Sustainable Development Report 2011 1 Rio Tinto, Fer et Titane Building for the Future Fer et Titane Sustainable Development Report 2011 Building for the Future

Building for the Future - Rio Tinto · 2 Sustainable Development Report 2011 Rio Tinto, Fer et Titane Building for the Future Rio Tinto deals in mineral resources exploration, development

Embed Size (px)

Citation preview

Sustain

able Developm

ent Rep

ort 20111

Rio Tin

to, Fer et Titane

Buildin

g for the Fu

ture

Fer et TitaneSustainable Development Report 2011

Buildingfor theFuture

2Sustain

able Developm

ent Rep

ort 2011

Rio Tin

to, Fer et Titane

Buildin

g for the Fu

ture

Rio Tinto deals in mineral resourcesexploration, development andprocessing. Its principal products arealuminum, copper, diamonds,metallurgical and thermal coal,uranium, industrial gold and minerals (borax, titanium dioxide and salt),and iron ore. Although it carries out its activities on a global scale, Rio Tinto is solidly entrenched in Australia and North America, and owns largebusinesses in Asia, Europe, Africaand South America.

ISBN: 978-2-9812550-7-5Legal Deposit: Bibliothèque et Archives nationales du Québec, 2011Legal Deposit: Library and Archives Canada, 2011

Sustain

able Developm

ent Rep

ort 20113

Rio Tin

to, Fer et Titane

Buildin

g for the Fu

ture

Environment and ResourcesAir Quality

Water Management

Residual Materials Management

By-Product Flow Diagram

Energy and Climate Change

Noise and Environmental Incidents

Land Use

Concerns and Issues Management

21

21

23

24

26

28

29

30

30

The SectorsMine and Terminal

Ore Pre-treatment Plant

Reduction Plant

UGS Plant

Steel Plant

Metal Powders Plant

The Process at Rio Tinto, Fer et Titane

12

12

12

12

13

13

13

14

Our PeopleWork Force Planning

Training

Business Improvement

Safety in the Workplace

Health in the Workplace

16

16

17

18

19

20

The CompanyCore Values

Governance

Financial Performance

Overview

Major Projects

Innovation

Product Stewardship

5

6

7

7

8

9

11

11

CommunitiesContributions to the

Havre-Saint-Pierre Community

Contributions to the Sorel-Tracy Community

A Few Examples of Employees’ Involvement in Their Communities

31

32

33

34

President’s Message 4

Table of Contents

Aerial View of the Sorel-Tracy IslandsSeptember 2005; Anthony Bannister

Sustain

able Developm

ent Rep

ort 20114

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

In the foreground, left to right: Éric Planque, Executive Director, UGS Plant; Dominique Beaudry, Executive Director, Business Development; François Godin, Executive Director,Ore Pre-Treatment Plant and Mine; Dominique Bouchard, President. In the background, left to right: Luc Martel, Executive Director, Human Resources; Claudio Lazzari, Executive Director, TiO2050; Caroline Veillette, Executive Director, Health, Safety, Environment and Sustainable Development; Yves Langlois, Executive Director, Reduction Plant; Lorenzo Bonome, Director,TiO4 Program; Sylvain Paul-Hus, Vice-President, Powders and Steel Division; and Gildas Inisan, Executive Director, Finance.

I am pleased to invite you to read and consult the annual 2011 Annual Report on Sustainable Development for Rio Tinto, Fer et Titane (RTFT). This document is a mine of invaluable information for our employees and all our strategic partners regarding the efforts that our company has put into Sustainable Development. I wish to thank the management team and the entire staff for their immeasurable contribution to the preparation of this publication.

Sustainable development andharmonious relations with ourcommunities are an integral part of the Rio Tinto Group’s commitments. Today, we make economic decisions that take social and environmental impacts into account. Our investment projects are aligned with this perspective.

2011 has given us a boost for the future. Indeed, last May, we announced $ 800 million worth of investments to be made over the coming five years,

which will guarantee the future ofRio Tinto, Fer et Titane for at least four more decades. With this announcement,we confirmed employment andguaranteed major socio-economicspin-offs and benefits for our twohost regions, Havre-Saint-Pierreand Sorel-Tracy.

Our employees’ safety remains a core value at the very heart of our priorities and commitments. On this front, our safety results for last year did not meet our expectations. We must pursue our ultimate goal of “Zero Injury by Choice” by encouraging our employees toengage in safe behaviour. The health and wellbeing of our people is another pillar of our global strategy. In fact, we were one of the companies selected for pilot implementation of Pierre Lavoie’s challenge Le Grand défi entreprise.

We hold that implementing programs for maintaining our employees’ health is a requirement that cannot be ignored in reaching our corporate objectives.

Numerous challenges are in store for us in 2012, in particular, carrying out key corporate projects that will require involvement of all the organization’s employees. In addition to modernizingour equipment to support a 50 % increase in titanium slag production within the next five years, we intendto reduce our SO

2 and dust emissions.

2012 is also a key year for integrating our efforts to refine and implement our commitments to the future. We have to realize the vision we have created for our company: to become a modelof safe operation, with effective,high-performing, innovative andinvolved personnel in order to provide for the continuity of our growth.With the support of our employees, investors, host communities and unionpartners, as well as our owner Rio Tinto,together, we will make it happen.

President’s Message

Photo : Dominic Gouin

Sustain

able Developm

ent Rep

ort 20115

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

RTFT is a part of Rio Tinto Iron & Titanium (RTIT), which brings together firms that mine ilmenite ore in Canada, South Africa and Madagascar. These operations produce titanium slag, a high-quality raw material intended for the titanium dioxide (TiO

2)

industry. The coproducts include high-purity pig iron, steel and metal powders, among others.

In Canada, RTFT operates an open-pit ilmenite mine located near Havre-Saint-Pierre.It is one of the largest massive ilmenite deposits in the world. The ilmenite is shipped to Sorel-Tracy, where it is smelted and separated into molten iron and titanium slag. The latter is subsequently sold to pigment producers. To create the TiO

2 pigment,

manufacturers use two processes : one chloride, the other sulphate-based. RTIT offers its products to both of these two markets.

QIT Madagascar Minerals (QMM) is a mineral sands mining site located in the south of Madagascar. QMM’s operations differ from those of the Havre-Saint-Pierre mine in that it extracts the ilmenite from the mineral sands. Thereafter, the ore is shipped to RTFT’s installations in Sorel-Tracy for its processing into titanium slag.

Similar to QMM, Richards Bay Minerals (RBM), located in South Africa, produces ilmenite from the mineral sands and processes it at Richards Bay into pig iron and titanium slag.

The Company

Ilmenite Ore, Havre-Saint-Pierre, July 2011

Photo : © Xavier Dachez

Sustain

able Developm

ent Rep

ort 20116

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

RTIT’s Installations Across the Globe

Core Values

Integrity

We always approach and deal with our employees, clients, suppliers and host communities with open minds.

We treat every single one equitably and honestly.

