-based sheet with heavy paper facings, used as a wall and ceiling finish, fire stopping, and sound-deadening.

E East on the compass.

ELAP Environmental Laboratory Approval Program, administered by the New York State Department of Health.

Felt Any of a variety of thick papers and fabrics that are formed by pressing fibers into place, rather than weaving.

Friable Able to be crushed or pulverized by hand pressure.

Glazing Compound

A putty or caulk used to set and seal glass in a window frame.

HVAC Heating, ventilation, and air conditioning.

Joint Compound A gypsum or lime based plaster-like material used to conceal and finish joints in drywall.

Kit Kitchen.

Lagging Thermal insulation typically installed on a boiler or tank.

l.f. Linear feet; a unit of measure typically used to quantify the length of pipe insulation.

Limited For asbestos surveys, the term “limited” acknowledges the fact that all possible suspect materials may not be observed. Some materials can be concealed within inaccessible areas or cannot be reached due to safety concerns. Also, a client may request a survey with limits.

Page 51: BUILDING SURVEY FOR Report ASBESTOS CONTAINING …...Survey data, including sampling locations, material descriptions, friability, condition, estimated quantities of ACM (if any),

LR Living room.

Masonry Structures comprised of concrete, brick, concrete block, or similar materials.

N North on the compass.

NACM Non-asbestos containing material. Contains less than 1% asbestos by laboratory analysis.

NAD No asbestos detected (by laboratory analysis).

NE Northeast on the compass.

NOB Non-friable organically bound. NOBs have an organic matrix (tar, asphalt, plastic, etc.) that generally binds other constituents (fibers, powders) together. Examples are asphaltic roofing and resilient flooring.

Non-Friable Not able to be crushed or pulverized by normal hand pressure.

NW Northwest on the compass.

NYSDOL New York State Department of Labor

PACM Presumed asbestos-containing material.

PLM Polarized light microscopy; a laboratory analytical method for identifying asbestos.

Pre-Demolition Referring to an activity, such as a survey or inspection, conducted prior to the disturbance or demolition of a building or portion of a building.

Resilient Somewhat flexible or plastic; able to be slightly bent or flexed without breaking.

Roll Asphaltic rolled roofing.

S South on the compass.

SE Southeast on the compass.

s.f. Square feet; a unit of area measure typically used to quantify surfacing materials, roofing, drywall, etc.

Shingle A tile (of wood, asphalt, etc.) that is installed in overlapping fashion as a covering on roofs and walls.

Subject Property The building or buildings that are within the work scope of an asbestos survey.

Survey An inspection and sampling of a building, structure, debris pile, etc., for suspect asbestos-containing materials.

Suspect Material A material which may contain asbestos.

SW Southwest on the compass.

TEM Transmission electron microscopy; a laboratory analytical method for identifying asbestos.

Transite A brand of cementitious board or pipe. Older Transite typically contains asbestos.

TSI Thermal system insulation.

Util Utility.

VAT Vinyl asbestos tile (floor).

VCT Vinyl composition tile (floor).

W West on the compass.