Upload
enrique-ranson
View
213
Download
0
Tags:
Embed Size (px)
Citation preview
Building a model for the worldA capital campaign to create the first center for girls in the
Caribbean
Parking LotParking Lot
BasketballCourt
BasketballCourt
ClassroomsClassrooms
Pool
Storage Sheds
Main Office
Pavilion
Kitchen &
Cafeteria
Open Field
Cle
an
ing &
Lau
ndry
A
rea
Cla
ssroom
sSecu
rity
wall
and f
ront
gate
Gard
en
Main
Hig
hw
ay in C
abare
te
Ready, Set, GoEstimated Total Cost: $30,000Estimated Time Frame: 6 weeksThis is urgently needed to move onto the land and begin Phase 1
Phase 1: Get to Summer CampEstimated Total Cost: $32,000Estimated Time Frame: Needs to be completed by June 1st, 2013
*We anticipate that monthly costs will be an additional $1,000 more per month than we are now paying in our current location for exponentially more space that will enable us to cut down on other current costs, mostly food & transportation
Phase 2: Building the Model - Multipurpose space & accommodations for student groups, teachers, staff & volunteersEstimated Cost: $270,000Estimated time frame: Begin August, 2014, desired completion March, 2015
First Floor: Multipurpose roomThis will allow us to do many activities in a covered space: fundraising events, performances, guest speakers, student group activities, rainy day activities, exercise & dance classes, movie & media showings, parent meetings, additional dining space, additional storage and shower/locker rooms.
Second Floor: Student group & volunteer housingThis is how we envision creating a sustainable center. By housing volunteers & student groups on our property we will double the profit margin costs on our volunteer and student group income
Third Floor: Long-term & international staff & special visitorsBy providing private accommodations directly on our property we will be able to cut our costs for long-term volunteer housing and international staff travelling to the country for extended stays. We will attract a more diverse and qualified volunteer pool by providing free accommodations as a benefit to joining us as a volunteer. Ultimately this will allow us to offer more competitive salaries to employees and contractors in the Dominican Republic
Phase 2: Tennis Court Estimated Cost: $30,000Full cement tennis court with night lighting
Why a Tennis Court?Mariposa has had a tennis program for two years and it continues to be one of the most popular activities. Tennis is a life sport that will boost the self-esteem of our girls as this is normally a sport reserved for wealthy children. Building a tennis court is the exact out of the box thinking that we want to be known for. Lit tennis courts at night will also provide additional activity space for student groups while staying on the property as well as other events.
Parking LotParking Lot
BasketballCourt
BasketballCourt
ClassroomsClassrooms
Pool
Storage Sheds
Main Office
Pavilion
Kitchen &
Cafeteria
Cle
an
ing &
Lau
ndry
A
rea
Cla
ssroom
sSecu
rity
wall
and f
ront
gate
Gard
en
Main
Hig
hw
ay in C
abare
te
Ph
ase 2
: M
ultip
urp
ose
B
uild
ing
Phase 2: Tennis Court
Phase 1 & 2 Budget
Phase 1 Budget – October, 2012 – September, 2013 Amount
Ready, Set, Go $30,000
Get to Summer Camp $32,000
Loan Repayment $50,000
Monthly operating costs (Not including staff) at $1,600/month from October, 2012 – September 2013
$20,000
TOTAL $132,000
Phase 2 Budget – September, 2013 – March, 2014 Amount
Building Construction $270,000
Tennis Court $30,000
Monthly operating costs (Not including staff) at $2,000/month $24,000
Loan Repayment $50,000
TOTAL $374,000
Grand Total: $506,000
How are we going to raise the money?Naming opportunities: $255,000 and above.
