18
BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG – PNG LNG Fibre Cable Submarine Networks World Conference Singapore 8-10 September 2015 http:// www.terrapinn.com/conference/submarine-networks-world/index.stm Dominic Quai |Director Level 9, 370 Pitt St Sydney NSW 2000 T: 02 9267 6777 | F: 1300474 044 | M: +61 412911110 E: [email protected] www.gqiconsulting.com.au

BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Embed Size (px)

Citation preview

Page 1: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG – PNG LNG Fibre Cable

Submarine Networks World Conference Singapore 8-10 September 2015

http://www.terrapinn.com/conference/submarine-networks-world/index.stm

Dominic Quai |Director

Level 9, 370 Pitt St Sydney NSW 2000 T: 02 9267 6777 | F: 1300474 044 | M: +61 412911110 E: [email protected] www.gqiconsulting.com.au

Page 2: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

Contents

• Introduction

• Trends and fibre solution for offshore platform communications

• PNG LNG Fibre Cable

2

Page 3: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

Introduction

• DataCo is a new PNG SOE established in 2014 – Is building the PNG National Transmission Network (NTN)– Will be responsible for National and International submarine cables

and international gateways.– The NTN will use part of the PNG LNG fibre cable

• The PNG LNG fibre cable project– Completed in 2014– Serves a major new PNG oil and gas project– Example of Government and private enterprise working together to

provide much needed fibre infrastructure for public communications.• Use of fibre technology to offshore and on shore serve oil and gas installations• Provides new fibre capacity to parts of PNG that would otherwise not be able

to economically justify the investment• DataCo is now commercialising some of the fibres

3

Page 4: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

Submarine Cables in PNG

• International Submarine cables

– Existing cables - APNG-2 and PPC-1

– Planned new cable from Port Moresby - A number of options being considered

• National Submarine Cable Project

– Planned new 5,500km domestic submarine cable network connecting 14 coastal centres and major islands in PNG

– At the vendor evaluation stage

4

Page 5: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

Proposed PNG NationalSubmarine fibre optic cable network

5

ICN1 Existing ICN 1 cable

PNG LNG Fibre

Hides Gas Plant

The PNG LNG Fibre cable will form part of the PNG National Submarine fibre

optic cable network

Page 6: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

Trends in Oil and Gas offshore operations

6

Offshore platform• Onsite

measuring and interpretation

• Decision and action

Today

Short term

Long term

Offshore platform• Onsite measuring• Onshore office

information and consulting on key issues

• Decision and action

Offshore platform• Action and key

HSE decision

Onshore office• Post operations

modeling• Information &

data backup

Onshore office• Real time monitoring• Operations real time

modeling• Communication of

key issues & remarks to offshore field

Onshore office• Real time

controlling and contribution to operating decisions

Platform Connectivity

Onshore office Offshore field

Onshore office Offshore field

Unlimited distance

Onshore officeOffshore

field

Unlimited distance

Onshore Monitoring

Onshore Controlling & Co-operating

Moving towards remote monitoring & less human presence on the

platform

Page 7: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

0

200

400

600

800

1,000

1,200

Capacity required now and in the future

7

> 1 Gb/s75 – 150 Mb/s3 – 9 Mb/s

Illustrations: 150 people offshore platform in deep water with satellite

150 people platform in deep water with fibreoptic technology

Future 150 people offshore platform in deep water with fibre optic

• Currently, data transmission on

an deep water offshore

platform far from the shore is

limited and constrained by its

satellite connection to well

below 10 Mb/s

• Platforms already connected

with optical fibre technology

benefit from much higher

capacity (~1Gb/s installed

capacity) and experience much

higher traffic (75 – 150 Mb/s)

