Application Package – Building Activity Adelaide Airport Limited Revision 6 June 2018 O:\E&AS\3-93 Page i
BUILDING ACTIVITY
APPLICATION PACKAGE ADELAIDE and PARAFIELD AIRPORTS
JUNE 2018
Application Package – Building Activity Adelaide Airport Limited Revision 6 June 2018 O:\E&AS\3-93 Page ii
Contents Page INTRODUCTION 1 SUBMISSION OF APPLICATION 1
Application Information 2 Supporting Documentation 2 Applicant / Lessee Responsibilities 3 General Compliance 3 Drawing Standards 3
FEES AND PAYMENTS 4 Fees Payable to Adelaide Airport Limited (AAL) 4 Invoicing 4 Fees Payable to Airport Building Controller 4
REVIEW BY ADELAIDE AIRPORT LIMITED 5 Administration 5 Review of Building Consent 5
REVIEW BY AIRPORT BUILDING CONTROLLER 6 WORK PHASE 7
Client / Applicant Obligations 7 Other Client Responsibilities 7
ANNEXURE Application Forms
AAL (with check list) 4 Pages Airport Building Controller. • Refer to ABC online via this Link Includes:• Application for Building Permit• Application for Works Permit• Demolition Authorisation
Building Approval Close Out Request Site Rules and Conditions for Contractors
Application Package – Building Activity Adelaide Airport Limited Revision 6 June 2018 O:\E&AS\3-93 Page 1 of 8
APPLICATION PACKAGE BUILDING ACTIVITY
ADELAIDE & PARAFIELD AIRPORTS
INTRODUCTION
Building activity on Adelaide Airport is subject to statutory controls under the Airports Act 1996 and the Airports (Building Control) Regulations.
Approval is required from Adelaide Airport Limited (AAL) and the Airport Building Controller (ABC) prior to the commencement of works.
SUBMISSION OF APPLICATION
Separate applications need to be submitted to the: • Airport Building Controller via ABC Online via this Link.• Adelaide Airport Limited
Applications should include the appropriate application form and all supporting documentation.
Airport Building Controller An application for either: Building Permit Works Permit Demolition authorisation
should be made to the Airport Building Controller with supporting information via this Link
Airport Building Controller contact details Airport Building Controller—Tonkin Consulting Pty Ltd Level 3, 60 Light Square ADELAIDE SA 5000 Mr David Nash Phone: (08) 8110 2220 Facsimile: (08) 8110 2281 Mobile: 0418 839 035 Email: [email protected]
Application Package – Building Activity Adelaide Airport Limited Revision 6 June 2018 O:\E&AS\3-93 Page 2 of 8
Adelaide Airport Limited An application for: Building Activity Consent (by external applicant)
should be made to Adelaide Airport Limited at:
Adelaide Airport Limited Infrastructure Planning Officer 1 James Schofield Drive ADELAIDE AIRPORT SA 5950 Telephone: (08) 8308 9211 Facsimile: (08) 8308 9311 Email [email protected]
Applicant Information The applicant shall provide all information detailed in the correct application form. To facilitate efficient transfer of information and documentation including reference documentation, the applicant shall supply the following contact information as a minimum: Name of applicant company Applicant point of contact (Project Officer) Contact number Facsimile number Email address
Applicants should complete the “Check List” provided and submit with their application to AAL.
Supporting Documentation Supporting documentation must comply with the Airport (Building Control) Regulations 1996 and is summarised below.
A single copy of the supporting documents shall be submitted with each application. Documentation shall be commensurate with the activity to be undertaken, supporting documentation should include but not be limited to:
Minimal Requirement (simple project) Scope of Work Program or Schedule Location/Site Plan Plan detailing service connection points (if applicable) Work Health and Safety compliance documentation (where applicable):
Appropriate Safe Work Method Statement (SWMS) or Job Safety Analysis (JSA)
Risk register or analysis for high risk activities Operator licences for EWP or high risk equipment
A statement/declaration indicating compliance with the following: Airport Master Plan Airport Environmental Strategy Master Development Plan (MDP) as appropriate
Application Package – Building Activity Adelaide Airport Limited Revision 6 June 2018 O:\E&AS\3-93 Page 3 of 8
Additional Information (detailed project) Certificates required under applicable law (health, services,
communications etc) Design Engineers Certificate Details of progress inspections Construction Environmental Management Plan Maximum Electrical Demand Water flow calculations and demands Building Plan, including:
class of building type of construction dimensions floor plans at each level elevations fire safety design construction material
Drawings as appropriate including: All services Sections / Elevations
Specifications as appropriate, including: Detail type of construction and material method of drainage gas water sewerage supply use of second hand material
Applicant / Lessee Responsibilities All lessees/applicants are expected to take all reasonable steps to ensure a safe and compliant workplace during Building Approval works. This should be reflected in the application and the quality of documentation submitted. Changes to the WHS Act and Regulations places additional responsibilities on the provision of documentation and processes associated with risk assessment, safety documentation such as Safe Work Method Statement (SWMS) and compliance documentation such as operator licences for high risk equipment
Work Health and Safety Compliance All works undertaken on the airport is to be compliant with the WHS Act and Workplace Health and Safety Regulations 2012 and be supported by the appropriate documentation as part of the application. This may include but not limited to
Appropriate Safe Work Method Statement (SWMS) or Job Safety Analysis (JSA)
Risk register or analysis for high risk activities Operator licences for EWP or high risk equipment
Copies of this documentation are to be provided to AAL prior to the commencement of works and at any time thereafter when reasonably requested.
