Building Assets Conditions Assessment Kogarah War Memorial Swimming Pool
23 September 2016 Cardno i
Building Assets Conditions Assessment
Kogarah War Memorial Swimming Pool 80817051
Prepared for Georges River Council 23rd September 2016
Building Assets Conditions Assessment Kogarah War Memorial Swimming Pool
23 September 2016 Cardno ii
Contact Information
Cardno (NSW/ACT) Pty Ltd
ABN 95 001 145 035
Level 9, The Forum
203 Pacific Highway
St Leonards NSW 2065
Telephone: 02 9496 7700
Facsimile: 02 9439 5170
International: 61 2 9496 7700
www.cardno.com
Author(s):
Leo Meng (LM)
Structural Remedial Team Leader
Ling Kai Kong (LK)
Senior Electrical Engineer
Dijana Cupac (DC)
Hydraulics and Fire Engineer
Niren Farias (NF)
Senior Mechanical Engineer
Approved By:
Leo Meng
Remedial Team Leader
Document Information
Prepared for Georges River Council
Project Name Kogarah War Memorial
Swimming Pool
File Reference 108-ME-R001
Job Reference 80817051
Date 23 September 2016
Version Number 2
Effective Date 23 September 2016
Date Approved: 23 September 2016
Document History
Version Effective Date Description of Revision Prepared by:
1 26 August 2016 Draft Leo Meng
2 23 September 2016 Final Leo Meng
Building Assets Conditions Assessment Kogarah War Memorial Swimming Pool
23 September 2016 Cardno iii
Table of Contents
1 Executive Summary 4
2 Introduction 6
3 Condition Review – Electrical 7
3.1 Power 7
3.2 Lighting 10
3.3 Communications 13
3.4 Security 15
4 Condition Review – Mechanical 16
5 Condition Review – Hydraulics 27
6 Condition Review – Fire 43
7 Overall Services Assessment 44
8 Condition Review – Structural 45
9 Site Capex Expenditure 65
10 Condition of the Outdoor Swimming Pool 68
11 Conclusion 69
12 Appendix A – Air Quality Report 70
13 Appendix B – Thermal Imaging on Switchboard 71
23 September 2016 Cardno 4
1 Executive Summary
Electrical
The electrical equipment sited are generally built very long time ago and are in a poor condition. Having no
emergency and exit lighting within the installation is a significant safety hazard. Please find below the points
to summarise the electrical service.
A. The swimming pool site is services by two distribution boards. The distribution boards were found to
be in an acceptable condition.
B. Electrical, communications, security and multimedia cabling are managed very poorly. Cardno
recommend to tidy up the cable within 2 years.
C. Inadequate power outlets are available in the building. External power outlets are not adequately
protected against moisture. Cardno recommend installing new power outlets as soon as possible.
D. Internal lighting and ceiling fans are in very poor condition. Cardno recommend replacing existing
with new as soon as possible.
E. External lighting are in a poor condition. Cardno recommend replacing existing external lights with
new as soon as possible. Light poles could be retained and reused.
F. All existing lighting circuits are controlled by ON/OFF switches. Cardno recommend replacing
existing lighting control with new lighting control as per Building Code of Australia when light fitting
upgrade works take place.
G. The swimming pool site does not have emergency and exit lighting. Cardno recommend installing
emergency and exit lighting as soon as possible.
H. The Building Distributor telephone frame is at the end of its services life, Cardno recommend
replacing existing Building Distributor with new as soon as possible
I. MATV/Pay-TV service is in poor condition, Cardno recommend replacing existing MATV service with
new in 2 years’ time.
J. Audio Visual and Public Announcement speakers are in poor condition. External speakers are not
protected against water ingress. Cardno recommend replacing existing speakers with new in 2
years’ time.
K. CCTV cameras are generally in a poor condition. Cardno recommend re-installing poorly installed
cameras as soon as possible.
Mechanical
There is no air-conditioning for the swimming pool complex except for the Physio room which has a dedicated split ac unit. There is no air temperature or humidity control for the gyms, toilets and the reception areas. The Kogarah War Memorial Swimming Pool is adequately naturally ventilated through openable windows in external walls and less than full height internal walls.
A. The areas provided with natural ventilation include the male and female toilets and locker rooms, the
cardio and weight lifting gyms, and the reception / entrance areas.
B. Mechanical air circulation is provided by ceiling fans in both the cardio and weight gym areas. There
is a pedestal fan for air circulation in the reception area.
C. The pool equipment area is also naturally ventilated through openable windows and grilles.
D. There is no mechanical exhaust ventilation provided for the toilet areas.
E. No mechanical ventilation is provided for the kitchen area.
23 September 2016 Cardno 5
F. The equipment store room has inadequate ventilation.
Hydraulics
The general condition of the hydraulic services inspected is in a poor condition.
A. Cold water is supplied to the property via a connection to the town’s main along Carwar Ave. The property water meter assembly incorporates insufficient level of backflow protection. The water connection in undersized. Water pressure in the areas inspected appears above the code minimum of 50 kPa and. There is no pumps or water storage utilised within the building. The cold water pipes are aged and at the end of their life span.
B. The building draws hot water from two electric hot water heaters. One aged 250L hot water heater is serving the female bathrooms and the other 25 electric hot water serving the kitchen.
C. The stormwater system is kept in a poor condition, gutters are not connected to the downpipes in some of the areas inspected. The downpipes are not directly connected to the stormwater system. The runoff surface falls are not according to AS3500.3. There are blockages within the system.