Respect

We care for each other’s health, safety and wellbeing.

We maximize our contribution to sustainable development by supporting and respecting our neighbouring communities.

We believe in diversity, and we promote and encourage the harnessing of individual and team contributions.

Responsibility

We assume responsibility for our own performance and decisions as well as their impacts on our business.

We encourage others to assume responsibility for their own work.

Team Work

We collaborate in order to attain the best possible results.

We trust others’ competence, skills and commitment.

We focus our collective efforts on the most promising initiatives for the Group.

Sustain

able Developm

ent Rep

ort 2011

RTFT’s financial performanceimproved in 2011 with a return on net assets (RONA) of 5.6 %, a sign of economic rebound.

Two important elements influenced our financial performance in 2011:a loss in production dueto reconstruction of one of the furnaces, and anincrease in maintenance costs,both inescapable expenses necessary for keeping our equipment dependable.

The $800 million ininvestments will enable us to modernize and upgrade our equipment, and thus increase our productioncapacities in a marketfavourable to our products.

Indeed, the pigment market’soutlook for the years to come is encouraging. Demand for TiO

2 products is steady and

ongoing, and especially so forthe high-end products we offer.

The financial crisis that rocked Europe in 2011 produced a certain number of adverse ripples on our activites. In this context, 2012 looms as a year filled with challenges. RTFT aims to attain record production levels while controlling its costs in order to preserve the flexibility required to adjust to permanently fluctuating markets.

Another major challenge awaiting us in 2012 is the Rio Tinto Business Solution(RTBS) implementation project.This Rio Tinto-developed solution integrates the company’s various systems and business processes; implementing it involves large-scale changes in our methods, procedures, and our way of doing business in all areas of the company’s activities.

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

7

Rio Tinto’s core values are conveyed in and through the company’sworldwide code of conduct, “The Way We Work.” RTFT has implemented rigorous management processes in order to make sure that both its internal and external requirements are respected and met. In 2011, we integrated our health andsafety, environment, and quality management systems in order

to improve our efficiency and effectiveness. Risk management lies at the heart of our administrative practices and guides our actions. In this same context, we have merged our various health, safety and environment policies while integrating sustainable development stakes and issues.www.rtft.com/documents/Politique_SSEDD-En.pdf

Governance

(RONA = Return on Net Assets)

% RONA

Revenues

Expenses

Net Assets

Financial Performance

Assurance • Rio Tinto Compliance Program

Core Values Code of Conduct Local Application ToolsCorporate Application Tools

Rio Tinto’s Core Values

The Way We Work

Rio Tinto’s Policies

Rio Tinto’s Standards

RTFT’s Policies

2001

12,6

2002

11,8

2003

7

2004

13,8

2005

9,8

2006

5,1

2007

4

2008

14,8

2009

-3,9

2010

4,9

2011

5,6

RONA Calculation (%)

Sustain

able Developm

ent Rep

ort 2011

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

8

5-Year Objectives Target for 2012

Operate without injuring our employees Reduce on our accidents by 20% Reduce our employees’ exposure to noise Assure operational safety

Minimize our environmental impactand preserve our operating permits

Comply with environmental standards Develop and maintain harmonious relations with our stakeholders and host communities

Increase our production by 50% Attain our production objectives Increase flexibility to better accommodate the market

Reach a 20% RONA* Reduce our costs and optimize our working capital Optimize our energy efficiency Optimize and maintain product quality (value added) Carry out the major development projects Create a culture of performance

Maximize operation of the TiO mineat Havre-Saint-Pierre

Implement TiO2050

Manage our talents Optimize talent management processes Motivate our resources Develop & coach our manpower Renew our collective agreements

*RONA = Return on Net Assets

Overview

Strategic planning is a major exercise that involves aligning the action plansof all the various sectors and operations with the priorities of the business.

Our Vision at Rio Tinto, Fer et Titane :That we evolve into a model company that creates value by being safe, involved, highperformingand innovative in order to guarantee our growthfor decades to come.

Sustain

able Developm

ent Rep

ort 2011

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

9

Major Projects

Havre-Saint-PierreThe investments of$200-million announcedby RTFT in May 2011 will enable the company tooptimize the mine’s potential for the next 40 years with the TiO

2050 project.

RTFT intends to make this investment a motivatingforce as much for the whole community as for theemployees. The scheduled work is spread out over a five-year period and focuses on improving effluenttreatment, modernizing installations such as garages, and implementing new equipment such as thecone crusher.

TiO2050

will create 70 new jobs. In 2011, 57 men,6 women and 2 Innus were hired, the majority of whom come from the Minganie MRC.

Changes in our operating methods are already being felt: since the fall of 2011, the mine has been in operation seven days a week, 24 hours a day. This new round-the-clock schedule has enabled us to reach our annual production objectives.

Activities kicked offimmediately after the May announcement. $13 million in capital expenditures were invested during the year,of which $8 million went to refurbishing the passenger rail cars.

RTFT also initiated studies for certain future projects, including implementationof a mine effluent capture and treatment program as well as construction of a potential new road to link the mine’s installations with Hydro-Québec’s La Romaine complex.

Our capital expenditures should reach $35 millionin 2012.

View of the Mingan Archipelago, Havre-Saint-Pierre, August 2011

Sustain

able Developm

ent Rep

ort 2011

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

10 Sorel-TracyThe $600 million investment RTFT announced in 2011 for its metallurgical complex will enable the companynot only to upgrade its installations, but also to strategically position itself as the world leader in raw materials meeting theneeds of the TiO

2 pigment

industry.

The $600 million slated for the Sorel-Tracy installations will provide for the executionof almost 200 different projects per year up to and including 2016.

Investments at the Sorel-Tracy complex will primarily cover the following: increase in production capacity;

equipment upgrade; execution of major air quality projects;

health and safety of our employees and outside contractors;

noise reduction for our workers and the community;

reduction of effluents to the river.

In 2011, RTFT injected over $110 million into various projects at its Sorel-Tracy complex. The same yearalso marked, in particular, the beginning of workon the expansion of the Metal Powders Plant, wich will by itself require a total investment of $30 million.

Among the other projects completed, let us mention reconstruction of furnace No 4 at the Reduction Plant, renewal of several mobileequipment units, andimprovement of healthand safety practices.

In this expansion context, RTFT also intends to improve equipment enabling it to shrink its eco-footprint and extend its compliance with environmental standards, that are becoming more and more rigorous. In particular,the company will carry on with the preparatory engineering assessments for its dust and SO

2 emissions

control projects.

In 2012, RTFT also expects to earmark approximatively $125 million for various projects to help it attain its production objectives:electrical equipment upgrades;machine safety work, mostly on conveyors; mobileequipment upgrades;continuation of Metal PowdersPlant expansion works;and finalization of workat Sorel-Tracy for the integration of Madagascar (QMM) minerals.

