BUILDERS STUDIO LLC OWNERS REPRESENTATION 9317 DICKENS AVENUE WILLIAM M FLECK AIA SURFSIDE, FL 33154 [email protected] 305.868.5804 WWW.BUILDERS-STUDIO.COM May 30, 2015 To Whom It May Concern: All BUSINESSES demand results during the design and construction of their facility. Completing a project on time and under budget is the key ingredient to a successful project. I would be delighted to offer you my assistance for any upcoming facility or property development projects in any capacity you deem necessary. Builders Studio is a 15-year-old company with a wealth of resources and experience while maintaining a minimum of overhead expense. Please find my introductory brochure for your review. As a leader in the design and construction industry, Builders Studio successfully completes multiple projects each year. Our projects include Entertainment, Hospitality, interiors, commercial, new construction, retail, residential, healthcare and institutional. Builders Studio will commit all resources toward the success of any endeavor. Our personnel will provide total attention all of the means and methods that make a project successful. Our professionals understands the three (3) components that steer any project as follows: ! Attention to detail ensuring the highest quality level possible. ! Sensitivity to the required time constraints continually monitoring the schedule to ensure the deadline is maintained. ! Concentration on costs to guarantee all means and methods utilized are the most cost effective. The following proposal of services within our brochure provides some insight into the depth and value of Builders Studio. We believe our sensitivity to the current marketplace provides our clients with the most competitive price possible. Our bidding subcontractors are hand selected for each project based on availability, suitability and ability to provide adequate manpower to complete the work. For instance, the same electrical subcontractor selected for a minor interior renovation would not necessarily be acceptable on a Television Studio or an entertainment center. In fact, there may be multiple electrical contractors on a large-scale project. Our wealth of subcontractor resources ultimately provides for the right competitive price and labor force. Most importantly, our staff is unmatchable in the industry. Their commitment to you always provides for a successful project. Please contact our references that will attest to our ability. Builders Studio can serve as Owners Representative, Design-Build Management, Construction Management, general contractor, and /or General Consultant depending upon which context best suits you particular requirements. Thank you for your consideration. I look forward to hearing from you. Sincerely, BUILDERS STUDIO LLC William M. Fleck AIA President

Builders Studio LLC Brochure 6-1-15R

Embed Size (px)

Citation preview

Page 1: Builders Studio LLC Brochure 6-1-15R

BUILDERS STUDIO LLC OWNERS REPRESENTATION 9317 DICKENS AVENUE WILLIAM M FLECK AIA SURFSIDE, FL 33154 [email protected] 305.868.5804 WWW.BUILDERS-STUDIO.COM

May 30, 2015 To Whom It May Concern: All BUSINESSES demand results during the design and construction of their facility. Completing a project on time and under budget is the key ingredient to a successful project. I would be delighted to offer you my assistance for any upcoming facility or property development projects in any capacity you deem necessary. Builders Studio is a 15-year-old company with a wealth of resources and experience while maintaining a minimum of overhead expense. Please find my introductory brochure for your review. As a leader in the design and construction industry, Builders Studio successfully completes multiple projects each year. Our projects include Entertainment, Hospitality, interiors, commercial, new construction, retail, residential, healthcare and institutional. Builders Studio will commit all resources toward the success of any endeavor. Our personnel will provide total attention all of the means and methods that make a project successful. Our professionals understands the three (3) components that steer any project as follows:

! Attention to detail ensuring the highest quality level possible. ! Sensitivity to the required time constraints continually monitoring the schedule to ensure the

deadline is maintained. ! Concentration on costs to guarantee all means and methods utilized are the most cost effective.

The following proposal of services within our brochure provides some insight into the depth and value of Builders Studio. We believe our sensitivity to the current marketplace provides our clients with the most competitive price possible. Our bidding subcontractors are hand selected for each project based on availability, suitability and ability to provide adequate manpower to complete the work. For instance, the same electrical subcontractor selected for a minor interior renovation would not necessarily be acceptable on a Television Studio or an entertainment center. In fact, there may be multiple electrical contractors on a large-scale project. Our wealth of subcontractor resources ultimately provides for the right competitive price and labor force. Most importantly, our staff is unmatchable in the industry. Their commitment to you always provides for a successful project. Please contact our references that will attest to our ability. Builders Studio can serve as Owners Representative, Design-Build Management, Construction Management, general contractor, and /or General Consultant depending upon which context best suits you particular requirements. Thank you for your consideration. I look forward to hearing from you. Sincerely, BUILDERS STUDIO LLC William M. Fleck AIA President

Page 2: Builders Studio LLC Brochure 6-1-15R

     

Mission  Statement:        

To  define  an  Architect  as  a  master  builder  one  must  first  understand  the  process  of  building.  Builders  Studio  is  an  orchestrated  composition  of  design  and  construction.  Our  philosophy  lies  at  the  root  of  the  building  solution.  Our  commitment  to  achieve  the  unattainable  as  well  as  most  practical  architectural  statement  is  precisely  our  goal  towards  "Concepts  Realized".  

       

  William  M.  Fleck,  AIA  

 

Page 3: Builders Studio LLC Brochure 6-1-15R

BUILDERS STUDIO LLC OWNERS REPRESENTATION 9317 DICKENS AVENUE WILLIAM M FLECK AIA SURFSIDE, FL 33154 [email protected] 305.868.5804 WWW.BUILDERS-STUDIO.COM

QUALIFICATIONS

William M Fleck AIA President & Founder Born in Jersey City, NJ and raised on the Jersey Shore, Mr. William Fleck (Bill) was destined for a career in Architecture, Construction and Property Development. His Great Grandfather was the Sheriff of the Bronx and owned a Construction and Property Development Company in NYC. Without knowledge of his family ancestry, Bill decided at the age of 13 to become an architect while watching the construction of his childhood home. Bill excelled in school studying design and architecture. After high school Bill began to work with his older brothers building beautiful seashore homes in Monmouth County, NJ. During an internship in NYC to design the interior of a Steamship Corporation, Bill began to follow his family roots back to NYC to pursue his career. Bill has worked for some of the top architectural firms and eventually managed the development of corporate space for some of the most infamous fortune 500 companies in America. This led to his interests in Construction Management and Finally Property Development which enabled Bill to further develop his experience in almost every arena of construction including Commercial, Hospitality, Gaming, Retail, Residential, Restaurant & Nightclubs, Healthcare, Religious and Museums. Bill’s experience with Paul Reilly Architects, J. Gordon Carr Architects, Mobil Oil, Shearson American Express, Salomon Brothers, HRH Construction, Bovis Lend Lease, Macklowe Properties and Parx Casino has guided him to excel in a leadership capacity providing a Portfolio of outstanding properties, many of which have been published, within the billions of dollar range throughout America. Ultimately Bill had founded his own firm, Builders Studio, which develops and implements inventive architectural details within a controlled studio environment to ensure the precision of superb design. Among many other assets, Bill offers a unique blend of managerial skills combining Real Estate Development, Construction Management, Architecture and Facilities Management experience. By utilizing his organizational, interpersonal and leadership skills Bill has been able to create a synergy of Design and Construction through hard work from the job site and the drawing board to the Executive Boardroom. Bill has developed and managed staff of the Design & Construction Department for property development groups and casinos. He has lead teams of professionals and has conducted very significant conferences through out the USA. He managed Architects & Design Consultants, Construction Managers, Realtors, Bankers, Lawyers, accountants and Tenants for large-scale real estate projects. In addition, he has overseen multiple building trades on new construction, renovation, tenant fit-outs and interiors of skyscrapers, major hotels, museums, residences, landmark structures and shopping centers. Bill is a visionary who’s expertise ranges from Leadership, Master Planning, Design, Logistics, Problem Solving to the details of Budgeting, Bid Package Preparation & Oversight, Project Scheduling, Site Preparation, Quality Control and Value Engineering Review. Bill is a licensed architect in New York and New Jersey as well as a Licensed Florida State General Contractor. He completed his undergraduate studies at the City College of New York in Architecture and New York University in Construction Management. His business affiliations are with The American Institute of Architects, the Construction Management Association of America and the General Builders Contractors Association where he received an award for Construction Excellence in Craftsmanship. In his role as President & Owner of Builders Studio, LLC, Bill is responsible for all operations and relations within the entity. His vision drives the Firms strategies and actions. Shaping the company’s goals with a committed focus on developing new investment, development and operating opportunities is Mr. Fleck’s model for continued success. As President & Owner of Builders Studio, LLC, Bill is recognized as one of the industry’s leaders today. He is based in mid-town Manhattan and Holmdel, NJ.

