Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Plantroom Areas
Plantroom Area Location Notes
Heating Plantroom 70 m Ground Floor -
Auditorium AHU 28 m Ground Floor -
Main AHU 96 m Ground Floor -
Sump Pump 4 m Roof -
Grey Water Storage
Plantroom
82 m Ground Floor -
HV Plantroom 35 m Ground Floor -
LV Plantroom 21 m Ground Floor -
Life Safety LV Plantroom 21 m Ground Floor -
Gas Meter Plantroom 2 m Ground Floor -
Telecoms Plantroom 8 m Ground Floor -
Transformers Plantroom 22 m Ground Floor -
Satellite 9 m Roof -
Computer AC Units 22 m Roof -
Domestic Hot Water
Plantroom
49 m Ground Floor -
MER Room 25 m Ground Floor -
Security Room 20 m Ground Floor
AV Room 7 m Ground Floor
BEMS and Maintenance
Room
9 m Ground Floor
8/12/2019 Building Schedule 2
2/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Riser Areas
Riser Area Location Notes
Flues 1.0 m Core -
Ventilation Riser 1 5.8 m -
Fire Fighting Riser 1.5 m Fire Fighting Core1 -
Fire Fighting Riser 2 1.5 m Fire Fighting Core2 Sprinkler valves and wet riser valves may be provided
in one of the two riser only.
Mechanical Riser 1 1.4 m Core 1 To serve the floors of the tower and the roof
condensers
Mechanical Riser 2 0.8 m Core 3 To serve lower building
Public Health Risers 1 1.3 m WC Riser core 1 To serve WC's
Public Health Risers 2 1.3 m WC Riser core 1 To serve WC's
WC Extract 0.7 m WC Riser -
Main Electrical Riser 1 2.6 m Core 1 Comprises all core and floor services items
Main Electrical Riser2 2.6 m Core 3 Comprises all core and floor services items
Electrical IT Riser 1 1.7 m Core 1 -
Electrical IT Riser 2 1.7 m Core 3 -
Core Fire Ventilation Riser
1
0.6 m Fire Fighting Cores Only required if the cores are away from facade and
require mechanical ventilation.
Core Fire Ventilation Riser
2
0.6 m Fire Fighting Cores 2 Only required if the cores are away from facade and
require mechanical ventilation.
Rainwater and Ventilation 0.2 m Provision in each core Provision in each core according to the rainwater and
basement drainageFire Systems Riser
(Ground to basement)
1.9 m Ground Floor From Ground to Basement
Ventilation Riser 2 5.8 m -
8/12/2019 Building Schedule 2
3/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
8/12/2019 Building Schedule 2
4/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Notes
...
8/12/2019 Building Schedule 2
5/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Heating Plantroom 12500 mm wide x 5600 mm deep x 3200 mm high (overall)
8/12/2019 Building Schedule 2
6/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Auditorium AHU 8200 mm wide x 3500 mm deep x 1700 mm high
8/12/2019 Building Schedule 2
7/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Main AHU 11300 mm wide x 8500 mm deep x 5400 mm high
8/12/2019 Building Schedule 2
8/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Sump Pump 2000 mm wide x 2000 mm deep x 1200 mm high (overall)
8/12/2019 Building Schedule 2
9/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Grey Water Storage Plantroom 12500 mm wide x 6600 mm deep x 3000 mm high
(overall)
8/12/2019 Building Schedule 2
10/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
HV Plantroom 7100 mm wide x 4900 mm deep x 3400 mm high (overall)
8/12/2019 Building Schedule 2
11/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
LV Plantroom 6000 mm wide x 3500 mm deep x 3000 mm high (overall)
8/12/2019 Building Schedule 2
12/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Life Safety LV Plantroom 6000 mm wide x 3500 mm deep x 3000 mm high
(overall)
8/12/2019 Building Schedule 2
13/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Gas Meter Plantroom 1000 mm wide x 2000 mm deep x 2500 mm high (overall)
8/12/2019 Building Schedule 2
14/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Telecoms Plantroom 4000 mm wide x 2000 mm deep x 2500 mm high (overall)
8/12/2019 Building Schedule 2