Application Package – Building Activity Adelaide Airport Limited Revision 6 June 2018 O:\E&AS\3-93 Page 4 of 8
General Compliance All application should be compliant with all appropriate state and Commonwealth legislation and or standards as appropriate, including but not limited to Environmental Protection Authority Work Health and Safety (WHS) Lighting in the Vicinity of Aerodromes - MOS Part 139
Drawing Standards Drawing submitted in support of a Building Approval should be provided in “standard engineering scale” in hard copy format. Electronic submission should be in PDF format.
FEES AND PAYMENTS
Application fees apply for both the AAL and the ABC assessment. Payment to AAL must be received on submission of the Building Activity Consent application and prior to commencement of application processing. The fee is based on the estimated value of the building activity as follows:
Fees Payable to AAL ESTIMATED
CONSTRUCTION COST FEE PAYABLE (including GST)
under $10,000 $150 $10,000 to $100,000 $300 over $100,000 $500 + 0.1% of the balance in
excess of $ 100,000NOTE: AAL fees are GST inclusive.
Invoicing AAL will issue a tax compliant invoice to the applicant / lessee upon receipt of either the application and / or payment of the application fee in accordance with ATO GST legislation. There will be no other invoice requirements for that application beyond this.
Details of the application will be provided to AAL Finance department for invoicing purpose upon receipt of an application. This will ensure AAL is complaint with its obligations whilst providing AAL customers with the necessary documentation.
Fees Payable to Airport Building Controller (refer to ABC Online) A separate fee applies for Permit applications to the Airport Building Controller. The Airport Building Controller fee structure is based on Schedule 1, Part 1 of the Regulations.
Application Package – Building Activity Adelaide Airport Limited Revision 6 June 2018 O:\E&AS\3-93 Page 5 of 8
REVIEW BY ADELAIDE AIRPORT LIMITED (AAL)
Administration Applications complete with supporting information must be submitted independently to both the Airport Building Controller and Adelaide Airport Limited.
Upon receipt, the application must be reviewed for completeness and any deficiencies noted. The application will then be registered in the AAL database and numbered with a BA number and AAL document file number. These details shall be recorded on the front page of the first application sheet. Invoicing and payment procedures shall be finalised appropriate to the payment status, prior to any further review.
Any documentation identified as ABC application documentation shall be immediately forwarded to the ABC via ABC Online within 48 hrs of receipt.
The AAL document package will be forwarded to the AAL Building Approval Project Officer for processing to commence as early as is practicable once full payment has been received.
AAL will provided the applicant/client with a letter acknowledging receipt of the application and requesting final payment and full documentation prior to assessment. Assessment may take up to 28 days from submission of the complete application. Delays in the submission of correct and detailed information may delay assessment and approval or otherwise.
Application Package – Building Activity Adelaide Airport Limited Revision 6 June 2018 O:\E&AS\3-93 Page 6 of 8
Review of Building Consent Processing and approval of the Building Consent must address the following criteria: AAL Master Plan Major Development Plan (if appropriate) AAL Environmental Strategy AAL’s Planning Objectives
Sub-criteria to be considered as part of the planning objectives shall include: Compliance of building appearance with surrounds Ground RL and Finished Floor Level (FFL) Connection to services and location of same Capacity of existing services to cope with additional capacity Maximum demands Compliance with regulatory bodies. Stormwater management OLS and PANS-OPS compliance Radar and Navigation aid interference Landscaping Signage and Lighting Contractor access/parking and affect on Airport Operations Insurances
A summary of typical approval conditions to be considered for all applications are listed at the end of this document.