Major Projects

View of the Sorel Islands, Sorel-Tracy, August 2011

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

11Sustainable Developm

ent Report 2011

Innovation

Product Stewardship

When it comes to innovation,we inevitably think about the RTIT Technology Centre in Sorel-Tracy, a veritable driving force for thecompany. Its team works in support of all of RTIT plants’ and RTFT’s activity areas.

Intently and steadfastly forward-looking, theTechnology Centre’s scientistsenjoy a unique opportunityto shape the company’s future. In addition, the Centre takes part in various trade shows and career days to promote RTFT with the students thushelping to provide for the company’s succession.

On the strength of ourabundant mineral reserves, our unique technology,the broad diversity of our products and our commitmenttoward our clients, we provide an entirely dependable supply of high-quality products. Moreover, we differentiate from our competitors bydelivering competent,skillful, personalized

technical support to each of our clients. We possess the equipment that allows us to reproduces the linitial steps of our clients own processes, which in turn allows usto study our products’fundamental behaviourand thus make sure thatour clients can use themin optimal fashion.

Rio Tinto, Fer et Titane acknowledges its social role of behaving eco-responsibly in the fabrication and use of its products, and their disposal at the end of their useful lives.

This accountability of our company is an integral part of our corporate objectives pertaining to sustainabledevelopment and maintenanceof market share. We callthis approach “productstewardship.”

In 2011, we revised the Material Safety Data Sheets (MSDS) of our principal products.We also adopted a policy for compliance with the new maritime transportation standards. Finally, wecontinued with analysisof our products’ life cycles.

We expect to publish theresults of this analysis in 2012. It will enable us to visualize the environmentalfootprint associated with producing our various products.

Sophie Lévesque, Analytical Laboratory Technician, and Sophie Fortin, Analytical Chemistry Technology Student, Sorel-Tracy, August 2011

Sustain

able Developm

ent Rep

ort 2011

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

12

The Sectors

Ilmenite Ore Extraction; Handling and rail transport towards the Havre-Saint-Pierre terminal, then transport by ship to the Sorel-Tracy metallurgical complex.

Achievements in 2011 Creation of close to 70 new jobs Expansion of the workweek from five to seven days a week (24 hours a day) Initiation of a mobile equipment operation training program in partnership with the school commission Improvement of the effluent treatment system Mapping out of a turnaround plan for mobile equipment availability

Challenges for 2012 Increase production by 40%, which means a 50% jump in the amount of tailings to be handled Help our local suppliers to meet Rio Tinto’s new requirements Support the MRC de Minganie the implementation of its new residual materials recycling program Extend availability and increase reliability of mobile equipment Provide for staff retention Complete studies for future construction of a water treatment system

Receiving, handling and shipping of bulk products;

Preparation of ores and anthracite.

Achievements in 2011 Improvement of operational efficiency and safety thanks to a $1.5-million investment in construction of a concrete surface for coal storage

Introduction of an emergency measures co-ordination program linking RTFT with the Canadian Coast Guard, the Société des traversiers du Québec and various regional contributors

Challenges for 2012 Improve safety on over 200 conveyers Make the ship loading/unloading system more reliable by improving planning of maintenance, shipping/receiving, and port equipment dependability

Improve equipment performance

Ore reduction in nine electric-arc furnaces

Achievements in 2011 Production records set during electrical recovery in October 2011

Planned scheduled stoppages rigorously complied with by maintenance services

Improved interdepartmental co-operation

Implementation of indicators enabling daily tracking of CO gas performance

Challenges for 2012 Optimize re-use of CO gas in our processes

Implement several dust capture devices

Reduce noise Contribute to increasing production

Mine and Terminal Ore Pre-Treatment Plant Reduction Plant

Sustain

able Developm

ent Rep

ort 201113

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

Titanium slag purification

Achievements in 2011 Attainment of production volumes planned Increase in RTCS slag production capacity, a $9-million investment Significant improvement in safety regarding storage of the acid used in the production process Implementation of equipment reliability programs Reinforcement of the safety interaction program

Challenges for 2012 Carry out the investment projects that will enable us to increase production capacities for UGS products and RTCS slag an ambitious challenge

High-quality iron and steel powder manufacturing

Achievements in 2011 Announcement of the Metal Powders Plant modernization project, a $30-million investment Provision of a whole week of workshops under a large tent, where engineers and supervisors presented their various modernization projects Over 70% of the plant’s employees took part, on a voluntary basis, in the Grand défi entreprise Pierre Lavoie

Challenges for 2012 Continue with the modernization projects announced in 2011, while the Metal Powders Plant will keep on operating at full capacity Renew the labour force following attrition through retirements

Steel billet manufacturing

Achievements in 2011 The Steel Plant celebrated the 25th anniversary of its inauguration in September 2011.

The Steel Plant used 62 % of all molten iron produced at the Reduction Plant to manufacture steel billets. Improvement in air quality owing to the change in vapour extraction system and replacement of the dust collector’s filter cartridges

Reduction in outside noise, resulting from integration of a muffler on the fume stack

Decrease in water consumption thanks to a water quality monitoring system Significant improvement in round billet quality

Challenges for 2012 Increase production using the molten iron derived from Madagascar minerals

Increase AK steel production Improve equipment reliability through implementation of IPT and LEAN initiatives

Increase round and square billet quality based on consecutive small-scale projects and employee involvement

UGS Plant Metal Powders Plant Steel Plant

Sustain

able Developm

ent Rep

ort 201114

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

QMMMadagascar

TiO MineHavre-Saint-Pierre

Sizing Plant

Havre-Saint-Pierre Titanium Slag

QMMTitanium Slag

Cast Iron

Ore Pre-Treatment Plant

AnthraciteReduction Plant

The process Rio Tinto, Fer et Titane

Sustain

able Developm

ent Rep

ort 201115

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

Steel Plant

UGS®

SORELSLAG®

RTCS

SORELSTEEL®

Steel Powders

Iron Powders

SORELMETAL®

UGS®UGS® slag is used for producing titanium pigment for the chloride process.

SORELSLAG®SORELSLAG® is mainly used forproducing titanium pigment using the sulphate process. Titanium pigment is an opacifier used in paints, plastics, papers and textiles.

RTCSRTCS slag bears the highest concentrationin TiO

2 equivalent without pre-treatment.

It is intended for the chloride basedtitanium pigment market.

SORELSTEEL®Round billets are used in manufacturingtubes for petroleum development, while the square ones are primarily intended for making nuts used in the automotive industry.

SORELMETAL®SORELMETAL® cast iron in used in foundries all over the world to produce the highest-quality ductile iron parts.

Steel and Iron PowdersApart from the automotive industry, which is our pivotal market, metal powders take on various forms in our daily lives and contribute to people’s quality of life. Indeed, they are one of the constituents of certain foods, such as cereals and bread, as an iron supplement.