Page 4: Builders Studio LLC Brochure 6-1-15R

BUILDERS STUDIO LLC OWNERS REPRESENTATION 9317 DICKENS AVENUE WILLIAM M FLECK AIA SURFSIDE, FL 33154 [email protected] 305.868.5804 WWW.BUILDERS-STUDIO.COM

EDUCATION AAS/Architecture, City College of New York, NYC/Brookdale College, NJ Diploma/Construction Management, NYU Real Estate Institute

CERTIFICATIONS New York State Registered Architect New Jersey State Registered Architect Florida State Certified General Contractor

MEMBERSHIPS AIA - America Institute of Architects REDA - Real Estate Development Association IH-RA - International Hotel & Restaurant Association CMAA - Construction Management Association of America GBCA - General Building Contractors Association AGC - Associated General Contractors of America

AWARDS GBCA 2010 - Excellence in Craftsmanship - Parx Casino

SUMMARY OF QUALIFICATIONS William M Fleck is an accomplished Owner’s Building Development and construction professional with

diverse experience on large-scale complex projects valued in excess of $250,000,000. Over the course of a 30+ year career, he has gained unparalleled management experience in leading design and construction teams including trade contractors on various project types including new building construction, renovations and high-end interiors encompassing skyscrapers, major hotels, apartment complexes, commercial, retail, gaming and entertainment, hospitality, television studios, landmark structures, health care centers, shopping centers and residential properties.

As a proactive, engaging and hands-on manager, his experience includes program compliance and

validation, construction management procurement including trade scope evaluation and general conditions analysis. He has provided direction to business development, operations and client relations. He has developed and managed staff for the Design & Construction department for property development organizations and casino owners. He has managed Property managers for large-scale commercial buildings. He will also take a hands-on approach to bid package preparation, equipment scheduling, preliminary site logistics, quality control, designer participation and review and leading value engineering studies to meet the owner’s goals. He will continue to build productive relationships with owners, developers, architects, engineers, suppliers and municipal officials.

William’s goal is to manage the day-to-day challenges of complex project delivery while maintaining an

unwavering focus on achieving the best value solutions without sacrificing quality, cost or schedule.

RECOGNIZED FOR: Results Orientation - Creative & Practical Problem Solving - Business Savvy - Reliability- Relationship Building - Ethics-Strategic Planning & Negotiations - Objective Reasoning

Construction Management Technical Core Competencies

Page 5: Builders Studio LLC Brochure 6-1-15R

  2  

Gaming,  Entertainment  and  Hospitality    

Parx  Casino  2999  Street  Road,  Bensalem,  PA    Total  Development  of  a  new  460,000  SF,  $500  million  casino.  As  the  first  Pennsylvania  venue  to  be  awarded  the  right  to  construct  a  gaming  facility,  Philadelphia  Park  Racetrack  constructed  a  new  and  separate  building  in  the  midst  of  a  450  acre  property  adjacent  but  detached  from  the  existing  racing  facility.  Thus,  the  birth  and  brand  of  ‘Parx’  Casino.  The  property  boasts  lush  green  landscapes  surrounding  the  new  casino  with  entrances  from  3  major  roadways  directly  off  the  PA  Turnpike.  The  facility  has  been  rated  ‘Most  technically  advanced,  highest  quality  design  and  the  most  eloquently  executed  finishes  for  a  property  on  the  east  coast’.  Entering  the  property  you  are  greeted  by  3  larger  than  life  sized  video  screens  atop  the  Porte  Cochere.  Along  both  sides  of  the  entrance  are  color  changing  LED  lighting  effects  upon  a  300’  x  30’  artistic  ribbon  wall  creating  the  most  dramatic  light  show  ever  displayed.  As  you  enter   the  building,  you  past  under  a  hand  blown  glass   tapestry  chandelier  and  through  a  beautiful  back  lit  Onyx  and  Taneo  wood  Portal  over  Teakwood  stone  floors.  The  finishes  through  out  consist  of  the  most  award  winning  displays  of  wood  species,   stone,   stainless   Steel,  wall   coverings,   etc.   ever   to  be   composed  with   the   finest  details  and  joinery  in  the  21st  century.  Even  the  restrooms  are  a  sight  worth  seeing.  From  the  Foodie  venues,  Steakhouse,  Chickie’s  and  Pete’s,  slot  high  limits,  table  game  high  limits,  Jax  sports  bar,  360  club,  table  game  pits  and  slot  layout,  Parx  Casino  is  truly  legendary.          

         

Parx  Front  Entrance    

               

LED  Lit  Ribbon  Walls  

Page 6: Builders Studio LLC Brochure 6-1-15R

  3  

   

                 

Glass  Blown  Entrance  Tapestry  and  Lobby  Portal          

 

   

360  Bar  and  Night  Club        

   

360  Bar  and  Night  Club    

   

Page 7: Builders Studio LLC Brochure 6-1-15R

  4  

 

   

360  Bar  and  Night  Club  Entrance        

   

Jax  Sports  Bar  and  Foodies  Dining            

   

Xclusive  High  Limit  Slots  and  Parx  Grill  

Page 8: Builders Studio LLC Brochure 6-1-15R

  5  

                                 

   

Interior  Details    

   

Gaming  Floor    

Showboat  Mardi  Gras  Casino,  East  Chicago,  IN    

Total  development  of  the  Showboat  Mardi  Gras  Casino  from  the  construction  on  the  East  Chicago  property  to  the  off-­site  fabrication  of  the  Casino  vessel.  The  project  consisted  of  a  386   feet   long   x   74   feet   wide,   four-­level   multi-­themed   gaming   vessel   comprising  approximately  75,000  sq.  ft.  of  gaming  space,  retail  space,  a  110,000  sq.  ft.  Pavilion  building,  2,000  car  parking  garage,  a  Marina  with  breakwater  and  extensive  site  work  development.  All  finishes  completed  in  Mardi  Gras  theme.      

                                                                                                     

Page 9: Builders Studio LLC Brochure 6-1-15R

  6  

Showboat  Hotel  Casino,  Atlantic  City,  NJ    

New  50-­story  Hotel  Tower  and  2500  car  Parking  Garage  valued  at  $100  million.  The  north  tower  continues  with  the  Mardi  Gras  theme  with  an  update  and  clean  feel.  Larger  rooms  with   all   the   latest   amenities.   Various   projects   throughout   Atlantic   City   hotel   casino,  including  new  restaurants,  lobbies,  existing  parking  garage  façade,  slot/table  game  areas  and  remodel  of  the  existing  hotel  suites.      USA  Network  Television  Studio,  Jersey  City,  NJ      Relocation  of  the  USA  Network  Studio  and  Post  Production  facility  from  New  York  City  into  new  studio  facility  at  Newport  Tower;  40,000  sq.  ft.  ($7  million).        The  Columbia  House  Company,  New  York,  NY      New  Headquarters  on  three  floors  (120,000  sq.  ft.)  at  the  McGraw  Hill  Building  with  new  dining  facilities,  studios,  executive  offices,  and  3-­floor  interconnecting  cable  suspended  staircase.  ($7  million).    