• Data transmission for

operations will jump in future

platforms connected with

optical fibre given the

increased weight of remote

control and new operations

needs such as Permanent

Reservoir Monitoring

2 - 4 Mb/s 5 - 75 Mb/s 30 - 75 Mb/sCrew welfare

1 - 4 Mb/s 30 Mb/s 40 Mb/sPlatform management

0. 25 - 0.51 Mb/s 40 Mb/s 1 000 Mb/sOperations

Today Tomorrow

Satellite Optical Fibre

Fibre matches the Data Traffic needs of today and tomorrow

Page 8: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

Three main connectivity options

8

Platform connectivity provided by

SatelliteOptical FibreMicrowave / Troposcatter

<150 kmUnlimitedReachable distance

300 Mb/sUp to 10 Tb/sCapacity

Point to multi-pointPoint to point & point to multi-pointConnection

Unlimited

10 Mb/s

Point to point

Reliability ++++ ++

Optical fibre offers the best mix

Capex/Opex $$/$$$$$$/$ $$/$$$

Page 9: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

Fibre connection to Offshore Platforms

9

Beach Manhole

CableStation

DRY PLANT

POP LandCable

WET PLANT

Backbone is common with TelecomSpecific Last Mile for

Oil & Gas

Page 10: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

Fixed Platform Static Riser Cable Installation in I/J Tube

10

Page 11: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

Dedicated Dynamic Riser• Assumes an I-Tube is available

• Typically uses flotation to minimize strain

• Requires specific engineering

11

Page 12: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

Floating Asset

Telecom room

Cable CTA UTA/SDU

I-Tube

Seabed

Topside cable

Wet mate connector C2Wet mate connector C1

HoseLength ~60 m

Riser/Umbilical

Subsea Connections Principle

12

Source: Alcatel-Lucent Submarine Networks

Page 13: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

PNG LNG Fibre cable project• PNG LNG Pipeline route

13

Page 14: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

PNG LNG FibreSubmarine Cable route

14

Page 15: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

PNG LNG Fibre cable system • Repeater less 24 optical fibre cable Hides to Port Moresby

• 340Km land fibre optic cable plus 400Km Submarine fibre cable

• Alactel Submarine Networks turnkey contractor to ExxonMobil for submarine part

• Extera Optical SLTE

• Exxon operate and maintains the cable

15

BMH

Caution Bay Near

Port Moresby

HidesGas Plant

Kopi

340 Km land cable Hides to Omati, 10 fibres for DataCo. Remainder for Esso Highlands, Oil Search and SHP

Omati

2x 10 G 2x 10 G 2x 10 G

400Km Submarine cable Omati to Caution Bay, 10 fibres for DataCo. Remainder for: Esso Highlands, Oil Search and SHP

Land fibre access points

2x10 G

DataCo lit capacityonly shown

BMH

Kumul Oil Platform(Connected)

KeremaBU

BereimaBU

Daru BU

BU

DataCo lit capacity only

Submarine Cable 24 fibresLand Cable 24 fibres

Data C

o lan

d fib

re

To P

ort M

ore

sby

Page 16: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

PNG LNG Submarine CableConnecting remote production platform to onshore facilities

• Fibre connection to a fixed offshore platform (KumulMarine Terminal) through a J-tube

• Provides communication from the platform and associated equipment to Port Moresby

• Additional BU’s provided for future use for National Submarine Fibre Cable connection to: – Daru, – Kerrima– Bereima

16

Page 17: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015

Summary

• Only fibre can provides cost effective and reliable communications solutions for the long term communication needs of off shore oil and gas operator for. – Crew welfare

– Safety

– Platform management and

– operations functions in

• Fibre solutions are more expensive that alternatives such as satellites so have a number of economic and technical issues that need to be resolved.

• The PNG LNG fibre project is a good example of where the economic and technical problems were successfully solved.– The project was technically difficult because of the remote location and difficult route e.g. the

fibre cable was required to be buried over a long length of the submarine route in the delta of the Fly River.

– The project structure is an example of successful Government and the oil/gas companies cooperating to share costs to enable the superior fibre solutions for the oil and gas project operator as well as to provide much needed communications capacity in remote areas of PNG which would other wise not be viable for fibre communications.

17

Page 18: BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS … · BUILDING SUBMARINE CABLES FOR OFFSHORE PLATFORMS IN PNG –PNG LNG Fibre Cable Submarine Networks World Conference Singapore

Submarine Networks World Conference, Singapore 8 -10 September 2015 18

THANK YOUQuestions?Contacts

Dominic Quai |Director

Level 9, 370 Pitt St Sydney NSW 2000 T: 02 9267 6777 | F: 1300474 044 | M: +61 412911110 E: [email protected] www.gqiconsulting.com.au