Metal Powders Plant

UGS(UpGraded Slag)

Sustain

able Developm

ent Rep

ort 201116

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

The company’s work force is one of its main assets. In a business environment plagued by a shortage of qualified personnel andan ever-growing numberof retirements, RTFT has increased its involvement and actions to position itself as an employer of choice.Rio Tinto’s nationalrecruitment campaign launched in the fall across Canada produced results with several people showingtheir interest in working at RTFT during this campaign.

RTFT now has arepresentative within the employment education committee at the CÉGEP de Sorel-Tracy. This committee also comprises representativesfrom regional economic development firms andorganizations. By the same token the company also hostsstudents from the CEGEPfor work terms and recruits new employees from among their graduates.

Employees visit schoolsto promote our companyand career opportunities.We actively take part inSemaine de la métallurgie(“Metallurgy Week”), inparticular because RTFT sits on the Metallurgy Sector Committee’s Board of Directors

In addition, RTFT acts as a financial partner to the Accès-région Pierre-De Saurelprogram initiated by theOrienthèque a localorganization offering integration programs for people who wish to settlein the Sorel-Tracy region.

In 2011, we hired 204 new employees at the Sorel-Tracycomplex, and 69 at the Havre-Saint-Pierre facilities.

The company intends to enhance its work force’s cultural diversity. Indeed,we are planning to integrate aboriginalpeople living close to our Havre-Saint-Pierre facilities into our organization, and we wish to further attractother non-traditional worker groups such as women,Innus and immigrants.

Our People

Work Force Planning

Louis-Philippe Lavoie, Supervisor at the UGS Plant, Who Greatly Contributed to Rio Tinto’s National Recruitment Campaign. Sorel-Tracy, August 2011

Over the next five years, 15% of RTFT’smanagement personnel and 18% of itsunionized employees will take their retirement.

Sustain

able Developm

ent Rep

ort 201117

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

RTFT looks after thedevelopment of all its resources’ skills. To this end, a specialized team meets the organization’s requirements by developing training that allows RTFT to take advantageof the most competentemployees and provide contractors with the best internal support there is.

Training is an absolute must, not only when hiring new employees, but also when implementing technologicalchanges, improving processes,purchasing new equipment, and upgrading existingpersonnel’s skills. A capsuleseries and a leadership model development program have been prepared for executives and management personnel.

These initiatives will enablethem to improve their involvement and actions concerning their respective work teams.

In 2011, the hiring surge required a record number of training hours be provided for integrating new employees : 15,364 hours atHavre-Saint-Pierre, and 102,987 at Sorel-Tracy.This represents an 18% increase compared to the previous year. Finally, our suppliers’ employees also followed more than 11,300 hours’ worth of training.

Training

353 1 791

Havre-Saint-Pierre Sorel-Tracy

36 Age 20 to 24 82

224 Age 25 to 44 799

91 Age 45 to 64 905

2 Age 65 and over 5

In 2012, we have scheduled some 140,000 training hoursfor all RTFT personnel. We are also planning training on implementation on the RTBS business solution.

Management Employee Hourly Employee

% of Head Count 25 % 75 %

Number ofTraining Hours

15 364 100 987

Number ofHours per Employee

28 hours 63 hours

Use SPEAK-OUTto express your concerns aboutserious problems to Rio Tinto’ssenior management.

1 866 226 1685- You do not have to identify yourself.- A safe and confidential process.- No penalty for honest calls.

Express yourself…

Training

Number of Employees per Age Bracket (December, 2011)

Sustain

able Developm

ent Rep

ort 201118

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

Consolidated into a single team in 2011, the members of Business Improvementare employees specializedin several fields of expertise.By implementation ofrecognized, efficient andeffective managementpractices, Business Improvementallows RTFT to assumea world leader’s role.

Business Improvement’sapproach is decidedly focused on team work. The group is active in both optimizing daily activities (operations support) and improving performance in the longer term, through identifying opportunities and carrying out strategic projects.

In 2011, we had keystakeholders from each of the organization’s sectors and functions participate in an exercise intended to align strategic objectives for 2012. Thus every stakeholder can contribute to carrying out RTFT’s business plan.

In addition, the Business Improvement experts’ involvement made itpossible to: come up with a historic breakthrough in re-using the cast iron derived from QMM minerals in a secondary process; significantly reduce the number of furnace shut-downs due to failure of water-cooled arch panels, thanks to the preventive replacement program; implement the LEAN philosophy; with the help of Business Improvement’s and the operations teams’ collaboration, this allowed the Reduction Plant to establish new production records.

We will implement the LEAN philosophy in all Sorel-Tracyand Havre-Saint-Pierre sectors and maintain our support of the company’s growth as part of the TiO

2050

project. Thus 2012 will see our completing deployment of the first LEAN tools in all sectors.

Business Improvement

This team draws upon the strengths of four different groups to address the company’s issues:

Process Development Process Safety Management Asset Management LEAN Six Sigma

Reduction Furnace Productivity RecordThe Reduction Plant established a production recordof 7,700 tons per day in October 2011. The former record of 7,400 tons per day dated back to 2008. The implemented LEAN dashboards make for a privileged daily information exchange and activity co-ordination space among the sector’s various players. Focusing team work on key issues and stakes played a vital role in setting this new record.

LEAN DashboardThe LEAN dashboard is a visual element that allows personnel to witness, at a glance, all production problems encountered. This increases action efficiency and enables application of the best possible solutions. Thus we quickly solve problems that are not necessarily the worst, but that do hamperour performance.

Sustain

able Developm

ent Rep

ort 201119

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

In 2011, we pursued our efforts to develop a culture in which everyone assumes responsibility for and ownership of his own safety and that of his work colleagues. To this end, various initiativeshave been either implementedor reinforced.

RTFT is aware of its inherent complexity and risks, which is why contractor managementremains one of our topconcerns. We have put a lot of effort into improving their mentoring and supervision. First of all, we evaluate their skills and make sure they follow the requisite training needed to complete their tasks safely. We also perform analyses in order to either eliminate risks or manage them more appropriately through implementation of control measures.

The Cleanliness and Good Order program has been revised to enhance our housekeeping standardsand lower accident risks.

A workplace in good order is without a doubt an element that fuels our people’s pride, efficiency and safety.

Taking advantage of lessons learned from incidentsto reduce likelihood ofrecurrence is one of the orientations focused on in 2011. Indeed, we have emphasized our incident management process usinga structured approachallowing us to better identify the fundamental causesof every incident anddevelop the correctivemeasures needed.

RTFT now uses a rigorous semi-quantitative riskanalysis (SQRA) process based on actual facts as well as participants’ knowledge and experience. The involvement of employees and managers is crucial to the successof this process. In 2011, owing to numerous actions identified and implemented, RTFT has lowered its critical risk by 15%.

Safety in the Workplace

Frequency Calculation: (number of lost-times, restrictedactivities and medical follow-ups) x 200,000/number of hours worked

2007 2008 2009 2010 2011

RTFT – Havre-Saint-Pierre:A Finalist for the Innovation 2011 CSST Côte-Nord AwardSpace Retainer for Tire RemovalMechanics now use a new, safer and more universal retainer for maintaining space between the tire and the wheel rim edge. Unlike use of a nut previously inserted to conservethis space, this new retainer minimizes risk of injury fromthe nut being violently projected by the 10-tons of pressure applied to secure the tire.