                               

                                                               

 Time  Warner  Direct  Entertainment,  New  York,  NY      

A  $2  million,  40,000  sq.  ft.  interior  fit-­out  for  studio  and  offices.    

New  York  1  News,  New  York,  NY      

A  $4  million,  30,000  SF  fit  out  of  a  new  24-­hour  cable  TV  all-­news  broadcasting  studio  for  Time  Warner  Inc.      Brooklyn  Academy  of  Music,  Brooklyn,  NY      

A  $3.2  Million  Office/Rehearsal  Dance  Studio  renovation.  

Page 10: Builders Studio LLC Brochure 6-1-15R

  7  

   Racing  and  Simulcast    Philadelphia  Park  Racetrack  –  Parx  Racing,  Bensalem,  PA    

A   $10,000   million,   60,000   SF   renovation   of   existing   racetrack   building.   Greenwood  Gaming’s  commitment  to  the  horse  racing  commission  was  to  totally  remodel  the  existing  racing/simulcast  facility  previously  used  as  a  temporary  gaming  facility.  This  included  all  para-­mutuels  stations,  betting  floor,  stadium  seating,  bar,  grab  &  go  food,  Cotillion  Room,  Clubhouse,  Racing  Hall  of  Fame,  Poker  Room,  Steakhouse,  Paddock  and  BOH  facilities.  Also,  36  Barn  Buildings  were  demolished  and  rebuilt  phase  at  6  per  year  for  6  years.    

                   

Philadelphia  Park  Racing  Entrance      

                   

Philadelphia  Park  Racing  &  Simulcast    

       

Page 11: Builders Studio LLC Brochure 6-1-15R

  8  

                                       

Parx  Racing  Club  House  and  Hall  of  Fame        

                                       

         Paddock        

                                       

         Barns  11  &  12          

Page 12: Builders Studio LLC Brochure 6-1-15R

  9  

   Restaurants  and  Nightclubs    Parx  Grill  2999  Street  Road,  Bensalem,  PA    A  $5  Million,  4500  SF  modern  steakhouse  with  finishes  that  are  different,  but  include  the  theme  of  Parx  Casino.  Back  lit  honey  onyx  stone  with  a  high  resolution  video  screen  display  a   faux   fireplace.   Silverwood   portals   and   banquette   seating   for   an   intimate   dining  experience.    

                 

Main  Dining  Room        

Chickie’s  and  Pete’s  Restaurant  2999  Street  Road,  Bensalem,  PA    Arguably,  the  best  sports  bar  on  the  east  coast  with  the  liveliest  atmosphere.  A  7  Million,  9500  SF  Sports  Bar  and  Restaurant  with  a  night  club  environment.  The  restaurant  features  ‘Play  2’  sporting  event  cubes  for  private  viewing  and  Wii  play  stations.  

 

                                   

Chickie’s  and  Pete’s  Entrance  and  interior        

Page 13: Builders Studio LLC Brochure 6-1-15R

  10  

   

Michael  Chow’s  Noodle  Bar  2999  Street  Road,  Bensalem,  PA    A  $3.5  million,  3000  SF  Asian  Noodle  Bar  and  Restaurant.  Set  in  an  elegant  theme,  Michael  Chow’s  Asian  Noodle  Bar  has  the  food  that  surpasses  this  setting.  

 

                                       

         Noodle  Bar  and  Restaurant        

The  Press  Room  610  Bangs  Avenue,  Asbury  Park,  NJ    A  $1  Million,  1500  SF  Night  Club  located  within  the  heart  of  the  gentrified  area  of  New  Jersey’s  shore  town  of  Asbury  Park  (Home  of  the  Boss).  The  nightclub  was  installed  within  the  historical  Asbury  Park  Press  newspaper  building,  which  had  been  vacated  for  a  new  facility.      

                                                                   

The  Press  Room  Stage      

Page 14: Builders Studio LLC Brochure 6-1-15R

  11  

Commercial  and  Business  Properties    

The  General  Motors  Building  767  Fifth  Avenue,  New  York,  NY        

A  $120  million  renovation  and  facelift  to  New  York’s  most  premier  building.  This  project  consists  of  an  entire  new  curtain  wall  at  the  3  story  pedestal  encompassing  Fifth  Avenue,  Madison  Avenue,  59th  Street  and  58th  Street.  On  the  east  side  of  the  building  an  addition  was  added  to  Madison  Avenue  enlarging  the  building  to  the  property  line  and  thereby  creating  additional  retail  space  as  well  as  relocating  the  lobby  from  Madison  Avenue  to  59th  Street  with  easy  access  off  Madison  using  a  superbly  designed  space  as  a  lure  for  those  who  enter.  The  retail  space  on  Madison  will  house  such  stores  as  Bally,  Porsche,  Kate  Spade  and  others  of  the  same  caliber.  On  the  west  side  is  the  infamous  GM  Plaza  totally  renovated  with  new  fountain  pools,  tree  pits,  stone  bench  seating  and  fiber  optic  lighting  within  the  steps  and  pools  to  create  a  spectacular  sense  of  space  on  the  grandest  of  all  granite  stone  cladded  plazas.  The  North  plaza  will  continue  to  produce  the  popular  CBS  early  show  and  the  South  plaza  will  remain  the  entry   to   the   infamous  FAO  Schwarz  retail  store.  The  big  event   is  staged  within  the  center  as  a  structurally  glazed  32  feet  cube  will  grace  the  plaza  as  an  entrance   to   an   all   new   flagship   Apple   Computer   store   to   be   located   below  within   the  concourse  level.  The  Glass  cube  will  lead  your  way  to  a  glass  bridge  with  a  glass  elevator  at  its   center   and   a   spiraling   glass   stair   surrounding   the   glass   elevator   bringing   you   to   a  voluminous  and  spacious  state  of  the  art  computer  and  technology  retail  store.  Truly  a  sight  worthy  to  see.  

         

                                     

General  Motors  Building  Plaza  

Page 15: Builders Studio LLC Brochure 6-1-15R

  12  

                             

Apple  Fifth  Avenue  Store  Glass  Cube    

                                 

Apple  Fifth  Avenue  Store  Entrance    

                           

Apple  Fifth  Avenue  Store  and  GM  Plaza  

Page 16: Builders Studio LLC Brochure 6-1-15R

  13  

The  Hippodrome  Building  1120  Avenue  of  the  Americas,  New  York,  NY        

The  Hippodrome  was  originally  built  as  a  theater  in  1905.  The  Hippodrome  was  known  for  its  lavish  spectacles  including  circus  animals,  diving  horses,  opulent  sets,  a  500  member  chorus  and  popular  vaudeville  artists  of  the  day  such  as  Harry  Houdini.  On  August  16,  1939  the   Hippodrome   hosted   its   last   show   and   in   1954   the   current   office   building   was  constructed  on  the  site.  The  tower  was  added  to  the  building  in  1962  totaling  21  stories.  The  building  has  been  family  owned  and  operated  since  1978.  In  2004  the  owner  decided  to  spend  $60  million  to  renovate  the  building  into  a  state  of  the  art  class  ‘A’  building.  The  renovation  consisted  of  a  new  aluminum  and  glass  curtain  wall  system  cladding  the  existing  structure,  rebuilding  of  the  structure  and  renovation  of  the  existing  3  level  garage,  entire  new   MEPS   /   life   safety   /   security   /   telecommunications   infrastructure,   addition   and  restoration  of  all  ground  floor  retail  stores  and  a  superbly  designed  2  story  high  main  building  entrance  lobby.  The  finishes  selection  were  made  using  only  the  finest  of  stone  for  the  floors  and  walls,  Benhiem  glass  and  metal  portals  corridors  and  aluminum  leaf  glazed  ceiling.  A  space  begging  to  be  visited.    