D. Sanitary system is aged, the penetration though the walls are missing fire collars.
E. There is no trade waste in site. Trade waste is required to serve the kitchen.
F. The pool plant is in a poor condition and is past the end of its life span.
G. The gas system is in a good condition and is fully operations.
Fire
The only fire service present onsite are the fire Extinguishers
A. Sprinklers are not present onsite, which is acceptable by BCA.
B. Fire hose reels and fire hydrants present are not present on site, however both systems are required as the building foot print is greater than 500 sqm. The building is non-compliant.
C. Fire extinguishers serve the kitchen and the pool area.
D. Smoke detection and EWIS system are not present on site. As there building does not have a two or more storeys the system is not required by the BCA.
Structural
The original structure at Kogarah War Memorial Swimming Pool is believed to be approximately 50 years
ago. It is our opinion that the current gym structure/reception building does not comply with current
Australian Standards in term of loading requirement. Foundation settlement is evident throughout the site in
the forms of cracking to slab and brick walls. Significant corrosion to the steel framed awning structure is
evident throughout. The overall condition of the structure throughout is in poor condition and our major
concerns are generally as follows,
A. Foundation settlement cause excessive cracking to load brick walls.
B. Extensive corrosion to the steel framed awning adjoining swimming pool.
C. Extensive water ingress throughout the reception and gym areas.
D. Existing roof structure is likely to be under sized according to current code requirement and sagging
to the roof sheeting is evident.
E. Comments regarding the outdoor swimming pool is discussed in Section 10 of this report.
23 September 2016 Cardno 6
2 Introduction
Cardno was commissioned to carry out a building assets conditions assessment at Kogarah War Memorial
Swimming Pool.
A visual site inspection was carried out on 5th August 2016, the inspection was carried out during regular
business hours. This report is based on the documentation, visual inspection and discussions with the
buildings representative.
Inevitably with a building of this size and age some areas of the building could not be visually examined. For
example, concealed ceiling space ductwork above set plasterboard ceilings, however it is our goal to
maximise the extent of our investigation within the constraints of time and the level of investigation defined
by the Client.
The building services covered in this report are as following:
Electrical services;
Mechanical services;
Hydraulics services;
Fire services;
Structural conditions;
Figure 2-1 Kogarah War Memorial Swimming Pool
Legend Condition
Poor 1
Fair 2
Good 3
23 September 2016 Cardno 7
3 Condition Review – Electrical
3.1 Power
ITEM
Kogarah War Memorial Swimming Pool
Pool Plant Distribution Board 2
The site appear to be fed power from a main distribution board which is located outside the pump room. The main distribution board is locked, therefore Cardno could inspect the externals only.
Figure 3-1 – Pool Plant Distribution Board
Metering n/a
The electrical meter was not found within the building. The meter is owned and operated by the supply authority.
Standby Power Generation n/a
The building does not contain a backup generator.
Pool Kiosk Distribution Board 2
The distribution board is located within a store room, it supplies local power and lighting circuits. The distribution board is in an acceptable condition, but the store room is seriously under-illuminated.
Figure 3-2 – Pool Kiosk Distribution Board
23 September 2016 Cardno 8
Electrical Cabling 1
Electrical cabling in building is very poorly managed. Bundled, untidy cables of various sorts are exposed to occupants, making the building unsightly. Facility maintenance becomes more difficult. Having exposed loose cable is also a potential safety hazard.
Figure 3-3 – Exposed Cables Picture 1
External electrical cables exposed to weather.
Figure 3-4 – Exposed Cables Picture 2
23 September 2016 Cardno 9
Power Outlets 1
Insufficient power outlets have been provided. Many power boards and double adaptors are used to service electrical equipment.
Figure 3-5 – Power board and Untidy Cables
Some outdoors outlets do not have adequate protection against water ingress. Loose power plugs exposed to weather/rain were found on site. Having moist in power outlets is a significant safety hazard.
Figure 3-6 – Power Outlet without IP65/56 Protection & Exposed Power Plug
23 September 2016 Cardno 10
3.2 Lighting
ITEM
Kogarah War Memorial Swimming Pool
Internal Lighting 1
Lighting within the building are generally provided by fluorescent luminaires. The luminaires are generally very old and in very poor condition.
Figure 3-7 – Internal Fluorescent Light Fitting
Ceiling Fans 1
Ceiling fans within gymnasiums are very old and are covered in dust.
Figure 3-8 – Ceiling Fan in Gymnasium
23 September 2016 Cardno 11
External Lighting 1
External lighting is currently provided by weather proof fluorescent luminaires as well as pole mounted flood lights. Fluorescent luminaires are generally in a poor condition. Two of the flood lights do not currently have lamp.
Figure 3-9 – External Fluorescent Light
Figure 3-10 – External flood Lights
23 September 2016 Cardno 12
Switching 1
Manual ON/OFF control has been provided throughout the site for internal and external light
fitting as well as ceiling fans. Manual switching is obsolete and could cause significant energy
wastage.
Figure 3-11 – Existing Lighting and Fan Controls
Exit Lighting 0
No exit lighting is available on site. This is a significant safety hazard.
Emergency Lighting 0
No emergency lighting is available on site. This is a significant safety hazard.
23 September 2016 Cardno 13
3.3 Communications
ITEM
Kogarah War Memorial Swimming Pool
Building Distributor 1
The building distributor is at the end of its services life.
Figure 3-12 – Building Distributor
MATV/PayTV 1
MATV/PayTV system is in poor condition, with very poor cable management.
Figure 3-13 – MATV Headend Equipment in Gymnasium
23 September 2016 Cardno 14
Audio Visual (AV) & Public Announcement (PA) 1
Audio Visual service is provided within the building as well as the semi-open external area surrounding the swimming pool. The AV system is in poor condition. Majority of external speakers are not protected against water ingress. Cable management is very poor.