Before After

Reducing the Risk of Explosion in the Metal Powders Plant’s Annealing FurnaceTo ensure process stability, we installed an oxygen analyzer on an annealing furnace. This analyzer takes continuous atmospheric readings within the furnace to minimize risk of hydrogen explosion. Our objective consists in providing each furnace with one such analyzer.

562,

28

30

22

19

221,16

0,80

0,791,

05

Injuries at RTFT

Frequency Index Number of Injuries

Sustain

able Developm

ent Rep

ort 201120

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

Our workplace healthstandards are among the most rigorous in industry because our employees’ healthis at the heart of RTFT’sconcerns. RTFT promotesan integrated approach to industrial hygiene and health in the workplace.

The industrial hygiene team’smandate consists of monitoringemployees’ exposure tothe various hazards andcontaminants, including dust and noise, by applicationof a sampling campaign approach. Meanwhile, the health services department provides a medical follow-up to all employees, and more specifically those who hold high-risk positions. It carries out periodical examinations, clinical follow-ups andspecific exposure follow-ups.

Various programs have beenintroduced to reduce workers’exposure and the employees regularly undergo trainingon hearing protection, measures to be taken and procedures to be observedin confined spaces, as wellas respiratory protection.

In 2011, we carried outseveral awareness-raising campaigns focused on means to prevent workerexposure, in particular,to noise and the effectsof high heat. In addition,we have noticed that the rate of participation in periodical medical exams hassignificantly increased.

2012 promises to be rife with challenges. Indeed, theintroduction of a vast samplingprogram will enable us to take noise and air quality measurements in all sectors. In addition, a noise exposure reduction program, another for health and wellbeing, and a third one for stress attenuation in management personnel will be launched in 2012.

Health in the Workplace

Sound work methods are an efficient means of avoiding incidents. In this light, the theme for Health and Safety in the Workplace Month in November 2011 focused on the prevention ofmusculo-skeletal disorders. A renowned posture practitioner came and addressed all employees on the principles of safe, healthy postures that can prevent musculo-skeletal disorders.

Sustain

able Developm

ent Rep

ort 2011

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

21

Environment and Resources

Air Quality

Transportation of Ilmenite from the Mine to Port Facilities, Havre-Saint-Pierre, July 2011

Photo : © Xavier Dachez

For several years now, RTFT has deployed efforts to reduce dust loadings, one of the principal contributors to the company’s air emissions. Reducing sulphur dioxide (SO

2) emissions is also an

issue. RTFT is taking the necessary measures toimprove ambient air quality.

Quebec’s new Clean AirRegulation, in effect since June 2011, will be more stringent on numerouspollutant emissions and will control most emission sources on the Sorel-Tracy site.

As result certain emissions will be subjected to more exacting standards over the next few years and our emission tracking practices will also get stricter.

SO2 at the Sorel-Tracy

Metallurgical ComplexSulphur dioxide (SO

2)

emissions decreased from 10,886 tons in 2010 to9,087 in 2011. This dropis primarily due to theincreased use of ores from abroad with alower sulphur content than that ofHavre-Saint-Pierre ore. It should be noted that 95% of SO

2 emissions result from

the ore’s desulphurization pre-treatment at theOre Pre-Treatment Plant.

RTFT is planning a major SO

2 emissions capturing

project whose objective will consist in cutting emission back 63% in 2015. Large investments are plannedfor this project’s execution.

A central system equipped with a reactor using calcium hydroxide will be installedin 2014 at RTFT’s Ore Pre-Treatment Plant.

2006 2007 2008 2009 2010 2011 2012 2013 2014

1 000

3 000

5 000

7 000

9 000

11 000

13 000

2015

SO2 Emissions (2006-2015)

Sustain

able Developm

ent Rep

ort 201122

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

Air Quality

A Project to Reduce Dust Emissionsat the Ore Pre-Treatment PlantWe carried out a continuous improvement project to minimize dust emissions from yard operations at the Ore Pre-Treatment Plant. We conducted tests and implemented solutions, such as truck speed reduction, asphalt surfacing, and changes in operating methods.

Watering Test

Work on the Steel Plant’s Dust CollectorAs part of the Steel Plant’s annual shutdown in August 2011, the operations team initiated major work on the dust collector. In an effort to increase the unit’s effectiveness, the employees replaced the full slate of 1,500 cartridges on the collector. The work was executed overnight every day for more than a week.

David Projean, Flame-Cutter at the Steel Plant, February 2012

Dust at the Sorel-Tracy Metallurgical ComplexDust handling continues to be a key issue. The most recent five-year dustemissions reduction action plan, implemented in 2010, is still active. Thus since 2011, outside stackinghas been limited thanksto the commissioningof new storage facilities acquired in 2010.

On-going projects beginning to produce results: in 2011, atmospheric dust emissions in Saint-Joseph-de-Sorel and Saint-Ignace-de-Loyola decreased slightly when compared with 2010.

In 2011, no exceedances of the Quebec Clean Air Regulations were registered in Saint-Joseph-de-Sorel or Saint-Ignace-de-Loyola.

In 2012, the company plans to improve ambient air monitoring and tracking by installing an additional sampling station inSaint-Joseph-de-Sorel.

Moreover, as the new Clean Air Regulation now include fine particulates, the companywill regularly monitor and track this parameter at Saint-Joseph-de-Sorel.

2007 2008 2009 2010 2011

4

02

0 0

Number of Exceedances Measured Vs. the QuebecClean Air Regulations Ambient Air Quality Criteriaat Sorel-Tracy

Sustain

able Developm

ent Rep

ort 201123

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

Daniel Horth, Samuel Lapointe, Jean-François Bibeau, Alexandre Déziel,Donald Laflamme, Claude Chrétien, Jean-Guy Levasseur

Water ConsumtionWater consumption in 2011 declined slightly in comparisonwith previous years. The water,which originates principally from the Saint-Lawrence River, is used for preparing the ore before its entry into the Reduction Plant, cleaningoff-gases, and various other applications. Efforts tocut back on river waterconsumption per ton producedare being put into actionin order to reach the goalof a 16% reduction by 2013.

The most promising project consists of re-directing part of the final effluent towards the Ore Pre-Treatment Plant’s operations.

The efforts deployed toincrease effluent qualityare yielding positive results, and should allow us to attain this project’s target.

Effluent Treatment at the Sorel-Tracy ComplexIn 2011, the rate of particles present in the treated water at the Sorel-Tracy complex’s Water Purification Plant significantly dropped, going from an average of 44 mg/l of suspended solids in 2010 to 26 mg/l in 2011.

The improvements brought by the team consist, among other things, of optimizing products added to waterand adjusting treatmentflow rates.

