Lake Constance 5D-Conference 2016 Building Information Modeling as a Total Contractor Samir Alzeer Office BIM Manager 25.10.2016

Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

Building Information Modeling

as a Total Contractor

Samir Alzeer

Office BIM Manager

25.10.2016

Page 2: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

2

ROYAL BAM GROUP AT A GLANCE

CHALLENGES & SOLUTIONS

AGENDA

PROJECT CASE STUDY FELIX PLATTER-HOSPITAL

COLLABORATION THROUGH OPEN BIM STANDARDS

BIM COORDINATION

ISSUE MANAGEMEN IN THE CLOUD

BIM2FM THROUGH OPEN BIM STANDARDS

DIGITAL DOCUMENTATION

Page 3: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

3

UK

IRELAND

NETHERLANDS

GERMANY

BELGIUM

SWITZERLAND

BAM

INTERNATIONAL

Head office

Bunnik, the Netherlands

Employees

approximately 21,500

Berlin

DresdenDüsseldorf

Frankfurt

Stuttgart

Basel

Hamburg

Construction and M&E services

Property

PPP

Civil engineering

ROYAL BAM GROUP AT A GLANCE

Samir Alzeer, BAM Deutschland AG

Page 4: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

eeEmbedded

European Network of Construction Companies for Research and Development

Holistic and Optimized Life-Cycle Integrated Supportfor Energy-Efficient Building Design and Construction

Energy-Efficient Embedded

5D-Initiative (Ballast Nedam, Royal BAM Group, CCC, Max Bögl

and Strabag)

4

ROYAL BAM GROUP AT A GLANCEBIM RESEARCH & DEVELOPMENT

Samir Alzeer, BAM Deutschland AG

Page 5: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

5

ROYAL BAM GROUP AT A GLANCEBIM PROJECTS IN GERMANY & SWITZERLAND

Samir Alzeer, BAM Deutschland AG

Klinikum

Frankfurt-Höchst

Cost

Estimation,

Allianz Coeur

Cologne

Haus der

Zukunft, BerlinAlsterufer

Hamburg

Meininger

Hotel, Berlin

Campus

Derendorf

Fire Station,

Leverkusen

Stuttgart

Hospital

Felix Platter

Hospital,

Basel

Page 6: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

6

CHALLENGES

Samir Alzeer, BAM Deutschland AG

Page 7: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

7

Productivity

CHALLENGES

Samir Alzeer, BAM Deutschland AG

Page 8: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

8

Productivity

CHALLENGES

Samir Alzeer, BAM Deutschland AG

Tools Person Material

Processes are still traditional

Methods

Technology

Page 9: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

9

Productivity

CHALLENGES

Patrick MacLeamy: It’s not about

my business or about your

business...it’s about our

industry!!

Buildingsmart.de, Berlin, 19.10.2016

Patrick MacLeamy: Chairman of BuildingSMART International &

HOK Architects

Samir Alzeer, BAM Deutschland AG

Page 10: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

10

CHALLENGES

Samir Alzeer, BAM Deutschland AG

Achieved

NOT achieved

Step leading to next stage has been achieved

2

1

3

Technology Processes Policy

STEP TYPES

ST

AG

E M

AT

UR

ITY

SO

FT

WA

RE

HA

RD

WA

RE

NE

TW

OR

K

LE

AD

ER

SH

IP

INF

RA

ST

RU

CT

UR

E

HR

PR

OD

UC

TS

&

SE

RV

ICE

S

CO

NT

RA

CT

UA

L

PR

EP

AR

AT

OR

Y

RE

GU

LA

TO

RY

Modelling

Collaboration

Integration

After Succar, 2008

Maturity Level

Page 11: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

11

INTEROPERABILITY

Coordination model

Room Book

IFC-Format

Project Communication Format

CAFM-SoftwareCAD

Digital BIM Library

CIMS

BIM2Field

Room book Architecture

As-built model

Design Construction Operation

VMS

CHALLENGES

Samir Alzeer, BAM Deutschland AG

Page 12: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

12

Interoperability

$15.8 billion from$374 billion is theannual interoperabilitycosts 2002 in US

(National Institute of Standards and Technology)