Figure 3-14 – External Speaker Above Unused Old Communications Rack
Figure 3-15 – Very Old External Speaker
Communications Cabling 1
Communications cabling is managed very poorly. Please refer to Figures 3-5 and 3-12 for details.
23 September 2016 Cardno 15
3.4 Security
ITEM
Kogarah War Memorial Swimming Pool
CCTV Headend 2
The CCTV headend is located behind the reception counter and is in reasonable condition.
Figure 3-16 – Security Headend
CCTV Camera 1
CCTV Cameras on site are in a poor condition. Cardno found poorly managed CCTV cables and poorly installed cameras during site visit.
Figure 3-17 – CCTV Camera Not Installed Properly
ELECTRICAL
CONDITION 17/48
23 September 2016 Cardno 16
4 Condition Review – Mechanical
ITEM
Kogarah War Memorial Swimming Pool
Reception area
1
The reception area is adequately naturally ventilated through an open walk through area. The openings are more than 10 % of the served floor area as required by the BCA.
Figure 4.1 Ceiling fans and openable windows
Figure 4.2 Ceiling fans and openable windows
23 September 2016 Cardno 17
Cardio Gym
1
The cardio gym area is adequately naturally ventilated through openable windows. The openings are more than 10 % of the served floor area as required by the BCA.
Figure 4.3 Ceiling fans and openable windows
Figure 4.4 Ceiling fans and openable windows
23 September 2016 Cardno 18
Weightlifting Gym
1
The weight lifting gym area is adequately naturally ventilated through openable windows. The openings are more than 10 % of the served floor area as required by the BCA.
Figure 4.5 Ceiling fans and wooden mesh openings
Figure 4.6 Ceiling fans and openable windows
23 September 2016 Cardno 19
Female locker room and toilets 1
This area is adequately naturally ventilated through openings above walls. The openings are more than 10 % of the served floor area as required by the BCA.
Figure 4.7 naturally ventilated openings above wall
Figure 4.8
23 September 2016 Cardno 20
Figure 4.9 Openable windows
23 September 2016 Cardno 21
Male locker room and toilets 1
This area is adequately naturally ventilated through openings above walls. The openings are more than 10 % of the served floor area as required by the BCA.
Figure 4.10 – naturally ventilated through openings above walls
Figure 4.11
23 September 2016 Cardno 22
Figure 4.12
Figure 4.13
23 September 2016 Cardno 23
Kitchen Exhaust System 1
The kitchen area is naturally ventilated through openable windows though it appears to be inadequate. The opening area is less than the minimum 10 % of the served floor area as required by the BCA.
Figure 4.14
Figure 4.15 naturally ventilated through openable windows
23 September 2016 Cardno 24
Equipment store room 1
The Equipment area is inadequately naturally ventilated. The opening area is less than the required minimum of 10 % of the served floor area as required by the BCA.
Figure 4.16 – inadequate ventilation provided for equipment store room
23 September 2016 Cardno 25
Split ac unit for Physio room 2
The Physio room is the only area that has room temperature control by way of an ac unit which appears to be in good condition.
Figure 4.17 – Outdoor unit , indoor unit could not be assessed
23 September 2016 Cardno 26
Pool Equipment Room 2
The Equipment room is inadequately naturally ventilated through openable windows. The openings are less than 10 % of the served floor area as required by the BCA.
Figure 4.18 – natural ventilation through openable windows
Mechanical MECHANICAL
Condition
11/27
23 September 2016 Cardno 27
5 Condition Review – Hydraulics
We have generally undertaken a review of the existing services as installed within the subject property with the intent to identify and cost any future maintenance and plant replacement issues.The general condition of the hydraulic services inspected is in poor working condition.
ITEM
Kogarah war Memorial Swimming Pool
Cold Water 1
Cold water is supplied to the property via a connection to the town’s main along Carwar Ave. The water meter assembly is located at the south corner of the property. The backflow prevention device utilised as part of the water meter assembly is Double Check Valve. The water supplies the pool plant hence a higher level of protection is required for a water meter assembly to comply with AS/NZS3500.1 and Sydney Water meter installation guide. The size of water supply to the building is undersized given the number of wet fixtures (including the pool) within the building. Water pressure within main is adequate to serve the building hence no pumps are installed onsite. There is no water storage utilised within the building Water reticulates throughout the site to serve all the external and internal fixtures. The system appears to be in a poor operating condition.
Figure 5-1 – 32mm Cold Water Supply to the property
23 September 2016 Cardno 28
Hot Water 1
The building has three main wet areas which require hot water. The female shower rooms, the male shower rooms and the kitchen. Each area has it’s own dedicated hot water system. Within the female change rooms there is a 250L electric hot water system. The hot water system only serves 2 out of 6 showers. There is no hot water circulating pumps however hot water fixtures are within acceptable proximity. It is unclear why all fixtures are not served with hot water. The hot water heater is manufactured in 2009, hence is approaching the end of its 10 year life span. The hot water is regulated via tempering valve and not a thermostatic mixing valve. Thermostatic mixing valve is required to be installed as per AS3500.4 Hot water pipework is not thermally insulated. This means more energy than required is utilised to provide hot water and there is OHS risk in handling the hot water pipework. The hot water heater in the male bathroom is missing, there is no hot water available in the male showers.
Figure 5-2 – 250L Electric Hot Water Units within female shower rooms
Figure 5-3 – Tempering Valve regulating hot water temperature instead of required thermostatic mixing valve
23 September 2016 Cardno 29
The kitchen has its own dedicated electric hot water system. The heater has been
manufactured in 2015. The hot water heater s reasonably new and with proper
maintenance can be utilised for approximately another 8 years.