                             The  Hippodrome  Building    

                                               The  Hippodrome  Building  Lobby  

Page 17: Builders Studio LLC Brochure 6-1-15R

  14  

350  Madison  Avenue,  New  York,  NY        

A  400,000  sq.  ft.,  $30  million  renovation  of  the  existing  Condé-­Nast  building  consisting  of  total  demolition  of  interior  space,  penthouse  and  existing  MEPS  infrastructure.  Installation  of  new  MEPS  infrastructure,  new  25th  floor  penthouse  with  dunnage  for  cooling  towers,  pumps   and   generator.   Expansion/addition   to   the   18th   and   19th   floors.   New   freight  elevators  with  a  new  shaft  way  and  eight  new  passenger  elevators,  total  renovation  of  lobby  which  included  demolition  of  existing  adjacent  building,  rock  excavation  and  underpinning  of  adjacent  Brooks  Brothers  building  while  maintaining  existing  tenant  Paul  Stuart  store  functional  during  the  creation  of  a  glass  enclosed  structure  passage  to  the  new  lobby  with  a  glass  courtyard  displaying  a  40-­foot-­high  vertical  plaster  wall  on  the  Brooks  Brothers  side  and  a  40-­foot-­high  corrugated  metal/flat  metal  panel/fritted  glass  curtain  wall  all  of  which  won  the  architect  (SOM)  the  AIA  New  York  design  award.        

       

Exterior  and  Interior  of  Façade  and  Lobby      400  Madison  Avenue,  New  York,  NY        

A  120,000  sq.  ft.,  $15  million  renovation  of  landmark  building  consisting  of  a  complete  gut/demolition  and  remodeling  of  entire  building  while  shifting/swinging  existing  and  new  tenants  within  building  during  construction.  Similar  to  the  350  Madison  Avenue  project,  but  with  a  total  exterior  restoration.        Shearson  Lehman  Brothers,  New  York,  NY      A   $35   million,   240,000   SF   re-­stack   for   Shearson   Lehman   and   American   Express  International  Bank  at  the  World  Financial  Center  and  at  195  Broadway.      

                             

Floor  Plans    

Page 18: Builders Studio LLC Brochure 6-1-15R

  15  

Salomon  Brothers  Inc,  7  World  Trade  Center,  New  York,  NY    A  $70  million,  300,000  SF  Fit  Out  of  the  relocated  corporate  headquarters  building.  The  entire  building  was  dedicated  to  bring  together  the  relocated  facilities  for  both  one  and  two  New  York  Plaza.  Providing  for  the  latest  in  technology  with  state  of  the  art  interior  spaces.  Triple  redundant  mechanical  and  electrical  systems,  trading  floors  on  18”  high  raised  floor  system   for   a   cooling   plenum   below   to   keep   the   trading   desk   equipment   cool.   New  cafeteria/dinning  rooms,  Corporate  finance  offices  and  operational  spaces.  The  building  location  was  determined  after  Salomon  changed  plans  from  the  mid-­town  coliseum  site.      Salomon  Brothers  Inc,  2  New  York  Plaza,  New  York,  NY      A  $40  million,  200,000  SF  Construction  of  the    headquarters  space  at  2  New  York  Plaza,  with  new   corporate   finance   offices,   new   operations   offices   and   new   cafeteria.  Renovation/alteration  to  100,000  sq.  ft.  trading  floor  at  1  New  York  Plaza.      

                           

Conference/Reception/Office  Interior            

Salomon  Brothers  Inc,  Domestic  offices,  USA    National  Construction  Program  Managed  assignments  in  New  York  and  eight  other  cities,  including  new  offices  consisting  of  trading  floor,  corporate  finance,  operations,  executive  dining  facilities  in  the  following  buildings:  

• Georgia  Pacific  Plaza,  Atlanta,  GA;  30,000  sq.  ft.  ($5.3  million)    • 99  High  Street,  Boston,  MA;  22,000  sq.  ft.  ($3.3  million)    • Sears  Tower,  Chicago,  IL;  60,000  sq.  ft.  ($9.0  million)    • Trammel  Crow  Center,  Dallas,  TX;  36,000  sq.  ft.  ($5.4  million)    • Security  Pacific  Center,  Los  Angeles,  CA;  66,000  sq.  ft.  ($9.9  million  • Bank  of  America,  San  Francisco,  CA;  44,000  sq.  ft.  ($6.6  million)  • Toronto  Dominion  Center,  Ontario,  Canada;  6,000  sq.  ft.  ($1.5  million)  • Willard  Building,  Washington,  DC;  6,5000  sq.  ft.  ($1.6  million)  

   

Salomon  Brothers  Data  Center/Disaster  Recovery,  Rutherford,  NJ      

A  New  $2  million,  200,000  SF  data  center/disaster  recovery  center  for  Salomon  Brothers  .    Lehman  Brothers,  Jersey  City,  NJ      

A  $30  million,  450,000  SF  relocation  from  New  York  City  to  101  Hudson  Street  in  Jersey  City;  project  comprised  of  interior  fit-­out  on  15  floors.    

Page 19: Builders Studio LLC Brochure 6-1-15R

  16  

Retail    

Macy’s,  Freehold  Raceway  Mall,  Freehold,  NJ        

A  $25  million,  240,000  SF  New  building  of  complete  retail  space  out  of  the  ground  attached  to   the   mall,   including   EIFS   façade,   stone/metal   and   glass   entrances,   center   skylight,  escalators,  marble  aisles  and  extensive  casework,  consisting  of  three  floors  fully  built  out  for  retail  operation.    

                             

Macy’s  Freehold    Lord  &  Taylor,  Freehold  Raceway  Mall,  Freehold,  NJ    

$8  Million,  60,000  S.F.  addition  to  an  existing  two  story  retail  store  building.  Added  half  of  the   existing   building   space   with   3   new   entrances,   new   loading   dock,   parking,   etc.  Completely  renovated  existing  store  interior  with  new  design  motif.  Phased  existing  store  renovation  into  two  sections.  After  opening  the  new  addition,  the  first  half  of  the  existing  store  space  was  closed  and  renovated.  Then  the  second  half  of  the  existing  store  space  was  closed   and   renovated   after   opening   the   newly   renovated   section.   Ultimately   the   total  building  was  completely  renovated  as  a  new  store.      

                               

Lord  and  Taylor  Freehold          

Page 20: Builders Studio LLC Brochure 6-1-15R

  17  

Chanel  Soho,  139  Spring  Street,  New  York,  NY        A  $4  million,  8000  SF  renovation  of  existing  Landmark  building  in  Soho  to  create  two  retail  spaces  for    Chanel,  Inc.  and  their  subsidiary  Holland  &  Holland.  Unique  boutique  designed  by  Peter  Marino  utilizing  the  existing  tin  ceiling  with  new  multilevel  suspended  ceiling  panels  below  and  over  showcase  millwork  displays  manufactured  by  Cenacchi  in  Italy.  New  state-­of-­the-­art  moving  feature  wall  with  a  metal  cube  display  area  and  new  finishes  using  carbon  fiber,  polyester  resin  and  Venetian  plaster.  Also,  new  wood  clad  metal  exterior  windows  and  doors  and  a   totally   restored  stone  and  cast   iron  exterior   for  Landmarks  approval.    Chanel  at  the  Drake  Hotel,  Chicago,  IL        

A  $5  Million,  10,000  SF  renovation  of  new  retail  space  within  ground  floor  of  the  Drake  Hotel  on  Michigan  Avenue.  New  Jewelry  area  and  Oprah  Salon.  