CHALLENGES

Samir Alzeer, BAM Deutschland AG

Page 13: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

13

BIM Level 0

CHALLENGES

Samir Alzeer, BAM Deutschland AG

Pre BIM

Architect

Structure MEP

Page 14: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

14

CHALLENGES

Samir Alzeer, BAM Deutschland AG

Structure MEP

Architect

Pre BIM

Object based Modelling / Lonely BIM

BIM Level 1

Page 15: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

Structure MEP

Architect

15

CHALLENGES

Samir Alzeer, BAM Deutschland AG

Pre BIM

Model based Collaboration / Social BIM

Object based Modelling / Lonely BIM

BIM Level 2

Page 16: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

Structure MEP

Architect

16

CHALLENGES

Samir Alzeer, BAM Deutschland AG

SHARED AREA

Coordination Model

Pre BIM

Object based Modelling / Lonely BIM

Model based Collaboration / Social BIM

BIM Level 2+

Page 17: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

Structure MEP

Architect

17

CHALLENGES

Samir Alzeer, BAM Deutschland AG

Coordination Model

Pre BIM

Network based Integration

Object based Modelling / Lonely BIM

Model based Collaboration / Social BIM

BIM Level 3

CAFMCIMS

Page 18: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

Structure MEP

Architect

18

CHALLENGES

Samir Alzeer, BAM Deutschland AG

Coordination Model

Pre BIM

Network based Integration

Object based Modelling / Lonely BIM

Model based Collaboration / Social BIM

BIM Level 3+

CAFMCIMS

Digital BIM LibraryDocumentation Management System

Post BIM

Online Data base

Page 19: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

19

SOLUTION

Samir Alzeer, BAM Deutschland AG

Page 20: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

20

Standardization

SOLUTION

Samir Alzeer, BAM Deutschland AG

SPEAK THE SAME LANGUAGE

Page 21: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

21

Efficiency

SOLUTION

Samir Alzeer, BAM Deutschland AG

ELIMINATE WASTEFUL TASKS

Page 22: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

22

Process Optimization

SOLUTION

Samir Alzeer, BAM Deutschland AG

Application-centric

Content-centric

IFC IFC IFC

Page 23: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

23

PROJECT CASE STUDY FELIX PLATTER-HOSPITAL

Samir Alzeer, BAM Deutschland AG

Page 24: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

24

GFA: 45,262 m²

Contract value: 194 million SFr.

Construction period: 01/2015 – 10/2018

Contract Type: Design-Build

PROJECT CASE STUDY FELIX PLATTER-HOSPITALPROJECT INTRODUCTION

Samir Alzeer, BAM Deutschland AG

Page 25: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

25

The use of open BIM Technologies

Level of innovation

Level of collaboration

Winner of buildingSMARTInternational Award 2016

Evaluation criteria

“Operation & Maintenance using open technology”

GFA: 45,262 m²

Contract value: 194 million SFr.