Figure 5-4 – Kitchen 25L – Electric hot water heater
List of Hot water Units
Year of Manufacture Number of Units
2009 1
2015 1
All units are in working order and receive regular maintenance. For economic purposes the units manufactured in 2009 are considered to be almost fully depreciated.
23 September 2016 Cardno 30
Sanitary System 1
The building sanitary plumbing system serves the male and female change rooms, pool plant and the kitchen.
All the fixtures and fittings are in a poor condition and require replacement All discharge produced from the kitchen and preparation area discharge directly into the sanitary system, required trade waste system is not present onsite,
Figure 5-5
In the female shower rooms all the taps and basins requires replacement
Figure 5-6
In the male bathroom all taps and basins require replacement
23 September 2016 Cardno 31
Figure 5-7
In male bathrooms shower hot and cold water tapware is requires replacement and proper installation, currently taps are loosely connected. No hot water is available.
Figure 5-8
In female shower rooms, within toilet cubicle toilet seat is missing
23 September 2016 Cardno 32
Figure 5-9
Sanitary pipework passing tough the wall, however it is installed without a fire collar.
Figure 5-10
Vent pipe with in male bathroom not installed according to AS3500.2. It’s unclear
why the pipe is not installed in nonlinear manner.
23 September 2016 Cardno 33
Figure 5-11
Electric deep fryer installed in the kitchen. No grease arrestor is installed for the
kitchen. It’s unacceptable to directly injected grease waste into the sanitary system.
Figure 5-12
Toilets are not well maintained and flush buttons don’t work
23 September 2016 Cardno 34
Figure 5-13
There is a hole in the roof above the shower
Water to be serving the shower need to be of drinkable grade. The hole in the roof
means during a raining day people taking a shower have unhygienic water
dispersed onto them. This is a health hazard.
Figure 5-14
Unhygienic shower receives rusty water though the hole in the roof
23 September 2016 Cardno 35
Stormwater 1
The stormwater system is kept in a poor condition, and needs to be replaced
Gutters and downpipes are disconnected, and roof has holes in it.
Pipes are undersized.
Stormwater runoff falls are inadequate
There are blockages in the system.
There are no expansion joints built in the gutter system
Figure 5-15
Gutter are damaged and bent, it appears that there are no gutter expansion joints
Figure 5-16
Downpipes are not properly connected, rainwater spills out though the unsealed
junctions
23 September 2016 Cardno 36
Figure 5-17
Downpipes are disconnected from the gutter
Figure 5-18
Within the store room rainwater seeps thought the ceiling ( this means that there is
a hole in the roof)
23 September 2016 Cardno 37
Figure 5-19
Gutter and downpipes are not sized properly, hence are overflowing
Figure 5-20
Downpipes not connected to the stormwater system
23 September 2016 Cardno 38
Figure 5-21
Trench grates are old and rusty
Figure 5-22
Ponding of stormwater due to blockages
23 September 2016 Cardno 39
Pool System 1
The pool water treatment plant is in a poor condition and will require replacement in the near future.
Figure 5-23
The gas water boiler is utilised to heat the pool water, it is functional but well past its economic life span.
Figure 5-24
The sodium hypochlorite tank is aged but functional. The tank is well past its economic life span.
23 September 2016 Cardno 40
Figure 5-25
The pump has been replaced in 2014, the pump appears to be in a good operating condition. The pump plinth lacks adequate shock absorption.
Figure 5-26
The heat plate exchange is aged but functional. The heat plate exchanger is well past its economic life span and will require replacement in the near future.
23 September 2016 Cardno 41
Figure 5-27
The safety station has not been tested since 2014. It is a potential health hazard.
Figure 5-28
The pipework is aged and rusty and requires replacement.
23 September 2016 Cardno 42
Gas 2
Natural Gas is supplied to the building via the south end of the site, gas supplies the pool plant room. The gas system is in a good condition and is fully operations.
Figure 5-29 – Gas Meter
The water bill provided by the client indicates that the water usage between 3rd of March and 2nd June 2016 has been recoded as 6,281kL. The Sydney Water “best practice guidelines for water management in aquatic leisure centres”. Indicates that an average water usage for a 50m pool in a 3 month period is appx 3,000L. The water usage stipulated on the bill is excessive. The pool equipment is so old and inefficient and possibly there are leakages as the water usage. The water usage is more than 100% higher than the overall average water usage across the council owned aquatic centres.
23 September 2016 Cardno 43
6 Condition Review – Fire
Fire system 1
Fire extinguishers are located within the kitchen and the pool plant room. The he extinguishers have been regularly tested. Fire hydrants and fire hose reels are
Figure 6-1
Fire extinguishers located in the pool plant room
Figure 6-2
Extinguisher located within the kitchen
23 September 2016 Cardno 44
7 Overall Services Assessment
SERVICE
Kogarah War Memorial Swimming Pool
Electrical Overall Condition
Poor
Mechanical Overall Condition
Poor
Hydraulics Overall Condition
Poor
Fire Overall Condition
Poor
23 September 2016 Cardno 45
8 Condition Review – Structural
ITEM
Kogarah War Memorial Swimming Pool
Reception area
Exposed steel trusses were noted below the ceiling panels within the reception area. Based on our experience, this type of roof trusses are likely to be inadequate to support the roof loads in accordance with current Australian standards.
Figure 8-1
Reception area
The slab on ground within reception area was noted to be covered by carpet. However, extensive cracking below the carpet was still evident as shown in the photo below. It was reported that the current swimming centre was constructed on a filled site; therefore excessive cracking to slab on ground would be expected.