15/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Transformers Plantroom 5200 mm wide x 4300 mm deep x 3500 mm high (overall)
8/12/2019 Building Schedule 2
16/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Satellite 4000 mm wide x 2200 mm deep x 1800 mm high (overall)
8/12/2019 Building Schedule 2
17/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Computer AC Units 10100 mm wide x 2200 mm deep x 1200 mm high
8/12/2019 Building Schedule 2
18/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Domestic Hot Water Plantroom 9300 mm wide x 5300 mm deep x 3300 mm high
(overall)
8/12/2019 Building Schedule 2
19/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
MER Room 5900 mm wide x 4200 mm deep x 3400 mm high (overall)
8/12/2019 Building Schedule 2
20/40
8/12/2019 Building Schedule 2
21/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
AV Room 2900 mm wide x 2300 mm deep x 3700 mm high (overall)
8/12/2019 Building Schedule 2
22/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
BEMS and Maintenance Room 3600 mm wide x 2300 mm deep x 3700 mm high
(overall)
8/12/2019 Building Schedule 2
23/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Flues 1650 mm wide x 600 mm deep x 4000 mm high
8/12/2019 Building Schedule 2
24/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Ventilation Riser 1 3450 mm wide x 1675 mm deep x 4000 mm high (overall)
8/12/2019 Building Schedule 2
25/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Fire Fighting Riser 2275 mm wide x 650 mm deep x 4000 mm high (overall)
8/12/2019 Building Schedule 2
26/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Fire Fighting Riser 2 2275 mm wide x 650 mm deep x 4000 mm high (overall)
8/12/2019 Building Schedule 2
27/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Mechanical Riser 1 3125 mm wide x 450 mm deep x 4000 mm high
8/12/2019 Building Schedule 2
28/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Mechanical Riser 2 1800 mm wide x 425 mm deep x 4000 mm high
8/12/2019 Building Schedule 2
29/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Public Health Risers 1 2475 mm wide x 525 mm deep x 4000 mm high
8/12/2019 Building Schedule 2
30/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Public Health Risers 2 2475 mm wide x 525 mm deep x 4000 mm high
8/12/2019 Building Schedule 2
31/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
WC Extract 800 mm wide x 825 mm deep x 4000 mm high
8/12/2019 Building Schedule 2
32/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Main Electrical Riser 1 2600 mm wide x 1000 mm deep x 4000 mm high (overall)
8/12/2019 Building Schedule 2
33/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Main Electrical Riser2 2600 mm wide x 1000 mm deep x 4000 mm high (overall)
8/12/2019 Building Schedule 2
34/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Electrical IT Riser 1 2000 mm wide x 850 mm deep x 4000 mm high (overall)
8/12/2019 Building Schedule 2
35/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Electrical IT Riser 2 2000 mm wide x 850 mm deep x 4000 mm high (overall)
8/12/2019 Building Schedule 2
36/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Core Fire Ventilation Riser 1 1000 mm wide x 600 mm deep x 4000 mm high
8/12/2019 Building Schedule 2
37/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Core Fire Ventilation Riser 2 1000 mm wide x 600 mm deep x 4000 mm high
8/12/2019 Building Schedule 2
38/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Rainwater and Ventilation 525 mm wide x 300 mm deep x 4000 mm high
8/12/2019 Building Schedule 2
39/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Fire Systems Riser (Ground to basement) 3025 mm wide x 625 mm deep x 4000
mm high
8/12/2019 Building Schedule 2
40/40
Chapman Bathurst Area Schedule
Project Name Revision Date Description Made Checked Approved
Project No.
Schedule
Page No.
Date
Ventilation Riser 2 3450 mm wide x 1675 mm deep x 4000 mm high (overall)