Treatment optimization will continue in 2012 with tests targeting, among other things, addition of a new type of coagulant and a wa-ter heating system usedin preparing the polymer.

These improvements will be useful during the winter, when treatment challenges are more demanding. The treated water should reacha quality level enabling it to be recycled within the plant.

Water and Tailings Management at Havre-Saint-PierreWith the exception of four nickel exceedances recordedin January 2011, the treatment system for the main mining effluent at Havre-Saint-Pierre enabled us to complywith government standards.

Water Management

Water Consumption (Millions of Cubic Metres)2008 2009 2010 2011

69,7 68,4 69,5 64,8

Fina

l Effl

uent

(m

g/l)

2007 2008 2009 2010 2011

10

20

30

40

50

60

70

Results from research on the tailings’ geochemical behaviourwere published in several scientific articles produced inco-operation with, amongst others, the Industrial Chair CRSNG Polytechnique-UQAT. It has been demonstrated that the tailings’ geochemical behaviour is linked with their sulphide content, and that various sorption phenomena have a correlation with the percentage ilmenite content in the tailings as well as their age. External laboratory tests on run-off waters and Lac Petit-Pas’s water are in progress, for the purpose of defining the treatment technology that will be selected. Pilot tests will be conducted at the mine site in 2012, as well as in surrounding lakes. This will enable us to target the appropriate technology for the water treatment station planned as part of the TiO2050 project.

Annual Average of Suspended Solids in the Effluentat the Sorel-Tracy Metallurgical Complex

Sustain

able Developm

ent Rep

ort 201124

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

Non-HazardousResidual Materials2011 stands out from previousyears at Sorel-Tracy because the amount of residual materials has more than doubled compared to 2010. The projects that had a significant bearing on this result are the replacement of part of the slag car fleet, the full reconstruction of furnace No 4, the slag yard’s redevelopment, and the rehabilitation of the former

Atlas industrial site (located in front of the Sorel-Tracy Metallurgical Complex).The demolition andrehabilitation worksgenerated substantial amounts of scrap, concrete and asphalt that enabled the complex to improve its performance to almost 64% recycled residual materials.

Residual Materials Management

Project for 1640, Marie-Victorin Road (former Atlas plant)The former Atlas industrial site, in front of RTFT’s facilities,is currently the subject of a rehabilitation program in partnership with the MDDEP. The site’s rehabilitated sections will enable us to close down warehouses outside the complex in the short and mid terms, thereby reducing urban truck traffic and negative impact on the environment. Cleanup, dismantling, demolition and renovation works were necessary for restoring the buildings in place. Special attention was paid to sorting and segregation of residual materials generated, which ledto recovery of 1,317 tons out of a total of 2,059 tons of residual materials generated in 2011.

Non-Hazardous Residual Materials

2007 2008 2009 2010 2011

Percentage Recycled Amount Generated in Tons Percentage Recycled Amount Generated in Tons

Non-Hazardous Residual Materials

2007 2008 2009 2010 2011

Refractory Materials

2007 2008 2009 2010 2011

Percentage Recycled Amount Generated in Tons

6 89

5

6 84

9

7 06

1

15 5

99

8 10

1

46 % 23 % 41 %

64 %

47 %

Sorel-Tracy Metallurgical Complex Mine and Terminal at Havre-Saint-Pierre

Sorel-Tracy Metallurgical Complex

962

1 30

0 1 43

7

950

886

13 %17 %

23 %

10 % 21 %

4 93

4 7 33

7

5 73

9

7 46

0 9 20

4

26 %

69 %71 %

80 %

73 %

Sustain

able Developm

ent Rep

ort 201125

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

A Web Site for the Terres-d’en-Haut Residential District, near P-84This tool is the brainchild of an area resident who wanted tocreate a user-friendly virtual platform that would bringinhabitants closer together and broadcast information relevant to life in the neighbourhood. The company supported and took part in this initiative, building on the relationship that has been established through the local Citizens Committee. From RTFT’s point of view, this is an exceptional opportunity to reach out and inform the community about the tailing site’s geographicalcharacteristics as well as the operations and environmental follow-ups carried out there.

Hazardous ResidualMaterialsThe principal Hazardous residual materials generated in 2011 were absorbents, oily waters, acetone and waste oils.

The total amount ofhazardous residual materials produced fell off incomparison with 2010, while the re-use/recycling/recovery percentage is on the upswing.

By-ProductsIlmenite ore processinggenerates large amounts of mine tailings and processes by-products. For the most part, they are recovered externally by specialized recyclers and finallyreconditioned for various applications recognized and authorized by the ministère du Développement durable,de l’Environnement et des Parcs du Québec.

Primary uses are distributed under five categories: granular material used in road infrastructure construction;

farming applications; abrasives (sandblasting, road abrasive);

residential, institutional and industrial filtration;

input in other industrial processes.

By-products that cannotbe re-used, recycled or recovered internally or externally are disposed of at the P-84 mine tailing site. Projects are under way with institutes and recyclersso these tailings caneventually be re-used,recycled or recovered.

Diposition 0 %Disposition in P-84 38 %Internal Recycling 8 %External Recycling 54 %

Hazardous Residual Materials

2007 2008 2009 2010 2011

Percentage Recycled Amount Generated in Tons

Hazardous Residual Materials

2007 2008 2009 2010 2011

Percentage Recycled Amount Generated in Tons

By-Product Destinations in 2011Sorel-Tracy Metallurgical Complex

Mine and Terminal at Havre-Saint-Pierre

375 47

9

478 86 %

56 %89 %

653

59 %

564

70 %

234

77 %

188 20

6

234

227

72 %70 %

73 %74 %

Sustain

able Developm

ent Rep

ort 201126

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

Reduction Plant

Ore Pre-Treatment Plant

Steel Residues

Cast Iron and Slag Residues

Dust

Sludge (WWTP Residues)

Dust

Mine Tailings

Enriched Ore and Coal

Slag and Cinders

Coal Fines

WaterPurification

Plant

Disposal to P-84

Légende

External landfill

Internal Recycling

External Recycling

Small Portion

Ore/Coal

Ilmenite Ore

Sustain

able Developm

ent Rep

ort 201127

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

By-Product Flow DiagramSorel-Tracy Metallurgical Complex

Steel Plant

Metal Powders Plant

UGS(UpGraded Slag)

Titanium Slag

Iron/Cast Iron/Steel Residues

Cast Iron and Slag Residues

Cast Iron

Steel

Oxides

Dust

Scale

Slag and Cinders

Slag and CindersDust

Sustain

able Developm

ent Rep

ort 201128

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

In 2011, the energyconsumption calculated against the sum of saleable products was 13.78 GJ/t.

RTFT has the firm intentionof improving its energyperformance. It is fromthis perspective that we defined an integrated energy management program in 2011. Implementation of this program in our daily operations will enable us to efficiently track and follow up on energy consumption by targeting improvement projects.

Although RTFT is planning an increase in production over the next few years,we do not anticipate that energy intensity will rise proportionally.