Figure 8-2
23 September 2016 Cardno 46
Store room
Extensive water ingress into the store room was noted during our inspection.
Figure 8-3
Store room
2mm wide vertical cracking to the wall adjoining store room entry was noted; a gap between the door frame and wall as also evident. This indicates there has been foundation settlement in the past.
Figure 8-4
23 September 2016 Cardno 47
Reception area
Horizontal cracking to the entire length of the southern wall between kitchen and reception area as noted. The wall was noted to be leaning towards the reception area. It is our opinion that this is caused by foundation movement.
Figure 8-5
Southern Gym
Extensive water ingress into the corridor to southern gym was noted.
Figure 8-6
23 September 2016 Cardno 48
Southern Gym
The roof structure over southern gym consists timber beams, timber rafters, timber purlins and a metal sheeted roof over. The timber roof frame is supported by load bearing brick wall with brick blades and steel columns. All the timber beams were coated with paint, therefore exact condition remained unknown at the time of our inspection. All the timber rafters connecting to timber beams were noted to be notched excessively.
Figure 8-7
Southern Gym
Splitting to one of the timber rafters was noted as shown in the photo below.
Figure 8-8
23 September 2016 Cardno 49
Southern Gym
Diagonal cracking to the brickwall adjoining the corridor was noted. This is likely caused by foundation settlement.
Figure 8-9
Southern Gym
Diagonal and vertical cracking was noted to the load bearing brickwall adjoining the roller door. This is likely caused by foundation settlement.
Figure 8-10
23 September 2016 Cardno 50
Southern Gym
Horizontal and diagonal cracking to the load bearing wall adjoining window opening was noted. It is likely caused by foundation settlement.
Figure 8-11
Southern Gym
Brickwork securing the socketed timber rafter was noted to be dislodged slightly at one location.
Figure 8-12
23 September 2016 Cardno 51
Northern Gym
Northern Gym consists of similar structural elements as Southern Gym. However, the metal sheeted roof was noted coated.
Figure 8-13
Northern Gym
Water leaking through the roof was noted. Staining to the painted timber rafters and purlins was noted throughout the area.
Figure 8-14
23 September 2016 Cardno 52
Northern Gym extension
There is a steel framed extension to the Northern Gym as shown in the photo below. Corrosion varies in levels was noted due to lack of maintenance throughout.
Figure 8-15
Northern Gym extension
Extensive corrosion to column baseplate as noted; surface corrosion to cross bracing was also noted.
Figure 8-16
23 September 2016 Cardno 53
Northern Gym extension
Surface corrosion to roof horizontal cross bracing was noted.
Figure 8-17
Northern Gym extension
Extensive corrosion to column baseplate with surface corrosion to steel column adjoining brick pier was noted. Cracking to the brick pier was also evident; it’s possible that the tie down plate inside the brickwork may be corroded.
Figure 8-18
23 September 2016 Cardno 54
Northern Gym extension
Surface corrosion to top plate of the column was noted. It is my opinion that the column may have been installed after the cracking to the brickwork as a secondary measure.
Figure 8-19
Awning
The end of the steel frame gym extension forms part of the external awning adjoining the swimming. An overview of the awning is shown in the photo below. Extensive corrosion was noted at multiple locations throughout.
Figure 8-20
23 September 2016 Cardno 55
Awning
Surface corrosion to the welding between steel rafter and awning column was noted. Evidence of water leaking was noted in the form of staining.
Figure 8-21
Awning
Extensive corrosion to column base plate was noted.
Figure 8-22
23 September 2016 Cardno 56
Awning
Downpipe directs water onto the column baseplate during rain.
Figure 8-23
Awning
Extensive corrosion to column baseplates were noted to be typical.
Figure 8-24
23 September 2016 Cardno 57
Awning A typical photo showing the extensive corrosion to the column baseplate.
Figure 8-25
Awning
Surface corrosion to steel pit cover plate was noted.
Figure 8-26
23 September 2016 Cardno 58
Swimming Pool
Cracking to concrete swimming pool was noted due to aging.
Figure 8-27
Awning
Extensive corrosion to awning column was noted typically.
Figure 8-28
23 September 2016 Cardno 59
Awning
Extensive corrosion to cold form top hat purlins was noted.
Figure 8-29
Awning
Extensive corrosion to the awning column was noted. The corrosion of steel baseplate has caused the grout to crack.
Figure 8-30
23 September 2016 Cardno 60
Awning/walkway Corrosion to the column baseplate over walkway was noted. Cracking to footpath slab due to subsidence was noted.
Figure 8-31
External wall
Evidence of foundation settlement was noted as the downpipe was noted to be dislodged and gap between slab on ground and substrate was observed.
Figure 8-32
23 September 2016 Cardno 61
Pump house
Deterioration to the rear wall if the pump house building was noted; corroded masonry anchors have also caused the brick wall to crack.
Figure 8-33
Change room
Extensive water ingress through the corroded roof sheeting was noted.
Figure 8-34
23 September 2016 Cardno 62
External wall
It appeared that the external wall adjoining main entry might had been damaged by vehicle impact previously.
Figure 8-35
Carpark
Multiple cracking to the asphalt pavement was noted.
Figure 8-36
23 September 2016 Cardno 63
Carpark
Evidence of subsidence was noted to the carpark kerb & gutter.
Figure 8-37
Rainwater tanks Cracking to the concrete tanks was noted at multiple locations.
Figure 8-38
23 September 2016 Cardno 64
Roof
Decay to the exposed timber fascia board was noted.