REVIEW BY AIRPORT BUILDING CONTROLLER
Refer to ABC Online via this Link
The Airport Building Controller represents the Commonwealth, (Department of Infrastructure & Transport) throughout the approval process and is responsible for “Building Approval”. The Airport Building Controller will review the application for compliance with the Building Code of Australia (BCA), Australian Standards, engineering, aviation and environmental compliance.
:
Application Package – Building Activity Adelaide Airport Limited Revision 6 June 2018 O:\E&AS\3-93 Page 7 of 8
WORKS PHASE
Client / Applicant Obligations
The client / applicant is responsible for conducting all works in a safe and secure manner ensuring compliance with the condition of the approvals. It is the client’s responsibility to ensure all contractors comply with these same conditions.
Only those works approved by AAL and the Airport Building Controller are authorised to be carried out.
The Client /applicant is also responsible for the provision of documentation to meet general compliance obligation and the conditions detailed with the AAL Consent and Airport Building Controller Permit. Where applicable, copies of this documentation are to be provided to the AAL Project Officer prior to the commencement of works.
Other Client Responsibilities
The Client is responsible to liaise with the AAL Project Officer identified on the approval to provide additional documentation and or complete additional activities in relation to the works.
These may include activities such as: Completing or securing:
Inductions Airside access Security passes Escorts Additional permits
Excavation Isolation etc
Drug & Alcohol Management Plan (DAMP) compliance Provision of documentation prior to commencement of works including:
Construction Environmental Management Plan (CEMP) Insurances certificates Schedules & staff lists Work Zone Traffic Management Plans WHS , including:
Safe Work Method Statements (SWMS) Job Safety Analysis (JSA) Copy of operator licence (high risk equipment) Risk registers
Completion of approved works only Ensuring general compliance with the conditions of the approval, in
particular: Construction Environmental Management Plan
Application Package – Building Activity Adelaide Airport Limited Revision 6 June 2018 O:\E&AS\3-93 Page 8 of 8
Works plans for airside Traffic Management Plan
Ensuring compliance with airport operational and safety requirements Work site refurbished and left clean and tidy Finalising project close off documentation within 14 days of completion:
Providing as constructed drawings at the completion of the worksfor submission to the AAL Drawing Office
Statutory certificates O&M to Facilities Maintenance department
Application Package – Building Activity Adelaide Airport Limited Revision 5 June 2016 O:\E&AS\3-93 Page i
APPLICATION FORMS
Adelaide Airport Limited
Airport Building Controller - refer to ABC online via this Link
The contents of this form are confidential. If you are not the intended recipient, you must not disclose or use the information contained in this form. Please advise us by telephone 8308 9211 immediately and shred the document.
Adelaide Airport Limited ABN 78 075 176 653 1 James Schofield Drive, Adelaide Airport SA 5950, Ph 08 8308 9211 Page 1 of 6
APPLICATION FOR BUILDING ACTIVITY CONSENT
This application is covered under the Airport Act 1996 and the Airport (Building Control) Regulation 2.03
OFFICE USE ONLY
Date Received: BA Number:
APPLICANT DETAILS
Name:
Postal Address:
Contact Person:
Email:
Telephone: Facsimile:
LESSEE DETAILS (IF NOT APPLICANT)
Name:
Postal Address:
Contact Person:
Email:
Telephone: Facsimile:
BUILDING ACTIVITY
Location of Works:
Description of Works:
Purpose of Works:
Estimated Start Date: Estimated Completion Date:
BUILDING CONTRACTOR
Name:
Postal Address:
Contact Person:
Email:
Telephone: Facsimile:
The contents of this form are confidential. If you are not the intended recipient, you must not disclose or use the information contained in this form. Please advise us by telephone 8308 9211 immediately and shred the document.
Adelaide Airport Limited ABN 78 075 176 653 1 James Schofield Drive, Adelaide Airport SA 5950, Ph 08 8308 9211 Page 2 of 6
APPLICATION FEE
Estimated Value of Building Activity: $
Fee Amount: $150 (Value under $10,000)
$300 (Value between $10,000 and $100,000)
$500 + 0.1% (Value of the balance in excess of $100,000)
AAL project
WORKS COMPLY WITH
Complete this section in full
Masterplan: Yes Not Applicable
Environmental Strategy: Yes Not Applicable
MDP (as applicable): Yes Not Applicable
SIGNATURE OF OWNER OR AGENT
Signature Date
ATTACHED DOCUMENTS (PLEASE LIST ALL SUPPORTING DOCUMENTS BELOW)
All contractors working on Adelaide Airport must provide evidence of appropriate insurances including: • Public and Product Liability Insurance• Work Cover/Workers Compensation Insurance• Contract Work Insurance (indemnifying AAL and the Commonwealth of Australia)
The contents of this form are confidential. If you are not the intended recipient, you must not disclose or use the information contained in this form. Please advise us by telephone 8308 9211 immediately and shred the document.