     

Chanel  at  the  Bellagio  Hotel,  Las  Vegas,  NV        

A    $4  million,  10,000  SF  build-­out  of  new  boutique  on  retail  row  of  the  extraordinary  hotel  casino,  with  fountain  views.          Holland  &  Holland,  New  York,  NY      A  $10  Million,  8000  SF  conversion  of  an  existing  8-­story  brownstone  on  57th  Street  into  a  prestigious  award  winning  retail   store.  Total  gut  and  restoration,   including  new  MEPS  infrastructure,  façade,  interior,  and  sweeping  staircase  throughout  the  store.      

                                                     

Exterior  and  Interior  of  Holland  &  Holland        

Page 21: Builders Studio LLC Brochure 6-1-15R

  18  

Nordstrom,  Paramus,  NJ      A  $3  million,  three-­story  addition  to  existing  building  and  new  west  elevation/entrance.      

                             

Façade  of  new  Nordstrom  Addition    Century  21  Department  Stores,  New  York,  NY      

Building  expansion  of  an  existing  1937  five-­story  landmark  building  ($3.5  million).      

Residential    The  Drake  Hotel  Park  Avenue  &  56th  Street,  NY    A  new  $800  million,  90  story  skyscraper.  Includes  tear  down  of  existing  26  story  hotel  building  and  the  construction  of  a  new  Hotel/Residential  building.  The  garage  is  within  the  5  story  below  grade  basement  with  retail  on  the  lower  floors,  a  hotel  on  the  first  40  floors  and  high-­end   luxury  private  residential  condominiums  on   the  remaining  upper   floors.  Originally  design  by  Renzo  piano  and  place  on  hold.  The  project  is  now  continuing  under  the  design  of  Herzog  DeMuron.  Slated  for  Completion  in  2016.    Cutchogue  Estates  Cutchogue,  Long  Island,  NY    A  $90  million  new  construction  planned  development  for  186  units  of  Studio,  1,  2,  &  3  bedroom  condominiums  with  a   community   center   tailored   to   contextually   fit  with   the  surrounding  town  environment.    Kellis  Pond  Bridgehampton,  NY    Three  separate  $5  million  residences  of  6,000  SF  with  eastern  Long  Island  beach  style  finishes  complete  with  pools  and  landscape  to  be  summer  homes  for  the  NYC  executive.    Sher  Residence,  Franklin  Lakes,  NJ      

A  $9  million,  18,000  SF  high-­end  luxury  residence  on  4  acres  with  3,000  feet  long  driveway  to  top  of  property,  indoor  pool/spa,  extensive  woodwork,  etc.        

Page 22: Builders Studio LLC Brochure 6-1-15R

  19  

Healthcare    Payton  Lane  Nursing  Home,  64  County  Road  39,  South  Hampton,  NY        

A   $45  million,   185,000   SF   280   bed,   two-­story   plus   cellar   building   constructed   out   of  reinforced  concrete/masonry/concrete  plank  on  a  10-­acre  site  with  sewerage  treatment  plant,   roadways,   extensive   site  work,   guard  house  etc.   Full   facility  nursing  home  both  patient/nurses  residences,  commercial  kitchen  and  medical  facilities.    

                                                 

Front  entry  drive  to  Payton  Lane      Kensington  Green,  34  Locust  Avenue,  Oakdale,  NY        

A,  $12  million,  60,000  SF  two-­story  assisted-­living  facility  with  110  apartments  and  central  living  spaces  constructed  with  a   steel   frame  paneled  wall   system  with  a  Hambro   floor  system,  steel  trusses,  architectural  shingles  and  a  Hardy  plank  siding,  Heavy  Landscaping.      Tree  Tops  Nursing  Home,  Yorktown,  NY        

$25   million   Expansion/addition   of   approximately   90   additional   beds   with   a   MEPS  infrastructure   upgrade   throughout   existing   160,000   sq.   ft.   nursing   home   facility   and  renovation  of  entrances  and  common  spaces  throughout.        Stony  Brook  Child  Care  Center,  1474  Stony  Brook  Rd  Stony  Brook,  NY        

A   $4   million   specialized   day   care   center   created   after   12+   years   of   planning   by   the  University  of  Stony  Brook.  A  20,000  sq.  ft.  building  consisting  of  5  classroom  pods  centered  to  a  central  entry  and  office  area  on  a  5-­acre  site.  Required  total  site  clearing,  university  utility  tie-­in  and  central  monitoring.  Extensive  site  development  and  landscaping.        

           

Page 23: Builders Studio LLC Brochure 6-1-15R

  20  

Merck-­Medco  Managed  Care,  Franklin  Lakes,  NJ        An  extensive  renovation  of  650,000  sq.  ft.  complex  located  on  201-­acre  site.  Total  building  restoration  with  new  MEPS  infrastructure,  220,000  sq.  ft.  roof,  and  interior  fit-­out  with  roadways   ($100   million).   Maintained   200   employees   on   site   during   renovation,   and  relocated  2,200  employees  into  the  building.      University  of  Medicine  &  Dentistry  of  New  Jersey,  Newark,  NJ      A  $650,000  renovation  and  expansion  of  the  Renal  Dialysis  Facility.      Our  Lady  of  Lourdes  Medical  Center,  Camden,  NJ      A  120  million,  600,000  SF  renovation  of  existing  1947  building  and  3-­floor  addition  to  1970  Rehab  building.  This  project  was  one  of  the  first  to  provide  for  single  patient  rooms  with  private  baths.  Leading  the  way  for  modern  hospitalization  coined  the  project  name…..  ‘Step  21’  (Stepping  imto  the  21st  century)    

       

Floor  Plans    

Miscellaneous  Interior  Projects    

Simon  &  Schuster,  Avenue  of  the  America’s,  New  York,  NY      

A  $25  million  renovation  and  re-­stack  of  12  floors  at  corporate  headquarters  in  Rockefeller  Center  to  accommodate  buyout  by  Paramount  and  Viacom.  

 eEmerge,  440  Ninth  Avenue,  New  York,  NY        

$9  million  on  two  floors  (approximately  60,000  sq.  ft.)  of  high-­tech  visual  interior  space  for  multi-­dot-­com  company  offices.  Exposed  cable  trays,  glass  enclosed  LAN  rooms,  etc.      Omni-­Point  Communications,  Wayne,  NJ      

A  40,000  sq.  ft.  renovation  of  an  existing  building  into  a  central  switch  and  headquarters  offices  ($4  million).    

Page 24: Builders Studio LLC Brochure 6-1-15R

  21  

Panalpina,  Morristown,  NJ      

A  40,000  sq.  ft.  interior  office  build-­out  on  two  floors  with  connecting  stairs  ($3.8  million).      

American  Institute  of  Certified  Public  Accountants,  Harborside  Financial,  Jersey  City,  NJ      

A  $5.5  million,  60,000  SF  interior  fit-­out.  New  entry  façade,  reception  area,  office  area,  etc.      

New  York  Telephone  Company,  New  York,  NY      

A  $2.1  million,  40,000  sq.  ft.  renovation  and  interior  fit  out  of  two  floors.    

Hollyar  Brady,  New  York,  NY      

A  $500,000,  8000  SF  Interior  Build  out  of  Law  offices  in  the  Fred  French  Building.    

Smith  Barney  Harris  Upham  &  Company,  New  York,  NY    

A  $1  million  build  out  of  Data  Center.    

Bryant  Park  Restoration,  New  York,  NY      

A  $300,000  exterior  and  interior  restoration  of  two  ancillary  buildings.      