Figure 8-39
23 September 2016 Cardno 65
9 Site Capex Expenditure
Any capital expenditure due to the site inspection and life cycle expectations on all plant items are individually listed within the respective sections.
Electrical
Budget Prioritisation
Immediately Necessary Works
New emergency and exit lights $8,000 High
Immediately Necessary Works
New internal lights, ceiling fans and external lights complete with controls
$36,000 Medium
Immediately Necessary Works
New power outlets $8,000 High
Immediately Necessary Works
New Building Distributor Telephone Frame $4,000 High
Immediately Necessary Works
Re-install CCTV Cameras $2,000 Medium
Year 1 – 2 Works Tidy all cables $10,000 Medium
Year 1 – 2 Works New MATV service $8,000 Medium
Year 1 – 2 Works New AV/PA speakers $10,000 Medium
Year 3 – 5 Works N/A N/A
Year 5 – 15 Works Replace distribution boards in 15 years $15,000 High
Year 5 – 15 Works New data outlets in 10 years $5,000 High
Year 5 – 15 Works New PA/AV headend in 10 years $20,000 Medium
Year 5 – 15 Works New CCTV headend and new CCTV cameras in 10
years
$20,000 Medium
Mechanical
Budget Prioritisation
Immediately Necessary Works
Rooftop PAC unit for reception and gym areas
$150,000
Medium
Immediately Necessary Works
Installation of kitchen, store and toilet exhaust fans.
$15,000
Medium
Hydraulics
Budget Prioritisation
Immediately Necessary Works
N/A N/A N/A
Year 1 – 2 Works Female bathroom fitout ( sanitary system, cold and hot water) fixtures and fittings
$70,000 High
Year 1 – 2 Works Male bathroom fitout ( sanitary system, cold and hot water) fixtures and fittings
$70,000 High
Year 1 – 2 Works Kitchen fitout including grease arrestors ( sanitary System, cold and hot water) fixtures and fittings
$7,000 High
Year 1 – 2 Works Stormwater system $30,000 High
Year 3 – 5 Works Pool plant its functional but in a bad condition. It can be expected that within next 3 years major problem will start to become apparent. Only the main 15kW pump can be reused.
$50,000 High
23 September 2016 Cardno 66
Fire
Budget Prioritisation
Immediately Necessary Works
Fire hydrant system $30 000 High
Immediately Necessary Works
Fire hose reel system $10,000 High
Structural – External awning
Budget Prioritisation
Immediately Necessary Works
N/A N/A N/A
Year 1 – 2 Works Awning should be fully replaced. $100,000 High
Year 3 – 5 Works N/A N/A N/A
Year 5 – 15 Works N/A N/A N/A
Structural – Roof sheeting replacement
Budget Prioritisation
Immediately Necessary Works
Roof replacement is recommended to terminate the water ingress
$100,000 High
Year 1 – 2 Works N/A N/A N/A
Year 3 – 5 Works N/A N/A N/A
Year 5 – 15 Works N/A N/A N/A
Structural – Foundation subsidence and rectifications to brickwork
Budget Prioritisation
Immediately Necessary Works
Ongoing underpinning and brickwork rectifications Over $100,000 High
Year 1 – 2 Works Ongoing underpinning and brickwork rectifications N/A N/A
Year 3 – 5 Works Ongoing underpinning and brickwork rectifications N/A N/A
Year 5 – 15 Works Ongoing underpinning and brickwork rectifications N/A N/A
Structural – External asphalt carpark
Budget Prioritisation
Immediately Necessary Works
N/A N/A N/A
Year 1 – 2 Works Maintenance $30,000 Medium
Year 3 – 5 Works Maintenance $30,000 Medium
Year 5 – 15 Works Maintenance $30,000 Medium
23 September 2016 Cardno 67
Structural – Swimming pool
Budget Prioritisation
Immediately Necessary Works
N/A N/A N/A
Year 1 – 2 Works Maintenance N/A N/A
Year 3 – 5 Works Maintenance N/A N/A
Year 5 – 15 Works Re-tiling and concrete repair works $200,000 Medium
Notes:
Please note the above information details the major works that may be required.
Please note the above costs are based upon the information provided by Rawlinson Australian
Construction Handbook.
Special consideration must be given to the shutdowns required to complete the works and a detailed
programme must be developed by the project team with the building owner approval before works
commence.
23 September 2016 Cardno 68
10 Condition of the Outdoor Swimming Pool
Visual inspection of outdoor swimming pool was carried out and it was only limited to the exposed swimming pool edges due to access. The detail inspection of the swimming pool base slab can only be carried out if the pool is dry and not in operation. However, based on our limited observation, past experience in similar structures and age of the swimming pool, our comments are as follows,
Cracking to the swimming pool edge due to aging was evident during our inspection.
Based on our experience in similar structure around this age, it is possible that there is no dowel
bars between base slab movement joints; therefore each panel of the base slab may move
independently; thus causing jointing sealant to crack. Water within the swimming may be
penetrating through the joints and cause soil erosion on site; this may be the other contributing
factor for excessive water bill.
Due to the age of this outdoor poor, the chloride-ion from chlorine may have penetrated the
concrete cover if the waterproofing layer has not been maintained; thus it is highly likely that the
reinforcement inside the base slab may have been corroded. This can only be confirmed by carrying
out invasive investigation.
It is very likely that there might be localised failure of the plumbing system below the pool base slab
if no maintenance works have been carried out in the past.
23 September 2016 Cardno 69
11 Conclusion
In general, the building structure at Kogarah War Memorial Swimming Pool was in poor condition at the time
of our inspection. Extensive rectifications are required in order to bring the building to the level of current
Australian Standards and reasonable condition. It is our opinion that the building structure has reached its
design life and rebuilding of the facility may be a more cost effective solution.