Adelaide Airport Limited ABN 78 075 176 653 1 James Schofield Drive, Adelaide Airport SA 5950, Ph 08 8308 9211 Page 3 of 6
CHECKLIST
1. Application Documentation
Scope of Works Yes
Specifications Yes No N/A
Electronic copy of Drawings / Plans:
Site plan Yes No N/A
Survey information Yes No N/A
Architectural Yes No N/A
Landscape Yes No N/A
Structural Yes No N/A
Civil Yes No N/A
Services Yes No N/A
Other (specify): Yes No N/A
Schedule of Works Yes No N/A
Construction Environmental Management Plan Yes No N/A
Traffic Management Plan Yes No N/A
Airside Work Plan Yes No N/A
2. Development Details
Development details to be provided: Site area: .................. m2
Building site coverage: ................... %
Building setback: Front Back Side
.................... m .................... m .................... m
Building height: .................... m
Car parking numbers: ......................
No. staff to be located at this development
......................
N/A
3. Certificates Design Engineers certificate provided, approving the structural elements of the building
Yes No N/A
Certificates required under applicable law provided, approving arrangements for health and comfort of persons, fire resistance, fire protection, or telecommunications services
Yes No N/A
4. Site Services Service connection points identified Note: A Services Isolation / Connection / Disconnection / Access Work Permit is required prior to works commencing.
Yes No N/A
(mandatory)
................................................
The contents of this form are confidential. If you are not the intended recipient, you must not disclose or use the information contained in this form. Please advise us by telephone 8308 9211 immediately and shred the document.
Adelaide Airport Limited ABN 78 075 176 653 1 James Schofield Drive, Adelaide Airport SA 5950, Ph 08 8308 9211 Page 4 of 6
5. Electrical Application for electrical supply required Yes No N/A
Meter provided Yes No N/A
Electrical maximum demand & supply Number of Phases: 1 2 3
Amps Per Phases: .............................
Total Power Demand: ....................... kwh
N/A
6. Lighting Details of all internal lighting have been provided Yes No N/A
Details of all external lighting has been provided and is compliant with MOS 139
Yes No N/A
7. Communications Telecommunication requirement has been provided Yes No N/A
8. Hydraulics Domestic water:
Connection required Yes No N/A
Meter provided Yes No N/A
Demand (size of supply or flow rate) ...................................................................
Recycled water:
Connection required Yes No N/A
Meter provided Yes No N/A
Demand (size of supply or flow rate) ...................................................................
Sewerage:
Connection required Yes No N/A
Demand (size of supply or flow rate) ...................................................................
Fire water:
Connection required Yes No N/A
Demand (size of supply or flow rate) ...................................................................
Confirmation that backflow prevention devices are to be installed on all water supply pipe work within a tenancy
Yes No N/A
9. Stormwater Drainage plan is provided including:
• Layout and levels of all pits and pipes• Catchments adequately defined
• Any provision to intercept water flowing onto sitefrom beyond its boundaries
• Locations, levels and details of all stormwatertreatment measures
• Location, volume and level of any proposed pointsof discharge to AAL system
Yes No N/A
10. Fire Engineering This project requires a Fire Engineering Solution Yes No N/A
The contents of this form are confidential. If you are not the intended recipient, you must not disclose or use the information contained in this form. Please advise us by telephone 8308 9211 immediately and shred the document.
Adelaide Airport Limited ABN 78 075 176 653 1 James Schofield Drive, Adelaide Airport SA 5950, Ph 08 8308 9211 Page 5 of 6
11. Gas Connection required Yes No N/A
Meter provided Yes No N/A
Demand ...................................................................
Will you be installing any gas appliances for cooking or otherwise?
Yes No N/A
12. Exhaust / Vents / Ventilation
Do you intend on installing any ventilation equipment e.g. fans, hoods, etc?
Yes No N/A
If yes, please provide detail
13. Radio Interference
Will the project generate any potential radio interference?
Yes No N/A
If yes, demonstrate ACMA Compliance ................................................................. Licence Details ......................................... Frequency ................................................ Band ......................................................... Transmission Power .................................. Antenna Height & Location ..................... m
14. Security Is the project located in a Security Restricted Area? Yes No N/A
Is the project located in a Customs Controlled Area? Yes No N/A
Is the project located in a Sterile Area? Yes No N/A
Will the project require a change to the Airside fence? Yes No N/A
Details of fencing, security in design, bollards, CCTV, access control, etc, provided
Yes No N/A
15. Structure Demolition of structures is proposed and details are provided
Yes No N/A
Does this project include the addition of permanent equipment onto existing structures?
