Clemson Core Campus Construction Update January 25, 2016 WORK PLANNED FOR THIS WEEK (1/25 – 1/29) Continue masonry veneer at Building D & A – North/East faces. Start masonry preparation at Building D, A, C – South face. Continue Building D, A, & C interior MEP and framing work. Continue installation of Building D, A, & C exterior framing/sheathing. Continue sprinkler installation at Building A & C. Continue underground utility installation. Continue installation of steam line from North vault into building. Continue installation of Building A Elevators 2 & 3. Continue drywall installation at Building D & A. Continue installation of high TPO roof at Building A. Start installation of high TPO roof at Building C. WORK PLANNED FOR NEXT WEEK (2/1 – 2/5) Continue masonry veneer at Building D & A – North/East faces. Continue masonry preparation at Building D, A, C – South face. Continue Building D, A, & C interior MEP and framing work. Continue installation of Building D, A, & C exterior framing/sheathing. Continue sprinkler installation at Building A & C. Continue underground utility installation. Continue installation of steam line from North vault into building. Continue installation of Building A Elevators 2 & 3. Continue drywall installation at Building D & A. Continue installation of high TPO roof at Building A. Start installation of high TPO roof at Building C. Potential setting of Building A & B Transformers. IMPORTANT ITEMS Fort Hill sidewalk adjacent the jobsite closed. CONCRETE POURS – JAN. 29, 2016 & FEB. 5, 2016 UNION ROAD CLOSURE: JANUARY 6, 2016 – AUGUST 1, 2016 CAMPUS STUDENT INVOLVEMENT Internships – 4 Clemson student interns. Summer internships – 8 Clemson students have accepted offers. Construction Update #71 Building A & B Building D Honors Great Hall Building C

Building D Honors Great Hall Clemson Core Campus Construction Update January 25…housing.clemson.edu/wp-content/uploads/2016/02/Clemson... · 2018-03-31 · Clemson Core Campus Construction

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Building D Honors Great Hall Clemson Core Campus Construction Update January 25…housing.clemson.edu/wp-content/uploads/2016/02/Clemson... · 2018-03-31 · Clemson Core Campus Construction

Clemson Core Campus

Construction UpdateJanuary 25, 2016

WORK PLANNED FOR THIS WEEK (1/25 – 1/29)

• Continue masonry veneer at Building D & A – North/East faces.• Start masonry preparation at Building D, A, C – South face.• Continue Building D, A, & C interior MEP and framing work. • Continue installation of Building D, A, & C exterior framing/sheathing. • Continue sprinkler installation at Building A & C.• Continue underground utility installation.• Continue installation of steam line from North vault into building.• Continue installation of Building A Elevators 2 & 3.• Continue drywall installation at Building D & A.• Continue installation of high TPO roof at Building A.• Start installation of high TPO roof at Building C.

WORK PLANNED FOR NEXT WEEK (2/1 – 2/5)

• Continue masonry veneer at Building D & A – North/East faces.• Continue masonry preparation at Building D, A, C – South face.• Continue Building D, A, & C interior MEP and framing work. • Continue installation of Building D, A, & C exterior framing/sheathing. • Continue sprinkler installation at Building A & C.• Continue underground utility installation.• Continue installation of steam line from North vault into building.• Continue installation of Building A Elevators 2 & 3.• Continue drywall installation at Building D & A.• Continue installation of high TPO roof at Building A.• Start installation of high TPO roof at Building C.• Potential setting of Building A & B Transformers.

IMPORTANT ITEMS

• Fort Hill sidewalk adjacent the jobsite closed.• CONCRETE POURS – JAN. 29, 2016 & FEB. 5, 2016

• UNION ROAD CLOSURE: JANUARY 6, 2016 – AUGUST 1, 2016

CAMPUS STUDENT INVOLVEMENT

• Internships – 4 Clemson student interns. • Summer internships – 8 Clemson students have accepted offers.