23 September 2016 Cardno 70
12 Appendix A – Air Quality Report
Client: Cardno
Project Reference: CN160802
Date: August 2016
Version: 1
Indoor Environment Quality Assessment Report
Kogarah War Memorial Pool, Blakehurst NSW 2221
Andrew Bellamy
BSc, AIOH, ISIAQ, LAA
Senior Consultant
Dr Vyt Garnys
PhD, B.Sc. (Hons) AIMM, ARACI, ISIAQ,
ACA, AIRAH, FMA
Principal Consultant & Managing Director
CN160802_AirQualityReport_KogarahV1 Page | 2
CONTENTS
CONTENTS 2
1. INTRODUCTION 3
2. BACKGROUND 4
2.1 THERMAL COMFORT 4
2.2 VENTILATION 4
2.3 CARBON MONOXIDE 4
2.4 AIRBORNE PARTICULATES 5
2.5 ASBESTOS 5
3. METHODOLOGY 6
3.1 TESTING METHODOLOGY 6
3.2 TESTING LOCATIONS AND FREQUENCY 6
4. RESULTS 7
4.1 THERMAL COMFORT RESULTS 7
4.2 AIR QUALITY RESULTS 8
4.3 ASBESTOS RESULTS 8
5. CONCLUSION 9
DISCLAIMER 10
COPYRIGHT 10
CN160802_AirQualityReport_KogarahV1 Page | 3
1. INTRODUCTION
CETEC was engaged by Cardno to conduct an assessment of Indoor Environmental Quality (IEQ) at
Kogarah War Memorial Pool, Blakehurst NSW 2221.
The scope of works was to measure the following key IEQ parameters at the facility:
Thermal services, including: Space temperature and relative humidity.
Indoor Air Quality, including: Carbon Dioxide (CO2), Carbon Monoxide (CO), Particulate matter
(PM10).
Monitoring of asbestos in air.
This report presents the findings of IEQ testing conducted on the 5th of August 2016.
CN160802_AirQualityReport_KogarahV1 Page | 4
2. BACKGROUND
2.1 Thermal comfort
Thermal comfort is a key component of IEQ and has been assessed in this study by measuring air
temperature and relative humidity. Other factors such as air flow, local climate, thermal radiation and
personal factors such as; clothing, an individual’s level of physical activity and acclimatisation to a
particular climate, can affect an individual’s perceived thermal comfort.
The American Society for Heating, Refrigeration and Air-conditioning Engineers (ASHRAE) have
developed a standard to specify the combinations of indoor thermal environmental factors and personal
factors that will produce thermal environmental conditions; ANSI/ASHRAE Standard 55-2013 Thermal
Environmental Conditions for Human Occupancy (ASHRAE 55). This standard is generally used as the
target for thermal comfort parameters. As a guide the range 20.0-25.5°C for temperature and 30%-60%
for relative humidity is generally acceptable for an air conditioned indoor environment however the
level of physical activity should be taken into account..
2.2 Ventilation
Ventilation rates do not directly affect occupant health or perception outcomes, they affect indoor
environmental conditions including air pollutant concentrations that may modify the occupants’ health
or perceptions. Research has shown that exposure to an increased ventilation rate can lead to
occupant’s reporting to having a clearer head, perceived fresher air and exerting less effort to complete
tasks.
Carbon dioxide (CO2) measurements can be used to determine if the HVAC system is balanced and
providing adequate ventilation to the building occupants. Hence carbon dioxide should not be
considered as an indoor air pollutant but instead as a measure of ventilation effectiveness.
ANSI/ASHRAE Standard 62-2007 Ventilation for Acceptable Indoor Air Quality (ASHRAE 62) recommends
an upper limit for CO2 of 1000 ppm.
2.3 Carbon Monoxide
Carbon Monoxide (CO) is a toxic air contaminant that is produced by various industrial processes or
when fossil fuels are burned such as vehicular exhaust externally or from unvented gas cooking in the
indoor environment.
CN160802_AirQualityReport_KogarahV1 Page | 5
Exposure to carbon monoxide may cause fatigue at the low concentrations expected to be present in
the indoor environment.
The WHO Guidelines for Indoor Air Quality: Selected Pollutants (2010) recommends an upper limit for CO
of 9 ppm.
2.4 Airborne Particulates
All people are continually exposed to airborne particles to some extent and recent epidemiological
research suggests that there is no threshold at which health effects do not occur but the health effects
vary widely depending on the composition of the particles, the size of the particles and the sensitivity of
individuals. Generally in non-industrial indoor environments like offices symptoms may include minor
irritation of mucous membranes, increased respiratory symptoms and aggravation of asthma.
For this study the measurement of airborne particulates were in the PM10 size fraction. PM10 refers to
particles with a diameter of 10 micrometres (10µm) or less.
NABERS IE recommends an upper limit for PM10 of 0.05 milligrams per cubic metre (0.05mg/m3).
2.5 Asbestos
The current national exposure standard (NES) for asbestos (all forms) is 0.1fibres per millilitre of air
(fibres/mL). Ref: Adopted National Exposure Standards for Atmospheric Contaminants In The
Occupational Environment [NOHSC: 1003 (1995)]
Control level for asbestos are also used to ensure the exposure standard is not exceeded. If the control
level is exceeded it is an indication that a control action to reduce airborne asbestos fibre
concentrations needs to be implemented. Control levels are occupational hygiene ‘best practice’, and
are not health-based standards. The control level for airborne asbestos is 0.01fibres per millilitre of air
which is one tenth of the exposure standard.
