69
SITE PLAN Building 5 93

Building 5 SITE PLAN - Kendall Square Initiative | Kendall

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

SITE PLANBuilding 5

93

SITE ELEVATIONS: BASE ALIGNMENTBuilding 5

94

SITE ELEVATIONS: BUILDING ALIGNMENTBuilding 5

95

SITE ELEVATIONS: VERTICAL METERBuilding 5

96

BUILT FORM: SETBACKS FROM ADJACENT BUILDINGSBuilding 5

Scale and massing

97

BUILT FORM: OVERALL MASSING BREAKDOWN AND ARTICULATIONScale and massing

98

BUILT FORM: PROPERTY LINE SETBACKS AND OVERALL DIMENSIONS Scale and massing

99

BUILT FORM: MASSING AND MATERIAL ARTICULATIONBuilding 5

Visual interest

100

GROUND FLOOR DESIGN GUIDELINESUses and façade

Building 5

101

GROUND FLOOR DESIGN GUIDELINESSetbacks and entrances

Building 5

102

NORTH ELEVATION: PRELIMINARY DEVELOPMENT PLANBuilding 5

103

NORTH ELEVATION: REVISED CONDITIONSBuilding 5

104

BUILDING MASSING: PRELIMINARY DEVELOPMENT PLANView from open space

Building 5

105

BUILDING MASSING: REVISED CONDITIONSView from open space

Building 5

106

BUILDING MASSING: PRELIMINARY DEVELOPMENT PLANView from Main Street

Building 5

107

BUILDING MASSING: REVISED CONDITIONSView from Main Street

Building 5

108

BUILDING MASSING: PRELIMINARY DEVELOPMENT PLANView from the Marriott

Building 5

109

BUILDING MASSING: REVISED CONDITIONSView from the Marriott

Building 5

110

BUILDING PROGRAM: GROUND LEVELBuilding 5

111

BUILDING PROGRAM: MUSEUM AND OFFICE LEVELS, 02-03 AND 04Building 5

112

BUILDING PROGRAM: OFFICE LEVELS, 05-16 AND 17Building 5

113

BUILDING PROGRAM: NORTH-SOUTH SECTIONBuilding 5

114

KENDALL T-STATION PLAZAView from Main Street looking south

Building 5

115

KENDALL T-STATION PLAZAView from open space looking north

Building 5

116

MAIN STREET SECTION PERSPECTIVE: EASTBuilding 5

117

GROUND FLOOR EXPERIENCEView from Main Street looking east

Building 5

118

GROUND FLOOR EXPERIENCEView from Main Street looking east

Building 5

119

CANTILEVER PRECEDENTS: NEW WHITNEY MUSEUMBuilding 5

120

MATERIALITY: BASE, CLOSE-UPBuilding 5

121

MATERIALITY PRECEDENTSBuilding 5

122

UPPER FLOOR PRECEDENTS

BASE PRECEDENTS

FAÇADE: VIEW FROM MAIN STREET LOOKING EAST Building 5

123

17

SOMA SITE PLANBuilding 6

124

EXISTING CONDITIONSBuilding 6

1125

EXISTING CONDITIONSBuilding 6

1126

SITE PLANBuilding 6

127

GROUND FLOOR: USES AND FACADESBuilding 6

128

SITE CONDITIONS: SETBACKS AND ENTRANCESBuilding 6

129

BUILT FORM: SCALE AND MASSINGBuilding 6

130

BUILT FORM: VISUAL INTERESTBuilding 6

131

MAIN STREET ELEVATIONRelation to Kendall Hotel & Ford Building

Building 6

132

MAIN STREET: EXISTING VIEW FROM THE NORTHEASTBuilding 6

133

MAIN STREET: PROPOSED VIEW FROM THE NORTHEASTBuilding 6

134

MAIN STREET: VIEW FROM OPEN SPACEBuilding 6

135

EXISTING CONDITIONS View from Carleton looking toward Hayward

Site Planning and Design

136

PROPOSED OPEN SPACEView from Carleton looking toward Hayward

Site Planning and Design

137

EXISTING CONDITIONSView from Hayward looking toward Carleton

Site Planning and Design

138

PROPOSED OPEN SPACEView from Hayward looking toward Carleton

Site Planning and Design

139

EXISTING CONDITIONSLooking toward Carleton at Charlotte’s Way

Site Planning and Design

140

PROPOSED OPEN SPACELooking toward Carleton at Charlotte’s Way

Site Planning and Design

1141

EXISTING CONDITIONSLooking toward Carleton at Amherst

Site Planning and Design

1142

PROPOSED OPEN SPACELooking toward Carleton at Amherst

Site Planning and Design

143

PROPOSED OPEN SPACE CONNECTIONSSite Planning and Design

1144

STREET OWNERSHIPSite Planning and Design

1145

SHARED STREETS AND RAISED CROSSINGSSite Planning and Design

1146

SOMA & NOMA PEDESTRIAN CONNECTIONSSite Planning and Design

1147

POINT PARK TO WADSWORTH CONNECTIONSSite Planning and Design

1148

HAYWARD STREET IMPROVEMENTSSite Planning and Design

149

HAYWARD STREET: SECTION 1Site Planning and Design

1150

HAYWARD STREET: SECTION 2Site Planning and Design

1151

GATEWAY SECTIONSite Planning and Design

152

PROPOSED PEDESTRIAN AND GARAGE FLOWSSite Planning and Design

153

1

PROPOSED OPEN SPACELooking toward Carleton at Charlotte’s Way

Site Planning and Design

154

Connective Pedestrian Environment Significant Bicycle Amenities Major Reconstruction of the MBTA

Headhouse Continued support of EZ Ride Shuttle and

CRTMA Major Roadway Improvements –

“Complete Streets” All loading off-street Aggressive parking ratios Majority of parking below grade

3

TRANSPORTATION STUDYTraffic and Parking

155

Comprehensive Analysis

TRANSPORTATION STUDYTIS intersections

Traffic and Parking

3156

TRANSPORTATION STUDY

MIT Kendall Square Red Line study

Traffic and Parking

3

On-Time Performance Analysis

Passenger Wait Time Analysis

Two Day On Platforms Observation Data

Observed overcapacity caused by fewer trains operating during the PM peak hour due to system issues

Existing and new morning and evening passengers would be accommodated if scheduled trains operated during peaks

157

INFRASTRUCTURE INVESTMENTS

Vehicle and bicycle parking

TIS Overview

3

Over 1,000 Long-term and Short-term Bicycle Spaces SoMa Garages 809 New Car Spaces Reduced Number of Replacement

Commercial Spaces Relocated 200 Academic Spaces

Innovative Parking Management and Operations Approach Car-sharing and Ridesharing

158

TRANSIT, PEDESTRIAN AND BICYCLE IMPROVEMENTSTraffic and Parking

3

Major Reconstruction MBTA Headhouse

Wadsworth “Complete” Street

Hayward “Complete” Street

Ames Street Separated Bicycle Lanes

3 Hubway Stations

161

CONTINUED SUPPORT FOR TRANSIT, PEDESTRIAN AND BICYCLE PROGRAMS

EZ Ride Shuttle Services

Participant in KS Mobility Study

PTDM Plan (development underway) Employee Transportation Coordinator Employer Subsidy Options Program Real Time Transit Screens Charles River TMA and EZ Ride Membership Incentives and Marketing Monitoring

3162

Traffic and Parking

DISCUSSION

161