Construction period: 01/2015 – 10/2018

Contract Type: Design-Build

PROJECT CASE STUDY FELIX PLATTER-HOSPITALPROJECT INTRODUCTION

Samir Alzeer, BAM Deutschland AG

Page 26: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

PRELIMINARY STUDIES DEVELOPMENT DESIGN DETAILED DESIGN CONSTRUCTION OPERATION

GA

TH

ER CAPTURE

QUANTIFY

GENERATE

AN

AL

YZ

E

COORDINATE

FORECAST

VALIDATE

CO

MM

UN

ICA

TE

VISUALIZE

TRANSFORM

DRAW

DOCUMENT

RE

AL

IZE

FABRICATE

ASSEMBLE

CONTROL

REGULATE

26

FELIX PLATTER-HOSPITALTHE BIM USES

AS-BUILTCAPTURE EXISTING

FACILITY/SITE

Client Uses

GC Uses

CLIENT BIM USES

BIM COORDINATION

5D (COST ESTIMATION)LCC ESTIMATION, ENERGY

ANALYSIS, PROCESS

ANALYSIS

CODE VALIDATION, ATTRIBUTE VALIDATION, ESCAPE ROUTES, INSERTION ROUTES

3D VISUALIZATION AND DESIGN VALIDATION

COLLABORATION THROUGH OPEN STANDARDS

BIM2FM THROUGH OPEN STANDARDS

BIM-BASED DRAWINGS PRODUCTION

DIGITAL

DOCUMENTATION

DIGITAL CONSTRUCTION

CONSTRUCTION INFORMATION MANAGEMENT

SYSTEM

Samir Alzeer, BAM Deutschland AG

Page 27: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

PRELIMINARY STUDIES DEVELOPMENT DESIGN DETAILED DESIGN CONSTRUCTION OPERATION

GA

TH

ER CAPTURE

QUANTIFY

GENERATE

AN

AL

YZ

E

COORDINATE

FORECAST

VALIDATE

CO

MM

UN

ICA

TE

VISUALIZE

TRANSFORM

DRAW

DOCUMENT

RE

AL

IZE

FABRICATE

ASSEMBLE

CONTROL

REGULATE

27

FELIX PLATTER-HOSPITALTHE BIM USES

BIM COORDINATION

Samir Alzeer, BAM Deutschland AG

Page 28: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

28

Physical clashes (pipe with pipe)

Physical clashes (pipe with wall)

Physical clashes (electrical with ducts)

Physical clashes (pipe with electrical)