$10,000 - $30,000 Opportunities
•Tennis Court $30,000 (Phase 2)•Children’s Library $20,000•Adolescent Library $20,000•Main Kitchen $20,000•Teaching Kitchen $20,000•Dining Hall $20,000•Music Room $15,000•Art & Wood-working Rooms $15,000•Sewing Room $15,000•Health & Wellness $15,000•Swimming pool $10,000
$5,000 – $7,000 Opportunities
•Volunteer resource room $7,000•Outdoor reading pavilion $5,000•Academic Classroom #1 $5,000•Academic Classroom #2 $5,000•Academic Classroom #3 $5,000•Basketball Court $5,000•School Supply Room $5,000•Thrift Store Room $5,000•Garden and toolshed $5,000•Skate Park $15,000
* A donation of the size indicated above will get a plaque with name dedication on the selected room or area of the center. This donation amount ONLY gets the name dedication. Must be clear that it does not pay for any of the materials or equipment that may go into the room.
How are we going to raise the money?Potential Student Group Projects: $125,000
•Building security walls•Painting classrooms•Gardening: herb, vegetable & flower•Repairing basketball & volleyball courts•Setting up libraries & volunteer resource room•Organize & inventory supplies•Sports, educational & various activities with kids
How are we going to raise the money?Grants, Corporate Partnerships, Small Individual Donations: $150,000
•Solicit corporate partnerships•Apply for small family foundation grants•Approach individual donors•Global Giving fundraising campaigns
Phase 3: It’s all about sustainability – Visitors Center & Mini MallEstimated Time Frame: Fall 2018 (Visitors Center 2018)Estimated Cost: TBD
It is our vision that the Mariposa Center for Girls become self-sustaining by hosting student groups and service learning trips and creating employment opportunities for our girls and their families. Phase 3 will include the construction of a highly visible visitors center and mini-mall where the girls can learn and practice trades and earn an income for the center and for themselves.
• Large visitors center with gift shop where people from all over the world can come to learn about the work at Mariposa and how to apply our concepts to girls’ programs across the world and girls can sell their handcrafted goods
• Beauty salon run by trained Mariposa girl beauticians• Two small restaurants, Dominican and International Café • Thrift store where Mariposa girls can hone their sales and management
skills and provide donated items to their community at an affordable price• Organic Market / Fruit & Vegetable Stand where locally grown and
produced products will be sold by Mariposa vendors
Parking LotParking Lot
ClassroomsClassrooms
Pool
Pavilion
Kitchen &
Cafeteria
Cle
an
ing &
Lau
ndry
A
rea
Cla
ssroom
sMain
Hig
hw
ay in C
abare
te
Ph
ase 2
: M
ultip
urp
ose
B
uild
ing
Phase 2: Tennis Court
Ph
ase 3
:V
isit
ors
Cente
r, M
ini M
all
&
Main
Offi
ces
Utility shed
Mosa
ic w
all
& E
ntr
y w
ay w
ith n
am
ing
opport
unit
ies
Dominican Restaurant
International Cafe Visitors, Information
Center & Gift ShopBeauty Salon Thrift Store
First Floor: Welcome Area and Mini Mall
Second Floor:Main Offices & Conference Room
Third Floor:Open Outdoor Area
Over the next three to five years we will create training programs so that Mariposa program graduates can develop marketable job skills, become independent and earn income. By creating a Mini Mall, we anticipate that the organization will become 80% self-sustaining through revenue from the stores and income from student groups and service learning trips. Our goal is to launch Phase 3 in 2018 with the opening of the Visitors Center and Gift Shop and establish our main offices.
Mosaic Wall and Entry Gate with Naming OpportunitiesMosaic Wall and Entry Gate with Naming Opportunities
Long Term Sustainability
Organic MarketOrganic Market
Overall Design Concepts
We strive to be eco-friendly in all phases of development of the Mariposa Center for Girls. Our intention is to be thoughtful of our environmental impact every step of the way and support the development of sustainable eco-living.
•Green construction – bamboo, recyclable & repurposed materials•Solar energy•Water conservation•Composts•Organic flower, herb & vegetable gardens