This situation is due to the Madagascar (QMM) ore being naturally more concentrated and requiring fewerpreparatory steps, thusconsuming less energy.

In 2011, the greenhouse-gas emissions calculated against the sum of saleable products was 0.64 ton of CO2/t.

Again this year, recoveryand re-use of the processgas (CO gas) for its energy potential helped avoidemissions of more than 313,000 tons of CO

2

equivalent. We appointed an internal committee to further optimize the re-use of this gas.

2012 will prove to be a transition year, in which we will implement processes to comply with rules and regulations on mandatory reporting and adjusting to the carbon market.

Energy and Climate Change

Reduction Plant 56 %

UGS 17 %

Ore Pre-Treatment Plant 15 %

Steel Plant 7 %

Metal Powders Plant 3 %

Havre-Saint-Pierre 2 %

Electricity 57 %

Process Gas 25 %

Natural Gas 16 %

Others 3 %

Process 83 %

Combustibles 14 %

Fuel 3 %

GHG Emissions by Sector

GHG Distribution by Category

Energy Consump-tion

TC02e1,26

Sustain

able Developm

ent Rep

ort 201129

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

The number of environmentalincidents reported togovernment authorities went up to 62 versus 57 in 2010.

Most of these incidents were petroleum product spills and untreated effluent discharges.We investigated the incidentsand took corrective measuresto minimize likelihood of their recurrence.

Environmental Incidents

Havre-Saint-Pierre Sorel-Tracy

Total 10

Oil Spill 10

Total 52

Oil Spill 21

Waste Water Spill 3

Chemical Spill 3

Gas Emissions 2

Explosion 1

Non-complianceof effluent pH

3

Overflow 19

Noise

Rio Tinto, Fer et Titane continued with its work to reduce environmental noise. Our efforts focusedon implementing specificcorrective actions,in particular : installation of dampers at one of the reduction furnaces;

integration of a muffler on the Steel Plant’s fume stack.

Furthermore, we paid special attention to each project that introduced new equipment into our operations.When both selecting and commissioning equipment, we carefully study how,and whether or not, the equipment respects our noise criteria.For example, replacement of the standard back-up alarms by a new technology, white noise alarms, enabled us to sig-nificantly reduce our noise perception.

White noise alarms integrate with ambient noise more easily than conventional tone alarms. From a certain distance away, the soundemitted becomes inaudible in the community.

Saint-Joseph-de-Sorel Saint-Ignace-de-Loyola

* Ad hoc contribution from the former port tower’s portable dust collector.The latter was removed following installation of the new port tower.

Noise ImpactSound Intensity Generated, in Decibels dB(A)

54* 50 51 51 50

54 55 54 54 54

2007 2008 2009 2010 2011

Sustain

able Developm

ent Rep

ort 201130

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

Concerns Management

Conscious of ourneighbouring communities concerns, RTFT followed up on the 348 complaints and comments received in 2011.

The Neighbouringcommunities’ chiefconcernsare still dustemissions. Noise andvibrations are also issues that we take very seriously.

We have set up amultidisciplinary teamto identify and develop innovative solutions for reducing the most important sources of emissions.

In 2010, we acquired the industrial lot located at 1640 Marie-Victorin Road, the former Atlas industrial site in front of RTFT’s Sorel-Tracy complex. It is being subjected to a rehabilitation program carried out jointly by the company and the Ministère du Développement durable, de l’Environnementet des Parcs du Québec (MDDEP). The premises will beprogressively decontaminatedby sector under the direction of the MDDEP, and RTFTwill then revamp and retrofit the freed-up space for its operations.

In 2011, part of the main building was rehabilitated and reorganized for storage of RTCS slag. This operationled to a cutback on bulk transportation of RTFTproducts to other warehousesin the region and a drop in the environmental impact inherent in such activities. Considering that therestricted space in the present industrial complex imposes a major limitation on development of itsoperations, the lot at1640 Marie-Victorin Road, once entirely rehabilitated,will become a strategicasset required for future investment projects.

Land Use

Havre-Saint-Pierre511 ha

Sorel-Tracy139 ha

The company’s footprint is evaluated at the following numbers:

Sustain

able Developm

ent Rep

ort 201131

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

Aerial View of Havre-Saint-Pierre, July 2011

RTFT is working onoptimizing its relationswith its host communitiesand contributing to their development. At the same time, RTFT also seeks means to trim down these communities’ dependence on one main employer by promoting the secondary (manufacturing) sector and encouraging diversification of complimentary niches. For example, the company enthusiastically supports the Sorel-Tracy region’s initiatives so it can be fully recognized as an industrial ecology technocity.

The company’s soundness depends on that of its host region. This is why RTFT’s objective consists of creating actively committedpartnerships that do not simply limit themselves to financial contributions.

RTFT has positioned itself as a genuine regional economic driver. In 2011, it injected over $340 million directly into the Quebec economy, which amounts to more than 70% of our procurements.Of this amount, close to$17 million were spent in the MRC de Minganie, and over $160 million in theMRC Pierre-de-Saurel.

With the help of its donation and sponsorship contributionprogram, RTFT has distributedover $522,000 to localnon-profit organizationsin Sorel-Tracy andHavre-Saint-Pierre.

Communities

Culture 4,6 %

Business Development 41,7 %

Education 7,5 %

Environment 15,6 %

Leisure 7,2 %

Health 7,7 %

Others 15,7 %

Photo : © Xavier Dachez

Direct Financial Contributionto Communities in 2011

2011 $ 522 000

2010 $ 319 700

Total Amount

Sustain

able Developm

ent Rep

ort 201132

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

The Mingan islands, Havre-Saint-Pierre, August 2011

RTFT’s relations withthe communities ofHavre-Saint-Pierre and Ekuanitshitare increasingly important and contribute not only to ensuring the company’s growth, but also to the development of the North Shore (Côte-Nord) municipalities.

In 2011, we paid specialattention to formingpartnerships with the region’s communities and non-profit organizations. Indeed, RTFT relies on the communities’ collaborationto guarantee the mine’s sustainability as well asemployment consolidation

RTFT re-affirms itself as an active corporate citizen by disseminating informationto its employees and host communities. RTFT supports structuring local initiativessuch as the request toimplement a day-care centre for 80 children. Newcomers also benefit from hosting, integration and trainingstructures set up andimplemented by localdevelopment organizations in co-operation with RTFT.

In 2011, RTFT began to develop closer ties with the Ekuanitshit Innu community based in Mingan, becauseit wants the latter’sinhabitants to benefitfrom the dynamism and favourable spin-offsattributableto the TiO

2050

project’s implementation.

RTFT is aware of the underlying value to obtainingFirst Nations’ support for carrying out its development projects and wishes to set up a win-win partnership for all.

Harmonious cohabitationon the territory, mutualunderstanding, use ofeffective communication channels and execution of common interest projects are the four general guiding principles in the declaration of partnership and mutual respect issued betweenRTFT and the Ekuanitshit community.