Goldman  Sachs  &  Company,  New  York,  NY      

A  $8  million  Re-­stack  and  renovation  of  corporate  offices  and  trading  facilities  throughout  30  floors.  

 

BEBE,  Woodbridge,  NJ      

Build  out  of  6,000  sq.  ft.  retail  store  ($400,000.00).      

Museum  of  Modern  Art,  New  York,  NY      Moderate  renovations  through  out  museum  ($500,000.00).    

 

National  Cleaning  Contractors,  New  York,  NY      

20,000  sq.  ft.  interior  renovation  for  new  offices  ($700,000.00).      

190  south  LaSalle  Street,  Chicago,  IL    New  lobby  renovation  consisting  of  lavishly  high  end  finishes  including  intricate  wood  and  stone  work  and  gold  leaf  painted  ceilings.    

                                                                                     

                                                                                                                                                                                   

Page 25: Builders Studio LLC Brochure 6-1-15R

     

CORPORATE  PROFILE          Builders  Studio,  LLC  was  formed  in  October  of  2000  as  a  privately  owned  organization.    Since  its  first  year  of  operation,  Builders  Studio  has  been  committed  to  leading  our  clients   towards   achieving   their   goals.       Our   success   can   be   attributed   to   our   key  corporate  philosophy  -­  The  dedication  of  our  principals  and  professional  staff.    Builders  Studio’s  formation  was  the  result  of  several  talented  executives  and  employees  looking  to  create  an  organization  capable  of  achieving  the  highest  level  of  success  in  a  new  industry  arena.    By  virtue  of  our  collective  decades  of  experience,  we  are  experts  in  the  construction  of  all  types  of  Architecture  including  commercial  offices,  hospitals  and  health   care   facilities,   media   facilities,   restaurants,   hotels   and   residences.     We   are  dedicated   to   providing   the   finest   craftsmanship   within   the   most   professional  atmosphere  never  compromising  the  personal  touch.    Our  confidence  in  our  ability  to  satisfy  your  requirements  stems  from  the  thoroughness  of  our  management  programs.    From  the  commencement  of  the  design  phase  through  the  final  project  close-­out,  we  will  guide  the  client  through  the  entire  process.    On  every  project,  our  staff  is  supported  by  a  full  complement  of  specialists  in  every  field  including  programming,  design,  planning,  CD’s,  scheduling,  estimating,  purchasing,  cost  and  quality  control  construction  and  administration,  each  of  which  share   the  same  sense  of  pride  and  dedication.          We  serve  our  clients  in  many  capacities  such  as  an  Architectural  Studio,  Design  Build,  Owner=s   Representative,   Construction   Manager,   General   Contractor   and/or  Construction  Consultant.    Our  goal  is  to  provide  that  service  which  best  suits  the  project  in  question.  Builders  Studio  is  results  oriented.  Our  process  can  be  demonstrated  by  our  sense  of  commitment  from  the  planning  phase  through  the  occupancy  phase.    Our  standards  are  certainly  the  most  demanding  in  the  industry.    At  Builders  Studio,  a  project  is  only  a  success  when  the  client  is  totally  satisfied  with  the  results,  including  time,  quality,  and  cost.    We  will  not  settle  for  anything  less.  

Page 26: Builders Studio LLC Brochure 6-1-15R

           

BUILDERS  STUDIO,  LLC  

SERVICES    

FOR    

OUR  CLIENTS    

 

Page 27: Builders Studio LLC Brochure 6-1-15R

 OWNERS  REPRESENTATION  

   

-­‐Building  for  the  future-­‐  At  Builders  Studio  we  build  relationships  as  well  as  projects.  Establishing  a  long  term  relationship  with  our  client  is  our  goal  and      repeat  business  is  the  result  of  our  dedication  towards  meeting  their  construction  objectives.  

   

Builders  Studio  has  a  reputation  for  quality  orchestration  of  our  services  with  a  focus  on  budget  constraints  and  schedule.  Our  team  management  policies  and  procedures  will  ensure  excellence  from  effective  planning  through  post  occupancy.  Our  strategy  will  allow  controlled  execution  and  meticulous  follow  through  in  every  aspect  of  the  project.    

   

Builders  Studio  will  plan  in  advance  for  post  construction  follow  up  to  the  sensitive  areas  of  your  business.  Therefore,  special  attention  must  be  provided  to  you  for  maintenance  and  timely  follow  through  of  all  facility  functions  to  ensure  prompt  remediation  to  any  inconsistency  that  may  occur  during  the  first  year  post  construction.  Also,  you  can  outsource  our  facilities  team  at  any  phase  of  the  project  including  post  occupancy  and  during  your  long  range  master  planning.    

   

The  choice  is  yours;  we'll  service  your  needs.  

Page 28: Builders Studio LLC Brochure 6-1-15R

 DESIGN  BUILD  

 "Concepts  Realized”  That’s  our  motto  -­‐  At  Builders  Studio  we  have  achieved  unmatched  experience  in  the  art  and  science  of  construction.  A  steadfast  willingness  to  innovate  and  a  deep  commitment  to  client  satisfaction  are  our  standards.  

   

EVALUATION  –    

Evaluation  of  the  requirements  listed  below  is  only  part  of  the  equation.  Some  of  these  are  as  follows:  

 • Planning    • Design    • Technical  Services    • Value  Engineering    • Budgeting    • Procurement    • Implementation  

   

Builders  Studio  will  formulate  tailored  a  procedure  to  assist  your  needs.      

SUBCONTRACTOR  PRE-­‐QUALIFICATION  –    

Our  subcontractor  database  is  meticulously  monitored  and  updated  monthly  to  ensure  only  pre-­‐qualified  subcontractors  are  selected  for  your  project.  It's  those  subcontractors  who  regularly  meet  our  expectations  for  quality,  financial  stability,  present  workload  and  past  performance  that  continue  to  qualify.  

Page 29: Builders Studio LLC Brochure 6-1-15R

   

ARCHITECTURAL  STUDIO      

A   concept   must   be   developed   collectively   and   concurrently   with   our   client   to  ultimately  produce  a  desired  goal.  Further,  such  concept  must  be  proven  in  terms  of  feasibility,   cost  and  practicality.  For   this   reason,  Builders  Studio  will  painstakingly  provide  a  system  of  checks  and  balances  to  prototype  and  mock  up  a  design  until  a  solution  is  achieved  to  produce  a  Concept  Realized.  

   

Architecture  is  the  art  and  science  of  a  beautiful  design  solution.  Therefore,  we  must  push  the  envelope  on  design  in  an  ever  changing  environment.  Builders  Studio  has  the  forethought  and  ability  to  utilize  and  implement  the  cutting  edge  of  technology.  There  are  no  limits  to  the  capabilities  and  creativity  required  to  produce  quality  architecture.  

   

Some  services  provided  will  include:    

• Programming    • Impact  studies  

 • Planning    • Schematic  design  

 • Design  development    • Contract  documents  

 • Contract  administration  

 A  comprehensive  selection  of  services  will  ultimately  be  tailored  to  fit  your  needs.  

Page 30: Builders Studio LLC Brochure 6-1-15R

     

CONSTRUCTION  MANAGEMENT  

A  Project  Manager  will  lead  your  team  from  concept  to  reality.  Its  multidisciplinary  strengths  that  will  enable  the  dedicated  employees  of  Builders  Studio  to  complete  projects  on  schedule  and  within  budget  while  maintaining  the  highest  level  of  quality,  responsibility  and  accountability.  We  establish  your  priorities  before  we  assign  the  tasks.  

     

An  integrated  team  will  organize  and  manage  a  full  range  of  services  necessary  to  implement  your  project  demands  from  master  planning  to  your  business  operation.  Continuous  communication  is  our  key  approach.  