PHYSICAL CLASHES

BIM COORDINATION

Samir Alzeer, BAM Deutschland AG

Page 29: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

29

Clear space in front of

windows

Clear Space in front of electrical

Cabinets

Clear Space in front of doors

Accessibility to fire alarm

indicators

Clear space in front of electrical

sockets

Accessibility to mechanical

equipment

NON-PHYSICAL CLASHES

BIM COORDINATION

Samir Alzeer, BAM Deutschland AG

Page 30: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

30

review of escape routes

review insertion routes

CODE VALIDATION

BIM COORDINATION

Samir Alzeer, BAM Deutschland AG

Page 31: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

PRELIMINARY STUDIES DEVELOPMENT DESIGN DETAILED DESIGN CONSTRUCTION OPERATION

GA

TH

ER CAPTURE

QUANTIFY

GENERATE

AN

AL

YZ

E

COORDINATE

FORECAST

VALIDATE

CO

MM

UN

ICA

TE

VISUALIZE

TRANSFORM

DRAW

DOCUMENT

RE

AL

IZE

FABRICATE

ASSEMBLE

CONTROL

REGULATE

31

FELIX PLATTER-HOSPITALTHE BIM USES

COLLABORATION THROUGH OPEN STANDARDS

Samir Alzeer, BAM Deutschland AG

Page 32: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

32

BIM Management 1

BIM-

Manager

2BCF

CAD

Planner1

3

4

IFC

BCF

5

Control

BCF

BCF + IFC

COLLABORATION THROUGH OPEN STANDARDSISSUE MANAGEMENT

Samir Alzeer, BAM Deutschland AG

Page 33: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

33

CAD

Planner1

BIM Management

BIM-

Manager

CAD

Planner2

IFC

BCF

BCF

Control

BCF

BCF + IFC

COLLABORATION THROUGH OPEN STANDARDSISSUE MANAGEMENT

Samir Alzeer, BAM Deutschland AG

Page 34: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

34

CAD

Planner1

BIM Management

BIM-

Manager

CAD

Planner2

CAD

Planner3

IFC

BCF

BCF

Controll

BCF

BCF + IFC

COLLABORATION THROUGH OPEN STANDARDSISSUE MANAGEMENT

Samir Alzeer, BAM Deutschland AG

Page 35: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

35

KUBUS

ISSUE MANAGEMEN IN THE CLOUDBIMcollab

Samir Alzeer, BAM Deutschland AG

Page 36: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

36

Online Plattform / Always accessible

ISSUE MANAGEMEN IN THE CLOUDBIMcollab

Samir Alzeer, BAM Deutschland AG

Page 37: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

37

Online Plattform / Always accessible Clear responsibilities through Filtering

ISSUE MANAGEMEN IN THE CLOUDBIMcollab

Samir Alzeer, BAM Deutschland AG

Page 38: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

38

Online Plattform / Always accessible Clear responsibilities through Filtering

Changes are documented

ISSUE MANAGEMEN IN THE CLOUDBIMcollab

Samir Alzeer, BAM Deutschland AG

No more finger pointing

Page 39: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

PRELIMINARY STUDIES DEVELOPMENT DESIGN DETAILED DESIGN CONSTRUCTION OPERATION

GA

TH

ER CAPTURE

QUANTIFY

GENERATE

AN

AL

YZ

E

COORDINATE

FORECAST

VALIDATE

CO

MM

UN

ICA

TE

VISUALIZE

TRANSFORM

DRAW

DOCUMENT

RE

AL

IZE

FABRICATE

ASSEMBLE

CONTROL

REGULATE

39

FELIX PLATTER-HOSPITALTHE BIM USES

BIM2FM THROUGH OPEN STANDARDS

Samir Alzeer, BAM Deutschland AG

Page 40: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

40

Data Base

Alphanumeric

3D Models

Graphic

DMS

Documents

Structure

MEP

Architecture

Construction Information

Management System

Information System

CAFM System

Virtual

Maintenance

system

Alphanumeric

Documents

Graphic

BIM2FM THROUGH OPEN BIM STANDARDS

Samir Alzeer, BAM Deutschland AG

Employer’s Information Requirements

NativeIFC Alphanumeric DocumentsBCF After FPS BIM2FM Document

Page 41: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

Construction Information Management SystemVirtual

Maintenance

system

Alphanumeric

Documents

Graphic

41

Data Base

DMS

Documents

Mirrored

Documents

3D Models

Room Book

Digital BIM Library

NativeIFC Alphanumeric DocumentsBCF

Structure

MEP

Architecture

CAFM System

After FPS BIM2FM Document

Information System

BIM2FM THROUGH OPEN BIM STANDARDS CURRENT CONCEPT

Samir Alzeer, BAM Deutschland AG

Common Data Environment

Page 42: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

PRELIMINARY STUDIES DEVELOPMENT DESIGN DETAILED DESIGN CONSTRUCTION OPERATION

GA

TH

ER CAPTURE

QUANTIFY

GENERATE

AN

AL

YZ

E

COORDINATE

FORECAST

VALIDATE

CO

MM

UN

ICA

TE

VISUALIZE

TRANSFORM

DRAW

DOCUMENT

RE

AL

IZE

FABRICATE

ASSEMBLE

CONTROL

REGULATE

42

FELIX PLATTER-HOSPITALTHE BIM USES

DIGITAL

DOCUMENTATION

Samir Alzeer, BAM Deutschland AG

Page 43: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

43

DIGITAL DOCUMENTATION

Samir Alzeer, BAM Deutschland AG

Page 44: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

44

TRADITIONAL DOCUMENTATION DIGITAL DOCUEMENTATION

Difficult to gather, edit and update

Storage space is an issue

Vanishes through project phases

Easy to access (online)

documents can be retrieved from

mobile devices

Easy to edit and update

Ideal for Facility Managers

DIGITAL DOCUMENTATIONTRADITIONAL DOCUMENTATION VS. DIGITAL DOCUMENTATION

Samir Alzeer, BAM Deutschland AG

Page 45: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

45

www.xxxxxxxxxxx.ch

DIGITAL DOCUMENTATIONCASE STUDY

Samir Alzeer, BAM Deutschland AG

Page 46: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

46

DIGITAL DOCUMENTATIONCASE STUDY

Samir Alzeer, BAM Deutschland AG

www.xxxxxxxxxxx.ch

Page 47: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

47

DIGITAL DOCUMENTATIONCASE STUDY

Samir Alzeer, BAM Deutschland AG

www.xxxxxxxxxxx.ch

Page 48: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

48

DIGITAL DOCUMENTATIONCASE STUDY

Samir Alzeer, BAM Deutschland AG

www.xxxxxxxxxxx.ch

Page 49: Building Information Modeling as a Total Contractor · PPP Civil engineering ROYAL BAM GROUP AT A GLANCE Samir Alzeer, BAM Deutschland AG. Lake Constance 5D-Conference 2016 eeEmbedded

Lake Constance 5D-Conference 2016

THANK YOU FOR

YOUR

ATTENTION

Samir Alzeer M.ENG. International Project Management,

Architect

Office BIM Manager

49

[email protected]

+49 (172) 621 27 64

+49 (711) 2500 74 12

BAM Deutschland AG, Stuttgart

CONTACT INFORMATION