RTFT is also proud to have formed partnerships with local developmentorganizations. RTFT’sexecutive committee has

met several times with the Ekuanitshit Innu council and the Havre-Saint-Pierremunicipal council to discuss respective issues and stakes.

In other respects,representatives from RTFT’s procurement sector have initiated a series of meetings with local business owners to broaden and deepen their understanding of issuesand stakes regarding the company’s needs.

Finally, construction of 32 new housing units intended for future new employees will be completed in the spring of 2012.

Contribution to the Communities of Havre-Saint-Pierre

Sustain

able Developm

ent Rep

ort 2011

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

33RTFT has been involvedfor over 60 years in the Sorel-Tracy community and pursues its support of majordevelopment projects and participation in local and regional joint action efforts.

In 2011, RTFT continued with its active involvementin the two large-scale consensus-buildingendeavours that are the Écocollectivité de Pierre-de-Saurel and recognition of the Pierre-de-Saurel region as an industrial ecology technocity.

In addition, we arecollaborating with theCoopérative de solidaritédu parc régional des Grèvesin developing regionalprojects such as theMaison de la métallurgie.

RTFT also contributes tothe community’s growth,through its support of the Centre d’action bénévole du Bas-Richelieu, the FondationHôtel-Dieu de Sorel, theFondation des bénéficiairesdes CHSLD Pierre-de-Saurel, the Fondation du Cégep de Sorel-Tracy and the Biophare.

We also proudly support the Orienthèque’s Accès-région Pierre-de-Saurel program for hosting newcomers to the region.

RTFT’s great challengeconsists in developing a strategy to find out how it can continue leveraging regional economicdevelopment in keeping with strategic orientations tied into industrial ecology and the Écocollectivité.

RTFT wants to be one of the catalysts for bringing new citizens into the region and promoting the region’s dynamism.

Contribution to the Community of Sorel-Tracy

Parc Regard-sur-le-Fleuve, Sorel-Tracy, May 2007

Photo : Véronique Meunier

Sustain

able Developm

ent Rep

ort 2011

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

34

Fondation Hôtel-Dieu de SorelDominique Bouchard, President of RTFT, chose to actively get involved in the region in accepting presidency of both the Fondation Hôtel-Dieu de Sorel and the Fondation du Cégep de Sorel-Tracy. He poses here with Odette Fleury, Managing Director of the Fondation Hôtel-Dieu de Sorel.

OrienthèqueSteve Morin, Department Manager,Human Resources, took part indeveloping Orienthèque as a member of its Board, from the very genesis of the organization. He still takes part in expansion of Orienthèque’s programs and activities, such as the Accès-région Pierre-de-Saurel service. He is seen here with Christine Latour, Managing Director of Orienthèque.

Fondation du Cégep de Sorel-TracyRéjean Rousseau, Manager, Labour Relations, has beensitting on the Board of the Fondation du Cégep de Sorel-Tracy for several years. He works closely with Myriam Arpin,Managing Director of the foundation.

Fondation des bénéficiaires des CHSLDde Pierre-De SaurelJean Ricard, Chief Analyst, Production Planning,Metal Powders Plant, acts as Vice-Presidentof the foundation’s Board.

Centre d’action bénévoleThe CAB, headed by Claudette Dupuis-Salvas, takes care ofpromoting volunteer action in the community and voluntarily provides various support and assistance services.Richard Bourque, Senior Safety Advisor at RTFT, also sits on the CAB’s Board, and, along with the other Administrators, looks after thisorganization’s sound management.

A Few Examples of Employees’ Commitment and Involvementin their Community

Sustain

able Developm

ent Rep

ort 2011

Rio Tin

to, Fer et Titane

Buildin

g for the fu

ture

35

2011 Report’sFeedback MechanismAlways concerned withaccounting for its performance,Rio Tinto, Fer et Titane has been publishing a SustainableDevelopment Report since 1999. Following publication of the current report,we will gather comments from our stakeholders in order to integrate them into the next report.

In case of questions orcomments about this report, please contact theCommunications Departmentat its e-mail address [email protected]

In order to reduce thecompany’s ecologicalfootprint, the Sustainable Development Report isaccessible in electronic format, in both English and French, on the organization’s Web sites at the following addresses:www.rtft.comwww.riotinto.com

GRI GuidelinesThe Rio Tinto, Fer et Titane Sustainable Development Report is based on the GRI (G3) guidelines.

AnthraciteHigh-purity coal.

CinderScum produced through oxidation or accumulation of impurities at the surface of a liquid metal as part of its development or purification process.

DrillingTo make a hole in a hard material (for example, an ilmenite deposit).

IlmeniteOre that constitutes the primary source of titanium. Generally represented as an iron titanium oxide.

OverflowExcess, overfill.

Pig ironMetal or alloy mass of asimple shape generally intended to be converted via remelting or other process.

Scale DepositsOxide layer that forms on steel from its contact with air at high temperatures.

SlagOxide scum formed oradded at the surface ofliquid metals. It is produced by reducing the ilmeniteore’s iron oxide in the smelter. In contrast withthe metallurgical industry, where slag is a by-product, we make it our flagship product, titanium dioxide.

TailingsRock or other materialin place on or within or extracted from an ore or mineral body, that doesnot contain minerals insufficient quantities to allow it to be used for profitable development.

TiO2

Titanium dioxide.

Sustainable Development Report 2011

Glossary

Jean-Sébastien AbranSuzie ArsenaultNicolas BehmRené BélandFariel BenameurSerge BergeronSerge BérubéIsabelle BironChristian BlanchetMichel BourassaRichard Bourque

Linda CapletteDaniel CôtéRémi DallaireLucie Descheneaux Hugo DomaineMaxime DubéJimmy DufresneJean DumasDavid Gallant Roy GemmellGilles Grégoire

Gildas InisanJean-François JompheChantal LabrecqueAnne LaganièreMichelle LalondeRichard LamanaClaudio LazzariNathalie LeMayMarco L’ItalienCécile MichouxSteve Morin

Jérôme MorneauMarie-Josée ParentYves PépinMartin PhaneufJosée PinardPierre RacineJean RicardJean-Pierre RossYves Sylvestre

Acknowledgements and thanks for their collaboration and participation in the contents

Rio TintoFer et TitaneMetallurgical Complex1625 Marie-Victorin RoadSorel-Tracy, QuebecJ3R 1M6T + 1 450 746 3000F + 1 450 746 4438

Rio TintoFer et TitaneMine and Terminal951 de l’Escale StreetHavre-Saint-Pierre, QuebecG0G 1P0T + 1 418 538 2400F + 1 418 538 2796 www.rtft.com • www.riotinto.com

Design and printing: Cournoyer communication marketingWriting, editing and co-ordination: Hélène Goulet, Marie Rousseau and Julie TraversyRevision: Amélie Salvas, Hélène Goulet and Sylvio MorinTranslation: Robert Jeffery, RPL and Andrew Broaded