     

Builders  Studio  will  create  a  top-­‐rate  facility  with  the  flexibility  to  efficiently  meet  your  future  needs  and  demands.  Your  corporate  profile  and  standards  will  be  an  intricate  part  of  all  future  endeavors  for  any  project  where  Builders  Studio  is  involved.  

 

Page 31: Builders Studio LLC Brochure 6-1-15R

 GENERAL  CONTRACTING  

     

"The  Consummate  Professional";  that’s  our  people.  From  Clerk  to  Account  Executive  our  staff  is  seasoned  experts  to  service  you  with  their  skills  in  communication,  cooperation,  leadership  and  effective  team  assistance.  

   

Although  we  maintain  a  sense  of  urgency,  the  Builders  Studio  culture  is  to  practice  a  proactive  style  rather  than  a  reactive  style.  We  utilize  your  feedback  and  concerns  as  a  springboard  to  implement  a  quick  response  to  your  top  priorities.  

   

Some  management  services  provided  will  include:      

• Scheduling    • Procurement    • Shop  drawings/submittals    • Requests  for  information    • Meeting  minutes    • Logs    • Field  supervision    • Project  close  out      

A  comprehensive  selection  of  services  will  ultimately  be  tailored  to  fit  your  needs.    

 

Page 32: Builders Studio LLC Brochure 6-1-15R

 

 

   

BUILDERS  STUDIO’S  MANAGEMENT  PROGRAM  OVERVIEW    

for    

OUR  CLIENTS      

During  the  Pre-­Construction  Phase,  BUILDERS  STUDIO,  LLC  will:    

1. Dedicate  BUILDER  STUDIO  professionals  as  required  to  the  Project  Team,  with  the  advice  and  consent  of  OUR  CLIENT.  

   

2. Initiate  a  thorough  study  of  preliminary  plans  and  specifications  to  assist  in  the  definition  of  construction  requirements  

 3.   Consult  with  and  advise  the  Project  Team  concerning  details  of  the  systems  to  

be  used;    

4.   Prepare  a  comprehensive  value  engineering  study,  consulting  with  the  Project  Team  concerning  materials  and  major  design  and/or  construction  elements  to  be  used,  while  taking  into  consideration  cost,  speed  of  construction  and  maintenance;  

 5.   Initiate  construction  planning  to  establish  finite  schedule  commencement  and  

completion  dates,  and  develop  a  detailed  Schedule  of  Events  for  the  project;    

6.   Develop  financial  projections  over  the  duration  of  the  project,  including  commitments,  cash  flow  and  exposure;  

 7.   Initiate  regular  meetings  of  the  entire  Project  Team  with  written  summaries  

of  each  meeting  to  ensure  that  all  aspects  of  the  pre-­construction  process  are  covered;  

 8.   Prepare  preliminary  construction  budgets,  based  on  preliminary  plans  and  

specifications  and  reflecting  OUR  CLIENTS  overall  project  goals,  including  a  comparative  analysis  of  similar  projects;  

   

Page 33: Builders Studio LLC Brochure 6-1-15R

  2  

9.   Review  the  preliminary  drawings  and  specifications  for,  and  make  recommendations  concerning,  the  following:  

 a.   Availability  of  materials  and  long  lead  items;  

 b.   Conflicts  and  overlapping  jurisdictions  among  subcontractors;  

 c.     Method  of  construction  operations;  

 d.   Good  construction  practices;  

 e.   Equipment  costs;  

 f.     Construction  costs;    

 g.   Unit  prices  and/or  alternates;  

 h.   Inclusion  of  required  temporary  and  job  site  support  facilities;  

 I.     Coordination  between  the  drawings  and  specifications;  

 j.     Construction  detailing  (e.g.,  whether  the  details,  wall  sections  and  other  

sections  shown  are  easily  built  and  adequate  to  assure  a  reliable  permanent,  trouble-­free  installation);  

    10.      Review  and  make  recommendations  regarding  insurance  limits  and  

requirements  for  the  project,  including:    

a.   Worker's  Compensation  and  Comprehensive  Liability  Insurance;    b.   Owner's  Protective  Liability  Insurance;  

 c.     Builders  Risk  Coverage  (Specified  Perils  vs.  All  Risks);  

 11.      Develop  and  review  with  OUR  CLIENTS    the  recommended    mechanisms  for  

competitively  bidding  the  project,  including  the  size  and  scope  of  each  bid  package,  dates  of  bidding,  use  of  "fast  track"  methods,  etc.;  

         

Page 34: Builders Studio LLC Brochure 6-1-15R

  3  

 12.      Make  recommendations  regarding  the  establishment  and  implementation  of  

a  comprehensive  safety  program  for  the  project,  to  include  security  and  monitoring  analysis;  

 13.      Based  on  the  preliminary  schedule,  establish  a  site  mobilization  plan  to  

ensure  the  efficient  flow  of  construction  personnel  and  materials  during  the  course  of  the  work;  

 14.      Advise  and  make  recommendations  concerning  the  best  order  and  sequence  

for  development  of  working  drawings  and  specifications  on  a  fast  track  basis;  

 15.      With  the  advice  and  approval  of  OUR  CLIENTS  and  the  other  members  of  the  

Project  Team,  assemble  a  detailed  list  of  pre-­qualified  subcontractors  to  bid  the  various  trade  classifications,  as  well  as  the  method  and  forms  of  contract  awards;  

 16.      Help  to  develop  detailed  bid  packages  and,  with  the  Project  Team's  

cooperation,  conduct  pre-­bid  conferences  to  acquaint  potential  bidders  with  the  project,  its  requirements,  management,  special  systems  and  materials,  and  other  aspects  that  must  be  factored  into  the  bidders'  estimates;  

 17.      Carefully  review  competitive  bids  from  a  minimum  of  three  pre-­qualified  

subcontractors  in  each  trade  category,  to  determine  whether  the  prices  are  complete,  reasonable  and  consistent  and  that  no  overlap  exists  between  trades;  

 18.      In  conjunction  with  the  Project  Team,  make  recommendations  regarding  the  

subcontractor  in  each  trade  whose  price,  craftsmanship  and  schedule  will  result  in  the  best  performance;  

 19.      Conduct  conferences  with  the  successful  competitive  subcontract  bidders,  

assist  the  Project  Team  in  preparing  and  implementing  trade  contracts,  and  organize  the  subcontractors  in  order  to  most  efficiently  carrying  out  their  portions  of  the  work;  

   

Page 35: Builders Studio LLC Brochure 6-1-15R

  4  

 20.      Establish  unit  price  schedules  for  all  trades  to  be  included  in  trade  contracts,  

and  establish  change  order  approval  procedures  at  the  subcontractor  level;    21.      Complete  the  project  planning  activity,  to  include  development  of  a  finished  

fast  track  construction  schedule  and  CPM  program,  with  particular  emphasis  on  the  scope  of  work  for  each  subcontractor;  the  start  and  completion  dates  in  each  trade;  the  progress  to  date  in  each  branch  of  work;  the  status  of  long-­lead  time  materials  and  equipment;  and  the  client-­controlled  activities;  

 22.      Establish  a  site  security  plan  to  insure  the  integrity  of  the  job  site  and  secure  

materials  and  equipment;    

23.      Finalize  responsibility  for  organization,  scheduling  and  supervision  of  work  necessary  for  the  completion  of  the  project  as  scheduled;  

 24.      Establish  procedures  for  and  maintain  coordination  among  all  Project  Team  

members  and  all  contractors  so  that  the  project  may  be  completed  in  accordance  with  the  contract;  

 25.      Implement  computerized  administrative  reporting  and  control  systems  that  

are  tailored  to  the  parameters  of  the  project  and  the  requirements  of  OUR  CLIENT.  