CN160802_AirQualityReport_KogarahV1 Page | 6
3. METHODOLOGY
3.1 Testing Methodology
The methods employed to measure IEQ are summarised below in table 1.
Table 1: Testing Methods Summary
IEQ Parameter Instrumentation / Method Duration
Thermal services TSI Q-TRAK 10 minute average reading at each location
Ventilation (Carbon dioxide) TSI Q-TRAK 10 minute average reading at each location
Carbon monoxide TSI Q-TRAK 10 minute average reading at each location
Particulate matter (PM10) TSI Dust-TRAK DRX 10 minute average reading at each location
Airborne asbestos Membrane filter method Approx. 500L of air sampled at 1 location
3.2 Testing Locations and Frequency
The level and number of sampling locations were as follows:
Table 3: Sample Locations
Location Ref: Level Location Description
Location 1 Lower ground Admin area near entrance
Location 2 Lower ground Lobby near cafe
Location 3 Lower ground Left wing gym, near entrance
Location 4 Lower ground Left wing gym, near back of building
Location 5 Lower ground Left wing gym near, poolside near entrance
Location 6 Lower ground Left wing gym near, poolside near back of building
Location 7 Lower ground East wing gym, near entrance
Location 8 Lower ground East wing gym, near back of building
Location 9 Lower ground Kitchen
Location 10 Lower ground Storage area
CN160802_AirQualityReport_KogarahV1 Page | 7
4. RESULTS
4.1 Thermal Comfort Results
Table 4: Summary of thermal comfort measurements.
Location Space Temperature (oC) Relative Humidity (%)
Location 1 13.6 75.1
Location 2 13.5 78.1
Location 3 13.8 77
Location 4 14.1 80.4
Location 5 14.1 77.9
Location 6 14 79
Location 7 13.9 77.5
Location 8 13.9 77.2
Location 9 14.1 77.7
Location 10 13.9 77.5
Recommended Limit 20-25.5 30-60
CN160802_AirQualityReport_KogarahV1 Page | 8
4.2 Air Quality Results
Table 5: Summary of average carbon dioxide concentrations
Location Carbon Dioxide
(ppm)
PM10
(mg/m3)
Carbon Monoxide
(ppm)
Location 1 451 0.013 0
Location 2 454 0.011 0
Location 3 475 0.013 0
Location 4 456 0.024 0
Location 5 447 0.014 0
Location 6 445 0.011 0
Location 7 499 0.012 0
Location 8 489 0.011 0
Location 9 479 0.01 0
Location 10 454 0.009 0
Recommended Limit 1000 0.05 9
4.3 Asbestos Results
Asbestos was tested in the administration/entrance area as the asbestos register identified this area as
having suspected asbestos containing materials.
One sample was collected – Sample Number 102405.
The results of laboratory analysis indicated that airborne asbestos was below the detection limit and
hence the airborne asbestos fibre concentration has been calculated to be less than 0.01 fibres per
millilitre of air at the time of testing.
The laboratory analysis certificate can be supplied on request.
CN160802_AirQualityReport_KogarahV1 Page | 9
5. CONCLUSION
The findings of the indoor environment quality assessment can be summarised as follows:
All sampling locations were outside the recommended temperature range however at the time
of testing, the air conditioning system was not on and therefore the internal thermal conditions
were similar to external conditions. Relative humidity was elevated at all locations.
CO2 levels indicate that ventilation was adequate for the occupant density at all sampling
locations on the day of testing.
Carbon monoxide was not detected at any locations on the day of testing.
PM10 concentrations were below the recommended limit at all locations on the day of testing.
Asbestos fibres were not detected in air at the site on the day of testing.
CN160802_AirQualityReport_KogarahV1 Page | 10
DISCLAIMER
CETEC has taken all reasonable care to ensure that the information contained in this report is accurate.
The report is based on data and information collected by CETEC personnel during location visits and
information accepted in good faith from various personnel associated with this work. However, no
warranty or representation can be given that the information and materials contained in it are complete
or free from errors or inaccuracies.
CETEC accepts no responsibility for any deficiency, misstatements or inaccuracies contained in this
report as a result of omissions, misinterpretation or fraudulent acts of the persons interviewed or
contacted.
To the extent permitted by applicable laws, CETEC accepts no liability for any decision, action, loss,
damages or expenses of any kind including without limitation, compensatory, direct, indirect or
consequential damages, loss of data, income or profit, loss of or damage to property, or claims by third
parties howsoever arising in connection with the use or reliance on the information in this report. This
exclusion of liability shall also apply to damages arising from death or personal injury potentially caused
by the negligence of CETEC or any of its employees or agents.
By viewing this report, you are acknowledging that you have read and agree to the above disclaimer.
COPYRIGHT
The material in this report is protected by copyright, which is owned by CETEC. Users may view, print
and download the contents for personal use only and the contents must not be used for any commercial
purposes, without the express permission of Cardno and CETEC. Furthermore, the material in this
report, or any part of it, is not to be incorporated or distributed in any work or in any publication in any
form without the permission of Cardno and CETEC.
23 September 2016 Cardno 71
13 Appendix B – Thermal Imaging on Switchboard
Plantroom switchboard Thermal heat carried out on plantroom switchboard. All circuit breakers and switchboard are working at a safe temperature with a maximum temperature of 26.5 degrees Celsius.
23 September 2016 Cardno 72
23 September 2016 Cardno 73
Kiosk switchboard
Switchboard and circuit breakers are working at a safe temperature with a maximum temperature of 26.7 degrees Celsius
23 September 2016 Cardno 74