Yes No N/A
If yes, please provide details
Location: ..................................................... Load: .........................................................
Does this project require the use of heavy plant onto existing structures or terminal forecourt during construction?
Yes No N/A
If yes, please provide details
Location: .................................................... Load: ......................................................... Plant: .........................................................
Are there requirements for any new penetrations in the floor / wall / roof?
Yes No N/A
If yes, please provide details
Location: .................................................... Size: .......................................................... Material: .....................................................
16. DDA Does the proposed design comply with the current building code regulations as well as the intent of the Disability Discrimination Act 1992?
Yes No N/A
Location ..................................................... Discharge rate(s) ......................................
The contents of this form are confidential. If you are not the intended recipient, you must not disclose or use the information contained in this form. Please advise us by telephone 8308 9211 immediately and shred the document.
Adelaide Airport Limited ABN 78 075 176 653 1 James Schofield Drive, Adelaide Airport SA 5950, Ph 08 8308 9211 Page 6 of 6
17. Environment and sustainability
Details of all measures incorporated to demonstrate sustainability initiatives provided
Yes No N/A
Design complies with Section J of the Building Code of Australia
Yes No N/A
Method and capacity of rainwater harvesting has been provided
Yes No N/A
Does your project include landscaping? Yes No N/A
If yes, does it comply with the Environmental Strategy and Guidelines?
Yes No
18. Excavation Does the development include excavation? Note: An Excavation Work Permit is required prior to any excavation works
Yes No N/A
If yes, please provide details
Maximum depth: .........................................
19. Waste Management
Trade Waste Form has been provided Yes No N/A
Proposed grease traps and/or interceptors provided Yes No N/A
Details of waste management during construction and after construction have been provided
Yes No N/A
20. Asbestos Has the asbestos register for the building/infrastructure been reviewed? Note: An Asbestos Work Permit is required prior to any maintenance or removal works
Yes No N/A
21. Dust, Fumes or Odours
Could your construction or operational activities produce dust, fumes or odours?
Yes No N/A
If yes, please provide details
22. Fuel, Toxic and Hazardous Material Storage
Details of any fuel, toxic and hazardous material storage during construction or site operation have been provided
Yes No N/A
23. Construction activity
Proposed hours of construction activity ...................................................................
Is a crane and/or lifting platform required? Note: A Crane Permit is required prior to any crane operation
Yes No N/A
If yes, please provide details
...................................................................
...................................................................
Does construction include hot works, including but not limited to welding, grinding? Note: A Hot Work Permit is required prior to any hot works activities
Yes No N/A
Does construction include access to confined spaces? Note: A Confined Space Work Permit is required prior to works commencing
Yes No N/A
Proposed location of waste skips or compactor units provided
Yes No N/A
Note: If you select ‘Yes’ for any of the checklist items above, you must provide further information in the space provided and ensure you have attached supporting documentation as appropriate. Please ensure you have also listed all supporting documentation in the ‘Attached Documents’ section on page 2 of this form.
....................................................................
....................................................................
....................................................................
BUILDING APPROVAL CLOSE OUT PHASE
The contents of this form are confidential. If you are not the intended recipient, you must not disclose or use the information contained in this form. Please advise us by telephone 8308 9211 immediately and shred the document.
Adelaide Airport Limited ABN 78 075 176 653 1 James Schofield Drive, Adelaide Airport SA 5950, Ph 08 8308 9211
Page 1 of 1
BUILDING APPROVAL CLOSE OUT PHASE
This form shall be submitted to AAL by the applicant at the completion of the approved works
to notify AAL of the works completion.
DETAILS OF THE BUILDING APPROVAL ACTIVITY
Applicant
Activity
BA No
Location
Contact Name Phone No
The above mentioned works have been completed or will be completed on the following date / /
The following documents have been attached
As Building Drawings
Inspection Certificate
Other (please specify)
SIGNATURE OF OWNER OF AGENT
Signature Date
AAL OFFICE USE ONLY
Task Signature Date
Site Inspection Conducted
Site Inspection Approved
As Builts Received
As Builts Approved
Application Package – Building Activity Adelaide Airport Limited Revision 6 June 2018 O:\E&AS\3-93 Page i
SITE RULES AND CONDITIONS FOR CONTRACTORS
Application Package – Building Activity Adelaide Airport Limited Revision 6 June 2018 O:\E&AS\3-93 Page 1
Provided Separately