   During  the  Construction  Phase,  BUILDERS  STUDIO  will:    

1.   Coordinate  the  work  of  the  subcontractors,  engineers,  and  other  Project  Team  consultants,  assuring  that  all  work  is  completed  according  to  approved  programs  and  plans,  with  appropriate  levels  of  workmanship,  and  within  cost,  time  and  quality  goals;  

 2.   Monitor  the  detailed  construction  schedule  for  appropriate  sequencing  of  

subcontractor  activities  for  maximum  effectiveness  in  each  trade,  appropriate  allocation  of  labor  and  materials,  and,  in  addition,  monitor  that  products,  systems  and  materials  are  being  delivered  on  schedule  and  "fed"  to  the  project  properly;  

Page 36: Builders Studio LLC Brochure 6-1-15R

  5  

 3.   Issue  regular  reports  to  the  Project  Team  on  the  percentage  of  trade    

completion  against  the  scheduled  progress,  noting  any  variances  and  their  impact  on  the  overall  schedule.    Where  variances  exist,  we  will  (1)  report  them  to  the  appropriate  members  of  the  Project  Team,  (2)  report  the  potential  cost  and  schedule  impact  of  each,  (3)  make  recommendations  for  solving  problems  leading  to  potential  variances  and  (4)  recommend  corrective  action  to  assure  compliance  with  the  scheduled  completion  date;  

 4.   Review  the  project  schedule  and  schedule  of  events  and  make  any  

adjustments  that  are  required  to  continue  the  expeditious  completion  of  the  work;  

 5.   Conduct  job  and  coordination  meetings  that  shall  be  held  when  necessary  and  

not  less  than  once  each  week.    

6.   Prepare  a  detailed  written  report  of  each  job  and  coordination  meeting  for  OUR  CLIENT  furnishing  copies  to  all  attendees  and  other  parties  designated  to  receive  such  reports.    The  Job  Meeting  Report  may  include  the  following  items,  as  required  by  the  project.

   

a.   Minutes  of  the  meeting;    

b.   Open  items  status  report;       c.   Trade  completion  status  report;       d.   Long  lead  items  report;       e.   Subcontractor  bid  status;       f.   Manpower  status;       g.   Shop  drawing/sample  submission  report;       h.   Budget  status  report;       i.   Change  order  report;       j.   Inspections  report;  

 

Page 37: Builders Studio LLC Brochure 6-1-15R

  6  

7.    Prescribe  and  monitor  an  on-­site  record  keeping  system  including    daily  logs,  shop  drawing  logs,  daily  manpower  report,  etc.;  

 8.    Continuously  update  the  project  budget  incorporating  approved  variations  

as  they  occur;    

9.    Assist  in  selecting  and  retaining  the  professional  services  of  any  special  consultants,  and  coordinate  with  the  various  subcontractors  the  services  of  those  consultants  selected;  

 10.  Supervise  work  in  place  and  installation  of  systems  and  special  construction  

items  to  assure  full  compliance  with  plans,  specifications,  pertinent  codes  and  special  requirements;  

 11.    Inspect  and  supervise  work  of  subcontractors  to  protect  against    potential  

defects  and  deficiencies  in  the  work;  require  any  subcontractor  to  stop  the  performance  of  any  portion  of  the  work  that  is  not  in  accordance  with  the  drawings  and  specifications,  reject  any  work  that  does  not  conform  to  the  requirements  of  the  drawings  and  specifications;  in  such  cases,  recommend  courses  of  action  to  OUR  CLIENTS;  and  similarly  inspect  materials  and  equipment  for  compliance  with  the  drawings  and  specifications;  

 12.    Resolve  disputes  with  subcontractors  or  suppliers  relating  to  the  

performance  of  their  work  or  the  furnishing  of  materials;    

13.    Verify  the  storage,  insurance,  protection  and  security  of  all  systems,  materials  and  equipment  that  are  a  part  of  the  project  until  they  are  installed;  

 14.    Insure  that  the  job  site  operates  in  a  clean  and  orderly  fashion;  

 15.          Assure  compliance  with  all  federal,  state  and  local  safety,  environmental  and  

other  governmental  requirements  by  all  subcontractors,  suppliers  and  others  at  the  project  site  during  execution  of  the  work;  

 16.     Implement   our   highly   developed  procedure   for   review   and  processing   of  

subcontractor  applications  for  progress  and  final  payments;  

Page 38: Builders Studio LLC Brochure 6-1-15R

  7  

 17.    Schedule  and  conduct  monthly  inspections  and  reviews  by  the  Project  Team  

and   all   subcontractors   of   work   completed   to   direct   the   preparation   of  monthly  requisitions  according  to  the  recommendations  of  the  Project  Team;  

 18.     Review   all   requests   for   payments   by   subcontractors   and   suppliers   and  

determine,  in  accordance  with  monthly  review,  whether  and  to  what  extent  the  sums  requested  are  due  and  should  be  approved  for  payment  and  certify  to  OUR  CLIENT  as  to  the  same;    

19.     Change   orders   that   may   be   authorized   by   OUR   CLIENT   and   establish   a  procedure   for   the   approval   and   implementation   of   such   change   orders  warranted  by  field  conditions;  

   

20.    Monitor  and  review  cost  accounting  records  as  required  and  institute  agreed-­upon  accounting  procedures  including  regular  updates  and  comparisons  of  amounts  budgeted,  committed  and  expended;  

 21.  Review  field  orders  approved  by  OUR  CLIENT   to  ensure  that  subcontractor  

costs  on  all  such  orders  adhere  to  relevant  unit  price  schedules;    

22.    Review  all  required  permits  and  approvals,  and  verify  that  all  applicable  fees  and  assessments  have  been  paid;  

 23.    Supervise  testing  and  inspection  of  work  in  place  required  by  jurisdictional  

agencies;    

24.     Assist   in   wire   and   cable   management   and   the   development   of   utility  parameters;  

 25.    With  the  project  engineers,  monitor  the  installations  of  all  systems,  support  

equipment;   special   telecommunications   support   facilities,   and   any   other  technical  equipment;  

 26.    Initiate  and  implement  preparation  of  "punch  lists"    as  each  segment  of  the  

project  enters  its  final  phase  but  before  "substantial  completion"  is  achieved,  in   order   to   finalize   all   punch   list   work   simultaneously   with   project  completion.  

   During  the  Project  Close-­Out  Phase,  BUILDERS  STUDIO  will:  

Page 39: Builders Studio LLC Brochure 6-1-15R

  8  

 1. Determine  when   substantial   completion   of   the   project   has   taken   place   and  

provide  written  notice  to  OUR  CLIENT  that  the  work  is  ready  for  final  inspection;    

2.    Supervise  completion  of  the  final  construction  punch  list  items,  check  out  all  remaining  equipment  and  systems,  and  see  that  contractors  turn  over  all  keys,  manuals,  record  drawings  and  maintenance  materials;  

 3.  Ensure  that  contractors  deliver  to  OUR  CLIENT    all  guarantees,  affidavits,  releases,  

waivers,   certificates   and   other   documents   (including  warranties,   operating  manuals,   drawings,   handbooks,   commercial   and   technical   standards   and  specifications,  maintenance  manuals,  etc.)  that  are  required  in  the  contract;  

 4.  Assist  in  checking  for  readiness  of  operations,  start-­up  and  testing  of  equipment  

and   systems;   assure   that   appropriate   personnel   are   entirely   familiar   with  operational  systems  and  equipment;  

 5.  Prepare  an  "abstract"  of  the  project,  including  comparisons  of  projected  and  actual  costs  and  completion  dates,  a  summary  of  all  authorized  change  orders,  and  a  recap  and  total  of  all  cost  savings.